Res. 01333-2017 Tribunal de Apelación de Sentencia Penal II Circuito Judicial de San José · Tribunal de Apelación de Sentencia Penal II Circuito Judicial de San José · 06/11/2017

Insufficient Proof of Environmental Damage Attributable to RenovationsFalta de prueba del daño ambiental atribuible a una remodelación

View document ↓ Ver documento ↓ View original source ↗ Ver fuente original ↗

Loading…Cargando…

OutcomeResultado

Partially grantedParcialmente con lugar

The environmental civil damages and costs awards were vacated and remanded because the judgment insufficiently established harm attributable to the renovations, while the criminal conviction and all other portions remained undisturbed.Se anuló la condena civil y en costas por falta de fundamentación suficiente sobre el daño ambiental atribuible a las remodelaciones y se ordenó su reenvío, pero permanecieron firmes la condena penal y los demás extremos del fallo.

SummaryResumen

The Criminal Sentence Appeals Court upheld the criminal conviction for violating the Forestry Law by encroaching upon the protection area of Quebradilla stream. It found sufficient proof that the defendant, acting as representative of the property-owning corporation, ordered work involving a vehicle ramp, reconstruction of a retaining wall, and installation of metal fencing, begun without a permit and within the protected strip. The court rejected the alleged absence of intent, mistake concerning restrictions on the property, and application of the in dubio pro reo principle. It nevertheless vacated the civil award for environmental damage and related costs because the trial judgment did not adequately determine whether the renovations attributable to the defendant worsened preexisting environmental conditions. Technical reports indicated that the wall was old, its restoration had not altered hydraulic conditions, and economic valuation of the environmental harm was not feasible. The court therefore remanded the civil claim for new proceedings while leaving the remainder of the judgment undisturbed.El Tribunal de Apelación confirmó la condena penal por infracción a la Ley Forestal derivada de la invasión del área de protección de la quebrada Quebradilla. Consideró suficientemente acreditado que el imputado, como representante de la sociedad propietaria, ordenó obras que comprendían una rampa vehicular, la reconstrucción de un muro de contención y la instalación de verjas, iniciadas sin permiso y dentro de la franja protegida. Rechazó la alegada falta de dolo, el error sobre las restricciones del inmueble y la aplicación del in dubio pro reo. Sin embargo, anuló la condena civil por daño ambiental y costas porque la sentencia no determinó adecuadamente si las remodelaciones atribuibles al demandado agravaron las condiciones ambientales preexistentes. Los informes técnicos indicaban que el muro era antiguo, que su restauración no alteró las condiciones hidráulicas y que no era factible valorar económicamente el daño. Por ello, ordenó el reenvío para una nueva sustanciación de la acción civil, manteniendo incólume el resto del fallo.

Key excerptExtracto clave

In this context, it was essential to determine not whether environmental damage existed in the area—which is undeniable—but, specifically, whether the restoration performed by the defendant adversely changed that situation and itself caused independent environmental damage; the trial judgment contains no adequate analysis of this essential issue. All of the foregoing completely undermines the civil judgment entered against the defendant, including costs. Accordingly, points 2.vi and 2.vii of the second ground of appeal are granted as to those matters, and the case is remanded to the court of origin for new proceedings in accordance with law. The challenged judgment otherwise remains undisturbed. Points 2.vi and 2.vii of the second ground of the appeal filed by the public defense are granted. Consequently, the trial judgment is partially vacated only insofar as it granted the civil damages action and awarded costs. The case is remanded to the court of origin for new proceedings in accordance with law.En este contexto era imprescindible determinar, no la existencia de un daño ambiental en la zona (el cual es innegable), sino, de manera específica, si la restauración que realizó el encartado varió negativamente tal situación, generando en sí mismo un daño ambiental independiente, siendo que sobre este tema esencial no existe un adecuado análisis en el fallo de instancia. Todo lo anterior deslegitima por completo la condenatoria civil dispuesta contra la parte demandada (incluidas las costas), razón por la cual en cuanto a dichos extremos se acogen los puntos 2.vi.) y 2.vii.) de este segundo motivo de apelación, disponiéndose el reenvío a la oficina de origen para una nueva sustanciación conforme a Derecho. En lo demás, el fallo impugnado permanece incólume. Se declaran con lugar los puntos 2.vi.) y 2.vii.) del segundo motivo del recurso apelación interpuesto por la defensa pública. En virtud de ello, se anula parcialmente el fallo de instancia, sólo en cuanto se declaró con lugar la acción civil resarcitoria y se dispuso la condena en costas. Al respecto, se ordena el reenvío a la oficina de origen para una nueva sustanciación conforme a Derecho.

Pull quotesCitas destacadas

  • "De haber seguido el imputado Nombre01 el orden natural y legal para construir habría podido determinar las restricciones que existían sobre su propiedad, siendo que, al no cumplir con la ley no es posible que resulte beneficiado de su propia falta."

    "Had the defendant followed the natural and lawful process for building, he could have determined the restrictions applicable to his property; having failed to comply with the law, he cannot benefit from his own wrongdoing."

    Considerando I

  • "De haber seguido el imputado Nombre01 el orden natural y legal para construir habría podido determinar las restricciones que existían sobre su propiedad, siendo que, al no cumplir con la ley no es posible que resulte beneficiado de su propia falta."

    Considerando I

  • "En este documento no se afirma que el referido muro (antiguo) no haya causado un daño ambiental, pero sí se concluye que su restauración (que sería la obra que se le puede atribuir al aquí demandado) no ha variado las condiciones preexistentes."

    "This document does not state that the old wall caused no environmental damage, but it does conclude that its restoration—the work attributable to the defendant—did not change the preexisting conditions."

    Considerando sobre la acción civil resarcitoria

  • "En este documento no se afirma que el referido muro (antiguo) no haya causado un daño ambiental, pero sí se concluye que su restauración (que sería la obra que se le puede atribuir al aquí demandado) no ha variado las condiciones preexistentes."

    Considerando sobre la acción civil resarcitoria

Full documentDocumento completo

Sections

Procedural marks

Decision: 20 17-1333 Decision: 20 17-1333 Case file: 08-001268-0283 -PE( 13 ) TRIBUNAL DE APELACIÓN DE SENTENCIA PENAL. Segundo Circuito Judicial de San José. Goicoechea, at nueve horas quince minutos, del seis de noviembre de dos mil diecisiete.- APPEAL (RECURSO DE APELACIÓN) filed in these proceedings brought against Nombre01, of legal age, Costa Rican, identity card number CED01, born in San José on 24 de diciembre de 1968, son of Nombre02 and Nombre03, divorced, employed as a waiter, resident of San José, Hatillo 7, 300 meters west and 200 meters south of Palacio del Mueble, walkway 4, house 276, a beige-colored house with cruise-style windows on the left; for the offense of VIOLATION OF THE LEY FORESTAL BY ENCROACHMENT UPON A PROTECTION AREA (ÁREA DE PROTECCIÓN), to the detriment of the ENVIRONMENT. Judge Mario Alberto Porras Villalta and associate judges Patricia Vargas González and Laura Murillo Mora participated in deciding the appeal. Juliana Yglesias Luconi, public defender for the accused, entered an appearance before this court.

WHEREAS:

I.By judgment number 594 -20 17, at nueve horas treinta minutos del cinco de junio de dos mil diecisiete, the Tribunal Penal del Tercer Circuito Judicial de San José, Sede Suroeste, Pavas, ruled: “POR TANTO: Pursuant to the foregoing and Articles 36, 39, 41 and 50 of the Constitución Política; 1, 4, 11, 16, 18 through 20, 30, 45, 50, 51, 59 through 63, 71, 73, 74, 103 subsections 1) and 2) of the Código Penal; section 58 subsection 1) of Ley Forestal number 7575; sections 1, 2, 3, 4, 5, 6, 8, 10, 37, 38, 40, 41, 76, 111 through 115, 140, 141, 142, 144, 180, 181, 182, 184, 265 through 270, 360, 361, 363, 364, 365, 367 and 368 of the Código Procesal Penal; Article 3 of the Ley Orgánica de la Procuraduría General de la República; 122, 123, 124 and 126 of the Código Penal de 1941 Reglas Vigentes sobre Responsabilidad Civil, in relation to section 57 of Ley Forestal number 7575; 1045 of the Código Civil; and Articles 41 and 45, in relation to Article 18 of Decreto de Honorarios Profesionales en Derecho Número 32493, effective as of 9 de marzo del 2005, it is hereby ordered: 1.

Nombre01 is found criminally responsible as the perpetrator of the offense of VIOLATION OF THE LEY FORESTAL BY ENCROACHMENT UPON A PROTECTION AREA, committed to the detriment of the ENVIRONMENT, and, in that capacity, is sentenced to THREE MONTHS’ IMPRISONMENT, which sentence shall be served at the place and in the manner prescribed by the applicable prison regulations, with credit for any pretrial detention (prisión preventiva) served. Because the convicted person meets the requirements established by law and the sentence imposed is less than three years, he is granted the Benefit of Conditional Execution of Sentence (Beneficio de Ejecución Condicional de la Pena) for a period of THREE YEARS, during which the convicted person may not commit any intentional offense punishable by more than six months’ imprisonment; otherwise, the benefit granted herein shall be revoked. The convicted person shall bear the costs of the criminal proceedings. 2.

The CIVIL CLAIM FOR DAMAGES (ACCIÓN CIVIL RESARCITORIA) brought by the State, through the Procuraduría General de la República, against the civil defendants Nombre01 and the corporation ROJAMOR ROJAS Y MORA S.A is GRANTED, and they are held jointly and severally liable for payment of the ECONOMIC DAMAGE caused, in the amount of FOUR MILLION FIVE HUNDRED NINETY THOUSAND COLONES (¢4.590.000). The civil defendants are ordered to pay the ATTORNEY’S FEES AND PROCEDURAL COSTS of the Civil Claim for Damages, which are awarded to the State and fixed in the amount of ONE MILLION FIFTY-FIVE THOUSAND SEVEN HUNDRED COLONES EXACTLY (¢1.055.700). The civil defendants are ordered to pay the ATTORNEY’S FEES of the private prosecution (querella), which are awarded to the State and fixed in the amount of TWO HUNDRED THOUSAND COLONES EXACTLY (¢200.000), for an aggregate total of ONE MILLION TWO HUNDRED FIFTY-FIVE THOUSAND SEVEN HUNDRED COLONES EXACTLY (¢1.255.700).

The civil defendants shall pay the amounts established within fifteen days after the judgment becomes final, with the warning that, should they fail to do so, judgment-enforcement proceedings (vía de ejecución de sentencia) may be commenced. 3. Pursuant to section 140 of the 3. Código Procesal Penal, restoration to the prior condition (restablecimiento de las cosas a su estado anterior) is ordered; accordingly, the structure built on the property registered in the San José district, record number , located in San Rafael de Escazú, cadastral plan number , which encroaches upon the protection area of Quebrada Quebradilla, shall be demolished. The bridge or access ramp built over the channel of the aforementioned stream shall be demolished, as shall the retaining wall built beside the fence structure erected along the bank of the stream channel. All debris resulting from the demolition process shall also be removed.

This work is entrusted to the Ministerio del Ambiente y Energía del Área de Conservación Pacífico Central and the Municipalidad de Escazú, which shall be notified of this decision. Before taking any action to comply with this order, those entities shall assess the impact that removal of the retaining wall and access ramp may cause and shall determine a means of proceeding that neither endangers the lives of third parties nor prevents restoration of the protected area. For this purpose, the company owning the property on which the retaining wall and access ramp are located shall authorize personnel from the Ministerio del Ambiente y Energía and the Municipalidad de Escazú to enter, both to conduct the corresponding studies and to demolish the aforementioned structures. Once the judgment becomes final, it shall be entered in the Registro Judicial, and the customary certified copies shall be forwarded to the Juzgado de Ejecución de la Pena and the Instituto Nacional de Criminología. The parties shall be duly notified through the full reading of the judgment.” (sic).

II. Juliana Yglesias Luconi, public defender for the accused, filed an appeal against the foregoing ruling

III.After conducting the corresponding deliberation pursuant to Article 465 of the Código Procesal Penal, the Court considered the issues raised in the appeal.

IV. The pertinent legal requirements have been observed throughout the proceedings

Drafted by Appellate Criminal Judgment Judge Porras Villalta; and,

CONSIDERING:

I. FIRST AND THIRD GROUNDS (procedural)

Insufficient reasoned justification (fundamentación intelectiva) and violation of in dubio pro reo. (1).- In her first ground, defense counsel explains that “[…] If we analyze the judgment under appeal, it is easy to see that the Court provides no explanation regarding my client to justify his conviction […] what the Court does is quote the various witness statements, one after another, linking them with phrases that, when analyzed as a whole, do not reflect any intellectual effort by the Court; there is no indication that, beyond what the witnesses stated, there is in substance the proper statement of reasons required by law; the evidence is used improperly because it is used excessively to give substance to the decision, quoting what the evidence for the prosecution and the defense indicated, while the Court’s own assessment is conspicuously absent […]” (cf. folio 536). (3).- In the third ground of appeal, defense counsel alleges a violation of the principle of in dubio pro reo, for the following reasons: 3.i.) It was established that the retaining wall at issue, as well as the access to the property, had existed since the accused purchased the property; that is, he was not the person who caused environmental damage, if any such damage could be established. 3.ii.) The property-registry report contained in the record establishes that no encumbrance (gravamen) or annotation concerning the Ley Forestal appears registered. 3.iii.) The documents identified in the preceding ground show that there was doubt regarding the environmental impact and, by extension, that doubt must apply to the accused’s guilt.

Both grounds of the complaint are without merit. The judgment on the merits explains with complete clarity, accuracy, and sufficiency why the act and the defendant’s responsibility for it were deemed proven, and no error can be discerned in that logical progression. In this regard, it was found that, at the time of the events, the accused was the president and attorney-in-fact with full powers (apoderado generalísimo) of ROJAMOR S.A., the legal entity holding registered title (titularidad registral) to the property in question, a fact that he admitted when testifying at trial; that he also acknowledged having ordered the remodeling work to be performed—for which he hired third parties, including Mr. Nombre04—which included widening the access ramp and rebuilding the retaining wall, upon which a gated structure was also erected, all within the protection zone (zona de protección) of the Quebradilla stream, in Escazú.

The judgment explains fully and plainly that, in addition, testimony was received at trial from several officials of the Municipalidad de Escazú (Nombre05, Nombre06, and Nombre07), whose accounts were corroborated by the reports they had prepared in writing at the time. They detected that the remodeling work had begun and was proceeding without any building permit and that, after one was issued as a result of an intervention by inspector Nombre05 (that permit authorized only minor work), it was found that the ramp had been widened to allow vehicle access and that the retaining wall had been rebuilt, with a gated structure erected upon it. Moreover, the former owner (Mr. Nombre08), who sold the property to the defendant, corroborated the municipal officials’ accounts by stating that the work depicted in the image at folio 7 was performed after that sale (cf. folio 508). All of this rules out the alleged defect of inadequate reasoning claimed by the public defender.

Instead, the dispute at trial centered on the lack of intent (dolo) alleged by counsel, who argued that her client acted under a mistaken perception of reality because he stated during the adversarial proceedings that he had acquired the property free of restrictions or limitations; that he had never intended to act outside the law and therefore, through an attorney named Nombre09, applied for the building permits before beginning the work; that those permits were ultimately granted; that “Nombre04” built a new bridge without first consulting him; and that he believed the building permit authorized him to repair the existing retaining wall and place a gated structure on top of it, while acknowledging that this was a mistake he made because of poor advice. That position, concerning the existence of a mistake and lack of intent, was rejected by the trial judge essentially for the following reasons: Nombre01 never applied for building permits before beginning the work.

In this regard, it was established that Mr. Nombre05 (a building inspector) observed the construction process while performing fieldwork and, upon noting that there “were” (sic) no permits and that the work continued, he was required to issue a stop-work order (orden de clausura) and refer the case to his colleagues at the Contraloría Ambiental. Likewise, in May 2007, the accused Nombre01 submitted two letters to the Municipalidad de Escazú, reporting that he was repairing a dwelling located at Dirección01, at a cost of one and a half million colones, and attaching a sketch—visible at folio 29—of the physical layout of the residence (cf. folio 509, line 18 et seq.). By virtue of the foregoing, the Departamento de Desarrollo Urbano of the Municipalidad de Escazú, through official letter DU-562-07-EXT, visible at folio 25, ordered the accused to pay fifteen thousand colones as construction tax “and 15.000.00 as a penalty relating to the building permit, for having performed the work without the corresponding license.” As reasoned in the judgment, this evidence completely discredits the accused’s account that he always complied with the law and applied for permits before building, because the evidence demonstrates the contrary and confirms that he began the work without permits and, when compelled to apply for them—as a consequence of the work having been shut down by inspector Nombre05, who observed the ongoing construction while inspecting the area—he was fined for doing so.

Witness Nombre05 explained that, when he went to the site, he observed that a ramp and a retaining wall were being built, and therefore left a warning notice; when he returned to the site for a second inspection, he confirmed that the work had continued and, because there were no permits, he shut down the project and referred the case to the Contraloría Ambiental. He specified that, when he was at the site, the ramp had just been “poured,” and the workers were working on the wall, noting that “when I served notice, the facing and the gates were not there.” The trial judge thus stated that it was entirely certain that, by the time officials from the Contraloría Ambiental of the Municipalidad de Escazú arrived at the site—which occurred on 07 de setiembre de 2007—that ramp and wall had already been erected, and it could be established that this occurred before 29 de mayo de 2007, that is, before the remodeling permit was granted.

The challenged judgment also explains that “[…] It is true that, after the shutdown, Mr. Nombre01 applied for a series of permits, but he did so to replace the mosaic floors with domestic ceramic tile, replace the fibrolit ceilings with gypsum, and apply two coats of paint throughout the house—work that had nothing to do with building a retaining wall with a gated structure on top or enabling vehicular access to the dwelling. As a natural consequence of the foregoing, it can be completely ruled out that Nombre01 misinterpreted the scope of the permit granted to him by the Municipalidad de Escazú, simply because, by the time it was granted—29 de mayo del 2007—he had already built the retaining wall and the ramp, which rules out any mistake in his conduct […]” (cf. folio 30). Similarly, the defense’s account that the construction foreman, motu proprio and without consulting the defendant, built a ramp that allowed vehicle access was rejected as illogical: “[…] the accused’s account that one of the contractors performed that work without his consent, taking advantage of his absence, cannot be accepted.

If we assess that account against the most basic rules of rational sound judgment (sana crítica racional), logic, experience, and common sense, it is apparent that it is not credible. It is wholly illogical that a construction foreman or worker would take it upon himself to make decisions concerning the property and carry out substantial improvements without first consulting its owner, at the risk of having the cost of the materials used deducted from his payment and forfeiting payment for the labor. It is well known that construction workers quote every job they are going to perform and may charge by the hour or by the project; they constitute a trade that is highly exacting in carrying out work and always charges for any additional detail that was not quoted or included, precisely because their profit depends on the number of working hours they must devote to it. Accordingly, it is not credible that Mr.

Nombre04 took materials from the project—sand, stone, cement, reinforcing rods, and formwork intended for remodeling the floors, walls, and roofs—and used them to build access to the dwelling, essentially because one of the workers fell into the stream while carrying materials. First, it must be noted that this access was not a minor or inexpensive project. No; the images at folio 7 show that it was a concrete ramp of considerable width that allowed automobiles to enter, which logically means that a substantial number of worker-hours were devoted to assembling the supports and foundations for the access and then pouring the driving surface—work that undoubtedly entailed a considerable cost in materials and labor. It should also be noted at this point that, if the remodeling to be performed on the house consisted of replacing the ceilings, painting the walls, and installing floor tiles, there was no need for aggregates to make concrete—cement, sand, and stone—or reinforcing rods and steel for trusses, because it is clear that those improvements are carried out using other types of materials.

The presence of those materials on the property, and in the quantity found there, supports the conclusion that the accused had contracted for the construction of that ramp, for which those materials were indispensable. In addition to what has been stated thus far, it is utterly laughable to suggest that the builder would have absorbed the cost of the labor and diverted that substantial quantity of materials to construct the ramp for occupational-safety reasons concerning his employees, who, it bears noting, are well known to work under extreme conditions, build infrastructure from scratch, and adapt to surrounding conditions. In this case, it must be noted that the existing access to the property appeared to be in good condition and allowed people to pass safely, all of which warrants rejecting the defense’s theory. It is simply neither credible nor logical that the construction foreman would have donated his time and materials to improve the accused’s property to his own financial detriment and would have done so behind the accused’s back; this was an illogical exculpatory account offered by the accused to evade criminal and civil liability for his actions.

It should also be noted that, had the events occurred as don Nombre01 described them, the expected action of a law-abiding citizen would have been to demolish the ramp and leave the access as it was; however, that is not what occurred, because the images on case-file page 7 show that the former access was completely closed off and rendered unusable by the retaining wall (muro de contención) that was repaired and erected […]” (cf. case-file page 513, last line onward). The judgment on the merits (fallo de mérito) also addressed the argument raised by the defense at trial—which was again reiterated in these proceedings, where the appellant disregards and obscures the reasons given by the trial judge for rejecting it—namely, that the accused claimed he had acquired the property without any type of restriction. In that regard, the court not only invoked the principle that no one may plead ignorance of the law—specifically, of the prohibition established in Article 33 of the Ley Forestal, which protects as a protected area (zona protegida) “a strip fifteen meters wide in rural areas and ten meters wide in urban areas, measured horizontally on both sides along the banks of rivers, streams (quebradas), or brooks, if the land is flat, and fifty meters horizontally if the land is sloping”—but the judge also correctly stated that “[…] Had the accused Nombre01 followed the ordinary and lawful process for construction, he could have determined the restrictions affecting his property; because he failed to comply with the law, he cannot benefit from his own failure […]” (cf. case-file page 516; the transcription is verbatim).

In addition, in explaining why the accused could not claim that he was unaware that, before commencing the work, he was required to obtain a construction permit (permiso constructivo) from the local government to carry out the remodeling of the retaining wall, the judge found that, under the rules of experience (reglas de la experiencia), he should have known this not only as a matter of general knowledge but also because he had pursued higher education in business administration and had even worked as a restaurant manager. This reasoning applies equally to his alleged ignorance of the restriction imposed by the Ley Forestal, since, as the judgment correctly notes, the accused knew—as a matter of public and notorious fact (hecho público y notorio)—that a stream runs in front of his home. Moreover, the judge also considered that señor Nombre08 had warned the accused that the existing ramp did not permit vehicular access and that the Municipalidad had denied him permission to build a wall to protect the property (cf. case-file page 516).

The foregoing shows that, subtly and implicitly, defense counsel bases the second ground of her challenge on two premises that do not arise from the trial judgment: (i) that señor Nombre01 was not the person who built the wall and ramp, but that those structures had already existed even before he purchased the property; and (ii) that she not only asserts that those structures caused no environmental harm (daño ambiental) in this case, but also appears to assume that the occurrence of such harm is one of the objective elements (elementos objetivos) required to establish the offense of encroachment into a protected area (delito de invasión de zona protegida). Regarding the first objection, it must be noted that the trial court found it proven that the accused, through workers he had hired, carried out a “remodeling” of the property, by which he not only enlarged the ramp, increasing its dimensions to permit vehicular access, but also rebuilt the retaining wall and erected a gated structure on top of it.

As explained supra, he himself acknowledged responsibility for the second of those works, although he claimed mistake (error), believing that the work on the wall was covered by the permit issued by the Municipalidad, while attributing the first work to the foreman. That account was entirely rejected in the judgment, as explained supra. Furthermore, although the reasoning of the judgment (fundamentación de la sentencia) contains errors insofar as it found that the unlawful conduct carried out by the accused caused environmental harm—an issue that will be examined in the following recital (considerando)—this in no way undermines the finding of criminal liability (responsabilidad penal) set forth in the judgment, and it is apparent that the appellant confuses the two issues despite their clear distinction. In addition, the provision governing that statutory offense (tipo penal)—Article 58, subsection 1, of the Ley Forestal—imposes a sentence of three months to three years’ imprisonment simply upon anyone who “[…] encroaches upon a conservation or protected area, regardless of its management category, or upon other forest areas or lands subject to the forestry regime (régimen forestal), regardless of the area occupied and irrespective of whether they are privately owned lands belonging to the State or other agencies of the Public Administration, or privately owned lands.

The perpetrators of or participants in the act shall have no right to any compensation for any construction or work they may have carried out on the encroached lands […]”. As reasoned in the judgment on the merits, in defining this statutory offense the legislature nowhere required the occurrence of environmental harm as an objective element; consequently, the claim raised is immaterial. Furthermore, it is important to note that the mere remodeling of preexisting structures qualifies as encroachment upon the protective zone (zona protectora) of a stream channel, as was found proven in this case. The objections raised under both grounds are denied.

II. SECOND GROUND (form)

Insufficient and contradictory reasoning supporting the “civil judgment” (specifically, the ecological or environmental damage (daño ecológico o ambiental), as well as its economic quantification). Defense counsel challenges the civil judgment because it does not analyze whether the economic assessment of the ecological damage appearing at folios 57 through 64 reflected the factual circumstances, particularly since documentary evidence issued by government institutions existed that contradicted it. The aforementioned environmental impact study (estudio de impacto ambiental) contains a series of “variables” used to assign an economic value, on a percentage basis, to the damage caused, but those variables did not exist in the area alleged to have been affected. Specifically, the following objections are raised: 2.i.) The item identified as “C” (cf. folio

  • 62)is based on the assumption that the accused was the person who built the retaining wall, even though it was duly established at trial (through testimonial and documentary evidence) that the retaining wall existed before he purchased the property. Report ACOPAC-OSRP-456-08 at folio 49 must be reviewed; in its conclusions and recommendations, it states that the existing retaining wall was built by the accused, and therefore the economic charge based on the indicated variable is improper. 2.ii.) Under the item identified as “2,” environmental damage (daño ambiental) is calculated using the variable of trees in regrowth pasture and open areas. Nevertheless, it was established that no flora or fauna was at risk, because this was a residential area. Moreover, the fact that it was “open” caused no impact, because that had been a government decision, and the stream had been placed in pipes along some sections. 2.iii.) It was determined that no stream ran through the site, but rather an “irrigation ditch (asequia)” (sic). 2.iv.) The item identified as “5” (cf. folio
  • 63)states that the ecosystem is somewhat fragile and assigns it a percentage of 50 percent. However, the witnesses clearly stated that no flora or fauna requiring protection existed in the area alleged to have been affected, and ecosystems were never mentioned. 2.v.) Item 10 (cf. folio
  • 64)refers to “IN situ” (sic) damage and assesses a series of variables that do not reflect the factual circumstances, departing from the actual truth of the facts or the environmental damage allegedly caused by the accused. 2.vi.) The court states that field-visit report CP1-001-005 appearing at folios 118 and 119, issued by the Sistema Nacional de Áreas de Conservación, which states, among other things, that under the existing circumstances it is not feasible to conduct an economic assessment of the environmental damage because this is an area with a high concentration of urban development, homes, housing developments, condominiums, and shopping centers (the same circumstances that existed when the accused acquired the property), does not affect or alter its decision ordering the defendant to pay damages. Accordingly, Mr. Nombre01 could not be held responsible for causing the environmental damage for which payment is sought. 2.vii.) Technical inspection and complaint-recommendation report N° AT-04435-2008 (cf. folio 162), offered by the defense and issued by the water department of the Instituto Meteorológico Nacional, states that both the wall on the accused’s property and the wall on the neighboring property are old structures, and that the renovations did not alter the hydraulic conditions of the irrigation ditch compared with the section that was not renovated. Accordingly, even though the aforementioned reports were issued on different dates, the defendant cannot be held liable for the specified environmental damage. 2.viii.) Folio 170 contains a document in which the Secretaría Técnica Nacional Ambiental (SETENA) granted environmental feasibility approval (viabilidad ambiental) to the defendant. 2.ix.) An accused person cannot be blamed for bureaucracy and the slow pace of government procedures as a basis for disregarding certain documents and entering judgment against him based on a document that contradicts the others, all of which are of the same type and nature. He was even charged an excessive amount without any consideration of the fact that he had paid a fine to the Municipalidad de Escazú (cf. folio 25). 2.x.) The appropriate remedy is to declare the judgment ineffective with respect to the civil recovery and the court costs and attorney’s fees (costas procesales y personales) that the defendant was ordered to pay; alternatively, the appellant requests remand for new proceedings. The portions of the claim identified as “2.vi.)” and “2.vii.)” are sustained. The content of these two aspects of the claim shows that defense counsel’s disagreement centers on the finding that environmental damage resulted from the renovation work performed by the accused, which is the basis for the civil judgment ordering him to pay ¢4.590.000,°°, the amount at which the damage was quantified. These two specific matters challenged (proof of that damage and its economic determination) were supported in the trial judgment essentially by the following arguments: “[…] The accused, Nombre01, proceeded to build a bridge or access ramp to the property across the Quebrada Quebradilla, as well as a retaining wall with a fence structure on top along the front of the property, structures that were erected within the protected area (área de protección) of the Quebrada Quebradilla, causing environmental damage estimated at four million five hundred ninety thousand colones […] the Court found it established that, as a direct consequence of the actions of the civil defendants, harm was caused to the environment, facts that, in accordance with the analysis concerning criminal liability, were established based on the testimony of Nombre07, Nombre06, and Nombre05, together with the documentary evidence consisting of the criminal complaints at folios 1 through 7, the certified copy of the municipal case file at folios 8 through 29, and the expert damage-assessment report at folios 49 through 63, all of which established the existence of a causal nexus (nexo causal) between the harmful acts and the consequences suffered by the State as a result thereof […] With respect to that damage, payment of the sum of FOUR MILLION FIVE HUNDRED NINETY THOUSAND COLONES (¢4.590.000) is ordered. In determining that amount, the Court relied on the expert damage-assessment report prepared by engineer Gilberto Brooks Johnson of the Sistema de Áreas de Conservación Pacífico Central, subregional office of the Ministerio del Ambiente y Energía, appearing at folios 57 through 63 […] To calculate the amount of the damage caused, the ecological-damage assessment guide authorized by ACOPAC-MINAE was considered […] taking into account an affected life zone, the type and condition of the vegetation cover (cobertura vegetal), the fact that the area was a protected area along the bank of a watercourse, in a somewhat fragile ecosystem located in a residential area, all of which causes hydrological pollution and contributes to soil compaction; all these components made it possible to determine that the total value of the ecological damage is exactly four million five hundred ninety thousand colones, an amount established through technical and expert estimates evaluating the site, which appears reasonable and proportionate to the damage caused. As stated, ecological damage was indeed caused and must be compensated; the defense arguments seeking to undermine the foregoing expert assessment with a study providing that the structure built at the front of the property did not affect the watercourse’s hydraulic dynamics are unacceptable because it is clear that the latter assessment was conducted solely to evaluate the flow of the body of water and never assessed whether the structures affected the environment, as was determined by the expert assessment analyzed above. The defense argument denying the existence of environmental damage must therefore be rejected […]” (cf. folios 525 et seq.). As may be inferred from the foregoing, the trial judge provided insufficient reasoning for her conclusion that the renovation work performed by the defendant caused environmental damage, and the defense is therefore correct as to points 2.vi.) and 2.vii.) of this second ground of appeal. First, the trial court asserts that this damage was established by the testimony of the three municipal officials who handled the case and by the complaint appearing at folios 1 through 7 (signed by the Alcalde Municipal de Escazú), without explaining how or why it reached that conclusion, even though the first three essentially referred to confirming the existence of structures encroaching upon the stream’s protected area. As to the complaint, although it asserts that the renovation work caused environmental damage, it limits that damage to the “[…] vulnerability of the ecosystem, since this stream has collapsed and, despite that fact, until a few months ago fauna could be observed in the watercourse; in addition to the direct impact on it from the construction of a wall over it, as well as the impact caused by constricting the stream at a highly vulnerable point through the construction, over the streambed, of access to the property; a location where the neighboring dwelling has even been declared uninhabitable because, during the severe rainy season of the preceding year, the waters destroyed that dwelling. All of this places at risk not only the protected area, but also the neighbors, the riparian fauna, and the natural dynamics of the watercourse […]” (cf. folios 2 and 3). The foregoing passage shows that the trial court did not analyze the content of this information, much less relate it to the other reports included in the case record. Note that, on this point, the complaint refers to fauna having been observed “months earlier” (without specifying a more precise period) in the streambed (without specifying whether this was the particular section where the defendant in this case performed the renovation work), without explaining or supporting that assertion. It further states that the constructed wall (without referring to its restoration or renovation, which is what matters for purposes of attributing the environmental damage and the corresponding monetary compensation to the defendant) affects the already-collapsed streambed, without relating that assertion to the conclusions reached in the reports that the defense alleges were omitted. This lack of analysis becomes evident because technical inspection and complaint-recommendation report N° AT-04435-2008 (cf. folio 162), issued by the water department of the Instituto Meteorológico Nacional, would appear, at least initially, to contradict what is stated in the complaint. Indeed, that document establishes that the site inspection was conducted on 29 de julio de 2009; that the wall (both the defendant’s and his neighbor’s) is an old structure, although it had recently been restored; and that the renovations did not alter the hydraulic conditions of the irrigation ditch compared with the section that had not been renovated—that is, the old section of the wall. This document does not state that the aforementioned (old) wall did not cause environmental damage, but it does conclude that its restoration (which would be the work attributable to the defendant in this case) did not alter the preexisting conditions. In this context, it was essential to determine not whether environmental damage existed in the area (which is undeniable), but specifically whether the restoration performed by the accused negatively altered that situation, thereby independently causing environmental damage. The trial judgment contains no adequate analysis of this essential issue.

In addition, the judge finds damage arising from the remodeling carried out by Mr. Nombre01, relying on the report at pages 49 to 63 (which, in essence, consists of an economic assessment of the environmental damage (daño ambiental) existing in the area), without comparing that expert evidence (pericia) with site-visit report CP1-001-005, appearing at pages 118 and 119, issued by three officials of the Sistema Nacional de Áreas de Conservación, who inspected the site on 25 de noviembre de 2008 from 9:00 to 11:50 in the morning in response to a request submitted by Deputy Attorney Juan Carlos Rojas Peñaranda, seeking an analysis of the environmental impact (impacto ambiental) of the remodeling work at issue in these proceedings and a quantification of the possible loss and damages caused. It is in this context that, after observing and analyzing the remodeling work, the report concludes that the site is located in an urban area with a high concentration of residences, housing developments, condominiums, and shopping centers; that the protection area (área de protección) of the creek is completely encroached upon by numerous dwellings, yards, access bridges, and walls (from which it is understood that such encroachment is caused not only by the property of the defendant herein, but also by all those other structures); and that, given the existing circumstances, it is not feasible to conduct an economic assessment of the environmental damage.

It is clear that, despite its critical importance, this report was not specifically analyzed by the trial judge (jueza de mérito), nor did she compare it with the report cited in support of her decision; in this regard, she merely states that environmental damage was found in the affected area (understood to mean damage caused by the structures existing on the property in question), without considering that the wall had already existed and was merely restored and remodeled by Mr. Nombre01. Furthermore, the judge discounts “a study” (apparently referring to the report at page 162) “which stipulated that the structure built at the front of the property did not affect the watercourse in terms of its hydraulic dynamics,” because—the judge argues—it is clear to her that the assessment was conducted solely to consider the flow of the body of water, but never assessed whether the work affected the environment, as was indeed determined by the expert report at pages 49 et seq.

Nevertheless, the trial court (tribunal de mérito) fails to consider not only that the natural flow of the water is an essential part of the environment, but also that the report at pages 118 and 119 (which was prepared specifically in the context of determining environmental damage arising specifically from the work attributed to defendant Nombre01, and which she does not even analyze) appears to contradict the conclusions of the study cited in support of the decision rendered. Finally, and this is the most significant error evident in the analysis set forth in the challenged judgment, the judge does not consider that the official from the Sistema de Áreas de Conservación himself (engineer Gilberto Brooks Jhonson, who prepared the document at pages 49 et seq.) states that it cannot be asserted that the retaining wall (muro de contención) existing in the creek bed (cauce de la quebrada) was built by the accused; and that the house being remodeled was built many years ago (cf. pages 51 and 52), this being the factual basis upon which that professional economically assessed the environmental damage.

As can be seen, the trial judge did not consider that these premises might have affected the conclusions she reached. Furthermore, that expert estimated the environmental damage (as a whole) that he identified in this area, consisting of the “[…] ENCROACHMENT UPON THE PROTECTION AREA AND THE BED OF THE QUEBRADA QUEBRADILLO THROUGH THE STRUCTURES (FENCES ON THE RETAINING WALL AND EXPANSION OF THE EXISTING DWELLING) […]” (cf. page 60). As can be seen, this economic calculation was based on the entire remodeling of the house and the fences on the retaining wall (without itemizing one component separately from the other), even though the facts supporting the complaint do not even mention the expansion of the existing dwelling, being limited instead to the access bridge and the wall and fence structure (cf. page 43). All of the foregoing entirely undermines the civil judgment (condenatoria civil) entered against the defendant (including costs), and therefore points 2.vi.) and 2.vii.) of this second ground of appeal are granted as to those matters, and the case is remanded (reenvío) to the originating office for new proceedings in accordance with law. In all other respects, the challenged judgment remains undisturbed. Because it is unnecessary, no ruling is made on the remaining objections included in this section of the appeal.

POR TANTO:

Points 2.vi.) and 2.vii.) of the second ground of the appeal (recurso de apelación) filed by the public defense are granted. Accordingly, the trial court judgment (fallo de instancia) is partially vacated, solely insofar as it granted the civil action for damages (acción civil resarcitoria) and ordered the payment of costs (costas). In this regard, the case is remanded (reenvío) to the court of origin for new proceedings in accordance with law. In all other respects, the challenged judgment remains undisturbed. As it is unnecessary, no ruling is issued regarding the other objections included in this section of the appeal. The first and third grounds of the challenge are denied. NOTICE SHALL BE GIVEN.- Mario Alberto Porras Villalta Patricia Vargas González Laura Murillo Mora Judge and Judges of the Criminal Judgment Appeals Court Case file: 08-001268-0283-PE(13) Defendant: Nombre01 Injured Party: Environment Offense: Violation of Ley Forestal by Encroachment upon a Protection Area (Área de Protección) AALFAROS

Secciones

Marcadores

Resolución: 20 17-1333 Resolución: 20 17-1333 TRIBUNAL DE APELACIÓN DE SENTENCIA PENAL. Segundo Circuito Judicial de San José. Goicoechea, a l ser las nueve horas quince minutos, del seis de noviembre de dos mil diecisiete.- RECURSO DE APELACIÓN interpuesto en la presente causa seguida contra Nombre01 , mayor, costarricense, cédula de identidad número CED01 , nacido en San José, el 24 de diciembre de 1968, hijo de Nombre02 y Nombre03 , divorciado, de oficio salonero , vecino de San José, Hatillo 7 del palacio del Mueble 300 metros oeste y 200 sur alameda 4, casa 276, casa color beige, con ventanales estilo crucero a mano izquierda ; por el delito de INFRACCIÓN A LA LEY FORESTAL POR INVASIÓN DE UN ÁREA DE PROTECCIÓN , en perjuicio de l MEDIO AMBIENTE . Intervienen en la decisión del recurso, el juez Mario Alberto Porras Villalta, las co- juezas Patricia Vargas González y Laura Murillo Mora . Se aperson ó en esta sede la licenciada Juliana Yglesias Luconi defensora pública del imputado .

RESULTANDO:

I.Que mediante sentencia número 594 -20 17 , de las nueve horas treinta minutos del cinco de junio de dos mil diecisiete , el Tribunal Penal del Tercer Circuito Judicial de San José, Sede Suroeste, Pavas , resolvió: "POR TANTO: De conformidad con lo expuesto y los artículos 36, 39, 41 y 50 de la Constitución Política, 1, 4, 11, 16, 18 al 20, 30, 45, 50, 51, 59 al 63, 71, 73, 74, 103 inciso 1) y 2) del Código Penal, numeral 58 inciso 1) de la Ley Forestal número 7575, ordinales 1, 2, 3, 4, 5, 6, 8, 10, 37, 38, 40, 41, 76, 111 al 115, 140, 141, 142, 144, 180, 181, 182, 184, 265 al 270, 360, 361, 363, 364, 365, 367 y 368 del Código Procesal Penal, artículo 3 de la Ley Orgánica de la Procuraduría General de la República, 122, 123, 124 y 126 del Código Penal de 1941 Reglas Vigentes sobre Responsabilidad Civil en relación al numeral 57 de la Ley Forestal número 7575; 1045 del Código Civil, artículo 41, 45 en relación con el 18 del Decreto de Honorarios Profesionales en Derecho Número 32493, vigente a partir del 9 de marzo del 2005, se resuelve; 1.

Se declara a Nombre01 autor responsable de un delito de INFRACCIÓN A LA LEY FORESTAL POR INVASIÓN DE UN ÁREA DE PROTECCIÓN cometido en perjuicio del MEDIO AMBIENTE y, en tal carácter, se le impone el tanto de TRES MESES DE PRISIÓN, sanción que deberá descontar en el lugar y forma que lo indiquen los respectivos reglamentos penitenciarios, previo abono de la preventiva que hubiere sufrido. Por contar el condenado con los requisitos establecidos por la ley y, siendo la pena impuesta menor a tres años, se le concede el Beneficio de Ejecución Condicional de la Pena, por el plazo de TRES AÑOS, dentro de los cuales el condenado no podrá cometer delitos dolosos que se sancionen con pena mayor a seis meses de prisión, caso contrario se le revocará el beneficio aquí concedido. Son las costas del proceso penal a cargo del sentenciado. 2. Se declara CON LUGAR la ACCIÓN CIVIL RESARCITORIA promovida por El Estado, por intermedio de la Procuraduría General de la República en contra de los demandados civiles Nombre01 y la sociedad anónima ROJAMOR ROJAS Y MORA S.A y, se les condena al pago solidario del DAÑO ECONÓMICO causado, ordenándose pagar la suma de CUATRO MILLONES QUINIENTOS NOVENTA MIL COLONES (¢4.590.000).

Se condena a los demandados civiles a pagar las COSTAS PERSONALES Y PROCESALES de la Acción Civil Resarcitoria, los cuales se conceden en favor del Estado y se fijan en la suma de UN MILLÓN CINCUENTA Y CINCO MIL SETECIENTOS COLONES EXACTOS (¢1.055.700). Se condena a los demandados civiles a pagar las COSTAS PERSONALES de la Querella, los cuales se conceden en favor del Estado y se fijan en la suma de DOSCIENTOS MIL COLONES EXACTOS (¢200.000) para un gran total de UN MILLÓN DOSCIENTOS CINCUENTA Y CINCO MIL SETECIENTOS COLONES EXACTOS (¢1.255.700). Los montos fijados deberán pagarlos los demandados civiles dentro de los quince días de la firmeza de la sentencia, bajo apercibimiento de que, en caso de no hacerlo, se podrá acudir a la vía de ejecución de sentencia. 3. De conformidad con el numeral 140 del 3. Código Procesal Penal se ordena el restablecimiento de las cosas a su estado anterior, en virtud de lo cual se dispone la demolición de la obra que fue construida en la finca del Partido de San José, matrícula , ubicada en San Rafael de Escazú, plano catastro número , invadiendo el área de protección de la Quebrada Quebradilla.

Se dispone la demolición del puente o rampa de acceso construido sobre el cauce de la citada quebrada, como del muro de contención construido junto a la estructura de verjas, levantadas al margen del cauce de la quebrada. Se ordena además la limpieza de todos los escombros que resulten del proceso de demolición. Se comisiona esa labor al Ministerio del Ambiente y Energía del Área de Conservación Pacífico Central y a la Municipalidad de Escazú, las cuales deberán ser notificadas de esta decisión. Dichas entidades, de previo a cualquier acción encaminada a cumplir con esta orden, deberá medir el impacto que la eliminación del muro de contención y de la rampa de acceso puede provocar, debiendo buscar la forma en la cual no se ponga en peligro la vida de terceras personas y pueda recuperarse la zona protegida. Para ello, la sociedad dueña de la propiedad donde se ubica el muro de contención y la rampa de acceso deberá autorizar el ingreso del personal del Ministerio del Ambiente y Energía y de la Municipalidad de Escazú, tanto para efectuar los estudios correspondientes, como para destruir las citadas obras.

Una vez firme la sentencia inscríbase en el Registro Judicial y envíense los testimonios de estilo para ante el Juzgado de Ejecución de la Pena y el Instituto Nacional de Criminología. Mediante la lectura integral del sentencia quedarán las partes debidamente notificadas. " (sic).

II.Que contra el anterior pronunciamiento, la licenciada Juliana Yglesias Luconi defensora pública del imputado , interpus o recurso de apelación.

III.Que verificada la deliberación respectiva de conformidad con lo dispuesto por el artículo 465 del Código Procesal Penal, el Tribunal se planteó las cuestiones formuladas en el recurso de apelación.

IV. Que en los procedimientos se han observado las prescripciones legales pertinentes

Redacta el juez de Apelación de Sentencia Penal Porras Villalta ; y,

CONSIDERANDO:

I. PRIMER Y TERCER MOTIVOS (forma)

Fundamentación intelectiva insuficiente y quebranto al in dubio pro reo. (1).- En su primer motivo explica la abogada defensora que “[…] Si analizamos la sentencia que se recurre es fácil notar que la exposición del Tribunal con respecto a mi representado justificando su condena es inexistente […] lo que se hace por parte del Tribunal es citar las diversas declaraciones de los testigos una y otras uniéndose con frases que analizadas de manera integral no denotan un esfuerzo intelectual por parte del Tribunal, no se logra observar que mas allá de lo dicho por los testigos exista en el fondo una debida fundamentación requerida por la ley, se hace un uso inadecuado de la prueba, porque se utiliza de manera excesiva para darle contenido al fallo citando la de cargo y descargo indicaron extrañándose la valoración propia del Tribunal […]” (cfr. folio 536). (3).- En el tercer motivo de apelación, reclama la defensora el quebranto del principio in dubio pro reo, por lo siguiente: 3.i.) Quedó acreditado que el muro de contención objeto de la discusión, así como el acceso a la propiedad, existían desde que el imputado compró la propiedad, es decir, no fue él quien ocasionó (si se pudiera determinar) un daño ambiental. 3.ii.) El estudio registral de la propiedad que consta en autos, determina que no aparece inscrito algún gravamen o anotación con respecto a la ley forestal. 3.iii.) Con los documentos indicados en el motivo anterior se ve que existió duda sobre la afectación ambiental y, por “resorte”, debe recaer esa duda en la culpabilidad del imputado.

Sin lugar ambos motivos de la queja. En el fallo de mérito se explica con toda claridad, corrección y suficiencia, por qué se llegaron a tener por demostrados el hecho y la responsabilidad del encartado en el mismo, sin que en ese iter lógico se advierta yerro alguno. Al respecto se consideró que, para el momento de los hechos, el acusado era el presidente y apoderado generalísimo de ROJAMOR S.A., persona jurídica que ostenta la titularidad registral de la propiedad en cuestión, extremo que, al declarar en juicio, aquel admitió; que también reconoció haber dispuesto la realización de los trabajos de remodelación (para lo cual contrató a terceras personas, entre ellas al señor Nombre04), mismos que incluyeron la ampliación de la rampa de acceso y la reconstrucción del muro de contención, sobre el cual ‒además‒ se erigió una estructura con verjas, todo ello dentro de la zona de protección de la quebrada Quebradilla, en Escazú.

En la sentencia se explica con amplitud y sencillez que, aunado a ello, en juicio se recibieron las declaraciones de varios funcionarios de la Municipalidad de Escazú (Nombre05, Nombre06 y Nombre07), cuyos relatos se vieron respaldados por los informes que en su momento confeccionaron por escrito, quienes detectaron que las obras de remodelación se iniciaron y desarrollaban sin contar con permiso constructivo alguno, y que luego de extendido éste a raíz de una intervención del inspector Nombre05 (dicho permiso sólo autorizaba trabajos menores), se constató la ampliación de la rampa para permitir el acceso de vehículos, así como la reconstrucción del muro de retención, siendo que sobre éste a su vez se levantó una estructura con rejas. Es más, el propietario anterior (señor Nombre08), quien le vendió el inmueble al encartado, corroboró lo narrado por los funcionarios municipales, al mencionar que las obras cuya imagen aparece a folio 7 fueron realizadas después de esa venta (cfr. folio 508).

Todo esto permite descartar el supuesto vicio de falta de fundamentación que denuncia la defensora pública. En este caso la discusión en juicio se centró, más bien, en la falta de dolo que adujo dicha profesional en Derecho, al argumentar que su representado actuó bajo una falsa representación de la realidad, pues él señaló en el contradictorio que adquirió la propiedad sin afectaciones o limitaciones; que nunca quiso actuar al margen de la ley, por lo que a través de un abogado llamado Nombre09 solicitó los permisos de construcción antes de comenzar las obras; que finalmente éstos le fueron concedidos; que “Nombre04” construyó un puente nuevo sin consultarle antes; que él consideró que el permiso de construcción le autorizaba a reparar el muro de contención existente y ponerle encima una estructura de verjas, aceptando que ese fue un error que cometió por mala asesoría. Tal posición, relativa a la existencia de un error y falta de dolo, fue desacreditada por la juzgadora, en esencia, por lo siguiente: Nombre01 nunca solicitó los permisos de construcción antes de iniciar las obras.

Al respecto se tiene que don Nombre05 (inspector de construcciones) observó el proceso constructivo cuando estaba realizando labores de campo y, al advertir que no “habían” (sic) permisos y que la obra siguió su curso, debió emitir la orden de clausura y pasar el caso a sus compañeras de la Contraloría Ambiental. Asimismo, el acusado Nombre01 presentó dos notas a la Municipalidad de Escazú, en el mes de mayo de 2007, informando que estaba realizando una reparación de una casa de habitación, situada en la Dirección01, labores que ascendían al millón y medio de colones, aportando un croquis ‒visible a folio 29‒ de la planta física de la vivienda (cfr. folio 509, línea 18 en adelante). En virtud de lo anterior, el Departamento de Desarrollo Urbano de la Municipalidad de Escazú, mediante oficio DU-562-07-EXT visible a folio 25, le previno al endilgado el pago de la suma de quince mil colones por concepto de impuesto de construcción “y 15.000.00 por concepto de multa al permiso de construcción, por haber realizado las obras sin la respectiva licencia”.

Según se razona en el fallo, esas probanzas desacreditan por completo la versión del imputado, en el sentido de que él siempre respetó la ley y pidió los permisos antes de construir, porque la evidencia demuestra lo contrario y confirma que él comenzó las obras sin permisos y, al verse forzado a solicitarlos (como consecuencia de que la obra le había sido clausurada por el inspector Nombre05 que, en un recorrido por la zona, observó la construcción que se estaba haciendo), fue multado por ello. El testigo Nombre05 explicó que, cuando él fue al sitio, observó que se estaba construyendo una rampa y un muro de contención, por lo cual dejó una nota preventiva y, al regresar al sitio en una segunda inspección verificó que los trabajos habían continuado y, ante la ausencia de permisos él clausuró la obra y pasó el caso a la Contraloría Ambiental; precisó que, cuando él estuvo en el sitio, la rampa estaba recién “chorreada” y los operarios estaban laborando en el muro, apuntando que “cuando notifiqué no estaba el enchape ni las verjas”.

De este modo la jueza de mérito indica que se tiene total certeza que, para el momento en que los funcionarios de la Contraloría Ambiental de la Municipalidad de Escazú se presentaron al sitio (lo cual ocurrió el 07 de setiembre de 2007) esa rampa y ese muro estaban ya levantados, pudiéndose establecer que ello ocurrió antes del 29 de mayo de 2007, es decir, antes de que se otorgara el permiso de remodelación. En el fallo impugnado también se explica que “[…] Ciertamente don Nombre01 solicitó luego de la clausura una serie de permisos pero ello lo hizo para cambiar los pisos de mosaico por cerámica nacional, para sustituir los cielos de fibrolit por gypsum y pintar a dos manos toda la casa, obras que nada tenían que ver con construir un muro de contención con una estructura de verjas encima y habilitar un acceso vehicular a la vivienda. Como consecuencia natural de lo anterior se puede desechar por completo que, Nombre01 hizo una mala interpretación de los límites del permiso que le fue dado por la Municipalidad de Escazú sencillamente porque, para el momento en que le fueron dados -29 de mayo del 2007- ya había construido el muro de contención y la rampa, lo cual permite desechar que se esté ante un error en su actuar […]” (cfr. folio 30).

De igual manera, se rechazó, por resultar ilógica, la versión defensiva según la cual fue el maestro de obras quien, de motu proprio y sin consultarle al encartado, construyó una rampa que permitía el acceso a un vehículo: “[…] la versión rendida por el imputado en el sentido de que esa obra la hizo uno de los contratistas, sin su consentimiento, aprovechando su ausencia, no resulta de recibo. Si analizamos la citada versión contra las más básicas reglas de la sana crítica racional, la lógica, la experiencia y el sentido común se advierte que la misma no es creíble. Es absolutamente ilógico que un maestro de obras o un operario dispongan de la propiedad y realicen mejoras sustanciales sin consultarlas antes con su propietario, con el riesgo de que se le sea descontado del pago los materiales utilizados y perdiendo el pago de la mano de obra. Es bien sabido que los operarios de construcción cotizan todo trabajo que vayan a hacer y pueden cobrar por hora o bien por proyecto, siendo un gremio que se comporta de forma muy recelosa en la ejecución de la obras y cualquier detalle extra que no se hubiera cotizado o incluido siempre lo cobran, precisamente porque la ganancia que tienen depende de las horas de trabajo que deben destinar.

En esa medida no es creíble que don Nombre04 haya tomado el material de la obra -arena, piedra, cemento, varillas, formaleta para remodelar los pisos, paredes y techos- y los empleara para construir un acceso a la vivienda, básicamente porque uno de los operarios se cayó a la quebrada cuando llevaba material. En primer lugar debe señalarse que ese acceso no era una obra de poca monta y costo. No, se si aprecian las imágenes de folio 7 se evidencia que se trataba de una rampa en concreto con un ancho considerable que permitía el acceso de automóviles, lo cual lógicamente supone que se destinaron una importante cantidad de horas de operario para montar los soportes y bases del acceso para luego chorrear la superficie de rodamiento, obra que, sin duda alguna tenía un costo considerable en materiales y mano de obra. Inclusive en este punto debe señalarse que, si la remodelación que se iba a hacer a la casa era el cambio de los cielorrasos, la pintura de las paredes y el enchape de los pisos, no era necesario contar con agregados para obtener concreto -cemento, arena, piedra-, más varillas y acero para cerchas, porque es claro que esos arreglos se hacen con otro tipo de materiales.

La presencia de los mismos en la propiedad y en la cantidad que lo había permite concluir que era porque el acusado había contratado la construcción de esa rampa, por lo cual esos materiales eran imprescindibles. Además de lo hasta aquí dicho, resulta absolutamente risible que el constructor hubiere asumido la pérdida del costo de la mano de obra y desviado esa importante cantidad de materiales para la confección de dicha rampa, por razones de seguridad ocupacional para sus empleados, los cuales valga señalar es bien sabido laboran bajo condiciones extremas y construyen desde cero infraestructura y se adecuan a las condiciones del entorno. En este caso es preciso hacer notar que el acceso que había a la propiedad era uno que se podía ver en buen estado y que permitía el paso de personas en condiciones de seguridad, todo lo cual permite desechar la tesis de la defensa. Sencillamente no es creíble y lógico que el maestro de obras hubiera donado el tiempo y el material para mejorar la propiedad del imputado en detrimento de sus finanzas y lo hubiera hecho a sus espaldas, siendo esa una versión de descargo ilógica que brindó el imputado para evadir la responsabilidad penal y civil por sus acciones.

Inclusive debe llamarse la atención que, de haber sucedido los hechos como don Nombre01 lo señaló, la acción esperable de un ciudadano respetuoso con la ley era demoler la rampa y dejar el acceso tal como estaba, sin embargo eso no fue lo que ocurrió porque las imágenes de folio 7 denotan que ese antiguo acceso fue cerrado por completo, quedando condenado con el muro de contención que se reparó y levantó […]” (cfr. folio 513, última línea en adelante). En el fallo de mérito también hubo pronunciamiento en cuanto al alegato que esgrimió la defensa en juicio (que de nuevo fue reiterado en esta sede, donde la impugnante ignora e invisibiliza las razones que al respecto expuso la jueza de instancia para rechazarlo), centrado en que el encartado adujo que él adquirió la propiedad sin ningún tipo de limitación. Al respecto no sólo se invocó el principio de que nadie puede alegar ignorancia de la ley (concretamente, de la prohibición que contempla el artículo 33 de la Ley Forestal, al tutelar como zona protegida “una franja de quince metros en zona rural y de diez metros en zona urbana, medidas horizontalmente a ambos lados, en las riberas de los ríos, quebradas o arroyos, si el terreno es plano, y de cincuenta metros horizontales, si el terreno es quebrado”), sino que, con toda corrección, la juzgadora señala que “[…] De haber seguido el imputado Nombre01 el orden natural y legal para construir habría podido determinar las restricciones que existían sobre su propiedad, siendo que, al no cumplir con la ley no es posible que resulte beneficiado de su propia falta […]” (cfr. folio 516; la transcripción es literal).

Aunado a esto, a efectos de explicar por qué el encartado no podía alegar que desconocía que para realizar la remodelación (del muro de contención) era indispensable contar, de previo al inicio de las obras, con un permiso constructivo otorgado por el gobierno local, la jueza consideró que, conforme a las reglas de la experiencia, ello no sólo debía conocerlo por cultura general, sino ‒además‒ porque él cursó estudios superiores en administración de empresas y hasta laboró como gerente de un restaurante. Este razonamiento es igualmente aplicable al alegado desconocimiento de la limitación impuesta por la ley forestal, siendo que, como bien se señala en el fallo, por tratarse de un hecho público y notorio el encartado sabía que una quebrada pasa frente a su vivienda. Pero es que, además, la juzgadora también analiza que el señor Nombre08 le advirtió al acusado acerca de que la rampa existente no permitía el acceso vehicular, y que la Municipalidad le había denegado el permiso para construir un muro que protegiera la propiedad (cfr. folio 516).

De lo hasta aquí expuesto se aprecia que, de modo sutil e implícito, la defensora sustenta el segundo motivo de su queja en dos premisas que no se derivan del fallo de instancia, a saber, (i) que el señor Nombre01 no fue quien construyó el muro y la rampa, sino que dichas obras ya existían ‒incluso‒ desde antes de que él comprara el inmueble; y (ii) no sólo asegura que en este caso dichas obras no generaron un daño ambiental, sino que ‒además‒ parece asumir que la producción de éste es uno de los elementos objetivos que se requieren para la configuración del delito de invasión de zona protegida. Respecto del primer reparo se debe indicar que el tribunal de instancia tuvo por demostrado que el encartado, a través de trabajadores contratados por él, realizó una “remodelación” en la propiedad, en virtud de la cual no sólo amplió la rampa, ampliando sus dimensiones a efectos de que permitiera el acceso vehicular, sino que -además- reconstruyó el muro de contención, erigiendo sobre él una estructura con rejas.

Tal y como se explicó supra, él mismo reconoció la paternidad de la segunda de esas obras, aunque adujo un error al haber creído que los trabajos en el citado muro estaban comprendidos en el permiso otorgado por la municipalidad; mientras que la primera se la endosó al maestro de obras. Tal versión fue del todo descartada en el fallo, según se explicó supra. Por otra parte, si bien en este caso existen yerros en la fundamentación de la sentencia, en cuanto se tuvo por demostrado ese daño ambiental, derivado de la conducta ilícita desplegada por el encartado (extremo que se analizará en el siguiente considerando), ello en modo alguno desacredita el juicio de responsabilidad penal asentado en el fallo, siendo notorio cómo la impugnante confunde ambas cuestiones, pese a su evidente diferenciación. Aunado a ello, la norma que regula ese tipo penal (artículo 58 inciso 1° de la Ley Forestal) sanciona con pena de tres meses a tres años de prisión, simplemente a quien “[…] invada un área de conservación o protección, cualquiera que sea su categoría de manejo, u otras áreas de bosques o terrenos sometidos al régimen forestal, cualquiera que sea el área ocupada; independientemente de que se trate de terrenos privados del Estado u otros organismo de la Administración Pública o de terrenos de dominio particular.

Los autores o participes del acto no tendrán derecho a indemnización alguna por cualquier construcción u obra que hayan realizado en los terrenos invadidos […]”. Tal y como se razonó en la sentencia de mérito, al estructurar este tipo penal en ninguna parte el legislador exigió, como elemento objetivo, la producción de un daño ambiental, de ahí lo inconducente que resulta el reclamo planteado. Además, es importante señalar que la sola remodelación de obras preexistentes, califica como una invasión a la zona protectora del cauce de una quebrada, conforme se tuvo por acreditado en la especie. Sin lugar los reproches que se plantean en ambos motivos.

II. SEGUNDO MOTIVO (forma)

Insuficiente y contradictoria fundamentación de la “condena civil” (concretamente, del daño ecológico o ambiental así como de su cuantificación económica). Reprocha la defensora la condena civil, por cuanto no se analiza si la valoración económica del daño ecológico visible de folios 57 al 64 se adecuaba a la realidad de los hechos, máxime que existía prueba documental emitida por instituciones del gobierno que la desvirtuaba. En el referido estudio de impacto ambiental se encuentra una serie de “variables” que se utilizan para, porcentualmente, darle valor económico al daño ocasionado, pero las mismas no existían en la zona que se dice afectada. En concreto, se reprocha lo siguiente: 2.i.) El punto señalado como “C” (cfr. folio

  • 62)se basa en la suposición que fue el imputado quien construyó el muro de contención, cuando en el debate quedó debidamente demostrado (con las pruebas testimonial y documental) que el muro de contención existía desde antes de que éste comprara la propiedad. Se debe revisar el informe ACOPAC-OSRP-456-08 de folio 49, el cual, en su parte conclusiva y de recomendaciones, señala que el muro de contención existente fue construido por el encartado, no siendo procedente –entonces‒ el cobro económico por la variable indicada. 2.ii.) En el punto señalado como “2” se calcula el daño ambiental con la variable de árboles en repasto y zonas abiertas. No obstante, quedó acreditado que no existía ningún tipo de flora y de fauna que corriera peligro, ya que se trata de una zona residencial. Además, el hecho de ser “abierto” en nada afectaba, porque eso había sido una decisión del gobierno, siendo que en algunos tramos se había entubado la quebrada. 2.iii.) Se determinó que en el sitio no pasaba una quebrada si no una “asequia” (sic). 2.iv.) El punto señalado como “5” (cfr. folio
  • 63)señala que el ecosistema es un poco frágil, y le otorga un porcentaje del 50 por ciento. Sin embargo, fueron claros los testigos al indicar que no existía en la zona que se decía afectada ningún tipo de flora ni fauna qué proteger, y en ningún momento se habló de ecosistemas. 2.v.) En el punto 10 (cfr. folio
  • 64)habla de daño “IN situ” (sic) y valora una serie de variables que no se ajustan a la realidad, apartándose de la verdad real de los hechos o del daño ambiental que supuestamente ocasionó el imputado. 2.vi.) El tribunal indica que el informe de gira CP1-001-005 visible a folios 118 y 119, emitido por el Sistema Nacional de Áreas de Conservación, el cual señala, entre otras cosas, que debido a las circunstancias presentes no es factible la realización de una valoración económica del daño ambiental, por ser una zona de alta concentración urbana, de casas de habitación, urbanizaciones, condominios y centros comerciales (mismas circunstancias que existían desde que el imputado adquiere la propiedad), no interfiere o no varía su decisión de condenar al demandado al pago de los daños. Así, no se le podría atribuir al señor Nombre01 la comisión del daño ambiental que se le presente cobrar. 2.vii.) El informe técnico de inspección y recomendación de denuncias N° AT-04435-2008 (cfr. folio 162), ofrecido por la defensa, emitido por el departamento de aguas del Instituto Meteorológico Nacional, indica que tanto el muro de la propiedad del imputado así como de la del vecino, hacen referencia a una construcción antigua; y que las remodelaciones no han variado las condiciones hídricas de la acequia, en relación al sector no remodelado. De acuerdo con esto, y a pesar de que los informes que se han indicado hayan sido dados en fechas diferentes, no se le puede atribuir al demandado la responsabilidad por el daño ambiental indicado. 2.viii.) A folio 170 consta un documento en el cual la Secretaría Técnica Nacional Ambiental (SETENA) otorgó la viabilidad ambiental al demandado. 2.ix.) No se le puede achacar a un imputado la burocracia y lo lento de los trámites gubernamentales, para dejar de lado ciertos documentos y condenarlo con uno que es contradictorio a los demás, todos de la misma especie y naturaleza. Incluso, se le cobra una suma excesiva sin siquiera tomar en cuenta que él había pagado una multa a la Municipalidad de Escazú (cfr. folio 25). 2.x.) Lo que corresponde es declarar la ineficacia de la sentencia con respecto al cobro civil y al pago de costas procesales y personales a los que se le ha condenado a demandado; en su defecto, la recurrente solicita el reenvío para una nueva sustanciación. Con lugar los puntos de la queja que se identifican como “2.vi.)” y “2.vii.)”. Del contenido de estos dos extremos del reclamo se aprecia que la inconformidad de la defensora se centra en que se haya tenido por acreditado un daño ambiental derivado de las obras de remodelación ejecutadas por el encartado, siendo esta la base sobre la cual se le condena civilmente a pagar ¢4.590.000,°°, suma en la cual fue cuantificado. Estos dos aspectos puntuales que se objetan (acreditación de ese daño y su determinación económica) fueron sustentados en la sentencia de instancia, en esencia, a partir de los siguientes argumentos: “[…] El acusado Nombre01 procedió a ejecutar la construcción de un puente o rampa de acceso al inmueble, atravesando la quebrada Quebradilla, al igual que un muro de contención con una estructura de verjas encima a lo largo del frente de la propiedad, obras que se levantaron dentro del área de protección de la Quebrada Quebradilla, provocando un daño ambiental estimado en la suma de cuatro millones quinientos noventa mil colones […] el Tribunal tuvo por acreditado que, como consecuencia directa de la acción de los demandados civiles se provocó un daño al medio ambiente hechos que, de conformidad con lo analizado en relación a la responsabilidad penal se acreditaron a partir de la deposición de Nombre07, Nombre06, Nombre05, junto a la prueba documental consistente en las denuncias penales de folios 1 al 7, copia certificada del expediente municipal de folios 8 al 29, dictamen pericial de valoración del daño de folios 49 al 63, todo lo cual ha permitido acreditar la existencia de un nexo causal entre los hechos dañosos y las consecuencias que del mismo sufrió el Estado […] En cuanto a dicho daño se ordena pagar la suma de CUATRO MILLONES QUINIENTOS NOVENTA MIL COLONES (¢4.590.000). Para la determinaci ón de dicho monto el Tribunal se ha amparado en el contenido del dictamen pericial de valoración del daño, realizado por el ingeniero Gilberto Brooks Johnson del Sistema de Áreas de Conservación Pacífico Central, oficina subregional del Ministerio del Ambiente y Energía, visible a folios 57 al 63 […] Para calcular el monto del daño causado se consideró la guía de valoración del daño ecológico autorizado por ACOPAC-MINAE […] considerándose una zona de vida afectada, el tipo de cobertura vegetal y su estado, que el área era una de protección en la rivera de un cauce, en un ecosistema poco frágil, situado en una zona habitacional, todo lo cual provoca contaminación hidrológica e incide en la compactación del suelo, componentes todos que permitieron determinar que el valor total del daño ecológico es de cuatro millones quinientos noventa mil colones exactos, suma que ha sido fijada gracias a estimaciones técnicas y periciales que evaluaron el sitio, monto que se aprecia es razonable y proporcional con el daño causado. Como se ha podido referir sí se causó un daño ecológico, el cual debe ser resarcido, no siendo aceptable los alegatos de la defensa que pretende minar la anterior valoración pericial con un estudio que estipuló que la obra construida en el frente de la propiedad no afectó el cauce en su dinámica hidráulica porque, es claro que esa valoración fue únicamente realizada para considerar el fluido del cuerpo de agua pero nunca valoró si las obras impactaron el medio ambiente como sí se determinó en la pericia supra analizada, por lo cual debe rechazarse el alegato de la defensa negando la existencia de un daño ambiental […]” (cfr. folios 525 y siguientes). Como se colige de lo antes reseñado, la jueza de mérito incurre en una fundamentación insuficiente en lo tocante a su conclusión de que las obras de remodelación realizadas por el demandado provocaron un daño ambiental, y de ahí que lleve razón de defensa en los puntos 2.vi.) y 2.vii.) de este segundo motivo de apelación. En primer término, el tribunal de instancia asegura que ese daño se acredita con las deposiciones de los tres funcionarios municipales que atendieron el caso y con la denuncia que rola a folios 1 a 7 (suscrita por el Alcalde Municipal de Escazú), sin que explique cómo o por qué llega a tal conclusión, pese a que los tres primeros se refirieron, en esencia, a la constatación de las obras que invadían el área de protección de la quebrada. En cuanto a la denuncia, si bien en ella se asegura que las obras de remodelación ocasionaron un daño ambiental, lo circunscribe a la “[…] vulnerabilidad del ecosistema, ya que esta quebrada se encuentra colapsada y a pesar de ello hasta hace algunos meses se observaba fauna en el cauce; además de la afectación directa sobre éste por construcción de muro sobre el mismo, así como la afectación por estrangulamiento de la quebrada en un punto altamente vulnerable de la misma con la construcción sobre el cauce de la quebrada de un acceso a la propiedad; ubicación donde inclusive se ha dado declaratoria de inhabitabilidad a la vivienda vecina dado que , con el fuerte invierno del año anterior, las aguas destrozaron dicha vivienda. Todo esto pone en riesgo no sólo el área de protección sino también a los vecinos, a la fauna riparia y la dinámica natural del cauce […]” (cfr. folios 2 y 3). De lo antes transcrito se aprecia que el tribunal de instancia no analiza el contenido de esta información, ni mucho menos la relaciona con los otros informes agregados a los autos. Nótese que en este punto la denuncia alude a que “meses antes” (sin detallar un período más preciso) en el cauce de la quebrada (tampoco precisa si se trata específicamente del sector en donde el aquí demandado realizó las obras de remodelación) se observaba fauna (sin justificar ni sustentar tal afirmación). Además, se indica que el muro construido (no alude a su restauración o remodelación, que es lo que interesa a efectos de atribuirle a la parte demandada la producción del daño ambiental y su indemnización económica) impacta el cauce de la quebrada, ya colapsado, sin relacionar tal afirmación con las conclusiones a las que se llega en los informes que la defensa denuncia como omitidos. Esta falta de análisis se hace palpable cuando el informe el informe técnico de inspección y recomendación de denuncias N° AT-04435-2008 (cfr. folio 162), emitido por el departamento de aguas del Instituto Meteorológico Nacional, pareciera contradecir ‒en principio‒ lo que se indica en la denuncia. En efecto, en dicha pieza se establece que la inspección del lugar se realizó el 29 de julio de 2009; que el muro (tanto del aquí demandado como de su vecino) es una obra antigua, aunque recientemente fue restaurado; y que las remodelaciones no han variado las condiciones hidráulicas de la acequia en relación al sector no remodelado, esto es, la sección antigua del muro. En este documento no se afirma que el referido muro (antiguo) no haya causado un daño ambiental, pero sí se concluye que su restauración (que sería la obra que se le puede atribuir al aquí demandado) no ha variado las condiciones preexistentes. En este contexto era imprescindible determinar, no la existencia de un daño ambiental en la zona (el cual es innegable), sino, de manera específica, si la restauración que realizó el encartado varió negativamente tal situación, generando en sí mismo un daño ambiental independiente, siendo que sobre este tema esencial no existe un adecuado análisis en el fallo de instancia. Aunado a esto, la jueza establece un daño derivado de la remodelación ejecutada por el señor Nombre01, apoyándose en el informe de folios 49 a 63 (el cual, en esencia, consiste en una valoración económica del daño ambiental existente en el sector), sin contrastar dicha pericia con el informe de gira CP1-001-005 visible a folios 118 y 119, emitido por tres funcionarios del sistema Nacional de Áreas de Conservación, quienes por su parte inspeccionaron el sitio el 25 de noviembre de 2008 de las 9:00 a las 11:50 de la mañana, ello con motivo de una gestión planteada por el procurador adjunto Juan Carlos Rojas Peñaranda, donde se solicitó analizar el impacto ambiental de las obras de remodelación objeto de este proceso y cuantificar el posible daño y perjuicio causados. Es en este contexto que, luego de observar y analizar las obras de remodelación, en este informe se concluye que el sitio pertenece a un área urbana con alta concentración de casas de habitación, urbanizaciones, condominios y centros comerciales; que el área de protección de la quebrada se encuentra totalmente invadida por gran cantidad de viviendas, patios, puentes de acceso y muros (de lo cual se entiende que dicha invasión no sólo la produce el inmueble del aquí demandado, sino también todas esas otras construcciones); y que, debido a las circunstancias presentes, no es factible realizar una valoración económica del daño ambiental. Es claro que este informe, pese a su esencialidad, no fue analizado de manera concreta por la jueza de mérito, ni lo contrastó con el que cita en sustento de su decisión, siendo que al respecto se limita a señalar que en la zona afectada (se entiende que por las obras existentes en el inmueble en cuestión) se constata un daño ambiental, sin considerar que el muro ya existía con antelación y sólo fue restaurado y remodelado por el señor Nombre01; además, la jueza demerita “un estudio” (parece hacer referencia al informe de folio 162) “que estipuló que la obra construida en el frente de la propiedad no afectó el cauce en su dinámica hidráulica” porque –argumenta la juzgadora‒ a ella le resulta claro que esa valoración fue únicamente realizada para considerar el fluido del cuerpo de agua, pero nunca valoró si las obras impactaron el medio ambiente, como sí se determinó en la pericia de folios 49 y siguientes. No obstante, el tribunal de mérito no sólo deja de considerar que el fluido natural del agua es una parte esencial del medio ambiente, sino -además- que en el informe de folios 118 y 119 (que específicamente se confecciona en el contexto de determinar un daño ambiental derivado, específicamente, de las obras que se le atribuyen al demandado Nombre01, y que ella ni siquiera analiza) parece contradecir las conclusiones del estudio que se cita como sustento de la decisión adoptada. Por último, siendo éste el mayor yerro que se aprecia en el análisis que se vierte en la sentencia impugnada, la jueza no considera que el propio funcionario del Sistema de Áreas de Conservación (ingeniero Gilberto Brooks Jhonson, quien confeccionó el documento de folios 49 y siguientes) menciona que el muro de contención existente en el cauce de la quebrada, no se puede afirmar que fue construido por el imputado; y que la casa que se remodela tiene muchos años de haberse construido (cfr. folios 51 y 52), siendo a partir de esta base fáctica que dicho profesional estimó económicamente el daño ambiental. Como se observa, la jueza de mérito no consideró que estas premisas pudieran haber afectado las conclusiones a las que ella llegó. Además, dicho perito realizó una estimación del daño ambiental (como un todo) que detectó en este sector, consistente en la “[…] INVASIÓN A LA ZONA DE PROTECCIÓN Y EL CAUCE DE LA QUEBRADA QUEBRADILLO MEDIANTE LAS CONSTRUCCIONES (VERJAS SOBRE EL MURO DE CONTENCION Y AMPLIACION DE LA VIVIENDA EXISTENTE) […]” (cfr. folio 60). Como se ve, este cálculo económico se estableció sobre la base de toda la remodelación de la casa y de las verjas sobre el muro de contención (sin desglosar un rubro del otro), pese a que los hechos que sustentan la demanda no mencionan siquiera la ampliación de la vivienda existente, siendo que se limitan al puente de acceso y a la estructura de muros y vejas (cfr. folio 43). Todo lo anterior deslegitima por completo la condenatoria civil dispuesta contra la parte demandada (incluidas las costas), razón por la cual en cuanto a dichos extremos se acogen los puntos 2.vi.) y 2.vii.) de este segundo motivo de apelación, disponiéndose el reenvío a la oficina de origen para una nueva sustanciación conforme a Derecho. En lo demás, el fallo impugnado permanece incólume. Por resultar innecesario, se omite pronunciamiento en cuanto a los demás reparos que se incluyen en este apartado del recurso.

POR TANTO:

Se declaran con lugar los puntos 2.vi.) y 2.vii.) del segundo motivo del recurso apelación interpuesto por la defensa pública. En virtud de ello, se anula parcialmente el fallo de instancia, sólo en cuanto se declaró con lugar la acción civil resarcitoria y se dispuso la condena en costas. Al respecto, se ordena el reenvío a la oficina de origen para una nueva sustanciación conforme a Derecho. En lo demás, el fallo impugnado permanece incólume. Por resultar innecesario, se omite pronunciamiento en cuanto a los demás reparos que se incluyen en este apartado del recurso. Sin lugar los motivos primero y tercero de la impugnación. NOTIFÍQUESE.- Mario Alberto Porras Villalta Patricia Vargas González Laura Murillo Mora Juez y j uezas de Apelación de Sentencia Penal Imputado : Nombre01 Ofendido : Medio Ambiente Delito : Infracción a la Ley Forestal por Invasión de un Área de Protección AALFAROS

Document not found. Documento no encontrado.

Implementing decreesDecretos que afectan

    TopicsTemas

    • Environmental Criminal LiabilityResponsabilidad Penal Ambiental
    • Forestry Law 7575 — Land Use and Forest ProtectionLey Forestal 7575 — Uso del Suelo y Protección Forestal

    Concept anchorsAnclajes conceptuales

      Spanish key termsTérminos clave en español

      This document cites

      • Ley 7575 Forestry Law

      Este documento cita

      • Ley 7575 Ley Forestal

      News & Updates Noticias y Actualizaciones

      All articles → Todos los artículos →

      Weekly Dispatch Boletín Semanal

      Field reporting and policy analysis from Costa Rica's forests. Reportajes y análisis de política desde los bosques de Costa Rica.

      ✓ Subscribed. ✓ Suscrito.

      One email per week. No spam. Unsubscribe in one click. Un correo por semana. Sin spam. Cancela en un clic.

      Or WhatsApp channelO canal de WhatsApp →
      Coalición Floresta © 2026 · All rights reserved © 2026 · Todos los derechos reservados

      Stay Informed Mantente Informado

      Conservation news and action alerts, straight from the field Noticias de conservación y alertas de acción, directo desde el campo

      Email Updates Actualizaciones por Correo

      Weekly updates, no spam Actualizaciones semanales, sin spam

      Successfully subscribed! ¡Suscripción exitosa!

      WhatsApp Channel Canal de WhatsApp

      Join to get instant updates on your phone Únete para recibir actualizaciones instantáneas en tu teléfono

      Join Channel Unirse al Canal
      Coalición Floresta Coalición Floresta © 2026 Coalición Floresta. All rights reserved. © 2026 Coalición Floresta. Todos los derechos reservados.
      🙏