Decreto 36-A · 26/07/2022
OutcomeResultado
SummaryResumen
This decree, approved by the Board of Directors of the Costa Rican Institute of Aqueducts and Sewers (AyA), amends Article 15 of its Service Provision Regulation. The amendment aims to streamline institutional procedures in line with the Law for the Protection of Citizens from Excessive Requirements and Administrative Procedures. It sets forth the means for submitting applications (in person, email, digital platforms such as the CFIA's APC-R), the mandatory use of forms with digital signatures when submitted electronically, and the ex officio verification of cadastral and registry information by service operators within three days. It regulates representation requirements, the need for up-to-date billing, and the procedure for preventing and archiving incomplete applications. The measure seeks to reduce the documentary burden on users by leveraging available inter-institutional platforms.Este decreto, aprobado por la Junta Directiva del Instituto Costarricense de Acueductos y Alcantarillados (AyA), reforma el artículo 15 de su Reglamento de Prestación de Servicios. La modificación busca agilizar los trámites institucionales en concordancia con la Ley de Protección al Ciudadano del Exceso de Requisitos y Trámites Administrativos. Se establecen los medios para presentar solicitudes (presencial, correo electrónico, plataformas digitales como APC-R del CFIA), el uso obligatorio de formularios con firma digital cuando se haga por medios digitales, y la verificación oficiosa de información catastral y registral por parte de los operadores del servicio en un plazo de tres días. Se regulan los requisitos de representación, la necesidad de estar al día en las facturaciones, y el procedimiento de prevención y archivo de solicitudes incompletas. La medida pretende reducir la carga documental para los usuarios, aprovechando las plataformas interinstitucionales disponibles.
Key excerptExtracto clave
Article 15.-General conditions for the handling and approval of procedures regulated by this regulation. The user shall submit applications for the procedures regulated by this regulation through any of the following available means: 1. In person at the service platforms located at the various AYA service points. 2. Digital access through the email address: [email protected]. 3. Other email addresses indicated in the corresponding articles of this regulation and duly published by AyA. 4. APC-R Platform under the Costa Rican Association of Engineers and Architects, solely for prior procedures for construction permits, as established by this regulation and its respective procedures. 5. AyA Virtual Agency once it is enabled and operational, in accordance with the provisions of Article 136 of this regulation. The user must submit the application using the respective form, either preprinted at AyA service points or digitally, in which case the use of a digital signature shall be mandatory. When the operator receives, through any of the indicated means, an application for any of the procedures regulated by this regulation, they must verify, through the official and available inter-institutional platforms, the information required for processing the respective administrative file. In this regard, the information consulted shall be that pertaining to cadastral and registry conditions of the properties, as well as registry or administrative information on active legal entities, general attorney-in-fact authorized for this purpose, executor, guardians, curators, concessions, leases, and assignments. This verification shall be carried out within a maximum period of three calendar days from the day following receipt or entry of the application. Once this period has elapsed, the remaining term provided for resolving the requested procedure shall continue to be computed, as appropriate.Artículo 15.-Condiciones generales para la atención y aprobación de los trámites que regula este reglamento. El usuario realizará las solicitudes de los trámites que regula el presente reglamento, por alguno de los siguientes medios que se encuentren disponibles: 1. De forma presencial en las plataformas de servicios ubicadas en los distintos puntos de atención del AYA. 2. Acceso digital mediante la dirección electrónica: [email protected]. 3. Otras direcciones electrónicas indicadas en los artículos correspondientes de este reglamento y debidamente divulgadas por AyA. 4. Plataforma APC-R adscrita al Colegio de Ingenieros y Arquitectos de Costa Rica, únicamente para los trámites previos para permisos de construcción, que este reglamento y sus respectivos procedimientos establezcan. 5. Agencia Virtual de AyA una vez se encuentre habilitada y en funcionamiento, de acuerdo con lo dispuesto por el artículo 136 del presente reglamento. El usuario deberá realizar la solicitud de los trámites mediante el formulario respectivo, ya sea de forma preimpresa en el caso de los puntos de atención del AyA, o bien digital en cuyo caso será obligatorio el uso de la firma digital. Cuando el operador reciba por cualquiera de los medios indicados una solicitud de alguno de los trámites que regula el presente reglamento, deberá verificar a través de las plataformas interinstitucionales oficiales y disponibles la información requerida para la tramitación del expediente administrativo respectivo. En ese sentido, la información consultada será la referente a condiciones catastrales y registrales de los inmuebles, así como información registral o administrativa de personerías jurídicas vigentes, apoderado general facultado al efecto, albacea, tutores, curadores, concesiones, arriendos y asignaciones. Esta verificación se realizará en un plazo máximo de tres días naturales contados a partir del día siguiente de recibida o ingresada la solicitud. Transcurrido este término, se continuará con el cómputo del plazo restante previsto para resolver la gestión solicitada, según corresponda.
Pull quotesCitas destacadas
"Cuando el operador reciba por cualquiera de los medios indicados una solicitud de alguno de los trámites que regula el presente reglamento, deberá verificar a través de las plataformas interinstitucionales oficiales y disponibles la información requerida para la tramitación del expediente administrativo respectivo."
"When the operator receives, through any of the indicated means, an application for any of the procedures regulated by this regulation, they must verify, through the official and available inter-institutional platforms, the information required for processing the respective administrative file."
Artículo 15 (texto modificado)
"Cuando el operador reciba por cualquiera de los medios indicados una solicitud de alguno de los trámites que regula el presente reglamento, deberá verificar a través de las plataformas interinstitucionales oficiales y disponibles la información requerida para la tramitación del expediente administrativo respectivo."
Artículo 15 (texto modificado)
"Conforme a lo establecido en el artículo 6 de la Ley N° 8220...en caso de que el solicitante no cumpla con la totalidad de los requisitos, que no puedan ser verificados o bien, estén incorrectos, AyA lo prevendrá para que dentro del plazo máximo de 10 días hábiles los aporte o subsane."
"In accordance with the provisions of Article 6 of Law No. 8220...if the applicant fails to comply with all of the requirements, which cannot be verified or are incorrect, AyA shall warn them so that they may provide or correct them within a maximum period of 10 business days."
Artículo 15 (texto modificado)
"Conforme a lo establecido en el artículo 6 de la Ley N° 8220...en caso de que el solicitante no cumpla con la totalidad de los requisitos, que no puedan ser verificados o bien, estén incorrectos, AyA lo prevendrá para que dentro del plazo máximo de 10 días hábiles los aporte o subsane."
Artículo 15 (texto modificado)
Full documentDocumento completo
in the entirety of the text - Complete Text of Regulation 36 Amendment to the Regulation for the Provision of Water Supply and Sewerage Services INSTITUTO COSTARRICENSE DE ACUEDUCTOS Y ALCANTARILLADOS Nº 2022-335 SUBJECT: Approval of the amendment to Article 15 of the Regulation for the Provision of Services of AyA Session N° 2022-36 Ordinary.-Date Held 26/Jul/2022.-Article 5.3-Amendment of Article 15 of the Regulation for the Provision of Services of AyA. Memorandum GG-202202901.-Attention Executive Presidency, Deputy Management for Environment, Research and Development, Deputy Management for Delegated Systems, Legal Directorate, Deputy Management for Greater Metropolitan Area Systems, Deputy Management for Peripheral Systems, Commercial System Directorate, General Management.-Communication Date 27/Jul/2022 BOARD OF DIRECTORS INSTITUTO COSTARRICENSE DE ACUEDUCTOS Y ALCANTARILLADOS
Whereas
1. "Under no circumstances may acts be issued that are contrary to unambiguous rules of science or technology, or to elementary principles of justice, logic, or convenience.
2. (.)."
"Article 1- With the objective of directing, setting policies, establishing and applying standards, carrying out and promoting planning, financing, and development, and of resolving everything related to the supply of potable water and the collection and evacuation of sewage (aguas negras) and liquid industrial waste, as well as the regulatory aspect of stormwater drainage systems (sistemas de alcantarillado pluvial) in urban areas, the Instituto Costarricense de Acueductos y Alcantarillados is created for the entire national territory, as an autonomous institution of the State.
a. Directing and supervising everything concerning providing the inhabitants of the Republic with a service of potable water, collection and evacuation of sewage (aguas negras) and liquid industrial waste, and of stormwater (aguas pluviales) in urban areas (.)"
The user shall submit requests for the procedures regulated by this regulation, through one of the following available means:
1. In-person at the service platforms located in the different points of service of AYA.
2. Digital access through the email address: [email protected].
3. Other email addresses indicated in the corresponding articles of this regulation and duly publicized by AyA.
4. APC-R Platform ascribed to the Colegio de Ingenieros y Arquitectos de Costa Rica, solely for prior procedures for construction permits, as established by this regulation and its respective procedures.
5. Virtual Agency of AyA once it is enabled and in operation, in accordance with the provisions of Article 136 of this regulation.
The user must submit the request for the procedures using the respective form, either in pre-printed form in the case of AyA service points, or digitally, in which case the use of digital signatures (firma digital) shall be mandatory.
When the operator receives, through any of the indicated means, a request for one of the procedures regulated by this regulation, they must verify through the official and available inter-institutional platforms the information required for the processing of the respective administrative case file (expediente administrativo). In that regard, the information consulted shall be that relating to cadastral and registration conditions of the properties, as well as registration or administrative information of current legal statuses (personerías jurídicas), authorized general agent (apoderado general) empowered for this purpose, executor (albacea), guardians (tutores), conservators (curadores), concessions, leases (arriendos), and assignments.
This verification shall be carried out within a maximum period of three calendar days counted from the day after the request is received or filed. Once this period has elapsed, the computation of the remaining period envisaged for resolving the requested procedure shall continue, as applicable.
Operators acting by delegation of AyA that do not have the tools and/or access to the indicated official digital platforms must request from the interested parties the submission of the documentation required as established by the respective procedure as a condition for the admissibility of their action:
III.Registration or administrative certifications of current legal statuses (personerías jurídicas), authorized general agents (apoderados generales) empowered for this purpose, executors (albaceas), guardians (tutores), and conservators (curadores).
The respective owner or legal representative may be represented by a third party, through a formal authorization that accredits them to carry out the required procedure, which must be issued by the represented party and duly authenticated by a lawyer.
The billings for the services provided by the institution or a delegated operator that fall upon the property with respect to which the action is being taken must be up to date. In case of default, the debt must be regularized prior to the approval of the request. Excepted are cases defined by other standards, agreements, and State institutions whose payment of bills is being processed within the permitted 45-day period.
The admission of the request shall be subject to the fulfillment of all requirements that the applicant must provide and to the information obtained by AyA and the Delegated Operators from the Official Digital Platforms.
In accordance with the provisions of Article 6 of Law N° 8220, Protection of Citizens from Excessive Administrative Requirements and Procedures, its amendments Law N° 8990 and Law N° 10072, and its Regulation, Decreto Ejecutivo N° 37045-MP-MEIC, in the event that the applicant does not meet all the requirements, that they cannot be verified, or they are incorrect, AyA shall formally notify the applicant (prevendrá) so that within a maximum period of 10 business days they provide or correct them. Once this period has elapsed without the requirement being met, the procedure shall be closed ex officio (archivado de oficio), and for AyA to process it again, the interested party must initiate the action as a new procedure. Let it be communicated and published.
en la totalidad del texto - Texto Completo Norma 36 Reforma Reglamento para la prestación de servicios de Acueductos y Alcantarillados INSTITUTO COSTARRICENSE DE ACUEDUCTOS Y ALCANTARILLADOS Nº 2022-335 ASUNTO: Aprobación de la modificación al artículo 15 del Reglamento de Prestación de Servicios del AyA Sesión N° 2022-36 Ordinaria.-Fecha de Realización 26/Jul/2022.-Artículo 5.3-Modificación del artículo 15 del Reglamento para Prestación de los Servicios de AyA. Memorando GG-202202901.-Atención Presidencia Ejecutiva, Subgerencia Ambiente, Investigación y Desarrollo, Subgerencia de Gestión de Sistemas Delegados, Dirección Jurídica, Subgerencia Gestión de Sistemas Gran Área Metropolitana, Subgerencia Gestión de Sistemas Periféricos, Dirección Sistema Comercial, Gerencia General.-Fecha Comunicación 27/Jul/2022 JUNTA DIRECTIVA INSTITUTO COSTARRICENSE DE ACUEDUCTOS Y ALCANTARILLADOS
Considerando
1. "En ningún caso podrán dictarse actos contrarios a reglas unívocas de la ciencia o de la técnica, o a principios elementales de justicia, lógica o conveniencia.
2. (.)."
"Artículo 1- Con el objeto de dirigir, fijar políticas, establecer y aplicar normas, realizar y promover el planeamiento, financiamiento y desarrollo y de resolver todo lo relacionado con el suministro de agua potable y recolección y evacuación de aguas negras y residuos industriales líquidos, lo mismo que el aspecto normativo de los sistemas de alcantarillado pluvial en áreas urbanas, para todo el territorio nacional se crea el Instituto Costarricense de Acueductos y Alcantarillados, como institución autónoma del Estado.
a. Dirigir y vigilar todo lo concerniente para proveer a los habitantes de la República de un servicio de agua potable, recolección y evacuación de aguas negras y residuos industriales líquidos y de aguas pluviales en las áreas urbanas (.)"
El usuario realizará las solicitudes de los trámites que regula el presente reglamento, por alguno de los siguientes medios que se encuentren disponibles:
1. De forma presencial en las plataformas de servicios ubicadas en los distintos puntos de atención del AYA.
2. Acceso digital mediante la dirección electrónica: [email protected].
3. Otras direcciones electrónicas indicadas en los artículos correspondientes de este reglamento y debidamente divulgadas por AyA.
4. Plataforma APC-R adscrita al Colegio de Ingenieros y Arquitectos de Costa Rica, únicamente para los trámites previos para permisos de construcción, que este reglamento y sus respectivos procedimientos establezcan.
5. Agencia Virtual de AyA una vez se encuentre habilitada y en funcionamiento, de acuerdo con lo dispuesto por el artículo 136 del presente reglamento.
El usuario deberá realizar la solicitud de los trámites mediante el formulario respectivo, ya sea de forma preimpresa en el caso de los puntos de atención del AyA, o bien digital en cuyo caso será obligatorio el uso de la firma digital.
Cuando el operador reciba por cualquiera de los medios indicados una solicitud de alguno de los trámites que regula el presente reglamento, deberá verificar a través de las plataformas interinstitucionales oficiales y disponibles la información requerida para la tramitación del expediente administrativo respectivo. En ese sentido, la información consultada será la referente a condiciones catastrales y registrales de los inmuebles, así como información registral o administrativa de personerías jurídicas vigentes, apoderado general facultado al efecto, albacea, tutores, curadores, concesiones, arriendos y asignaciones.
Esta verificación se realizará en un plazo máximo de tres días naturales contados a partir del día siguiente de recibida o ingresada la solicitud. Transcurrido este término, se continuará con el cómputo del plazo restante previsto para resolver la gestión solicitada, según corresponda.
Los operadores por delegación del AyA que no cuenten con las herramientas y/o acceso a las plataformas digitales oficiales indicadas, deberán solicitar a los interesados la presentación de la documentación que se requiera según lo establece el trámite respectivo como condición para la admisibilidad de su gestión:
III.Certificaciones registrales o administrativas de personerías jurídicas vigentes, apoderados generales facultados al efecto, albaceas, tutores y curadores.
El titular o representante legal respectivo podrán ser representados por un tercero, mediante una autorización formal que lo acredite para realizar el trámite requerido, la cual deberá ser extendida por el representado y debidamente autenticada por un abogado.
Las facturaciones de los servicios brindados por la institución o un operador delegado que recaen sobre el inmueble respecto al cual se realiza la gestión, deberán encontrarse al día. En caso de mora se deberá normalizar la deuda de previo a la aprobación de la solicitud. Se exceptúan los casos definidos por otras normas, convenios e instituciones del Estado cuya cancelación de las facturas se encuentren en trámite dentro del plazo de los 45 días permitidos.
La admisión de la solicitud quedará sujeta al cumplimiento de todos los requisitos que debe aportar el solicitante y a la información obtenida por parte de AyA y los Operadores Delegados en las Plataformas Digitales Oficiales.
Conforme a lo establecido en el artículo 6 de la Ley N° 8220, Protección al Ciudadano del Exceso de Requisitos y Trámites Administrativos, sus reformas Ley N° 8990 y Ley N° 10072, y su Reglamento, Decreto Ejecutivo N° 37045- MP-MEIC, en caso de que el solicitante no cumpla con la totalidad de los requisitos, que no puedan ser verificados o bien, estén incorrectos, AyA lo prevendrá para que dentro del plazo máximo de 10 días hábiles los aporte o subsane. Transcurrido dicho plazo sin que se cumpla con el requerimiento, el trámite será archivado de oficio y para que AyA lo atienda una vez más, el interesado deberá iniciar la gestión como un trámite nuevo. Comuníquese y publíquese.