Agreement 2008-068 was repealed by the 2017 Regulation for the approval and transfer of sanitation systems.El Acuerdo 2008-068 fue derogado por el Reglamento de aprobación y recepción de sistemas de saneamiento de 2017.
SummaryResumen
Agreement No. 2008-068 of the AyA Board of Directors modified and created institutional procedures for the approval and transfer of wastewater treatment plants (WWTP) and pumping stations in developments and condominiums. Grounded in a binding opinion of the Attorney General's Office (C-257-2003), the regulation establishes AyA's obligation to assume administration, operation, and control of these systems. It defines the technical, legal, and documentary requirements for procedures TEP-2 (approval), TRPTAR-1 (transfer of WWTPs), and TREBAR-2 (transfer of pumping stations), including specific documentation and processing timelines. The agreement implements administrative simplification under Law 8220 and reinforces AyA's role as the competent sanitation authority, excluding developers and municipalities from direct operation.El Acuerdo Nº 2008-068 de la Junta Directiva del AyA modificó y creó los trámites institucionales para la aprobación y recepción de plantas de tratamiento de aguas residuales (PTAR) y estaciones de bombeo en urbanizaciones y condominios. La norma fundamenta la obligación del AyA de asumir la administración, operación y control de estos sistemas, basándose en un dictamen vinculante de la Procuraduría General de la República (C-257-2003). El acuerdo establece los requisitos técnicos, legales y documentales para los procedimientos TEP-2 (aprobación), TRPTAR-1 (recepción de PTAR) y TREBAR-2 (recepción de estaciones de bombeo), detallando la documentación exigida y los plazos de resolución. Adopta medidas para simplificar trámites conforme a la Ley 8220, y refuerza el rol del AyA como ente competente en saneamiento, excluyendo a desarrolladores y municipalidades de la operación directa.
Key excerptExtracto clave
1st- That in accordance with the opinion of the Attorney General's Office in its capacity as State Advisory Body, the entity competent to administer and operate Wastewater Treatment Plants is the Costa Rican Institute of Aqueducts and Sewers (AyA). Municipalities only have, in this matter, a residual competence, under the terms indicated, which would be defined by the circumstance of administering and operating the potable water system that supplies the development in question; otherwise, its administration and operation corresponds to AyA. Under no circumstances does the builder or urban developer have the responsibility for its administration and operation, even if it is a public entity such as the National Institute of Housing and Urbanism (INVU). As explained, INVU, in exercising its urban development control powers, supervises the construction of the plants by granting the corresponding approval for development projects and their respective plans, as regulated in Chapter VI of the Regulations for the National Control of Subdivisions and Developments, but does not operate or administer them. Finally, it should be noted that the Costa Rican Institute of Aqueducts and Sewers, as the competent entity to administer and operate potable water systems and the collection and evacuation of wastewater, may authorize Associations established under the provisions of Decree 29.100-S of November 9, 2000, to administer and operate such systems, or alternatively resort to various legal means to fulfill its duties.1º-Que de conformidad con el criterio de la Procuraduría General de la República en su carácter de Órgano Asesor del Estado, el ente competente para administrar y operar las Plantas de Tratamiento de Aguas Residuales, es el Instituto Costarricense de Acueductos y Alcantarillados. Las Municipalidades sólo tienen, en esta materia, una competencia residual, en los términos en que se ha indicado y que en el caso de estas, lo definiría la circunstancia de estar administrando y operando el sistema de agua potable que provee a la urbanización de que se trate, pues de lo contrario correspondería a AyA su administración y operación. En ningún caso corresponde al constructor o desarrollador urbanístico su administración y operación, aunque sea un ente público como el Instituto Nacional de Vivienda y Urbanismo. Como se ha explicado, el INVU, en ejercicio de sus competencias de control del desarrollo urbano, fiscaliza la construcción de las plantas al dar el visado correspondiente a proyectos de las urbanizaciones y los planos respectivos, según se regula en el capítulo VI del Reglamento para el Control Nacional de Fraccionamientos y Urbanizaciones, pero no las opera ni administra. Finalmente habría que indicar que el Instituto Costarricense de Acueductos y Alcantarillados, en tanto ente competente para administrar y operar los sistemas de agua potable y recolección y evacuación de aguas residuales, puede autorizar que Asociaciones constituidas con base en lo establecido en el Decreto 29.100-S de 9 de noviembre de 2000, administren y operen dichos sistemas, o facultativamente recurrir a diversas figuras jurídicas a fin de cumplir con sus competencias.
Pull quotesCitas destacadas
"el ente competente para administrar y operar las Plantas de Tratamiento de Aguas Residuales, es el Instituto Costarricense de Acueductos y Alcantarillados."
"the entity competent to administer and operate Wastewater Treatment Plants is the Costa Rican Institute of Aqueducts and Sewers."
Considerando 1º
"el ente competente para administrar y operar las Plantas de Tratamiento de Aguas Residuales, es el Instituto Costarricense de Acueductos y Alcantarillados."
Considerando 1º
"En ningún caso corresponde al constructor o desarrollador urbanístico su administración y operación, aunque sea un ente público como el Instituto Nacional de Vivienda y Urbanismo."
"Under no circumstances does the builder or urban developer have the responsibility for its administration and operation, even if it is a public entity such as the National Institute of Housing and Urbanism."
Considerando 1º
"En ningún caso corresponde al constructor o desarrollador urbanístico su administración y operación, aunque sea un ente público como el Instituto Nacional de Vivienda y Urbanismo."
Considerando 1º
Full documentDocumento completo
in the entirety of the text - Full Text of Standard 068 Modification of the procedures, requirements and processes TEP-2 Approval of Wastewater Treatment Plants for Urbanizations and Condominiums and creation of the procedures TRPTAR 1 Reception of Treatment Plants and TREBAR 2 Reception of Pumping Stations...
Full Text of record: 1154FF COSTA RICAN INSTITUTE OF AQUEDUCTS COSTA RICAN INSTITUTE OF AQUEDUCTS AND SEWERS (This standard was repealed by the Por Tanto of the Regulation for the approval and reception of sanitation systems by the Instituto Costarricense de Acueductos y Alcantarillados, approved in session No. 009 of February 15, 2017) 2008-008 SUBJECT: Procedures, requirements, and processes for: a) approval of wastewater treatment plants for urbanizations and condominiums, b) the reception of wastewater treatment plants of urbanizations and condominiums to be administered, operated, and controlled by AyA and that are currently administered by other institutions, etc. and c) the reception of wastewater pumping stations of urbanizations and condominiums to be administered, operated, and controlled by AyA and that are currently administered by other institutions, associations, or individuals. Agreement No. 2008-068.
8º-This Board of Directors proceeds to review the proposal presented by the Wastewater Treatment Plants Commission, so that AyA approves the Draft Agreement for the procedures, requirements, and processes for: a) the Approval of Wastewater Treatment Plants for Urbanizations and Condominiums; b) the Reception of Wastewater Treatment Plants of Urbanizations and Condominiums to be administered, operated, and controlled by AyA, which are administered by other institutions, associations, or individuals; c) the Reception of Wastewater Pumping Stations of Urbanizations and Condominiums to be administered, operated, and controlled by AyA, which are administered by other institutions, associations, or individuals.
Under no circumstances does the builder or urban developer handle its administration and operation, even if it is a public entity like the Instituto Nacional de Vivienda y Urbanismo. As has been explained, INVU, in exercising its powers to control urban development, monitors the construction of the plants when granting the corresponding endorsement to projects for the urbanizations and respective plans, as regulated in chapter VI of the Reglamento para el Control Nacional de Fraccionamientos y Urbanizaciones, but it does not operate or administer them.
But it also does not do so when it acts as a builder, because in this case, in addition to having to deliver the public-use areas to the corresponding municipality, the latter is obligated to accept the treatment plant if it is technically viable and to transfer to the Instituto Costarricense de Acueductos y Alcantarillados the portion where the plants are located, so that said Institute administers and operates them, just as provided by the current regulations that have already been analyzed.
Finally, it should be noted that the Instituto Costarricense de Acueductos y Alcantarillados, as the competent entity to administer and operate potable water systems and wastewater collection and disposal, may authorize Associations constituted based on the provisions of Decreto 29.100-S of November 9, 2000, to administer and operate said systems, or optionally resort to various legal figures in order to fulfill its competencies.
By virtue of the considerations set forth, and based on the provisions of the Constitutive Law of the Instituto Costarricense de Acueductos y Alcantarillados, Law No. 2726 of April 14, 1961; the General Health Law, Law No. 5395 of October 30, 1973, published in La Gaceta No. 222 of November 24, 1973; as well as what is referred to regarding the environment and wastewater by the Organic Law of the Environment, Law No. 7554 of October 4, 1996, published in La Gaceta No. 215 of November 13, 1995; the Wildlife Conservation Law, Law No. 7317 of October 30, 1992, published on December 7, 1992; the Regulation for the management of sludge from septic tanks, Decreto Ejecutivo No. 21297-S of May 15, 1992, published in La Gaceta No. 114 of June 15, 1992; the Regulation for approval and operation of wastewater treatment systems, Decreto Ejecutivo No. 31545-S-MINAE of October 9, 2003, published in La Gaceta No. 246 of December 22, 2003; the Regulation for discharge and reuse of wastewater, Decreto Ejecutivo No. 33601-MINAE-S of August 9, 2006, published in Supplement No. 8 to La Gaceta No. 55 of March 19, 2007; the Seismic Code of Costa Rica, Decreto Ejecutivo No. 31553-MICIT-MOPT, published in La Gaceta No. 249 of December 26, 2003; and in compliance with the provisions of the Procuraduría General de la República, issued through communication C-257-2003 of August 27, 2003; and in accordance with the powers conferred in the Constitutive Law of AyA and articles 4, 5, and 8 of the Law for the Protection of Citizens from Excessive Administrative Requirements and Procedures and articles 6 and 9 of its Regulation, it is Agreed:
To approve the modification of the procedures, requirements, and processes TEP-2 for the APPROVAL OF WASTEWATER TREATMENT PLANTS FOR URBANIZATIONS AND CONDOMINIUMS, and to create the procedures TRPTAR-1, RECEPTION OF WASTEWATER TREATMENT PLANTS OF URBANIZATIONS AND CONDOMINIUMS TO BE ADMINISTERED, OPERATED, AND CONTROLLED BY AYA, WHICH ARE ADMINISTERED BY OTHER INSTITUTIONS, ASSOCIATIONS, OR INDIVIDUALS; TREBAR-2, RECEPTION OF WASTEWATER PUMPING STATIONS OF URBANIZATIONS AND CONDOMINIUMS TO BE ADMINISTERED, OPERATED, AND CONTROLLED BY AYA, WHICH ARE ADMINISTERED BY OTHER INSTITUTIONS, ASSOCIATIONS, OR INDIVIDUALS, in the following manner:
| Procedure | Requirements | Process | Legal Basis | Department | Legal Deadline for Resolution | | --- | --- | --- | --- | --- | --- | | TEP-2 | | | | | | | APPROVAL OF WASTEWATER TREATMENT PLANTS | 1. Application letter for treatment plant approval, addressed to the Head of the Department of Study Design and Projects. | 1. Receipt of construction plans and documents. | Constitutive Law of AyA. | Directorate of Studies and Projects | 1 MONTH | | | 2. Note from the Ministry of Health for the current Location Permit. | 2. Verification of submitted documents. | INVU requests it for the approval of projects. | | | | | 3. Letter from the entity that will be in charge of the treatment plant's operation and maintenance, undertaking to operate the system. | 3. Review of plans. | No. 33601-MINAE-S. Regulation for Discharge and Reuse of Wastewater. | | | | | 4. Copy of the cadastral plan. | 4. Review of the design report. | No. 31545-S-MINAE. Regulation for Approval and Operation of Wastewater Treatment Systems. | | | | | 5. Final construction plans for the treatment system (bearing the seal of approval from the Colegio Federado de Ingenieros y Arquitectos), including an electrical plan (*) and the plan for the final effluent disposal system. | 5. Review of the operation and maintenance manual. | No. 21518-S. Standards for the Location of Wastewater Treatment Plants. | | | | | 6. Final construction plans in digital format (CD). | 6. Review of the required documents for each final effluent disposal case. | | | | | | 7. Descriptive project report, signed by the Responsible Engineer, including: calculation report for the treatment system and the final effluent disposal. | 7. Inform the user if the approval is granted or denied. | | | | | | 8. Operation and Maintenance manual for the treatment plant and the final effluent disposal system, when disposal is through reuse or infiltration, signed by the Responsible Engineer. | | | | | | | 9. Additionally, | | | | | | | a) For effluent reuse: | | | | | | | - Hydrogeological study of contaminant transport (**). | | | | | | | b) For effluent infiltration: | | | | | | | - Hydrogeological study of contaminant transport (**). | | | | | | | - Sworn statement that groundwater will not be contaminated with nitrates, signed by the Responsible Engineer. | | | | | | | c) For effluent evaporation: | | | | | | | -Infiltration test (when the wastewater storage tank is built on natural soil). | | | | | | | - Mass balance study of the pond. | | | | | | | (*) Plans with electrical design, indicating at least: control system, power system, and table with specifications for electromechanical equipment and control elements (brand, description, model, and part number) | | | | | | | (**) The hydrogeological study of contaminant transport must contain the following information: | | | | | | | I. Project Background, site design, indicating lot density, number of houses in the Project, destination, indicating distance to existing infrastructure, and cadastral plan number. | | | | | | | II. Cadastral plan. | | | | | | | III. Regional and local Geology, with the respective map. | | | | | | | IV. Project location map. | | | | | | | V. Map with the location of water resource sources (wells and springs) near the project. | | | | | | | VI. Hydrogeological profiles with their respective interpretation, groundwater levels, zone geology, and their scales. | | | | | | | VII. Hydrogeology defining the existing aquifers in the study area. | | | | | | | VIII. Table indicating: well number, coordinates, owner, well depth, static level, flow rate, lithology, and construction of the wells to be used in the project. | | | | | | | IX. Water-table contour map. | | | | | | | X. Calculation of contaminant transport times using the methodology established in the document "Standards for the calculation of transport times between septic tank drainages and groundwater sources, 1994, by Hugo Rodríguez", to evaluate the unsaturated zone and the saturated zone if necessary. | | | | | | | XII. In-situ infiltration tests shall be performed in accordance with the Design and Construction Presentation Standards for Urbanizaciones and Fraccionamientos of AyA, and 3 infiltration tests must be conducted per hectare of land to be used for effluent disposal. | | | | | | | XIII. In-situ porosity tests or the bibliographic source from which it was taken. | | | | | | | XIV. Conclusions where the professional determines the following: the study results determine that the subsoil would allow a rapid and complete degradation of bacterial contamination. | | | | | | | XV. Each hydrogeological study must be signed by a responsible Geologist or Hydrogeologist accredited by the respective Professional Association. | | | | | | TRPTAR-1 | 1- Application letter from the interested party or Municipal Council Agreement (owner of the WWTP) requesting that AyA receive the wastewater treatment plant for its administration, operation, and control. | 1-Receipt of information at the Wastewater Directorate at AyA Headquarters. | -Art. 50 of the Political Constitution. | Wastewater Directorate | 2 months | | RECEPTION OF WASTEWATER TREATMENT PLANTS OF URBANIZATIONS AND CONDOMINIUMS TO BE ADMINISTERED, OPERATED, AND CONTROLLED BY AYA, WHICH ARE ADMINISTERED BY OTHER INSTITUTIONS, ASSOCIATIONS, OR INDIVIDUALS. | 2-Connection of at least 75% of the project's houses. | 2-Preparation of a Report on operation, maintenance, and control costs. | -Art 50 and 52 of the Organic Law of the Environment. | | | | | 3-Performance of the WWTP in full compliance with the Maximum Permissible Limits established in national legislation. | 3-Preparation of a preliminary technical report. | -Arts 264, 285 to 288 of the General Health Law. | | | | | 4-Fulfillment of complementary technical aspects: screens, influent and effluent flow measurement, anti-corrosive materials, roof on the drying bed, chain-link fence with razor/barbed wire, gate, access for personnel and vehicle, operator and watchman's booth, lighting, control panel in a concrete structure, all electrical installation with NEC standards (See preliminary technical report). | 4-Registry investigation. | -Art 35 of the Urban Planning Law. | | | | | 5-Cadastral plan of the land and easements required for the operation and maintenance of the Wastewater Treatment Plant and the wastewater conveyance pipes. | 5-Topographic survey (verification). | -Arts 1 and 2 of the Constitutive Law of AyA. | | | | | 6-Copy of the legal status certification. | 6-Appraisal of civil works, electromechanical equipment, land, and easements. | Art. 261 of the General Public Administration Law. | | | | | 7-Copy of the Wastewater Treatment Plant plans. | 7-Preparation of a technical suitability report. | -Pronouncement C-257-2003, of the Procuraduría General de la República. | | | | | 8-Copy of the calculation report of the Wastewater Treatment Plant. | 8-Preparation of a draft public deed for the transfer of land and other assets. | -Decreto 33601-MINAE-S. | | | | | 9-Copy of the operation and maintenance manual for the Wastewater Treatment Plant. | 9-Preparation of the Board of Directors Agreement. | | | | | | 10-Copy of the construction permit from the Municipality. | 10- Resolution of the Board of Directors. | | | | | | 11-Manuals for the electromechanical equipment. | 11- Notification to the Regional Office and the residents of the change of administration, signing of deeds. | | | | | | 12-Copy of the warranties for the electromechanical equipment. | 12-Registration of land and easements in the public registry; transfer of services to the name of AyA. | | | | | | 13-Copy of the sanitary sewer system plans. | 13-Publication in La Gaceta. | | | | | | 14-Report on: operation and maintenance activities, construction and start-up date, number of connected houses, copy of Operational Reports and operational controls. | 14-Delivery act by the applicant to AyA. | | | | | | 15-Copy of the municipal agreement for the reception of public areas, indicating: approval date, total project area, children's playground area, and communal facilities area. | 15-Assume the direct administration and operation of the potable water system. | | | | | | 16-Copy of paid utility bills (last 12 months). | | | | | | | 17-Draft public deed. | | | | | | | 18-Guarantee deposit for proper functioning (will be requested once the internal AyA procedures are completed). | | | | | | TREBAR-2 | 1- Application letter from the interested party or Municipal Council Agreement (owner of the WWTP) requesting that AyA receive the Wastewater Pumping Station for its administration, operation, and control. | 1-Receipt of information at the Wastewater Directorate at AyA Headquarters. | -Art. 50 of the Political Constitution. | Wastewater Directorate | 2 months | | RECEPTION OF WASTEWATER PUMPING STATIONS OF URBANIZATIONS AND CONDOMINIUMS TO BE ADMINISTERED, OPERATED, AND CONTROLLED BY AYA, WHICH ARE ADMINISTERED BY OTHER INSTITUTIONS, ASSOCIATIONS, OR INDIVIDUALS. | 2-Connection of at least 75% of the project's houses. | 2-Preparation of a Report on operation, maintenance, and control costs. | -Art 50 and 52 of the Organic Law of the Environment. | | | | | 3-Satisfactory functioning of the Pumping Station without electromechanical problems. | 3-Preparation of a preliminary technical report. | -Arts 264, 285 to 288 of the General Health Law. | | | | | 4-Fulfillment of complementary technical aspects: screens, hour meters, anti-corrosive materials, pumping station booth in good condition, chain-link fence with razor/barbed wire, gate, access for personnel and vehicle, operator and watchman's booth, lighting, control panel in a concrete structure, all electrical installation with NEC standards (See preliminary technical report). | 4-Registry investigation. | -Art 35 of the Urban Planning Law. | | | | | 5-Cadastral plan of the land and easements required for the operation and maintenance of the Wastewater Pumping Station and the wastewater conveyance pipes. | 5-Topographic survey (verification). | -Arts 1 and 2 of the Constitutive Law of AyA. | | | | | 6-Copy of the interested party's legal status certification. | 6-Appraisal of civil works, electromechanical equipment, land, and easements. | Art. 261 of the General Public Administration Law. | | | | | 7-Copy of the Wastewater Pumping Station plans. | 7-Preparation of a technical suitability report. | -Pronouncement C-257-2003, of the Procuraduría General de la República. | | | | | 8-Copy of the calculation report of the Wastewater Pumping Station. | 8-Preparation of a draft public deed for the transfer of land and other assets. | -Decreto 33601-MINAE-S. | | | | | 9-Copy of the operation and maintenance manual for the Wastewater Pumping Station. | 9-Preparation of the Board of Directors Agreement. | | | | | | 10-Copy of the construction permit from the Municipality. | 10- Resolution of the Board of Directors. | | | | | | 11-Manuals for the electromechanical equipment. | 11- Notification to the Regional Office and the residents of the change of administration, signing of deeds. | | | | | | 12-Copy of the warranties for the electromechanical equipment. | 12-Registration of land and easements in the public registry; transfer of services to the name of AyA. | | | | | | 13-Copy of the sanitary sewer system plans. | 13-Publication in La Gaceta. | | | | | | 14-Report on: operation and maintenance activities, construction and start-up date, number of connected houses, copy of operational controls. | 14-Delivery act by the applicant to AyA. | | | | | | 15-Copy of the municipal agreement for the reception of public areas, indicating: approval date, total project area, children's playground area, and communal facilities area. | 15-Assume the direct administration and operation of the potable water system. | | | | | | 16-Copy of paid utility bills for the last 12 months. | | | | | | | 17-Draft public deed. | | | | | | | 18-Guarantee deposit for proper functioning; will be requested once the internal AyA procedures are completed. | | | | | Let it be published and notified to the Ministerio de Economía, Industria y Comercio for its due promulgation. Let it be communicated. Firm Agreement.
Agreement No. 2008-068, adopted by the Board of Directors of the Instituto Costarricense de Acueductos y Alcantarillados in article 1, of the extraordinary session No. 2008-008, held on 05/02/2008.
Resultando:
Considerando:
en la totalidad del texto - Texto Completo Norma 068 Modificación de los trámites, requisitos y procedimientos TEP-2 Aprobación de Plantas de Tratam. de aguas residuales para Urb. y Condóminos y creación de los trámites TRPTAR 1 Recepción Plantas de Tratamiento y TREBAR 2 Recepción Estaciones de Bombeo...
Texto Completo acta: 1154FF INSTITUTO COSTARRICENSE DE ACUEDUCTOS INSTITUTO COSTARRICENSE DE ACUEDUCTOS Y ALCANTARILLADOS (Esta norma fue derogada por el Por Tanto del Reglamento de aprobación y recepción de sistemas de saneamiento por parte del Instituto Costarricense de Acueductos y Alcantarillados, aprobado en sesión N° 009 del 15 de febrero de 2017) 2008-008 ASUNTO: Trámites, requisitos y procedimientos para: a) aprobación de plantas de tratamiento de aguas residuales para urbanizaciones y condominios, b) la recepción de plantas de tratamiento de aguas residuales de urbanizaciones y condominios para ser administradas , operadas y controladas por el aya y que se encuentran administradas por otras instituciones, etc. y c) la recepción de estaciones de bombeo de aguas residuales de urbanizaciones y condominios para ser administradas, operadas y controladas por el aya y que se encuentran administradas por otras instituciones, asociaciones o particulares. Acuerdo Nº 2008-068.
8º-Procede esta Junta Directiva a conocer la propuesta presentada por la Comisión de Plantas de Tratamiento de Aguas Residuales, con el fin de que AyA, apruebe el Proyecto de Acuerdo para los trámites, los requisitos y los procedimientos para: a) la Aprobación de Plantas de Tratamiento de Aguas Residuales para Urbanizaciones y Condominios; b) la Recepción de Plantas de Tratamiento de Aguas Residuales de Urbanizaciones y Condominios para ser administradas, operadas y controladas por el AyA, que se encuentren administradas por otras instituciones, asociaciones o particulares; c) la Recepción de Estaciones de Bombeo de Aguas Residuales de Urbanizaciones y Condominios para ser administradas, operadas y controladas por el AyA, que se encuentren administradas por otras instituciones, asociaciones o particulares.
En ningún caso corresponde al constructor o desarrollador urbanístico su administración y operación, aunque sea un ente público como el Instituto Nacional de Vivienda y Urbanismo. Como se ha explicado, el INVU, en ejercicio de sus competencias de control del desarrollo urbano, fiscaliza la construcción de las plantas al dar el visado correspondiente a proyectos de las urbanizaciones y los planos respectivos, según se regula en el capítulo VI del Reglamento para el Control Nacional de Fraccionamientos y Urbanizaciones, pero no las opera ni administra.
Pero tampoco lo hace cuando actúa como constructor, porque en este caso, además de que debe hacer entrega de las áreas uso público a la municipalidad correspondiente, esta última está en la obligación de aceptar la planta de tratamiento si es técnicamente viable y traspasar al Instituto Costarricense de Acueductos y Alcantarillados la porción donde se ubiquen las plantas, para que dicho Instituto las administre y opere, tal y como lo dispone la normativa vigente que ya ha sido analizada.
Finalmente habría que indicar que el Instituto Costarricense de Acueductos y Alcantarillados, en tanto ente competente para administrar y operar los sistemas de agua potable y recolección y evacuación de aguas residuales, puede autorizar que Asociaciones constituidas con base en lo establecido en el Decreto 29.100-S de 9 de noviembre de 2000, administren y operen dichos sistemas, o facultativamente recurrir a diversas figuras jurídicas a fin de cumplir con sus competencias.
A tenor de las consideraciones expuestas, y con fundamento en lo que disponen la Ley Constitutiva del Instituto Costarricense de Acueductos y Alcantarillados Ley Nº 2726 de 14 de abril del 1961, Ley General de Salud Ley Nº 5395 de 30 de octubre de 1973 Publicada en La Gaceta Nº 222 de 24 de noviembre de 1973, así también a lo que en materia de ambiente y aguas residuales refieren la Ley Orgánica del Ambiente Ley Nº 7554 De 4 de octubre de 1996 Publicada en La Gaceta Nº 215 de 13 de noviembre de 1995, Ley de Conservación de la Vida Silvestre Ley Nº 7317 de 30 de octubre de 1992 Publicada el 7 de diciembre de 1992, Reglamento para el manejo de lodos procedentes de tanques sépticos Decreto Ejecutivo Nº 21297-S de 15 de mayo de 1992. Publicado en La Gaceta Nº 114, de 15 de junio de 1992, Reglamento de aprobación y operación de sistemas de tratamiento de aguas residuales Decreto Ejecutivo Nº 31545-S-MINAE de 9 de octubre del 2003. Publicado en La Gaceta Nº 246 de 22 de diciembre del 2003, Reglamento de vertido y reuso de aguas residuales Decreto Ejecutivo Nº 33601-MINAE-S del 9 de agosto del 2006, Publicado en el Alcance Nº 8 a La Gaceta Nº 55 del 19 de marzo del 2007, Código Sísmico de Costa Rica Decreto Ejecutivo Nº 31553-MICIT-MOPT. Publicado en La Gaceta Nº 249 del 26 de diciembre de 2003.Y en acatamiento a las disposiciones de la Procuraduría General de la República, emitidas mediante oficio C-257-2003 del 27 de agosto del 2003 de diciembre de 2003; y de conformidad con las facultades conferidas en la Ley Constitutiva del AyA y los artículos 4, 5 y 8 de la Ley de Protección al Ciudadano del Exceso de Requisitos y Trámites Administrativos y 6 y 9 de su Reglamento se Acuerda:
Aprobar la modificación de los trámites, requisitos y procedimientos TEP-2 de APROBACIÓN DE PLANTAS DE TRATAMIENTO DE AGUAS RESIDUALES PARA URBANIZACIONES Y CONDOMINIOS, y crear los trámites TRPTAR-1, RECEPCIÓN DE PLANTAS DE TRATAMIENTO DE AGUAS RESIDUALES DE URBANIZACIONES Y CONDOMINIOS PARA SER ADMINISTRADAS, OPERADAS Y CONTROLADAS POR EL AYA, QUE SE ENCUENTREN ADMINISTRADAS POR OTRAS INSTITUCIONES, ASOCIACIONES O PARTICULARES; TREBAR-2, RECEPCIÓN DE ESTACIONES DE BOMBEO DE AGUAS RESIDUALES DE URBANIZACIONES Y CONDOMINIOS PARA SER ADMINISTRADAS, OPERADAS Y CONTROLADAS POR EL AYA, QUE SE ENCUENTREN ADMINISTRADAS POR OTRAS INSTITUCIONES, ASOCIACIONES O PARTICULARES, de la siguiente manera:
| Trámite | Requisitos | Procedimiento | Fundamento Legal | Dependencia | Plazo Legal para resolver | | --- | --- | --- | --- | --- | --- | | TEP-2 | | | | | | | APROBACIÓN DE PLANTAS DE TRATAMIENTO PARA AGUAS RESIDUALES | 1. Carta de solicitud de aprobación de la planta de tratamiento, dirigida al Jefe del Departamento de Diseño de Estudios y Proyectos. | 1. Recibo de planos constructivos y documentos. | Ley Constitutiva de AyA. | Dirección de Estudios y Proyectos | 1 MES | | | 2. Nota de Ministerio de Salud del Permiso de Ubicación vigente. | 2. Verificación de documentos presentados. | El INVU lo solicita para la aprobación de los proyectos. | | | | | 3. Carta del ente que se encargará de la operación y mantenimiento de la planta de tratamiento donde se compromete a operar el sistema. | 3. Revisión de planos. | No. 33601-MINAE-S. Reglamento de Vertido y Reuso de Aguas Residuales. | | | | | 4. Copia de plano catastrado. | 4. Revisión de la memoria de diseño. | No. 31545-S-MINAE. Reglamento de Aprobación y Operación de Sistemas de Tratamiento de Aguas Residuales. | | | | | 5. Planos constructivos finales del sistema de tratamiento (traer sello del visado del Colegio Federado de Ingenieros y Arquitectos), que incluya un plano eléctrico (*) y del sistema de disposición final del efluente. | 5. Revisión de la memoria de operación y mantenimiento. | No.21518-S. Normas de Ubicación de Plantas de Tratamiento de Aguas Residuales. | | | | | 6. Planos constructivos finales en formato digital (CD). | 6. Revisión de los documentos requeridos para cada caso de disposición final del efluente. | | | | | | 7. Memoria descriptiva del proyecto, firmada por el Ing. Responsable, que incluya: memoria de cálculo del sistema de tratamiento y de la disposición final del efluente. | 7. Informar al usuario si procede la aprobación o no procede. | | | | | | 8. Manual de Operación y mantenimiento de la planta de tratamiento y del sistema de disposición final del efluente, cuando se disponga por medio del reuso o la infiltración, firmado por el Ing. Responsable. | | | | | | | 9. Adicionalmente, | | | | | | | a) Para reuso del efluente: | | | | | | | - Estudio hidrogeológico de tránsito de contaminantes (**). | | | | | | | b) Para infiltración del efluente: | | | | | | | - Estudio hidrogeológico de tránsito de contaminantes (**). | | | | | | | - Declaración jurada de que no se contaminarán las aguas subterráneas con nitratos, firmada por el Ing, Responsable. | | | | | | | c) Para la evaporación del efluente: | | | | | | | -Prueba de infiltración (cuando el tanque de almacenamiento de las aguas residuales se realice con el suelo natural). | | | | | | | - Estudio del balance de masa en el estanque. | | | | | | | (*) Planos con diseño eléctrico, indicando al menos: sistema de control, sistema de potencia y tabla con especificaciones de equipos electromecánicos y elementos de control (marca, descripción, modelo y número de parte) | | | | | | | (**) El estudio hidrogeológico de tránsito de contaminantes debe contener la siguiente información: | | | | | | | I. Antecedentes del Proyecto, Diseño de sitio, indicando densidad de lotes, número de viviendas del Proyecto, el destino, indicar distancia de la infraestructura existente y número de plano catastro. | | | | | | | II. Plano catastrado. | | | | | | | III. Geología Regional y local, con el respectivo mapa. | | | | | | | IV. Mapa de ubicación del Proyecto. | | | | | | | V. Mapa con la ubicación de las fuentes de recursos hídricos (pozos y manantiales) cercanas al proyecto. | | | | | | | VI. Perfiles hidrogeológicos con su respectiva interpretación, niveles de agua subterránea, geología de la zona y sus escalas. | | | | | | | VII. Hidrogeología donde se definen los acuíferos existentes en la zona de estudio. | | | | | | | VIII. Cuadro donde se indique: número de pozo, coordenadas, propietario, profundidad del pozo, nivel estático, caudal, litología y armado de los pozos que se emplearán en el proyecto. | | | | | | | IX. Mapa de curvas isofreáticas. | | | | | | | X. Cálculo de los tiempos de tránsito de contaminantes con la metodología establecida en el documento "Normas para el cálculo de tiempos de transito entre los drenajes de tanques sépticos y las fuentes de aguas subterráneas, 1994, de Hugo Rodríguez", para evaluar la zona no saturada y la zona saturada de ser necesario. | | | | | | | XII. Las pruebas de infiltración in situ, serán realizadas de conformidad con las Normas de Presentación de Diseño y Construcción para Urbanizaciones y Fraccionamiento de AyA y deberán hacerse 3 pruebas de infiltración por cada hectárea del terreno que se utilizará para la disposición del efluente. | | | | | | | XIII. Pruebas de porosidad in situ o fuente bibliográfica donde se tomó. | | | | | | | XIV. Conclusiones donde el profesional determine lo siguiente: los resultados de estudio determinan que el subsuelo permitirían una rápida y completa degradación de la contaminación bacteriana. | | | | | | | XV. Cada estudio hidrogeológico deberá venir firmado por un Geólogo o un Hidrogeólogo responsable y acreditado por el respectivo Colegio. | | | | | | TRPTAR-1 | 1- Carta de solicitud del interesado o Acuerdo del Consejo Municipal (propietario de la PTAR) en donde solicita que el AyA, reciba la planta de tratamiento de aguas residuales para su administración, operación y control. | 1-Recibo de información en la Dirección de Aguas Residuales en Sede Central AyA. | -Art. 50 Constitución Política. | Dirección de Aguas Residuales | 2 mes | | RECEPCIÓN DE PLANTAS DE TRATAMIENTO DE AGUAS RESIDUALES DE URBANIZACIONES Y CONDOMINIOS PARA SER ADMINISTRADAS, OPERADAS Y CONTROLADAS POR EL AYA, QUE SE ENCUENTREN ADMINISTRADAS POR OTRAS INSTITUCIONES, ASOCIACIONES Ó PARTICULARES. | 2-Conexión de al menos un 75% de las viviendas del proyecto | 2-Elaboración de Informe sobre costos de operación, mantenimiento y control | -Art 50 y 52 de la Ley Orgánica del Ambiente | | | | | 3-Desempeño de la PTAR en pleno cumplimiento de los Límites Máximos Permisibles establecidos en la legislación nacional | 3-Elaboración de Informe técnico preliminar | -Arts 264, 285 al 288 de la Ley General de Salud. | | | | | 4-Cumplimiento de aspectos técnicos complementarios: rejillas, medición de caudal afluente y efluente, materiales anticorrosivos, techo en lecho de secado, malla ciclón con alambre navaja/púas, portón, acceso para personal y vehículo, caseta para operador y vigilante, iluminación, panel de control en estructura de concreto, toda instalación eléctrica con normas NEC (Ver Informe técnico preliminar) | 4-Investigación registral | -Art 35 de la Ley de de Planificación Urbana | | | | | 5-Plano catastrado de terreno y servidumbres requeridos para operación y mantenimiento de la Planta de Tratamiento de Aguas Residuales y las tuberías de conducción de aguas residuales | 5-Levantamiento topográfico (verificación) | -Art 1 y 2 de la Ley Constitutiva del AyA. | | | | | 6-Copia de personería jurídica | 6-Avalúo de obras civiles, equipo electromecánico, terreno y servidumbres | Art. 261 de la Ley General de Administración Pública. | | | | | 7-Copia de los planos de la Planta de Tratamiento de Aguas Residuales | 7-Elaboración de informe de idoneidad técnica | -Pronunciamiento C-257-2003, de la Procuraduría General de la República | | | | | 8-Copia de la memoria de cálculo de la Planta de Tratamiento de Aguas Residuales | 8-Elaboración de borrador de escritura para traspaso de terrenos y otros activos | -Decreto 33601-MINAE-S | | | | | 9-Copia del manual de operación y mantenimiento de la Planta de Tratamiento de Aguas Residuales | 9-Elaboración del Acuerdo de Junta Directiva | | | | | | 10-Copia del permiso de construcción de la Municipalidad | 10- Resolución de Junta Directiva | | | | | | 11-Manuales de los equipos electromecánicos | 11- Notificación a Oficina Regional y a los vecinos del cambio de administración, firma de escrituras. | | | | | | 12-Copia de las garantías de los equipos electromecánicos | 12-Inscripción de terrenos y servidumbres en registro público; traspaso de servicios a nombre del AyA | | | | | | 13-Copia de los planos del alcantarillado sanitario | 13-Publicación en La Gaceta | | | | | | 14-Informe sobre: actividades de operación y mantenimiento, fecha de construcción y puesta en marcha, cantidad de viviendas conectadas, copia de Reportes Operacionales y controles operativos | 14-Acto de entrega por parte del solicitante al AyA. | | | | | | 15-Copia del acuerdo municipal de recepción de áreas públicas, tal que se indique: fecha de aprobación, área total del proyecto, área de juegos infantiles y área de facilidades comunales | 15-Asumir la administración y operación directa del sistema de agua potable. | | | | | | 16-Copia de recibos cancelados para los servicios públicos (últimos 12 meses) | | | | | | | 17-Borrador de escrituras | | | | | | | 18-Depósito de garantía de buen funcionamiento (se solicitará una vez completada la tramitología interna de AyA) | | | | | | TREBAR-2 | 1- Carta de solicitud del interesado o Acuerdo del Consejo Municipal (propietario de la PTAR) en donde solicita que el AyA, reciba la Estación de Bombeo de Aguas Residuales para su administración, operación y control. | 1-Recibo de información en la Dirección de Aguas Residuales en Sede Central AyA. | -Art. 50 Constitución Política. | Dirección de Aguas Residuales | 2 mes | | RECEPCIÓN DE ESTACIONES DE BOMBEO DE AGUAS RESIDUALES DE URBANIZACIONES Y CONDOMINIOS PARA SER ADMINISTRADAS, OPERADAS Y CONTROLADAS POR EL AYA, QUE SE ENCUENTREN ADMINISTRADAS POR OTRAS INSTITUCIONES, ASOCIACIONES Ó PARTICULARES. | 2-Conexión de al menos un 75% de las viviendas del proyecto. | 2-Elaboración de Informe sobre costos de operación, mantenimiento y control | -Art 50 y 52 de la Ley Orgánica del Ambiente | | | | | 3-Funcionamiento satisfactorio de la Estación de Bombeo sin problemas electromecánicos. | 3-Elaboración de Informe técnico preliminar | -Arts 264, 285 al 288 de la Ley General de Salud. | | | | | 4-4-Cumplimiento de aspectos técnicos complementarios: rejillas, horímetros, materiales anticorrosivos, caseta de bombeo en buen estado, malla ciclón con alambre navaja/púas, portón, acceso para personal y vehículo, caseta para operador y vigilante, iluminación, panel de control en estructura de concreto, toda instalación eléctrica con normas NEC (Ver Informe técnico preliminar) | 4-Investigación registral | -Art 35 de la Ley de de Planificación Urbana | | | | | 5-Plano catastrado de terreno y servidumbres requeridos para operación y mantenimiento de la Estación de Bombeode Aguas Residuales y las tuberías de conducción de aguas residuales. | 5-Levantamiento topográfico (verificación) | -Art 1 y 2 de la Ley Constitutiva del AyA. | | | | | 6-Copia de personería jurídica del interesado. | 6-Avalúo de obras civiles, equipo electromecánico, terreno y servidumbres | Art. 261 de la Ley General de Administración Pública. | | | | | 7-Copia de los planos de la Estación de Bombeo de Aguas Residuale. | 7-Elaboración de informe de idoneidad técnica. | -Pronunciamiento C-257-2003, de la Procuraduría General de la República | | | | | 8-Copia de la memoria de cálculo de la Estación de Bombeo de Aguas Residuales | 8-Elaboración de borrador de escritura para traspaso de terrenos y otros activos. | -Decreto 33601-MINAE-S | | | | | 9-Copia del manual de operación y mantenimiento de la Estación de Bombeo de Aguas Residuales | 9-Elaboración del Acuerdo de Junta Directiva | | | | | | 10-Copia del permiso de construcción de la Municipalidad | 10- Resolución de Junta Directiva. | | | | | | 11-Manuales de los equipos electromecánicos | 11- Notificación a Oficina Regional y a los vecinos del cambio de administración, firma de escrituras. | | | | | | 12-Copia de las garantías de los equipos electromecánicos | 12-Inscripción de terrenos y servidumbres en registro público; traspaso de servicios a nombre del AyA | | | | | | 13-Copia de los planos del alcantarillado sanitario | 13-Publicación en La Gaceta | | | | | | 14-Informe sobre: actividades de operación y mantenimiento, fecha de construcción y puesta en marcha, cantidad de viviendas conectadas, copia de controles operativos . | 14-Acto de entrega por parte del solicitante al AyA. | | | | | | 15-Copia del acuerdo municipal de recepción de áreas públicas, tal que se indique: fecha de aprobación, área total del proyecto, área de juegos infantiles y área de facilidades comunales. | 15-Asumir la administración y operación directa del sistema de agua potable. | | | | | | 16-Copia de recibos servicios públicos cancelados durante los últimos 12 meses. | | | | | | | 17-Borrador de escrituras | | | | | | | 18-Depósito de garantía de buen funcionamiento se solicitará una vez completada la tramitología interna de AyA. | | | | | Publíquese y Notifíquese al Ministerio de Economía, Industria y Comercio para su debida promulgación. Comuníquese. Acuerdo firme.
Acuerdo Nº 2008-068, adoptado por la Junta Directiva del Instituto Costarricense de Acueductos y Alcantarillados en el artículo 1º, de la sesión extraordinaria Nº 2008-008, celebrada el 05/02/2008.
Resultando:
Considerando:
Document not found. Documento no encontrado.