"Urban Renewal Zones of this Regulation".
1
← Environmental Law Center← Centro de Derecho Ambiental
Reglamento municipal 53-C · 30/04/2007
OutcomeResultado
SummaryResumen
This municipal regulation, part of Montes de Oca's Regulatory Plan, defines and regulates three types of urban renewal zones: by urban potential, by road infrastructure, and by risk. Specific provisions are established for each. In potential zones, uses such as housing, commerce, education, and public spaces are promoted, prioritizing pedestrians through sidewalk widening and new alignments. Road renewal zones detail road sections requiring expansion, creation of new streets, and pedestrian improvements, with a focus on connectivity and safety. Risk zones prohibit new construction and lot segregation, require reforestation with native species approved by the Forestry Directorate of MINAE, establish setback strips of 10 or 50 meters along rivers and streams depending on slope, and make the municipality responsible for coordinating relocation and compensation plans. The regulation aims to eradicate slums, rehabilitate defective urban areas, and prevent deterioration, improving quality of life and resident safety.Este reglamento municipal, parte del Plan Regulador de Montes de Oca, define y regula tres tipos de zonas de renovación urbana: por potencial urbano, por vialidad y por riesgo. Para cada una establece disposiciones específicas. En las zonas de potencial urbano se promueven usos como vivienda, comercio, educación y espacios públicos, priorizando al peatón mediante ampliación de aceras y nuevos alineamientos. Las zonas de renovación por vialidad detallan tramos viales que requieren ampliación de calzadas, creación de nuevas calles y mejoras peatonales, con un enfoque de conectividad y seguridad. Las zonas de riesgo prohíben nuevas construcciones y segregaciones, exigen reforestación con especies nativas aprobadas por la Dirección Forestal del MINAE, establecen franjas de protección de 10 o 50 metros a lo largo de ríos y quebradas según pendiente, y responsabilizan a la municipalidad de coordinar planes de reubicación e indemnización. El reglamento busca erradicar tugurios, rehabilitar áreas urbanas defectuosas y prevenir el deterioro, mejorando la calidad de vida y la seguridad de los habitantes.
Key excerptExtracto clave
Article 12. Lands classified as high risk due to landslide or flood and that are evacuated or abandoned must be regenerated in such a way that future construction of new homes or buildings is made impossible, either through physical barriers or intensive tree planting in the evacuated or abandoned areas. These zones shall be used as municipal areas. Article 13. For all types of lands indicated in the previous articles, a reforestation plan approved by the Forestry Directorate of the Ministry of Environment and Energy must be submitted. It must be considered that the vegetation is native to the area and that the stability of the land is not affected, but improved. Article 14. In urban areas, where it is intended to urbanize properties crossed by rivers or streams or that border them, a non-construction strip with a minimum width of 10 meters along the average riverbed and measured on each side, in horizontal projection, must be provided. This strip cannot be reduced for any reason, since its purpose is to protect the river. In streams and intermittent streams, 10 meters of protection strip must be left on each side of the bed. On lands with a slope equal to or greater than 40%, the protection area shall consist of 50 meters on each side of the river bank.Artículo 12. Los terrenos clasificados como de alto riesgo por deslizamiento o inundación y que sean evacuados o abandonados, se deben regenerar de manera que se imposibilite la construcción de nuevas de viviendas o edificaciones en el futuro, ya sea por medio de barreras físicas o la siembra de árboles intensiva en las zonas evacuadas o abandonadas. Estas zonas serán aprovechadas como áreas municipales. Artículo 13. Para todos los tipos de terrenos indicados en los artículos anteriores, se deberá presentar un plan de reforestación aprobado por la Dirección Forestal del Ministerio del Ambiente y Energía. Se debe valorar que la vegetación sea nativa de la zona y que la estabilidad del terreno no se vea afectada, sino mejorada. Artículo 14. En zonas urbanas, donde se pretenda urbanizar fincas atravesadas por ríos o quebradas o que colinden con éstos, deberá proveerse una franja de no construcción con un ancho mínimo de 10 metros a lo largo del lecho promedio río y medidos a cada lado del mismo, en la proyección horizontal. Esta franja no puede ser disminuida por ninguna razón, pues el fin de la misma es proteger al río. En quebradas y quebradas intermitentes se deben dejar 10 metros de franja de protección a cada lado del lecho. En terrenos cuya pendiente sea igual o mayor al 40% el área de protección consistirá en 50 metros a cada lado del margen del río.
Pull quotesCitas destacadas
"Se prohíbe la construcción de nuevas edificaciones y la segregación de lotes en estas zonas."
"The construction of new buildings and the segregation of lots in these zones is prohibited."
Artículo 11, Regulaciones en las zonas de renovación por riesgo
"Se prohíbe la construcción de nuevas edificaciones y la segregación de lotes en estas zonas."
Artículo 11, Regulaciones en las zonas de renovación por riesgo
"Para todos los tipos de terrenos indicados en los artículos anteriores, se deberá presentar un plan de reforestación aprobado por la Dirección Forestal del Ministerio del Ambiente y Energía."
"For all types of lands indicated in the previous articles, a reforestation plan approved by the Forestry Directorate of the Ministry of Environment and Energy must be submitted."
Artículo 13
"Para todos los tipos de terrenos indicados en los artículos anteriores, se deberá presentar un plan de reforestación aprobado por la Dirección Forestal del Ministerio del Ambiente y Energía."
Artículo 13
"Esta franja no puede ser disminuida por ninguna razón, pues el fin de la misma es proteger al río."
"This strip cannot be reduced for any reason, since its purpose is to protect the river."
Artículo 14, sobre franjas de protección en ríos y quebradas
"Esta franja no puede ser disminuida por ninguna razón, pues el fin de la misma es proteger al río."
Artículo 14, sobre franjas de protección en ríos y quebradas
Full documentDocumento completo
in the entirety of the text - Complete Text of Regulation 53 Urban Renewal Regulation (Regulatory Plan of the canton of Montes de Oca) Complete Text record: A9EA2 MUNICIPALITY OF MONTES DE OCA MUNICIPALITY OF MONTES DE OCA Municipal Council and Mayor's Office, communicates formal adoption of the Regulatory Plan of the canton of Montes de Oca. According to a firm agreement of the Municipal Council of Montes de Oca, taken in ordinary session number fifty-three / two thousand seven, dated April thirtieth, two thousand seven, article number eight, point number two, by six votes in favor and 1 against by councilmember González Gamboa, this Council agreed to proceed to take the agreement of formal adoption of the Regulatory Plan approved by the Urban Planning Directorate of the National Institute of Housing and Urbanism, as follows:
The Municipal Council of the Municipality of Montes de Oca, based on the provisions of articles 15, and 17 subsections 3) and 4) of the Urban Planning Law, formally adopts the Regulatory Plan of the Canton of Montes de Oca, approved by the Urban Planning Directorate of the National Institute of Housing and Urbanism, which was published in Supplement number 51 of La Gaceta Nº 165 of August 29, year 2006. Also agreeing that said Regulatory Plan shall come into effect for the canton of Montes de Oca, starting May 21, year 2007. Let this agreement be published in the Official Gazette La Gaceta.
Montes de Oca, May 2, 2007 (NOTA SINALEVI: As indicated in the preceding paragraph, the text corresponds to that published in Supplement N° 51a La Gaceta N° 165 of August 29, 2006 ) URBAN RENEWAL REGULATION INDEX URBAN RENEWAL ZONES.......................................................................................... ......................... 1 SINGLE TITLE........................................................................................ ............................................. 1
BIBLIOGRAPHY........................................................................................ .............................................. 9 TABLE INDEX Table 1. Preferable uses in Urban Renewal zones.......................................... 2 Table 2. Proposed sections for the expansion of roads..................................................... 4 Table 3. Proposed sections for the creation of new streets......................................... 6 Table 4. Proposed sections for the district of San Rafael................................................. 7 MAP INDEX Map 1. Urban Renewal Zones............................................................................... 10 Map 2. Primary, secondary, and tertiary streets of Montes de Oca............................. 11 Map 3. Primary, secondary, and tertiary streets in San Rafael.................................... 12 Map 4. Roadway proposal for the district of San Rafael.................................................. 13 GLOSSARY OF INSTITUTIONS CCSS.................................... Costa Rican Social Security Fund.
CFIA...................................... Federated College of Engineers and Architects.
CNE....................................... National Emergency Commission / National Commission for Risk Prevention and Emergency Response.
CNFL..................................... National Power and Light Company.
ICAA o ICAyA......................... Costa Rican Institute of Aqueducts and Sewers.
ICE........................................ Costa Rican Electricity Institute.
INS......................................... National Insurance Institute.
INVU...................................... National Institute of Housing and Urbanism.
MOPT.................................... Ministry of Public Works and Transport.
MS......................................... Ministry of Health.
ProDUS................................. Research Program in Sustainable Urban Development.
UCR...................................... University of Costa Rica SETENA................................ National Environmental Technical Secretariat urban renewal zones For the purposes of this regulation, Urban Renewal is defined as the process of improvement, aimed at eradicating slum areas and rehabilitating urban areas in decay or in a defective state, road improvement, and the conservation of urban areas and the prevention of their deterioration. For such purposes, state investment is necessary.
The Regulatory Plan of Montes de Oca promotes three distinct types of urban renewal zones, for different purposes:
text-indent:18.0pt'>b) Urban Renewal Zones by Roadways, whose purpose is the improvement of the spatial structure of the road infrastructure.
SINGLE TITLE Definition of the renewal zones within the canton · The urban renewal regulation contains the regulations that are locally adopted to conserve, rehabilitate or remodel defective, deteriorated, decaying urban areas, or those with a clear potential to change the current predominant uses, taking into account inconvenient parceling, segregation of properties or building, the lack of services and communal facilities, the propensity to natural risks or any other situation adverse to general safety, health, and well-being.
Chapter 1. DEFINITION OF RENEWAL ZONES WITHIN THE CANTON................... 1
Chapter 2. REGULATIONS IN RENEWAL ZONES DUE TO URBAN POTENTIAL..... 1
Chapter 3. REGULATIONS IN RENEWAL ZONES DUE TO ROADWAYS........................... 3
Chapter 4. REGULATIONS IN RENEWAL ZONES DUE TO RISK............................ 7
"Urban Renewal Zones of this Regulation".
Likewise, the sanctions in each case shall be those established by these laws, the General Law of Public Administration and also those established in the Penal and Civil Codes.
Chapter 1. Regulations in the renewal zones due to urban potential
"Urban Renewal Zones" of this regulation. The following list mentions the neighborhoods in which they are located, but the map details the specific sectors within those neighborhoods, which correspond to this type of renewal zones:
a. Calle Quirós b. Zone between Calles 0 and 3
Table 1. Preferable uses in Urban Renewal Zones | Zone | Type of Use | | --- | --- | | Calle Quirós | § Rental housing § Student residences § Apartment Buildings § Mixed-use complexes (residential and commercial) § Museums- libraries-information kiosks § Post office § Offices § Park, public sports or recreational area § Social Club § Educational Academies § Handicrafts or Marquetry § International organizations | | Zone between Calles 0 and 3 | § Pedestrian zones § Sidewalk widening § Recreational areas |
The current provisions of the MOPT and the
a. The section that goes approximately 60 meters west of Kennedy Park to the La Hispanidad roundabout, shall have a 5-meter new alignment, of which 2 meters shall be added to the width of the already existing sidewalk for its widening. This value is additional to the existing sidewalk, so that the actual width of the sidewalk shall be the current plus 2 meters. The other remaining 3 meters shall be destined for a special bus lane.
b. The section that goes along Calle 3, between Avenida 0 and the University of Costa Rica, shall have a new alignment of 3 meters on the properties located to the west, to add 1.5 meters to the sidewalk on each side. This 1.5 meters is additional to the existing sidewalk, so that the actual width of the sidewalk shall be the current plus 1.5 meters.
Potential Uses of these Renewal Zones:
· The location of Calle Quirós makes it a zone of great potential due to its accessibility and because it is surrounded by lands of the University of Costa Rica; in addition to being located relatively close to the commercial center of San Pedro. Even so, the infrastructure of this zone is deficient and unattractive to potential users such as university students, professors, service companies, among many others. The renewal approach is based on the possibility of converting Calle Quirós into a "university" zone in which both services and adequate recreation and leisure spaces are combined. Among the possible uses, museums, theater halls, student residences, laundromats, photocopy centers, restaurants, cybercafés, among others, can be mentioned. This alternative would not be possible to achieve if this zone is not also converted into a pedestrian-friendly and attractive place, reason for which new alignments and sidewalk widenings are proposed.
· The zone comprised between the University of Costa Rica and Avenida 0 and Calles 0 and 3, establishes a zone in which it is necessary to create wider and more pleasant pedestrian spaces. This is a zone of high pedestrian flows due to the presence of the commercial corridor of San Pedro and the presence of the University of Costa Rica. The large number of people who transit in this area makes it necessary to provide the pedestrian with safer, more pleasant, and exclusive spaces. Among the options for this sector are: dedicating some sections exclusively to pedestrians and the creation of wider sidewalks from roadway spaces that have been used up to now for vehicle parking. This zone would be integrated with other zones that are part of other alternatives established within this Regulatory Plan such as the use of the Train Line as a pedestrian and cyclist boulevard.
· The location of these two renewal zones means they form part of a system of pedestrian spaces, due to their proximity and also because they are connected by means of the university campus of the UCR which has, in itself, spaces that allow the comfortable and adequate passage of pedestrians. In this way, certain spaces of the University of Costa Rica become the bridge between these two zones, which were created from their conception to provide more spaces for pedestrians who circulate through these zones due to the high concentration of activities and the accessibility of this zone by public transportation. The area of influence of these zones is not limited to the UCR, but by proposing strategic connections such as these, and the connection with the train line and with a circuit for cyclists, it is possible to integrate the corridor San Pedro-Curridabat and other sectors crossed by the train line such as the Universidad Latina, the Vargas Calvo High School, the Calasanz School, Mall San Pedro, among others.
Chapter 2. Regulations in the renewal zones due to roadways
The map details the sectors and the road sections that are proposed to be renewed by means of widenings or creations of connections or new roads.
a. Sections where emergent widening is required, which does not include all possible cases, which are detailed below; the capital letter indicates the name of the section on the Hierarchy Map of the road system of the canton of Montes de Oca at the end of this regulation:
Table 2. Proposed sections for road widening | Section | Description | Type of intervention | | --- | --- | --- | | A | The street section between the intersection of the University Student Residences and the intersection in front of the School of Music Building needs widening of the running surface and implementation of pedestrian infrastructure. On the other hand, the section between the intersection of the University Student Residences and that of LANAMME must be widened to three lanes, where the center must be destined for the left turn from the secondary street, which is the street coming from the north. | Urgent | | B | On the Road towards Sabanilla (Route 202), pedestrian infrastructure and at least three lanes must be enabled up to Supermercado La Cosecha. | | | C | To the West of the La Bandera Roundabout in front of the Ana Lorena Building and the Dutch House, it is necessary to prohibit parking on the public road at least 50 meters on each side of the mentioned building. Furthermore, widening the width of the running surface and implementing pedestrian infrastructure is recommended. | | | D | In this section, the right-of-way must be widened to 20 meters and the roadway, at least to 2 lanes, even if this includes the stabilization of the land on the North side | | | E | The bridge at "Paso Hondo" must be widened to at least two lanes. | Rapid | | F | The access street to the "Paso Hondo" bridge requires improvement of the pedestrian infrastructure and widening of the roadway width, it consists of recovering the right-of-way. | | | G | About 300 meters North of the Transport Office of the University of Costa Rica, the street is continually destroyed by the absence of efficient drainage and probably by the soil type. The corresponding technical studies must be carried out and the necessary solution implemented to enable the street. In the last 150 meters of the street before reaching the ICE Substation, the roadway widths must be widened and pedestrian infrastructure implemented, especially on the curve and on the bridge. | | | H | In front of the Transport Office of the University of Costa Rica right at the junction with the road to Sabanilla. Widen the width of the roadway and build sidewalks. | | Table 2. Proposed sections for road widening (continuation) | Section | Description | Type of intervention | | --- | --- | --- | | I | This section starts at the Gallo Pinto restaurant and extends about 300 meters South, to the entrance of urbanization Carmiol. The roadway must be widened and pedestrian infrastructure improved. | Rapid | | J | On the street leading to Goicoechea located about 100 meters East of Sabanilla Park, the roadway widths must be widened and pedestrian infrastructure rehabilitated, taking advantage of the setbacks on the East side (even if stabilization of some small slopes is necessary when taking advantage of the setbacks of nearby houses). | | | K | The street between Supermercado Sindy and Residencial San Marino must be enabled with a minimum right-of-way width of 14 meters. | | | L | This street is currently used in a single direction -towards San Pedro- due to the available roadway width. Two investment options could be considered: · The expansion of pedestrian facilities with reduction of the roadway width and conservation of a single lane in the customary direction · The expansion of pedestrian facilities with widening of the roadway to allow one more lane in the south direction (towards Zapote). | | | M | The street section between the North Parking Entrance of the Universidad Latina and the junction with the street between it and Vargas Araya. The old vehicles that are permanently parked on the edge of the street, using it as a warehouse and interrupting passage, must be removed. Furthermore, the width of the roadway must be widened and pedestrian infrastructure improved. | Necessary | | N | There is an evident decrease in the right-of-way near Supermercado Sindy - at the end of the street on the West side - land that must be recovered by the Municipality immediately, as well as the roadway must be widened and road infrastructure put in place. | | | O | From the Church of Sabanilla to the cemetery of Sabanilla, the street requires widening of the roadway and improvement of pedestrian facilities. | | | P | This section is located about 100 meters West of the Más X Menos in Sabanilla and requires widening of the roadway and improvement of the road infrastructure. | | | Q | The street section is very important but the width of the roadway must be widened and pedestrian infrastructure implemented. Also, the width of the roadway must be increased in some subsections, mainly at the junction with the Main Road (Sabanilla-San Rafael). In addition, the use of the street "El Chorro" must be restricted to a single direction (Northeast-Southwest) and take advantage of the remaining width to enable pedestrian infrastructure. | | b. Sections where the creation of new streets is proposed:
Table 3. Proposed sections for the creation of new streets | | Description | | --- | --- | | 1 | Consists of a small section to eliminate the awkward curves of the street at the northwestern edge of the José Joaquín Vargas Calvo High School, enabling this route even for buses. The lot is owned by the School and -in the proposed sector- has no investment in infrastructure. The recommended right-of-way in this section is twenty meters and has an approximate length of 145 meters. | | 2 | Entrances of the La Alhambra urbanization. Consists of two short sections to connect the internal streets of the residential area with the secondary one of Carmiol. | | 3 | Connects the wide street of Cedros with the main road between San Rafael and Sabanilla. It has a length of 345 meters and crosses only two properties | | 4 | by means of these streets, the redundancy of the network in the North-South direction is increased and an exit is provided towards the south. It is divided into three sections detailed below: · Section 1: completes the redundancy on the west side connecting the street of Lourdes-Cedros with the main street of Vargas Araya. It has a length of 235 meters. · Section 2: completes the redundancy on the south side, has a length of 620 meters and a width of 20 meters is recommended. · Section 3: allows the connection to the south of section 2 with the main road to Granadilla -the same one that goes to Universidad Fidélitas - with a length of 70 meters and a width of 16.8 meters is recommended. | c. The proposed sections for the sector of San Rafael are detailed in "Map 4. Roadway proposal for the district of San Rafael".
Table 4. Proposed sections for the district of San Rafael
| Section * | Length (m) |
|---|---|
| A1-A2 | 150 |
| A2-A3 | 380 |
| A3-A4 | 145 |
| A4-A5 | 161 |
| A5-A6 | 237 |
| A5-B1 | 430 |
| B2-B3 | 169 |
| B3-B4 | 127 |
| B3-C1 | 109 |
| C1-C2 | 79 |
| D1-D2-D3-D4 | 488 |
| D4-D5 | 47 |
| D5-D6-D7 | 97 |
| D5-D8 | 47 |
| E1-E2-C1 | 191 |
| E2-D4 | 573 |
| A4-1 | 208 |
| A4-2 | 198 |
* the nomenclature of the sections corresponds to that used in "Map 4. Roadway proposal for the district of San Rafael" .
Chapter 3. Regulations in the renewal zones due to risk
Flood: General condition of a temporary nature during which the surface of normally dry land is partially or totally flooded. A flood can be caused by any of the following events:
- The overflow of bodies of water.
- The unusual and rapid accumulation or runoff of surface waters coming from any source, such as heavy rain.
- The incidence of mudslides or mudflow caused by flooding, which are comparable to a river of liquid mud.
- The collapse or destabilization of the land along the shore of a lake or other body of water caused by erosion.
-The effect of water currents that exceed their normal cyclical levels.
Storm sewer saturation: When the capacity of the storm sewer system is at the point of not being able, under normal conditions, to admit a greater quantity of water.
"Urban Renewal Zones" of this regulation. The following list mentions the neighborhoods in which they are located, but the map details the specific sectors within those neighborhoods, which correspond to the renewal zones due to risk:
a. Barrio Sinaí b. Calle Mora c. Urb. Rosemary Karpinsky d. Salitrillos
These zones shall be used as municipal areas.
It must be assessed that the vegetation is native to the zone and that the stability of the land is not affected, but rather improved. For this, the use of bioengineering or biotechnical engineering systems that help obtain better land stability can also be resorted to.
This strip cannot be decreased for any reason, as its purpose is to protect the river. In streams and intermittent streams, 10 meters of protection strip must be left on each side of the riverbed. On lands whose slope is equal to or greater than 40%, the protection area shall consist of 50 meters on each side of the riverbank.
The adopted limit would be the maximum level reached by said flood or where the National Emergency Commission dictates. The National Emergency Commission has the option of increasing the width of these strips if, through a study, it considers it appropriate to do so, either to guarantee the safety of the area against landslides or as protection against floods. These zones must be intensively reforested or protected with specialized slope bio-stabilization systems to prevent the urbanization of these hazardous areas. Furthermore, these zones can be used for passive recreation activities.
Bibliography Alfaro, Dionisio. Código Urbano. Editorial Porvenir, San José-Costa Rica, 2000.
Neufert, Ernst. Architects' Data, Ediciones Gili, S.A., México 1991.
Vernez M., Anne. Public Streets for Public Use. Editorial Columbia University Press. Nueva York, EEUU. 1991.
Brenes Mata, Eduardo. Peatonización. Una opción para el Rescate Urbano. Editorial Tecnológica de Costa Rica. Cartago, Costa Rica. 1995.
(Due to the type of format, see Maps in Supplement N°51 to La Gaceta N°165 of August 29, 2006)
en la totalidad del texto - Texto Completo Norma 53 Reglamento de Renovación Urbana (Plan Regulador del cantón de Montes de Oca) Texto Completo acta: A9EA2 MUNICIPALIDAD DE MONTES DE OCA MUNICIPALIDAD DE MONTES DE OCA Concejo y Alcaldía Municipal, comunica adopción formal Plan Regulador del cantón Montes de Oca. Según acuerdo firme del Concejo Municipal de Montes de Oca, tomado en la sesión ordinaria número cincuenta y tres / dos mil siete, de fecha treinta de abril del dos mil siete, artículo número ocho, punto número dos, por seis votos a favor y 1 en contra del regidor González Gamboa, este Concejo acordó proceder a tomar el acuerdo de adopción formal del Plan Regulador aprobado por la Dirección de Urbanismo del Instituto Nacional de Vivienda y Urbanismo, como sigue:
El Concejo Municipal de la Municipalidad de Montes de Oca, con fundamento en las disposiciones de los artículos 15, y 17 incisos 3) y 4) de la Ley de Planificación Urbana, adopta formalmente el Plan Regulador del Cantón de Montes de Oca, aprobado por la Dirección de Urbanismo del Instituto Nacional de Vivienda y Urbanismo, que fuera publicado en el Alcance número 51 de La Gaceta Nº 165 del 29 de agosto del año 2006. Acordando así mismo que dicho Plan Regulador entre a regir para el cantón de Montes de Oca, a partir del 21 de mayo del año 2007. Publíquese el presente acuerdo en el Diario Oficial La Gaceta.
Montes de Oca, 2 de mayo del 2007 (NOTA SINALEVI: Tal como se indica en el párrafo anterior, el texto corresponde al publicado en el Alcance N° 51a La Gaceta N° 165 del 29 de agosto de 2006 ) REGLAMENTO DE RENOVACION URBANA ÍNDICE ZONAS DE RENOVACIÓN URBANA.......................................................................... ......................... 1 TÍTULO ÚNICO........................................................................................ ............................................. 1
BIBLIOGRAFÍA........................................................................................ .............................................. 9 ÍNDICE DE TABLAS Tabla 1. Usos preferibles en las zonas de Renovación Urbana.......................................... 2 Tabla 2. Tramos propuestos para la ampliación de vías..................................................... 4 Tabla 3. Tramos propuestos para la creación de calles nuevas......................................... 6 Tabla 4. Tramos propuestos para el distrito de San Rafael................................................. 7 ÍNDICE DE MAPAS Mapa 1. Zonas de Renovación Urbana............................................................................... 10 Mapa 2. Calles primarias, secundarias y terciarias de Montes de Oca............................. 11 Mapa 3. Calles primarias, secundarias y terciarias en San Rafael.................................... 12 Mapa 4. Propuesta de vías para el distrito de San Rafael.................................................. 13 GLOSARIO DE INSTITUCIONES CCSS.................................... Caja Costarricense de Seguro Social.
CFIA...................................... Colegio Federado de Ingenieros y Arquitectos.
CNE....................................... Comisión Nacional de Emergencia / Comisión Nacional de Prevención de Riesgos y Atención de Emergencias.
CNFL..................................... Compañía Nacional de Fuerza y Luz.
ICAA o ICAyA......................... Instituto Costarricense de Acueductos y Alcantarillados.
ICE........................................ Instituto Costarricense de Electricidad.
INS......................................... Instituto Nacional de Seguros.
INVU...................................... Instituto Nacional de Vivienda y Urbanismo.
MOPT.................................... Ministerio de Obras Públicas y Transportes.
MS......................................... Ministerio de Salud.
ProDUS................................. Programa de Investigación en Desarrollo Urbano Sostenible.
UCR...................................... Universidad de Costa Rica SETENA................................ Secretaría Técnica Nacional Ambiental zonas de renovación urbana Para efectos de este reglamento, se define Renovación Urbana como el proceso de mejoramiento, dirigido a erradicar las zonas de tugurios y rehabilitar las áreas urbanas en decadencia o en estado defectuoso, el mejoramiento vial y la conservación de áreas urbanas y la prevención de su deterioro. Para tales propósitos es necesaria la inversión del estado.
El Plan Regulador de Montes de Oca promueve tres tipos distintos de zonas de renovación urbana, para distintos fines:
text-indent:18.0pt'>b) Zonas de Renovación por Vialidad, cuyo fin es el mejoramiento de la estructura espacial de la infraestructura vial.
DEfinición de las zonas de renovación dentro del cantón · El reglamento de renovación urbana contiene las regulaciones que localmente se adopten para conservar, rehabilitar o remodelar las áreas urbanas defectuosas, deterioradas, en decadencia, o con un claro potencial para cambiar los usos predominantes actuales, tomando en cuenta la inconveniente parcelación, segregación de fincas o edificación, la carencia de servicios y facilidades comunales, la propensión a riesgos naturales o cualquier otra situación adversa a la seguridad, salubridad y bienestar generales.
Capítulo 1. DEFINICIÓN DE LAS ZONAS DE RENOVACIÓN DENTRO DEL CANTÓN................... 1
Capítulo 2. REGULACIONES EN LAS ZONAS DE RENOVACIÓN POR POTENCIAL URBANO..... 1
Capítulo 3. REGULACIONES EN LAS ZONAS DE RENOVACIÓN POR VIALIDAD........................... 3
Capítulo 4. REGULACIONES EN LAS ZONAS DE RENOVACIÓN POR RIESGO............................ 7
TÍTULO ÚNICO
De igual forma, las sanciones del caso serán las establecidas por estas leyes, la Ley General de la Administración Pública y también las establecidas en los Códigos Penal y Civil.
Capítulo 1. Regulaciones en las zonas de renovación por potencial urbano
a. Calle Quirós b. Zona entre Calles 0 y 3
Tabla 1. Usos preferibles en las zonas de Renovación Urbana | Zona | Tipo de Uso | | --- | --- | | Calle Quirós | § Vivienda de alquiler § Residencias estudiantiles § Edificios de Apartamentos § Complejos mixtos (residencial y comercial) § Museos- bibliotecas-kioscos de información § Oficina de correos § Oficinas § Parque, área deportiva o recreativa pública § Club Social § Academias Educativas § Artesanías o Marqueterías § Organismos internacionales | | Zona entre Calles 0 y 3 | § Zonas peatonales § Ampliación de aceras § Áreas recreativas |
Aplicarán las disposiciones vigentes del MOPT y de la Ley de Expropiaciones en los casos respectivos.
a. El tramo que va aproximadamente 60 metros al oeste del Parque Kennedy hasta la rotonda de la Hispanidad, tendrá 5 metros de nuevo alineamiento, de los cuales 2 metros se sumarán al ancho de la acera ya existente para su ampliación. Este valor es adicional a la acera existente, por lo que el ancho real de la acera será el actual más 2 metros. Los otros 3 metros restantes se destinarán a un carril especial para autobuses.
b. El tramo que va sobre calle 3, entre la avenida 0 y la Universidad de Costa Rica, tendrá un nuevo alineamiento de 3 metros sobre las propiedades ubicadas al oeste, para sumar 1,5 metros a la acera de cada lado. Este 1,5 metros es adicional a la acera existente, por lo que el ancho real de la acera será el actual más 1,5 metros.
Usos Potenciales de estas Zonas de Renovación:
· La ubicación de Calle Quirós lo convierte en una zona de gran potencial por su accesibilidad y por estar rodeada por terrenos de la Universidad de Costa Rica; además de ubicarse relativamente cerca del centro comercial de San Pedro. Aún así la infraestructura de esta zona es deficiente y poco atractiva para usuarios potenciales como los estudiantes universitarios, profesores, empresas de servicios, entre otras tantas. El planteamiento de renovación se basa en la posibilidad de convertir a Calle Quirós en una zona "universitaria" en la cual se conjuguen tanto servicios como espacios de recreación y esparcimiento adecuados. Entre los usos posibles se pueden mencionar los museos, salas de teatro, residencias estudiantiles, lavanderías, centros de fotocopiado, restaurantes, cafés cibernéticos, entre otros. Esta alternativa no sería posible de lograr si además no se convierte a esta zona en lugar peatonalmente agradable y atractivo, razón por la cual se plantean nuevos alineamientos y ampliaciones en las aceras.
· La zona comprendida entre la Universidad de Costa Rica y la avenida 0 y las calles 0 y 3, establece una zona en la que es necesario crear espacios peatonales más amplios y agradables. Esta es una zona de altos flujos de peatones debido a la presencia del corredor comercial de San Pedro y por la presencia de la Universidad de Costa Rica. La gran cantidad de personas que transitan en esta área hace que sea necesario brindarle al peatón espacios más seguros, agradables y exclusivos. Dentro de las opciones para este sector están: dedicar algunos tramos exclusivamente a los peatones y la creación de aceras más anchas a partir de espacios de la calzada que han sido aprovechados hasta el momento para el estacionamiento de vehículos. Esta zona se integraría con otras zonas que son parte de otras alternativas establecidas dentro de este Plan Regulador como es la utilización de la Línea del Tren como un bulevar peatonal y para ciclistas.
· La ubicación de estas dos zonas de renovación hace que formen parte de un sistema de espacios peatonales, por su proximidad y además porque están conectadas por medio del campus universitario de la UCR que tiene, de por sí, espacios que permiten el paso confortable y adecuado de los peatones. De esta manera, ciertos espacios de la Universidad de Costa Rica se convierten en el puente entre estas dos zonas, que fueron creadas desde su concepción para proporcionar más espacios para los peatones que circulan por estas zonas debido a la gran concentración de actividades y a la accesibilidad de esta zona por transporte público. El área de influencia de estas zonas no se limita a la UCR, sino que al plantear conexiones estratégicas como estas, y la conexión con la línea del tren y con un circuito para ciclistas, se logra integrar al corredor San Pedro-Curridabat y otras sectores atravesados por la línea del tren como son la Universidad Latina, el Liceo Vargas Calvo, el Colegio Calasanz, el Mall San Pedro, entre otros.
Capítulo 2. Regulaciones en las zonas de renovación por vialidad
En el mapa se detallan los sectores y los tramos de carretera que se proponen sean renovados por medio de ampliaciones o creaciones de conexiones o vías nuevas.
a. Tramos donde se requiere ampliación emergente que no incluye todos los casos posibles, los cuales a continuación se detallan, la letra en mayúscula indica el nombre del tramo en el Mapa de Jerarquía del sistema vial del cantón de Montes de Oca al final de este reglamento:
Tabla 2. Tramos propuestos para la ampliación de vías | Tramo | Descripción | Tipo de intervención | | --- | --- | --- | | A | El tramo de calle entre la intersección de las Residencias Estudiantiles de la Universidad y la intersección frente al Edificio de la Escuela de Música necesita ampliación de la superficie de rodamiento e implementación de infraestructura peatonal. Por otro lado el tramo entre la intersección de Residencias Estudiantiles de la Universidad y la del LANAMME debe ser ampliada a tres carriles, donde el central debe ser destinado al giro a la izquierda desde la calle secundaria que es la calle que vienen desde del norte. | Urgente | | B | En la Carretera hacia Sabanilla (Ruta 202) deben habilitarse la infraestructura peatonal y al menos tres carriles hasta el Supermercado La Cosecha. | | | C | Al Oeste de la Rotonda la Bandera frente al Edificio Ana Lorena y a la Casa Holandesa es necesario prohibir el estacionamiento en la vía pública al menos a 50 metros a cada lado del edificio mencionado. Además se recomienda ampliar en ancho de la superficie de rodamiento e implementar la infraestructura peatonal. | | | D | En este tramo debe ampliarse el derecho de vía a 20 metros y la calzada, al menos a 2 carriles, aunque esto incluya la estabilización del terreno del lado Norte | | | E | El puente en el "Paso Hondo" debe ampliarse al menos a dos carriles. | Rápida | | F | La calle de acceso al puente del "Paso Hondo" requiere de mejoramiento de la infraestructura peatonal y ampliación del ancho de la calzada, consiste en recuperar el derecho de vía. | | | G | A unos 300 metros al Norte de la Oficina de Transportes de la Universidad de Costa Rica, la calle se destruye continuamente por la ausencia de drenajes eficientes y probablemente por el tipo de suelo. Deben realizarse los estudios técnicos correspondientes e implementarse la solución necesaria para habilitar la calle. En los últimos 150 metros de la calle hasta llegar al Subestación del ICE deben ampliarse los anchos de calzada e implementarse la infraestructura peatonal, especialmente en la curva y en el puente. | | | H | Frente a La Oficina de Transportes de la Universidad de Costa Rica justo en el entronque con la carretera a Sabanilla. Ampliar el ancho de la calzada y construir aceras. | | Tabla 2. Tramos propuestos para la ampliación de vías (continuación) | Tramo | Descripción | Tipo de intervención | | --- | --- | --- | | I | Este tramo inicia en el restaurante Gallo Pinto y se extiende unos 300 metros al Sur, hasta la entrada a la urbanización Carmiol. Debe ampliarse la calzada y mejorarse la infraestructura peatonal. | Rápida | | J | En la calle con salida a Goicoechea ubicada a unos 100 metros al Este del Parque de Sabanilla deben ampliarse los anchos de calzada y rehabilitar la infraestructura peatonal aprovechando los retiros del lado Este (aunque sea necesaria la estabilización de algunos pequeños taludes al aprovechar los retiros de las casas cercanas). | | | K | La calle entre el Supermercado Sindy y el Residencial San Marino debe habilitarse con el ancho de derecho de vía mínimo de 14 metros. | | | L | Esta calle se utiliza actualmente en una sola dirección -hacia San Pedro- debido al ancho de calzada disponible. Podrían considerarse dos opciones de inversión: · La ampliación de las facilidades peatonales con disminución del ancho de la calzada y conservación de un solo carril en la dirección acostumbrada · La ampliación de las facilidades peatonales con ampliación de la calzada para permitir un carril más en la dirección sur (hacia Zapote). | | | M | El tramo de calle entre la Entrada del Parqueo Norte de la Universidad Latina y el entronque con la calle entre ésta y Vargas Araya. Debe desalojarse los vehículos antiguos que se encuentran parqueados permanentemente a la orilla de la calle utilizándola como bodega e interrumpiendo el paso. Además debe ampliarse el ancho de calzada y mejorarse la infraestructura peatonal. | Necesaria | | N | Existe una evidente disminución del derecho de vía cerca del Supermercado Sindy - al final de la calle del lado Oeste - terreno que debe ser recuperado por la Municipalidad de inmediato así como debe ampliarse la calzada y colocarse la infraestructura vial. | | | O | Desde la Iglesia de Sabanilla hasta el cementerio de Sabanilla la calle requiere de ampliación de la calzada y de mejoramiento de las facilidades peatonales. | | | P | Este tramo se ubica unos 100 metros al Oeste del Más X Menos de Sabanilla y requiere ampliación de la calzada y mejoramiento de la infraestructura vial. | | | Q | El tramo de calle es muy importante pero ampliarse el ancho de la calzada y implementarse infraestructura peatonal. Además debe aumentarse el ancho de la calzada en algunos subtramos, principalmente en el entronque con la Carretera Principal (Sabanilla-San Rafael). Además el uso de la calle "El Chorro" debe restringirse a una sola dirección (Noreste- Suroeste) y aprovechar el ancho restante para habilitar infraestructura peatonal. | | b. Tramos donde se plantea la creación de calles nuevas:
Tabla 3. Tramos propuestos para la creación de calles nuevas | | Descripción | | --- | --- | | 1 | Consiste de un pequeño tramo para eliminar las incómodas curvas de la calle al borde noroeste del Liceo José Joaquín Vargas Calvo habilitando esta ruta incluso para autobuses. El lote es propiedad del Colegio y -en el sector propuesto- no posee ninguna inversión en infraestructura. El derecho de vía recomendado en este tramo es de veinte metros y tiene una longitud aproximada de 145 metros. | | 2 | Entradas de la urbanización La Alhambra. Consiste en dos tramos cortos para unir las calles internas del residencial con la secundaria de Carmiol. | | 3 | Comunica la calle ancha de Cedros con la carretera principal entre San Rafael y Sabanilla. Tiene una longitud de 345 metros y cruza tan solo dos propiedades | | 4 | por medio de estas calles se aumenta la redundancia de la red en la dirección Norte-Sur y se le proporciona salida hacia el sur. Se divide en tres tramos detallados a continuación: · Tramo 1: completa la redundancia del lado oeste uniendo la calle de Lourdes-Cedros con la calle principal de Vargas Araya. Tiene una longitud de 235 metros. · Tramo 2: completa la redundancia del lado sur, tiene una longitud de 620 metros y se recomienda un ancho de 20 metros. · Tramo 3: permite la conexión al sur del tramo 2 con la calle principal a Granadilla -la misma que se dirige a la Universidad Fidélitas - con una longitud de 70 metros y se recomienda un acho de 16.8 metros. | c. Los tramos propuestos para el sector de San Rafael se detallan en el "Mapa 4. Propuesta de vialidad para el distrito de San Rafael".
Tabla 4. Tramos propuestos para el distrito de San Rafael
| Tramo * | Longitud (m) |
|---|---|
| A1-A2 | 150 |
| A2-A3 | 380 |
| A3-A4 | 145 |
| A4-A5 | 161 |
| A5-A6 | 237 |
| A5-B1 | 430 |
| B2-B3 | 169 |
| B3-B4 | 127 |
| B3-C1 | 109 |
| C1-C2 | 79 |
| D1-D2-D3-D4 | 488 |
| D4-D5 | 47 |
| D5-D6-D7 | 97 |
| D5-D8 | 47 |
| E1-E2-C1 | 191 |
| E2-D4 | 573 |
| A4-1 | 208 |
| A4-2 | 198 |
* la nomenclatura de los tramos corresponde con la utilizada en el "Mapa 4. Propuesta de vialidad para el distrito de San Rafael" .
Capítulo 3. Regulaciones en las zonas de renovación por riesgo
Inundación: Condición general de carácter temporal durante la cual la superficie del terreno normalmente seco es parcial o totalmente inundada. Una inundación puede ser causada por cualquiera de los siguientes eventos:
- El desbordamiento de cuerpos de agua.
- La inusual y rápida acumulación o correntía de aguas superficiales provenientes de cualquier fuente, tal como la lluvia fuerte.
- La incidencia de derrumbes de fango o flujo de fango causados por inundación, que son comparables a un río de fango líquido.
- El colapso o desestabilización del terreno a lo largo de la orilla de un lago u otro cuerpo de agua causado por la erosión.
-El efecto de corrientes de agua que excedan sus niveles cíclicos normales.
Saturación de alcantarillado pluvial: Cuando la capacidad del alcantarillado pluvial se encuentra hasta el punto de no poder, en condiciones normales, admitir mayor cantidad de agua.
"Zonas de Renovación Urbana" de este reglamento. La siguiente lista hace mención de los barrios en que se ubican, pero en el mapa se detallan los sectores específicos dentro de esos barrios, que corresponden con las zonas de renovación por riesgo:
a. Barrio Sinaí b. Calle Mora c. Urb. Rosemary Karpinsky d. Salitrillos
Estas zonas serán aprovechadas como áreas municipales.
Se debe valorar que la vegetación sea nativa de la zona y que la estabilidad del terreno no se vea afectada, sino mejorada. Para ello también se puede recurrir al uso de sistemas de bioingeniería o ingeniería biotécnica que ayuden a obtener una mejor estabilidad del terreno.
Esta franja no puede ser disminuida por ninguna razón, pues el fin de la misma es proteger al río. En quebradas y quebradas intermitentes se deben dejar 10 metros de franja de protección a cada lado del lecho. En terrenos cuya pendiente sea igual o mayor al 40% el área de protección consistirá en 50 metros a cada lado del margen del río.
El límite adoptado sería el nivel máximo alcanzado por dicha inundación o en donde la Comisión Nacional de Emergencia dictamine. La Comisión Nacional de Emergencia tiene la opción de incrementar el ancho de estas franjas si por medio de un estudio considera oportuno hacerlo, ya sea para garantizar la seguridad del área contra deslizamientos o como protección contra inundaciones. Estas zonas deben ser reforestadas intensivamente o protegidas con sistemas especializados de bio-estabilización de laderas para impedir la urbanización de estas áreas peligrosas. Además estas zonas pueden ser utilizadas para actividades de recreación pasiva.
Bibliografía Alfaro, Dionisio. Código Urbano. Editoral Porvenir, San José-Costa Rica, 2000.
Neufert, Ernst. El Arte de Proyectar en Arquitectura, Ediciones Gili, S.A., México 1991.
Vernez M., Anne. Public Streets for Public Use. Editorial Columbia University Press. Nueva York, EEUU. 1991.
Brenes Mata, Eduardo. Peatonización. Una opción para el Rescate Urbano. Editorial Tecnológica de Costa Rica. Cartago, Costa Rica. 1995.
(Por el tipo de formato ver Mapas en el Alcance N°51 a la Gaceta N°165 del 29 de agosto de 2006)
Document not found. Documento no encontrado.