The object of this Regulation is to regulate, at the national level, the drilling of the subsoil for purposes of investigation, exploration, and/or use of groundwater.
Artículo card
← Environmental Law Center← Centro de Derecho Ambiental
Decreto 43053 · 22/04/2021
OutcomeResultado
SummaryResumen
This Executive Decree 43053-MINAE establishes the regulatory framework for drilling the subsurface for the investigation, exploration, and use of groundwater throughout the national territory. It regulates drilling permits, the registry of drilling companies, required technical reports, and water concession procedures. It introduces clear institutional roles for the Water Directorate, AyA, and SENARA, and defines criteria for aquifers with special regulations and water reserve zones. It also provides protective measures such as operational setbacks and saline intrusion monitoring, as well as penalties for non-compliance.Este Decreto Ejecutivo 43053-MINAE establece el marco normativo para la perforación del subsuelo con fines de investigación, exploración y aprovechamiento de agua subterránea en todo el territorio nacional. Regula los permisos de perforación, el registro de empresas perforadoras, los informes técnicos requeridos y el trámite de concesión de agua. Introduce roles institucionales claros para la Dirección de Agua, el AyA y el SENARA, y define criterios para acuíferos con regulación especial y zonas de reserva acuífera. Además, dispone medidas de protección como los retiros operacionales y el monitoreo de intrusión salina, así como sanciones por incumplimiento.
Key excerptExtracto clave
Article 1—Purpose. This Regulation aims to regulate nationwide the drilling of the subsurface for the purposes of investigating, exploring, and/or using groundwater. Article 2—Subjects and scope of application. This Regulation shall apply to any public or private entity, whether a natural or legal person, that wishes to drill the subsurface for the investigation, exploration, and use of groundwater throughout the national territory. Article 5—Single Window for Procedures. The Water Directorate shall act as a single window, admitting the application and deciding the permit in accordance with science and technique, providing an audience and integrating the criteria of the Costa Rican Institute of Aqueducts and Sewers (AyA) and the National Groundwater, Irrigation and Drainage Service (SENARA) at the procedural stage set forth in this Regulation.Artículo 1º-Objeto. El presente Reglamento tiene por objeto regular a nivel nacional la perforación del subsuelo con fines de investigación, exploración y/o aprovechamiento del agua subterránea. Artículo 2º-Sujetos y ámbito de aplicación. Este Reglamento se aplicará a todo sujeto de derecho público o privado, persona física o jurídica, que desee perforar el subsuelo con fines de investigación, exploración y aprovechamiento de aguas subterráneas en todo el territorio nacional. Artículo 5º-Ventanilla Única de Trámites. La Dirección de Agua funcionará como ventanilla única, quien dará admisibilidad a la solicitud y resolverá el permiso en apego a la ciencia y la técnica; brindando audiencia e integrando los criterios del Instituto Costarricense de Acueductos y Alcantarillados (AyA), Servicio Nacional de Aguas Subterránea, Riego y Avenamiento (SENARA) en el momento procesal que dispone este Reglamento.
Pull quotesCitas destacadas
"Todo permiso para perforación de pozo se entenderá que se autoriza con fines iniciales de exploración. Una vez cumplido con lo dispuesto en este Reglamento, al Jerarca del MINAE le corresponde autorizar el aprovechamiento del agua mediante la concesión como lo dispone el artículo 17 de la Ley de Aguas N° 276."
"Any well drilling permit shall be understood as authorized for initial exploration purposes. Once the provisions of this Regulation are fulfilled, it is incumbent upon the head of MINAE to authorize the use of the water through a concession as provided in Article 17 of the Water Law No. 276."
Artículo 7, Alcance del permiso de perforación
"Todo permiso para perforación de pozo se entenderá que se autoriza con fines iniciales de exploración. Una vez cumplido con lo dispuesto en este Reglamento, al Jerarca del MINAE le corresponde autorizar el aprovechamiento del agua mediante la concesión como lo dispone el artículo 17 de la Ley de Aguas N° 276."
Artículo 7, Alcance del permiso de perforación
"No se permite la excavación ni la perforación de pozos, dentro de las áreas de protección de ríos, quebradas, arroyos y nacientes, conforme lo dispuesto en el artículo 33 de la Ley Forestal N° 7575 del 13 de febrero de 1996, así como en las señaladas en los artículos 31 y 149 de la Ley de Aguas N° 276 del 27 de agosto de 1942."
"Excavation or drilling of wells is not permitted within the protection areas of rivers, streams, creeks, and springs, as provided in Article 33 of the Forestry Law No. 7575 of February 13, 1996, as well as in Articles 31 and 149 of the Water Law No. 276 of August 27, 1942."
Artículo 16, Áreas de protección de corrientes y nacientes
"No se permite la excavación ni la perforación de pozos, dentro de las áreas de protección de ríos, quebradas, arroyos y nacientes, conforme lo dispuesto en el artículo 33 de la Ley Forestal N° 7575 del 13 de febrero de 1996, así como en las señaladas en los artículos 31 y 149 de la Ley de Aguas N° 276 del 27 de agosto de 1942."
Artículo 16, Áreas de protección de corrientes y nacientes
"De conformidad con el artículo 8º de la Ley de Aguas Nº 276, a todo pozo con fines de aprovechamiento de agua, se le establece una distancia de retiro de hasta 40 metros, dentro de la cual, se permiten únicamente actividades directamente relacionadas con la extracción, distribución del agua y mantenimiento del pozo."
"In accordance with Article 8 of the Water Law No. 276, for every well for water use purposes, a setback distance of up to 40 meters is established, within which only activities directly related to the extraction, distribution, and maintenance of the well are permitted."
Artículo 34, Del retiro operacional del pozo (ROP)
"De conformidad con el artículo 8º de la Ley de Aguas Nº 276, a todo pozo con fines de aprovechamiento de agua, se le establece una distancia de retiro de hasta 40 metros, dentro de la cual, se permiten únicamente actividades directamente relacionadas con la extracción, distribución del agua y mantenimiento del pozo."
Artículo 34, Del retiro operacional del pozo (ROP)
Full documentDocumento completo
Regulation for the Drilling of Wells and Use of Groundwater No. 43053-MINAE THE PRESIDENT OF THE REPUBLIC AND THE MINISTER OF ENVIRONMENT AND ENERGY In use of the powers conferred by Articles 50, 140 subsections 3), 18), and 146 of the Political Constitution; Articles 27 subsection 1) and 28 subsection 2) paragraph b) of the General Law of Public Administration No. 6227 of May 2, 1978; Article 177 of the Water Law No. 276 of August 27, 1942; and Article 50 of the Organic Law of the Environment No. 7554 of October 4, 1995.
I.—That in accordance with the Water Law No. 276, in its Articles 17, 21, 27, 176, 177, and 178, the Ministry of Environment and Energy is the governing body for water at the national level and is responsible for providing for its ownership, use, utilization, governance, and oversight; which it carries out through its Water Directorate (Dirección de Agua) pursuant to Executive Decree No. 35669-MINAE of December 4, 2009, entitled "Organic Regulation of the Ministry of Environment and Energy." II.—That Law No. 5516 of May 2, 1974, entitled "Reform of Articles 131 to 135 of the Water Law of 1942," establishes in its Article 2, that to facilitate the powers of ownership, governance, and oversight of public-domain waters vested in the Ministry of Environment and Energy, it shall maintain a registry for the enrollment of persons or companies engaged in the activity of well drilling and shall not grant a license to drill to those not enrolled in said registry.
III.—That in accordance with Article 3 subsections ch) and e) of Law No. 6877 of July 18, 1983, entitled "Creation of SENARA (Servicio Nacional Aguas Subterráneas Riego y Avenamiento)," the National Groundwater, Irrigation and Drainage Service (Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento, SENARA) is responsible for investigating, protecting, and promoting the use of the country's water resources, both surface and underground, as well as conducting, coordinating, promoting, and keeping updated the hydrological, hydrogeological, agrological, and other investigations deemed necessary in the hydrographic basins.
IV.—That in accordance with the provisions of Article 2 subsection f) of the Constitutive Law of the Costa Rican Institute of Aqueducts and Sewers (Instituto Costarricense de Acueductos y Alcantarillados, AyA) No. 2726 of April 14, 1961, AyA is responsible for using, utilizing, governing, or overseeing, as the case may be, all public-domain waters essential for the due fulfillment of the provisions of said law.
V.—That in accordance with the Organic Law of the Environment No. 7554, water is in the public domain, and its conservation and sustainable use are of social interest.
VI.—That in accordance with Executive Decree No. 35669-MINAE, it is the responsibility of the Water Directorate of the Ministry of Environment and Energy to admit, process, and resolve requests for subsurface drilling for the exploration and exploitation of groundwater and to assign the respective well number; likewise, it is responsible for operating and maintaining the registry of well drilling companies.
VII.—That water resources must be managed based on the principle of integrated resource management, which promotes the coordinated management and development of water, land, and natural resources, in order to maximize the resulting social and economic well-being equitably, without compromising the sustainability of vital ecosystems, for which inter-institutional coordination is essential.
VIII.—That as part of a continuous regulatory improvement process and the opportunity to allow greater availability to attend to other substantive tasks of the Water Directorate, such as oversight and administration of water in the field, the procedures and deadlines have been adjusted and reduced, both for the Administration and for the administered party, facilitating the process but with added value in its control and follow-up. In accordance with the foregoing, this Regulation conforms to the exception budget established in Article 2 subsection e) of Directive 052-MP-MEIC entitled "Moratorium on the creation of new formalities, requirements, or procedures for citizens to obtain permits, licenses, or authorizations," published in La Gaceta No. 118 of June 25, 2019, as well as to point B.2.e.i of Circular 001-2019 MEIC-MP, in that it reduces resolution deadlines and promotes the digitization of the processing of all procedures carried out within the Water Directorate.
IX.—That in accordance with the third paragraph of Article 12 of the Regulation to the Law for the Protection of Citizens from Excessive Administrative Requirements and Formalities, Executive Decree No. 37045-MP-MEIC and its reforms, it was determined that this proposal does not establish or modify formalities, requirements, or procedures that the administered party must comply with, a situation for which the prior control procedure was not carried out. Therefore; They decree:
"Regulation for the Drilling of Wells and Use of Groundwater"
Object, subjects, and scope of application
Considering:
CHAPTER I
The object of this Regulation is to regulate, at the national level, the drilling of the subsoil for purposes of investigation, exploration, and/or use of groundwater.
Artículo card
This Regulation shall apply to any subject of public or private law, natural or legal person, who wishes to drill the subsoil for purposes of investigation, exploration, and use of groundwater throughout the national territory.
Artículo card
For the purposes of this regulation, the acronyms shall be understood as follows:
1. AyA: Instituto Costarricense de Acueductos y Alcantarillados.
2. CCSS: Caja Costarricense de Seguro Social.
3. CTI-AGUA SUBTERRÁNEA: Comisión Técnica Interinstitucional para la Gestión de Agua Subterránea.
4. DA: Dirección de Agua of the Ministerio de Ambiente y Energía.
5. IFP: Informe final de perforación.
6. IPB: Informe prueba de bombeo.
7. MINAE: Ministerio de Ambiente y Energía.
8. ROP: Retiro operacional del pozo.
9. SENARA: Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento.
10. SINIGIRH: Sistema Nacional de Información para la Gestión del Recurso Hídrico.
11. SIPECO: Sistema de Permiso y Concesiones.
Artículo card
For the purposes of this Regulation, the following shall be understood as:
Everything not defined in this Regulation shall be considered in accordance with the provisions of Acuerdo No. 60-2012 of eight o'clock on June twelve, two thousand twelve, published in La Gaceta No. 147, Alcance Digital No. 105 of July 31, 2012, which makes official the Hydrogeological Methodologies for the Evaluation of Water Resources.
Artículo card
Processing of drilling permits
CHAPTER II
The Water Directorate shall function as a single window, which shall admit the application and resolve the permit in adherence to science and technique; providing a hearing and integrating the criteria of the Instituto Costarricense de Acueductos y Alcantarillados (AyA), and the Servicio Nacional de Aguas Subterránea, Riego y Avenamiento (SENARA) at the procedural moment established by this Regulation.
Artículo card
To carry out the analysis of the application, the intervening institutions shall resolve according to their competencies and the following roles:
AyA, in accordance with Law No. 2726 and its reforms, must state its position regarding whether it affects sources intended for its purposes.
The DA is responsible in the first instance for resolving the drilling permit for exploratory purposes. In turn, and pursuant to the provisions of Article 17 of the Water Law No. 276, it is responsible for analyzing and deciding on interference between wells and bodies of water, well retirement (retiro del pozo), and recommending to the Senior Official (Jerarca) of MINAE on the use of water under concession and its conditions.
SENARA, once the well is drilled, is responsible for pronouncing on its final conditions (depth, diameter, casing, sanitary seals) in relation to the characterization of the aquifer. Additionally, it must analyze and pronounce on the studies submitted regarding the special regulations of the aquifers according to this Regulation, all in accordance with Law No. 6877 and its reforms.
Artículo card
Any permit for well drilling shall be understood to be authorized for initial exploration purposes. Once the provisions of this Regulation have been fulfilled, it is the responsibility of the Senior Official (Jerarca) of MINAE to authorize the use of the water through a concession as provided in Article 17 of the Water Law No. 276.
Artículo card
Registry of natural or legal persons authorized to drill
CHAPTER III
Any subject of public or private law, natural or legal person, who intends to engage in the activity of subsoil drilling for purposes of investigation, exploration, and use of groundwater, must be registered with the Water Directorate of the Ministry of Environment and Energy, in accordance with Article 2 of Law No. 5516.
Artículo card
If it is a legal person, the representative of the drilling company (perforadora) must submit an enrollment application using the digital form on the SIPECO platform of the Water Directorate and sign it digitally. The name of the drilling company, legal identification number (cédula jurídica), name of the legal representative and their identity or residency card number (cédula de identidad o de residencia), legal domicile of the drilling company, and place or means for receiving notifications must be indicated. They must declare that they possess drilling equipment and the quantity; indicating for each at least the following basic characteristics: brand, type of equipment, VIN, maximum drilling depth, license plate number for road circulation, and attach the official logo of the drilling company.
If the applicant is a natural person, the interested party must submit an enrollment application using the digital form on the SIPECO platform of the Water Directorate and sign it digitally. They must indicate their full name, identity or residency card number (cédula de identidad o de residencia), and place or means for receiving notifications. They must declare that they possess drilling equipment and the quantity; indicating for each at least the following basic characteristics: brand, type of equipment, VIN, maximum drilling depth, license plate number for road circulation, and attach the official logo of the drilling company.
Artículo card
Once the application has been submitted in accordance with this regulation and reviewed, the Water Directorate shall proceed within a period of 15 days with the enrollment in the Drilling Companies Registry (Registro de Perforadoras) and shall authorize the exercise of the subsoil drilling activity for a period of ten years, assigning an identification code.
Artículo card
The application for renewal of the license must be requested one month before expiration, for which it must be done by submitting a non-notarized sworn statement, indicating that it is a renewal under the same conditions. If there were any change in the conditions under which the original license was issued, for example, acquisition of new equipment, it must be indicated in the application.
Artículo card
The Water Directorate shall be responsible for keeping the National Registry of Drilling Companies updated based on the information provided by the drilling company and allowing public access to it through SINIGIRH.
Artículo card
The obligations of the drilling company (perforadora) are as follows:
Artículo card
Regulation of drilling and use of water
CHAPTER IV
In the aquifer reserve zones (zonas de reserva acuífera), the Water Directorate shall resolve the drilling permit in the exploration phase in adherence to the regulations and conditions set forth for each of them, within the period indicated in Article 21 of this Regulation.
Artículo card
In aquifers with special regulation, the Water Directorate shall resolve the drilling permit in the exploration phase in adherence to these regulations and conditions, within the period indicated in Article 21 of this Regulation.
Artículo card
The excavation or drilling of wells is not permitted within the protection areas of rivers, quebradas, arroyos, and springs (nacientes), as provided in Article 33 of the Ley Forestal No. 7575 of February 13, 1996, as well as in those indicated in Articles 31 and 149 of the Water Law No. 276 of August 27, 1942.
Artículo card
For the use of wells in self-supply of water in condominiums, the drilling must be carried out within the condominium and in a common area, in accordance with Article 10 of the Regulatory Law of Condominium Property No. 7933 of October 28, 1999. In these cases, the special regulations governing this use shall apply.
Artículo card
Drilling permits
CHAPTER V
The application for a well drilling permit must be submitted together with the application for a water concession to the DA. It must be submitted by the owner or possessor of the land where the drilling will take place, through the means established through SIPECO or other means provided by the DA.
Artículo card
The application must meet the following requirements:
Artículo card
To resolve drilling permits in the exploratory phase, the DA shall evaluate the information provided in relation to the following criteria:
Artículo card
Once the requirements set forth in this regulation are met, the DA shall resolve the drilling permit within a period of 7 days and under the terms set forth in Article 19 of this Regulation. The DA shall assign the well identification number, which shall consist of an alphanumeric code, using the combination of the initial letters of the 1:50000 scale cartographic sheet corresponding to the location to be drilled and a consecutive number, which shall be recorded in the National Well Registry (Registro Nacional de Pozos) administered by the DA.
The drilling site may be located within a maximum margin of ± 20 meters from the authorized point, provided that the other conditions given in the permit are respected. Any change beyond this margin must be previously communicated by the Administered Party to the DA and shall be resolved in accordance with Article 22.
Artículo card
The drilling company (perforadora), the responsible professional, and the owner or possessor of the property shall be jointly responsible for compliance with the conditions set forth in the drilling permit.
Before drilling work begins, any change in the permit conditions must be requested by the Administered Party and expressly authorized by the DA, which shall have a period of 5 days to resolve accordingly.
Once the construction of the well and pumping tests (pruebas de bombeo) are completed, the well owner must place a cap on the external part of the well piping to prevent contamination from direct exposure of the aquifer while the use under concession is being authorized.
Artículo card
To begin drilling, a period of one month shall be available, counted from the date of notification of the permit. The drilling company or responsible geologist must inform the DA, at the email address indicated in the resolution, of the scheduled start date of the drilling, as well as the estimated timeframe for its completion.
Artículo card
The applicant may request from the Water Directorate, 10 working days prior to the expiration of the drilling start period, a single extension. This shall be for a maximum period of one month, from the expiration date of the permit.
For the above, the administered party shall submit a non-notarized sworn statement to the DA, stating that they will carry out the drilling within an additional one-month period from the expiration date of the permit and that it will be carried out under the same conditions as the original permit.
Artículo card
Once the permit is granted and prior to the start of drilling, if a change in the contractual relationship between the applicant and the drilling company and/or the professional responsible for the drilling occurs, the Water Directorate must be informed in writing within the validity period of the drilling permit. This information must be submitted on the form provided for this purpose in SINIGIRH and must be signed by the holder of the drilling permit, the representative of the new contracted drilling company, and the professional responsible for the drilling.
Once the complete information is received from the applicant, the DA shall resolve the request for changes to the permit conditions within a period of three working days and shall notify the applicant of its result. Afterward, drilling may begin or resume.
Artículo card
Once drilling is completed, a pipe with a minimum diameter of thirty-eight millimeters must be installed to measure water levels. It must be installed from the ground surface to two meters below the pump location. Likewise, a fitting must be left on the piping for measuring flow and water sampling very close to the wellhead, at the ground surface.
Artículo card
Once the drilling and well completion (armado del pozo) are finished, the owner shall permanently place on the wellhead a metal plate with the well number and the resolution number of the drilling permit.
Artículo card
AyA, 10 calendar days prior to the start of subsoil drilling and well construction, must notify the Water Directorate of MINAE, so that a well number may be assigned and so that it may be enrolled in the National Well Registry.
Within 30 working days after completing the well completion (armado), hydraulic tests, and water quality tests, AyA shall provide the DA and SENARA with a digital copy in editable format of the technical information as established in Chapters VI and XI of this Regulation and must register the use (aprovechamiento) with the DA in accordance with the provisions of Article 18 of the Water Law No. 276.
If the drilling responds to an emergency situation qualified according to current legislation, provided that the institution's own drilling equipment is used, the prior notification period mentioned above shall not apply. This condition does not exempt AyA from the submission of the technical drilling information and the registration of the flow used.
Artículo card
Final drilling report and pumping test report
CHAPTER VI
The IFP must be submitted within 10 working days after the completion of drilling and signed by the Geologist responsible for it. The drilling company (perforadora) shall be jointly responsible for its timely submission.
It must be accompanied by a non-notarized sworn statement by the Geologist, who was in charge of supervising the drilling, declaring that it was carried out respecting the conditions indicated in the permit and the current regulations governing the matter, especially the provisions of Article 8 of the Water Law No. 276, as well as the provisions of Articles 14, 15, and 16 of this regulation.
Artículo card
The IFP must be submitted digitally with its online entry on the platform provided by the Water Directorate in SINIGIRH and must be signed with a digital signature by the drilling geologist. The IFP must contain the following information:
1. Regarding the drilling process:
2. Regarding hydrogeological conditions:
3. Regarding well completion (armado del pozo):
Artículo card
The pumping test (prueba de bombeo) must be conducted in such a way as to characterize the potential of the well and its area of influence, considering the maximum potential extraction flow according to the well design.
Artículo card
When the use is for population supply and self-supply in condominiums, the minimum pumping time shall be 72 hours. For other uses, the period shall be up to 24 hours. The foregoing is without prejudice to the Water Directorate considering the need for a pumping test time different from that indicated, which it shall request by means of a duly justified and reasoned resolution.
After the pumping time, the recovery time must be controlled, which must reach at least 85% of the reported drawdown.
The IPB must be submitted within 10 working days after the completion of the exploratory drilling.
5. It must identify the presence of positive or negative barriers.
6. Indicate the maximum potential extraction flow rate, pumping regime, and maximum depth that the water level must reach during exploitation.
Article sheet
Studies to enable the use of the well for water utilization
CHAPTER VII
Once the exploration phase is completed with the drilling of the well, according to the results and drilling conditions described in the IFP and IPB, the applicant must digitally submit to the Water Directorate the studies indicated in this article when applicable, according to requirement criteria, as detailed below:
This distance may be reduced with the authorization of MINAE through the Water Directorate, for which the interested party must provide a study that demonstrates with technical-scientific certainty that the aquifer will not be affected or contaminated by the activities carried out directly within this requested setback.
The ROP must not cross the boundaries of properties neighboring the well site.
These studies must be submitted within a maximum period of 30 business days after the completion of drilling and use the information generated by the authorized drilling as base data.
Article sheet
According to the analysis of the IFP and the IFB by the administration's geology professional, justified and reasoned in relation to the location of the well and topographical condition regarding the coast, local geological information, well depth, static and dynamic water table level, recommended extraction flow rate, and geological conditions susceptible to contamination by saline intrusion, and other variables recorded in the analysis, if it is technically and scientifically concluded that there is a potential risk of saline intrusion in the captured aquifer, the Water Directorate shall require the concession holder to perform quarterly monitoring of the water quality in the well, which includes: daily extracted flow rate, piezometric level, and the result of monthly water quality measurements for the parameters of electrical conductivity and chlorides. These reports must be submitted by the concessionaire every three months and must be signed by a responsible professional.
Based on the control and follow-up of this information, the Water Directorate may establish modifications to the monitoring periods, extraction regimes, or even the temporary or permanent cessation of extraction, following due process, in order to maintain a degree of aquifer exploitation that ensures the adequate water quality of the aquifer through a positive hydraulic gradient towards the sea.
Article sheet
The hearing process
CHAPTER VIII
Once the Water Directorate has received the IFP, IPB, and the studies when applicable as indicated in article 34 of this regulation, it will prepare the edict and inform the applicant to proceed with its publication three consecutive times in the Official Gazette La Gaceta, in accordance with article 179 of the Water Law No. 276, and will grant a hearing to SENARA and AyA.
At this time, the Water Directorate must notify the applicant of their duty to make the deposit, electronic transfer, or other payment mechanism to SENARA for the costs of the hearing procedure before this agency, and the interested party must notify this institution of the payment.
Article sheet
SENARA and AyA shall have a period of 10 calendar days from the notification to respond to the Water Directorate. In accordance with the General Law of Public Administration No. 6227, they must issue a justified and reasoned opinion, adhering to science and technique, according to the roles established in article 6 of this Regulation and in adherence to the principle of the objectification of environmental protection (principio de la objetivación de la tutela ambiental).
Article sheet
In accordance with the drilling results, the studies submitted, and after the hearing period has elapsed, the DA shall, within a period of one month, decide on the enabling (habilitación) or not of the well; for this, it will carry out a technical-scientific analysis adhering to the Law, integrating the analysis of the opinions of SENARA and AyA, updating the National Well Registry administered by the DA.
The DA will proceed to enable the IFP information for public access through the National Information System for Water Resource Management (Sistema Nacional de Información para la Gestión del Recurso Hídrico, SINIGIRH).
Article sheet
Water utilization concession
CHAPTER IX
The drilling permit does not confer the right to exploit the water resource. Once the well is enabled (habilitado) for its use, the Water Directorate will enable the continuation to the water utilization concession phase.
If the property where the drilling is located does not correspond to the property of utilization, an authorization from the owner of the land where the water will be captured must be provided, with the signature duly authenticated by a Notary Public. This does not apply when the request is for the supply of water for public human consumption.
Article sheet
To continue with the concession procedure, the applicant must comply with the following:
Article sheet
The DA may request, through a reasoned and justified resolution, the presentation of a new pumping test, which must comply with the provisions of articles 31, 32, and 33 of this regulation.
Article sheet
Once the technical recommendation on water utilization is issued, within a one-month period, the DA will prepare the draft water concession resolution for the signature of the head of MINAE, who will resolve definitively within a period of one month from the transfer of the documentation.
Article sheet
In order to ensure the calibration and control of the aquifer extraction, and in technically justified and reasoned cases, MINAE shall order the installation of a flow meter, whose location, periodicity, and report submission will be indicated in the resolution.
Article sheet
Piezometer drilling permit and their registration
CHAPTER X
The drilling of piezometers must have a permit from the Water Directorate and will only be authorized for groundwater research and/or monitoring purposes.
Article sheet
The application must be submitted to the Water Directorate, complying with the following requirements:
Article sheet
Once the requirements indicated in the previous article are met, the DA will resolve the piezometer drilling permit, registering it within a period of 3 days. The DA will assign the well identification number, which will consist of an alphanumeric code, using the combination of the initial letters of the 1:50000 scale cartographic sheet corresponding to the place to be drilled and a consecutive number, which will be recorded in the National Well Registry administered by the DA.
Article sheet
The permit will be conditional on the submission to the Water Directorate, in digital format, of the following information:
Article sheet
Due to their research or monitoring nature, the well setback and additional studies are not applicable to this type of drilling.
Article sheet
The National Well Registry
CHAPTER XI
In accordance with articles 17 and 18 of the Water Law No. 276 and article 2 of Law No. 5516, the National Well Registry is established, which will be administered by the Water Directorate of MINAE and integrated into the National Information System for Integrated Water Resource Management (Sistema Nacional de Información para la Gestión Integrada del Recurso Hídrico, SINIGIRH), becoming the official national well registry. All technical and administrative information related to well drilling will be stored here and will be fed with the information generated from the drilling reports. The information shall be of public access.
Article sheet
Sanctions
CHAPTER XII
Drilling companies and other regulated parties must comply with the environmental protection regulations established in the Water Law No. 276 and its reform through Law No. 5516, the Organic Environmental Law, Law No. 7554, the General Law of Public Administration No. 6227, the Forest Law No. 7575, the Law Creating the National Service of Groundwater, Irrigation, and Drainage No. 6877, the General Health Law No. 5395, and the Constitutive Law of the Costa Rican Institute of Aqueducts and Sewers No. 2726, and other legislation applicable to this matter.
Article sheet
In accordance with the provisions of article 2 of Law No. 5516, and without prejudice to the provisions established in current legal regulations, violations of the provisions of this Regulation shall be sanctioned upon prior fulfillment of due process, as follows:
Article sheet
The Water Directorate of MINAE, through a reasoned resolution, shall order the sealing of a drilled well under the following conditions:
Article sheet
The well must be filled with gravel up to the surface level. Additionally, if the piping is metallic, a metal cap must be placed covering the entire pipe opening and secured with welding; and if it is PVC, a PVC threaded cap must be placed and secured with glue. Subsequently, a reinforced concrete slab must be cast to completely cover the well cap with a thickness of no less than 10 centimeters, and the minimum area must coincide with the sanitary seal (sello sanitario) area. Furthermore, the well sealing report must be submitted to the Water Directorate by means of a notarial deed (acta notarial) that includes the description of the sealing and removal of the pump.
Article sheet
(Repealed by article 1 of Executive Decree No. 43712 of September 7, 2022) Article sheet
CHAPTER XIII
The Regulation for Subsoil Drilling for the Exploration and Utilization of Groundwater, Executive Decree No. 35884-MINAET of March 7, 2010, and article 6 of Executive Decree No. 17390-MAG-S, called "Creates the Protective Zone for the Aquifers of Guácimo and Pococí" of December 15, 1986, are hereby repealed.
Article sheet
Issued at the Presidency of the Republic. San José, on the twenty-second day of April of the year two thousand twenty-one.
Article sheet Go to the beginning of the document
Reglamento para la perforación de pozos y aprovechamiento de aguas subterráneas N° 43053-MINAE EL PRESIDENTE DE LA REPÚBLICA Y LA MINISTRA DE AMBIENTE Y ENERGÍA text-align:justify;text-indent:35.4pt'>En uso de las facultades que les confieren los artículos 50, 140 incisos 3), 18) y 146 de la Constitución Política; artículos 27 inciso 1) y 28 inciso 2) acápite b) de la Ley General de la Administración Pública N° 6227 del 2 de mayo de 1978; artículo 177 de la Ley de Aguas Nº 276 del 27 de agosto de 1942; y el artículo 50 de la Ley Orgánica del Ambiente Nº 7554 del 4 de octubre de 1995.
1.-Que de conformidad con la Ley de Aguas Nº 276, en sus artículos 17, 21, 27, 176, 177 y 178, el Ministerio de Ambiente y Energía es el ente rector del agua a nivel nacional y le corresponde disponer sobre su dominio, aprovechamiento, utilización, gobierno y vigilancia de estas; lo cual realiza por medio de su Dirección de Agua conforme al Decreto Ejecutivo N° 35669-MINAE del 04 de diciembre de 2009, denominado "Reglamento Orgánico del Ministerio de Ambiente y Energía".
II.-Que la Ley Nº 5516 del 2 de mayo de 1974 denominada "Reforma artículos 131 a 135 Ley de Aguas de 1942", establece en su artículo 2º, que para facilitar las atribuciones de dominio, gobierno y vigilancia de las aguas de dominio público que corresponde al Ministerio de Ambiente y Energía, éste llevará un registro para la inscripción de las personas o empresas que tengan como actividad la perforación de pozos y no dará licencia para perforar a quienes no estén inscritos en el mencionado registro.
III.-Que de conformidad con el artículo 3 incisos ch) y e) de la Ley N° 6877 del 18 de julio de 1983 denominada "Crea SENARA (Servicio Nacional Aguas Subterráneas Riego y Avenamiento", al Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento (SENARA), le corresponde investigar, proteger y fomentar el uso de los recursos hídricos del país, tanto superficiales como subterráneos, así como el realizar, coordinar, promover y mantener actualizadas las investigaciones hidrológicas, hidrogeológicas, agrológicas y otras que se considere necesarias en las cuencas hidrográficas.
IV.-Que de conformidad con lo dispuesto en el artículo 2 inciso f) de la Ley Constitutiva del Instituto Costarricense de Acueductos y Alcantarillados (AyA) N° 2726 del 14 de abril de 1961, le corresponde al AyA aprovechar, utilizar, gobernar o vigilar, según sea el caso, todas las aguas de dominio público indispensables para el debido cumplimiento de las disposiciones de la citada ley.
V.-Que de conformidad con la Ley Orgánica del Ambiente N° 7554, el agua es de dominio público, y su conservación y uso sostenible son de interés social.
VI.-Que de conformidad con el Decreto Ejecutivo Nº 35669-MINAE, corresponde a la Dirección de Agua del Ministerio de Ambiente y Energía, admitir, tramitar y resolver sobre solicitudes de perforación del subsuelo para la exploración y explotación de aguas subterráneas y asignar el número de pozo respectivo, asimismo, le corresponde operar y mantener el registro de perforadoras de pozos.
VII.-Que el recurso hídrico debe manejarse con base al principio de gestión integrada del recurso, que promueve el manejo y desarrollo coordinado del agua, la tierra y los recursos naturales, con el fin de maximizar el bienestar social y económico resultante de manera equitativa, sin comprometer la sustentabilidad de los ecosistemas vitales, para lo cual se hace esencial la coordinación interinstitucional.
VIII.-Que como parte de un proceso continuo de mejora regulatoria y la oportunidad de permitir mayor disponibilidad para atender otros quehaceres sustantivos de la Dirección de Agua, como es la vigilancia y administración del agua en campo, se han ajustado y disminuido los procesos y plazos, tanto para la Administración como para el administrado, facilitando el trámite, pero con valor agregado en su control y seguimiento. De conformidad con lo anterior, el presente Reglamento se ajusta al presupuesto de excepción establecido en el artículo 2 inciso e) de la Directriz 052-MP- MEIC denominada "Moratoria a la creación de nuevos trámites, requisitos o procedimientos al ciudadano para la obtención de permisos, licencias o autorizaciones", publicada en La Gaceta N° 118 del 25 de junio de 2019, así como al punto B.2.e.i de la Circular 001-2019 MEIC-MP, en cuanto reduce plazos de resolución y promueve la digitalización del trámite de todos los procedimientos que se realizan dentro de la Dirección de Agua.
IX.-Que de conformidad con el párrafo tercero del artículo 12 del Reglamento a la Ley de Protección al Ciudadano del Exceso de Requisitos y Trámites Administrativos, Decreto Ejecutivo Nº 37045-MP-MEIC y sus reformas, se determinó que la presente propuesta no establece ni modifica trámites, requisitos o procedimientos, que el administrado deba cumplir, situación por la que no se procedió con el trámite de control previo. Por tanto;
"Reglamento para la Perforación de Pozos y Aprovechamiento de Aguas Subterráneas"
Del objeto, sujetos y ámbito de aplicación
Considerando:
Decretan:
CAPÍTULO I
El presente Reglamento tiene por objeto regular a nivel nacional la perforación del subsuelo con fines de investigación, exploración y/o aprovechamiento del agua subterránea.
Este Reglamento se aplicará a todo sujeto de derecho público o privado, persona física o jurídica, que desee perforar el subsuelo con fines de investigación, exploración y aprovechamiento de aguas subterráneas en todo el territorio nacional.
Para los efectos del presente reglamento se deberá entender los acrónimos de la siguiente manera:
1. AyA: Instituto Costarricense de Acueductos y Alcantarillados.
2. CCSS: Caja Costarricense de Seguro Social.
3. CTI-AGUA SUBTERRÁNEA: Comisión Técnica Interinstitucional para la Gestión de Agua Subterránea.
4. DA: Dirección de Agua del Ministerio de Ambiente y Energía.
5. IFP: Informe final de perforación.
6. IPB: Informe prueba de bombeo.
7. MINAE: Ministerio de Ambiente y Energía.
8. ROP: Retiro operacional del pozo.
9. SENARA: Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento.
10. SINIGIRH: Sistema Nacional de Información para la Gestión del Recurso Hídrico.
11. SIPECO: Sistema de Permiso y Concesiones.
Para los efectos de este Reglamento se entenderá por:
Lo no definido en este Reglamento, se considerará conforme a lo establecido en el Acuerdo N° 60-2012 de las ocho horas del doce de junio de dos mil doce, publicado en La Gaceta N° 147, Alcance Digital N° 105 del 31 de julio de 2012, que oficializa las Metodologías Hidrogeológicas para la Evaluación del Recurso Hídrico.
Del trámite de permisos de perforación
CAPÍTULO II
La Dirección de Agua funcionará como ventanilla única, quien dará admisibilidad a la solicitud y resolverá el permiso en apego a la ciencia y la técnica; brindando audiencia e integrando los criterios del Instituto Costarricense de Acueductos y Alcantarillados (AyA), Servicio Nacional de Aguas Subterránea, Riego y Avenamiento (SENARA) en el momento procesal que dispone este Reglamento.
Para llevar a cabo el análisis de la solicitud, las instituciones que intervienen resolverán conforme sus competencias y según los siguientes roles:
El AyA de conformidad con la Ley N° 2726 y sus reformas, debe manifestarse con relación a si afecta fuentes destinadas para sus fines.
A la DA le corresponde en primera instancia resolver sobre el permiso de perforación con fines le corresponde analizar y definir sobre interferencia entre pozos y cuerpos de agua, retiro del pozo y recomendar al Jerarca del MINAE sobre el aprovechamiento del agua en concesión y sus condiciones.
El SENARA, una vez perforado el pozo, le corresponde pronunciarse sobre las condiciones finales de este (profundidad, diámetro, encamisado, sellos sanitarios) en relación a la caracterización del acuífero. Además, deberá analizar y pronunciarse sobre los estudios presentados en razón de las regulaciones especiales de los acuíferos conforme este Reglamento, todo de conformidad con la Ley N° 6877 y sus reformas.
Todo permiso para perforación de pozo se entenderá que se autoriza con fines iniciales de exploración. Una vez cumplido con lo dispuesto en este Reglamento, al Jerarca del MINAE le corresponde autorizar el aprovechamiento del agua mediante la concesión como lo dispone el artículo 17 de la Ley de Aguas N° 276.
Del Registro de las personas físicas o jurídicas habilitadas para perforar
CAPÍTULO III
Todo sujeto de derecho público o privado, persona física o jurídica, que pretenda dedicarse a la actividad de perforación del subsuelo con fines de investigación, de Agua del Ministerio de Ambiente y Energía, de conformidad con el artículo 2º de la Ley N° 5516.
En caso de que se trate de una persona jurídica, el representante de la empresa perforadora debe presentar solicitud de inscripción mediante formulario digital en la plataforma SIPECO de la Dirección de Agua y firmarlo digitalmente. Se debe indicar nombre de la empresa perforadora, cédula jurídica, nombre del representante legal y su cédula de identidad o de residencia, domicilio legal de la perforadora, lugar o medio para atender notificaciones. Deberá manifestar que posee equipo de perforación y cantidad; indicando para cada uno al menos las siguientes características básicas: marca, tipo de equipo, vin, profundidad máxima de perforación, número de placa para su circulación vial y adjuntar el logo oficial de la perforadora.
En caso de que el solicitante, sea una persona física, el interesado debe presentar solicitud de inscripción mediante formulario digital en la plataforma SIPECO de la Dirección de Agua y firmarlo digitalmente. Debe de indicar nombre completo, cédula de identidad o de residencia, lugar o medio para atender notificaciones. Deberá manifestar que posee equipo de perforación y cantidad; indicando para cada uno al menos las siguientes características básicas: marca, tipo de equipo, vin, profundidad máxima de perforación, número de placa para su circulación vial y adjuntar el logo oficial de la perforadora.
Presentada la solicitud conforme al presente reglamento y revisada la misma, la Dirección de Agua procederá en un plazo de 15 días con la inscripción en el Registro de Perforadoras y habilitará al ejercicio de la actividad de perforación del subsuelo por un período de diez años, asignando un código de identificación.
La solicitud de renovación de la licencia, deberá solicitarse un mes antes del vencimiento, para lo cual deberán hacerlo mediante la presentación de declaración jurada no protocolizada, en la que se indique que se trata de una renovación en las mismas condiciones. Si hubiese algún cambio en las condiciones en las cuales se expidió la licencia original, por ejemplo, adquisición de nuevos equipos, deberá ser indicada en la solicitud.
La Dirección de Agua será la responsable de mantener actualizado el Registro Nacional de Perforadoras a partir de la información aportada por la perforadora y permitir su acceso público mediante el SINIGIRH.
Son obligaciones de la perforadora, las siguientes:
Regulación a la perforación y aprovechamiento de agua
CAPÍTULO IV
En las zonas de reserva acuífera, la Dirección de Agua resolverá el permiso de perforación en la fase de exploración en apego a las regulaciones y condiciones expuestas para cada una de ellas, dentro del plazo señalado en el artículo 21 del presente Reglamento.
En los acuíferos con regulación especial, la Dirección de Agua resolverá el permiso de perforación en la fase de del presente Reglamento.
No se permite la excavación ni la perforación de pozos, dentro de las áreas de protección de ríos, quebradas, arroyos y nacientes, conforme lo dispuesto en el artículo 33 de la Ley Forestal N° 7575 del 13 de febrero de 1996, así como en las señaladas en los artículos 31 y 149 de la Ley de Aguas N° 276 del 27 de agosto de 1942.
Para el uso de pozos en el autoabastecimiento de agua en condominio, la perforación debe realizarse dentro del condominio y en área común, conforme al artículo 10 de la Ley Reguladora de la Propiedad en Condominio N° 7933 del 28 de octubre de 1999. En estos casos se aplicará la normativa especial que regula este uso.
Permisos de perforación
CAPÍTULO V
La solicitud de permiso de perforación debe presentarse en conjunto con la solicitud de concesión de agua ante la DA. Esta debe ser presentada por el propietario o poseedor del terreno donde se realizará la perforación, por los medios establecidos por medio de SIPECO u otros medios que disponga la DA.
La solicitud deberá cumplir con los siguientes requisitos:
Para resolver los permisos de perforación en fase exploratoria, la DA valorará la información aportada con relación a los siguientes criterios:
Una vez cumplidos los requisitos que señala el presente reglamento, la DA resolverá el permiso de perforación en un plazo de 7 días y en los términos señalados en el artículo 19 de este Reglamento. La DA asignará el número de identificación del pozo, que estará conformado por un código alfanumérico, utilizando la combinación de las letras iniciales de la hoja cartográfica escala 1:50000 correspondiente al lugar a perforar y un número consecutivo, el cual se consignará en el Registro Nacional de Pozos que administra la DA.
El sitio de la perforación se podrá ubicar dentro de un margen máximo de ± 20 metros del punto autorizado, siempre que se respete las demás condiciones dadas en el permiso. Cualquier cambio más allá de este margen, debe ser previamente comunicado por el Administrado a la DA y se resolverá conforme el artículo 22.
La perforadora, el profesional responsable y el propietario o poseedor del inmueble serán corresponsables del cumplimiento de las condiciones dispuestas en el permiso de perforación.
Antes de que se inicien los trabajos de perforación, cualquier cambio en las condiciones del permiso, deben solicitarse por parte del Administrado, y estar expresamente autorizadas por la DA, quien tendrá un plazo de 5 días para resolver lo que corresponda.
Finalizada la construcción del pozo y las pruebas de bombeo, el propietario del pozo deberá colocar en la parte externa de la tubería del pozo un tapón para evitar la contaminación por la exposición directa del acuífero en tanto se le habilita el aprovechamiento en concesión.
Para iniciar la perforación se tendrá un plazo de un mes contado a partir de la fecha de notificación del permiso. La perforadora o geólogo responsable, deberá informar a la DA al correo electrónico que se indique en la resolución, la fecha prevista de inicio de la perforación, así como el plazo previsto para su conclusión.
El solicitante podrá gestionar ante la Dirección de Agua con 10 días hábiles de anticipación al vencimiento del plazo de inicio de la perforación, una única prórroga. Ésta será de un plazo máximo de un mes, a partir de la fecha de vencimiento del permiso.
Para lo anterior el administrado presentará declaración jurada no protocolizada ante la DA, de que realizará la perforación dentro del plazo de un mes más, a partir de la fecha de vencimiento del permiso y que se realizará en las mismas condiciones del permiso original.
Una vez otorgado el permiso y previo al inicio de la perforación, cuando se presente un cambio en la relación contractual entre el solicitante y la perforadora y/o el profesional responsable de la perforación, deberá ser informada por escrito la Dirección de Agua dentro del plazo de vigencia del permiso de perforación. Esta información debe presentarse en el formulario que para tal efecto se encuentra dispuesto en el SINIGIRH y deberá venir firmada por el titular del permiso de perforación, el representante de la nueva perforadora contratada y el profesional responsable de la perforación.
Una vez recibida la información completa por parte del solicitante, la DA resolverá la solicitud de cambios de condiciones del permiso, dentro del plazo de tres días hábiles y notificará su resultado al solicitante. Posterior a ello podrá iniciarse o reiniciarse la perforación.
Una vez concluida la perforación, se deberá instalar un tubo de un diámetro mínimo de treinta y ocho milímetros, con el fin de realizar las mediciones de niveles de agua. Debe ser instalado desde la superficie del terreno hasta dos metros debajo de la ubicación de la bomba. Asimismo, se debe dejar una prevista en la tubería para realizar la medición del caudal y muestreo de agua muy cercano al brocal, en la superficie del terreno.
Una vez terminada la perforación y armado del pozo, el propietario colocará con carácter permanente en el brocal, una placa metálica con el número del pozo y número de resolución del permiso de perforación.
El AyA, 10 días naturales de previo al inicio de la perforación del subsuelo y construcción de pozos, deberá comunicar a la Dirección de Agua del MINAE, con el fin de que se le asigne un número de pozo y para que este sea inscrito en el Registro Nacional de Pozos.
En el plazo de 30 días hábiles luego de finalizado el armado, pruebas hidráulicas y de calidad de agua, el AyA aportará a la DA y al SENARA copia digital en formato editable de la información técnica conforme se establece en los capítulos VI y XI de este Reglamento y deberá inscribir el aprovechamiento ante la DA conforme a lo dispuesto en el artículo 18 de la Ley de Aguas N°276.
En el caso que la perforación responda a una situación de emergencia calificada conforme la legislación vigente, siempre que se utilice el equipo de perforación de la institución, no aplicará el plazo previo de la comunicación señalado anteriormente. Esta condición no exime al AyA de la presentación de la información técnica de la perforación y la inscripción del caudal aprovechado.
Informe final de perforación y prueba de bombeo
CAPÍTULO VI
El IFP se debe presentar en un plazo de 10 días hábiles de finalizada la perforación y ser suscrito por el Geólogo responsable de la misma. La perforadora será corresponsable de su presentación en tiempo.
Debe acompañarse de la declaración jurada no protocolizada por parte del Geólogo, que tuvo a cargo la supervisión de la perforación, en la que manifieste que la misma se hizo respetando las condiciones indicadas en el permiso y la normativa vigente que rige en la materia, en especial, lo señalado en el artículo 8 de la Ley de Aguas N°276, así como en lo dispuesto en los artículos 14,15 y16 del presente reglamento.
El IFP se debe presentar en digital con su ingreso en línea en la plataforma que disponga la Dirección de Agua en el SINIGIRH y debe ser suscrito con firma digital por el geólogo de la perforación. EL IFP debe tener la siguiente información:
1. Sobre el proceso de la perforación:
2. Sobre condiciones hidrogeológicas:
3. Sobre el armado del pozo:
La prueba de bombeo debe realizarse de tal forma que se caracterice el potencial del pozo y su área de influencia, considerando el caudal potencial máximo de extracción conforme al diseño del pozo.
Cuando el aprovechamiento corresponde para uso poblacional y autoabastecimiento en condominio, el tiempo de bombeo mínimo será de 72 horas. Para los otros usos, el periodo será de hasta 24 horas. Lo anterior sin perjuicio que la Dirección de Agua considere la necesidad de realizar un tiempo de prueba de bombeo diferente al indicado, lo cual solicitará mediante resolución debidamente justificada y motivada.
Luego del tiempo de bombeo, se debe tener el control del tiempo de la recuperación que deberá alcanzar al menos el 85% del abatimiento reportado.
El IPB debe ser presentado en un plazo de 10 días hábiles de concluida la perforación exploratoria.
El IPB deberá presentarse en conjunto con el IFP y debe contemplar los siguientes requisitos:
1. Fecha de realización; 2. Profundidad de ubicación y potencia de la bomba empleada; 3. Tiempo total de la prueba, tipo de la prueba, registro de caudales, variaciones de niveles y abatimientos y análisis gráfico de la prueba, tanto en fase de bombeo como en la de recuperación.
4. Debe contener el cálculo de la transmisibilidad, capacidad específica, coeficiente de almacenamiento; 5. Debe identificar presencia de barreras positivas o negativas.
6. Indicar el caudal potencial máximo de extracción, régimen de bombeo y profundidad máxima que debe alcanzar el nivel del agua durante la explotación.
De los estudios para habilitar el uso del pozo para el aprovechamiento del agua
CAPÍTULO VII
Una vez concluida la fase de exploración con la perforación del pozo, conforme los resultados y condiciones de perforación descritos en el IFP e IPB, el solicitante deberá presentar de forma digital ante la Dirección de Agua los estudios indicados en este artículo cuando corresponda, conforme criterios de requerimiento, según el siguiente detalle:
Esta distancia puede ser menor con la autorización del MINAE a través de la Dirección de Agua, para lo cual deberá aportar el interesado estudio que demuestre con certeza técnico-científica que el acuífero no será afectado ni contaminado por las actividades directamente realizadas dentro de este retiro solicitado.
El ROP no debe traspasar los linderos de propiedades circunvecinas al sitio del pozo.
Estos estudios deben ser presentados en un plazo máximo de 30 días hábiles de concluida la perforación y utilizar como información base la generada por la perforación autorizada.
Conforme al análisis del IFP y el IFB del profesional en geología de la administración, justificado y motivado en relación de la ubicación del pozo y condición topográfica respecto a la costa, información de geología local, profundidad del pozo, nivel freático estático y dinámico, caudal recomendado a extraer y condiciones geológicas susceptibles a la contaminación por intrusión salina, y otras variables que se consignen en el análisis, se concluya que técnica y científicamente existe un potencial riesgo de intrusión salina en el acuífero captado, la Dirección de Agua solicitará al titular de la concesión, el monitoreo trimestral de la calidad del agua en el pozo que incluya: caudal extraído diario, nivel piezométrico y resultado de medición mensual de la calidad de agua de los parámetros de conductividad eléctrica y cloruros. Estos reportes deberán ser entregados por el concesionario cada tres meses y deberán venir suscritos por profesional responsable.
Con base en el control y seguimiento de esta información, la Dirección de Agua podrá establecer modificaciones a los periodos de monitoreo, regímenes de extracción o bien el cese de la extracción temporal o permanente, siguiendo el debido proceso; con el fin de mantener un grado de explotación del acuífero que asegure la adecuada calidad de agua del acuífero mediante un gradiente hidráulico positivo hacia el mar.
Del proceso de audiencias
CAPÍTULO VIII
La Dirección de Agua una vez recibido el IFP, IPB y los estudios cuando correspondan conforme lo señalado en el artículo 34 del presente reglamento, preparará el edicto e informará al solicitante para que proceda a su publicación por tres veces consecutivas en el Diario Oficial La Gaceta, de conformidad con el artículo 179 de la Ley de Aguas Nº276 y brindará audiencia al SENARA y AyA.
En este momento la Dirección de Agua deberá notificar al solicitante, su deber de realizar depósito, transferencia electrónica u otro mecanismo del pago a SENARA por los costos del trámite de audiencia ante esta dependencia y el interesado deberá comunicar del pago a esta institución.
El SENARA y el AyA, tendrán un plazo de 10 días naturales a partir de la notificación para responder a la Dirección de Agua. De conformidad con la Ley General de la Administración Pública N° 6227, deberá emitir criterio justificado y motivado apegado a la ciencia y a la técnica conforme los roles dispuestos en el artículo 6 de este Reglamento y en apego al principio de la objetivación de la tutela ambiental.
De conformidad con los resultados de la perforación, estudios entregados y transcurrido el plazo de audiencia, la DA en el plazo de un mes, resolverá sobre la habilitación o no del pozo; para ello realizará el análisis técnico-científico y apegado a Derecho; integrando el análisis de los criterios del SENARA y AyA, actualizando el Registro Nacional de Pozos que administra la DA.
La DA procederá a habilitar la información del IFP para su acceso público mediante el Sistema Nacional de Información para la Gestión del Recurso Hídrico (SINIGIRH).
De la concesión de aprovechamiento del agua
CAPÍTULO IX
El permiso de perforación no confiere el derecho de explotación del recurso hídrico. Una vez habilitado el pozo para su uso, la Dirección de Agua habilitará continuar con la fase de la concesión de aprovechamiento de agua.
En caso que la propiedad donde se ubica la perforación no corresponda con la del aprovechamiento, se deberá aportar autorización del titular propietario del terreno donde se captará el agua, debidamente autenticada la firma por un Notario Público. Esto no aplica cuando la solicitud sea para el abastecimiento de agua para consumo humano poblacional.
Para continuar con el trámite de la concesión, el solicitante deberá cumplir con lo siguiente:
La DA podrá solicitar mediante resolución razonada y justificada la presentación de una nueva prueba de bombeo; la cual debe cumplir con lo dispuesto en el artículo 31, 32 y 33 del presente reglamento
Emitida la recomendación técnica sobre el aprovechamiento de agua, en un mes plazo, la DA preparará el proyecto de resolución de concesión de agua para firma del jerarca del MINAE, quien resolverá en definitiva dentro de un plazo de un mes, a partir del traslado de la documentación.
Con el fin de asegurar la calibración y control de la extracción del acuífero y en casos técnicamente justificados y motivados, el MINAE ordenará la instalación de un medidor de caudales cuya ubicación, periodicidad y aporte de reportes serán indicados en la resolución.
Del permiso de perforación de piezómetros y su inscripción
CAPÍTULO X
La perforación de piezómetros debe contar con permiso de la Dirección de Agua y solo se autorizarían con fines de investigación y/o monitoreo de las aguas subterráneas.
La solicitud deberá entregarse a la Dirección de Agua, cumpliendo los siguientes requisitos:
Una vez cumplidos los requisitos que señala el artículo anterior, la DA resolverá el permiso de perforación del piezómetro, inscribiendo el mismo en un plazo de 3 días. La DA asignará el número de identificación del pozo, que estará conformado por un código alfanumérico, utilizando la combinación de las letras iniciales de la hoja cartográfica escala 1:50000 correspondiente al lugar a perforar y un número consecutivo, el cual se consignará en el Registro Nacional de Pozos que administra la DA.
El permiso se condicionará a la presentación ante la Dirección de Agua en formato digital, de la siguiente información:
Por su carácter de investigación o monitoreo a este tipo de perforaciones no les es aplicable el retiro de pozo y estudios adicionales.
Del Registro Nacional de Pozos
CAPÍTULO XI
De conformidad con el artículo 17 y 18 de la Ley de Aguas N° 276 y artículo 2 de la Ley N° 5516, se constituye el Registro Nacional de Pozos que será administrado por la Dirección de Agua del MINAE y estará integrado al Sistema Nacional de Información para la Gestión Integrada del Recurso Hídrico (SINIGIRH), constituyéndose el registro nacional oficial de pozos. En este se almacenará toda la información técnica y administrativa relativa a la perforación de pozos y será alimentado con la información generada de los informes de perforación. La información será de acceso público.
De las sanciones
CAPÍTULO XII
Las perforadoras y demás administrados deberán cumplir las normativas de protección ambiental establecidas en la Ley de Aguas Nº 276 y su reforma mediante la Ley Nº 5516, Ley Orgánica del Ambiente, Ley Nº 7554, Ley General de la Administración Pública Nº 6227, Ley Forestal N° 7575, Ley de Creación del Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento Nº 6877, Ley General de Salud Nº 5395 y Ley Constitutiva del Instituto Costarricense de Acueductos y Alcantarillados Nº 2726, y demás legislación aplicable a esta materia.
De conformidad con lo establecido en el artículo 2º de la Ley Nº 5516 y sin perjuicio de las disposiciones establecidas en la normativa jurídica vigente, las violaciones a las disposiciones en el presente Reglamento, se sancionarán previo cumplimiento del debido proceso, de la siguiente manera:
La Dirección de Agua del MINAE mediante resolución razonada, dispondrá del sellado de un pozo perforado, en las siguientes condiciones:
El pozo se deberá llenar con grava hasta el nivel de la superficie. Además, en caso de que la tubería sea metálica, se debe colocar una tapa metálica que cubra todo el boquete de la tubería y asegurarla con soldadura y en el caso de ser de PVC se debe colocar una tapa de rosca de PVC ajustada con pegamento. Posteriormente se debe chorrear una losa de concreto armado, que cubra totalmente la tapa del pozo con un espesor no menor a 10 centímetros y el área mínima sea coincidente con el área del sello sanitario. Además, deberá presentarse a la Dirección de Agua, el informe del sellado del pozo mediante levantamiento de un acta notarial donde se incluya la descripción del sellado y extracción de la bomba.
(Derogado por el artículo 1° del decreto ejecutivo N° 43712 del 7 de setiembre de 2022)
CAPÍTULO XIII
Deróguese el Reglamento de Perforación del Subsuelo para la Exploración y Aprovechamiento de Aguas Subterráneas, Decreto Ejecutivo N° 35884-MINAET del 07 de marzo de 2010 y el artículo 6 del Decreto Ejecutivo N° 17390-MAG-S, denominado "Crea Zona Protectora Acuíferos de Guácimo y Pococí" del 15 de diciembre de 1986.
Dado en la Presidencia de la República. San José, el veintidós de abril del año dos mil veintiuno.
Document not found. Documento no encontrado.