Coalición Floresta Logo Coalición Floresta Search Buscar
Language: English
About Acerca de Contact Contacto Search Buscar Notes Notas Donate Donar Environmental Law Derecho Ambiental
About Acerca de Contact Contacto Search Buscar Notes Notas Donate Donar Environmental Law Derecho Ambiental
Language: English
Beta Public preview Vista previa

← Environmental Law Center← Centro de Derecho Ambiental

Resolución 071 · 30/06/2015

Tariff band for new private hydroelectric generatorsFijación de banda tarifaria para generadores hidroeléctricos privados nuevos

View document ↓ Ver documento ↓ View original source ↗ Ver fuente original ↗

Loading…Cargando…

OutcomeResultado

In forceNorma vigente

SummaryResumen

Resolution RIE-071-2015 from ARESEP's Energy Directorate sets the tariff band applicable to all new private hydroelectric generators selling energy to the Costa Rican Electricity Institute (ICE) under Chapter I of Law 7200. This setting complies with a Board of Directors' agreement that partially upheld ICE's appeal against a prior resolution, ordering a recalculation of operation costs and inclusion of the Toro III plant in the cost sample. The supporting technical study details the methodology: a sample of 11 hydroelectric plants with installed capacities up to 50 MW is used, costs are indexed, and a logarithmic regression estimates operation costs for a 10 MW plant, resulting in US$ 174.40 per kW. The tariff band consists of a lower limit of $0.0918/kWh, average of $0.1029/kWh, and upper limit of $0.1141/kWh, each with a time-of-day/seasonal structure, establishing that prices paid cannot exceed the upper limit or fall below the lower limit.La resolución RIE-071-2015 de la Intendencia de Energía de la ARESEP fija la banda tarifaria aplicable a todos los generadores privados hidroeléctricos nuevos que vendan energía al Instituto Costarricense de Electricidad (ICE) bajo el capítulo I de la Ley 7200. Esta fijación se realiza en acatamiento de un acuerdo de la Junta Directiva que declaró parcialmente con lugar un recurso de apelación del ICE contra una resolución anterior, ordenando recalcular el costo de explotación e incluir la planta Toro III en la muestra de costos. El estudio técnico que sustenta la resolución detalla la metodología: se utiliza una muestra de 11 plantas hidroeléctricas con capacidades instaladas de hasta 50 MW, se indexan los costos y se realiza una regresión logarítmica para estimar el costo de explotación para una planta de 10 MW, resultando en US$ 174,40 por kW. La banda tarifaria se compone de una tarifa inferior de $0,0918/kWh, una tarifa promedio de $0,1029/kWh y una tarifa superior de $0,1141/kWh, cada una con estructura horario-estacional, estableciendo que los precios pagados no pueden superar el límite superior ni ser inferiores al límite inferior.

Key excerptExtracto clave

To establish the tariff band, the following steps are taken: i. The standard deviation for all data used to estimate the average investment cost is calculated, resulting in $466.69. ii. The upper limit is set as the updated average investment cost plus the standard deviation, i.e., $2,928 + $466 = $3,395 per kW. iii. The lower limit is set as the updated average investment cost minus the standard deviation found in step 1, i.e., $2,928 - $466 = $2,462 per kW. According to RJD-152-2011, at no time may the prices paid for the purchase of electric energy exceed the upper limit of the current tariff band, or be less than the lower limit of that band.Para establecer la banda tarifaria se realizan los siguientes pasos: i. Se calculó la desviación estándar correspondiente a todos los datos utilizados para estimar el costo de inversión promedio, lo que da como resultado $466,69. ii. El límite superior se establece como el costo de inversión promedio actualizado más la desviación estándar, es decir, $2 928 + $466 = $3 395 por kW. iii. El límite inferior se establece como el costo de inversión promedio actualizado menos la desviación estándar encontrada en el paso 1, en otras palabras, $2 928 - $466 = $2 462 por kW. Según la RJD-152-2011, en ningún momento los precios pagados por la compra de energía eléctrica pueden ser mayores que el límite superior de la banda tarifaria vigente, ni menores que el límite inferior de esa banda.

Pull quotesCitas destacadas

  • "La banda tarifaria para todos los generadores privados hidroeléctricos nuevos que vendan energía eléctrica al Instituto Costarricense de Electricidad al amparo del capítulo I de la Ley 7200, queda compuesta por la tarifa inferior (límite inferior) de $0,0918, la tarifa promedio en $0,1029 y una tarifa superior (límite superior) de $0,1141 por kWh."

    "The tariff band for all new private hydroelectric generators that sell electric energy to the Costa Rican Electricity Institute under Chapter I of Law 7200 shall consist of a lower rate (lower limit) of $0.0918, an average rate of $0.1029, and an upper rate (upper limit) of $0.1141 per kWh."

    Conclusiones del estudio técnico

  • "La banda tarifaria para todos los generadores privados hidroeléctricos nuevos que vendan energía eléctrica al Instituto Costarricense de Electricidad al amparo del capítulo I de la Ley 7200, queda compuesta por la tarifa inferior (límite inferior) de $0,0918, la tarifa promedio en $0,1029 y una tarifa superior (límite superior) de $0,1141 por kWh."

    Conclusiones del estudio técnico

  • "Según la RJD-152-2011, en ningún momento los precios pagados por la compra de energía eléctrica pueden ser mayores que el límite superior de la banda tarifaria vigente, ni menores que el límite inferior de esa banda."

    "According to RJD-152-2011, at no time may the prices paid for the purchase of electric energy exceed the upper limit of the current tariff band, or be less than the lower limit of that band."

    Considerando I, sección 1

  • "Según la RJD-152-2011, en ningún momento los precios pagados por la compra de energía eléctrica pueden ser mayores que el límite superior de la banda tarifaria vigente, ni menores que el límite inferior de esa banda."

    Considerando I, sección 1

  • "Se hace un ejercicio de regresión para estimar la curva que mejor aproxima la función que relaciona capacidad instalada y costo de explotación. Se elige una regresión logarítmica."

    "A regression exercise is performed to estimate the curve that best approximates the function relating installed capacity and operation cost. A logarithmic regression is chosen."

    Considerando I, sección a

  • "Se hace un ejercicio de regresión para estimar la curva que mejor aproxima la función que relaciona capacidad instalada y costo de explotación. Se elige una regresión logarítmica."

    Considerando I, sección a

Full documentDocumento completo

Sections

Procedural marks

in the entirety of the text - Full Text of Standard 071 Annual application of the "Reference Tariff Methodology for new private hydroelectric generation plants" Full Text of minutes: 104AF4 REGULATORY AUTHORITY FOR PUBLIC SERVICES ENERGY INTENDENCY RIE-071-2015. At 2:35 p.m. on June 30, 2015 COMPLIANCE WITH AGREEMENT 05-27-2015 OF THE BOARD OF DIRECTORS OF ARESEP ANNUAL APPLICATION OF THE "REFERENCE TARIFF METHODOLOGY FOR NEW PRIVATE HYDROELECTRIC GENERATION PLANTS" ET-050-2015

I.That on December 18, 2014, through resolution RIE-101-2014, published in Digital Supplement No. 2 to La Gaceta 17 of January 12, 2015, the Energy Intendency (IE) resolved to set the tariff band for all new private hydroelectric generators that sign a contract for sale to the Instituto Costarricense de Electricidad (ICE) under Chapter I of Law 7200 (folios 164 to 188).

II.That on January 15, 2015, ICE, dissatisfied with what was resolved, filed an appeal for reversal with a subsidiary appeal, against resolution RIE-101-2014 (folio 151 to 159).

III.That on March 27, 2015, through resolution RIE-037-2015, the IE resolved, among other things, to partially grant the appeals for reversal filed by Doña Julia S.R.L., P.H. Don Pedro S.A., P.H. Río Volcán S.A., and Molinos de Viento Arenal S.A. against resolution RIE-099-2014. Said resolution was published in Digital Supplement No. 24 of La Gaceta No. 67 of April 8, 2015 (Folios 229 to 233 and 240 to 250).

IV.That on June 23, 2015, through resolution RJD-111-2015, the Board of Directors of the Regulatory Authority resolved to partially grant the appeal, as detailed below:

"(.)

I.To partially grant the appeal filed by the Instituto Costarricense de Electricidad, against resolution RIE-101-2014, regarding the determination of the operating cost (costo de explotación), under the terms set forth in Considering Clause I, Section IV.1.a, of this resolution.

II.To partially annul resolution RIE-101-2014, and by connection, resolution RIE-038-2015, solely regarding the determination of the operating cost, under the terms set forth in Considering Clause I, Section IV.1.a., of this resolution.

III.To revert the procedure to the appropriate procedural stage, that is, to the tariff analysis by the Energy Intendency, which must consider

what is indicated in this resolution and, if applicable, set the corresponding tariff band.

IV.To dimension the effects of the annulment act that this Board of Directors orders in relation to resolution RIE-038-2015, such that the tariff band set therein remains in force, until the Energy Intendency, through a lawful act, carries out the tariff analysis taking into consideration the criteria established in this resolution and, if applicable, sets the corresponding tariff band.

(.)"

V.That on June 30, 2015, through official communication 1159-IE-2015, the Energy Intendency issued the respective technical study on what was ordered by agreement 05-27-2015 of the Board of Directors.

VI.That in compliance with the provisions of the Board of Directors, the Energy Intendency, through official communication 1159-IE-2015 of June 30, 2015, issued the respective technical study on what was ordered.

I.That from the cited technical study 1159-IE-2015, which serves as the basis for this resolution, it is appropriate to extract the following:

"5. ANALYSIS OF THE MATTER In compliance with Agreement 05-27-2015 of Extraordinary Session No. 27 of June 22, 2015, in which the appeal filed by the Instituto Costarricense de Electricidad (ICE) against resolution RIE-101-2014, processed in file ET-141-2014, was analyzed, the Toro III hydroelectric plant is included within the sample of operating costs and a new calculation of the operating costs is performed, starting from the costs in colones for the hydroelectric plants provided by ICE. All other variables are kept at the same values as those approved in resolution RIE-038-2015 of March 27, 2015, published in Digital Supplement No. 24 of La Gaceta No. 67 of April 8, 2015.

The result is then as follows:

a. Operating costs (CE) As indicated in resolution RIE-101-2014, the operating costs considered are those necessary to maintain and operate a plant under normal conditions for our country, not including depreciation expenses, financial expenses, and taxes associated with profits or gains.

The methodology approved in RJD-152-2011 indicates that the calculation will be obtained by determining a sample of the operating costs of hydroelectric plants operating in the country, of different installed capacities.

For the calculation of the operating costs, data from private generation plants, for which Aresep has information, will be incorporated, and from the 2012 Generation System Cost Report (data updated to December 2012), only the costs of plants up to a maximum of 50 MW will be taken into account, as these are the plants most similar to those for which tariffs are intended to be set, values that will be indexed according to the industrial producer price index of Costa Rica.

The information used in RIE-038-2015 is modified as indicated, and the sample to be used for operating costs consists of 11 plants; the information for the plants: Toro I, Sandillal, Garita, Peñas Blancas, Echandi, Toro III, and Tres Ríos is taken from the 2012 Generation System Cost Report (data updated to December 2012); and the information for the plants: Vara Blanca, Sigifredo Solís, El Ángel, and Cubujuquí is taken from tariff determinations for private generators carried out by the Regulatory Authority in recent years (data considered as the 2011 average, except for Cubujuquí, which is a January 2013 figure).

The operating cost was calculated as follows:

i. The operating cost data is taken from a sample of hydroelectric plants operating in the country, of different installed capacities.

ii. A regression exercise is performed to estimate the curve that best approximates the function relating installed capacity and operating cost.

iii. The value of the mentioned function is used, corresponding to a 10 MW plant, which is the mean value of the range permitted by Chapter 1 of Law No. 7200.

iv. In each tariff determination, new operating cost data that may have been obtained, corresponding to hydroelectric plants operating in the country, is incorporated.

The operating cost data taken from the ICE report is from December 2012; the data for the Vara Blanca, Sigifredo Solis, and El Ángel plants are from 2011; and the data for the Consorcio Cubujuquí is from January 2013. These were indexed using the Industrial Producer Price Index of Costa Rica (IPPI) as of October 2014.

When performing the regression exercise to estimate the curve that best approximates the function relating installed capacity and operating cost, a logarithmic regression is chosen, as shown in the attached graph:

The operating cost resulting from the procedure described above for a hydroelectric plant is US$174.40 per kW, while in RIE-028-2015, it was US$174.38 per kW. The detail is shown in the following table:

Table No.1 Operating costs of hydroelectric plants 1. Definition of the band To establish the tariff band, the following steps are taken:

i. The standard deviation corresponding to all the data used to estimate the average investment cost was calculated, resulting in $466.69.

ii. The upper limit is established as the updated average investment cost plus the standard deviation, that is, $2,928 + $466 = $3,395 per kW.

iii. The lower limit is established as the updated average investment cost minus the standard deviation found in step 1, in other words, $2,928 - $466 = $2,462 per kW.

According to RJD-152-2011, at no time may the prices paid for the purchase of electric energy be higher than the upper limit of the current tariff band, nor lower than the lower limit of that band.

2. Tariff calculation Once the new operating cost value has been incorporated, the calculation of the tariff band is as follows:

Table No. 2 Tariff band calculation 3. Time-of-use and seasonal structure For the calculation of the hourly seasonal tariff structure, the dimensionless parameters approved in resolution RJD-152-2011 were used, resulting in the following:

Table No. 3 Tariff structure according to dimensionless parameters for the tariff band (dollars / kWh) 6. CONCLUSIONS 1. The resulting operating cost for a new hydroelectric generation plant is US$174.40 per kW.

2. The tariff band for all new private hydroelectric generators that sell electric energy to the Instituto Costarricense de Electricidad under Chapter I of Law 7200, is composed of the lower tariff (lower limit) of $0.0918, the average tariff at $0.1029, and an upper tariff (upper limit) of $0.1141 per kWh. Each of these with a time-of-use and seasonal structure.

(.)

II.That in accordance with the aforementioned whereas and considering clauses and on the merits of the proceedings, it is appropriate to set the electric tariffs, as ordered.

THE ENERGY INTENDENT

I.To set the tariff band for all new private hydroelectric generators that sell energy to the Instituto Costarricense de Electricidad, composed of the lower tariff (lower limit) of $0.0918, the average tariff at $0.1029, and an upper tariff (upper limit) of $0.1141 per kWh.

II. To set the structure for the resulting tariff ($/kWh) as follows

In compliance with the provisions of articles 245 and 345 of the Ley General de la Administración Pública (LGAP), it is hereby informed that against this resolution, the ordinary remedies of reversal and appeal, and the extraordinary remedy of review, may be filed. The reversal remedy may be filed before the Energy Intendent, who is responsible for resolving it, and the appeals and review remedies may be filed before the Board of Directors, which is responsible for resolving them.

In accordance with article 346 of the LGAP, the remedies of reversal and appeal must be filed within a period of three business days counted from the business day following notification, and the extraordinary remedy of review, within the periods set forth in article 354 of said law.

WHEREAS

CONSIDERING

THEREFORE

RESOLVES:

Secciones

Marcadores

en la totalidad del texto - Texto Completo Norma 071 Aplicación anual de la "Metodología Tarifaria de referencia para plantas de generación privada hidroeléctricas nuevas" Texto Completo acta: 104AF4 AUTORIDAD REGULADORA DE LOS SERVICIOS PÚBLICOS INTENDENCIA DE ENERGIA RIE-071-2015. A las 14:35 horas del 30 de junio de 2015 CUMPLIMIENTO DE ACUERDO 05-27-2015 DE LA JUNTA DIRECTIVA DE LA ARESEP APLICACIÓN ANUAL DE LA "METODOLOGÍA TARIFARIA DE REFERENCIA PARA PLANTAS DE GENERACIÓN PRIVADA HIDROELÉCTRICAS NUEVAS" ET-050-2015

I.Que el 18 de diciembre de 2014, mediante la resolución RIE-101-2014, publicada en el Alcance Digital N°2 a La Gaceta 17 del 12 de enero de 2015, la Intendencia de Energía (IE) resolvió fijar la banda tarifaria para todos los generadores privados hidroeléctricos nuevos que firmen un contrato para la venta al Instituto Costarricense de Electricidad (ICE) al amparo del capítulo I de la Ley 7200 (folios 164 a 188).

II.Que el 15 de enero de 2015, el ICE, inconforme con lo resuelto, interpuso recurso de revocatoria con apelación en subsidio, contra la resolución RIE-101-2014 (folio 151 al 159).

III.Que el 27 de marzo de 2015, mediante la resolución RIE-037-2015, la IE resolvió, entre otras cosas, acoger parcialmente los recursos de revocatoria interpuestos por Doña Julia S.R.L., P.H. Don Pedro S.A., P.H. Río Volcán S.A. y Molinos de Viento Arenal S.A. contra la resolución RIE-099-2014. Dicha resolución fue publicada en el Alcance Digital N°24 de La Gaceta N°67 del 08 de abril de 2015 (Folios del 229 al 233 y 240 al 250).

IV.Que el 23 de junio de 2015 mediante la resolución RJD-111-2015, la Junta Directiva de la Autoridad Reguladora resolvió acoger el recurso de manera parcial, tal y como se detalla:

"(.)

I.Declarar parcialmente con lugar el recurso de apelación interpuesto por el Instituto Costarricense de Electricidad, contra la resolución RIE-101-2014, en cuanto a la determinación del costo de explotación, en los términos señalados en el Considerando I, Apartado IV.1.a, de esta resolución.

II.Declarar la nulidad parcial de la resolución RIE-101-2014, y por conexidad la de la resolución RIE-038-2015, únicamente en cuanto a la determinación del costo de explotación, en los términos señalados en el Considerando I, Apartado IV.1.a., de esta resolución.

III.Retrotraer el procedimiento a la etapa procesal oportuna, es decir, al análisis tarifario por parte de la Intendencia de Energía, en el cual deberá considerar lo

indicado en la presente resolución y en caso de ser procedente, fijar la banda tarifaria que corresponda.

IV.Dimensionar los efectos del acto anulatorio que esta Junta Directiva dispone con relación a la resolución RIE-038-2015, de manera que se mantenga vigente la banda tarifaria fijada en esta, hasta que la Intendencia de Energía, mediante un acto conforme a derecho, proceda a realizar el análisis tarifario tomado en consideración los criterios establecidos en la presente resolución y en caso de ser procedente, fije la banda tarifaria que corresponda.

(.)"

V.Que el 30 de junio de 2015, mediante el oficio 1159-IE-2015, la Intendencia de Energía, emitió el respectivo estudio técnico sobre lo ordenado por el acuerdo 05-27-2015 de la Junta Directiva.

VI.Que en cumplimiento de lo dispuesto por la Junta Directiva, la Intendencia de Energía mediante el oficio 1159-IE-2015 del 30 de junio de 2015, emitió el respectivo estudio técnico sobre lo ordenado.

I.Que del estudio técnico 1159-IE-2015, citado, que sirve de base para la presente resolución, conviene extraer lo siguiente:

"5. ANÁLISIS DEL ASUNTO En cumplimiento del Acuerdo 05-27-2015 de la Sesión Extraordinaria N°27 del 22 de junio de 2015, en la cual se analizó el recurso de apelación interpuesto por el Instituto Costarricense de Electricidad (ICE) contra la resolución RIE-101-2014, tramitada en el expediente ET-141-2014, se incluye dentro de la muestra de los costos de explotación la planta hidroeléctrica Toro III y se realiza el nuevo cálculo de los costos de explotación, partiendo de los costos en colones para las plantas hidroeléctricas aportados por el ICE. Todas las demás variables se mantienen en los mismos valores que los aprobados en la resolución RIE-038-2015 del 27 de marzo de 2015, publicado en El Alcance Digital N°24 de La Gaceta N°67 del 08 de abril de 2015.

El resultado entonces es el siguiente:

a. Costos de explotación (CE) Tal y como se indicó en la resolución RIE-101-2014, entre los costos de una planta en condiciones normales para nuestro país, sin incluir gastos de depreciación, gastos financieros e impuestos asociados a las utilidades o a las ganancias.

La metodología aprobada en la RJD-152-2011 indica que el cálculo se obtendrá mediante la determinación de una muestra de los costos de explotación de plantas hidroeléctricas que operan en el país, de diferentes capacidades instaladas.

Para el cálculo de los costos de explotación se van a incorporar los datos de plantas de generación privada, para las cuales Aresep cuenta con información y del Informe de Costos del Sistema de Generación del 2012 (datos actualizados a Diciembre de 2012) se van a tomar en cuenta solamente los costos de plantas hasta un máximo de 50 MW, ya que son las plantas más parecidas a las cuales se pretende tarifar, valores que serán indexados según el índice de precios al productor industrial de Costa Rica.

La información utilizada en la RIE-038-2015 se modifica tal y como se indicó y la muestra a utilizar para costos de explotación consta de 11 plantas, la información para las plantas: Toro I, Sandillal, Garita, Peñas Blancas, Echandi, Toro III y Tres Ríos es tomada del Informe de Costos del Sistema de Generación del 2012 (datos actualizados a Diciembre de 2012); y la información de las plantas: Vara Blanca, Sigifredo Solís, El Ángel y Cubujuquí es tomada de fijaciones tarifarias a generadores privados que ha realizado la Autoridad Reguladora en los últimos años (datos considerados como promedio del 2011, excepto para Cubujuquí, que es un dato de enero 2013).

El costo de explotación se calculó de la siguiente manera:

i. Se toman los datos de costos de explotación de una muestra de plantas hidroeléctricas que operan en el país, de diferentes capacidades instaladas.

ii. Se hace un ejercicio de regresión para estimar la curva que mejor aproxima la función que relaciona capacidad instalada y costo de explotación.

iii. Se utiliza el valor de la función mencionada, correspondiente a una planta de 10 MW, que es el valor medio del rango permitido por el Capítulo 1 de la Ley N°7200.

iv. En cada fijación tarifaria se incorporan los nuevos datos de costo de hidroeléctricas que operen en el país.

Los datos del costo de explotación tomados del informe del ICE son de diciembre 2012, los datos de las plantas Vara Blanca, Sigifredo Solis y El Ángel son datos del 2011 y los datos del Consorcio Cubujuquí son de enero del 2013, los mismos se indexaron con el índice de Precios al Productor Industrial de Costa Rica (IPPI) al mes de octubre 2014.

Al hacer el ejercicio de regresión para estimar la curva que mejor aproxima la función que relaciona capacidad instalada y costo de explotación se elige una regresión logarítmica, tal y como se muestra en el gráfico adjunto:

El costo de explotación resultante del procedimiento descrito anteriormente para una planta hidroeléctrica es de US$ 174,40 por kW, siendo este en la RIE-028-2015 de US$ 174,38 por kW. El detalle se muestra en el siguiente cuadro:

Cuadro No.1 Costos de explotación plantas hidroeléctricas 1. Definición de la banda Para establecer la banda tarifaria se realizan los siguientes pasos:

i. Se calculó la desviación estándar correspondiente a todos los datos utilizados para estimar el costo de inversión promedio, lo que da como resultado $466,69.

ii. El límite superior se establece como el costo de inversión promedio actualizado más la desviación estándar, es decir, $2 928 + $466 = $3 395 por kW.

iii. El límite inferior se establece como el costo de inversión promedio actualizado menos la desviación estándar encontrada en el paso 1, en otras palabras, $2 928 - $466 = $2 462 por kW.

Según la RJD-152-2011, en ningún momento los precios pagados por la compra de energía eléctrica pueden ser mayores que el límite superior de la banda tarifaria vigente, ni menores que el límite inferior de esa banda.

2. Cálculo de la tarifa Una vez que incorporado el nuevo valor del costo de explotación, el cálculo de la banda tarifaria es el siguiente:

Cuadro No. 2 Cálculo de la banda tarifaria 3. Estructura horario-estacional Para el cálculo de la estructura tarifaria horaria estacional, se utilizó los parámetros adimensionales aprobados en la resolución RJD-152-2011, dando como resultado lo siguiente:

Cuadro No. 3 Estructura tarifaria según parámetros adimensionales para la banda tarifaria (dólares / kWh) 6. CONCLUSIONES 1. El costo de explotación resultante para una planta de generación hidroeléctrica nueva es de US$ 174,40 por kW.

2. La banda tarifaria para todos los generadores privados hidroeléctricos nuevos que vendan energía eléctrica al Instituto Costarricense de Electricidad al amparo del capítulo I de la Ley 7200, queda compuesta por la tarifa inferior (límite inferior) de $0,0918, la tarifa promedio en $0,1029 y una tarifa superior (límite superior) de $0,1141 por kWh. Cada una de estas con una estructura horario estacional.

(.)

II.Que de conformidad con lo señalado en los resultandos y considerandos precedentes y en el mérito de los autos, lo procedente es fijar las tarifas eléctricas, tal y como se dispone.

EL INTENDENTE DE ENERGÍA

I.Fijar la banda tarifaria para todos los generadores privados hidroeléctricos nuevos que vendan energía al Instituto Costarricense de Electricidad, compuesta por la tarifa inferior (límite inferior) de $0,0918, la tarifa promedio en $0,1029 y una tarifa superior (límite superior) de $0,1141 por kWh.

II. Fijar la estructura para la tarifa resultante ($/kWh) así

En cumplimiento de lo que ordenan los artículos 245 y 345 de la Ley General de la Administración Pública (LGAP) se informa que contra esta resolución pueden interponerse los recursos ordinarios de revocatoria y de apelación y el extraordinario de revisión. El de revocatoria podrá interponerse ante el Intendente de Energía, a quien corresponde resolverlo y los de apelación y de revisión podrán interponerse ante la Junta Directiva, a la que corresponde resolverlos.

De conformidad con el artículo 346 de la L. G. A. P., los recursos de revocatoria y de apelación deberán interponerse en el plazo de tres días hábiles contado a partir del día hábil siguiente al de la notificación y, el extraordinario de revisión, dentro de los plazos señalados en el artículo 354 de dicha ley.

RESULTANDO

CONSIDERANDO

POR TANTO

RESUELVE:

Document not found. Documento no encontrado.

Implementing decreesDecretos que afectan

    TopicsTemas

    • Off-topic (non-environmental)Fuera de tema (no ambiental)

    Concept anchorsAnclajes conceptuales

    • Ley 7200 Capítulo I
    • Ley General de la Administración Pública Art. 245, 345, 346, 354

    Spanish key termsTérminos clave en español

    News & Updates Noticias y Actualizaciones

    All articles → Todos los artículos →

    Weekly Dispatch Boletín Semanal

    Field reporting and policy analysis from Costa Rica's forests. Reportajes y análisis de política desde los bosques de Costa Rica.

    ✓ Subscribed. ✓ Suscrito.

    One email per week. No spam. Unsubscribe in one click. Un correo por semana. Sin spam. Cancela en un clic.

    Or WhatsApp channelO canal de WhatsApp →
    Coalición Floresta © 2026 · All rights reserved © 2026 · Todos los derechos reservados

    Stay Informed Mantente Informado

    Conservation news and action alerts, straight from the field Noticias de conservación y alertas de acción, directo desde el campo

    Email Updates Actualizaciones por Correo

    Weekly updates, no spam Actualizaciones semanales, sin spam

    Successfully subscribed! ¡Suscripción exitosa!

    WhatsApp Channel Canal de WhatsApp

    Join to get instant updates on your phone Únete para recibir actualizaciones instantáneas en tu teléfono

    Join Channel Unirse al Canal
    Coalición Floresta Coalición Floresta © 2026 Coalición Floresta. All rights reserved. © 2026 Coalición Floresta. Todos los derechos reservados.
    🙏