OutcomeResultado
Agreement 9 establishes the requirements, technical standards, deadlines, and controls of procedure ECA-SE-P01-I05, version 01, for ECA and MINAE to process through EXONET the equipment tax exemptions provided under Law 7447.El Acuerdo 9 establece los requisitos, normas técnicas, plazos y controles del procedimiento ECA-SE-P01-I05, versión 01, para que el ECA y el MINAE tramiten en EXONET las exoneraciones de equipos contempladas por la Ley 7447.
SummaryResumen
Agreement 9 establishes procedure ECA-SE-P01-I05, version 01, for obtaining tax exemptions for materials and equipment used for rational energy use and renewable or alternative energy under Law 7447. Each application corresponds to one invoice and requires, among other documents, a technical data sheet, a MINAE exemption license, and conformity certificates issued by bodies accredited or recognized by the Ente Costarricense de Acreditación (ECA) under INTE/ISO IEC 17065. The text identifies the technical standards applicable to solar, wind, and hydroelectric equipment, batteries, inverters, controllers, green-hydrogen systems, and fuel cells. An application may be initiated without certain documents, but the missing documents must be supplied within 45 calendar days. After ECA grants its technical endorsement, the MINAE Energy Directorate has up to 10 business days to issue its recommendation through EXONET. Exempt equipment may subsequently be subjected to random market controls.El Acuerdo 9 establece el procedimiento ECA-SE-P01-I05, versión 01, para obtener la exoneración tributaria de materiales y equipos destinados al uso racional de la energía y al aprovechamiento de energías renovables o alternativas conforme a la Ley 7447. Cada trámite corresponde a una factura y requiere, entre otros documentos, ficha técnica, licencia de exención del MINAE y certificados de conformidad emitidos por organismos acreditados o reconocidos por el ECA bajo la norma INTE/ISO IEC 17065. El texto identifica las normas técnicas aplicables a equipos solares, eólicos, hidroeléctricos, baterías, inversores, controladores, sistemas de hidrógeno verde y celdas de combustible. Permite iniciar la gestión sin determinados documentos, pero exige completarlos dentro de 45 días naturales. Tras el aval técnico del ECA, la Dirección de Energía del MINAE dispone de hasta 10 días hábiles para formular su recomendación en EXONET. Los equipos exonerados pueden quedar sujetos a controles aleatorios de mercado.
Key excerptExtracto clave
5.1 The interested party may initiate the procedure at eco.eca.or.cr without yet having the commercial invoice, B/L, waybill or bill of lading, and the EXONET application; in such cases, the party must upload, in the space corresponding to those documents, a file stating that the document will be provided later or that it does not apply. After the procedure is approved at eco.eca.or.cr, the interested party has 45 calendar days to submit the missing documents; once that period expires, the procedure may no longer be used. To proceed with the recommendation in EXONET and referral to MINAE, the pending documents must be sent to exoneracion@eca.or.cr, indicating the corresponding ECA procedure number. Note: The matter will NOT be referred to MINAE until the procedure is complete with all required attachments. 5.2 If the verification result is positive, the approving officer approves the procedure on the eco.eca.or.cr platform, enters the recommendation in EXONET, and sends the information to MINAE by email.5.1 El interesado puede realizar el trámite en el sitio eco.eca.or.cr sin contar todavía con la factura comercial, el BL, carta de porte o conocimiento de embarque y la solicitud de Exonet; en estos casos debe subir en el espacio correspondiente a esos documentos un archivo donde indique que se entregará posteriormente o que no aplica. Luego de aprobado el trámite en el sitio eco.eca.or.cr, el interesado cuenta con 45 días naturales para presentar los documentos faltantes; si se pasa de ese plazo, ya no podrá utilizar el trámite. Para poder proceder con la recomendación en EXONET y el traslado al MINAE, deben enviar los documentos pendientes, al correo exoneracion@eca.or.cr indicando el número de trámite de ECA correspondiente. Nota: NO se realizará el traslado al MINAE hasta que esté completo el trámite con todos los anexos requeridos. 5.2 Si la verificación resulta positiva, el aprobador aprueba el trámite en la plataforma eco.eca.or.cr, realiza la recomendación en EXONET y remite por correo electrónico, la información al MINAE.
Pull quotesCitas destacadas
"Aval técnico: aprobación realizada a los resultados de evaluación de la conformidad previamente realizados, para determinar el cumplimiento de los requisitos técnicos de los equipos."
"Technical endorsement: approval of previously obtained conformity-assessment results to determine whether the equipment complies with technical requirements."
Definiciones, apartado 3.1
"Aval técnico: aprobación realizada a los resultados de evaluación de la conformidad previamente realizados, para determinar el cumplimiento de los requisitos técnicos de los equipos."
Definiciones, apartado 3.1
"Los certificados de evaluación de la conformidad que respaldan la solicitud de exoneración deben ser emitidos por un organismo de certificación de producto acreditado o reconocido por el ECA en la norma INTE/ISO IEC 17065 en su versión vigente y en el alcance específico de la norma correspondiente según el listado siguiente o una norma declarada equivalente."
"The conformity-assessment certificates supporting the exemption application must be issued by a product-certification body accredited or recognized by ECA under the current version of INTE/ISO IEC 17065 and within the specific scope of the applicable standard listed below or a standard declared equivalent."
Requisitos, apartado 4.3
"Los certificados de evaluación de la conformidad que respaldan la solicitud de exoneración deben ser emitidos por un organismo de certificación de producto acreditado o reconocido por el ECA en la norma INTE/ISO IEC 17065 en su versión vigente y en el alcance específico de la norma correspondiente según el listado siguiente o una norma declarada equivalente."
Requisitos, apartado 4.3
"Los equipos que gocen del beneficio de exoneración, podrán ser sometidos a un control de mercado aleatorio, para confirmar que cumplen con los requisitos establecidos en el apartado 6."
"Equipment benefiting from the exemption may be subjected to random market controls to confirm compliance with the requirements established in section 6."
Controles posteriores, apartado 7.1
"Los equipos que gocen del beneficio de exoneración, podrán ser sometidos a un control de mercado aleatorio, para confirmar que cumplen con los requisitos establecidos en el apartado 6."
Controles posteriores, apartado 7.1
"La Policía Fiscal del Ministerio de Hacienda es la responsable de controlar que el beneficio de exoneración sea trasladado al consumidor final."
"The Policía Fiscal of the Ministry of Finance is responsible for ensuring that the benefit of the exemption is passed on to the final consumer."
Controles posteriores, apartado 7.2
"La Policía Fiscal del Ministerio de Hacienda es la responsable de controlar que el beneficio de exoneración sea trasladado al consumidor final."
Controles posteriores, apartado 7.2
Full documentDocumento completo
Agreement 9 Procedure ECA-SE-P01-I05 Guidelines for Equipment Tax Exemption – Ley 7447 (version 01) Go to the latest version Version of the Regulation: 1 of 1 ENTE COSTARRICENSE DE ACREDITACIÓN Notice 2026-009.—In compliance with Ley 10473 Ley del Sistema Nacional de la Calidad, the Ente Costarricense de Acreditación (ECA) hereby announces the amendment of the following documents: ECA-SE-P01 General Process for Processing Equivalency Services, version 01; ECA-SE-P01-I01 Recognition of the Equivalence of the Accreditation Certificate, version 01; ECA-SE-P01-I02 Declaration of Compliance and Issuance of Technical Notes, version 01; and ECA-SE-P01-I05 Guidelines for Equipment Tax Exemption – Ley 7447, version 01. The documents described above are available to interested parties on the website http://www.eca.or.cr/; they may also request electronic delivery or request a free uncontrolled copy from the Quality Management Office at the ECA headquarters located at C.40, Mántica San José 10102.—San José, Costa Rica, 19.08.2026.—
(Sinalevi Note: This Procedure ECA-SE-P01-I05 Guidelines for Equipment Tax Exemption – Ley 7447, version 01, was obtained from the website of the Ente Costarricense de Acreditación and is transcribed below:)
1. PURPOSE AND SCOPE 2. REFERENCE DOCUMENTS 3. DEFINITIONS 4. REQUIREMENTS 5. PROCEDURE FOR TECHNICAL ENDORSEMENT BY THE ECA 6. MINAE. VERIFICATION AND APPROVAL PROCEDURE 7. SUBSEQUENT CONTROLS 8. TRANSITIONAL PROVISION 9. IDENTIFICATION OF CHANGES 1. PURPOSE AND SCOPE 1.1. To establish guidelines for obtaining a tax exemption for materials or equipment under Ley Nº 7447 Ley de Regulación del Uso Racional de la Energía.
2. REFERENCE DOCUMENTS 2.1. Ley No. 7447. Ley de Regulación del Uso Racional de la Energía of 3 November 1994, as amended 2.2. Decreto Ejecutivo N° 41121-MINAE-H – “Official List of Goods Eligible for Tax Exemption Pursuant to Article 38 of Ley de Regulación del Uso Racional de la Energía, Ley Nº7447 of 3 November 1994, as amended” 2.3. Decreto Ejecutivo N° 43095-MINA-H – “Amendment to Decreto Ejecutivo N° 41121-MINAE-H of 5 April 2018, entitled ‘Official List of Goods Exempted Pursuant to Article 38 of Ley de Regulación del Uso Racional de la Energía, Ley N° 7447 of 3 November 1994, as amended.’” 3. DEFINITIONS 3.1. Technical endorsement (aval técnico): approval of previously obtained conformity-assessment results to determine compliance with the technical requirements applicable to the equipment.
3.2. Exonet: Electronic Information System for managing and processing tax-exemption applications, as well as other related matters, before the Exemption Management Department of the Tax Incentives Division of the General Directorate of Taxation of the Ministry of Finance.
4. REQUIREMENTS 4.1. The procedure must be completed for each invoice for which a tax exemption is sought before the Ministry of Finance.
4.2. To complete the procedure, the interested party must submit the following specific documents, in addition to the general documents specified in ECA-SE-P01 General Process for Processing SE Applications:
Document Comments True copy of the corresponding B/L or waybills The interested party may begin the procedure on the ECA digital platform up to 45 days before submitting the application through the Exonet system; therefore, submission of the B/L or waybill on the eco.eca.or.cr platform is not mandatory. However, a document stating that it will be submitted subsequently must be included in the application.
True copy of the invoice The interested party may begin the procedure on the ECA digital platform up to 45 days before submitting the application through the Exonet system; therefore, submission of the invoice on the eco.eca.or.cr platform is not mandatory. However, a document stating that it will be submitted subsequently must be included in the application.
Technical data sheet for the equipment or product for which the tax exemption is sought.
Required for all applications.
Exonet application The interested party may begin the procedure on the ECA digital platform up to 45 days before submitting the application through the Exonet system; therefore, submission of the application on the eco.eca.or.cr platform is not mandatory. However, a document stating that it will be submitted subsequently must be included in the application.
MINAE Tax-Exemption License Required for all applications.
INTECO equivalency determination, where applicable. The certificate or certificates may be sent to exoneracion@eca.or.cr to inquire whether this determination is required.
The product conformity certificate must be issued for the standards and technical requirements established in Decreto Ejecutivo N° 41121-MINAE-H – “Official List of Goods Eligible for Tax Exemption Pursuant to Article 38 of Ley de Regulación del Uso Racional de la Energía, Ley Nº7447 of 3 November 1994, as amended.” Certificates issued to demonstrate compliance with other international standards will be accepted, provided that an INTECO determination regarding the equivalence of the standards is submitted.
4.3. The conformity-assessment certificates supporting the tax-exemption application must be issued by a product-certification body accredited or recognized by the ECA under the current version of the INTE/ISO IEC 17065 standard and for the specific scope of the corresponding standard listed below, or an equivalent standard.
4.4. The renewable- or alternative-energy equipment listed below is exempt from the selective consumption, ad valorem, and sales taxes, as well as the tax established in Ley N° 6946 of 14 January 1984, whether imported or manufactured and assembled domestically.
- Solar Water Heaters: The applicable technical standards are:
INTE E23-2: Solar thermal systems and their components. Part 2: Factory-made systems. General requirements.
INTE E23-1: Solar thermal systems and their components. Part 1: Solar collectors. General requirements.
- Photovoltaic Solar Panels: The applicable technical standards are:
INTE/IEC 61215-1, Terrestrial photovoltaic (PV) modules. Design qualification and type approval. Part 1: Test requirements.
INTE/IEC 61215-1-2, Terrestrial photovoltaic (PV) modules. Design qualification and type approval. Part 1-2: Special testing requirements for cadmium telluride (CdTe) thin-film photovoltaic (PV) modules.
INTE/IEC 61215-1-3, Terrestrial photovoltaic (PV) modules. Design qualification and type approval. Part 1-3: Special testing requirements for amorphous-silicon-based thin-film photovoltaic (PV) modules.
INTE/IEC 61215-1-4, Terrestrial photovoltaic (PV) modules – Design qualification and type approval. Part 1-4: Special testing requirements for Cu (In,Ga) (S,Se)2-based thin-film photovoltaic (PV) modules.
- Micro- and Mini-Hydroelectric Generators: The applicable technical standards are:
IEC -60034-22. Rotating electrical machines. Part 22: Alternating-current generators for reciprocating internal-combustion engine-driven generating sets.
- Small Wind Turbines: The applicable technical standards are:
IEC-61400-2. Wind turbines. Part 2: Design requirements for small wind turbines.
- DC/AC Inverters for Photovoltaic Systems and Small Hydroelectric and Wind Generators. The applicable technical standards are:
INTE/IEC 62109-1: Safety of power converters for use in photovoltaic power systems. Part 1: General requirements.
INTE/IEC 62109-2: Safety of power converters for use in photovoltaic power systems. Part 2: Particular requirements for inverters.
INTE N71, Interconnection of distributed-energy-resource equipment with electric power systems. Test methods.
INTE N75, Electrotechnology. Inverters, converters, controllers, and interconnection equipment systems for use with distributed energy resources.
- Batteries for Photovoltaic Systems and Small Hydroelectric and Wind Generators. The applicable technical standards are:
INTE/IEC 61427-1: Secondary cells and batteries for renewable-energy storage. General requirements and test methods. Part 1: Off-grid photovoltaic applications.
INTE N39:2020 Lithium batteries.
INTE N40:2020 Batteries for use in light electric rail (LER) and stationary applications.
INTE/IEC 62619:2020 Secondary cells and batteries containing alkaline or other non-acid electrolytes. Safety requirements for large-format secondary lithium cells and batteries for use in industrial applications.
INTE/IEC 62485-1:2020 Safety requirements for secondary batteries and battery installations. Part 1: General safety information.
INTE /IEC 62133-2:2020 Secondary cells and batteries containing alkaline or other non-acid electrolytes. Safety requirements for portable sealed secondary cells, and for batteries made from them, for use in portable applications. Part 2: Lithium systems.
INTE N116:2020 Standby batteries.
INTE N117:2020 Energy-storage systems and equipment.
- Battery Charge Controllers for Photovoltaic Systems, Wind Generators, or Hydroelectric Systems. The applicable technical standard is:
INTE/IEC 62509: Battery charge controllers for photovoltaic systems. Performance and functioning.
INTE N75 – Electrotechnology. Inverters, converters, controllers, and interconnection equipment systems for use with distributed energy resources.
- Direct-Current Converters for Energy Optimization in Photovoltaic Systems. The applicable technical standards are:
INTE N75 Electrotechnology. Inverters, converters, controllers, and interconnection equipment systems for use with distributed energy resources.
- Gaseous-Hydrogen Dispensers for Fuel-Cell Electric Vehicles. The applicable technical standards are:
INTE/ISO 17268 Connection devices for refueling land vehicles with compressed hydrogen.
Stationary Storage Tanks for High-Pressure Gaseous Hydrogen. The applicable technical standards are:
ASME Boiler and Pressure Vessel Code, Section VIII.
- Mechanical Compressor for Gaseous Hydrogen. The applicable technical standards are:
ISO 19880-1 Gaseous hydrogen – fueling stations. Part 1: General requirements.
- Green-Hydrogen Generators Using Water Electrolysis. The applicable technical standards are:
INTE/SO 22734 Hydrogen generators using water electrolysis, industrial, commercial, and residential applications.
- Fuel Cells for Generating Electricity from Green Hydrogen. The applicable technical standards are:
IEC 62282-2-100 Fuel-cell modules. Safety.
IEC 62282-3-300 Fuel-cell technologies. Part 3-300: Fuel-cell power systems. Installation.
5. PROCEDURE FOR TECHNICAL ENDORSEMENT BY THE ECA 5.1. The interested party may begin the procedure on the eco.eca.or.cr website without yet having the commercial invoice, B/L, consignment note or bill of lading, or the Exonet application. In such cases, the interested party must upload, in the space designated for those documents, a file stating that the document will be submitted subsequently or that it is not applicable. After the application has been approved on the eco.eca.or.cr website, the interested party has 45 calendar days to submit the missing documents; after that period expires, the application may no longer be used. To proceed with the recommendation in EXONET and referral to MINAE, the pending documents must be sent to exoneracion@eca.or.cr, indicating the corresponding ECA application number.
Note: The application will NOT be referred to MINAE until it is complete and includes all required attachments.
5.2. If the verification result is positive, the approving officer approves the application on the eco.eca.or.cr platform, enters the recommendation in EXONET, and sends the information to MINAE by email.
5.3. If the application in the EXONET system is returned by any of the other recommending entities, the interested party must send an email to exoneracion@eca.or.cr requesting that the recommendation be entered again in EXONET.
6. MINAE. VERIFICATION AND APPROVAL PROCEDURE 6.1. Within no more than 10 business days after proper receipt of the tax-exemption application submitted by the user through the EXONET system, the MINAE Energy Directorate must issue a recommendation, taking the following requirements into account:
- The documentation received from the ECA is compared with the Ministry of Finance’s EXONET portal digital form for the same application.
- The validity of the tax-exemption license is verified; the license must be current for the applicant to receive the tax benefits.
- The endorsement issued by the ECA is reviewed.
- Any technical requirement necessary to confirm compliance with the specified standards is reviewed to determine whether it has been satisfactorily met.
The MINAE Energy Directorate will use the EXONET platform to request from the importer any additional information that is missing or that must be expanded or amended in the respective digital form.
If the information on the form yields a positive result, the information supplied by the ECA is correct, and the conformity-assessment results are satisfactory, the corresponding recommendation will be sent through the Ministry of Finance’s EXONET system with the following comment: “According to the technical review conducted by this Ministry, the goods for which the beneficiary applicant company requests the exemption technically comply with the legal requirements to qualify for the tax-exemption benefit, in accordance with Ley 7447 Ley Reguladora del Uso Racional de Energía, Chapter No. 9, Article 38. The beneficiary applicant company’s license is current.” If the information supplied by the ECA yields a negative result or the conformity-assessment results are unsatisfactory, the official in charge at the MINAE Energy Directorate will return the open application through the EXONET system with the comment: “Application denied due to failure to meet technical requirements.” If the Ministry of Finance conducts its own review after the recommendation by the MINAE Energy Directorate and rejects the application because a correction is required, it will be assessed on a case-by-case basis whether the information supplied by the ECA remains relevant to the application and whether the original recommendation remains unchanged.
7. SUBSEQUENT CONTROLS.
7.1. Equipment receiving the benefit of the tax exemption may be subject to random market surveillance to confirm compliance with the requirements established in section 6.
7.2. The Tax Police of the Ministry of Finance is responsible for ensuring that the benefit of the tax exemption is passed on to the final consumer.
8. TRANSITIONAL PROVISION N.A.
9. IDENTIFICATION OF CHANGES Reason:
Creation of document Refer to the consecutively numbered document-management request:
2026-101 Comments:
This document corresponds to the former ECA-MC-MA-P20.
Article 1 Record
Acuerdo 9 Procedimiento ECA-SE-P01-I05 Lineamientos para la exoneración de equipos – Ley 7447 (versión 01) Ir a la última versión Versión de la Norma: 1 de 1 ENTE COSTARRICENSE DE ACREDITACIÓN Aviso 2026-009.—El Ente Costarricense de Acreditación (ECA), en cumplimiento de la Ley 10473 Ley del Sistema Nacional de la Calidad, da a conocer la modificación de los documentos: ECA-SE-P01 Proceso general de tramites de Servicios de equivalencias en la versión 01, ECA-SE-P01-I01 Reconocimiento de la equivalencia del certificado de acreditación en la versión 01, ECA-SE-P01-I02 Declaración de cumplimiento y emisión de notas técnicas en la versión 01 y ECA-SE-P01-I05 Lineamientos para la exoneración de equipos – Ley 7447 en la versión 01. Los documentos descritos anteriormente se encuentra a disposición de los interesados en la página electrónica http://www.eca.or.cr/; así mismo puede solicitar el envío de manera electrónica o solicitar gratuitamente una copia no contralada en la Gestoría de Calidad en las oficinas centrales del ECA ubicadas en C.40, Mántica San José 10102.—San José, Costa Rica, 19.08.2026.—
(Nota de Sinalevi: El presente Procedimiento ECA-SE-P01-I05 Lineamientos para la exoneración de equipos – Ley 7447 en la versión 01, se extrajo del sitio web del Ente Costarricense de Acreditación y se transcribe a continuación:)
1. OBJETO y ALCANCE 2. DOCUMENTOS DE REFERENCIA 3. DEFINICIONES 4. REQUISITOS 5. PROCEDIMIENTO PARA EL AVAL TÉCNICO POR PARTE DEL ECA 6. MINAE. PROCEDIMIENTO DE VERIFICACIÓN Y APROBACIÓN 7. CONTROLES POSTERIORES 8. TRANSITORIO 9. IDENTIFICACIÓN DE CAMBIOS 1. OBJETO y ALCANCE 1.1. Establecer lineamientos para la obtención de exoneración de materiales o equipos en el marco de la Ley Nº 7447 Ley de Regulación del Uso Racional de la Energía.
2. DOCUMENTOS DE REFERENCIA 2.1. Ley No. 7447. Ley de Regulación del Uso Racional de la Energía del 03 de noviembre de 1994 y sus reformas 2.2. Decreto Ejecutivo N° 41121-MINAE-H - “Lista oficial de bienes exonerables conforme al artículo 38 de la Ley de Regulación del Uso Racional de la Energía, Ley Nº7447 del 03 de noviembre de 1994 y sus reformas” 2.3. Decreto Ejecutivo N° 43095-MINA-H – “Modificación al Decreto Ejecutivo N° 41121-MINAE-H del 05 de abril de 2018 denominado “Lista Oficial de bienes exonerados conforme al artículo 38 de la Ley de Regulación del Uso Racional de la Energía, Ley N° 7447 del 03 de noviembre de 1994 y sus reformas”.
3. DEFINICIONES 3.1. Aval técnico: aprobación realizada a los resultados de evaluación de la conformidad previamente realizados, para determinar el cumplimiento de los requisitos técnicos de los equipos.
3.2. Exonet: Sistema de Información Electrónico para la gestión y trámite de las solicitudes de exención de tributos, así como las demás gestiones relacionadas con estas, ante el Departamento de Gestión de Exenciones de la División de Incentivos Fiscales de la Dirección General de Hacienda del Ministerio de Hacienda.
4. REQUISITOS 4.1. El trámite debe ser realizado por cada factura a exonerar que se trámite ante el Ministerio de Hacienda.
4.2. Para realizar el trámite, el interesado debe aportar los siguientes documentos específicos, además de los documentos generales indicados en el ECA-SE-P01 Proceso general de trámites de SE:
Documento Observaciones Copia fiel del B/L o guías que correspondan El interesado puede realizar el trámite en la plataforma digital del ECA desde 45 días antes de presentar la solicitud al sistema Exonet, por lo que no es obligatorio que presente el BL o guía en la plataforma eco.eca.or.cr; sin embargo, en el trámite debe agregar un documento donde indique que se entregará posteriormente.
Copia fiel de la factura El interesado puede realizar el trámite en la plataforma digital del ECA desde 45 días antes de presentar la solicitud al sistema Exonet, por lo que no es obligatorio que presente la factura en la plataforma eco.eca.or.cr; sin embargo, en el trámite debe agregar un documento donde indique que se entregará posteriormente.
Ficha técnica del equipo o producto a exonerar.
Se requiere para todos los trámites.
Solicitud de Exonet El interesado puede realizar el trámite en la plataforma digital del ECA desde 45 días antes de presentar la solicitud al sistema Exonet, por lo que no es obligatorio que la presente en la plataforma eco.eca.or.cr; sin embargo, en el trámite debe agregar un documento donde indique que se entregará posteriormente.
Licencia de Exención del MINAE Se requiere para todos los trámites.
Criterio de equivalencia de INTECO, cuando aplique. Se puede enviar el o los certificados al correo exoneracion@eca.or.cr para consultar si requieren el mismo.
El certificado de conformidad de producto debe ser emitido para la normativa y requisitos técnicos definidos en el Decreto Ejecutivo N° 41121-MINAE-H - “Lista oficial de bienes exonerables conforme al artículo 38 de la Ley de Regulación del Uso Racional de la Energía, Ley Nº7447 del 03 de noviembre de 1994 y sus reformas”. Se aceptarán certificados emitidos para demostrar cumplimiento con otras normas internacionales siempre y cuando presenten el Criterio de la equivalencia de normas de INTECO.
4.3. Los certificados de evaluación de la conformidad que respaldan la solicitud de exoneración deben ser emitidos por un organismo de certificación de producto acreditado o reconocido por el ECA en la norma INTE/ISO IEC 17065 en su versión vigente y en el alcance específico de la norma correspondiente según el listado siguiente o una norma declarada equivalente.
4.4. Los equipos para el aprovechamiento de las energías renovables o alternativas que se listan a continuación se eximen del pago de los impuestos selectivo de consumo, ad valorem, de ventas, y el estipulado en la Ley N° 6946 de 14 de enero de 1984, tanto importados como de fabricación y ensamblaje nacional.
- Calentadores Solares de Agua: Las normas técnicas aplicables son:
INTE E23-2: Sistemas solares térmicos y sus componentes. Parte 2: Sistemas prefabricados. Requisitos generales.
INTE E23-1: Sistemas solares térmicos y sus componentes. Parte 1: Colectores solares. Requisitos generales.
- Paneles Solares Fotovoltaicos: Las normas técnicas aplicables son:
INTE/IEC 61215-1, Módulos fotovoltaicos (PV) para uso terrestre. Cualificación del diseño y homologación. Parte 1: Requisitos de ensayo.
INTE/IEC 61215-1-2, Módulos fotovoltaicos (FV) para uso terrestre. Cualificación del diseño y homologación. Parte 1-2: Requisitos especiales de ensayo para los módulos fotovoltaicos (FV) de lámina delgada de telururo de cadmio (CdTe).
INTE/IEC 61215-1-3, Módulos fotovoltaicos (FV) para aplicaciones terrestres. Cualificación del diseño y homologación. Parte 1-3: Requisitos particulares de ensayo para módulos fotovoltaicos (FV) de lámina delgada basados en silicio amorfo.
INTE/IEC 61215-1-4, Módulos fotovoltaicos (FV) para aplicaciones terrestres - Cualificación del diseño y homologación. Parte 1 - 4: Requisitos particulares de ensayo para módulos fotovoltaicos (FV) de lámina delgada basados en Cu (In,Ga) (S,Se)2.
- Generadores micro y minihidroeléctricos: Las normas técnicas aplicables son:
IEC -60034-22. Máquinas eléctricas rotativas. Parte 22: Generadores de corriente alterna para grupos electrógenos accionados por motores de combustión interna de pistones.
- Mini generadores eólicos: Las normas técnicas aplicables son:
IEC-61400-2. Aerogeneradores. Parte 2: Requisitos de diseño para pequeños aerogeneradores.
- Inversores DC/AC para sistemas fotovoltaicos y mini generadores hidroeléctricos y eólicos. Las normas técnicas aplicables son:
INTE/IEC 62109-1: Seguridad de los convertidores de potencia utilizados en sistemas de potencia fotovoltaicos. Parte 1: Requisitos generales.
INTE/IEC 62109-2: Seguridad de los convertidores de potencia utilizados en sistemas de potencia fotovoltaicos. Parte 2: Requisitos particulares para inversores.
INTE N71, Interconexión de equipos de recursos distribuidos con sistemas de potencia eléctrica. Métodos de ensayo.
INTE N75, Electrotecnia. Inversores, convertidores, controladores, y sistemas de equipos de Interconexión para uso con recursos de energía distribuida.
- Baterías para Sistemas Fotovoltaicos y mini generadores hidroeléctricos y eólicos. Las normas técnicas aplicables son:
INTE/IEC 61427-1: Acumuladores y baterías de acumuladores para el almacenamiento de energía renovable. Requisitos generales y métodos de ensayo. Parte 1: Aplicaciones fotovoltaicas independientes de la red.
INTE N39:2020 Baterías de litio.
INTE N40:2020 Baterías para uso en aplicaciones de riel eléctrico ligero (LER) y aplicaciones estacionarias.
INTE/IEC 62619:2020 Acumuladores con electrolitos alcalinos u otros electrolitos no ácidos. Requisitos de seguridad para acumuladores de litio de gran formato y para baterías para uso en aplicaciones industriales.
INTE/IEC 62485-1:2020 Requisitos de seguridad para las baterías e instalaciones de baterías. Parte 1: Información general de seguridad.
INTE /IEC 62133-2:2020 Acumuladores alcalinos y otros acumuladores con electrolito no ácido. Requisitos de seguridad para acumuladores estancos portátiles y para baterías construidas a partir de ellos, para uso en aplicaciones portátiles. Parte 2: Sistemas de Litio.
INTE N116:2020 Baterías de reserva.
INTE N117:2020 Sistemas y equipos de almacenamiento de energía.
- Controlador de carga de Baterías para Sistemas Fotovoltaicos, generadores eólicos o sistemas hidroeléctricos. La norma técnica aplicable es:
INTE/IEC 62509: Controladores de carga de batería para instalaciones fotovoltaicas. Comportamiento y rendimiento.
INTE N75 - Electrotecnia. Inversores, convertidores, controladores y sistema de equipos de interconexión para uso con recursos de energía distribuida.
- Convertidores de corriente directa para optimización de energía en sistemas fotovoltaicos. Las normas técnicas aplicables son:
INTE N75 Electrotecnia. Inversores, convertidores, controladores y sistemas de equipos de interconexión para uso con recursos de energía distribuida.
- Dispensadores de hidrógeno gaseoso para vehículos eléctricos de celda de combustible. Las normas técnicas aplicables son:
INTE/ISO 17268 Dispositivos de conexión para la recarga de vehículos terrestres con hidrógeno comprimido.
Tanques de almacenamiento estacionarios para hidrógeno gaseoso de alta presión. Las normas técnicas aplicables son:
Código ASME de calderas y recipientes a presión, sección VIII.
- Compresor mecánico para hidrógeno gaseoso. Las normas técnicas aplicables son:
ISO 19880-1 Hidrógeno gaseoso – estaciones de combustible. Parte 1: Requerimientos generales.
- Generadores de hidrógeno verde mediante electrólisis del agua. Las normas técnicas aplicables son:
INTE/SO 22734 Generadores de hidrógeno mediante electrólisis del agua, aplicaciones industriales, comerciales y residenciales.
- Celdas de combustible para la generación de electricidad a partir de hidrógeno verde. Las normas técnicas aplicables son:
IEC 62282-2-100 Módulos de celdas de combustible. Seguridad.
IEC 62282-3-300 Tecnologías de celdas de combustible. Parte 3-300: Sistemas de potencia de celdas de combustible. Instalación.
5. PROCEDIMIENTO PARA EL AVAL TÉCNICO POR PARTE DEL ECA 5.1 El interesado puede realizar el trámite en el sitio eco.eca.or.cr sin contar todavía con la factura comercial, el BL, carta de porte o conocimiento de embarque y la solicitud de Exonet; en estos casos debe subir en el espacio correspondiente a esos documentos un archivo donde indique que se entregará posteriormente o que no aplica. Luego de aprobado el trámite en el sitio eco.eca.or.cr, el interesado cuenta con 45 días naturales para presentar los documentos faltantes; si se pasa de ese plazo, ya no podrá utilizar el trámite. Para poder proceder con la recomendación en EXONET y el traslado al MINAE, deben enviar los documentos pendientes, al correo exoneracion@eca.or.cr indicando el número de trámite de ECA correspondiente.
Nota: NO se realizará el traslado al MINAE hasta que esté completo el trámite con todos los anexos requeridos.
5.2 Si la verificación resulta positiva, el aprobador aprueba el trámite en la plataforma eco.eca.or.cr, realiza la recomendación en EXONET y remite por correo electrónico, la información al MINAE.
5.3 En caso de que la solicitud en el sistema EXONET sea devuelta por alguna de los otros entes recomendadores, el interesado debe enviar un correo a exoneracion@eca.or.cr solicitando que se realice nuevamente la recomendación en EXONET.
6. MINAE. PROCEDIMIENTO DE VERIFICACIÓN Y APROBACIÓN 6.1. La Dirección de Energía del MINAE, en un plazo no mayor de 10 días hábiles contados a partir de recibo conforme de la solicitud de exoneración remitida por el usuario a través del sistema de EXONET, debe realizar una recomendación, considerando los siguientes requisitos:
- Se coteja la documentación proveniente del ECA con el formulario digital del portal EXONET del Ministerio de Hacienda relacionado con el mismo trámite.
- Se verifica la vigencia de la licencia de exoneración, la cual debe estar al día para recibir los beneficios fiscales.
- Revisión del aval emitido por el ECA.
- Revisión de cualquier requisito técnico necesario para confirmar el cumplimiento de la normativa indicada y determinar si son satisfactorios o no.
La Dirección de Energía del MINAE, utilizará la plataforma EXONET para solicitarle al importador cualquier información adicional que esté ausente o que sea necesario ampliar o modificar en el formulario digital respectivo.
Si la información del formulario es positiva, la información suministrada por el ECA es correcta y los resultados de evaluación de la conformidad son satisfactorios, se procede a enviar la respectiva recomendación utilizando el sistema EXONET del Ministerio de Hacienda con la siguiente observación: “De acuerdo a la revisión técnica efectuada por este Ministerio, los bienes sobre los cuales la empresa solicitante beneficiaria requiere la exención, técnicamente cumplen con los requerimientos legales para optar por el beneficio fiscal exoneración, de acuerdo con lo estipulado en la Ley 7447 Ley Reguladora del Uso Racional de Energía, en el capítulo No. 9, artículo 38. La licencia de la empresa interesada beneficiaria está vigente”.
Si la información suministrada por el ECA arroja un resultado negativo los resultados de evaluación de la conformidad no son satisfactorios, el encargado la Dirección de Energía del MINAE, devolverá el trámite abierto en el sistema EXONET con la observación “Denegación de trámite por incumplimiento de requisitos técnicos”.
Si existiese un control propio de Hacienda posterior a la recomendación de la Dirección de Energía del MINAE, que rechace el trámite porque sea necesario realizar alguna corrección, se valorará para cada caso si la información suministrada por el ECA sigue siendo atinente al trámite y si la recomendación dada en un principio se mantiene.
7. CONTROLES POSTERIORES.
7.1. Los equipos que gocen del beneficio de exoneración, podrán ser sometidos a un control de mercado aleatorio, para confirmar que cumplen con los requisitos establecidos en el apartado 6.
7.2. La Policía Fiscal del Ministerio de Hacienda es la responsable de controlar que el beneficio de exoneración sea trasladado al consumidor final.
8. TRANSITORIO N.A.
9. IDENTIFICACIÓN DE CAMBIOS Motivo:
Creación de documento Referirse a la solicitud de gestión de documento consecutivo:
2026-101 Observaciones:
Este documento corresponde al anterior ECA-MC-MA-P20.
Ficha Artículo 1
Document not found. Documento no encontrado.