Res. 01702-2026 Sala Constitucional · Sala Constitucional · 16/01/2026

Land-Use Restrictions and Participation in a Protected ZoneRestricciones territoriales y participación en zona protectora

View document ↓ Ver documento ↓ View original source ↗ Ver fuente original ↗

Loading…Cargando…

OutcomeResultado

DeniedSin lugar

The Chamber denied the amparo because participation, disclosure, and formal processing of the plans were established, while technical, economic, and legality disputes over land-use restrictions belong in administrative or contentious-administrative proceedings.La Sala declaró sin lugar el amparo porque tuvo por acreditadas la participación, publicidad y tramitación formal de los planes, y remitió las controversias técnicas, patrimoniales y de legalidad sobre las restricciones territoriales a las vías administrativa o contencioso-administrativa.

SummaryResumen

The Constitutional Chamber denied the amparo filed against the Municipality of El Guarco and MINAE concerning the amended Regulatory Plan and preparation of the General Management Plan for the Río Navarro–Río Sombrero Protected Zone. It found that SINAC held community meetings, disclosed the plan and zoning map, allowed time for comments, and answered the submissions received; the plan also contained no expropriation provisions. As to the municipality, the Chamber verified compliance with the procedure established by Article 17 of the Urban Planning Law, including a public hearing, SETENA environmental approval, INVU technical approval, and official publication. The Chamber held that disputes over minimum subdivision areas, density, permitted uses, building conditions, retroactivity, proportionality, diminished property value, and possible compensation require technical evidence and review through administrative or contentious-administrative proceedings. Because those matters concern ordinary legality and administrative merits, and no direct, current, clearly attributable constitutional injury was established, constitutional amparo was not the appropriate avenue.La Sala Constitucional rechazó el amparo promovido contra la Municipalidad de El Guarco y el MINAE por la modificación del Plan Regulador y la elaboración del Plan General de Manejo de la Zona Protectora Río Navarro–Río Sombrero. Consideró acreditado que el SINAC realizó reuniones comunitarias, divulgó el plan y su mapa de zonificación, concedió un plazo para observaciones y respondió las consultas recibidas; además, el instrumento no contenía disposiciones expropiatorias. Respecto de la municipalidad, verificó el cumplimiento del procedimiento del artículo 17 de la Ley de Planificación Urbana, incluida la audiencia pública, la viabilidad ambiental de SETENA, la aprobación técnica del INVU y la publicación oficial. La Sala determinó que las controversias sobre áreas mínimas de fraccionamiento, densidad, usos permitidos, edificación, retroactividad, proporcionalidad, pérdida de valor y posibles indemnizaciones requieren análisis técnico y probatorio propio de la vía administrativa o contencioso-administrativa. No encontró una lesión constitucional directa, actual y claramente imputable que justificara la tutela por amparo.

Key excerptExtracto clave

Finally, regarding the claims concerning allegedly “disproportionate and retroactive restrictions” on exercising property rights, building, subdividing, or disposing of the land, as well as a possible economic impact arising from minimum subdivision areas, residential density per lot, or the financial consequences of land-use planning, this Court notes that, in substance, those arguments concern questions of ordinary legality and administrative merits: (i) the validity, scope, and interpretation of technical urban-planning and environmental rules; (ii) their compatibility with the applicable regulatory framework, including INVU guidelines and sector-specific regulations; (iii) the determination of subdivision parameters, permitted uses, and building conditions; (iv) possible effects on the value, utility, or use of the properties; and (v) entitlement to compensation or damages for particular burdens. All these matters require the evidentiary and technical analysis proper to administrative proceedings and, if the dispute persists, to the jurisdiction competent to review legality and potential state liability. It is not for this Chamber to replace the Administration or act as a general reviewing body for the expediency, advisability, or technical correctness of land-use planning instruments. Along the same lines, constitutional jurisdiction is not the appropriate avenue for determining in the abstract whether an urban-planning parameter is “insufficient” or “excessive,” or for deciding as the principal issue whether retroactivity or disproportionality exists as a matter of ordinary legality, when no direct, current, and clearly attributable injury is established that would, by itself, make amparo relief appropriate.Finalmente, en cuanto a los reclamos vinculados con supuestas “restricciones desproporcionadas y retroactivas” para ejercer el derecho de propiedad, construir, segregar o disponer de los terrenos, así como una eventual afectación patrimonial derivada de áreas mínimas de fraccionamiento, densidad habitacional por lote o consecuencias económicas del ordenamiento territorial, este Tribunal advierte que tales planteamientos, en lo sustancial, remiten a una discusión de legalidad y mérito administrativo: i) sobre la validez, alcance e interpretación de normas técnicas urbanísticas y ambientales; ii) sobre su compatibilidad con el marco reglamentario aplicable, incluidos los lineamientos del INVU y la normativa sectorial; iii) sobre la determinación de parámetros de fraccionamiento, usos permitidos y condiciones de edificación; iv) sobre eventuales efectos en el valor, utilidad o aprovechamiento de los inmuebles; y v) sobre la procedencia de compensaciones o indemnizaciones por cargas singulares. Todos estos aspectos demandan un análisis probatorio y técnico propio de las sedes administrativas y, de persistir la inconformidad, de la jurisdicción competente para el control de legalidad y la eventual responsabilidad patrimonial, sin que corresponda a esta Sala sustituir a la Administración ni fungir como instancia revisora general de oportunidad, conveniencia o acierto técnico de los instrumentos de planificación territorial. En esta misma línea, la jurisdicción constitucional no es la vía idónea para determinar, en abstracto, si un parámetro urbanístico resulta “insuficiente” o “excesivo”, ni para definir como cuestión principal la existencia de retroactividad o desproporción en términos de legalidad ordinaria, cuando no se acredita una lesión directa, actual y claramente imputable que, por sí misma, torne procedente el amparo.

Pull quotesCitas destacadas

  • "Esta circunstancia permite constatar que la Administración ha desplegado los mecanismos ordinarios de información y publicidad propios de los procedimientos de planificación urbana, los cuales se insertan en el ámbito de la legalidad ordinaria y de las potestades de ordenación territorial, mas no en el núcleo de derechos fundamentales cuya tutela inmediata no corresponda a esta jurisdicción constitucional."

    "This circumstance shows that the Administration deployed the ordinary information and disclosure mechanisms applicable to urban-planning procedures, which fall within ordinary legality and land-use planning powers rather than the core of fundamental rights warranting immediate protection by this constitutional jurisdiction."

    Considerando III

  • "Esta circunstancia permite constatar que la Administración ha desplegado los mecanismos ordinarios de información y publicidad propios de los procedimientos de planificación urbana, los cuales se insertan en el ámbito de la legalidad ordinaria y de las potestades de ordenación territorial, mas no en el núcleo de derechos fundamentales cuya tutela inmediata no corresponda a esta jurisdicción constitucional."

    Considerando III

  • "En efecto, la participación ciudadana en este tipo de procesos se articula primordialmente a través de los cauces específicos previstos en la legislación urbanística y municipal, de modo que eventuales inconformidades sobre la suficiencia, oportunidad o alcance de tales espacios de intervención deben ser examinadas por las vías administrativa o contencioso-administrativa, sin que resulte procedente su conocimiento en sede de amparo."

    "Indeed, public participation in this type of process is primarily conducted through the specific channels established by urban-planning and municipal legislation; therefore, disputes over the adequacy, timing, or scope of those opportunities for participation must be examined through administrative or contentious-administrative proceedings and are not properly heard in amparo."

    Considerando III

  • "En efecto, la participación ciudadana en este tipo de procesos se articula primordialmente a través de los cauces específicos previstos en la legislación urbanística y municipal, de modo que eventuales inconformidades sobre la suficiencia, oportunidad o alcance de tales espacios de intervención deben ser examinadas por las vías administrativa o contencioso-administrativa, sin que resulte procedente su conocimiento en sede de amparo."

    Considerando III

  • "A partir de lo anterior, al menos desde la perspectiva constitucional, no observamos que se haya violado el derecho fundamental a la participación ciudadana."

    "Based on the foregoing, at least from a constitutional perspective, we do not find that the fundamental right to public participation was violated."

    Razones adicionales de los magistrados Cruz Castro y Rueda Leal

  • "A partir de lo anterior, al menos desde la perspectiva constitucional, no observamos que se haya violado el derecho fundamental a la participación ciudadana."

    Razones adicionales de los magistrados Cruz Castro y Rueda Leal

  • "Se declara sin lugar el recurso. Los magistrados Cruz Castro y Rueda Leal dan razones adicionales."

    "The appeal is denied. Justices Cruz Castro and Rueda Leal provide additional reasons."

    Por tanto

  • "Se declara sin lugar el recurso. Los magistrados Cruz Castro y Rueda Leal dan razones adicionales."

    Por tanto

Full documentDocumento completo

Sections

Procedural marks

Document Review SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, at nine twenty in the morning on dieciseis de enero de dos mil veintiseis.

Amparo proceeding (recurso de amparo) processed under expediente No. 25- 035381-0007-CO, filed by [Nombre 001], identity card number [Valor 001], against the MUNICIPALIDAD DE EL GUARCO AND THE MINISTERIO DE AMBIENTE Y ENERGÍA.

Considering the Facts:

  1. 1By a written submission received by the Clerk’s Office of this Chamber on 12 de noviembre de 2025, the petitioner filed an amparo proceeding on behalf of [Nombre 002] against the MUNICIPALIDAD DE EL GUARCO AND THE MINISTERIO DE AMBIENTE Y ENERGÍA. The petitioner states that INDER granted land to persons who had historically inhabited the Zona Protectora Río Navarro – Río Sombrero, which belongs to the Área de Conservación Central-ACC of SINAC and near which the petitioner resides. The petitioner notes that residents who have inhabited the area for decades have regularly paid municipal taxes and land taxes, thereby recognizing the legal and legitimate existence of the properties. The petitioner states that the approval and implementation of the Municipal Regulatory Plan (Plan Regulador Municipal) established a restriction that increased the minimum subdivision (fraccionamiento) area from 120 square meters to 7000m², preventing the historical inhabitants from freely exercising their property rights, carrying out lot divisions (segregaciones), building homes, or disposing of their property like any other owner.The petitioner alleges that this decision was implemented without a public consultation process involving the communities historically settled in the area and without offering any compensation or indemnification for the loss of the land’s value or use. Furthermore, the measure is disproportionate, retroactive, and contrary to the principles of equality, legal certainty, and private property, thereby violating constitutional rights. Regarding SINAC, the petitioner states that it has processed the approval of the General Management Plan (Plan General de Manejo) for the Zona Protectora Río Navarro– Río Sombrero without ensuring an adequate public participation process in the preparation of that plan; public participation was particularly limited on the most sensitive issues, such as lot divisions and restrictions, making it a plan that was imposed rather than developed jointly with the population.The petitioner further states that the full contents of the plan have not been transparently disclosed in a timely manner and that the plan is currently not even publicly accessible for scrutiny, despite being only one month away from approval and publication in the official gazette La Gaceta. The petitioner considers this to constitute a threat to the fundamental rights of access to information, participation, and a healthy environment, while revealing the plan’s opacity and secrecy. The petitioner also states that, in its General Management Plan, SINAC threatens to expropriate landowners who have inhabited the area for decades, taking from farmers the land granted by INDER, as well as arbitrarily imposing minimum lot-division dimensions and the number of residences per lot without considering the population’s current distribution, much less its future distribution. This jeopardizes family assets and forces persons related by up to the third degree of kinship or consanguinity (children, grandchildren, nephews and nieces, etc.) to inhabit the land without legal certainty, informally and unlawfully, or alternatively forces a rural exodus to the city.The petitioner asserts that, with respect to provisions governing the protected zone (zona protectora), SINAC’s General Management Plan would replace the already-questioned Municipal Regulatory Plan. Although the General Management Plan is more flexible regarding minimum lot-division dimensions, it remains insufficient and would therefore violate the same rights already violated by the Regulatory Plan. For these reasons, the petitioner requests the intervention of this Court.
  2. 2By a ruling issued at 19:04 on 09 de noviembre de 2025, the present amparo proceeding was admitted for consideration.
  3. 3DAVID CHAVARRÍA MORALES, in his capacity as acting executive director of the Sistema Nacional de Áreas de Conservación (SINAC), states under oath as follows: “… FIRST: In compliance with the Chamber’s order, a report was requested from the Dirección del Área de Conservación Central, as the competent entity, which reported as follows: By official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1659-2025, dated 03 December 2025, the Oficina Subregional de Cartago del Área de Conservación Central (SINAC) reports the following for the relevant purposes before the Constitutional Chamber: FIRST: Mr. Mena contends that SINAC: • Failed to ensure an adequate citizen-participation process in preparing the General Management Plan (Plan General de Manejo, PGM). • Failed to disclose the plan’s complete contents transparently and in a timely manner. • Threatens to expropriate land from landowners and farmers who have resided there for decades. • Arbitrarily imposes minimum subdivision (segregación) dimensions and a maximum number of residences per lot, without considering the population’s circumstances or the preservation of family property. • The PGM would replace the Municipal Regulatory Plan, reproducing its violations of rights.SECOND: Regarding citizen participation in preparing the General Management Plan, the office head states that this process began in 2023 and included the participation of persons from different communities within the Zona Protectora Río Navarro Río Sombrero (ZP-RN-RS). It is reported that SINAC has endeavored to work, within the scope of its authority, with as many persons as possible. The annexes presented below show that, in 2023, a total of 04 meetings were held with associations and persons from different communities, involving a total of 95 people; the supporting records for this activity are attendance lists located at folios 01-02, 03-09, 30-32, 054-058. In 2024, no meetings were held with the communities because the legislation was being analyzed, for which purpose technical working groups were convened; and in 2025, 01 meeting was held with residents of communities within the ZP-RN-RS, representing a total of 140 persons.It should be noted that the working meetings with the communities were held to keep them informed of progress and also to define the focal management elements, a matter in which it is vitally important and essential that the communities themselves define those elements, with SINAC’s support. The technical working groups review the interinstitutional regulations of the various state entities having jurisdiction over the ZP. Notices posted at strategic locations, such as bus stops, grocery shops, schools, and churches, were used to publicize and convene the community meetings. The notices used are attached. As shown by the supporting records, persons from the community attended every meeting, thereby fulfilling an adequate citizen-participation process. See folios 017-023,033,102. It should also be noted that the invitation posters were circulated through text-messaging groups in the different communities.One of the general requests made by those who attended the meeting of 26 August was to be able to review the PGM and verify the specific location of their properties. To fulfill these requests and thereby disclose the PGM transparently for scrutiny by the general public, arrangements were made with the Municipalidad de EL Guarco so that citizens could access both the zoning map and the PGM on its website, thus providing broader access: https://experience.arcgis.com/experience/eb9c92a6c4fe4d459eecf7de 93040a2. This action was undertaken through official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1288-2025 FOLIOS 113-118. It should likewise be noted that, in 2025, following the meeting of 26 August, a period of 8 weeks was granted for individuals and various neighborhood associations to submit comments on the latest version of the General Management Plan (PGM). During that period, 02 inquiries were received from the following associations: Desarrollo Integral de Verde and Desarrollo Integral de la Luchita.A private individual also submitted a series of comments. Each association received a written response as follows: 1. The Asociación de Desarrollo Integral de Verde requested a copy of the PGM on 01 September, and a digital copy was sent to it on 05 September by institutional email through official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1299-2025 FOLIOS 119-121. 2. On 26 September, Mr. Wilberth Jiménez submitted a series of comments to the institutional email address [email protected]. Responses were provided on 03 October 2025 through official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1411-2025 FOLIOS 122- 134. 3. On 13 October 2025, the Asociación de Desarrollo Integral de la Luchita submitted, through the institutional email address [email protected], a series of comments concerning the PGM. These were reviewed by the head of the OSC, and responses were provided through official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1458-2025 FOLIOS 135-152.This amparo proceeding also states: “Likewise, he indicates that SINAC, in its General Management Plan, threatens to expropriate landowners who have lived in the area for decades, taking away the lands granted to farmers.” After reviewing the PGM document, this office head can affirm that the terms “Expropriate / Expropriation” are not mentioned anywhere in the document. Accordingly, the PGM is provided in digital format. THIRD: In this proceeding, Mr. Mena states that the management plan proposes arbitrarily imposing minimum subdivision dimensions and a maximum number of residences per lot without considering the population’s current distribution, much less its future distribution, thereby jeopardizing family property and thus forcing persons related by up to the third degree of kinship or consanguinity (children, grandchildren, nephews, nieces, etc.) to occupy the land without legal certainty, informally and unlawfully, or alternatively forcing a rural exodus to the city.Regarding this assertion, at every meeting held since 2023 with the communities of the ZP-RN-RS, this office head has stated that the PGM is a technical document compiling the different regulations currently in force and that it lacks legal authority to amend regulations, decrees, much less statutes. The minimum subdivision dimensions and number of properties comply with INVU regulations, as INVU is the entity authorized by law to define these matters. The entire analysis was conducted jointly with officials from that institution through the technical working groups. The dates of each working-group session are listed below, and the attendance lists are attached as supporting records:  17 June 2023 Folio 024  19 June 2023 Folio 025 05 September 2023 Folio 026  14 December 2023 Folio 059  20 August 2025 Folio 095. In addition to these working groups, INVU issued official letters DU-169-2024 AND DU-178-2024 concerning subdivision matters within the ZP- RS-RN.Folios 069-085. The regulations used to define the minimum subdivision dimensions and number of residences were Reglamento 6411 INVU, which remains in force as of today. It is abundantly clear that the minimum subdivision areas were defined through interinstitutional working processes conducted in accordance with the applicable regulations. FOURTH: Lastly, the amparo proceeding asserts that SINAC’s General Management Plan would replace the likewise previously challenged Municipal Regulatory Plan with respect to provisions governing the protected zone and that, although the General Management Plan is more flexible concerning minimum subdivision dimensions, it remains insufficient and would therefore violate the same rights already violated by the Regulatory Plan. This office head must state that a management plan for a protected wilderness area (área silvestre protegida) is the planning instrument used to guide the management of a protected wilderness area toward the fulfillment of its long-term conservation objectives.It is based on medium-term strategic lines of action and management objectives for the natural and cultural elements contained within the area, as well as on the relationship of those elements with their social and environmental surroundings. It serves as the basis for developing other planning and regulatory instruments for Protected Wilderness Areas. (Reglamento a la Ley de Biodiversidad, Art.3, Inc. p). In this case, the PGM is not more flexible; it is a more up-to-date instrument. The map was prepared using inputs that more faithfully reflect actual conditions in the field. Lastly, it should be noted that the PGM is the technical document that state institutions must consult before issuing any permit within the territories comprising the ZP-RN-RS. FIFTH: Based on the actions documented in official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1659-2025, SINAC maintains, in summary, that the process of preparing the General Management Plan (PGM) was participatory and transparent, as evidenced by the multiple community meetings held in 2023 and 2025, which were duly convened through notices posted at strategic locations and messaging groups and whose attendance records are included in the case file; that the PGM contains no expropriation provisions whatsoever, a fact that can be verified in the complete digital copy of the plan made available; that all land-use (uso del suelo) regulations, particularly the minimum subdivision dimensions and number of residences, strictly comply with the national regulations currently in force, specifically Reglamento 6411 del INVU, and were agreed upon through interinstitutional technical working groups with that entity’s formal participation, as demonstrated by official letters DU-169-2024 and DU-178-2024 and the attached working records; and, finally, that the PGM performs a technical conservation-planning function pursuant to Article 3 of the Ley de Biodiversidad, serving as a prior-consultation instrument for state institutions without replacing municipal regulatory authority, and that it was prepared using updated cartographic inputs that faithfully reflect actual territorial conditions.SIXTH: In view of the facts set forth and the attached documentation, it has been conclusively demonstrated that the Área de Conservación Central has at all times acted strictly within the scope of its legal and technical authority and that this institution has not violated any constitutional right.”.
  4. 4VÍCTOR MONESTEL TENCIO, HEYLIN CALDERON UREÑA, and MARTHA ELENA BOLAÑOS CERDAS, respectively mayor, president of the Municipal Council, and Urban Development Manager, all of the Municipalidad de El Guarco, report under oath and state as follows: “… FIRST. Regarding the appellant’s assertion: “That INDER granted land to persons who have historically inhabited La Zona Protectora Río Navarro – Río Sombrero, which belongs to the central conservation area – ACC of SINAC and near which he resides. He states that the residents who have inhabited the area for decades have regularly paid municipal taxes and property taxes, thereby recognizing the legal and legitimate existence of the properties.” The appellant is correct in stating that the former Instituto de Tierras y Colonización (ITCO), now Instituto de Desarrollo Rural (INDER), during the seventies, distributed property XXX, which belonged to that institute, among residents of the area who were beneficiaries; they were granted the real right of possession (derecho real de posesión), thus regularizing the property into parcels eligible for registration in the Registro Nacional and requiring the owners, as taxpayers of this municipal corporation, to pay real property taxes and municipal fees.It should be noted that, following the transformation of ITCO into the Instituto de Desarrollo Agrario (IDA), on 3 de marzo de 1984 the Zona Protectora Río Navarro – Río Sombrero was legally established by executive decree Decreto Nº 15436-MAG. SECOND. Regarding the assertion: “With the approval and implementation of the Municipal Zoning Plan (Plan Regulador Municipal), a restriction was established that increased the minimum subdivision (fraccionamiento) area from 120 metros cuadrados to 7000 metros cuadrados, preventing the long-standing residents from freely exercising their property rights,” in response to this allegation, this municipal corporation was required to comply with the regulations governing the Zona Protectora Río Navarro-Río Sombrero, including the amendment of the Zoning Plan based on the observations and recommendations issued by INVU in document DU-188-06-2024. Through document MG-SM-ACUER-118-2024, the administration was informed of Agreement 115DA concerning approval of the Report of the Special Zoning Plan Committee, which recommended, among other things, the inclusion of Article 10.8 in the building regulations—correctly understood as the zoning regulations.That article regulates the protected zone (zona protectora) insofar as the area does not have the proper management plan (plan de manejo) prepared by SINAC. THIRD. The appellant alleges that this Municipality implemented the Zoning Plan without the required public consultation process, which is untrue, since the process for preparing zoning plans is established in numeral 17 of the Ley de Planificación Urbana, which requires municipalities to comply with the following: “Article 17.- Before implementing a zoning plan or any part thereof, the municipality seeking to do so shall:1) Convene a public hearing through the Diario Oficial and any additional necessary publicity, specifying the location, date, and time for consideration of the project and of any oral or written observations that residents or interested parties may wish to submit. Notice shall be given no less than fifteen business days in advance;2) Obtain approval from the Dirección de Urbanismo if the project did not originate in that office or differs from the proposal made by that office, without prejudice to the remedies established in Article 13;3) Formally approve its adoption by an absolute majority vote; and4) Publish in “La Gaceta” notice of the approved adoption, indicating the date from which the corresponding regulations shall become enforceable. The foregoing requirements shall likewise be observed when the referenced plan or any of its regulations is to be amended, suspended, or repealed, in whole or in part.” Accordingly, at ordinary session 135-2022 held on 31 de enero de 2022, the Concejo Municipal approved the Regulations for the In-Person and Virtual Public Hearing on the Proposed Amendment to the El Guarco Zoning Plan. Subsequently, in Supplement No. 204 to La Gaceta No. 183 of martes 27 de septiembre del 2022, Agreement number 802 from ordinary session number 180-2022 of 5 de septiembre de ese año was published, through which the Concejo Municipal de El Guarco definitively approved the Notice of Public Hearing to Present the Proposed Amendment to the El Guarco Zoning Plan. The aforementioned supplement contains the agenda and the publications made in nationally circulated media. At special session number 190 – 2022, the public hearing was approved after the legal requirements had been met. On 24 de octubre de 2024, in official letter DU-346-10-2024, Licda. Hilda Carvajal Bonilla, Head of the Departamento de Urbanismo del Instituto Nacional de Vivienda y Urbanismo, informed us: “It is hereby reported that, upon receipt of the information entitled: Amendment to the El Guarco Urban Zoning Plan, prepared and proposed by the Municipalidad de El Guarco, it was concluded that it satisfactorily addresses the observations stated in official letter DU-188-06-2023; furthermore, it has the environmental feasibility resolution (Resolución de viabilidad ambiental) granted by SETENA through resolution N°109-2022-SETENA and a Public Hearing pursuant to Supplement 204 to La Gaceta 183 of martes 27 de setiembre de 2022. Based on the foregoing, the Departamento de Urbanismo approves the proposed amendment to the urban zoning plan for the canton of El Guarco, province of Cartago. The Municipality is urged to proceed as specified in Article 17 of the Ley de Planificación Urbana regarding its adoption by the Concejo Municipal through an absolute majority vote and the publication in the Diario oficial La Gaceta of the proposed amendment to the cantonal urban zoning plan, which was approved by this Department through this official letter.” It should be noted that the cited official letter is attached to this response as evidence to assist in adjudicating the matter. The Zoning Plan for the Canton of El Guarco was published in Supplement 192 to La Gaceta 224 of 28 de noviembre de 2024. Therefore, based on the arguments presented, we request that the allegations be dismissed because there has been no violation of constitutional rights such as private property, legal certainty, and equality. FOURTH. With respect to the appellant’s statements concerning the General Management Plan (Plan General de Manejo) for the Zona Protectora Río Navarro – Río Sombrero, this matter falls within the jurisdiction of the Sistema Nacional de Áreas de Conservación and the Ministerio de Ambiente y Energía; we therefore declare that we lack jurisdiction because it is beyond the scope of our authority. It should be emphasized that this report is signed by the President of the Concejo Municipal and the Urban Development Manager because the Sala Constitucional so requested. Nevertheless, it must be clarified that the matter before us, raised by the appellant through the submitted official letters, has not yet been considered by this collegiate body, as it is being processed administratively and, at the appropriate time and in accordance with the procedural stages, will be referred to the Concejo Municipal for the corresponding action. FIFTH: The appellant states: “Given that the plan is not even currently publicly accessible for scrutiny.” This assertion is likewise false, since the Municipality has posted the Zoning Plan on its website, as shown below and as may be verified at the following link: https://muniguarco.go.cr/wpfd_file/plan-regulador-canton-de-el-guarco/ (image inserted) …”. “… That webpage is accessible to any citizen; the documents concerning the regulations may be downloaded, and the plan maps may be accessed at the following link: https://muniguarco.go.cr/geoportal/ (image inserted) ...”.”.
  5. 5The legal requirements have been observed in the proceedings conducted.

Magistrate Hess Herrera drafts the decision; and,

Whereas:

I. SUBJECT MATTER OF THE APPEAL

The appellant seeks a ruling from this Court granting the appeal and ordering the Municipalidad de El Guarco and SINAC to nullify or suspend implementation of the Municipal Zoning Plan and the General Management Plan for the Zona Protectora Río Navarro–Río Sombrero, on the grounds that they were approved without consultation or effective citizen participation, without transparency or access to information, and because they impose restrictions, thereby seeking protection of the rights to private property, equality, legal certainty, citizen participation, access to information, and a healthy environment.

II- PROVEN FACTS. The following facts are deemed duly proven and relevant to the adjudication of this matter:

Regarding the Sistema Nacional de Áreas de Conservación (SINAC):

  • a)In 2023, SINAC began the process of preparing the General Management Plan (PGM) for the Zona Protectora Río Navarro–Río Sombrero, with the participation of local communities (see report submitted under oath and attached evidence).
  • b)On 17 y 19 de junio de 2023, interinstitutional technical working sessions were held with INVU concerning subdivision and land use (uso del suelo) (see report submitted under oath and attached evidence).
  • c)On 05 de setiembre de 2023, another technical working session was held with INVU (see report submitted under oath and attached evidence).
  • d)On 14 de diciembre de 2023, another interinstitutional technical working session was held (see report submitted under oath and attached evidence).
  • e)In 2023, four community meetings were held with the participation of approximately 95 persons from various communities in the area (see report submitted under oath and attached evidence).
  • f)In 2024, no community meetings were held; the PGM was analyzed through technical working sessions and a review of the applicable regulations (see report submitted under oath and attached evidence).
  • g)On 20 de agosto de 2025, an additional technical working session was held with the participation of INVU (see report submitted under oath and attached evidence).
  • h)On 26 de agosto de 2025, a community meeting was held with approximately 140 persons in attendance; residents requested access to the PGM and the zoning maps (mapas de zonificación) (see report submitted under oath and attached evidence).
  • i)After 26 de agosto de 2025, a period of eight weeks was granted for the submission of observations concerning the PGM (see report submitted under oath and attached evidence).
  • j)On 01 de setiembre de 2025, the Asociación de Desarrollo Integral de Verde requested a copy of the PGM (see report submitted under oath and attached evidence).
  • k)On 05 de setiembre de 2025, SINAC sent a digital copy of the PGM to that association (see report submitted under oath and attached evidence).
  • l)On 26 de setiembre de 2025, Mr. Wilberth Jiménez submitted observations concerning the PGM (see report submitted under oath and attached evidence).
  • m)On 03 de octubre de 2025, SINAC responded in writing to Mr. Jiménez’s observations (see report submitted under oath and attached evidence).
  • n)On 13 de octubre de 2025, the Asociación de Desarrollo Integral de La Luchita submitted observations concerning the PGM (see report submitted under oath and attached evidence).
  • o)In octubre de 2025, SINAC formally responded to that association’s observations (see report submitted under oath and attached evidence).
  • p)On 03 de diciembre de 2025, the Oficina Subregional de Cartago del SINAC issued official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1659-2025, informing this Chamber about the participatory process, the absence of expropriation provisions in the PGM, and the alignment of the regulations with INVU regulations (see report submitted under oath and attached evidence).

Regarding the Municipalidad de El Guarco:

  • a)On 03 de marzo de 1984, the Zona Protectora Río Navarro–Río Sombrero was formally created by Decreto Ejecutivo N.° 15436-MAG (see sworn report and attached evidence).
  • b)On 31 de enero de 2022, at ordinary session N.° 135-2022, the Municipal Council approved the Reglamento de Audiencia Pública presencial y virtual para la modificación del Plan Regulador (see sworn report and attached evidence).
  • c)On 27 de setiembre de 2022, in Alcance N.° 204 to La Gaceta N.° 183, the resolution convening a Public Hearing for the amendment of the Regulatory Plan (Plan Regulador) was published (see sworn report and attached evidence).
  • d)In 2022, the public hearing was held in accordance with the requirements of Article 17 of the Ley de Planificación Urbana (see sworn report and attached evidence).
  • e)According to document DU-188-06-2024 (2024), INVU issued technical observations concerning the regulation of the Zona Protectora (see sworn report and attached evidence).
  • f)On 24 de octubre de 2024, through official communication DU-346-10-2024, INVU approved the amendment to the Urban Regulatory Plan of the canton of El Guarco after verifying compliance with the observations, environmental approval, and the public-hearing requirement (see sworn report and attached evidence).
  • g)On 28 de noviembre de 2024, in Alcance N.° 192 of La Gaceta N.° 224, the amendment to the Regulatory Plan of the canton of El Guarco was officially published (see sworn report and attached evidence).
  • h)The municipal corporation was required to comply with the regulations governing the Zona Protectora Río Navarro-Río Sombrero, including page 3 of 8 of the amendment to the Regulatory Plan based on the observations and recommendations issued by INVU in document DU-188-06-2024. Likewise, through document MG-SM-ACUER-118-2024, the administration was informed of Acuerdo 115DA concerning the approval of the Report of the Special Regulatory Plan Commission, which recommended, among other things, the inclusion of Article 10.8 in the building regulations—properly read as the zoning regulations. That article governs the protected zone (see sworn report and attached evidence).
  • i)In 2025, the respondent Municipality continued to make the Regulatory Plan, its regulations, and zoning maps publicly available on its website and geoportal (see sworn report and attached evidence).

III. THE SPECIFIC CASE

From a comprehensive examination of the subject matter of the amparo proceeding (recurso de amparo), the facts that this Court deems duly established, and the evidence entered into the record, it is concluded that the amparo must be denied because no unlawful, arbitrary, or omissive action attributable to the respondent authorities has been established that currently and directly infringes the fundamental rights invoked.

First, as concerns SINAC, it has been established that the process of preparing the General Management Plan (Plan General de Manejo, PGM) for the Zona Protectora Río Navarro–Río Sombrero began in 2023 and included mechanisms for participation and communication with local communities through community meetings (four in 2023 and one in 2025) convened through local outreach and messaging channels, as well as an eight-week period for submitting observations, during which written submissions from development associations and a private individual were received and addressed. It was also established that the PGM was made available digitally and that, to expand access, arrangements were made for its publication, together with the cartographic materials, on a municipal website, thereby facilitating public scrutiny. It was likewise established that SINAC, acting within the scope of its authority, explained that the PGM constitutes a technical planning instrument intended to guide the management of a protected wildlife area (área silvestre protegida) and to serve as a reference for consultation by other public institutions, without this, in itself, entailing the automatic displacement of municipal regulatory powers.

The document also contains no expropriation provisions and does not employ expropriation terminology, which disproves the existence of a definite and imminent threat in that regard under the standard required by constitutional jurisdiction for finding a current injury or a real and verifiable risk.

Second, with respect to the Municipalidad de El Guarco, it has been established that the amendment to the Regulatory Plan was processed under the procedure prescribed by Article 17 of the Ley de Planificación Urbana, including approval of the regulations governing the public hearing, official publication of the notice in La Gaceta, holding the corresponding hearing, obtaining environmental approval from SETENA, and securing technical approval from INVU, followed finally by publication of the instrument in the official gazette. Thus, the formal process for the adoption and publication of the Regulatory Plan is duly supported by the record.

Within this framework, it has also been established that the municipal corporation was legally required to harmonize its regulations with the specific rules governing the Zona Protectora Río Navarro–Río Sombrero by incorporating the technical observations and recommendations made by INVU in document DU-188-06-2024, and to implement Acuerdo 115DA, communicated through official communication MG-SM-ACUER-118-2024, which approved the report of the Special Regulatory Plan Commission recommending, among other matters, the inclusion of Article 10.8 in the zoning regulations, a provision intended expressly to regulate the protected zone while it lacked the corresponding management plan (plan de manejo).

It was further established that the municipal corporation continuously makes the Regulatory Plan, its regulations, and zoning maps available on its digital platform and institutional geoportal; these instruments constitute the regulatory and technical basis for local land-use planning (ordenamiento territorial). This circumstance demonstrates that the Administration has implemented the ordinary information and public-disclosure mechanisms applicable to urban-planning procedures, which fall within the sphere of ordinary legality and land-use planning powers, rather than within the core of fundamental rights warranting immediate protection by this constitutional jurisdiction. Indeed, public participation in these types of proceedings is primarily conducted through the specific channels prescribed by urban-planning and municipal legislation. Accordingly, any disagreements concerning the adequacy, timing, or scope of such opportunities for participation must be examined through administrative or contentious-administrative proceedings, and may not properly be adjudicated in an amparo proceeding.

Finally, regarding the claims concerning allegedly “disproportionate and retroactive restrictions” on exercising the right to property or on building, subdividing, or disposing of the land, as well as any potential economic harm arising from minimum subdivision (fraccionamiento) areas, residential density per lot, or the economic consequences of land-use planning, this Court observes that these arguments essentially concern questions of ordinary legality and administrative merits: i) the validity, scope, and interpretation of technical urban-planning and environmental regulations; ii) their compatibility with the applicable regulatory framework, including INVU guidelines and sector-specific regulations; iii) the determination of subdivision parameters, permitted uses, and building conditions; iv) potential effects on the value, usefulness, or utilization of real property; and v) entitlement to compensation or damages for particular burdens.

All these matters require the evidentiary and technical analysis proper to administrative proceedings and, should the disagreement persist, to the jurisdiction competent to review legality and adjudicate potential governmental liability. It is not for this Chamber to replace the Administration or to act as a general reviewing body regarding the expediency, advisability, or technical soundness of land-use planning instruments. Along the same lines, constitutional jurisdiction is not the appropriate forum for determining in the abstract whether an urban-planning parameter is “insufficient” or “excessive,” or for deciding, as the principal issue, whether retroactivity or disproportionality exists as a matter of ordinary legality, when no direct, current, and clearly attributable injury has been established that would, in itself, render the amparo appropriate.

IV. ADDITIONAL REASONS OF JUSTICES CRUZ CASTRO AND RUEDA LEAL

In this case, the report of the acting executive director of the Sistema Nacional de Áreas de Conservación states:

“It is reported that SINAC has endeavored to work, within the scope of its authority, with as many people as possible. The annexes presented below show that, in 2023, a total of 04 meetings were held with associations and individuals from different communities, involving a total of 95 people. The verification records for this activity are attendance lists located on folios 01-02, 03-09, 30-32, 054-058. In 2024, no meetings were held with the communities because the analysis concerned legislation, for which technical working groups (mesas de trabajo técnicas) were convened; and in 2025, 01 meeting has been held with residents of communities in the ZP-RN-RS, involving a total of 140 people. It should be noted that the working meetings with the communities were held to keep them informed of progress and also to define the focal management elements (elementos focales de manejo), a process in which it is vitally important and essential that the communities themselves define those elements, with SINAC’s support.

The technical working groups review the interinstitutional regulations of the various state entities having jurisdiction over the ZP. To announce the meetings with the communities, signs were posted in strategic locations such as bus stops, neighborhood grocery stores, schools, and churches. The signs used are attached. As shown by the verification records, members of the community attended every meeting, thereby fulfilling an appropriate citizen-participation process (proceso de participación ciudadana). See folios 017-023,033,102. It should also be noted that the invitation posters were circulated through text-messaging groups in the various communities. One of the general requests made by the people who attended the meeting of 26 de agosto was to be able to review the General Management Plan (Plan General de Manejo, PGM) and verify the specific location of their properties. To fulfill these requests and thereby disseminate the PGM transparently for public scrutiny, arrangements were made with the Municipalidad de EL Guarco so that the public could access both the zoning map (mapa de zonificación) and the PGM through its website, thereby achieving broader reach: https://experience.arcgis.com/experience/eb9c92a6c4fe4d459eecf7de 93040a2.

This action was carried out through official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1288-2025, FOLIOS 113-118. It should likewise be noted that, in 2025, following the meeting of 26 de agosto, a period of 8 weeks was provided for individuals and various neighborhood associations to submit comments on the latest version of the PGM. During that period, 02 inquiries were received from the following associations: Desarrollo Integral de Verde and Desarrollo Integral de la Luchita. A private individual also submitted a series of comments. Each association received a written response as follows: 1. La Asociación de Desarrollo Integral de Verde requested a copy of the PGM on 01 de setiembre, and a digital copy was sent to it on 05 de setiembre via institutional email through official letter CARTA-SINAC-ACC-DR-DRFVS-OSC-1299-2025, FOLIOS 119-121 …” Based on the foregoing, at least from a constitutional perspective, we do not find that the fundamental right to citizen participation (derecho fundamental a la participación ciudadana) was violated.

V. DOCUMENTATION SUBMITTED TO THE CASE FILE (DOCUMENTACIÓN APORTADA AL EXPEDIENTE)

The parties are hereby advised that, if they submitted any paper document, as well as any objects or evidence contained on any additional electronic, computer, magnetic, optical, or telematic device, or produced through new technologies, they must retrieve them from the court within a maximum period of 30 business days following notification of this judgment. Otherwise, any material not retrieved within that period shall be destroyed, pursuant to the "Reglamento sobre Expediente Electrónico ante el Poder Judicial", approved by the Corte Plena at session N° 27-11 of 22 de agosto del 2011, article XXVI, and published in Boletín Judicial number 19 of 26 de enero del 2012, as well as the agreement approved by the Consejo Superior del Poder Judicial at session N° 43-12 held on 3 de mayo del 2012, article LXXXI.

Por tanto:

The appeal (recurso) is denied. Magistrates Cruz Castro and Rueda Leal provide additional reasons.

Fernando Castillo V.

President Fernando Cruz C.

Paul Rueda L.

Luis Fdo. Salazar A.

Jorge Araya G.

Anamari Garro V.

Ingrid Hess H.

Telephone numbers: 2549-1500 / 800-SALA-4TA (800-7252-482). Fax: 2220-4607 / 2220-4844. Website: www.poder-judicial.go.cr/salaconstitucional. Address: (Sabana Sur, Calle Morenos, 100 mts. south of the iglesia del Perpetuo Socorro).

Secciones

Marcadores

Revisión del Documento SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del dieciseis de enero de dos mil veintiseis .

Recurso de amparo que se tramita en expediente No. 25- 035381-0007-CO, interpuesto por [Nombre 001], cédula de identidad [Valor 001], contra la MUNICIPALIDAD DE EL GUARCO Y EL MINISTERIO DE AMBIENTE Y ENERGÍA.

Resultando:

  1. 1Por escrito recibido en la Secretaría de esta Sala el 12 de noviembre de 2025, la parte recurrente interpone recurso de amparo a favor de [Nombre 002] contra la MUNICIPALIDAD DE EL GUARCO Y EL MINISTERIO DE AMBIENTE Y ENERGÍA. Manifiesta que el INDER otorgó terrenos a personas que históricamente habitaban la Zona Protectora Río Navarro – Río Sombrero, perteneciente a la Área de Conservación Central-ACC del SINAC y del cual es vecino. Señala que los vecinos que habitan desde hace décadas la zona han pagado los impuestos municipales y tributos territoriales regularmente, reconociendo la existencia legal y legítima de las fincas. Indican que con la aprobación y aplicación del Plan Regulador Municipal, se estableció una restricción que aumentó el área mínima de fraccionamiento de 120 metros cuadrados a 7000m², impidiendo a los habitantes históricos ejercer libremente su derecho de propiedad, realizar segregaciones, construir viviendas o disponer de sus bienes como cualquier otro propietario.Alega que tal decisión se aplicó sin proceso de consulta ciudadana con las comunidades históricamente asentadas en la zona y sin ofrecer compensación ni indemnización alguna por la pérdida de valor o uso de los terrenos. Además, dicha medida resulta desproporcionada, retroactiva y contraria a los principios de igualdad, seguridad jurídica y propiedad privada, violentando derechos constitucionales. En cuanto al SINAC, indica que ha tramitado la aprobación del Plan General de Manejo de la Zona Protectora Río Navarro– Río Sombrero sin garantizar un proceso adecuado de participación ciudadana en la conformación de dicho plan, siendo en los puntos más delicados como segregaciones y restricciones la poca participación ciudadana siendo así un plan más impuesto que conformado en conjunto con la población. Continúa señalando que tampoco se ha divulgado de forma transparente el contenido completo del plan en tiempo adecuado, siendo que actualmente siquiera está de acceso público para escrutinio dicho plan a escaso mes de su aprobación y publicación en el diario oficial La Gaceta, lo que considera que constituye una amenaza a los derechos fundamentales de acceso a la información, participación y a un ambiente sano dejando en evidencia la opacidad y secretismo del mismo.Asimismo, señala que el SINAC amenaza en su Plan General de Manejo con expropiar a terratenientes con décadas de habitar la zona, quitando a los agricultores las tierras dadas por el INDER, así como imponer de forma arbitraria las dimensiones mínimas de segregaciones y cantidad de residencias por lote sin tomar en cuenta la distribución actual de la población, ni mucho menos la futura que ve el patrimonio familiar vulnerado, obligando así a personas con hasta tercer grado de parentesco o consanguinidad (hijos, nietos, sobrinos, etc), a habitar las tierras sin seguridad jurídica, en la informalidad e ilegalidad, u obligando también el éxodo rural a la ciudad. Afirma que el Plan General de Manejo del SINAC vendría a sustituir en cuanto a disposiciones de la zona protectora el también ya cuestionado Plan Regulador Municipal, que aunque el Plan General de Manejo viene más flexible a dimensiones mínimas de segregaciones, sigue siendo insuficiente por lo que vulneraría los mismos derechos que ya vulnera el Plan Regulador. Por tales motivos, solicita la intervención de este Tribunal.
  2. 2Por resolución de las 19:04 horas del 09 de noviembre de 2025, se le dio curso al presente recurso de amparo.
  3. 3Informa bajo juramento DAVID CHAVARRÍA MORALES, en su condición de director ejecutivo a.i. del Sistema Nacional de Áreas de Conservación (SINAC), quien manifiesta lo siguiente: “… PRIMERO: En atención al mandato de la Sala, se procedió a solicitar informe a la Dirección del Área de conservación central como ente competente informando lo siguiente: Mediante el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1659-2025, de fecha 03 de diciembre de 2025, la Oficina Subregional de Cartago del Área de Conservación Central (SINAC) informa lo siguiente, para los fines pertinentes ante la Sala Constitucional: PRIMERO: Que el señor Mena sostiene que el SINAC: • No garantizó un proceso adecuado de participación ciudadana en la elaboración del PGM. • No divulgó de manera transparente y oportuna el contenido completo del plan. • Amenaza con expropiar tierras a terratenientes y agricultores con décadas de residencia. • Impone dimensiones mínimas de segregación y cantidad de residencias por lote de forma arbitraria, sin considerar la realidad poblacional ni la preservación del patrimonio familiar. • El PGM vendría a sustituir al Plan Regulador Municipal, reproduciendo sus vulneraciones a los derechos.SEGUNDO: En cuanto a la participación ciudadana en la elaboración del Plan General de Manejo, la jefatura indica que este proceso se inició en el año 2023 en el cual se contó con la participación de personas de diferentes comunidades de la Zona Protectora Río Navarro Río Sombrero (ZP-RN-RS). Se informa que el SINAC ha velado y esforzado por trabajar con la mayoría de las personas que ha sido posible, dentro de sus competencias. En los anexos que se presentan a continuación se evidencia que en los años 2023, se realizaron un total de 04 reuniones con asociaciones y personas de diferentes comunidades para un total de 95 personal, los verificadores de esta actividad son listas de asistencia que se ubican en los folios 01-02, 03-09, 30-32, 054-058; en el año 2024 no hubo reuniones con las comunidades, dado que el análisis se hizo legislación y para esto se trabajó en mesas de trabajo técnicas y para el 2025 se han efectuado 01 reunión con vecinos de comunidades de la ZP-RN-RS, lo que represento un total 140 personas.Se debe indicar que en las reuniones de trabajo con las comunidades se hicieron para mantenerlos informados sobre los avances y también para definir los elementos focales de manejo, situación en donde es de vital importancia e indispensable que sean las comunidades quienes los definan, con el apoyo de SINAC. En las mesas de trabajo técnicas lo que se realiza es la revisión de las normativas interinstitucional de los diferentes entes estatales que tienen injerencia sobre la ZP. Para la convocatoria a las reuniones con las comunidades, se utilizó como medio de divulgación, rótulos colocados en lugares estratégicos como: Paradas de autobuses, pulperías, escuelas e iglesias. Se adjuntan los rótulos que se utilizaron. Como lo indican los verificadores en todas las reuniones hubo presencia de personas de la comunidad, cumpliéndose así un proceso adecuado de participación ciudadana. Ver folios 017-023,033,102.También se debe indicar que los afiches de invitación se circularon mediante grupos de mensajería de textos en las diferentes comunidades. Una de las peticiones generales de las personas que fueron a la reunión del 26 de agosto, era poder analizar el PGM y poder constatar la ubicación especifica de sus inmuebles. Con el fin de poder cumplir estas peticiones y así poder divulgar el PGM de forma transparente para escrutinio del público en general, se coordinó con la municipalidad de EL Guarco para que, en su página web, la ciudadanía tuviera acceso tanto al mapa de zonificación como el PGM y así tener un mayor alcance, https://experience.arcgis.com/experience/eb9c92a6c4fe4d459eecf7de 93040a2 Esta acción se realizó mediante el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1288-2025 FOLIOS 113-118. Así mismo cabe indicar que en año 2025, después de la reunión del 26 de agosto se dio un plazo de 8 semanas, para que las personas y diferentes asociaciones de vecinos, presentaran observaciones a la última versión del Plan General de Manejo (PGM).Durante ese periodo de tiempo se recibieron 02 consulta de parte de las siguientes asociaciones: Desarrollo Integral de Verde, Desarrollo Integral de la Luchita. Así mismo un usuario particular presentó una serie de observaciones. A cada asociación se le dio respuesta por escrito de la siguiente manera: 1. La Asociación de Desarrollo Integral de Verde, solicito copia del PGM el 01 de setiembre y se le envió copia en formato digital, el día 05 de setiembre vía correo institucional mediante el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1299-2025 FOLIOS 119-121. 2. El señor Wilberth Jiménez presenta el 26 de setiembre, una serie de observaciones al correo institucional [email protected]. A las mismas se le dan respuesta, el día 03 de octubre del 2025, mediante el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1411-2025 FOLIOS 122- 134. 3. La Asociación de Desarrollo Integral de la Luchita, el 13 de octubre del 2025, presentó vía correo institucional de [email protected].Una serie de observaciones sobre el PGM. Las cuales fueron revisadas por la jefatura de la OSC, las respuestas a las mismas se dieron mediante el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1458-2025 FOLIOS 135-152 También referente a este recurso, en el mismo se indica “Asimismo, señala que el SINAC amenaza en su Plan General de Manejo con expropiar a terratenientes con décadas de habitar la zona, quitando a los agricultores las tierras dadas. Una vez analizado el documento del PGM esta jefatura, puede afirmar que en ninguna parte del documento se hace mención de los términos Expropiar / Expropiación. Para lo cual se hace entrega del PGM en formato digital TERCERO: En este recurso el señor Mena manifiesta. Que el plan de manejo propone imponer de forma arbitraria las dimensiones mínimas de segregaciones y cantidad de residencias por lote sin tomar en cuenta la distribución actual de la población, ni mucho menos la futura que ve el patrimonio familiar vulnerado, obligando así apersonas con hasta tercer grado de parentesco o consanguinidad (hijos, nietos, sobrinos, etc), a habitar las tierras sin seguridad jurídica, en la informalidad e ilegalidad, u obligando también el éxodo rural a la ciudad.Concerniente a esta afirmación, esta jefatura en cada una de las reuniones sostenidas ante las comunidades de ZP-RN-RS desde el 2023, ha manifestado que el PGM es un documento técnico, que hace un recopilatorio de la diferente normativa vigente y que no posee la capacidad legal para modificar reglamentos-decretos ni mucho menos leyes. Las dimensiones mínimas de segregación y cantidad de inmuebles se ajustan a la normativa del INVU, que es el ente autorizado por ley para definir estas acciones, todo el análisis se hizo en conjunto con funcionarios de esta institución en las mesas técnicas de trabajo, a continuación, se mencionan las fechas de cada mesa y se adjuntas las listas de asistencia como verificador  17 de junio 2023 Folio 024  19 de junio 2023 Folio 025 05 de setiembre 2023 Folio 026  14 de diciembre 2023 Folio 059  20 de agosto del 2025 Folio 095 Complementariamente a estas mesas de trabajo, el INVU emitió los oficios DU-169-2024 Y DU-178-2024, referentes a temas de fraccionamiento en la ZP- RS-RN.Folios 069-085. La normativa que se utilizó para definir dimensiones mínimas de segregaciones y cantidad de residencias fue Reglamento 6411 INVU, la cual está vigente al día de hoy. Queda más que claro que la definición de las áreas mínimas de segregaciones fueron procesos de trabajo interinstitucional y apegados a la normativa. CUARTO: Por último, el recurso de amparo, Afirma que el Plan General de Manejo del SINAC vendría a sustituir en cuanto a disposiciones de la zona protectora el también ya cuestionado Plan Regulador Municipal que, aunque el Plan General de Manejo viene más flexible a dimensiones mínimas de segregaciones, sigue siendo insuficiente por lo que vulneraría los mismos derechos que ya vulnera el Plan Regulador. Esta jefatura debe indicar que un plan de manejo de un área silvestre protegida es el instrumento de planificación que permite orientar la gestión de un área silvestre protegida hacia el cumplimiento de sus objetivos de conservación a largo plazo.Se fundamenta en líneas de acción estratégicas a mediano plazo y en objetivos de manejo para los elementos naturales y culturales incluidos dentro del área, así como en la relación de estos últimos con su entorno socio ambiental. Es la base para el desarrollo de otros instrumentos de planificación y reglamentación de las Áreas Silvestres Protegidas. (Reglamento a la Ley de Biodiversidad, Art.3, Inc. p). En este caso el PGM no es más flexible, es instrumento más actualizado, el caso del mapa es realizado con insumos que vienen demostrar más fiel la realidad en el campo. Por último, se debe de indicar que el PGM de manejo es el documento técnico que las instituciones del estado deben de consultar previo a emitir algún permiso dentro de los territorios que comprenden la ZP-RN-RS. QUINTO: Con fundamento en las actuaciones documentadas en el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1659-2025, el SINAC sostiene de manera integral que el proceso de elaboración del Plan General de Manejo (PGM) se caracterizó por ser participativo y transparente, lo cual se evidencia con la realización de múltiples reuniones comunitarias en 2023 y 2025, debidamente convocadas mediante rótulos en lugares estratégicos y grupos de mensajería, y cuyas actas de asistencia obran en el expediente; que el PGM en ningún momento contiene disposiciones expropiatorias, extremo que puede ser verificado en la copia digital integral del plan puesta a disposición; que todas las regulaciones sobre uso del suelo, en particular las dimensiones mínimas de segregación y cantidad de residencias, se ajustan estrictamente a la normativa nacional vigente, específicamente al Reglamento 6411 del INVU, y fueron consensuadas en mesas técnicas interinstitucionales con la participación formal de dicha entidad, como lo demuestran los oficios DU-169-2024 y DU-178-2024 y las actas de trabajo adjuntas; y, finalmente, que el PGM cumple una función técnica y de planificación para la conservación, conforme al Artículo 3 de la Ley de Biodiversidad, actuando como un instrumento de consulta previa para las instituciones estatales y sin sustituir la competencia normativa municipal, habiéndose elaborado con insumos cartográficos actualizados que reflejan fielmente la realidad territorial.SEXTO: En atención a los hechos expuestos y a la documentación adjunta, se demuestra de manera fehaciente que el área de conservación central ha actuado en todo momento dentro del estricto marco de sus competencias legales y técnicas, no existiendo vulneración de ningún derecho constitucional por parte de esta institución.”.
  4. 4Informan bajo juramento VÍCTOR MONESTEL TENCIO, HEYLIN CALDERON UREÑA y MARTHA ELENA BOLAÑOS CERDAS, por su orden alcalde, presidenta del Concejo y gestora de Desarrollo Urbano, todos de la Municipalidad de El Guarco, quienes manifiestan lo siguiente: “… PRIMERO. Respecto a lo indicado por el recurrente en cuanto: “Que el INDER otorgó terrenos a personas que históricamente habitan La Zona Protectora Río Navarro – Río Sombrero, pertenecientes a el área de conservación central – ACC del SINAC y del cual es vecino. Señala que los vecinos que habitan desde hace décadas la zona han pagado los impuestos municipales y tributos territoriales regularmente, reconociendo la existencia legal y legitima de las fincas”. Lleva razón el recurrente en señalar que el antiguo Instituto de Tierras y Colonización (ITCO), hoy en día Instituto de Desarrollo Rural (INDER), entre los años setentas, repartió la finca XXX que perteneció a este instituto, entre habitantes de la zona que fueron beneficiados se les otorgo el derecho real de posesión y así regularizando la finca en parcelas inscribibles en el Registro Nacional, obligado a los propietarios a cumplir con el pago de impuestos de bienes inmuebles y tasas municipales como sujetos pasivos de esta cooperación municipal.Es menester que posterior a la trasformación del ITCO al Instituto de Desarrollo Agrario (IDA), este el 3 de marzo de 1984 nace a la vía legal la Zona Protectora Río Navarro – Río Sombrero, bajo el decreto ejecutivo Decreto Nº 15436-MAG. SEGUNDO. Sobre lo indicado: “Con la Aprobación y aplicación del Plan Regulador Municipal, se estableció una restricción que aumento el área mínima de fraccionamiento de 120 metros cuadrados a 7000 metros cuadrados, impidiendo a los habitantes históricos ejercer libremente su derecho de propiedad” sobre lo alegado esta corporación municipal se vio en la obligación de cumplir con la regulación de la Zona Protectora Río Navarro-Río Sombrero, incluyendo la modificación del Plan Regulador a partir de las observaciones y recomendaciones dadas por el INVU mediante el documento DU-188-06-2024. Mediante el documento MG-SM-ACUER-118-2024 se le informa a la administración el Acuerdo 115DA, sobre la aprobación del Informe de Comisión Especial de Plan Regulador, la cual recomendó entre otras cosas que se hiciera la inclusión del artículo 10.8 en el reglamento de construcciones, léase correctamente reglamento de zonificación.Dicho artículo es el que regula la zona protectora en el tanto la zona no cuente con el debido plan de manejo por parte del SINAC. TERCERO. El recurrente alega que esta Municipalidad aplico el Plan Regulador sin el debido proceso de consulta ciudadana, lo cual es contrario a la verdad, esto que el proceso de confección de los planes reguladores está establecido en la Ley de Planificación Urbana en el numeral 17 que obliga a las municipalidades “Artículo 17.- Previamente a implantar un plan regulador o alguna de sus partes, deberá la municipalidad que lo intenta:1) Convocar a una audiencia pública por medio del Diario Oficial y divulgación adicional necesaria con la indicación de local, fecha y hora para conocer del proyecto y de las observaciones verbales o escritas que tengan a bien formular los vecinos o interesados. El señalamiento deberá hacerse con antelación no menor de quince días hábiles;2) Obtener la aprobación de la Dirección de Urbanismo, si el proyecto no se hubiere originado en dicha oficina o difiera del que aquélla hubiere propuesto, sin perjuicio de los recursos establecidos en el artículo 13;3) Acordar su adopción formal, por mayoría absoluta de votos; y4) Publicar en "La Gaceta" el aviso de la adopción acordada, con indicación de la fecha a partir de la cual se harán exigibles las correspondientes regulaciones. Igualmente serán observados los requisitos anteriores cuando se trate de modificar, suspender o derogar, total o parcialmente, el referido plan o cualquiera de sus reglamentos.” En este orden de ideas, en sesión ordinaria 135-2022 celebrada el 31 de enero de 2022 del Concejo Municipal, se aprueba el Reglamento de la Audiencia Pública Presencial y Virtual del Proyecto de Modificación del Plan Regulador de El Guarco, posterior en el Alcance No. 204 de la Gaceta No. 183 de martes 27 de septiembre del 2022 se publica el acuerdo número 802 de la sesión ordinaria número 180-2022 del 5 de septiembre de ese año, el Concejo Municipal de El Guarco, aprobó mediante definitivamente la Convocatoria a Audiencia Pública para Exponer el Proyecto de Modificación del Plan Regulador de El Guarco. En el alcance supra mencionado contiene la agenda y las publicaciones en medios de circulación nacional, en sesión extraordinaria número 190 – 2022 celebrada, se aprueba la audiencia pública, después de haber cumplido con los requisitos de Ley, el 24 de octubre de 2024 bajo el oficio DU-346-10-2024, la Licda. Hilda Carvajal Bonilla Jefa de Departamento de Urbanismo del Instituto Nacional de Vivienda y Urbanismo, nos informa: “Se informa que una vez recibida la información denominada: Modificación del plan Regulador Urbano de El Guarco, elaborada y propuesta por la Municipalidad de El Guarco, se concluye que la misma cumple con las subsanaciones a las observaciones indicadas en el oficio DU-188-06-2023; además, que cuenta con la Resolución de viabilidad ambiental otorgada por SETENA mediante resolución N°109-2022-SETENA y Audiencia Pública según Alcance 204 de La Gaceta 183 del martes 27 de setiembre de 2022. Con base en lo anterior, el Departamento de Urbanismo, otorga aprobación a la propuesta de modificación del plan regulador urbano del cantón de El Guarco, provincia de Cartago. Se insta a la Municipalidad a proseguir con lo indicado en el artículo 17 de la Ley de Planificación Urbana para su adopción por parte del Concejo Municipal con mayoría absoluta de votos y la publicación de la propuesta de modificación al plan regulador cantonal urbano, misma que fue aprobada por este Departamento a través del presente oficio, en el Diario oficial La Gaceta.” Es menester señalar que el oficio en citas es adjunto de esta respuesta como prueba para mejor resolver, en el alcance 192 de la gaceta 224 del 28 de noviembre de 2024 se publica el Plan Regulador del Cantón de El Guarco. Por lo cual con los argumentos expuestos solicitamos se declare sin lugar los hechos expuestos ya que no hay violación a los derechos constitucionales como propiedad privada seguridad jurídica e igualdad. CUARTA. Con lo que expone el recurrente relacionado al Plan General de Manejo de la Zona Protectora Río Navarro – Río Sombrero, es competencia del Sistema Nacional de Áreas de Conservación y el Ministerio de Ambiente y Energía, nos declaramos incompetentes, ya que sale del alcance de nuestra competencia. Es menester resaltar que el presente informe es rubricado por la Presidenta del Concejo Municipal y la Gestora de Desarrollo Urbano en tanto fue así solicitado por la Sala Constitucional, no obstante, es necesario aclarar que el asunto que nos ocupa y señalado por la recurrente por medio de los oficios aportados, aún no ha sido conocido por este órgano colegiado, siendo que se está tramitando desde la parte administrativa y en el momento oportuno, según las etapas del procedimiento se trasladará al Concejo Municipal para lo que corresponda. QUINTA: El recurrente manifiesta: “Siendo que actualmente siquiera está de acceso público para escrutinio dicho plan” Referente a este aspecto, de igual manera es falso, en cuanto la Municipalidad tiene colgado en su página web el Plan Regulador, según se muestra a continuación y se puede constatar en el siguiente link: https://muniguarco.go.cr/wpfd_file/plan-regulador-canton-de-el-guarco/ (se inserta imagen) …”. “… Dicha página es de acceso de cualquier ciudadano, puede ser descargados los documentos referentes a los reglamentos y se puede tener acceso a los mapas del plan, en el siguiente link: https://muniguarco.go.cr/geoportal/ (se inserta imagen) ...”.”.
  5. 5En los procedimientos seguidos se han observado las prescripciones legales.

Redacta la Magistrada Hess Herrera; y,

Considerando:

I. OBJETO DEL RECURSO

La parte recurrente pretende que este Tribunal declare con lugar el recurso y ordene a la Municipalidad de El Guarco y al SINAC dejar sin efecto o suspender la aplicación del Plan Regulador Municipal y del Plan General de Manejo de la Zona Protectora Río Navarro–Río Sombrero, por haber sido aprobados sin consulta ni participación ciudadana efectiva, sin transparencia ni acceso a la información y por imponer, solicitando así la tutela de los derechos a la propiedad privada, igualdad, seguridad jurídica, participación ciudadana, acceso a la información y a un ambiente sano.

II- HECHOS PROBADOS. De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos:

En cuanto al Sistema Nacional de Áreas de Conservación (SINAC):

  • a)En el año 2023, el SINAC inició el proceso de elaboración del Plan General de Manejo (PGM) de la Zona Protectora Río Navarro–Río Sombrero, con participación de comunidades locales (ver informe rendido bajo juramento y prueba adjunta).
  • b)El 17 y 19 de junio de 2023, se realizaron mesas técnicas interinstitucionales con el INVU sobre fraccionamiento y uso del suelo (ver informe rendido bajo juramento y prueba adjunta).
  • c)El 05 de setiembre de 2023, se celebró nueva mesa técnica con el INVU (ver informe rendido bajo juramento y prueba adjunta).
  • d)El 14 de diciembre de 2023, se efectuó otra mesa técnica interinstitucional (ver informe rendido bajo juramento y prueba adjunta).
  • e)En el año 2023, se desarrollaron cuatro reuniones comunitarias con participación aproximada de 95 personas de distintas comunidades de la zona (ver informe rendido bajo juramento y prueba adjunta).
  • f)En el año 2024, no se realizaron reuniones comunitarias; el análisis del PGM se efectuó mediante mesas técnicas y revisión normativa (ver informe rendido bajo juramento y prueba adjunta).
  • g)El 20 de agosto de 2025, se realizó una mesa técnica adicional con participación del INVU (ver informe rendido bajo juramento y prueba adjunta).
  • h)El 26 de agosto de 2025, se celebró una reunión comunitaria con asistencia aproximada de 140 personas; los vecinos solicitan acceso al PGM y a mapas de zonificación (ver informe rendido bajo juramento y prueba adjunta).
  • i)Después del 26 de agosto de 2025, se otorga un plazo de ocho semanas para recibir observaciones al PGM (ver informe rendido bajo juramento y prueba adjunta).
  • j)El 01 de setiembre de 2025, la Asociación de Desarrollo Integral de Verde solicitó copia del PGM (ver informe rendido bajo juramento y prueba adjunta).
  • k)El 05 de setiembre de 2025, el SINAC remitió copia digital del PGM a dicha asociación (ver informe rendido bajo juramento y prueba adjunta).
  • l)El 26 de setiembre de 2025, el señor Wilberth Jiménez presentó observaciones al PGM (ver informe rendido bajo juramento y prueba adjunta).
  • m)El 03 de octubre de 2025, el SINAC respondió por escrito a las observaciones del señor Jiménez (ver informe rendido bajo juramento y prueba adjunta).
  • n)El 13 de octubre de 2025, la Asociación de Desarrollo Integral de La Luchita presentó observaciones al PGM (ver informe rendido bajo juramento y prueba adjunta).
  • o)En octubre de 2025, el SINAC respondió formalmente a las observaciones de dicha asociación (ver informe rendido bajo juramento y prueba adjunta).
  • p)El 03 de diciembre de 2025, la Oficina Subregional de Cartago del SINAC emitió el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1659-2025 informando a esta Sala sobre el proceso participativo, la ausencia de disposiciones expropiatorias en el PGM y el ajuste de las regulaciones a la normativa del INVU (ver informe rendido bajo juramento y prueba adjunta).

En cuanto a la Municipalidad de El Guarco:

 El 03 de marzo de 1984, se creó formalmente la Zona Protectora Río Navarro–Río Sombrero mediante el Decreto Ejecutivo N.° 15436-MAG (ver informe rendido bajo juramento y prueba adjunta).

 El 31 de enero de 2022, en sesión ordinaria N.° 135-2022, el Concejo Municipal aprueba el Reglamento de Audiencia Pública presencial y virtual para la modificación del Plan Regulador (ver informe rendido bajo juramento y prueba adjunta).

 El 27 de setiembre de 2022, en el Alcance N.° 204 a La Gaceta N.° 183 se publicó el acuerdo de convocatoria a Audiencia Pública para la modificación del Plan Regulador (ver informe rendido bajo juramento y prueba adjunta).

 En el año 2022, se celebró la audiencia pública conforme a los requisitos del artículo 17 de la Ley de Planificación Urbana (ver informe rendido bajo juramento y prueba adjunta).

 Según el documento DU-188-06-2024 (2024), el INVU formuló observaciones técnicas sobre la regulación de la Zona Protectora (ver informe rendido bajo juramento y prueba adjunta).

 El 24 de octubre de 2024, mediante oficio DU-346-10-2024, el INVU aprobó la modificación del Plan Regulador Urbano del cantón de El Guarco, tras constatar el cumplimiento de observaciones, viabilidad ambiental y audiencia pública (ver informe rendido bajo juramento y prueba adjunta).

 El 28 de noviembre de 2024, en el Alcance N.° 192 de La Gaceta N.° 224, se publicó oficialmente la modificación del Plan Regulador del cantón de El Guarco (ver informe rendido bajo juramento y prueba adjunta).

 La corporación municipal se vio en la obligación de cumplir con la regulación de la Zona Protectora Río Navarro-Río Sombrero, incluyendo la página 3 de 8 modificación del Plan Regulador a partir de las observaciones y recomendaciones dadas por el INVU mediante el documento DU-188-06-2024. Asimismo, mediante el documento MG-SM-ACUER-118-2024 se le informó a la administración el Acuerdo 115DA, sobre la aprobación del Informe de Comisión Especial de Plan Regulador, la cual recomendó entre otras cosas que se hiciera la inclusión del artículo 10.8 en el reglamento de construcciones, léase correctamente reglamento de zonificación. Dicho artículo es el que regula la zona protectora (ver informe rendido bajo juramento y prueba adjunta).

 En el año 2025, la Municipalidad recurrida mantiene disponible en su página web y geoportal el Plan Regulador, sus reglamentos y mapas de zonificación para acceso público (ver informe rendido bajo juramento y prueba adjunta).

III. SOBRE EL CASO CONCRETO

Del examen integral del objeto del recurso, de los hechos que este Tribunal tiene por debidamente acreditados y de la prueba incorporada, se concluye que el amparo debe declararse sin lugar, pues no se constata una actuación ilegítima, arbitraria u omisiva atribuible a las autoridades recurridas que lesione, de manera actual y directa, los derechos fundamentales invocados.

En primer término, en lo que concierne al SINAC, se encuentra demostrado que el proceso de elaboración del Plan General de Manejo (PGM) de la Zona Protectora Río Navarro–Río Sombrero se inició en 2023 y contempló mecanismos de participación y comunicación con comunidades locales, mediante reuniones comunitarias (cuatro en 2023 y una en 2025) convocadas por medios de divulgación territorial y mensajería, así como la habilitación de un periodo para presentar observaciones por ocho semanas, dentro del cual se recibieron y atendieron, por escrito planteamientos de asociaciones de desarrollo y de un particular. Asimismo, se acreditó que el PGM fue puesto a disposición en formato digital y que, para ampliar su acceso, se coordinó su publicación junto con los insumos cartográficos en un sitio web municipal, facilitando el escrutinio ciudadano. De igual manera, se comprobó que el SINAC, conforme a su ámbito competencial, sustentó que el PGM constituye un instrumento técnico de planificación para orientar la gestión de un área silvestre protegida y servir de parámetro de consulta a otras instituciones públicas, sin que ello suponga, por sí mismo, una sustitución automática de competencias normativas municipales; adicionalmente consta que en el documento no contiene disposiciones expropiatorias, ni se emplean términos de expropiación, lo que desvirtúa la existencia de una amenaza cierta e inminente en ese extremo, en los términos exigidos por la jurisdicción constitucional para estimar una lesión actual o un riesgo real y verificable.

En segundo término, respecto de la Municipalidad de El Guarco, se tiene por demostrado que la modificación del Plan Regulador se tramitó dentro del procedimiento previsto en el artículo 17 de la Ley de Planificación Urbana, incluyendo la aprobación del reglamento para la audiencia pública, la publicación oficial de la convocatoria en La Gaceta, la realización de la audiencia correspondiente, la obtención de la viabilidad ambiental por parte de SETENA y la aprobación técnica por el INVU, para finalmente disponerse la publicación del instrumento en el diario oficial, de manera que el iter formal de adopción y publicidad del plan regulador se encuentra debidamente respaldado en el expediente.

En ese marco, también se acredita que la corporación municipal se vio jurídicamente obligada a armonizar su normativa con la regulación específica de la Zona Protectora Río Navarro–Río Sombrero, incorporando las observaciones y recomendaciones técnicas formuladas por el INVU mediante el documento DU-188-06-2024, así como a ejecutar el Acuerdo 115DA comunicado mediante el oficio MG-SM-ACUER-118-2024, por el cual se aprobó el informe de la Comisión Especial de Plan Regulador que recomendó, entre otros extremos, la inclusión del artículo 10.8 en el reglamento de zonificación, disposición destinada a regular expresamente la zona protectora mientras esta no contara con el respectivo plan de manejo.

Además, se acreditó que la corporación municipal mantiene disponible, de manera continua, en su plataforma digital y geoportal institucional, el Plan Regulador, sus reglamentos y los mapas de zonificación, instrumentos que conforman el soporte normativo y técnico del ordenamiento territorial local. Esta circunstancia permite constatar que la Administración ha desplegado los mecanismos ordinarios de información y publicidad propios de los procedimientos de planificación urbana, los cuales se insertan en el ámbito de la legalidad ordinaria y de las potestades de ordenación territorial, mas no en el núcleo de derechos fundamentales cuya tutela inmediata no corresponda a esta jurisdicción constitucional. En efecto, la participación ciudadana en este tipo de procesos se articula primordialmente a través de los cauces específicos previstos en la legislación urbanística y municipal, de modo que eventuales inconformidades sobre la suficiencia, oportunidad o alcance de tales espacios de intervención deben ser examinadas por las vías administrativa o contencioso-administrativa, sin que resulte procedente su conocimiento en sede de amparo.

Finalmente, en cuanto a los reclamos vinculados con supuestas “restricciones desproporcionadas y retroactivas” para ejercer el derecho de propiedad, construir, segregar o disponer de los terrenos, así como una eventual afectación patrimonial derivada de áreas mínimas de fraccionamiento, densidad habitacional por lote o consecuencias económicas del ordenamiento territorial, este Tribunal advierte que tales planteamientos, en lo sustancial, remiten a una discusión de legalidad y mérito administrativo: i) sobre la validez, alcance e interpretación de normas técnicas urbanísticas y ambientales; ii) sobre su compatibilidad con el marco reglamentario aplicable, incluidos los lineamientos del INVU y la normativa sectorial; iii) sobre la determinación de parámetros de fraccionamiento, usos permitidos y condiciones de edificación; iv) sobre eventuales efectos en el valor, utilidad o aprovechamiento de los inmuebles; y v) sobre la procedencia de compensaciones o indemnizaciones por cargas singulares.

Todos estos aspectos demandan un análisis probatorio y técnico propio de las sedes administrativas y, de persistir la inconformidad, de la jurisdicción competente para el control de legalidad y la eventual responsabilidad patrimonial, sin que corresponda a esta Sala sustituir a la Administración ni fungir como instancia revisora general de oportunidad, conveniencia o acierto técnico de los instrumentos de planificación territorial. En esta misma línea, la jurisdicción constitucional no es la vía idónea para determinar, en abstracto, si un parámetro urbanístico resulta “insuficiente” o “excesivo”, ni para definir como cuestión principal la existencia de retroactividad o desproporción en términos de legalidad ordinaria, cuando no se acredita una lesión directa, actual y claramente imputable que, por sí misma, torne procedente el amparo.

IV. RAZONES ADICIONALES DE LOS MAGISTRADOS CRUZ CASTRO Y RUEDA LEAL

En la especie, se lee en el informe del director ejecutivo a.i. del Sistema Nacional de Áreas de Conservación:

“Se informa que el SINAC ha velado y esforzado por trabajar con la mayoría de las personas que ha sido posible, dentro de sus competencias. En los anexos que se presentan a continuación se evidencia que en los años 2023, se realizaron un total de 04 reuniones con asociaciones y personas de diferentes comunidades para un total de 95 personal, los verificadores de esta actividad son listas de asistencia que se ubican en los folios 01-02, 03-09, 30-32, 054-058; en el año 2024 no hubo reuniones con las comunidades, dado que el análisis se hizo legislación y para esto se trabajó en mesas de trabajo técnicas y para el 2025 se han efectuado 01 reunión con vecinos de comunidades de la ZP-RN-RS, lo que represento un total 140 personas. Se debe indicar que en las reuniones de trabajo con las comunidades se hicieron para mantenerlos informados sobre los avances y también para definir los elementos focales de manejo, situación en donde es de vital importancia e indispensable que sean las comunidades quienes los definan, con el apoyo de SINAC.

En las mesas de trabajo técnicas lo que se realiza es la revisión de las normativas interinstitucional de los diferentes entes estatales que tienen injerencia sobre la ZP. Para la convocatoria a las reuniones con las comunidades, se utilizó como medio de divulgación, rótulos colocados en lugares estratégicos como: Paradas de autobuses, pulperías, escuelas e iglesias. Se adjuntan los rótulos que se utilizaron. Como lo indican los verificadores en todas las reuniones hubo presencia de personas de la comunidad, cumpliéndose así un proceso adecuado de participación ciudadana. Ver folios 017-023,033,102. También se debe indicar que los afiches de invitación se circularon mediante grupos de mensajería de textos en las diferentes comunidades. Una de las peticiones generales de las personas que fueron a la reunión del 26 de agosto, era poder analizar el PGM y poder constatar la ubicación especifica de sus inmuebles.

Con el fin de poder cumplir estas peticiones y así poder divulgar el PGM de forma transparente para escrutinio del público en general, se coordinó con la municipalidad de EL Guarco para que, en su página web, la ciudadanía tuviera acceso tanto al mapa de zonificación como el PGM y así tener un mayor alcance, https://experience.arcgis.com/experience/eb9c92a6c4fe4d459eecf7de 93040a2 Esta acción se realizó mediante el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1288-2025 FOLIOS 113-118. Así mismo cabe indicar que en año 2025, después de la reunión del 26 de agosto se dio un plazo de 8 semanas, para que las personas y diferentes asociaciones de vecinos, presentaran observaciones a la última versión del Plan General de Manejo (PGM). Durante ese periodo de tiempo se recibieron 02 consulta de parte de las siguientes asociaciones: Desarrollo Integral de Verde, Desarrollo Integral de la Luchita. Así mismo un usuario particular presentó una serie de observaciones.

A cada asociación se le dio respuesta por escrito de la siguiente manera: 1. La Asociación de Desarrollo Integral de Verde, solicito copia del PGM el 01 de setiembre y se le envió copia en formato digital, el día 05 de setiembre vía correo institucional mediante el oficio CARTA-SINAC-ACC-DR-DRFVS-OSC-1299-2025 FOLIOS 119-121 …” A partir de lo anterior, al menos desde la perspectiva constitucional, no observamos que se haya violado el derecho fundamental a la participación ciudadana.

V. DOCUMENTACIÓN APORTADA AL EXPEDIENTE

Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, éstos deberán ser retirados del despacho en un plazo máximo de 30 días hábiles contados a partir de la notificación de esta sentencia. De lo contrario, será destruido todo aquel material que no sea retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en sesión N° 27-11 del 22 de agosto del 2011, artículo XXVI y publicado en el Boletín Judicial número 19 del 26 de enero del 2012, así como en el acuerdo aprobado por el Consejo Superior del Poder Judicial, en la sesión N° 43-12 celebrada el 3 de mayo del 2012, artículo LXXXI.

Por tanto:

Se declara sin lugar el recurso. Los magistrados Cruz Castro y Rueda Leal dan razones adicionales.

Fernando Castillo V.

Fernando Cruz C.

Paul Rueda L.

Luis Fdo. Salazar A.

Jorge Araya G.

Anamari Garro V.

Ingrid Hess H.

Document not found. Documento no encontrado.

Implementing decreesDecretos que afectan

    TopicsTemas

    • Subdivision and Fraccionamiento — Decreto 6411 and Forest LotsSubdivisión y Fraccionamiento — Decreto 6411 y Lotes Boscosos

    Concept anchorsAnclajes conceptuales

      Spanish key termsTérminos clave en español

      News & Updates Noticias y Actualizaciones

      All articles → Todos los artículos →

      Weekly Dispatch Boletín Semanal

      Field reporting and policy analysis from Costa Rica's forests. Reportajes y análisis de política desde los bosques de Costa Rica.

      ✓ Subscribed. ✓ Suscrito.

      One email per week. No spam. Unsubscribe in one click. Un correo por semana. Sin spam. Cancela en un clic.

      Or WhatsApp channelO canal de WhatsApp →
      Coalición Floresta © 2026 · All rights reserved © 2026 · Todos los derechos reservados

      Stay Informed Mantente Informado

      Conservation news and action alerts, straight from the field Noticias de conservación y alertas de acción, directo desde el campo

      Email Updates Actualizaciones por Correo

      Weekly updates, no spam Actualizaciones semanales, sin spam

      Successfully subscribed! ¡Suscripción exitosa!

      WhatsApp Channel Canal de WhatsApp

      Join to get instant updates on your phone Únete para recibir actualizaciones instantáneas en tu teléfono

      Join Channel Unirse al Canal
      Coalición Floresta Coalición Floresta © 2026 Coalición Floresta. All rights reserved. © 2026 Coalición Floresta. Todos los derechos reservados.
      🙏