Decreto 31250 · 21/04/2003

Declaration of National Convenience for the Pirrís Hydroelectric ProjectDeclaratoria de Conveniencia Nacional del Proyecto Hidroeléctrico Pirrís

View document ↓ Ver documento ↓ View original source ↗ Ver fuente original ↗

Loading…Cargando…

OutcomeResultado

In forceNorma vigente

SummaryResumen

This executive decree declares the Pirrís Hydroelectric Project, developed by the Costa Rican Electricity Institute (ICE), to be of national convenience. The declaration is based on Article 19(b) of the Forestry Law, which allows land use change in forested areas for state infrastructure works, and Article 3(m) of the same law, which designates as of national convenience activities whose social benefits outweigh socio-environmental costs. It argues that the project is necessary to ensure electricity supply and aligns with the National Electricity Generation Expansion Plan. The decree authorizes ICE, subject to prior authorization from SINAC, to cut trees in the protection areas of the Pirrís River and the Napoleón and Zapote streams, including protected or endangered species. ICE is required to replant trees at a minimum ratio of fifty to one, with maintenance for at least three years, and to submit reports to the Central Pacific Conservation Area. It also orders SINAC offices to expedite procedures so the project can begin operations on schedule.Este decreto ejecutivo declara de conveniencia nacional el Proyecto Hidroeléctrico Pirrís, desarrollado por el Instituto Costarricense de Electricidad (ICE). La declaratoria se fundamenta en el artículo 19 inciso b) de la Ley Forestal, que permite el cambio de uso del suelo en áreas con cobertura boscosa para obras de infraestructura estatal, y en el artículo 3 inciso m) de la misma ley, que califica como de conveniencia nacional las actividades cuyos beneficios sociales superen los costos socioambientales. Se argumenta que el proyecto es necesario para garantizar el suministro eléctrico y se alinea con el Plan de Expansión de la Generación Eléctrica. El decreto autoriza al ICE, previa autorización del SINAC, a cortar árboles en las áreas de protección del Río Pirrís y las quebradas Napoleón y Zapote, incluyendo especies vedadas o en peligro de extinción. Se impone al ICE la obligación de reponer los árboles cortados en una proporción mínima de cincuenta a uno, con mantenimiento por al menos tres años, y rendir informes al Área de Conservación Pacífico Central. Asimismo, ordena a las oficinas del SINAC agilizar los trámites para que el proyecto opere en el plazo programado.

Key excerptExtracto clave

Article 1—Declare the Pirrís Hydroelectric Project, developed by the Costa Rican Electricity Institute, of National Convenience. Article 2—By virtue of this declaration, the Costa Rican Electricity Institute may, with prior authorization from the corresponding office of the National System of Conservation Areas, proceed to cut trees located in the protection areas of the Pirrís River and the Napoleón and Zapote streams. Article 3—For the conservation of species that are threatened or in danger of extinction and may be affected, the Costa Rican Electricity Institute must replant and maintain for a minimum period of three years, in a ratio of no less than fifty to one, trees that shall be planted in the same area where the cutting occurs...Artículo 1º—Declarar el Proyecto Hidroeléctrico Pirrís, desarrollado por el Instituto Costarricense de Electricidad de Conveniencia Nacional. Artículo 2º—En virtud de la presente declaratoria el Instituto Costarricense de Electricidad, podrá previa autorización de la Oficina correspondiente del Sistema Nacional de Áreas de Conservación, proceder a la corta de árboles ubicados en las áreas de protección del Río Pirrís y las quebradas Napoleón y Zapote. Artículo 3º—Para la conservación de especies en vías o peligro de extinción que se puedan ver afectadas, el Instituto Costarricense de Electricidad deberá reponer y dar mantenimiento por un período de mínimo de tres años, en una proporción no menor de cincuenta a uno, árboles que se deben plantar en la misma zona donde se produzca la corta...

Pull quotesCitas destacadas

  • "el artículo 19 inciso b) de la Ley Forestal Nº 7575... permite el cambio de uso cuando se trate de obras de infraestructura realizados por el Estado."

    "Article 19(b) of Forestry Law 7575... allows land use change when it involves infrastructure works carried out by the State."

    Considerando 1

  • "el artículo 19 inciso b) de la Ley Forestal Nº 7575... permite el cambio de uso cuando se trate de obras de infraestructura realizados por el Estado."

    Considerando 1

  • "el artículo 3º inciso m) de la Ley Forestal Nº 7575 declara como actividades de conveniencia nacional las realizadas... cuyos beneficios sociales sean mayores a los costos socio-ambientales."

    "Article 3(m) of Forestry Law 7575 declares as activities of national convenience those carried out... whose social benefits are greater than the socio-environmental costs."

    Considerando 2

  • "el artículo 3º inciso m) de la Ley Forestal Nº 7575 declara como actividades de conveniencia nacional las realizadas... cuyos beneficios sociales sean mayores a los costos socio-ambientales."

    Considerando 2

  • "Para la conservación de especies en vías o peligro de extinción... el Instituto Costarricense de Electricidad deberá reponer y dar mantenimiento por un período de mínimo de tres años, en una proporción no menor de cincuenta a uno."

    "For the conservation of threatened or endangered species... the Costa Rican Electricity Institute must replant and maintain for a minimum period of three years, in a ratio of no less than fifty to one."

    Artículo 3

  • "Para la conservación de especies en vías o peligro de extinción... el Instituto Costarricense de Electricidad deberá reponer y dar mantenimiento por un período de mínimo de tres años, en una proporción no menor de cincuenta a uno."

    Artículo 3

Full documentDocumento completo

Articles

in the entirety of the text - Complete Text of Norm 31250 Declares the Pirrís Hydroelectric Project to be of National Convenience.

Complete Text record: 68662 No. 31250 No. 31250 THE PRESIDENT OF THE REPUBLIC AND THE MINISTER OF ENVIRONMENT AND ENERGY In exercise of the powers conferred upon them by Article 140, subsections 3) and 18) and 146 of the Political Constitution and section 6 of the General Law on Public Administration and Articles 3, subsection m), 19, subsection b), 33, and 34 of the Forest Law No. 7575 of February 13, 1996.

1st—That Article 19, subsection b) of the Forest Law No. 7575, despite establishing the prohibition of land-use change (cambio de uso del suelo) when in the presence of forest cover (cobertura boscosa), permits such change of use when it involves infrastructure works carried out by the State. 2nd—That Article 3, subsection m) of the Forest Law No. 7575 declares as activities of national convenience those carried out by centralized State agencies, autonomous institutions, or private companies, whose social benefits outweigh the socio-environmental costs. 3rd—That the efficient and timely supply of electrical services not only forms part of the government's policies for the country's development, but also leads to the improvement of citizens' quality of life. 4th—That the Constitutive Law of the Costa Rican Electricity Institute (Decreto Ley No. 449 of April 8, 1949), establishes, at the national level, the fundamental obligation to build new hydroelectric power plants. Likewise, it assigned the Institute the task of conserving and defending the country's hydraulic resources by protecting watersheds, sources, and the channels of rivers and water currents. 5th—That one of the main responsibilities of the Costa Rican Electricity Institute is the preparation of the National Electric System in electricity generation, transmission, and distribution. These plans, in addition to guaranteeing an adequate balance between electricity supply and demand, must comply with economic and environmental requirements. 6th—That the current Electricity Generation Expansion Plan of the Costa Rican Electricity Institute, prepared under the premise of minimizing the total cost for the country's economy, including investment and operation costs, while maintaining the reliability and robustness of the system, indicates the order for incorporating new plants into the national generation system to satisfy future electricity demand needs. According to this plan, the Pirrís Hydroelectric Project must be incorporated into the generation system in the year 2007. 7th—That the works of the Pirrís Hydroelectric Project are located in the provinces of San José, cantons 5 Tarrazú, 6 Aserrí, and 20 León Cortés (Caraigres Sheet of the National Geographic Institute, scale 1:50000) and Puntarenas, canton 9 Parrita (Quepos Sheet of the National Geographic Institute, scale 1:50000), works that need to be constructed within the protection areas of the Pirrís River and its tributaries (mainly in the Napoleón and Zapote streams). There exists the possibility that the cutting of forest species declared to be under a ban (veda) or in danger of extinction may be required. 8th—That in session No. 5388 of March 19, 2002, the Board of Directors of the Costa Rican Electricity Institute issued an environmental policy and a series of principles that establish, among other aspects, the duty to develop all activities under the philosophy of sustainable development and to apply the best practices that prevent, mitigate, restore, or compensate for environmental and social damages. 9th—That the Costa Rican Electricity Institute has facilities dedicated to the production of nurseries for tree species in danger of extinction, with the purpose of replacing those species that must be removed in the works carried out. Therefore,

Considering:

Decree:

1
2
3
4

In those cases where the replacement is carried out on land belonging to other institutions, the Costa Rican Electricity Institute shall also provide the authorization of the respective entity, in which it accepts the establishment of the plantation. The trees planted in accordance with Executive Decree No. 25700-MINAE may not be harvested by reason of being species on the verge of extinction or in danger of extinction.

5
6

Issued at the Presidency of the Republic.—San José, on the twenty-first day of April, two thousand three.

Artículos

en la totalidad del texto - Texto Completo Norma 31250 Declara Proyecto Hidroeléctrico Pirrís de Conveniencia Nacional.

Texto Completo acta: 68662 Nº 31250 Nº 31250 EL PRESIDENTE DE LA REPÚBLICA Y EL MINISTRO DE AMBIENTE Y ENERGÍA En ejercicio de las facultades que les confieren el artículo 140 incisos 3) y 18) y 146 de la Constitución Política y el numeral 6º de la Ley General de la Administración Pública y los artículos 3º inciso m), 19 inciso b) 33 y 34 de la Ley Forestal Nº 7575 del 13 de febrero de 1996.

  1. 1Que el artículo 19 inciso b) de la Ley Forestal Nº 7575, a pesar de que establece la prohibición del cambio de uso de suelo cuando estamos en presencia de cobertura boscosa, permite el cambio de uso cuando se trate de obras de infraestructura realizados por el Estado. 2º—Que el artículo 3º inciso m) de la Ley Forestal Nº 7575 declara como actividades de conveniencia nacional las realizadas por las dependencias centralizadas del Estado, instituciones autónomas o empresas privadas, cuyos beneficios sociales sean mayores a los costos socio-ambientales. 3º—Que el suministro eficiente y oportuno de los servicios eléctricos, no solo forma parte de las políticas del gobierno para el desarrollo del país, sino conllevan al mejoramiento de la calidad de vida de la ciudadanía. 4º—Que la Ley Constitutiva del Instituto Costarricense de Electricidad (Decreto Ley Nº 449 del 8 de abril de 1949), establece, en el ámbito nacional, la obligación fundamental de construir nuevas plantas de energía hidroeléctrica. Asimismo, le asignó al Instituto la tarea de conservar y defender los recursos hidráulicos del país protegiendo las cuencas, las fuentes y los cauces de los ríos y corrientes de agua. 5º—Que una de las responsabilidades principales del Instituto Costarricense de Electricidad, es la elaboración de los Planes de Expansión del Sistema Eléctrico Nacional, que contempla los requerimientos nacionales en generación, transmisión y distribución de la electricidad. Estos planes además de garantizar un adecuado equilibrio entre la oferta y la demanda de electricidad, deben cumplir con requerimientos económicos y ambientales. 6º—Que el Plan de Expansión de la Generación Eléctrica vigente del Instituto Costarricense de Electricidad, elaborado bajo la premisa de minimizar el costo total para la economía del país incluyendo costos de inversión y operación, manteniendo a la vez la confiabilidad y robustez del sistema, se señala el orden de incorporación de nuevas plantas al sistema de generación nacional para satisfacer las necesidades futuras de demanda eléctrica. De acuerdo con este plan, el Proyecto Hidroeléctrico Pirrís se debe incorporar al sistema de generación en el año 2007. 7º—Que las obras del Proyecto Hidroeléctrico Pirrís se ubican en las provincias de San José, cantones 5 Tarrazú, 6 Aserrí y 20 León Cortés (Hoja Caraigres del Instituto Geográfico Nacional, escala 1:50000) y Puntarenas, cantón 9 Parrita (Hoja Quepos del Instituto Geográfico Nacional, escala 1:50000), obras que requieren construirse dentro de las áreas de protección del Río Pirrís y sus afluentes (principalmente en las quebradas Napoleón y Zapote). Existiendo la posibilidad que se requiera la corta de especies forestales declaradas en veda o en peligro de extinción. 8º—Que en la sesión Nº 5388 del 19 de marzo del 2002, el Consejo Directivo del Instituto Costarricense de Electricidad emitió una política ambiental y una serie de principios que establecen, entre otros aspectos, el deber de desarrollar todas las actividades bajo la filosofía del desarrollo sostenible y aplicar las mejores prácticas que prevengan, mitiguen, restauren o compensen los daños ambientales y sociales. 9º—Que el Instituto Costarricense de Electricidad cuenta con instalaciones dedicadas a la producción de viveros de especies de árboles en peligro de extinción, con el fin de reponer aquellas especies que tengan que ser eliminadas en las obras que se realizan. Por tanto,

Considerando:

Decretan:

1
2
3
4

En aquellos casos en que la reposición se realice en terrenos de otras instituciones, el Instituto Costarricense de Electricidad, aportará además la autorización del ente respectivo, en donde acepte el establecimiento de la plantación. Los árboles plantados de acuerdo al Decreto Ejecutivo Nº 25700-MINAE no podrán ser aprovechados en razón de ser especies en vías o peligro de extinción.

5
6

Dado en la Presidencia de la República.-San José, a los veintiún días del mes de abril del dos mil tres.

Document not found. Documento no encontrado.

Implementing decreesDecretos que afectan

    TopicsTemas

    • Forestry Law 7575 — Land Use and Forest ProtectionLey Forestal 7575 — Uso del Suelo y Protección Forestal

    Concept anchorsAnclajes conceptuales

    • Ley Forestal 7575 Art. 19 inciso b
    • Ley Forestal 7575 Art. 3 inciso m
    • Decreto 25700-MINAE

    Spanish key termsTérminos clave en español

    News & Updates Noticias y Actualizaciones

    All articles → Todos los artículos →

    Weekly Dispatch Boletín Semanal

    Field reporting and policy analysis from Costa Rica's forests. Reportajes y análisis de política desde los bosques de Costa Rica.

    ✓ Subscribed. ✓ Suscrito.

    One email per week. No spam. Unsubscribe in one click. Un correo por semana. Sin spam. Cancela en un clic.

    Or WhatsApp channelO canal de WhatsApp →
    Coalición Floresta © 2026 · All rights reserved © 2026 · Todos los derechos reservados

    Stay Informed Mantente Informado

    Conservation news and action alerts, straight from the field Noticias de conservación y alertas de acción, directo desde el campo

    Email Updates Actualizaciones por Correo

    Weekly updates, no spam Actualizaciones semanales, sin spam

    Successfully subscribed! ¡Suscripción exitosa!

    WhatsApp Channel Canal de WhatsApp

    Join to get instant updates on your phone Únete para recibir actualizaciones instantáneas en tu teléfono

    Join Channel Unirse al Canal
    Coalición Floresta Coalición Floresta © 2026 Coalición Floresta. All rights reserved. © 2026 Coalición Floresta. Todos los derechos reservados.
    🙏