Res. 00474-2005 Tribunal Contencioso Administrativo Sección II · Tribunal Contencioso Administrativo Sección II · 12/10/2005

Mining precautionary measure conditioned on Colima Superior aquifer protectionMedida cautelar minera condicionada a protección del acuífero Colima Superior

View document ↓ Ver documento ↓ View original source ↗ Ver fuente original ↗

Loading…Cargando…

OutcomeResultado

Partially grantedParcialmente con lugar

The court suspends the full work-stoppage order and the concession cancellation for mining concession No. 1547, but authorizes extraction only in Zone F of the Western Sector, subject to strict Colima Superior aquifer protection conditions, unrestricted regulatory inspection access, and monthly reporting obligations.El Tribunal suspende las resoluciones que ordenaron la paralización total y la cancelación de la concesión minera Nº 1547, pero autoriza extracción únicamente en la Zona F del Sector Oeste, sujeta a condiciones estrictas de protección del acuífero Colima Superior, acceso irrestricto a inspectores e informes mensuales.

SummaryResumen

The Second Section of the Tribunal Contencioso Administrativo resolves a precautionary measure sought by quarry operator Productos Pedregal S.A. in an ordinary mining lawsuit against the State. The company had operated a non-metallic quarry in San Antonio de Belén, Heredia (concession No. 1547), suspended in 2001 by the Dirección de Geología y Minas after inspections confirmed breaching of the Colima Superior aquifer and violation of riparian protection zones under Article 33(a) of Forestry Law 7575. The concession was subsequently cancelled in 2002. The court partially grants the precautionary measure: it suspends the full work-stoppage order and the concession cancellation, but restricts all extraction to "Zone F" of the Western Sector—the only technically safe zone for the aquifer—subject to compliance with four hydrogeological and environmental management plans, eleven specific technical conditions, unrestricted inspection access for MINAE, SENARA, and ICAA officials, and monthly progress reports.La Sección Segunda del Tribunal Contencioso Administrativo resuelve la medida cautelar solicitada por Productos Pedregal S.A. dentro de un proceso ordinario minero contra el Estado. La empresa operaba una cantera de materiales no metálicos en San Antonio de Belén, Heredia (concesión Nº 1547), suspendida en 2001 por la Dirección de Geología y Minas tras comprobarse el rompimiento del acuífero Colima Superior y la afectación de zonas de protección bajo el artículo 33 inciso a) de la Ley Forestal 7575. En 2002, la concesión fue cancelada definitivamente. El Tribunal declara parcialmente con lugar la cautelar: suspende los efectos de la suspensión total y de la cancelación de la concesión, pero circunscribe cualquier extracción a la "Zona F" del Sector Oeste, la única técnicamente viable sin riesgo para el acuífero, condicionada al cumplimiento de cuatro planes hidrogeológicos y ambientales y once condiciones técnicas específicas, acceso irrestricto de inspectores de MINAE, SENARA e ICAA, e informes mensuales de avance.

Key excerptExtracto clave

The observations indicate damage to the Colima Superior aquifer in the eastern sector of the concession area. Pursuant to Article 33(a) of Forestry Law 7575, the protection zone was affected. Non-compliance with Articles 8 and 11 of Biodiversity Law 7788; all of this evidences the negative environmental impact and resulting negative externality. Starting from the zoning described in the previous Finding, it is noted that exploitation without risk to the aquifer—according to the studies on record—could only occur in zones designated A, E, and F; however, this tribunal considers that, for greater safety and for purposes of this measure, extraction must take place as far as possible from the upwelling and from Fuente Zamora, and at the greatest possible distance from the bank of the Río Virilla. Accordingly, operations must be confined solely to the zone in the Western Sector designated as "F," and in accordance with the Plans and studies indicated. The precautionary measure requested by the plaintiffs is partially granted. The execution of Dirección de Geología y Minas, Registro Nacional Minero resolutions No. 590 of August 3, 2001—insofar as it ordered the stoppage of all activity on mining concession No. 1547—and No. 451 of July 16, 2002—which cancelled that concession—and all dependent measures, is hereby suspended. The concessionaire is authorized to carry out extraction on the property solely in 'Zone F' of the Western Sector of the concession, provided this is done in strict accordance with the hydrogeological studies of Losilla & Agudelo (2001), Rodríguez & Gómez (2001), the 'Mining Extraction Plan' (Garro 2002), and the 'Environmental Management Plan and its Supplement' Astorga (2003).De las observaciones se desprende la afectación del acuífero Colima Superior en el sector Este del área concesionada. De acuerdo al artículo 33 inciso a) de la Ley Forestal 7575 se afectó la zona de protección. Incumplimiento del artículo 8 y 11 de la Ley de Biodiversidad 7788, todo lo anterior pone de manifiesto el impacto Ambiental negativo trayendo consigo una externalidad negativa. Partiendo de la zonificación indicada en el Considerando anterior, se advierte que la explotación sin riesgo para el acuífero -según los estudios que constan en autos-, sólo podría darse en las zonas designadas como A, E y F, pero este órgano estima que para mayor seguridad, y para los efectos de esta medida, debe tomarse en cuenta que las labores de extracción deben darse lo más lejos posible del afloramiento y de la Fuente Zamora, y además, a la mayor distancia de la margen del Río Virilla. Con lo cual, los trabajos deberán reducirse a la zona del Sector Oeste de la concesión, denominada como "F", únicamente, y de acuerdo con los Planes y estudios indicados. Se declara parcialmente con lugar la solicitud de medida cautelar interpuesta por las demandantes.- Se suspende la ejecución de las resoluciones de la Dirección de Geología y Minas, Registro Nacional Minero, números 590 de las quince horas treinta minutos del tres de agosto de dos mil uno -en cuanto ordenó la paralización de toda actividad en los terrenos de la concesión minera Nº1547-, y 451 de las trece horas diez minutos del dieciséis de julio del dos mil dos -que canceló esa concesión-, así como las que de ellas dependen.- Se autoriza a la concesionaria para realizar labores de extracción en el inmueble, únicamente en la "Zona F" del Sector Oeste de la concesión, siempre y cuando ello se haga con absoluto arreglo a los estudios hidrogeológicos de Losilla & Agudelo (2001), Rodríguez & Gómez (2001), "Plan de Extracción Minero" (Garro 2002), y el "Plan de Gestión Ambiental y su Complementación" Astorga (2003).

Pull quotesCitas destacadas

  • "se observó un frente de remoción de material reciente, con taludes de 15 a 20 metros de altura y en los niveles inferiores de dicho talud se observó el afloramiento del manto acuífero, con un caudal regular que fue drenado o encausado en dirección al Río Virilla, lo que podría evidenciar efectivamente el rompimiento del nivel freático producto de las labores de remoción."

    "A recent material-removal face was observed, with slopes of 15 to 20 metres in height, and at the lower levels of that slope the upwelling of the aquifer was observed, with a regular flow drained or channelled toward the Río Virilla, which could effectively evidence the breaching of the water table as a result of removal operations."

    Memorándum DGM-DC-803-2001, informe de campo 3 agosto 2001 (Considerando I, hecho 5)

  • "se observó un frente de remoción de material reciente, con taludes de 15 a 20 metros de altura y en los niveles inferiores de dicho talud se observó el afloramiento del manto acuífero, con un caudal regular que fue drenado o encausado en dirección al Río Virilla, lo que podría evidenciar efectivamente el rompimiento del nivel freático producto de las labores de remoción."

    Memorándum DGM-DC-803-2001, informe de campo 3 agosto 2001 (Considerando I, hecho 5)

  • "Las accionantes deberán permitir de forma irrestricta, el acceso a los funcionarios de la Dirección de Geología y Minas o cualesquiera otra Oficina del Ministerio de Ambiente y Energía, del Servicio de Aguas Subterráneas, Riego y Avenamiento (SENARA) y del Instituto Costarricense de Acueductos y Alcantarillados, a sus instalaciones, a fin de verificar el respeto de las condiciones indicadas."

    "The plaintiffs must unreservedly allow access by officials of the Dirección de Geología y Minas or any other office of the Ministry of Environment and Energy, the Groundwater, Irrigation and Drainage Service (SENARA), and the Costa Rican Institute of Aqueducts and Sewers, to their facilities, in order to verify compliance with the stated conditions."

    Considerando X

  • "Las accionantes deberán permitir de forma irrestricta, el acceso a los funcionarios de la Dirección de Geología y Minas o cualesquiera otra Oficina del Ministerio de Ambiente y Energía, del Servicio de Aguas Subterráneas, Riego y Avenamiento (SENARA) y del Instituto Costarricense de Acueductos y Alcantarillados, a sus instalaciones, a fin de verificar el respeto de las condiciones indicadas."

    Considerando X

  • "lo aquí dispuesto es sin perjuicio de las potestades generales que confiere la legislación nacional a todas las entidades y órganos encargados de velar por la protección de los recursos ambientales de la Nación."

    "What is hereby ordered is without prejudice to the general powers that national legislation confers on all entities and organs charged with safeguarding the protection of the Nation's environmental resources."

    Por Tanto

  • "lo aquí dispuesto es sin perjuicio de las potestades generales que confiere la legislación nacional a todas las entidades y órganos encargados de velar por la protección de los recursos ambientales de la Nación."

    Por Tanto

Full documentDocumento completo

Procedural marks

-2001 N°474-2005 ADMINISTRATIVE COURT (TRIBUNAL CONTENCIOSO ADMINISTRATIVO). SECTION TWO. SECOND JUDICIAL CIRCUIT OF SAN JOSÉ. Goicoechea, at eleven hours and twenty minutes on the twelfth of October of two thousand and five.

Precautionary measure (medida cautelar), requested by the plaintiff companies within the ordinary mining proceeding of "Productos Pedregal, Sociedad Anónima" and others, represented by their general attorney-in-fact with unlimited authority (apoderado generalísimo sin límite de suma), Rafael Angel Zamora Fernández, businessman, resident of San Antonio de Belén, national ID (cédula) 1-563-370, against the State, represented by Deputy Attorney General Julio Jurado Fernández, resident of San José, national ID 1-501-905. The special judicial attorney-in-fact (apoderado especial judicial) for the plaintiffs is attorney Aldo Milano Sánchez, resident of Montes de Oca, national ID 1-688-989. The persons named above are of legal age, married, and—with the noted exception—attorneys.

BACKGROUND:

1. The representative of the plaintiffs files this petition requesting that the court order the following: "a. to adopt, as a precautionary measure, the suspension of the effects of the challenged acts that prevent the extraction of non-metallic minerals from the quarry originally granted by concession to Productos Pedregal S.A.; b. to declare that the effectiveness of this measure is subject, in the public interest, to the following conditions: i. compliance with the Environmental Management Plan voluntarily designed by the plaintiffs (ASTORGA 2003); ii. compliance with the Mining Extraction Plan submitted by the plaintiff, Productos Pedregal S.A. (GARRO 2002). c. the measure decreed does not affect the effectiveness of the resolutions adopted by the Technical Environmental Secretariat (Secretaría Técnica Ambiental), which shall be subject to assessment in the appropriate proceeding." 2. Upon granting the mandatory hearing, the defendant opposed the petition.

3. The required procedural formalities have been observed throughout the proceedings, and no grounds for nullity capable of invalidating the actions taken have been noted. This ruling is issued within the statutory time limit.

Drafted by Judge Fernández Argüello; and

CONSIDERING:

I).- For the resolution of this precautionary measure (medida cautelar), the following has been duly established:

  • 1)That by resolution number 27-83 MIEM of the then Ministry of Industry, Energy and Mines, issued at ten o'clock in the morning on the fifth of September of nineteen eighty-three, the exploitation concession (concesión de explotación) of a quarry (cantera) located in San Antonio de Belén was granted to Productos Pedregal, Sociedad Anónima, for a term of twenty-five years (folio 151, Volume I of administrative file (expediente administrativo) Nº1547);
  • 2)That by memorandum DGM/DC-752-2001 of July fourth, two thousand and one, Ms. Wendy Pérez Fernández, Mining Coordinator for the Tempisque and Guanacaste Areas, reported on an inspection carried out at that site (Tajo Pedregal). Certain irregularities were found and the following corrective actions were proposed: "Place a layer of organic soil on top of the clay material and revegetate with grasses (zacates). In the area where there is brush, plant some trees. Relocate the washing unit as soon as possible, also regulate the flow rate (caudal), and design and implement a sedimentation pond (lagunas de sedimentación) system. The block storage area must be set back and kept a prudent distance from the river (approximately 10 m) to prevent any accident. Carry out and implement solid waste management in the quarry area to avoid depositing waste in various parts of the site and in the riverbed" (folios 582 and 583, Volume III of the administrative file);
  • 3)That the Directorate of Geology and Mines (Dirección de Geología y Minas), National Mining Registry (Registro Nacional Minero), in resolution Nº 589 at thirteen hundred hours on the thirty-first of that same month and year, granted Productos Pedregal S.A. a period of fifteen business days to comply with the foregoing recommendations (folios 595 to 597, Volume III of the administrative file);
  • 4)That on August third, two thousand and one, a new site inspection was conducted with the presence of officials from ICAA, the National Water, Irrigation and Drainage Service (Servicio Nacional de Aguas, Riego y Avenamiento, SENARA), the Ministry of Health, and the General Directorate of Geology and Mines. In the relevant part, the record drawn up at the site stated: "… we positioned ourselves in the zone where there is a water outcropping (afloramiento de agua). The water table (nivel freático) was intercepted; according to SENARA official Mr. Fernández, ICAA [referred to in the original as 'A y A'] was not capturing the water, while ICAA officials indicate that it was captured naturally at Puente Mulas. Mr. Zamora states that the only point where the water has surfaced is there, and that if it is blocked no more water will spring. (…) The water surfaced two months ago. Mr. Zamora proposes placing material in the zone to demonstrate that no more water flows out. ICAA officials indicate that this is not relevant and therefore the zone is not covered up …" (record at folios 601 and 602, Volume III of the administrative file);
  • 5)That in the report prepared in connection with the aforementioned field visit, dated that same day, geologist Ana Sofía Huayapa, Forest Engineer Edgar Sandí, and Deputy Director General of Geology and Mines, M.Sc. Marlene Salazar Alvarado, indicated that at the first extraction face (frente de extracción), at the eastern end of the concession, "… a recently worked material face was observed, with embankments (taludes) of 15 to 20 meters in height; in the lower levels of said embankment, the outcropping of the aquifer layer (manto acuífero) was observed, with a regular flow rate that was drained or channeled toward the Río Virilla, which could effectively evidence the breaching of the water table as a result of the removal operations. It is important to note that along the base of the embankment in certain sections, trenches entirely covered with material taking on a suanposa (sic) [swampy] consistency were observed, revealing water saturation in the area. Diagonally from this same face, the presence of a fill of considerable dimensions is evident (we used as a measure of depth the sinking of the legs of the D.G.M. officials into the ground, which reached approximately 55 centimeters). 3. Protection Zones (Áreas de Protección). The alteration of the protection zone (zona de protección) established in article 33, subparagraph a) of the Ley Forestal 7575 was observed. Likewise, the recent planting of 41 Indian Laurel (Laurel de la India) trees and three Cedar (Cedro) trees on a fill along the left bank was noted. 4. Second extraction face. Located at the western end of the concession. According to what was stated by the concessionaire, this is the current extraction face. In its profiles, the outcropping of the Puente Mulas ignimbrites (ignimbritas) was observed, which constitutes an aquitard (acuicierre) (according to the concession's supervising geologist). No intervention in the aquifer layer was observed at this face. Material extraction operations were underway." Additionally, the following conclusions and recommendations were issued: "CONCLUSIONS: 1. The observations reveal impact on the Colima Superior aquifer in the eastern sector of the concession area. 2. Pursuant to article 33, subparagraph a) of the Ley Forestal 7575, the protection zone was affected. 3. Non-compliance with articles 8 and 11 of the Ley de Biodiversidad 7788, all of which manifests a negative environmental impact entailing a negative externality. RECOMMENDATIONS: 1. To verify the information provided to this Directorate regarding the actual on-site situation and to determine the exact area affected, the Directorate of Geology and Mines will proceed to verify the elevation levels (cotas) of the extraction levels and the progress measurements of the extraction faces, verify the point of breaching of the aquifer, determine the waterlogged areas (áreas suanposas) (sic), and review the exploitation program against the most recent work reports and other technical studies submitted to the D.G.M., for which purpose the company must appoint a surveyor so that the verification may be conducted jointly. 2. The company must provide the characterization of the aquifer in the concession area, a hydrogeological study, and a determination of water table levels taking into account the irregularity of the aquifer in the zone, in order to determine the minimum extraction elevation levels for the concession material. 3. SETENA and ICAA must assess the environmental damage resulting from the impact on the aquifer and the violation of the protection zones, as well as any other damage they deem appropriate. 4. Immediate suspension of exploitation and material processing operations at the company Pedregal S.A. is recommended until it complies with the recommendations in points 1 and 2." (memorandum DGM-DC-803-2001, folios 602 to 605, Volume III of the administrative file);
  • 6)That on the basis of the foregoing report, the National Mining Registry of the Directorate of Geology and Mines, in resolution Nº 590 at 15:30 hours on August third, two thousand and one, communicated to the company that same day, ordered: "POR TANTO: In accordance with articles 50 of the Constitución Política, 1, 3, 34 subparagraph g), 93 and 98 of the Código de Minería, 11 of the Ley de Biodiversidad, 1 of the Ley General de Salud, and 1 of the Ley General de Agua Potable, it is resolved: a) IMMEDIATE SUSPENSION OF EXPLOITATION AND QUARRY MATERIAL PROCESSING OPERATIONS carried out by the company Productos Pedregal S.A. in the concession area of administrative file Nº1547 is hereby ordered. B) A period of 20 business days is granted to Productos Pedregal S.A. to comply with the submission of the studies and recommendations set forth in official communication DGM/DC 803-2001, transcribed in the present resolution. Warning is hereby given that should the required materials not be submitted, the procedure established in the last paragraph of article 63 of the Código de Minería will be followed. C) The present resolution shall be notified to the Secretaría Técnica Nacional Ambiental and to ICAA for the purpose of having them prepare the reports required in the present resolution. Productos Pedregal S.A. is warned that, in accordance with articles 146 and following of the Ley General de la Administración Pública, immediate compliance with the issued order is mandatory. Against the present resolution, motions for reconsideration (revocatoria) and appeal (apelación) are available in accordance with article 90 of the Código de Minería and within the period established in article 346 of the Ley General de la Administración Pública. Also available is the motion for review (recurso de revisión) in accordance with the provisions of the Ley General de la Administración Pública. Be it communicated." (folios 607 to 613, Volume III of the administrative file);
  • 7)Against that resolution, motions for reconsideration and appeal, as well as a request for suspension of the orders contained therein, were filed on the following sixth of August (motions at folios 616 and 617, supplementation at folios 627 to 630, Volume III of the administrative file);
  • 8)That during that same month of August, geologists Alfonso Alfaro Martínez, Roberto Ramírez Chavarría, and Sigifredo Morera Guillén, officials from the Groundwater Department (Área de Aguas Subterráneas) of SENARA, prepared the "Preliminary Assessment of the Impact on Water Resources Caused by the Exploitation of Materials or Metallic [Materials] at Tajo Pedregal, Belén Heredia." The report stated: "CONCLUSIONS: The most significant impacts observed at Tajo Pedregal are: Elimination of the confining layer (capa confinante) (upper volcanic materials) that naturally protected the discharge zone of the Colima Superior aquifer. The company may also be depositing contaminating effluents into the aquifer, which have not been assessed. Extraction at the quarry along the riverbank (river's edge) down to elevations close to the river level may cause flooding that carries contaminants to the outcroppings of the Colima aquifer. RECOMMENDATIONS: Other aspects such as capture zones (zonas de captura) of the Puente Mulas spring (Manantial de Puente Mulas), declines in the groundwater level, reduction of the saturated thickness, loss of capture points, and the exploitation of the quarry must be reassessed through a hydrogeological study whose objective is to determine the impact on the aquifers from the mining activity should extraction of rock continue westward in the zone, and to identify remediation measures for the impacted zone (outcropping of the Colima Superior level). The impact of removing the natural river barrier and the possibility of flooding and contamination of the aquifer must also be assessed. (…) With the results obtained from this study, the Directorate of Geology and Mines of MINAE must establish the extraction levels and methodology for the Tajo Zamora concession. A proper protection structure for the aquifer must be built in the areas where it has been exposed due to rock extraction. The protection zone of the Río Virilla that is legally required to be respected must be repaired and/or restored. A vulnerability assessment of the ICAA water intake at the facility must be conducted to evaluate the possibility of capturing water more safely at the spring itself or of excluding it from the system connected to Puente Mulas." (folios 660 to 665, Volume III of the administrative file);
  • 9)That the Directorate of Geology and Mines, National Mining Registry, in administrative act Nº 703 at nine thirty hours on September fifth, two thousand and one, rejected the concessionaire's request to suspend the effects of the aforementioned resolution 590. Specifically, it was resolved: "POR TANTO: By virtue of the foregoing, and in accordance with articles 50 of the Constitución Política, 33 of the Ley Forestal, 16 of the Ley de Agua Potable, 31 of the Ley de Aguas, 1, 93 and 98 of the Código de Minería, and 146 and following of the Ley General de la Administración Pública, the order suspending exploitation of materials in the concession area of file Nº 1547 in the name of Productos Pedregal S.A. is upheld.

Consequently, the request for suspension of the effects of the administrative act ordered in Resolution Nº590 of 15:30 hours on 3 August 2001 is rejected …" (folios 697 bis to 699 bis, Volume IV of the administrative case file (expediente administrativo));

  • 10)Whereas against this last decision, an appeal (recurso de apelación) with a concomitant claim of absolute nullity (nulidad absoluta) was filed on the following tenth of September. In resolving it, the then Minister of Environment and Energy, Licenciada Elizabeth Odio Benito, in Resolution Nº R-1726-2001-MINAE, at nine hours on the following ninth of October, determined: "1. The appeal with concomitant absolute nullity filed by the company Productos Pedregal S.A. against Resolution 703 of 9:30 on 5 September 2001, issued by the Directorate of Geology and Mines, is rejected. 2. The Directorate of Geology and Mines shall rule on the motion for reconsideration (recurso de revocatoria) filed against Resolution 590 of 15:30 on 3 August 2001. 3. Administrative remedies (vía administrativa) are hereby deemed exhausted…" (folios 956 to 959, Volume V of the administrative case file);
  • 11)Whereas the Plenary Commission (Comisión Plenaria) of the National Environmental Technical Secretariat (Secretaría Técnica Nacional Ambiental), SETENA, of the Ministry of Environment and Energy, MINAE, by means of Resolution Nº623-2001-SETENA of fourteen hours on the twenty-seventh of September of two thousand and one, agreed to order the company Productos Pedregal S.A. to carry out a phased technical closure (cierre técnico escalonado) of all industrial and commercial activities conducted at the site, by means of a Closure Management Plan (Plan de Gestión de Cierre). The guidelines to be followed in said plan were established therein, along with the deadlines for the final dismantling of the asphalt, concrete, and block plants, crushers (quebradores), workshops, buildings, and other structures (copy of folios 913 to 920, Volume V of the administrative case file);
  • 12)Whereas in Act Nº 784 of the Directorate of Geology and Mines, at nine hours forty minutes on the sixteenth of October of two thousand and one, it was resolved: "POR TANTO: In accordance with Articles 1, 34, and 93 of the Mining Code (Código de Minería), Resolution #623-2001-SETENA, and memorandum DGM/DC-1018-2001, it is resolved: To partially lift the suspension of operations ordered by Resolution #590 of fifteen hours thirty minutes on 3 August 2001, authorizing PRODUCTOS PEDREGAL S.A. to use the crushing system located to the west of the concession area between coordinates 217300-217400 North and 516600-516800 East until 1 June 2002, as indicated by Resolution #623-2001-SETENA of fourteen hours on 27 September 2001. In all other respects, the provisions of that resolution remain in force. The concessionaire (concesionaria) shall comply with the requirements set forth in memorandum DGM-DC-1018-2001 transcribed in the Considerando cuarto of this resolution. The concessionaire is hereby warned that failure to comply with the requirements established in official communication DGM/DC 1018-2001 within the deadlines established therein will result in revocation of the lifting of the processing suspension ordered by this resolution…" (folios 935 to 943, Volume V of the administrative case file);
  • 13)Whereas in Order 077 of the Directorate of Geology and Mines, National Mining Registry, issued at nine hours on the twenty-eighth of January of two thousand and two, it was ordered: "… a) The motion for reconsideration filed by Mr. Manuel Emilio Montero Anderson against Resolution Nº590 of 15:30 hours on 3 August 2001 is denied, maintaining in force the order to suspend extraction operations, as well as the mineral processing operations in the eastern sector of the concession. b) The proposals submitted by the company Productos Pedregal S.A. shall be referred to the Executive President of the Costa Rican Institute of Aqueducts and Sewers (Instituto Costarricense de Acueductos y Alcantarillados), so that, within a period of one month, the Institute may inform this Directorate whether or not said proposals are acceptable, with the understanding that if ICAA does not issue a ruling within the indicated period, the proposal of Productos Pedregal S.A. shall be deemed rejected. c) The studies submitted by ICAA and by SETENA, indicating that environmental damage occurred, shall be referred to the Environmental Administrative Court (Tribunal Ambiental Administrativo) so that it may act in accordance with its jurisdiction. Administrative case file Nº1547 is hereby elevated to the Office of the Minister by virtue of the appeal filed in the alternative. The appellant is warned that within three days they must submit to the Superior the arguments supporting the appeal. NOTICE IS HEREBY GIVEN" (folios 1071 to 1144, Volume V of the administrative case file);
  • 14)Whereas the appeal was rejected by the Minister of Environment and Energy, Elizabeth Odio Benito, by means of official communication R-234-2002-MINAE, at ten hours on the twenty-ninth of April of two thousand and two (folios 1172 to 1178, Volume V of the administrative case file);
  • 15)Whereas on the twelfth of June of two thousand and two, an inspection was carried out in the quarry (cantera) exploitation concession area of the company Productos Pedregal – case file 1547 –, with the presence of officials from the Legal Department of MINAE, the Director of the Directorate of Geology and Mines, a surveyor from that Directorate, the Director of the National Mining Registry, officials from SETENA, a representative of ICAA, and a representative of the Ministry of Public Works and Transportation (MOPT). The record drawn up that day states: "… First, the so-called western sector of the quarry was inspected, near where the scrap metal depot is located; a considerable accumulation of material was found … Subsequently, Engineer Luis Garro, the company's surveyor, joined the group and explained that the material accumulated in the western sector is part of material extracted from the quarry as part of water management measures, a technical recommendation they had followed. The crusher in the western sector is in operation, and a considerable amount of stockpiled material, mostly sand, is observed; according to Licenciada Muñoz, the material processed by the crusher comes from Barranca and Guápiles. At 15:07 hours, SETENA officials arrived … and toured the intervened sector where material was extracted in the western sector. We moved to the eastern sector; there, the crusher was not in operation, which is evidence that it has not functioned for quite some time; stockpiled material consisting of asphalt debris was found. In the area where the aquifer (acuífero) was tapped, two water tanker trucks ("pipas") were found transporting water, loading water with the assistance of a mechanical pump from the water running through the channel built to direct the water flowing from the spring (manantial); the tanker trucks bore the Pedregal logo and license plates C-133023 and C-132881. Once they finished loading the water, they left the area. In the sector where the aquifer was uncovered, it was found to have been covered with material from the quarry pit (tajo) itself, mainly rocks of various sizes and fill material (lastre); above that sector there is evidence of material displacement, the material having been removed by explosives. According to the company's surveyor, this material was removed to prepare a display area for a four-wheel-drive vehicle exhibition held in the area. On the floor of the quarry, still in the eastern sector, a large quantity of logs and other debris from the river was found, demonstrating that the river rose and entered the site several meters in; according to the company's surveyor, the rains of the previous Monday caused the river to swell and inundate part of the aforementioned sector …" (folios 1348 to 1350, Volume VI of the admin. case file (expdte. admvo.));
  • 16)Whereas surveyor Jorge Delgado Barboza, of the Directorate of Geology and Mines, conducted a field verification of case file 1547 on the following 14 June, after which he issued the following conclusions: "The toe of the slope (talud) located at an elevation of approximately 871 meters above sea level (msnm) has not undergone any alterations or modifications resulting from extraction subsequent to 7 August 2001. Although the access ramp shows differences in elevation, it retains the gradient recorded on 7 August 2001. At the extraction face (frente de explotación), at points near point A, significant differences in elevation are observed, including the formation of gullies (vaguadas) and slopes that did not exist as of 7 August 2001, as well as modification of the slopes recorded on that date. Elevation differences of more than 4.5 meters are found; such elevation differences could only be the result of extraction subsequent to the date on which the survey plan submitted at folio 879 was prepared. Figure Nº1 and part of the plan submitted at folio 879 (enlarged plan) are attached for the purpose of locating the access ramp and point A and their surroundings, which served as the basis for the comparison. Two stockpiles of accumulated material were measured: one processed, with an approximate volume of 21,805 m³, a figure obtained from a typical cross-section survey; the other unprocessed, with an approximate volume of 18,000 m³, a figure obtained by comparative methods. I further note the evidence of material removal in the area located near point PF3 in a southward direction (see plan submitted at folio 879), a removal carried out to drain the area in question, as subsequently confirmed by the company Pedregal's surveyor, Luis Garro Marín. As for the eastern extraction face, although there is evidence of material removal subsequent to 7 August 2001, no topographic surveys were conducted during any of these site visits (14 and 20 June of this year), which does not permit quantification of the work performed" (memorandum DGM-TOP-206-2002, folios 1351 to 1356, Volume VI of the admin. case file (expdte. admvo.));
  • 17)Whereas in memorandum DGM-DC-399-2002 of the twenty-first of June of two thousand and two, geologists Yannye Fallas R. and Lilliam Arrieta H., of the Directorate of Geology and Mines, submitted the "Site Visit Report. Case File 1547. Lambert Topographic Coordinates 217000-218000 North Latitude and 516 700 and 517 700 East Longitude," in which they recorded the following: "Conclusions: During the analysis of this report, the following conclusions were reached: 1. The physical evidence shows that processed and unprocessed materials at the western extraction face are of in situ origin. This can be verified by the high percentage of secondary mineral (galena) observed in the in situ rocks and in the stockpiled materials. 2. The degree of angularity of the unprocessed and stockpiled materials at the western face indicates little transport and, of course, differs from alluvial materials, as the latter are strongly rounded due to transport through fluvial systems. 3. The colors and textures of the stockpiled materials in the western sector, which range from yellow, orange, gray, wine-red, and brick-red, are strongly associated with the yellow high-permeability breccias (brechas), wine-red high-permeability breccia, jointed and fractured gray lava, and the orange medium-permeability breccia mentioned by Losilla (2001) and correlatable with the Colima Superior aquifer. 4. Evidently, these materials (varicolored breccias) are being sold. This assertion was corroborated by MINAE and Pedregal officials when two dump trucks (vagonetas) were observed loading and leaving the site — one belonging to the company Pedregal and the other to a private individual. 5. The changes in the upper slope in the northwestern sector of the western extraction face are evident, where approximately 5,000 m² of area is missing, and with a 15% expansion due to material bulking and depending on the thickness removed, this could amount to several cubic meters. 6.

Further evidence is the grade differential (desnivel) in the Southwest sector of up to 1.8 meters, as indicated in this report. 7. Earthworks (movimiento de materiales) were carried out in the East sector, with an access route to the upper terrace constructed, where the tuff deposits (tobas) are located. 8. The springs (nacientes) exposed in the East sector were obstructed with in-situ rock materials and without any technical recommendation. 9. In the East sector, the evidence shows recent use of explosives. 10. Furthermore, water is being reused without any permit. Recommendations. It is recommended that the National Mining Registry proceed as stipulated by law" (folios 1368 to 1372, Volume VI of the administrative file);

  • 18)That in order to justify the aforementioned material extraction activities, a hearing was granted to Productos Pedregal for a period of five days, which was answered by the company on the first of the following July (Resolution 416 of the National Mining Registry of the Directorate of Geology and Mines, at 09:00 hours on 24 June 2002, folios 1373 to 1386, written submission at folios 1397 to 1401, Volume VI of the administrative file);
  • 19)That the file was referred to the Office of the Minister of Environment and Energy, who, in official memorandum DM-408-2002 dated 15 July 2002, communicated to the Head of the National Mining Registry that: "… In accordance with the serious breach noted, and with reference to Articles 63, 93 paragraph h) and 97 et seq. of the Mining Code, the cancellation of the concession must be proceeded with …" (folio 1411, Volume VI of the administrative file);
  • 20)That the Directorate of Geology and Mines, National Mining Registry, by means of Resolution No. 451 at thirteen hours ten minutes on the sixteenth of July of two thousand and two, notified the following day, decided: "Por tanto: In view of the foregoing, due to the non-compliance by Productos Pedregal S.A. with the provisions of Resolutions No. 590 at fifteen hours thirty minutes on the third of August 2001 and No. 784 at 9:40 hours on the sixteenth of October 2001, and on the basis of official memoranda DGM/TOP206-2002 and DGM/DC 399-2002, both dated 21 June 2002, official memorandum DGM/OD 644-2002 dated 4 July 2002, and official memorandum DM-408-2002 dated 15 July 2002, in accordance with the final paragraph of Article 63 of the Mining Code, the quarry exploitation concession right (concesión de explotación de cantera) granted to Productos Pedregal S.A. by means of the resolution issued at 10:00 hours on 5 September 1983, recorded in file No. 1547, is hereby CANCELLED. The immediate suspension of all material extraction and processing activities carried out by the company in the area subject to the concession is hereby ordered. Productos Pedregal S.A. is hereby notified of its obligation to comply with the order issued herein in accordance with Article 146 et seq. of the General Law of Public Administration, and is warned of the legal consequences arising from non-compliance …" (folios 1412 to 1425, Volume VI of the administrative file);
  • 21)That against the foregoing, a motion for revocation (revocatoria) and an appeal were filed. The former was rejected in official memorandum No. 482 from that same Directorate, at eleven hours on the thirty-first of July, and the latter was dismissed by act R-388-2002 MINAE of the Minister of Environment and Energy, issued at nine hours forty minutes on the nineteenth of September, both of two thousand and two (motions at folios 1426 to 1435, Volume VI; Resolutions No. 482 and R-388-2002 MINAE, at folios 1516 to 1526 and 1539 to 1548 of Volume VII of the administrative file);
  • 22)That the ordinary proceedings (proceso ordinario) were initiated on the seventh of November of two thousand and two, and their object is that the judgment should order the following: "On the basis of the foregoing, as authorized by Articles 11, 33, 39, 41, 45, 46, 153, 140.9 of the Political Constitution; 1.1, 1.2, 10.3, 22, 23, 59.1 b), 62 of the Law Regulating Administrative Jurisdiction; Articles 11, 13, 14.3, 15, 16, 17, 19, 128, 129, 133, 137, 158, 166, 190, 191, 192, 308 of the General Law of Public Administration, I request: a.- That the challenged resolutions, as well as any other administrative act or material action derived from or in connection with them, be annulled for their manifest violation of the Administrative Legal Order (Ordenamiento Jurídico Administrativo); b.- That the individualized legal situation (situación jurídica individualizada) of the plaintiff, Productos Pedregal S.A., be recognized as concessionaire under the terms originally defined by the resolution mentioned in fact 7 of this complaint; c.- That compensation be ordered for the damages (daños y perjuicios) that the resolutions caused to the plaintiffs, in the amounts calculated in this complaint or as proven in the evidentiary phase; d.- That the State be ordered to pay all court costs (costas)" (initial motion, folios 137 and 138; formalization, folios 312 to 351, all from the principal file);
  • 23)That together with the initial motion for this precautionary measure (medida cautelar), the incidental party submitted the following: a) hydrogeological studies (estudios hidrogeológicos) by Losilla & Agudelo (2001) and Rodríguez & Gómez (2001), b) an Environmental Management Plan (Plan de Gestión Ambiental) prepared by Dr. Allan Astorga Gatgens, and c) a Mining Extraction Plan (Plan de Extracción Minero) prepared by Emilio Garro Rojas. In order to analyze those documents and determine "whether, on the basis thereof, it is possible to operate the quarry pit (Tajo) indicated without risk to the water resource (recurso hídrico)," the expert Ernesto Echandi Echeverría was appointed from a shortlist submitted by the Colegio de Geólogos de Costa Rica (Resolution No. 505-2003, folios 801 and 802, order at folio 852, documentation at folios 4 to 728, all from the precautionary measure file). The latter, a geologist specializing in hydrogeology, submitted his expert report (dictamen) on the twenty-seventh of June of the previous year, from which the following conclusions and recommendations are extracted: "4- CONCLUSIONS: 4.1- In the area where the quarry pit of mining project No. 1547 is located, there are very significant groundwater (agua subterránea) resources represented by the Colima Superior and Colima Inferior aquifers (acuíferos). At that site, the Colima Superior aquifer is located very close to the surface and gives rise to the Puente Mulas springs (manantiales), which are being captured by the A y A. This same aquifer is also captured at the Puente Mulas site by means of tunnels and galleries. 4.2- It has been confirmed for many years that material extraction in the southern sector of the quarry pit was causing the surfacing (afloramiento) of water from the Colima Superior aquifer. Reports on this matter exist from 1978, prepared by SENAS, and from 1980, by Hydrogeologist Daniel Mora; however, neither the state institutions directly involved in the matter nor the competent authorities followed up on the complaints filed at that time. When the A y A became aware of the enormous quantity of water surfacing in the quarry pit due to the displacement of the upper cover of the aquifer, it limited itself to exploiting the water by constructing the necessary infrastructure, without taking any other future preventive measures. 4.3- The Colima Superior aquifer naturally exhibited high vulnerability in the San Antonio de Belén area, including the Pedregal quarry pit and Puente Mulas. The extraction of rocky materials from the quarry pit increased the degree of vulnerability by eliminating part of the natural cover of the aquifer, in addition to the probable risks associated with any anthropogenic activity in the environment. 4.4- A very serious problem arising from the contamination of the water extracted at Puente Mulas must have occurred, under circumstances that have not yet been fully clarified, before awareness was raised about the existing problem at that site and corrective actions were initiated. 4.5- As a first measure, the water supply derived from the Fuente Zamora obtained from the gallery (galería) built in the quarry pit, as well as from source 3, was suspended; the operation of the quarry pit was also halted. Additionally, various research works were carried out, including the hydrogeological studies by Losilla & Agudelo and by Rodríguez y Gómez. Both studies rigorously adhere to the scientific method, are very accurate and comprehensive, and allow for the identification of the hydrogeological conditions prevailing in the area between the Pedregal quarry pit and Puente Mulas. They also explain in detail the reasons for the artificial surfacing of water in the quarry pit and the high vulnerability of the Colima Superior aquifer in that area. The recommendations emanating from both studies should be fully complied with, especially if the possibility of continuing the operation of the quarry pit is considered. 4.6. The Plan de Gestión Ambiental prepared by Dr. Allan Astorga Gâttgens I consider to be very accurate in most of its content. In fact, insofar as the protection of the water resource is concerned, it incorporates the recommendations arising from the studies by professionals Losilla & Agudelo and Rodríguez y Gómez, which are:

· Isolate the floor of the quarry pit over the area of influence of the Fuente Zamora infiltration gallery with an impermeable material that ensures no infiltration of rainwater or ponding (encharcamientos) over that area shown on the map in figure No. 4: Vulnerability zones for the PM water intakes (captaciones de PM). The insulating material may be a high-density geotextile material and/or a concrete slab on a base of compacted clay material.

· Pipe or channel in concrete all runoff (aguas de escorrentía) that reaches and flows over the floor of the quarry pit. The floor of the quarry pit must be properly leveled to avoid ponding of water and any other liquid. The leveling must direct runoff or accidental spillages to concrete drainage channels (cunetas) that carry the water to one or two discharge points into the Río Virilla. These discharge points into the river must be equipped with a structure that dissipates the hydraulic energy of the water and prevents erosion of the riverbank and riverbed.

· It must be ensured that all processing and domestic activities (sewage and wastewater [aguas negras y servidas]) carried out in the quarry pit do not produce solid or liquid waste that comes into contact with the area of influence of the Fuente Zamora infiltration gallery water intake. If this cannot be guaranteed, the activity must be relocated outside the area of influence delineated in figure No. 4.

· No domestic or industrial contaminating activity may be located at the NW corner of the quarry pit yard, at the base of the new extraction face (frente de explotación), where local flow network evidence from figure No. 12 indicates a direction of groundwater flow toward the PM intakes.

· The West channel that discharges the groundwater surfacing at the central and East extraction faces of the quarry pit must be protected, and no service activity (loading or unloading water from tanker trucks), industrial processing, or domestic activity may be carried out within a 10 m strip of the edge of its channel, up to approximately 50 m before its discharge into the Río Virilla, from which point it must be piped for discharge into the river through an appropriate hydraulic energy dissipation structure. It must be ensured that runoff does not reach the groundwater discharge channel. The groundwater discharging into the channel could subsequently be captured for use in human consumption.

· Study and design a protective shield and dyke (dique) for the slope (talud) of the right bank of the Río Virilla on the East side of the quarry pit yard to prevent erosion of the river slope and flooding of the East sector of the yard during Río Virilla flood events (crecidas del río). The height of this shield/dyke must be at least up to elevation 876 m above sea level (m snm), in anticipation of an extraordinary flood event (avenida extraordinaria) of the river that could underground-contaminate the Fuente Zamora infiltration gallery and the new surfacings at the East extraction face of the quarry pit.

· All of these works must have hydrogeological, hydrological, and geological studies, and must have design plans prior to their construction. They must not be improvised. · The waters of the infiltration gallery (galería de infiltración) of Fuente Zamora must be monitored for quality and quantity, and must be treated (disinfection and filtering to retain/absorb other possible toxic substances) independently from the other sources at the PM pumping station. · The collection tank (tanque de captación) of the Fuente Zamora gallery and its access point must be restricted and protected. · The wells of the executed piezometer network must be fitted with the construction of a small cement curb (brocal) and cover, in order to prevent the entry of runoff water and other substances that could contaminate the aquifer and to allow their use in subsequent studies; or they must be backfilled with fine sand when they are no longer needed.

4.7- Upon evaluating the information relating to the Extraction Plan prepared by Geologist Emilio Garro Rojas, as well as the technical document prepared by Dr. Allan Astorga Gatgens (2003), entitled Complementación Ambiental del Plan de Extracción del Tajo Pedregal, I find that a phased extraction is proposed, beginning by working blocks A, E, and F, and that in the remaining cases, detailed hydrogeological studies will be developed to rule out or include other blocks as work progresses. Nevertheless, I consider and recommend the following:

First: In my professional judgment, it is possible to exploit the quarry (tajo) without risk of harm to the water resource, provided that throughout the continuation of the quarry's extraction operations the recommendations arising from the hydrogeological studies by Losilla & Agudelo and Rodríguez Gómez are rigorously applied from the outset.

Second: For each extraction site proposed by Rodríguez and Gómez, a detailed study must be carried out concerning the hydrogeological conditions identified in the Losilla & Agudelo study, taking into account, among other aspects, the depth of the water table (nivel freático), the direction of the flow lines (líneas de flujo), and the risks of affecting water quality, so as to guarantee permanent protection of the water resource in relation to the intakes maintained by the Instituto Costarricense de Acueductos y Alcantarillados at Puente Mulas" (report at folios 868 to 873 of the precautionary-measure file); 24) Whereas, after the required hearing was granted, the parties requested clarification of the foregoing report, and the expert, by brief dated the twenty-fourth of January two thousand and five, stated, insofar as relevant: "… I consider that the proposal made by Productos Pedregal S.A. in what they have called the "Protocolo para estudio geológico-hidrogeológico ambiental para bloques de explotación en el tajo Pedregal, Belén, Heredia, Costa Rica" is very comprehensive and complies with the recommendations set forth in the various hydrogeological studies that were analyzed through this expert examination, as well as with my own conclusions, recommendations, and expectations (…) In the event that the proposal to continue with the exploitation of the quarry is approved, the responsibility and obligation of the developing company to prepare monthly hydrogeological reports must be established; those reports shall be sent to the Instituto Costarricense de Acueductos y Alcantarillados, to the Water Department (Departamento de Aguas) of MINAE, and to SENARA.

It will also be necessary for periodic inspections of the extraction site to be carried out by officials from those institutions" (expert clarification, folios 904 to 907); 25) Whereas, with respect to the plaintiff companies, certified public accountant Mailo A. González Alvarez prepared in February two thousand and three a document entitled "Análisis del Impacto sufrido, y perspectivas futuras, de la clausura de la fuente de materiales de LAS EMPRESAS (concesión #1547) por parte de la Dirección de Geología y Minas del Ministerio de Ambiente y Energía (MINAE)", in which, among other considerations, he stated: "…As a fundamental result. The Projected Condensed Income Statement for the period from December 1, 2002 through November 30, 2003 allows the inference that LAS EMPRESAS will continue the trend of generating losses and will obtain net losses in the substantial sum of approximately ¢1,338,000,000.00 (one billion three hundred thirty-eight million colones, 00/100).

Projected losses of this magnitude, together with a projected cash shortfall (faltante de efectivo) of -¢1,435,500,000.00 (one billion four hundred thirty-five million five hundred thousand colones) for the period analyzed, lead to the conclusion that LAS EMPRESAS will find themselves in a precarious financial situation, rendering them unable to continue efficiently carrying out their normal productive and commercial activities. This means that, technically, the accounting principle of Going Concern (principio contable de Negocio en Marcha) (an accounting principle defined as the presumption that a company will have permanent existence, implying that there is reasonable certainty that the company will not have to suspend its operations due to insolvency, since it is not capable of meeting its short-term obligations because it is operating with cash shortfalls) is compromised…" (cited document and its annexes, visible at folios 163 to 349 of the precautionary-measure file; specifically, folio 171); 27) Whereas Productos Pedregal maintains a large payroll of workers (see copy of monthly payroll records for worker movement, issued by the Caja Costarricense de Seguro Social, folios 353 to 392).

II). The incidental claimant (incidentista) states that Mining Project No. 1547, also known as "Tajo Pedregal," was originally dedicated to the extraction of mineral aggregates (agregados minerales) located near San Antonio de Belén, a non-metallic extraction activity that has been carried out on those lands for more than sixty years. With the enactment of the Mining Code (Código de Minería) in nineteen eighty-two, he explains, the company Productos Pedregal S.A. began the proceedings to obtain a concession before the Directorate of Geology and Mines (Dirección de Geología y Minas), and that in nineteen ninety-one, in the course of the exploitation, upon reaching the lowest level of the operation in the central part of the quarry, work continued advancing from South to North, and because the extraction base was very close to the groundwater level of the Acuífero Colima Superior, it was intercepted by the working face, causing a water spring to emerge.

By virtue of that situation, he adds, officials from Aqueducts and Sewers (Acueductos y Alcantarillados) proposed capturing the flowing water to supplement the flow at Puente de Mulas, so that, under the mediation of an official from the aforementioned Directorate, the water intake point was defined at the lower part of the working face, with the plaintiff undertaking to cooperate with A y A in the infrastructure works necessary to convey the water to Puente Mulas, in such a way as not to interfere with the progress of the extraction operation or the use of the water resource. As a result of the foregoing, he continues, an infiltration gallery (galería de infiltración)—named Fuente Zamora—was built in the central part of the quarry, and since then, the water from Fuente Zamora flows through an underground pipeline to the Puente de Mulas Station, where it undergoes chlorination treatment before being pumped into the urban aqueduct system of the Gran Área Metropolitana.

That once the concession was obtained, a productive structure was developed involving the plaintiff companies herein—"Productos Pedregal, S.A.," "Asfaltos Pedregal S.A.," "Bloques Pedregal S.A.," "Concretos Pedregal S.A.," "Constructora Pedregal S.A.," "Quebradores Pedregal S.A.," "Transporte Pedregal S.A." and "Servicios y Acarreos Belén S.A."—companies formed to serve different market niches, all related to the construction industry. The extraction, he asserts, reached forty-six thousand and one cubic meters per month, and in order to position themselves in the market, investments were made in productive fixed assets totaling approximately four thousand three hundred and seventy-eight million colones, and the companies jointly generated a total of four hundred and twenty-five direct employment positions. He states that in the month of July of two thousand and one, multiple health problems were reported in a sector of the capital's population, which were later linked to the supply of drinking water, a population made up in part of those who obtained their water from the water pumped from Puente Mulas.

The studies conducted, he argues, determined that there was an extremely high level of bacteriological contamination in the water, which was attributed, according to a complaint filed by the then Executive President of the Instituto Costarricense de Acueductos y Alcantarillados, to the activities carried out by the plaintiffs herein. He notes that, following a field visit, "on the basis of an a priori assessment of the reality of the situation," by resolution number 590 of fifteen hours thirty minutes on the third of August of two thousand and one, the Directorate of Geology and Mines abruptly ordered the suspension of quarry material extraction and processing operations. He states that there are scientific studies demonstrating that the contamination of the water at Puente de Mulas could not have been caused by the plaintiffs, the foregoing "... in view of the interaction of infectious agents (fecal pathogens) in the diarrhea outbreak that occurred among users of the drinking water service.

It was established that said pathogens were not present in the water of Fuente Zamora nor could they have been generated by the activities of the companies in the area adjacent to the spring, in view of the extraction methodology and the nature of the processing activities, as well as their location in relation to the aforementioned spring …." That at the time the aforementioned suspension was ordered, the company maintained multiple contractual obligations with various state entities for several public works, including the Projects "Tournón-Uruca," "Cruce Moravia-Cruce Ipís," "El Carmen-Jaboncillal," "Construcción Intersección a desnivel Rotonda Y Griega," and "Conservación Vial de la Ruta Nacional Nº 1, General Cañas," cases in which delivery dates had already been established, performance bonds posted for amounts exceeding one hundred sixty-two million colones and more than three hundred thousand dollars, as well as a marked public urgency to deliver the works on time.

It was for that reason, he argues, that Productos Pedregal S.A. was compelled to disobey that act and extracted material from the areas of the concession area, thereby causing, he contends, no environmental damage whatsoever. He alleges that through the resolutions challenged in the main proceeding (from the National Mining Registry (Registro Nacional Minero) of the Directorate of Geology and Mines, numbers 590 of the third of August and 784 of the sixteenth of October, both of two thousand and two; 077 of the twenty-eighth of January, 451 of the sixteenth of July; 482 of the thirty-first of July, these of two thousand and two; and those of the Minister of Environment and Energy, numbers R-234-2002 MINAE of the twenty-ninth of April and R-388-2002-MINAE of the nineteenth of September, both of two thousand and two), the General Directorate of Mines (Dirección General de Minas) decided to extinguish the concession granted in nineteen eighty-three to the company Productos Pedregal S.A., and in parallel, SETENA ordered the staged closure of the rest of its productive activities.

That without that source of materials, the companies saw their competitive advantage over other market competitors disappear, their productive assets are being underutilized, and they have had to absorb losses in two thousand and two alone of approximately one hundred and fifty-six million colones. Financially, "… according to the cash flow projections of the companies for the period from December 1, 2002 to November 30, 2003, there will be a shortfall of ¢1,435,500,000.00 (one thousand four hundred and thirty-five million five hundred thousand colones). Furthermore, losses can be projected for that same period of ¢1,338,000,000.00 (one thousand three hundred and thirty-eight million colones). Finally, it can be estimated that the companies will see their revenues reduced, by November 30, 2003, by up to ¢4,665,000,000.00 (four thousand six hundred and sixty-five million colones)," indicators that, in his view, allow one to technically affirm a serious compromise of the accounting going-concern principle (negocio en marcha), defined as the presumption that a company will have a permanent existence, such that there is no reasonable certainty that productive operations will not be suspended in the short term due to insolvency.

That furthermore, to support this application for precautionary relief (tutela cautelar), and to ensure the absence of any risk of environmental harm, they opted to define an Environmental Management Plan (Plan de Gestión Ambiental), which they undertake to comply with. On the other hand, they assert that to date there are no scientific arguments (technical or environmental) to support a cessation of mining operations, thus: "… apart from the negative environmental effects generated by a mining project such as the one analyzed here, which would be addressed through the application of the aforementioned Environmental Management Plan, the most significant environmental problem facing the Project relates to the interaction between the mining activity and the management of the groundwater resources present in its subsoil (Acuífero Colima Superior) … Based on that environmental impact, an Extraction Plan was designed that encompasses only those areas within the concession area that could be exploited without causing any impact on the Acuífero Colima Superior or Fuente Zamora itself, subject to prior compliance with the environmental commitments arising from the aforementioned Environmental Management Plan." In the specific case at hand, he argues, the requirements for granting the requested precautionary measure (medida cautelar) are fully met.

The foregoing because the challenged act lacks sufficient grounds, there is no legal basis for decreeing the lapse of the concession (caducidad de la concesión), the Administration's conduct is disproportionate, and the non-compliance with the work suspension order caused no environmental damage whatsoever—fumus boni iuris. He further alleges that the execution of the challenged acts causes real and effective harm, including the loss of productive and competitive capacity, an impact on financial stability, and the risk of entering a process of insolvency and cessation of operations, placing the jobs of more than four hundred workers in jeopardy, such that it is evident that: "… since the acts challenged in the main proceeding have, as their legal effect, the impossibility of extracting the non-metallic mineral resource indispensable to the plaintiffs' productive activity, we are faced with damages and losses that are impossible or very difficult to remedy.

It has been explained and demonstrated that this legal effect, causally and directly, entails the imminent closure of the plaintiffs' businesses …"—periculum in mora. Finally, he states that in order to avoid harm to the public interest, an "Environmental Management Plan" is submitted, containing commitments to manage the typical environmental impact of a mining operation and to address aspects such as those relating to air quality, ordinary and special solid waste, wastewater, protection areas along the Río Virilla, management of natural hazards, management and protection of groundwater and soil, landscape protection, and social management, as well as a "Mining Extraction Plan (Plan de Extracción Minera)," prepared by experts in hydrogeology (hidrogeología), which ensures that such extraction is not capable of causing damage to the water resource. In any event, they consent to the establishment of "… an effectiveness clause whereby, automatically, in the eventual case that exploitation practices are demonstrated that seriously breach the proposed Environmental Management Plan and/or the Extraction Plan, causing environmental damage, the precautionary measure shall cease to be effective …." III). — The state representative, for his part, considers that in this specific case, among the prerequisites that the legal order requires for granting precautionary measures (medidas cautelares) such as those requested here, the most important one to consider is the public interest, because what matters is to bear in mind the reasons that led to the order suspending operations, and not the grounds for the cancellation of the concession, "… because even if the act ordering the cancellation had not been issued, the plaintiff could not operate the open-pit quarry (tajo) by virtue of resolution number 590 [of the Dirección de Geología y Minas] already cited.

In other words, for the purposes of the precautionary measure being requested, the reasons that ultimately led to the cancellation of the concession—which were more than sufficient to esa (sic) make that decision (…)—matter little, because what the precautionary measure seeks is, precisely, to resume those extractive activities." This being the case, he states, resolution 590 is grounded in the environmental damage caused by the company's operations, which primarily affected the water resource present in the Colima aquifer (acuífero), and the fact that caused such damage was the aquifer's exposure as a result of the quarry's exploitation. Furthermore, he adds, those operations also affected the health of the population, which would be at risk if the extractive activities were allowed to continue. The actions taken do have a technical basis, as determined by SETENA, the body that indicated that, due to the proximity to the exposed aquifer, the rock crusher (quebrador) should not be used, as it is vulnerable to contamination, and that the current location of the industrial facilities compromises the water resource, precisely because of the exposure of the aquifer layer (manto acuífero); in light of which SETENA also ordered the gradual and phased technical closure of the industrial activities, including the asphalt plant, the concrete plant, the block-making plant, rock crushers, workshops, etc. In his view, at stake are the fundamental rights "to health" and "to a healthy and ecologically balanced environment," set forth in Articles 21 and 50 of the Constitución Política, which carry the same rank as the precautionary protection (tutela cautelar) being sought here, and that circumstances compel giving precedence to the "precautionary" principle and the "in dubio pro natura" principle, and that the challenged acts must therefore be upheld.

As to the other prerequisites of the application, he argues that it is debatable whether there exists a real and imminent danger that the company will suffer irreversible harm as a result of the suspension of quarry operations, and that the loss of comparative advantages is not, within the context in which the company operates, harm that is difficult or impossible to remedy—unlike the harm that the aquifer could suffer. He argues that the Management Plan is insufficient, because "What guarantees can a company offer, in this regard, that expressly acknowledged through its officers having disobeyed an order to suspend operations on account of the environmental damage caused and the risk of continuing to cause it?" Likewise, the state official considers that the challenge to the resolutions ordering the work stoppage—which the plaintiff ignored—borders on bad faith, since not only was that order disobeyed, but also the technical recommendations issued; and that there is a clear constitutional and legal basis for issuing the challenged acts, and consequently, the petition lacks the appearance of good law (apariencia de buen derecho); and finally, that if this Tribunal "… grants this motion, it would be granting through an incidental proceeding the substance of the main claim, allowing the plaintiff to do what it in any case did (until the concession was cancelled) in defiance of and in open disobedience of an administrative decision issued in the exercise of legally conferred powers and for the purpose of protecting the environment and human health, which would distort the purposes of a precautionary measure such as the one being requested." IV). — First of all, it is considered appropriate to recall that in the area of precautionary measures, the Costa Rican legal order grants the Administrative Contentious Jurisdiction broad powers, as its primary purpose is to guarantee, through their reasonable use, the final outcome of the proceedings and, consequently, the effective administration of justice.

The body of procedural guarantees set forth in the Constitución Política, particularly from Article 41 onward, and their development through case law, reveal the existence of a broad, flexible, and expeditious regime of precautionary protection, which forms part of the essential content of the right to prompt and effective justice. This is, as the Sala Constitucional recently noted, a fundamental right that encompasses "… the right to request and obtain from the court the necessary, suitable, and pertinent precautionary measures to guarantee the effectiveness of the judgment on the merits—the essential function of precautionary protection—if the prerequisites therefor are met (the appearance of good law—fumus boni iuris—and the danger of delay—periculum in mora). Correspondingly, the court has the obligation to order or issue the provisional measure if the prerequisites for its adoption are present …" (sentencia Nº2005-6224, of 15:16 hours of May 25, two thousand and five).

The granting of this type of protection is attributed to the Judge, as part of the jurisdictional function constitutionally assigned to the judiciary, and extends—with the exceptions validly provided by law—to any type of matter brought before the courts. In the field of administrative contentious proceedings, the law governing this subject matter—Nº 3667 of March 1966—consistent with the system of review of acts and provisions from which it derives, establishes as the basic precautionary measure the suspension of execution of the challenged acts, in Articles 91, 92, and 93 thereof; however, alongside it there coexists an unnamed regime, far more generous, which results from the referral permitted by Article 103 of the same law to the civil procedural legislation, whose Code, in Article 242, enables the court to adopt any type of measure when deemed appropriate to the purposes and when the requirements already indicated are met.

The application of such rules to matters relating to environmental subject matter is entirely possible. Acts, provisions—and even omissions—issued by the public authorities responsible for protecting the Nation's environmental resources, including the Ministerio de Ambiente y Energía and all of its bodies, the Instituto Costarricense de Acueductos y Alcantarillados, the Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento (SENARA), or the municipalities, to name just a few, partake of an "administrative" nature, and are therefore challengeable and their legality reviewable before this court, by virtue of the principle of universality of judicial review set forth in Articles 49 and 153 of the Carta Magna. Such bodies and institutions are subject to the principle of legality, and their actions may not exceed the legal provisions that regulate them, including those imposed by Article 11 of the latter and Article 11 of the Ley General de la Administración Pública, so that even decisions taken in the exercise of the powers derived from Article 50 of the Constitución Política may be subject to precautionary measures, if the legal prerequisites therefor are met.

This clarification, though it may seem self-evident, is considered necessary in light of the fact that, during the processing of this matter, one of the parties has argued that it is not possible to grant what is requested here—authorizing the extraction of materials from a quarry (cantera)—because any decision that is taken and that involves an aquifer layer or the exploitation of a quarry must necessarily be preceded by an authorization from SETENA or the Dirección de Geología y Minas, which this court does not accept. To accept that position would mean subjecting the Judge's powers to a prior administrative authorization, which in the specific case would have to come precisely from the bodies that issued the acts whose validity is being contested within the proceedings, under the pretext or argument that those are the technically competent bodies in the matter. And it would undoubtedly mean completely emptying the content of the right to precautionary protection, as well as an undue reduction of the Judge's powers, which cannot be countenanced.

This collegiate body understands that this is a particular, specific, and highly sensitive area, and that at stake are other fundamental rights, such as the right to a healthy and ecologically balanced environment and, alongside it, the rights to life and health, which requires careful study and a well-considered solution, so as not to harm the public and private interests involved. Any decision taken must not be made lightly, and no effort should be spared in seeking the essential elements needed to resolve the matter, including consultation with technicians and experts in the field. This also entails greater responsibility when issuing the ruling; however, for that reason alone, the possibility of suspending—by this means—even those measures taken with a view to protecting the country's environmental interests should not be entirely ruled out, if, as stated, the legal prerequisites are present and sufficient guarantees exist to ensure that those natural elements are not left unprotected.

V). — Having stated the foregoing, it is noted that what is sought through this motion is the suspension of the effects of the acts challenged within the ordinary mining proceedings (ordinario minero) brought by the plaintiffs, particularly the resolutions of the Dirección de Geología y Minas, Registro Nacional Minero, numbers 590 of fifteen hours thirty minutes on August 3, two thousand and one, and 451 of thirteen hours ten minutes on July 16, two thousand and two, as well as those dependent on them. The first ordered the precautionary suspension of the activities carried out by the plaintiffs on the land covered by mining concession Nº1547 in San Antonio de Belén, known as Tajo Pedregal, and the second ordered the cancellation of that act. As a consequence of the foregoing, the plaintiffs also request that the concessionaire be permitted to extract non-metallic minerals from that quarry, subject to an Environmental Management Plan (Plan de Gestión Ambiental) and a Mining Extraction Plan (Plan de Extracción Minero), proposed by them and submitted to the case file.

VI). — The Tribunal has carefully reviewed the arguments of the parties, the documentation submitted by them, and the extensive information contained in the administrative file (expediente administrativo). The hydrogeological studies submitted by the plaintiffs, as well as the Environmental Management and Mining Extraction Plans, were submitted for review by an official expert — a geologist specializing in hydrogeology, selected from a list of three candidates submitted, at the request of the Office, by the Colegio de Geólogos de Costa Rica — and, in addition, a judicial site inspection (reconocimiento judicial) was conducted at the site of concesión Nº 1547, with the full participation of the members of this collegiate body, the representatives of the parties, the aforementioned experts, and officials from the Dirección de Geología y Minas. The results of that proceeding, together with the other evidentiary elements mentioned, the study of the applicable regulations, and the balancing of the high-stakes interests at play, allow the following observations to be drawn.

As a starting point, and without prejudging the merits of the case, it is noted that the actions taken by the Dirección de Geología y Minas and MINAE had as their primary antecedent a complaint filed by the Executive President of the Instituto Costarricense de Acueductos y Alcantarillados regarding the possible contamination, in mid-2001, of the "Fuente Zamora," located at the said Tajo, and more specifically, an ocular inspection (inspección ocular) conducted on August 3rd of that year at that site by employees of the aforementioned Dirección. During that visit, it was found that in the first extraction face, in the eastern sector of the concession, an emergence of the aquifer layer (afloramiento del manto acuífero) had occurred, and that the company had diverted the runoff (escorrentía) toward the río Virilla and had backfilled part of that area with materials from the quarry itself. It was also noted that the riparian buffer zones (zonas de protección del cauce) of the River, provided for in the Ley Forestal, were not being observed, and that the activities being carried out there posed a contamination risk to the acuífero Colima Superior and the aforementioned Fuente.

In the report drawn up from that proceeding, it was recommended, among other things, that several hydrogeological studies be conducted, as well as a temporary suspension of the company's operations, which was acted upon by the Dirección de Geología y Minas, Registro Nacional Minero, in resolución 590. Subsequently, in Nº 784, that measure was moderated and use of the stone crusher (quebrador) was authorized until early June 2002, on the condition that no work of any kind be carried out in the sector where the emergence had occurred. After that date, specifically on June 12, 2002, a new inspection was conducted, and it was determined that materials were being extracted on site, despite the prohibition that had been issued to that effect. This situation was deemed a serious breach of the concessionaire's obligations and led to the cancellation of concesión Nº 1547 held by Productos Pedregal S.A. through resolución 451 of the following July 16th. Ordinary appeals were filed against that ruling and were dismissed, and subsequently this proceeding was initiated.

VII). — Regarding the legal requirements for the granting of a precautionary measure (medida cautelar) such as the one requested, it must first be noted that, as the plaintiffs contend, the effects of revoking the mining exploitation concession and the total shutdown of operations that this entails certainly cause the companies damages of considerable magnitude and scope. The challenged administrative decision prevents the extraction and processing of their primary source of non-metallic materials, which undoubtedly jeopardizes the proper functioning of the business. The record contains a study by a certified public accountant that describes the economic impact of the work stoppage on these companies and quantifies it at several billion colones, for the period between late 2002 and 2003 alone. There is also evidence of the large number of workers on their payroll who will face certain risk to their employment, and thereby to their own livelihood and that of their families; and furthermore, it is publicly known that Productos Pedregal S.A. and its affiliated companies are party to numerous public contracts (contratos administrativos), primarily for the construction and maintenance of public works, which could be left unfulfilled, with the consequent damage to the company's reputation and to its prospects of continuing to be a major participant in that type of relationship, which also involve a high public interest.

In sum, it is found that the execution of the challenged acts, combined with the foreseeable wait for a final ruling in this proceeding, would produce damages that are difficult or impossible to repair, in the terms provided in numeral 91 of the Ley Reguladora de la Jurisdicción Contencioso Administrativa. On the other hand, having summarily reviewed the main complaint and the arguments advanced therein, the seriousness of the case cannot be denied. The action is well-founded, and the legal questions debated by both parties — both constitutional and statutory in nature — will need to be analyzed at the time of the ruling on the merits, once all relevant evidence in the main proceeding has been received and all stages provided for in the applicable procedural legislation have been duly completed.

VIII). — It remains to be determined, therefore, whether there exists an overriding public interest that would preclude granting what is requested. It is clear, as evidenced by both the facts on the ground and the record, that the Tajo land is located on the right bank of the Río Virilla, near San Antonio de Belén, Heredia, above an aquifer system known as Colima. Likewise, that it borders the springs (manantiales) known as Puente de Mulas, which discharge a significant flow captured through tunnels and galleries (galerías), and which is or has been used by the Instituto Costarricense de Acueductos y Alcantarillados for public water supply. This collegiate body was able to verify this in situ during the judicial site inspection that was duly ordered. The inspection also confirmed the existence of the emergence in the eastern sector of the concession and the significant quantity of water that flows from it.

The site known as Fuente Zamora was also visited, along with the gallery constructed years earlier as a result of a prior emergence, and the facilities, including the stone crusher, administrative buildings, the asphalt mixing plant, and the block factory. Regardless of whether those outflows occurred due to the company's fault or for unrelated reasons — that is to say, whether or not the site was exploited beyond the permitted elevations (cotas) set by the Administration, as that is a matter to be addressed in the main proceeding and not here — it is not possible to deny either the existence of the groundwater (aguas subterráneas) or that of the emergences, and still less, the risk that carrying out extractive activities on the site poses to the water resource (recurso hídrico), activities that are carried out even through the use of explosives. The importance of this resource, essential to the life and health of the population and to the country's overall development, is beyond question, as is the duty to protect it at all costs.

The vulnerability of aquifer layers (mantos acuíferos) and the difficulty that, on many occasions, timely detection of the purity or contamination of the waters they hold presents, require particular rigor with respect to productive activities conducted in their vicinity and the taking of preventive measures to ensure that this risk of harm does not become a reality. On the matter of groundwater and its protection, the Sala Constitucional, in its ruling number 2004-1923 of 2:55 p.m. on February 25, 2004, stated:

GROUNDWATER CONTAMINATION. Unlike surface water (aguas superficiales) pollution, which is typically obvious and visible—thereby permitting environmental action aimed at mitigating or eradicating it—groundwater (aguas subterráneas) contamination, by its very nature, tends to go unnoticed and becomes evident only once it has reached significant proportions. Aquifer layers (mantos acuíferos), owing to the slow movement of water through them, the absorption capacity of the soil, and other factors, may take a very long time to show signs of contamination. In addition, the large volume of water contained means that extensive contamination may take a prolonged period to manifest itself, or, in the case of localized contamination, it is detected only when it surfaces at some point of extraction. Certainly, this type of water possesses a resistance to contamination; however, once contamination does occur, its regeneration can be extraordinarily slow and is sometimes irreversible due to the high cost of the means required to achieve it.

It has been demonstrated that attempts to repair damage caused by contamination to an aquifer in order to restore drinking-water quality levels have not been successful; cleanup technologies have contributed little to reducing the damage, and the methods involved are economically very costly. To the foregoing must be added the lack of organizational infrastructure and of the material, financial, and human resources—in the latter case, personnel properly trained to assess, measure, and, in general, monitor the quality of this water and the precise extent of its contamination. The degradation and contamination of aquifer layers imposes upon the legislature and public administrations the urgent and unavoidable task of protecting them. Groundwater contamination may be direct or indirect: it is of the first type when polluting substances are introduced directly into the aquifer, as in the case of cesspools (pozos negros) or injection wells (pozos de inyección); it is of the second type when, through dilution, it results from contamination of the natural recharge (recarga natural).

Contaminating agents may be of very diverse kinds—namely, mineral; degradable organic (excreta and slurry (purinas)); poorly or non-degradable organic (pesticides, detergents, hydrocarbons); biological (bacteria, viruses, algae); radioactive; and gaseous. Aquifer contamination depends on the geological, hydraulic, and chemical conditions of each location or site, and is therefore a function of local factors—which is why knowledge of each area and the study of similar cases is required. The sources of aquifer contamination may be of very diverse kinds, including the following: a) contamination from domestic activity, which is organic and biological in nature and originates from septic tanks (tanques sépticos), leaks in the sewage network (red de alcantarillado), and the discharge of sewage (aguas negras), to which must be added the increasing use of household chemical products such as detergents; b) contamination from agricultural activities, including the use of artificial fertilizers based on nitrates, phosphates, and potash, or natural fertilizers—based on manure—, irrigation with wastewater and high-salinity water, and the use of pesticides (insecticides, herbicides, and fungicides); c) contamination from livestock farming, which is essentially organic and biological in nature, similar to domestic contamination but more intense in the case of intensive farms; d) contamination from surface water, when it recharges aquifer layers and is itself contaminated; e) contamination from saltwater intrusion (intrusión salina), which occurs when marine and saline waters penetrate coastal regions through the over-exploitation, via wells, of coastal aquifers; f) contamination from mining activities—mineral—, associated with the discharge of mine water and mineral washing operations; g) contamination from industrial activities, which is as varied as the type of industry that originates it, with particularly harmful contamination coming from heavy metals produced by the metallurgical industry, as well as from chemical, petrochemical, food-processing (organic substances), and beverage (detergents) industries; h) contamination from nuclear activities, which, although exceptional in our context, may come from irradiated fuel treatment plants, from radioactive minerals, and from medical activities; i) contamination through poorly constructed wells, which can interconnect several aquifer layers and, when they have broken or corroded casings at levels of poor-quality water, or that allow surface water to enter, can cause such contamination; j) contamination through the discharge of wastewater by means of cesspools, septic tanks, leaks in the sewage network, or indiscriminate discharge into river basins (cuencas hidrográficas); k) contamination from the disposal of solid waste, which occurs when a sanitary landfill (relleno sanitario) is built on permeable or non-waterproofed terrain, through leachate (lixiviados); l) contamination through injection wells—a form of use of the subsoil as a waste storage facility—that are poorly designed, constructed, or operated…

PROTECTION OF GROUNDWATER. Given the characteristics of the contamination of aquifer layers intended for public supply and the difficulty of their regeneration, measures to prevent contamination must be preventive and protective in nature, through the prohibition of certain human activities in specific areas or by requiring safety measures for certain potentially contaminating activities. Our legal and administrative framework (legislation, regulations, and decrees) unfortunately lacks precise, clear, and comprehensive regulation for the protection of aquifer layers, recharge zones (zonas de recarga), and catchment areas (áreas de captación) of groundwater. Foreign legislation (e.g., the Spanish Water Law 29/1985 of August 2) provides for certain extraordinary administrative powers of intervention in the water economy that directly relate to the protection of aquifer layers, with a view to achieving the sustained use (aprovechamiento sostenido) of water resources—that is, to guarantee the availability of water in sufficient quantity and at the required quality to meet present and future human and ecological needs.

These extraordinary administrative powers, which must be recognized in our legal framework—despite their lack of explicit regulation—as implicit in the express and general competence for the protection and conservation of groundwater assigned to the State and to the decentralized entities of the water sector, are grounded in the need to achieve a rational and balanced use of water. The scarcity and degradation of the natural conditions of the water resource render it administratively possible to adopt such measures to prevent the resource's exhaustion or irreversible deterioration and to temporarily overcome the harmful effects that a water crisis may generate. Such administrative measures entail various restrictions and drastic controls over the multiple uses or exploitation rights (aprovechamientos) of water—particularly general or special uses of a private nature—and over pre-existing activities that may affect the resource, insofar as they are justified by a public interest; they therefore do not affect the right to property or the integrity of assets.

In essence, such measures must be regarded as limitations in the social interest that neither hollow out the content of the right to property nor expand the public domain over groundwater without prior compensation, but rather shape its essential content; they must therefore be borne, as a general sacrifice or burden, by all users, who are, ultimately, the beneficiaries of these measures, given that they are aimed at correcting a conjunctural situation of scarcity or imminent contamination affecting the water resource economy in a given area. Such administrative intervention measures, virtually contained in Articles 32 of the Ley de Aguas of 1942 and 10 of the Reglamento de Perforación y Explotación de Aguas Subterráneas (Decreto Ejecutivo No. 30387 del 29 de abril del 2002), may include the following:

  • a)Protection perimeters of aquifer layers (mantos acuíferos): One of the most innovative instruments in the protection of water resources is the definition of protection perimeters (perímetros de protección) for the conservation of the resource and its surroundings. This administrative intervention measure seeks to preserve both the quality and quantity of the water contained therein and the containing formation itself—that is, the geological formation known as the aquifer (acuífero). This activity consists of projecting and tracing on the surface a demarcation beneath which an aquifer, or part of one, lies, and within which a specific regime is established for the use of the hydraulic domain (dominio hidráulico)—regulating and restricting pre-existing water concessions (concesiones de agua) and prohibiting the granting of new ones—as well as for controlling, through authorizations, activities and installations that may affect it (e.g., mines, quarries; urban activities involving septic tanks, cemeteries, sanitary landfills (rellenos sanitarios)—storage, transportation, and treatment of solid and liquid waste; agricultural and livestock activities involving the storage and distribution of fertilizers and pesticides, irrigation with wastewater, and farms; industrial activities involving the storage, transportation, and treatment of liquid or gaseous hydrocarbons, and chemical, pharmaceutical, and radioactive products, as well as food industries and slaughterhouses, etc.).

Evidently, the definition of perimeters by the national authorities—MINAE and ICAA—must be respected by local governments (Municipalidades) and INVU (given INVU's residual competence in urban planning matters in the absence of local regulatory plans), in order to make compatible, develop, and effectively reflect the conditions established in the definition of protection perimeters within the regulations contained in the respective Planes Reguladores regarding land use and territorial planning (e.g., zoning regulations (reglamento de zonificación), construction regulations, etc.). Obviously, the foregoing must also include protection around intake areas (wells (pozos)—PPP: well protection perimeters (perímetros de protección de los pozos)—springs (manantiales), springs (nacientes), etc.), by defining a surrounding zone in which certain human activities are prohibited or restricted and in which land use is regulated or controlled.

The determination of the perimeter depends on the well capture or recharge zone (zona de captura o de carga del pozo, ZOC), and its extent depends on the characteristics and properties of the intake area and the recharge terrain, since the standards cannot be the same for permeable or fissured terrain as for terrain with impermeable formations. The definition of perimeters must be combined with vulnerability or natural susceptibility mapping (cartografía de vulnerabilidad o susceptibilidad natural) of water-supply aquifer layers to anthropogenic contamination loads, based on their hydrogeological and geochemical characteristics, in the face of anthropogenic contamination problems—an objective achieved through the preparation of maps. Both measures—protection perimeters and vulnerability mapping—are well suited to enabling the timely relocation of a given type of activity or supply source, or, as a last resort, the introduction of technical methods and instruments for the treatment and disposal of contaminants.

The measures to be taken based on perimeters and vulnerability mapping vary depending on whether the situation involves: (a) an area without territorial occupation, in which case they are useful for defining which activities may or may not be established in the future; (b) areas already occupied, in which case a mapping of natural vulnerability and areas with greater susceptibility to contamination is carried out—and, in the face of a threat of a high contamination index, activities and supply sources may be relocated and technology introduced for the treatment and disposal of contaminants; (c) areas already contaminated, for which alternative sources may be sought, the spread of contamination plumes (plumas de contaminación) may be prevented, and, where feasible given the high cost involved, the aquifer water treated after extraction; (d) areas designated for new intakes, in which case potentially contaminating activities and the impact area of each must be inventoried…" To the foregoing it should be added that, in keeping with the most modern doctrine and the prevailing environmental principles, Costa Rican legislation—including the Ley Orgánica del Ambiente and the Ley de Biodiversidad, to cite only the most recent—incorporates a series of interpretive criteria, such as the preventive criterion, the precautionary or indubio pro natura criterion, the criterion of environmental public interest, and the criterion of integration. Of these, the first two are especially significant, and the following has been stated regarding them:

"…One of the guiding principles of Environmental Law is the precautionary or prudent avoidance principle (principio precautorio o de evitación prudente). This principle is enshrined in the United Nations Conference on Environment and Development, or the Rio Declaration, which literally states: 'Principle 15.— In order to protect the environment, States shall apply the precautionary approach widely according to their capabilities. Where there are threats of serious or irreversible damage, lack of full scientific certainty shall not be used as a reason for postponing cost-effective measures to prevent environmental degradation.' In the domestic legal order, the Ley de Biodiversidad (No. 7788 of April 30, 1998), in its Article 11, incorporates the following interpretive parameters (criterios hermenéuticos) as principles: '1.— Preventive criterion (Criterio preventivo): It is recognized that it is of vital importance to anticipate, prevent, and address the causes of biodiversity loss or the threats thereto. 2.— Precautionary or indubio pro natura criteria (Criterios precautorio o indubio pro natura): Where there is a danger or threat of serious or imminent harm to biodiversity elements and to knowledge associated with them, the absence of scientific certainty shall not be used as a reason for postponing the adoption of effective protective measures.' In Voto No. 1250-99 of this Chamber, issued at 11:24 hours on February 19, 1999 (reiterated in Votos Nos. 9773-00 of 9:44 hours on November 3, 2000, 1711-01 of 16:32 hours on February 27, 2001, and 6322-03 of 14:14 hours on July 3, 2003), this Tribunal held as follows: '(…) Prevention aims to anticipate negative effects and to ensure the protection, conservation, and proper management of resources.

Consequently, the guiding principle of prevention is grounded in the need to take and assume all precautionary measures to avoid and contain the possible impact on the environment or on human health. Thus, where a risk of serious or irreversible harm exists—or where doubt exists in this regard—a precautionary measure must be adopted and, where applicable, the activity in question must be suspended. This is because, in environmental matters, post hoc enforcement (coacción a posteriori) is ineffective: once the socially harmful biological consequences have already occurred, repression may carry moral weight, but it will rarely compensate for the damage caused to the environment.' Subsequently, in Voto No. 3480-03 of 14:02 hours on May 2, 2003, this Tribunal stated that 'Properly understood, the precautionary principle concerns the adoption of measures not in the face of ignorance of the risk-generating facts, but rather in the face of the lack of certainty that such facts will in fact produce harmful effects on the environment.' In the case of groundwater (aguas subterráneas) contained in aquifer layers and recharge and discharge areas (áreas de carga y descarga), the precautionary or indubio pro natura principle means that where no studies or reports have been conducted in accordance with the unequivocal and exact rules of science and technology that would allow a state of absolute certainty to be reached regarding the harmlessness of the activity intended to be developed on the environment, or where such studies are contradictory with one another, the bodies and organs of the central and decentralized administration must refrain from authorizing, approving, or permitting any new request or any modification request, must suspend those currently in progress until the state of doubt is resolved, and must simultaneously adopt all measures aimed at the protection and preservation of the resource in order to guarantee the right to a healthy and ecologically balanced environment.

In essence, environmentally sound management of groundwater requires protecting the resource before contamination or degradation occurs." (Sala Constitucional, ruling (sentencia) 2004-1923, already cited).— The foregoing allows us to affirm that, in this case, a preponderant public interest is indeed at stake, manifested in the need to protect the water resource by all means available to the country and through the imposition of reasonable and pertinent measures to prevent its deterioration or contamination.— IX).— At this stage, the question is whether it is possible to provisionally allow the continuation of all or some of the extractive operations at the Tajo Pedregal, or whether, on the contrary, with a view to protecting the aquifer layers that traverse the terrain and the public interest this entails, such continuation must be denied.— The company submitted a Mining Extraction Plan (Plan de Extracción Minero), prepared by a geologist; two hydrogeological studies (Losilla & Agudelo —2001— and Rodríguez y Gómez —2001—), as well as an Environmental Management Plan (Plan de Gestión Ambiental) and its supplement, according to which, they argue, quarry (cantera) operations may be maintained without endangering the water resource involved.— The last-cited document contains a "Zoning Map of Areas According to Their Feasibility of Mineral Extraction at the Tajo Pedregal, Derived from the Hydrogeological Investigations of Rodríguez & Gómez (2001)" ("Mapa de Zonificación de áreas según su factibilidad de explotación mineral en el Tajo Pedregal, obtenido a partir de las investigaciones hidrogeológicas de Rodríguez & Gómez (2001)"), which is as follows:

Therein it states: "Zones A, E, and F: no impediments to extraction; Zones C and G: subject to additional investigation; Zone B: no impediment if a temporary additional water source is provided; Zone D: extraction not recommended" (see figure No. 3, folio 702, and explanation at folio 700, both in the precautionary measure (medida cautelar) file).— As this is a highly specialized and technical subject matter, it was decided to request a list of three expert candidates (terna de expertos) from the Colegio de Geólogos de Costa Rica, from which an expert witness (perito), a geologist specializing in hydrogeology, was appointed to review those documents and conduct an on-site study and shed light on the matter.— The appointed professional, licenciado Ernesto Echandi Echeverría, rendered his expert opinion (dictamen) in late June of last year, and stated, insofar as is relevant:

4- CONCLUSIONS:

4.1- In the area where the open-pit quarry (tajo) of mining project No. 1547 is located, there are very significant groundwater resources represented by the Colima Superior and Colima Inferior aquifers (acuíferos). At that site, the Colima Superior aquifer lies very close to the surface and gives rise to the springs (manantiales) of Puente Mulas, which are being tapped by the A y A. This same aquifer is also tapped at the Puente Mulas site through tunnels and galleries (galerías).

4.2- Many years ago it was established that the extraction of materials in the southern sector of the quarry was causing the surfacing (afloramiento) of water from the Colima Superior aquifer. Reports on this matter exist dating back to 1978, prepared by SENAS, and to 1980, prepared by Hydrogeologist Daniel Mora; however, neither the state institutions directly involved in the matter nor the competent authorities followed up on the complaints filed at that time. When the A y A became aware of the enormous quantity of water surfacing in the quarry due to the displacement of the upper cover (cubierta superior) of the aquifer, it limited itself to extracting the water by constructing the necessary infrastructure, without taking any further preventive measures.

4.3- The Colima Superior aquifer naturally exhibited high vulnerability (vulnerabilidad alta) in the San Antonio de Belén area, including the Pedregal quarry and Puente Mulas. The extraction of rocky materials from the quarry increased the degree of vulnerability by eliminating part of the natural cover (cobertura natural) of the aquifer, in addition to the probable risks introduced by any anthropogenic activity in the environment.

4.4- A very serious problem arising from the contamination of the water extracted at Puente Mulas had to occur — under circumstances that have still not been fully clarified — before awareness was raised about the existing situation at that site and corrective actions were initiated.

4.5- As a first measure, the water supply derived from Fuente Zamora, obtained from the gallery constructed in the quarry, as well as from source 3, was suspended; quarry operations were also halted. Various research works were carried out, including the hydrogeological studies (estudios hidrogeológicos) by Losilla & Agudelo and by Rodríguez y Gómez. Both works rigorously adhere to the scientific method, are highly accurate and thorough, and make it possible to identify the hydrogeological conditions that prevail in the area between the Pedregal quarry and Puente Mulas. They also explain in detail the reasons why water surfaced artificially in the quarry, and the high vulnerability presented by the Colima Superior aquifer in that area. The recommendations arising from both works should be fully complied with, particularly if the possibility of continuing quarry operations is being considered.

4.6. I consider the Environmental Management Plan (Plan de Gestión Ambiental) prepared by Dr. Allan Astorga Gatgens to be highly sound in most of its content. In fact, with regard to the protection of the water resource (recurso hídrico), it adopts the recommendations arising from the studies by professionals Losilla & Agudelo and Rodríguez y Gómez, which are:

· Seal the floor of the quarry over the area of influence of the Fuente Zamora infiltration gallery (galería de infiltración) with an impermeable material that guarantees no infiltration of rainwater or ponding (encharcamientos) over that area, as shown on the map in figure Nº4: Vulnerability zones for the PM water intakes (captaciones). The sealing material may be a high-density geotextile material (material geotextil de alta densidad) and/or a concrete slab on a base of compacted clay material.

· Pipe or channel in concrete all runoff (aguas de escorrentía) that reaches and flows over the floor of the quarry. The floor of the quarry must be properly graded to prevent ponding of water and any other liquid. The grading must direct runoff or accidental spills to concrete drainage channels (cunetas de concreto) that convey the water to one or two discharge points into the Río Virilla. These river discharge points must be constructed through a structure that dissipates the hydraulic energy of the water and prevents erosion of the riverbank and channel.

· It must be guaranteed that all industrial-process and domestic activities (including blackwater and greywater [aguas negras y servidas]) carried out in the quarry do not generate solid or liquid waste that comes into contact with the area of influence of the Fuente Zamora infiltration gallery water intake. If this cannot be guaranteed, the activity must be relocated outside the area of influence delineated in figure Nº4.

· No domestic or industrial polluting activity shall be located at the NW corner of the quarry yard, at the base of the new extraction face, where the local flow network shown in figure Nº12 indicates the existence of a groundwater flow direction toward the PM water intakes.

· The West channel that discharges the groundwater surfacing at the central and eastern extraction faces of the quarry must be protected, and no service activity (loading or unloading water from tanker trucks), industrial process activity, or domestic activity shall be carried out within a 10 m strip from the edge of its channel, up to approximately 50 m before its discharge into the Río Virilla, from which point it must be piped for discharge into the river through an appropriate hydraulic energy dissipation structure. It must be guaranteed that runoff does not reach the groundwater discharge channel. The groundwater discharging into the channel could subsequently be tapped for human consumption.

· Study and design a protective barrier and dike for the slope (talud) of the right bank of the Río Virilla on the eastern side of the quarry yard, to prevent erosion of the river slope and flooding of the eastern sector of the yard during Río Virilla flood events. The height of this barrier/dike must reach at least elevation 876 m snm, in anticipation of an extraordinary flood event (avenida extraordinaria) on the river that could contaminate, through underground pathways, the Fuente Zamora infiltration gallery and the new groundwater outcroppings at the eastern extraction face of the quarry.

· All of these works must be supported by hydrogeological, hydrological, and geological studies and must have design plans prior to their construction. They must not be improvised.

· The waters from the Fuente Zamora infiltration gallery must be monitored for quality and quantity, and must be treated (disinfection and filtration to retain/absorb other possible toxic substances) independently of the other sources at the PM pumping station.

· The collection tank of the Fuente Zamora gallery and its access must be restricted and protected.

· The wells of the piezometer network (red de piezómetros) that have been constructed must be [equipped] with a small cement well cap (brocal) and cover, to prevent the entry of runoff and other substances that could contaminate the aquifer and to enable their use in subsequent studies; or they must be filled with fine sand when they are no longer needed.

4.7- Upon evaluating the information relating to the Extraction Plan prepared by Geologist Emilio Garro Rojas, as well as the technical document prepared by Dr. Allan Astorga Gatgens (2003), entitled Complementación Ambiental del Plan de Extracción del Tajo Pedregal, I find that a phased extraction is proposed, beginning with the extraction of blocks A, E, and F, and that in the remaining cases, detailed hydrogeological studies will be developed to exclude or include other blocks as conclusions are reached. However, I consider and recommend the following:

First: In accordance with my professional judgment, it is possible to operate the quarry without risk of damage to the water resource, provided that the recommendations arising from the hydrogeological studies by Losilla & Agudelo and Rodríguez Gómez are rigorously applied from the outset in the continuation of quarry extraction works.

Second: For each extraction site proposed by Rodríguez y Gómez, a detailed study must be conducted relating to the hydrogeological conditions indicated by the Losilla & Agudelo study, taking into account, among other aspects, the depth of the water table (nivel freático), the direction of the flow lines (líneas de flujo), and the risks of affecting water quality, so as to guarantee permanent protection of the water resource with respect to the water intakes maintained by the Instituto Costarricense de Acueductos y Alcantarillados at Puente Mulas.

The Tribunal finds that report to be credible, both because it comes from a qualified expert in the field and because the expert was able to personally explain his observations during the judicial inspection (reconocimiento judicial) conducted in these proceedings, as recorded in the video prepared for that purpose, a copy of which is in the possession of each of the parties and to the content of which they were also able to refer in due course.- The expert witness's (perito) findings are, furthermore, supported by recently conducted hydrogeological studies by other professionals in the field, and therefore do constitute a sufficient technical and scientific basis for deciding the matter raised.- It is the view of the Court (Despacho) that if the conditions established in those studies, together with the recommendations of licenciado Echandi, are fully complied with, it is indeed possible to grant, at least in part, the precautionary measure (cautelar) requested, as explained below..- X).- Based on the zoning (zonificación) indicated in the preceding Considerando, it is noted that risk-free exploitation of the aquifer — according to the studies in the record — could only occur in the areas designated as A, E, and F; however, this body considers that, for greater security and for the purposes of this measure, it must be taken into account that extraction works must occur as far as possible from the groundwater surfacing and from Fuente Zamora, and also at the greatest possible distance from the bank of the Río Virilla.

Accordingly, the works shall be limited exclusively to the Western Sector zone of the concession, designated as "F", and in accordance with the Plans and studies indicated.- As expressed by the plaintiffs themselves, "… the effectiveness of the precautionary measure is subject, in the public interest, to the following conditions: i. Compliance with the Environmental Management Plan voluntarily designed by the plaintiffs (ASTORGA 2003); ii. Compliance with the Mining Extraction Plan presented by the plaintiff, Productos Pedregal S.A. (Garro 2002)."- The plaintiffs must unreservedly allow access to their facilities by officials from the Directorate of Geology and Mines (Dirección de Geología y Minas) or any other Office of the Ministry of Environment and Energy, from SENARA, and from the Instituto Costarricense de Acueductos y Alcantarillados, for the purpose of verifying compliance with the conditions indicated; and those officials, in the event of non-compliance with any of the conditions set forth herein, must duly report such non-compliance to the Tribunal, so that the appropriate determination may be made regarding the said activity.- The company must also submit to those bodies a monthly report on the progress of the works being carried out, in order to prevent any risk of contamination.- It is additionally clarified that the commencement of any work is subject not only to compliance with what has already been indicated, but also to the existence of operating permits from the Ministry of Health (Ministerio de Salud), in accordance with the applicable health legislation.-

POR TANTO:

The request for a preliminary injunction (medida cautelar) filed by the plaintiffs is hereby partially granted. The enforcement of the resolutions issued by the Dirección de Geología y Minas, Registro Nacional Minero, numbers 590 of fifteen hours thirty minutes on August 3, 2001 —insofar as it ordered the suspension of all activity on the lands of mining concession Nº1547— and 451 of thirteen hours ten minutes on July 16, 2002 —which cancelled that concession— is hereby suspended, as are any resolutions dependent upon them. The concession holder is authorized to carry out extraction works on the property, exclusively within "Zona F" of the Sector Oeste, as shown in the "Zoning Map of Areas According to Mineral Extraction Feasibility at Tajo Pedregal, Derived from the Hydrogeological Investigations of RODRÍGUEZ & GÓMEZ (2001)," provided that such works are carried out in strict accordance with the hydrogeological studies by Losilla & Agudelo (2001), Rodríguez & Gómez (2001), the "Plan de Extracción Minero" (Garro 2002), and the "Plan de Gestión Ambiental y su Complementación" Astorga (2003), and with the following provisions, which the companies shall comply with at their own expense in protection of the water resource (recurso hídrico):

  • a)The floor of the quarry (tajo) above the area of influence of the Fuente Zamora infiltration gallery (galería de infiltración) must be sealed with an impermeable material that guarantees the non-infiltration of rainwater or ponding (encharcamientos) over the area shown in the map in Figure Nº 4: Vulnerability Zones for the PM intake structures. The sealing material may be a high-density geotextile and/or a concrete slab over a base of compacted clay material.
  • b)All surface runoff (escorrentía) water that reaches and flows over the floor of the quarry must be piped or channeled in concrete; the floor must be adequately leveled to prevent the ponding of water or any other liquid. The leveling must direct surface runoff or accidental spills toward concrete drainage ditches (cunetas) that channel the water to one or two discharge points into the Virilla River. These river discharge points must be constructed through a structure that dissipates the hydraulic energy of the water and prevents erosion of the riverbank (margen) and riverbed (cauce).
  • c)It must be ensured that all process and domestic activities (sewage and wastewater (aguas negras y servidas)) conducted at the quarry do not produce solid or liquid waste that comes into contact with the water intake influence area of the Fuente Zamora infiltration gallery.
  • d)No domestic or industrial polluting activity may be located in the northwest corner of the quarry yard, at the base of the new extraction face (frente de explotación), where indications from the local flow network shown in Figure Nº12 suggest the existence of a groundwater flow direction toward the PM intake structures.
  • e)The western channel that discharges the groundwater emerging at the central and eastern extraction faces of the quarry must be protected; no service activity (loading or unloading water from tanker trucks), industrial process activity, or domestic activity may take place within a 10-meter strip along the edge of its channel, up to approximately 50 meters before its discharge into the Virilla River, from which point it must be piped for discharge into the river through an appropriate hydraulic energy-dissipating structure. It must be ensured that surface runoff does not reach the groundwater discharge channel. The groundwater discharging into the channel could subsequently be captured for use in human consumption.
  • f)A protective shield and dike for the embankment slope (talud) of the right bank of the Virilla River on the eastern side of the quarry yard must be studied and designed in order to prevent erosion of the riverbank and flooding of the eastern sector of the yard during flood events on the Virilla River. The height of this shield/dike must reach at least elevation (cota) 876 m snm (above sea level), with an extraordinary flood event (avenida extraordinaria) of the river in mind that could underground contaminate the Fuente Zamora infiltration gallery and the new groundwater seeps (afloramientos) at the eastern extraction face of the quarry.
  • g)All of these works must be supported by hydrogeological, hydrological, and geological studies and must have design plans prepared prior to construction. They must not be improvised.
  • h)The water from the Fuente Zamora infiltration gallery must be monitored for quality and quantity, and must be treated (disinfected and filtered to retain/absorb other possible toxic substances) independently from the other sources at the PM pumping station.
  • i)The collection tank of the Fuente Zamora gallery and its access must be restricted and protected.
  • j)The wells of the executed piezometer (piezómetros) network must be protected by the construction of a small concrete well collar (brocal) and cover, to prevent the entry of surface runoff and other substances that could contaminate the aquifer (acuífero) and to allow their use in future studies; or they must be backfilled with fine sand when they are no longer needed.
  • k)For the extraction site proposed by Rodríguez and Gómez for the indicated "Zona F" —the only zone in which the extraction of non-metallic material is permitted— a detailed study must be conducted regarding the hydrogeological conditions identified in the Losilla & Agudelo study, taking into account, among other aspects, the depth of the water table (nivel freático), the direction of the flow lines (líneas de flujo), and the risks of affecting water quality, so as to ensure the permanent protection of the water resource in relation to the intake structures maintained by the Instituto Costarricense de Acueductos y Alcantarillados at Puente Mulas.

Additionally, the companies must unconditionally permit access by officials of the Dirección de Geología y Minas or any other office of the Ministerio de Ambiente y Energía, of the Servicio de Aguas Subterráneas, Riego y Avenamiento (SENARA), and of the Instituto Costarricense de Acueductos y Alcantarillados, to all of their facilities, at any time, in order to verify compliance with the conditions set forth herein; and those officials, in the event of non-compliance with any of them, shall duly notify the Tribunal, setting forth the grounds, so that appropriate action may be determined with respect to the indicated activity. The plaintiffs must also submit to those entities a monthly report on the progress of the activities being carried out, in order to prevent any risk of contamination. Finally, it is clarified that the commencement of any work is subject not only to compliance with what has already been set forth herein, but also to the existence of operating permits issued by the Ministerio de Salud in accordance with applicable health legislation, and that what is ordered herein is without prejudice to the general powers conferred by national legislation upon all entities and bodies responsible for overseeing the protection of the Nation's environmental resources.

This resolution shall be notified to the parties and communicated in full to the Minister of Environment and Energy, to SETENA, to the Dirección de Geología y Minas, Registro Nacional Minero, to the Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento (SENARA), and to the Executive President of ICAA.

Sonia Ferrero Aymerich Cristina Víquez Cerdas Hubert Fernández Argüello Preliminary Injunction Incident Productos Pedregal S.A. v. El Estado Aartavia

Marcadores

-2001 N°474-2005 TRIBUNAL CONTENCIOSO ADMINISTRATIVO. SECCIÓN SEGUNDA. II CIRCUITO JUDICIAL DE SAN JOSÉ. Goicoechea, a las once horas veinte minutos del doce de octubre del dos mil cinco.- Medida cautelar, solicitada por las actoras dentro del proceso ordinario minero de "Productos Pedregal, Sociedad Anónima" y otras, representadas por su apoderado generalísimo sin límite de suma, Rafael Angel Zamora Fernández, empresario, vecino de San Antonio de Belén cédula 1-563-370, contra el Estado, representado por el Procurador General Adjunto Julio Jurado Fernández, vecino de San José, cédula 1-501-905.- Como apoderado especial judicial de las actoras figura el licenciado Aldo Milano Sánchez, vecino de Montes de Oca cédula 1-688-989.- Las personas citadas son mayores, casadas y con la excepción dicha abogados.-

RESULTANDO:

  1. 1El personero de las accionantes formula esta gestión, a fin de que se disponga lo siguiente: "a.- adoptar, como medida cautelar, la suspensión de los efectos de los actos impugnados que impiden la extracción de minerales no metálicos de la cantera originalmente concesionada en beneficio de Productos Pedregal S.A.; b.- declarar que la eficacia de esta medida queda sujeta, en beneficio del interés público, a las siguientes condiciones: i.- el cumplimiento del Plan de Gestión Ambiental que de forma voluntaria, diseñaron las actoras (ASTORGA 2003); ii.- el cumplimiento del Plan de Extracción minero planteado por la actora, Productos Pedregal S.A. (GARRO 2002). c. la medida decretada, no afecta la eficacia de las resoluciones adoptadas por la Secretaría Técnica Ambiental, la cual deberá ser objeto de valoración en el proceso respectivo".-
  2. 2Conferida la audiencia de rigor, el demandado se opuso a la petición.-
  3. 3En los procedimientos se han observado las prescripciones de rigor y no se notan causales de nulidad capaces de invalidar lo actuado. Esta sentencia se dicta dentro del término de ley.-

Redacta el Juez Fernández Argüello; y

CONSIDERANDO:

I).- Para la resolución de esta medida cautelar, se tiene como debidamente acreditado lo siguiente:

  • 1)Que mediante resolución número 27-83 MIEM del entonces Ministerio de Industria, Energía y Minas, dictada a las diez horas del cinco de setiembre de mil novecientos ochenta y tres se otorgó a Productos Pedregal, Sociedad Anónima, la concesión de explotación de una cantera ubicada en San Antonio de Belén, por un plazo de veinticinco años (folio 151, Tomo I del expediente administrativo Nº1547);
  • 2)Que por memorándum DGM/DC-752-2001 del cuatro de julio del dos mil uno, la licenciada Wendy Pérez Fernández, Coordinadora de Minería de las Areas Tempisque y Guanacaste, informó de una inspección realizada a ese sitio (Tajo Pedregal). Allí se encontraron algunas irregularidades y se propusieron las siguientes acciones correctivas: “Depositar encima del material arcilloso una capa de suelo orgánico y revegetar con zacates. En la parte donde hay maleza sembrar algunos árboles. Reubicar cuanto antes la lavadora, además de regular el caudal, así como diseñar e implementar un sistema de lagunas de sedimentación. El almacenamiento de bloques debe apartarse y dejar una distancia prudente del río (unos 10 m), para evitar cualquier accidente. Realizar y aplicar un manejo de desechos sólidos en el área de la cantera, para evitar depositarlos en partes y en el cauce del río” (folios 582 y 583, Tomo III del expediente administrativo);
  • 3)Que la Dirección de Geología y Minas, Registro Nacional Minero, en resolución Nº 589 de las trece horas del treinta y uno de ese mismo mes y año, concedió a Productos Pedregal S.A. el plazo de quince días hábiles para cumplir con las anteriores recomendaciones (folios 595 a 597, Tomo III del expediente administrativo);
  • 4)Que el tres de agosto de dos mil uno se realizó un nuevo reconocimiento en el lugar, con la presencia de funcionarios del Instituto Costarricense de Acueductos y Alcantarillados (ICAA), del Servicio Nacional de Aguas, Riego y Avenamiento (SENARA), el Ministerio de Salud y la Dirección General de Geología y Minas. En lo que interesa, el acta levantada en el lugar, indicó: “… nos ubicamos en la zona donde hay afloramiento de agua. Se interceptó el nivel freático, según funcionario de SENARA, el señor Fernández indica que A y A no captaba el agua, los funcionarios de A y A indican que en forma natural se captaba en Puente Mulas. El sr. Zamora indica que el único punto donde brotó el agua es ahí si se topa ya no brota más agua (…) El agua brotó hace dos meses. El sr. Zamora propone poner material en la zona para demostrar que no sale más agua. Los funcionarios de A y A indican que no es relevante por lo que no se procede a tapar la zona …” (acta de folios 601 y 602, Tomo III del expediente administrativo);
  • 5)Que en el informe elaborado con motivo de la anterior visita de campo, fechado ese mismo día, la geóloga Ana Sofía Huayapa, el Ingeniero Forestal Edgar Sandí y la Subdirectora General de Geología y Minas, Msc. Marlene Salazar Alvarado indicaron que en el primer frente de extracción, extremo Este de la concesión, “… se observó un frente de remoción de material reciente, con taludes de 15 a 20 metros de altura y en los niveles inferiores de dicho talud se observó el afloramiento del manto acuífero, con un caudal regular que fue drenado o encausado en dirección al Río Virilla, lo que podría evidenciar efectivamente el rompimiento del nivel freático producto de las labores de remoción. Es importante mencionar que a lo largo de la base del talud por sectores, se observa zanjas completamente cubiertas de material adquiriendo una consistencia suanposa (sic) poniendo en evidencia la saturación del agua en el área. Diagonal a este mismo frente es evidente la presencia de un relleno de dimensiones considerables (tomamos como medida de profundidad el hundimiento de piernas de los funcionarios de la D.G.M., estas se aproximan a 55 centímetros). 3 Áreas de Protección. Se observó la alteración de la zona de protección establecido en el artículo 33 inciso a) de la Ley Forestal 7575. Así mismo la siembra reciente de 41 árboles de Laurel de la India y tres de Cedro sobre un relleno a la margen izquierda. 4. Segundo frente de extracción. Ubicado al extremo Oeste de la concesión. Según lo manifestado por el concesionario es el frente actual de extracción. En sus perfiles se observó el afloramiento de las ignimbritas de Puente Mulas el cual representa un acuicierre (según el geólogo regente de la concesión). En este no se observa intervención en el manto acuífero. Se realizaban labores de arranque de material”. Adicionalmente, se emitieron las siguientes conclusiones y recomendaciones: “CONCLUSIONES: 1. De las observaciones se desprende la afectación del acuífero Colima Superior en el sector Este del área concesionada. 2. De acuerdo al artículo 33 inciso a) de la Ley Forestal 7575 se afectó la zona de protección. 3. Incumplimiento del artículo 8 y 11 de la Ley de Biodiversidad 7788, todo lo anterior pone de manifiesto el impacto Ambiental negativo trayendo consigo una externalidad negativa. RECOMENDACIONES: 1. Para comprobar la información suministrada a esta Dirección respecto a la realidad in situ y determinar exactamente el área afectada, la Dirección de Geología y Minas procederá a la comprobación de cotas de los niveles de explotación y las medidas de avance de los frentes de explotación, verificación del punto de rompimiento del acuífero, determinación de las áreas suanposas (sic) revisión de programa de explotación versus últimos informes de labores y otros estudios técnicos presentados a la D.G.M., para lo cual la empresa deberá nombrar un topógrafo a efecto que la comprobación se realice en forma conjunta. 2. La empresa deberá suministrar la caracterización del acuífero en el área de la concesión, estudio hidrogeológico y determinación de los niveles freáticos tomando en consideración la irregularidad del acuífero en la zona, para determinar las cotas mínimas de extracción del material en la concesión. 3. La SETENA y el ICAA, deberán valorar el daño ambiental producto de la afectación del acuífero y de la violación de las zonas de protección, así como cualquier otro daño que estimen conveniente. 4. Se recomienda la suspensión inmediata de labores de tanto la misma cumpla con lo recomendado en los puntos 1 y 2.” (memorándum DGM-DC-803-2001, folios 602 a 605, Tomo III del expediente administrativo);
  • 6)Que con fundamento en el anterior informe el Registro Nacional Minero, de la Dirección de Geología y Minas, en resolución Nº 590 de las 15:30 horas del tres de agosto de dos mil uno, comunicada a la empresa ese mismo día, dispuso: “POR TANTO: De conformidad con los artículos 50 de la Constitución Política, 1º 3º, 34 inciso g), 93 y 98 del Código de Minería, 11 de la Ley de Biodiversidad, 1º de la Ley General de Salud y 1º de la Ley General de Agua Potable se resuelve: a) se ordena la INMEDIATA SUSPENSIÓN DE LABORES DE EXPLOTACIÓN Y PROCESAMIENTO DE MATERIAL DE CANTERA que desarrolla la sociedad Productos Pedregal S.A. en el área de concesión del cumpla con la presentación de los estudios y recomendaciones emitidas en el oficio DGM/DC 803-2001 transcrito en la presente resolución. Se advierte que de no presentar lo requerido, se procederá conforme lo establece el último párrafo del artículo 63 del Código de Minería. C) Notifíquese la presente resolución a la Secretaría Técnica Nacional Ambiental y al Instituto Costarricense de Acueductos y Alcantarillados con el fin de que procedan a elaborar los informes requeridos en la presente resolución. Se advierte a la empresa Productos Pedregal S.A. que de conformidad con los artículos 146 y siguientes de la Ley General de la Administración Pública, el acatamiento inmediato de la orden emitida es obligatorio. Contra la presente resolución, cabe los recursos de revocatoria y apelación de conformidad con el artículo 90 del Código de Minería y dentro del plazo de (sic) establecido en el artículo 346 de la Ley General de la Administración Pública.- Además el recurso de revisión de conformidad con lo establecido en la Ley General de la Administración Pública. Comuníquese” (folios 607 a 613, Tomo III del expediente administrativo);
  • 7)Contra esa resolución se interpuso el seis de agosto siguiente, revocatoria y apelación, así como solicitud de suspensión de lo allí ordenado (recursos de folios 616 y 617, ampliación, de folios 627 a 630, Tomo III del expediente administrativo);
  • 8)Que en ese mismo mes de agosto, los geólogos Alfonso Alfaro Martínez, Roberto Ramírez Chavarría y Sigifredo Morera Guillén, funcionarios del Área de Aguas Subterráneas del SENARA, elaboraron la “Evaluación Preliminar del Impacto al Recurso Hídrico provocado por la explotación de materiales o metálicos en el Tajo Pedregal, Belén Heredia”. En él se señaló: “CONCLUSIONES: Los impactos más importantes observados en el Tajo Pedregal son: Eliminación de la capa confinante (materiales volcánicos superiores), que protegían naturalmente la zona de descarga de Acuífero Colima Superior. La empresa a su vez puede estar depositando efluentes contaminantes al acuífero, que no han sido evaluados. La extracción del tajo en la margen (orilla del río) hasta cotas cercanas al nivel del río, puede causar inundaciones que acarrean contaminantes a los afloramientos del acuífero Colima. RECOMENDACIONES: Otros aspectos como zonas de captura (zona de protección) del Manantial de Puente Mulas, descensos del nivel del agua subterránea, disminución del espesor saturado y pérdida de puntos de captación así como la explotación del tajo deben ser reevaluados con un estudio hidrogeológico, cuyo objetivo es determinar el impacto sobre los acuíferos por la actividad minera de continuar la extracción de roca hacia el Oeste de la zona y medidas de remediación para la zona impactada (afloramiento del nivel de Colima Superior). También se debe evaluar el impacto de quitar la barrera natural del río con la posibilidad de inundaciones e influencia de contaminación del acuífero (…) Con los resultados obtenidos de este estudio la Dirección de Geología y Minas del MINAE debe establecer los niveles y la metodología de extracción en la concesión del Tajo Zamora. Construir una debida protección del acuífero en las zonas en que ha sido expuesto debido a las extracciones de roca. Reparar y/o restaurar la zona de protección del Río Virilla que por ley se debe respetar. Realizar una evaluación de vulnerabilidad de la toma de agua en el plantel por parte de A y A, para la posibilidad de realizar una captación más segura en el propio manantial o descartarla del sistema que está conectado a Puente Mulas” (folios 660 a 665, Tomo III del expediente administrativo);
  • 9)Que la Dirección de Geología y Minas, Registro Nacional Minero, en acto Nº 703 de las nueve horas treinta minutos del cinco de setiembre de dos mil uno, rechazó la solicitud de la concesionaria, de suspender los efectos de la resolución 590 antes citada. En concreto se resolvió: “POR TANTO: En virtud de lo expuesto, artículos 50 de la Constitución Política, 33 de la Ley Forestal, 16 de la Ley de Agua Potable, 31 de la Ley de Aguas, 1º, 93 y 98 del Código de Minería, 146 y siguientes de la Ley General de la Administración Pública se mantiene la orden de suspensión de las labores de nombre de Productos Pedregal S.A.. En consecuencia, se rechaza la solicitud de suspensión de los efectos del acto administrativo ordenado en la resolución Nº590 de las 15:30 horas del 3 de agosto de 2001 …” (folios 697 bis a 699 bis, Tomo IV del expediente administrativo);
  • 10)Que contra esta última decisión se promovió apelación con acción de nulidad absoluta el diez de setiembre siguiente. Al resolverlo, la entonces Ministra de Ambiente y Energía, licenciada. Elizabeth Odio Benito, en resolución Nº R-1726-2001-MINAE, de las nueve horas del nueve de octubre siguiente determinó: “1. Se rechaza el recurso de apelación con nulidad absoluta concomitante interpuesto por la empresa Productos Pedregal S.A. contra la resolución 703 de las 9:30 del 5 de setiembre del d2001, emitida por la Dirección de Geología y Minas. 2. Proceda la Dirección de Geología y Minas a pronunciarse sobre el recurso de revocatoria interpuesto contra la resolución 590 de las 15:30 del 3 de agosto de 2001. 3. Se da por agotada la vía administrativa…” (folios 956 a 959, Tomo V del la Comisión Plenaria de la Secretaría Técnica Nacional Ambiental, del Ministerio de Ambiente y Energía (SETENA), mediante resolución Nº623-2001-SETENA de catorce horas del veintisiete de setiembre del dos mil uno, acordó ordenar a la empresa Productos Pedregal S.A., el cierre técnico escalonado de todas las actividades industriales y comerciales que se llevan a cabo en el sitio, mediante un Plan de Gestión de Cierre. Se establecieron allí los lineamientos que debe considerar el mencionado plan, así como las fechas de desmantelamiento final de las Plantas de asfalto, concreto, bloques, quebradores, talleres, edificios y demás obras (copia de folios 913 a 920, Tomo V del expediente administrativo);
  • 12)Que en acto de la Dirección de Geología y Minas Nº 784 de las nueve horas cuarenta minutos del dieciséis de octubre de dos mil uno, se resolvió: “POR TANTO: De conformidad con los artículos 1, 34, y 93 del Código de Minería, resolución #623-2001-SETENA y memorándum DGM/DC-1018-2001 se resuelve: Levantar parcialmente la suspensión de labores ordenada mediante resolución #590 de las quince horas treinta minutos del 3 de agosto del 2001 autorizándose a PRODUCTOS PEDREGAL S.A. la utilización del sistema de quebrado localizado al Oeste del área concesionada entre coordenadas 217300-217-400 Norte y 516600-516800 Este hasta el día 1 de junio del 2002 como lo indicó la resolución #623-2001-SETENA de las catorce horas del 27 de setiembre del 2001. En lo demás se mantiene lo ordenado en dicha resolución.- Deberá la concesionaria cumplir con lo requerido en el memorándum DGM-DC-1018-2001 transcrito en el Considerando cuarto de la presente resolución. Se advierte al concesionario que de no cumplir con los requisitos establecidos en el oficio DGM/DC 1018-2001 y dentro de los plazos establecidos en el mismo, se procederá a revocar el levantamiento de la suspensión de procesamiento, dictada por esta resolución…” (folios 935 a 943, Tomo V del expediente administrativo);
  • 13)Que en auto 077 de la Dirección de Geología y Minas, Registro Nacional Minero, dictada a las nueve horas del veintiocho de enero del dos mil dos, se dispuso: “… a) Se declara sin lugar el recurso de revocatoria interpuesto por el señor Manuel Emilio Montero Anderson contra la resolución Nº590 de las 15:30 horas del3 de agosto del 2001, manteniéndose vigente la orden de suspensión de labores de explotación, así como las labores de beneficiamiento de material en el sector Este de la concesión. b) Remítase al Presidente Ejecutivo del Instituto Costarricense de Acueductos y Alcantarillados, las propuestas realizadas por la empresa Productos Pedregal S.A., para que dentro del plazo de un mes manifieste a esta Dirección la procedencia o no de las mismas, en el entendido que si dentro del plazo indicado el ICAA no se pronuncia al respecto, se tendrá por rechazada la propuesta de la empresa Productos Pedregal S.A.. c) Remítase los estudios presentados por el Instituto Costarricense de Acueductos y Alcantarillados y por la Secretaría Técnica Nacional Ambiental, en los que se indica que existió daño al ambiente, al Tribunal Ambiental Administrativo, para que corresponda de acuerdo a su competencia. Se eleva el expediente administrativo Nº1547 al Despacho de la señora Ministra en virtud del recurso de apelación interpuesto en forma subsidiaria. Se advierte al recurrente que dentro del plazo de tres días deberá presentar al Superior los alegatos que fundamentan la apelación. COMUNÍQUESE” (folios 1071 a 1144, Tomo V del expediente administrativo);
  • 14)Que el recurso de apelación fue rechazado por la Ministra de Ambiente y Energía, Elizabeth Odio Benito, mediante oficio R-234-2002-MINAE, de las diez horas del veintinueve de abril del dos mil dos (folios 1172 a 1178, Tomo V del expediente administrativo);
  • 15)Que el día doce de junio del dos mil dos, se realizó una inspección en el área de concesión de la presencia de funcionarios del Departamento Legal del Ministerio de Ambiente y Energía, del Director de Geología y Minas, un topógrafo de esa Dirección, la Directora del Registro Nacional Minero, funcionarios de la Secretaría Técnica Nacional Ambiental , un servidor del Instituto Costarricense de Acueductos y Alcantarillados y un representante del Ministerio de Obras Públicas y Transportes. El acta levantada ese día indica: “… primero se inspeccionó el denominado sector Oeste de la cantera, cerca de donde se ubica el depósito de chatarra, se encontró un cúmulo considerable de material … Posteriormente se unió al grupo el Ing. Luis Garro, Topógrafo de la empresa, quien explicó que el material acumulado en el sector Oeste, es parte de un material extraído de la cantera, como cumplimiento al manejo de aguas, recomendación técnica que ellos siguieron. El quebrador del sector Oeste se encuentra laborando y se observa bastante material apilado de arena sobre todo, según la Licda. Muñoz el material que procesa el quebrador proviene de Barranca y Guápiles. Al ser las 15:07 horas se apersonaron los funcionarios de SETENA … quienes recorrieron el sector intervenido donde se extrajo el material en el sector oeste. Nos trasladamos al sector Este, ahí no estaba en operación el quebrador que evidencia que desde hace bastante tiempo no funciona, se encuentra material acumulado de restos de asfalto. En el área donde se intervino el acuífero, se encontró dos "pipas" que transportan agua, cargando agua con ayuda de una bomba mecánica de la que corre por el canal construido para encauzar el agua que brota del manantial, las "pipas" tenían el logotipo de Pedregal y con las placas C-133023 y C-132881. Una vez que cargaron el agua, se retiraron de la zona. En el sector donde se destapó el acuífero, se encuentra que el mismo fue cubierto por material proveniente del mismo tajo, principalmente piedra de distintos tamaños y lastre, arriba de ese sector se evidencia que hubo movimiento de material, el cual fue removido por explosivos. Según informó el topógrafo de la empresa, este material fue removido para realizar una exhibición de vehículos de doble tracción que se realizó en el área. En el piso de la cantera, siempre en el sector este, se encuentra gran cantidad de troncos y otros desechos provenientes del río, lo que demuestra que el río creció e ingresó al sitio varios metros adentro, según explicó el topógrafo de la empresa las lluvias del lunes pasado, provocaron una crecida del río e hizo que éste inundara parte del sector mencionado …" (folios 1348 a 1350, Tomo VI del expdte. admvo.);
  • 16)Que el topógrafo Jorge Delgado Barboza, de la Dirección de Geología y Minas, efectuó una verificación de campo del expediente 1547 el 14 del junio siguiente , luego de lo cual emitió las siguientes conclusiones: "El pie del talud que se encuentra a la elevación aproximada de 871 msnm no ha sufrido alteraciones ni modificaciones producto de extracción posterior al 7 de agosto del 2001. La rampa de acceso aunque presenta diferencias en las elevaciones, conserva la pendiente obtenida el 7 de agosto del 2001. En el frente de se observan diferencias representativas en las elevaciones, se observa la formación de vaguadas, taludes que al 7 de agosto del 2001 no existían, modificación de los taludes obtenidos en la fecha mencionada. Se encuentran diferencias en elevaciones superiores a los 4.5 mtrs; estas diferencias en las elevaciones sólo podrían ser producto de la extracción posterior a la fecha de elaboración del plano aportado al folio 879. Adjunto figura Nº1 y parte del plano aportado al folio 879 (plano ampliado) para ubicación de la rampa de acceso y punto A y alrededores mediante los cuales se realizó la comparación. Se cubicaron 2 stocks de material apilado, uno procesado el cual posee un volumen aproximado de 21805m3, dato obtenido a partir del levantamiento de una sección transversal típica; otro sin procesar con un volumen aproximado de 18.000 m3, dato obtenido por métodos comparativos. No omito indicar sobre la evidencia de remoción de materiales en el área ubicada cercana al punto PF3 con dirección Sur (ver plano aportado al folio 879), remoción realizada para drenar la zona mencionada, según lo conformó posteriormente el topógrafo de la empresa Pedregal. Luis Garro Marín. Sobre el frente este de extracción aunque existe evidencia de remoción de materiales posterior al 7 de agosto del 2001, no se realizaron trabajos topográficos en ninguna de estas visitas (14 y 20 de junio del año en curso) lo que no permite realizar una cuantificación de las labores realizadas" (memorándum DGM-TOP-206-2002, folios 1351 a 1356, Tomo VI del expdte. admvo.);
  • 17)Que en memorándum DGM-DC-399-2002 del veintiuno de junio del dos mil dos, las geólogas Yannye Fallas R. y Lilliam Arrieta H., de la Dirección de Geología y Minas, rindieron el "Informe de visita. Expte. 1547. Coordenadas Topográficas Lambert 217000-218000 Latitud Norte y 516 700 y 517 700 longitud Este", en el cual consignaron las siguientes: "Conclusiones: Durante el análisis de este informe se concluye lo siguiente: 1. Las evidencias físicas muestran que materiales procesados y no procesados en el frente Oeste de explotación, son de origen in situ. Esto puede verificarse por el alto porcentaje de mineral secundario (galena), y observado en las rocas in situ y en los materiales apilados. 2. El grado de angularidad en los materiales no procesados y apilados en el frente Oeste nos indica poco transporte y que por supuesto, difieren de los materiales aluvionales, pues estos son fuertemente redondeados debido al transporte en los sistemas fluviales. 3. Los colores y texturas de los materiales apilados en el sector Oeste, los cuales varían entre amarillos, naranja, grises, vinos y hasta ladrillo; son fuertemente relacionados con las brechas amarillas de alta permeabilidad, brecha de vino de alta permeabilidad, lavas gris diaclasada y fracturada y la brecha naranja de permeabilidad media mencionadas por Losilla (2001) y correlacionables con el acuífero de Colima Superior. 4. Evidentemente, estos materiales (brechas varicolor) están siendo vendidos. Esta afirmación fue corroborada por los funcionarios del MINAE y Pedregal cuando se vio cargar y salir dos vagonetas una de ellas de la empresa Pedregal y la otra de un particular. 5. Es evidente los cambios en el talud superior en el sector Noroeste del frente de explotación Oeste, en el cual está ausente aproximadamente 5000 m2 de área y que con un 15% de expansión por abultamiento de los materiales y dependiendo del espesor eliminado, esto puede ascender a varios metros cúbicos. 6. Otra evidencia, es el desnivel del piso en el sector Suroeste, de hasta 1,8 metros tal como se indicó en este informe. 7. Se realizó un movimiento de materiales en el sector Este, construyéndose un acceso hacia la terraza superior en el cual se encuentra las tobas. 8. Se obstruyó las nacientes expuestas en el sector Este, con materiales de roca in situ, y sin ninguna recomendación técnica.9. En el sector Este las evidencias muestran el uso reciente de explosivos. 10. Además, el agua está siendo reutilizada, sin ningún permiso. Recomendaciones. Se recomienda al registro Nacional Minero que proceda según lo estipula la ley" (folios 1368 a 1372, Tomo VI del expdte. admvo.);
  • 18)Que para que justificara las labores de explotación de materiales antes indicada, se concedió audiencia a Productos Pedregal por el plazo de cinco días, la que fue contestada por la empresa el primero de julio siguiente (resolución 416 del Registro Nacional Minero de la Dirección de Geología y Minas, de 09:00 horas del 24 de junio de 2002, folios 1373 a 1386, escrito de folios 1397 a 1401, Tomo VI del expdte. admvo.);
  • 19)Que el expediente se elevó al Despacho del Ministro de Ambiente y Energía, quien en oficio DM-408-2002 del 15 de julio del dos mil dos, comunicó a la Jefe del Registro Nacional Minero, que: "… De conformidad con el grave incumplimiento apuntado, así como en relación con los artículos 63, 93 inciso h) y 97 y siguientes del Código de Minería, se debe proceder a la cancelación de la concesión …" (folio 1411, Tomo VI, del expdte. admvo.);
  • 20)Que la Dirección de Geología y Minas. Registro Nacional Minero, mediante resolución número 451 de las trece horas diez minutos del dieciséis de julio del dos mil dos, notificada el día siguiente, decidió: "POR TANTO: En virtud de lo expuesto, debido al incumplimiento de la empresa Productos Pedregal S.A. a lo dispuesto a las resoluciones Nº 590 de las quince horas treinta minutos del tres de agosto del 2001 y Nº784 de las 9:40 horas del 16 de octubre del 2001, y con base en los oficios DGM/TOP206-2002 y DGM/DC 399-2002 ambos del 21 de junio del 2002, oficio DGM/OD 644-2002 del 4 de julio del 2002 y oficio DM-408-2002 del 15 de julio del 2002, de conformidad con el último párrafo del artículo 63 del Código de Minería, se CANCELA el derecho de concesión de explotación de cantera otorgado a la empresa Productos Pedregal S.A. mediante resolución de las 10:00 horas del 5 de setiembre de 1983, que rola en el expediente Nº1547. Se ordena la inmediata suspensión de toda labor de extracción y procesamiento de material que realiza la empresa en el área objeto de concesión. Se advierte a la empresa Productos Pedregal S.A. la obligación de acatar la orden aquí emitida de conformidad con el artículo 146 y siguientes de la Ley General de la Administración Pública, advirtiéndole de las consecuencias legales que se deriven de su incumplimiento …" (folios 1412 a 1425, Tomo VI del expediente administrativo);
  • 21)Que contra lo anterior, se planteó revocatoria y apelación. La primera se rechazó en oficio de esa misma Dirección, Nº482 de las once horas del treinta y uno de julio, y la segunda se desestimó por acto del Ministro de Ambiente y Energía R-388-2002 MINAE, dictado a las nueve horas cuarenta minutos del diecinueve de setiembre, ambas del dos mil dos (recursos de folios 1426 a 1435, Tomo VI; resoluciones Nº482 y R-388-2002 MINAE, de folios 1516 a 1526 y 1539 a 1548 del Tomo VII del ordinario se interpuso el siete de noviembre del dos mil dos, y tiene por objeto que en sentencia se disponga lo siguiente: "Con fundamento en lo señalado, por así autorizarlo los artículos 11, 33, 39, 41, 45, 46, 153, 140.9 de la Constitución Política; 1.1, 1.2, 10.3, 22, 23, 59.1 b), 62 de la Ley Reguladora de la Jurisdicción Contencioso Administrativa; artículos 11, 13, 14.3, 15, 16, 17, 19, 128, 129, 133, 137, 158, 166, 190, 191, 192, 308 de la Ley General de la Administración Pública, solicito: a.- Que se anulen por su manifiesta infracción al Ordenamiento Jurídico Administrativo, las resoluciones impugnadas, así como cualquier otro acto administrativo o actuación material, derivadas o en conexión con éstas; b.- Se reconozca la situación jurídica individualizada de la actora, Productos Pedregal S.A. como concesionaria en los términos originalmente definidos mediante la resolución mencionada en el hecho 7 de esta demanda; c.- Se ordene la indemnización de los daños y perjuicios que las resoluciones ocasionaron a las actoras en los términos liquidados en esta demanda o los que sean probados en la fase probatoria; d.- Se condene en ambas costas al Estado" (escrito inicial, folios 137 y 138, formalización, folios 312 a 351, todos del expediente principal);
  • 23)Que como al escrito inicial de esta medida cautelar, la incidentista aportó lo siguiente: a) estudios hidrogeológicos de Losilla & Agudelo (2001) y Rodríguez & Gómez (2001), b) Plan de Gestión Ambiental elaborado por el Dr. Allan Astorga Gatgens, y c) Plan de Extracción Minero elaborado por Emilio Garro Rojas. Para que analizara esos documentos y para que determine "si con base en ellos, es posible explotar el Tajo que se indica sin riesgo parea el recurso hídrico", de una terna remitida por el Colegio de Geólogos de Costa Rica, se designó al perito Ernesto Echandi Echeverría (resolución número 505-2003, folios 801 y 802, auto de folio 852, documentación de folios 4 a 728, todos del legajo de la medida cautelar). Este último, geólogo con especialidad en hidrogeología, rindió su dictamen el veintisiete de junio del año anterior, del que se extraen las siguientes conclusiones y recomendaciones: "4- CONCLUSIONES: 4.1- En la zona donde se ubica el tajo del proyecto minero No. 1547 existen recursos de agua subterránea muy importante representados por los acuíferos Colima Superior y Colima Inferior. En ese sitio, el acuífero Colima Superior se encuentra muy cerca de la superficie y da origen a los manantiales de Puente Mulas, los que están siendo captados por el A y A. Este mismo acuífero es captado también en el sitio Puente Mulas, por medio de túneles y galerías. 4.2- Desde hace muchos años se comprobó que la extracción de materiales en el sector sur del tajo, estaba provocando el afloramiento del agua del acuífero Colima Superior. Existen informes al respecto desde el año 1978 realizados por SENAS y en el año 1980 por el Hidrogeólogo Daniel Mora, sin embargo, ni las instituciones estatales directamente involucradas en la problemática, ni las autoridades competentes, dieron seguimiento a las denuncias formuladas en esos momentos. El A y A cuando se percató de la cantidad enorme de agua que afloraba en el tajo debido al desplazamiento de la cubierta superior del acuífero, se limitó a explotar el agua construyendo la infraestructura necesaria, pero sin tomar otras medidas de prevención futuras. 4.3- El acuífero Colima Superior mostraba naturalmente una vulnerabilidad alta en la zona de San Antonio de Belén, incluyendo el tajo Pedregal y Puente Mulas. La explotación de materiales rocosos desde el tajo, aumentó el grado de vulnerabilidad al eliminar parte de la cobertura natural del acuífero, además de los probables riesgos que aporta cualquier actividad antropogénica en el medio. 4.4- Debió de ocurrir un problema muy serio derivado por la contaminación del agua que se explota en Puente Mulas, bajo circunstancias que aún no están totalmente aclaradas, para que se tomara conciencia sobre la problemática existente en ese sitio y se iniciaran las acciones correctivas. 4.5- Como primera medida se suspendió el suministro de agua derivado de la Fuente Zamora obtenida de la galería construida en el tajo así como de la fuente 3; además se detuvo la explotación del tajo. Además se realizaron diversos trabajos de investigación, que incluyeron los estudios hidrogeológicos de Losilla & Agudelo y de Rodríguez y Gómez. Los dos trabajos se apegan con rigurosidad al método científico, son muy acertados y completos, y permiten identificar las condiciones hidrogeológicas que prevalecen en la zona comprendida entre el tajo de Pedregal y Puente Mulas. Además explican con detalle las causas por las que afloró de manera artificial el agua en el tajo, y la alta vulnerabilidad que presenta el acuífero Colima Superior en esa zona. Las recomendaciones emanadas de ambos trabajos deberían de ser cumplidas en su totalidad, máxime si se considera la posibilidad de continuar con la explotación del tajo. 4.6. El Plan de Gestión Ambiental elaborado por el Dr. Allan Astorga Gâttgens lo considero como muy acertado en la mayor parte de su contenido. De hecho, en lo que a la protección del recurso hídrico se refiere, acepta las recomendaciones emanadas de los estudios de los profesionales Losilla & Agudelo y Rodríguez y Gómez que son · Aislar el piso del tajo sobre el área de influencia de la galería de infiltración de Fuente Zamora con algún material impermeable que garantice la no infiltración de aguas de lluvia o encharcamientos sobre esa área mostrada en el mapa de la figura Nº4: Zonas de vulnerabilidad a las captaciones de PM. El material aislante puede ser un material geotextil de alta densidad y/o planche de concreto sobre una base de material arcilloso compactado. · Entubar o canalizar en concreto todas las aguas de escorrentía que lleguen y corran sobre el piso del tajo. El piso del tajo debe nivelarse adecuadamente para evitar encharcamientos de agua y cualquier otro líquido. La nivelación debe conducir las aguas de escorrentía o de derrames accidentales a cunetas de concreto que conduzcan el agua a uno o dos sitios de descarga al río Virilla. Éstos sitios de descarga al río deben hacerse a través de una estructura que disipe la energía hidráulica del agua y evite la erosión de la margen y cauce del río. · Debe garantizarse que todas las actividades de proceso y domésticas (aguas negras y servidas) que se utilizan en el tajo no produzcan desechos sólidos ni líquidos que estén en contacto con l área de influencia de captación de aguas de la galería de infiltración de Fuente Zamora. Si esto no se puede garantizar, la actividad deberá trasladarse fuera del área de influencia delimitada en la figura Nº4. · Ninguna actividad contaminante doméstica o industrial debe ubicarse en la esquina NO del patio del tajo, en la base del nuevo frente de explotación, donde hay indicios por la red de flujos local de la figura Nº12, que existe una dirección de flujo de aguas subterráneas hacia las captaciones de PM. · El canal Oeste que descarga las aguas subterráneas que afloran en el frente de servicios (cargar o descargar agua de camiones cisterna), proceso industrial o doméstica debe hacerse en una franja de 10 m del borde de su cauce, hasta unos 50 m antes de su descarga en el río Virilla, a partir de donde debe entubarse para su descarga al río a través de una estructura disipadora de energía hidráulica adecuada. Debe garantizarse que las aguas de escorrentía no lleguen al canal de descarga de aguas subterráneas. Las aguas subterráneas que descargan al canal podrían captarse posteriormente para su uso en consumo humano. · Estudiar y diseñar un escudo y dique protector del talud de la margen derecha del río Virilla al lado Este del patio del tajo para evitar la erosión del talud del río y la inundación del sector Este del patio durante las crecidas del río Virilla. La altura de este escudo / dique, debe ser al menos hasta la cota 876 m snm, pensando en una avenida extraordinaria del río que pueda contaminar subterráneamente la galería de infiltración de Fuente Zamora y los nuevos afloramientos en el frente de explotación Este del tajo. · Todas estas obras deben tener estudios hidrogeológicos, hidrológicos y geológicos y tener planos de diseño antes de su construcción. No deben improvisarse. · Las aguas de la galería de infiltración de la Fuente Zamora deben monitorearse en calidad y cantidad, así como tratarse (desinfección y filtrado para retener /absorber otras posibles sustancias tóxicas) en forma independiente de las demás fuentes de la estación de bombeo de PM. · El tanque de captación de la galería de Fuente Zamora y su acceso debe ser restringido y protegido. · Los pozos de la red de piezómetros ejecutados deben ser idos con la construcción de un pequeño brocal de cemento y tapa, para evitar la entrada de agua de escorrentía y otra sustancias que puedan contaminar el acuífero y para su uso en estudios posteriores; o deben ser rellenados con arena fina cuando estos ya no sean necesarios. 4.7- Al evaluar la información relativa al Plan de extracción preparado por el Geólogo Emilio Garro Rojas, así como el documento técnico preparado por el Dr. Allan Astorga Gatgens (2003), llamado Complementación Ambiental del Plan de Extracción del Tajo Pedregal, compruebo que se propone una explotación por etapas, explotando al inicio los bloques A, E, y F y que en los demás casos, se irá desarrollando estudios hidrogeológicos detallados para descartar o incluir otros bloques, según se vaya concluyendo. No obstante considero y recomiendo lo siguiente: Primero: Conforme a mi criterio profesional, es posible explotar el tajo sin riesgo de daño al recurso hídrico, siempre y cuando en la continuación de los trabajos de explotación del tajo se apliquen rigurosamente y desde el inicio las recomendaciones emanadas de los estudios hidrogeológicos de Losilla & Agudelo y Rodríguez Gómez. Segundo: Para cada sitio de extracción propuesto por Rodríguez y Gómez, se debe de efectuar un estudio detallado relacionado con las condiciones hidrogeológicas que señala el estudio de Losilla & Agudelo, considerando entre otros aspectos la profundidad del nivel freático, la dirección de las líneas de flujo y los riesgos de afección de la calidad del agua, de manera que se garantice una protección permanente del recurso hídrico con relación a las captaciones que mantiene el Instituto Costarricense de Acueductos y Alcantarillados en Puente Mulas" (informe de folios 868 a 873 del legajo de medida cautelar);
  • 24)Que conferida la audiencia de rigor las partes solicitaron aclaración del anterior informe y el experto, por memorial del veinticuatro de enero del dos mil cinco, en lo que interesa expresó: "… Considero que la propuesta que hace Productos Pedregal S.A. en lo que han llamado como el "Protocolo para estudio geológico-hidrogeológico ambiental para bloques de explotación en el tajo Pedregal, Belén, Heredia, Costa Rica" es muy completo, y cumple con las recomendaciones que señalan los distintos estudios hidrogeológicos, que se analizaron mediante este peritaje, y con mis propias conclusiones, recomendaciones y expectativas (…) En el caso de que se apruebe la propuesta de continuar con la explotación del tajo, debe de establecerse la responsabilidad y obligación de la empresa desarrolladora de elaborar informes hidrogeológicos mensuales, los que serán remitidos al Instituto Costarricense de Acueductos y Alcantarillados, al Departamento de Aguas del MINAE y al SENARA. También será necesario que se implemente la inspección periódica al sitio de explotación por parte de los funcionarios de esas instituciones" (aclaración de peritaje, folios 904 a 907);
  • 25)Que en relación con las empresas demandantes, el contador público autorizado Mailo A. González Alvarez elaboró en febrero del dos mil tres, el documento denominado "Análisis del Impacto sufrido, y perspectivas futuras, de la clausura de la fuente de materiales de LAS EMPRESAS (concesión #1547) por parte de la Dirección de Geología y Minas del Ministerio de Ambiente y Energía (MINAE)", en el cual entre otras consideraciones, indicó: "…Como resultado fundamental. El Estado de Resultados Condensado Proyectado, para el período comprendido entre el 1 de diciembre de 2002 y el 30 de noviembre de 2003, permite inferir que LAS EMPRESAS continuarán la línea de generación de pérdidas y obtendrán pérdidas netas por la cuantiosa suma de, aproximadamente, ¢1.338.000.000,00 (un mil trescientos treinta y ocho millones de colones con 00/100). Pérdidas proyectadas de esta magnitud, más el faltante de efectivo proyectado por un monto de -¢1.435.500.000,00 (un mil cuatrocientos treinta y cinco millones quinientos mil colones ) para el período de tiempo analizado, permiten concluir que LAS EMPRESAS se encontrarán en una precaria situación financiera, imposibilitándolas para poder continuar desarrollando eficientemente sus actividades productivas y comerciales normales. Esto hace que, técnicamente, se llegue a comprometer el principio contable de Negocio en Marcha (principio contable definido como la presunción de que una empresa tendrá existencia permanente, supone que existe una seguridad razonable de que la empresa no tenga que suspender sus operaciones por insolvencia, al no ser capaz de satisfacer sus obligaciones del corto plazo por estar operando con faltantes de efectivo) …" (documento citado y sus anexos, visibles de folios 163 a 349 de la medida cautelar; en concreto, folio 171); 27) Que Productos Pedregal maneja una numerosa planilla de trabajadores (ver copia de planillas mensuales para el movimiento de trabajadores, emitidas por la Caja Costarricense de Seguro Social, folios 353 a 392).- II).- Manifiesta el incidentista, que el Proyecto Minero Nº 1547, conocido también como "Tajo Pedregal", se dedicó originalmente a la extracción de agregados minerales localizados en las cercanías de San Antonio de Belén, actividad de tipo no metálico que se lleva a cabo en dichos terrenos desde hace más de sesenta años. Con la promulgación del Código de Minería en mil novecientos ochenta y dos, explica, la empresa Productos Pedregal S.A., inició los trámites para obtener la concesión ante la Dirección de Geología y Minas, y que en mil novecientos noventa y uno, en el curso de la explotación, al alcanzarse el nivel más bajo de ésta en la parte central del tajo, se continuó el avance de Sur a Norte, y que por estar la base de extracción muy próxima al nivel del agua subterránea del Acuífero Colima Superior, éste fue interceptado por el frente de los trabajos, provocándose un brote de agua.- En virtud de esa situación, agrega, los funcionarios de Acueductos y Alcantarillados les propusieron captar el agua que brotaba para reforzar el caudal de Puente de Mulas, por lo que bajo la mediación de un funcionario de la Dirección ya indicada, se definió el sitio de la toma de agua en la parte baja del frente de explotación, asumiendo la actora el compromiso de coadyuvar con el A y A, en las obras de infraestructura necesarias para la conducción del líquido hacia Puente Mulas, de modo que no se afectara el avance de la explotación, ni el aprovechamiento del recurso hídrico.- Como resultado de lo anterior, continúa, se construyó una galería de infiltración -denominada Fuente Zamora-, en la parte central del tajo y desde entonces, el agua de la Fuente Zamora pasa, mediante una tubería subterránea, hacia la Estación de Puente de Mulas, donde recibe un tratamiento por cloración para luego ser bombeada al sistema de acueductos urbanos del Gran Área Metropolitana. Que una vez obtenida la concesión, se inició el desarrollo de una estructura productiva que involucró a las aquí demandantes -"Productos Pedregal, S.A.", "Asfaltos Pedregal S.A.", "Bloques Pedregal S.A.", "Concretos Pedregal S.A.", "Constructora Pedregal S.A.", "Quebradores Pedregal S.A.", "Transporte Pedregal S.A." y "Servicios y Acarreos Belén S.A."-, empresas que se conformaron para ocuparse de distintos nichos de mercado, todos relacionados con el ramo de la construcción. La extracción, afirma, llegó a ubicarse en cuarenta y seis mil un metros cúbicos mensuales, y con el objeto de posicionarse en el mercado, se realizaron inversiones en activos fijos productivos, por una suma cercana a los cuatro mil trescientos setenta y ocho millones de colones, y se han generado en conjunto, un total de cuatrocientos veinticinco puestos directos de trabajo. Expresa que en el mes de julio del dos mil uno, se reportaron múltiples problemas de salud en un sector de la población capitalina, que luego fueron relacionados con el suministro de agua potable, población que estaba constituida en parte, por quienes se abastecían de las aguas bombeadas desde Puente Mulas.- Los estudios efectuados, aduce, determinaron que existía una altísima contaminación bacteriológica en las aguas, y ello se atribuyó, según denuncia planteada por el entonces Presidente Ejecutivo del Instituto Costarricense de Acueductos y Alcantarillados, a las actividades desplegadas por las aquí accionantes.- Señala que, luego de una visita de campo, "sobre la base de una apreciación a priori de la realidad de las cosas", mediante resolución número 590 de las quince horas treinta minutos del tres de agosto del dos mil uno, la Dirección de Geología y Minas ordenó, de forma intempestiva, la suspensión de las labores de explotación y procesamiento de material de cantera. Expresa que existen estudios científicos, que demuestran que la contaminación de las aguas de Puente de Mulas no pudo haber sido ocasionada por ellas, lo anterior, "... en vista de la interacción de agentes infecciosos (patógenos fecales) en el brote de diarrea que se dio en los usuarios del servicio de agua potable. Dichos patógenos, se comprobó, no estaban presentes en el agua de la Fuente Zamora ni pudieron haberse generado por las actividades de las empresas en la zona aledaña a la fuente, en vista de la metodología de extracción y naturaleza de las actividades de transformación, así como por su ubicación con relación a la citada fuente …".- Que al momento en que se dispuso la suspensión aludida, ésta mantenía múltiples compromisos contractuales con diversas entidades estatales, para varias obras públicas, entre ellas los Proyectos "Tournón-Uruca", "Cruce Moravia-Cruce Ipís", "El Carmen- Jaboncillal", "Construcción Intersección a desnivel Rotonda Y Griega" y "Conservación Vial de la Ruta Nacional Nº 1, General Cañas", casos en los que existían fechas de entrega ya definidas, garantías de cumplimiento rendidas hasta por más de ciento sesenta y dos millones de colones y más de trescientos mil dólares, así como una marcada urgencia pública de cumplir oportunamente con la entrega de las obras. Fue por esa razón, aduce, que Productos Pedregal S.A., se vio obligada a desobedecer ese acto, y extrajo material en las zonas del área concesionada, con lo cual, rescata, no causó daño ambiental alguno.- Alega que mediante las resoluciones que se impugnan en el principal (Del Registro Nacional Minero de la Dirección de Geología y Minas, las números 590 del tres de agosto y 784 del dieciséis de octubre, ambas del dos mil dos; 077 del veintiocho de enero, 451 del dieciséis de julio; 482 del treinta y uno de julio, éstas del dos mil dos; y las del Ministro de Ambiente y Energía, números R-234-2002 MINAE del veintinueve de abril y R-388-2002-MINAE del diecinueve de setiembre, ambas del dos mil dos), la Dirección General de Minas decidió extinguir la concesión otorgada en mil novecientos ochenta y tres a la empresa Productos Pedregal S.A., y paralelamente, la Secretaría Técnica Nacional Ambiental -SETENA-, ordenó el cierre escalonado del resto de sus actividades productivas.- Que al no contar con esa fuente de materiales, las empresas vieron desaparecer su ventaja competitiva frente a otros competidores del mercado, sus activos productivos se están sub utilizando y han debido asumir pérdidas sólo en el dos mil dos, por el orden de ciento cincuenta y seis millones de colones. Financieramente, "… de acuerdo con la proyección de flujo de caja de las empresas, para el período comprendido entre el 01 de diciembre de 2002 y 30 de noviembre de 2003, se presentará un faltante de ¢1.435.500.000,00 (un mil cuatrocientos treinta y cinco millones quinientos mil colones). Además, es posible proyectar pérdidas, en ese mismo período, por ¢1.338.000.000,00 (un mil trescientos treinta y ocho millones de colones). Finalmente, es posible estimar que las empresas verán disminuidos sus ingresos, al 30 de noviembre de 2003, hasta por la suma de ¢4.665.000.000,00 (cuatro mil seiscientos sesenta y cinco millones de colones)", índices que a su juicio permiten afirmar, técnicamente un serio compromiso del principio contable del negocio en marcha, que se define como la presunción de que una empresa tendrá una existencia permanente, de modo que no se tiene seguridad razonable de que no se suspendan, en el corto plazo, las operaciones productivas por insolvencia.- Que además, para dar sustento a esta solicitud de tutela cautelar, y asegurar la inexistencia de riesgos de afectación ambiental, se optó por definir un Plan de Gestión Ambiental, que se comprometen a cumplir.- Por otra parte, afirman que hasta ahora, no existen argumentos científicos (técnicos y ambientales) para sustentar un cese de las operaciones mineras, así, "… aparte de los efectos ambientales negativos que genera un proyecto minero como el aquí analizado y que tendrían solución por medio de la aplicación del citado Plan de Gestión Ambiental, el problema ambiental más importante que enfrenta el Proyecto se relaciona con el tema de la interacción entre la actividad minera y el manejo de los recursos hídricos subterráneos presentes en su subsuelo (Acuífero Colima Superior) … En función de ese impacto ambiental, se diseñó un Plan de Extracción que engloba, únicamente, aquellas zonas dentro del área concesionada que podrían ser explotadas sin que se ocasione ninguna afectación al Acuífero Colima Superior o la Fuente Zamora propiamente dicha, previo cumplimiento de los compromisos ambientales que derivan del Plan de Gestión Ambiental antes citado".- En el caso concreto, aduce, se dan plenamente los presupuestos para acoger la solicitud de medida cautelar planteada. Lo anterior, porque el acto impugnado carece de fundamentación suficiente, y no existe base legal para decretar la caducidad de la concesión, que lo actuado por la Administración no guarda proporcionalidad, y que no se causó con el incumplimiento de la orden de suspensión de labores, ningún daño ambiental -fumus boni iuris-. Alega además, que la ejecución de lo cuestionado le ocasiona menoscabos reales y efectivos, entre ellos, la pérdida de capacidad productiva y competitiva, la afectación a su estabilidad financiera y el riesgo de entrar en un proceso de cesación de pagos y cierre de actividades, se pone en peligro el trabajo de más de cuatrocientos trabajadores, por lo que es evidente que: "… al tener los actos impugnados en el principal, como efecto jurídico, la imposibilidad de extraer el recurso mineral no metálico indispensable para la actividad productiva de las actoras, estamos frente a daños y perjuicios de imposible o muy difícil reparación. Se ha explicado y demostrado que ese efecto jurídico, de forma causal y directa, conlleva el inminente cierre de los negocios de las actoras …" -periculum in mora-. Finalmente, manifiesta que a fin de evitar perjuicios al interés público, se presenta un "Plan de Gestión Ambiental", con compromisos para administrar el impacto ambiental típico de una actividad minera y atender aspectos tales como los referidos al aire, desechos sólidos ordinarios, especiales, aguas residuales, áreas de protección al Ríos Virilla, gestión de amenazas naturales, gestión y protección de las aguas subterráneas y suelo, protección del paisaje y gestión social, así como un "Plan de Extracción Minera", elaborado por expertos en hidrogeología, que asegura que dicha extracción, no es susceptible de ocasionar daños al recurso hídrico.- En todo caso, admiten que se establezca "… una cláusula de eficacia según la cual, de forma automática, en el caso eventual de que se demuestre prácticas de explotación que quebranten gravemente el Plan de Gestión Ambiental propuesto y/o el Plan de Extracción, ocasionando un daño ambiental, la medida cautelar dejará de ser eficaz …".- III).- El representante estatal, por su parte, considera que en este caso concreto, de los presupuestos que exige el ordenamiento para conceder medidas como las que aquí se piden, el más importante a considerar es el interés público, pues lo que interesa tener en mente, son las razones que llevaron a ordenar la suspensión de labores, y no los motivos para la cancelación de la concesión, "… pues aunque el acto donde se ordenó la cancelación no se hubiese dado, la actora no podría explotar el tajo por lo dispuesto en la resolución número 590 [de la Dirección de Geología y Minas] ya citada. En otras palabras, para los efectos de la medida cautelar que se solicita, poco importan los motivos que llevaron finalmente a la cancelación de la concesión, que fueron sobrados para esa (sic) tomar esa decisión (…) porque la medida cautelar lo que pretende es, precisamente, reanudar dichas actividades extractivas". Así las cosas, expresa, la resolución 590, tiene como fundamento el daño ambiental provocado por la operación de la empresa, que principalmente afectó el recurso hídrico presente en el acuífero Colima, y el hecho que los provocó fue su exposición en razón de la explotación del tajo.- Pero además, agrega, aquéllos afectaron la salud de la población, la que correría peligro si se permitiera continuar con las labores extractivas. Lo actuado sí tiene fundamento técnico, pues así lo determinó la Secretaría Técnica Nacional Ambiental (SETENA), órgano que señaló, que por la cercanía al acuífero expuesto no se debe utilizar el quebrador, por ser vulnerable a contaminaciones, y que la actual ubicación de las industrias compromete el recurso hídrico, justamente por la exposición del manto acuífero, en mérito de lo cual la SETENA ordenó además, el cierre técnico en forma escalonada, de las actividades industriales, entre ellas la planta de asfalto, de concreto, de bloques, quebradores, talleres, etc.- A su juicio, de por medio están los derechos fundamentales "a la salud" y "a un ambiente sano y ecológicamente equilibrado", previstos en los numerales 21 y 50 de la Constitución Política, que tienen el mismo rango que el de la tutela cautelar que se pretende, y que las circunstancias obligan a dar prevalencia a los principios "precautorio" e "indubio pro natura", debiendo entonces mantenerse los actos impugnados.- En cuanto a los demás requisitos de la solicitud, argumenta que es discutible que exista un peligro real e inminente de que la empresa sufra un daño irreversible en razón de la suspensión para explotar el tajo, y que la pérdida de ventajas comparativas no es, en el marco en que ésta se desenvuelve un daño de difícil o imposible reparación, como sí lo sería el que puede sufrir el acuífero. Que el Plan de Gestión no es suficiente, porque "¿Qué garantías puede ofrecer, en este sentido, una empresa que desobedeció, como lo han aceptado expresamente sus personeros, una orden para suspender labores porque el daño ambiental provocado y el peligro de continuar provocándolo?". Asimismo, considera el personero estatal que la impugnación de las resoluciones que ordenaron el cese de los trabajos, y que la actora ignoró, raya en lo temerario, pues no sólo se desobedeció esa orden, sino también las recomendaciones técnicas formuladas, y que sí existe un claro fundamento constitucional y legal para dictar los actos cuestionados, y en esa medida, la petición carece de una apariencia de buen derecho; y finalmente, que si este Tribunal "… acoge el presente incidente, estaría otorgando por la vía incidental lo esencial de la demanda principal permitiéndole a la actora hacer lo que esta de todos modos hizo (hasta que le fue cancelada la concesión) a contrapelo y en abierta desobediencia de una decisión administrativa dictada en ejercicio de competencias otorgadas por ley y con la finalidad de proteger el ambiente y la salud humana, lo cual desnaturalizaría los propósitos de una medida cautelar como la que se solicita".- IV).- Ante todo, se estima oportuno recordar que en materia de medidas cautelares, el ordenamiento jurídico costarricense otorga a la Jurisdicción Contencioso Administrativa, amplias potestades, pues su objeto primordial es garantizar, mediante su uso razonable, el resultado final del proceso y consecuentemente, la acción de la justicia.- El cúmulo de garantías procesales previstos en la Constitución Política, sobre todo a partir del artículo 41, y su desarrollo jurisprudencial, ponen de manifiesto la existencia de un régimen de tutela precautoria amplio, flexible y cumplida. Se trata, como lo señaló recientemente la Sala Constitucional, de un derecho fundamental, que comprende "… el derecho de pedir y obtener del órgano jurisdiccional las medidas cautelares necesarias, idóneas y pertinentes para garantizar la eficacia de la sentencia de mérito –función esencial de la tutela cautelar-, si se cumplen los presupuestos de ésta (apariencia de buen derecho -fumus boni iuris- y el peligro en la mora -periculum in mora-). Correlativamente, el órgano jurisdiccional tiene la obligación de ordenar o emitir la medida provisoria si concurren los presupuestos para su adopción …" (sentencia Nº2005-6224, de las 15:16 horas del 25 de mayo de dos mil cinco).- La aceptación de este tipo de tutelas se le atribuye al Juez, como parte de la función jurisdiccional que constitucionalmente se le asignó, y se extiende -con las excepciones previstas válidamente por la ley-, a cualquier tipo de materia que se someta a estrados judiciales. En el ámbito de lo contencioso administrativo, la Ley que regula la temática -Nº 3667 de marzo de 1966-, consecuente con el sistema revisor de actos y disposiciones del que es tributario, instituye como medida cautelar básica, la suspensión de la ejecución de los actos impugnados, en sus numerales 91, 92 y 93; empero, junto a ella coexiste un régimen innominado, mucho más generoso, que resulta de la remisión que permite el numeral 103 idem, a la legislación procesal civil, cuyo Código en su artículo 242, le habilita para tomar cualquier tipo de providencias, cuando se consideren adecuadas a los fines y cumplan los requisitos ya indicados.- La aplicación de esa normativa, en los asuntos relativos a la materia ambiental es enteramente posible.- Los actos, disposiciones -y aún las omisiones-, emanados de las autoridades públicas encargadas de la protección de los recursos ambientales de la Nación, entre ellos, el Ministerio de Ambiente y Energía -y todos sus órganos-, el Instituto Costarricense de Acueductos y Alcantarillados, el Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento (SENARA), o las municipalidades, sólo para citar algunos, participan de la naturaleza "administrativa", y por lo tanto, son impugnables y su legalidad revisable en esta sede, en virtud del principio de universalidad del control jurisdiccional, previsto en los numerales 49 y 153 de la Carta Magna.- Tales órganos e instituciones, están sujetos al principio de legalidad, y sus acciones no pueden exceder las previsiones legales que las regulan, y las que imponen los artículos 11 de aquélla y 11 de la Ley General de la Administración Pública, de forma que, incluso las decisiones tomadas en uso de las atribuciones que derivan del artículo 50 del Código Político, pueden sujetarse a medidas precautorias, si se dan los presupuestos legales para ello.- La aclaración, aunque parezca de perogrullo, se estima necesaria, en virtud de que durante la tramitación de este asunto, una de las partes ha señalado que no es posible acceder a lo aquí pedido -autorizar la extracción de materiales de un tajo-, en virtud de que cualquier decisión que se tome y que involucre un manto acuífero o la explotación de una cantera, debe estar necesariamente precedida de una autorización de la Secretaría Técnica Nacional Ambiental o de la Dirección de Geología y Minas, lo cual no es de recibo.- Acoger esa tesis, implicaría supeditar las potestades del Juzgador, a una autorización administrativa previa, que en el caso concreto debería provenir justamente, de los órganos que emitieron los actos cuya validez se discute dentro del proceso, bajo el pretexto o argumento de que son esos los órganos técnicos en la materia. Y significaría, a no dudarlo, vaciar por completo el contenido del derecho a la tutela cautelar, lo mismo que una reducción indebida de los poderes del Juez, que no es posible cohonestar.- Este órgano colegiado entiende, que se trata de una materia particular, específica y muy delicada, y que de por medio se encuentran otros derechos de orden fundamental, como el derecho a un ambiente sano y ecológicamente equilibrado y junto a él, los derechos a la vida y a la salud, lo cual exige un estudio cuidadoso y una solución bien meditada, a fin de no afectar los intereses públicos y privados involucrados.- Cualquier decisión que se tome, no ha hacerse a la ligera y tampoco debe escatimarse en la búsqueda de elementos indispensables para resolver, entre los que está la consulta con técnicos y emitir el fallo, pero no por ello, ha de descartarse toda posibilidad de suspender por esta vía, incluso aquellas medidas que se tomaron con vistas a la protección de los intereses ambientales del país, si como se dijo, se presentan los presupuestos de ley, y se cuenta con suficientes garantías para no dejar desprotegidos aquéllos elementos naturales.- V).- Dicho lo anterior, se constata que lo pretendido mediante este incidente, es que se suspendan los efectos de los actos impugnados dentro del ordinario minero interpuesto por las demandantes, particularmente las resoluciones de la Dirección de Geología y Minas, Registro Nacional Minero, números 590 de las quince horas treinta minutos del tres de agosto de dos mil uno, y 451 de las trece horas diez minutos del dieciséis de julio del dos mil dos, así como las que de ellos dependen. La primera ordenó suspender cautelarmente, las actividades desarrolladas por las actoras en el terreno que comprende la concesión minera Nº1547 en San Antonio de Belén, conocida como Tajo Pedregal, y la segunda, dispuso la cancelación de ese acto.- Como consecuencia de lo anterior, se solicita igualmente que se le permita a la concesionaria la extracción de minerales no metálicos de esa cantera, con sujeción a un Plan de Gestión Ambiental y un Plan de Extracción Minero, propuesto por ellas y aportado a los autos.- VI).- El Tribunal ha revisado detenidamente los argumentos de las partes, y la documentación presentada por ellas, así como la profusa información que obra en el expediente administrativo.- Los estudios hidrogeológicos aportados por las accionantes, lo mismo que los Planes de Gestión Ambiental y de Extracción Minera, fueron sometidos al criterio de un perito oficial, un geólogo con especialidad en hidrogeología que se designó de una terna enviada -a solicitud del Despacho-, por el Colegio de Geólogos de Costa Rica-, y además, se realizó un reconocimiento judicial en el lugar de la concesión Nº 1547, con la participación en pleno de los integrantes de este órgano colegiado, de los personeros de las partes, los expertos indicados y funcionarios de la Dirección de Geología y Minas.- Los resultados de esa diligencia, sumado a los demás elementos probatorios indicados, el estudio de la normativa aplicable, y la ponderación de los altos intereses en juego, permiten extraer los siguientes comentarios.- Como punto de partida, y sin que lo dicho implique prejuzgar sobre el fondo del asunto, se advierte que lo actuado por la Dirección de Geología y Minas y el Ministerio de Ambiente y Energía, tiene como antecedente primario, una denuncia del Presidente Ejecutivo del Instituto Costarricense de Acueductos y Alcantarillados, sobre la posible contaminación, a mediados del año dos mil uno, de la "Fuente Zamora" que se ubica en el Tajo dicho, y más concretamente, una inspección ocular, celebrada el tres de agosto en ese lugar por servidores de la Dirección mencionada.- En dicha visita, se constató que en el primer frente de afloramiento del manto acuífero, y que la empresa había desviado la escorrentía hacia el río Virilla y rellenado con materiales de la misma cantera, parte de esa zona. Igualmente, se señaló que no se estaban respetando las zonas de protección del cauce del Río, previstas en la Ley Forestal, y que las labores que allí se desarrollaban, ponían en riesgo de contaminación el acuífero Colima Superior y la Fuente citada.- En el informe que se levantó con motivo de esa diligencia, se recomendó, entre otras cosas, la elaboración de varios estudios hidrogeólogicos, así como la suspensión temporal de las actividades de la empresa, lo que fue atendido por la Dirección de Geología y Minas, Registro Nacional Minero, en la resolución 590. Posteriormente, en la Nº 784, se atenuó esa medida y se autorizó la utilización del quebrador hasta principios de junio del dos mil dos, a condición de que no se realizaran trabajos de ningún tipo en el sector en que se produjo el afloramiento.- Con posterioridad a esa fecha, específicamente el doce de junio de dos mil dos, se realizó una nueva inspección, y se determinó que se estaban extrayendo materiales en el lugar, a pesar de la prohibición emitida al efecto.- Tal situación se consideró un incumplimiento grave de los deberes de la concesionaria y dio lugar a que por resolución 451, del dieciséis de julio siguiente se le cancelara a Productos Pedregal S.A. la concesión Nº 1547.- Contra ella se interpusieron los recursos ordinarios, que fueron desestimados y luego, se promovió este proceso.- VII).- En punto a los requisitos legales para la procedencia de una medida cautelar como la que se pide, cabe expresar en primer lugar, que tal y como lo reclaman las demandantes, los efectos de suprimir la concesión de explotación minera, y la paralización total de las actividades que ella implica, ciertamente les ocasiona a las compañías daños de considerable magnitud y envergadura.- La decisión administrativa impugnada impide la extracción y el procesamiento de su principal fuente de materiales no metálicos, lo cual indudablemente pone en riesgo la buena marcha del negocio. En autos consta el estudio de un contador público, que menciona el impacto de la detención de las labores en la economía de éstas y lo cuantifica en varios miles de millones de colones, sólo para el período comprendido entre finales del dos mil dos y el dos mil tres.- Y también hay prueba de la gran cantidad de trabajadores que integran la planilla de éstas, los que verán en riesgo cierto sus empleos, y con ello, el sustento propio y el de sus familias, y además, es público y notorio que Productos Pedregal S.A. y sus empresas participan en múltiples contratos administrativos, sobre todo para la construcción y mantenimiento de obras públicas, que podrían verse incumplidos, con el consecuente deterioro de la imagen empresarial y de las posibilidades de seguir siendo actor importante en ese tipo de relaciones, que también involucran un alto interés público. En suma, se encuentra que efectivamente la ejecución de los actos cuestionados, aunada a la espera previsible en la resolución definitiva de este proceso, produciría daños de difícil o imposible reparación, en los términos en que lo prevé el numeral 91 de la Ley Reguladora de la Jurisdicción Contencioso Administrativa.- Y por otro lado, revisada sumariamente la demanda principal y los argumentos en ella deducidos, no es posible desconocer su seriedad.- La acción está bien fundamentada y las cuestiones jurídicas que se debaten -tanto de orden constitucional, como legal-, por parte de ambos contendientes, habrán de analizarse al momento del pronunciamiento de fondo, una vez que se haya evacuado toda la prueba pertinente en el principal y se cumplan como corresponde, todas las etapas que prevé la legislación procesal aplicable.- VIII).- Resta por determinar entonces, si de por medio existe un interés público prevalente, que impida acceder a lo requerido.- Está claro, porque se desprende de la realidad y del expediente, que el terreno del Tajo, se localiza sobre la margen derecha del Río Virilla, a la altura de San Antonio de Belén, Heredia, sobre un sistema de acuíferos denominado Colima. Igualmente, que éste colinda con los manantiales llamados Puente de Mulas, que descargan un importante caudal que se capta por medio de túneles y galerías, y que es o ha sido empleado por el Instituto Costarricense de Acueductos y Alcantarillados para el abastecimiento público. Así lo pudo constatar in situ este órgano colegiado, durante la diligencia de reconocimiento judicial que se ordenó oportunamente. En ella se verificó asimismo, la existencia del afloramiento en el sector Este de la concesión y la importante cantidad de líquido que de allí brota. También se visitó el lugar conocido como Fuente Zamora y la galería construida años atrás, como consecuencia de otro afloramiento anterior y las instalaciones, como el quebrador, los edificios administrativos, la mezcladora de asfalto y la fábrica de blocks. Con independencia de si aquellos brotes se produjeron, por culpa de la empresa o por cuestiones ajenas, valga decir, si se -pues eso es asunto a ventilar en el principal y no aquí-, no es posible desconocer ni la existencia de las aguas subterráneas, ni la de los afloramientos, y menos aún, el riesgo que encierra para el recurso hídrico, el desarrollo de labores extractivas en el lugar, las cuales se llevan a cabo incluso por medio de explosivos.- La importancia de ese líquido, esencial para la vida y salud de la población y para el desarrollo en general del país, está fuera de discusión, como también lo está el deber de protegerlo a toda costa. La vulnerabilidad de los mantos acuíferos, y la dificultad que conlleva en buena parte de las ocasiones, detectar a tiempo la pureza o contaminación de las aguas que guardan, obligan a ser especialmente rigurosos en cuanto a las actividades productivas que se desenvuelven en sus cercanías y a tomar medidas de carácter preventivo para evitar que ese riesgo de daño, se vuelva una realidad. Sobre el tema de las aguas subterráneas y su protección, la Sala Constitucional, en su pronunciamiento número 2004-1923 de las catorce horas con cincuenta y cinco minutos del veinticinco de febrero del dos mil cuatro, "… CONTAMINACION DE LAS AGUAS SUBTERRANEAS. A diferencia de la contaminación de las aguas superficiales que suele ser patente y visible, lo que permite tomar acciones ambientales tendentes a mitigarla o erradicarla, la de las aguas subterráneas, por su propia naturaleza, suele pasar inadvertida y se hace evidente cuando ha alcanzado grandes proporciones. Los mantos acuíferos por la lenta circulación de las aguas, la capacidad de absorción del terreno y otros factores, pueden tardar mucho tiempo en mostrar la contaminación. Adicionalmente, el gran volumen de las aguas contenido hace que las contaminaciones extensas tarden un lapso prolongado en manifestarse o bien cuando se trata de contaminaciones localizadas se detectan cuando fluyen en algún sitio de explotación. Ciertamente, este tipo de aguas tienen una resistencia a contaminarse, sin embargo cuando esta se produce su regeneración puede ser extraordinariamente lenta y en ocasiones es irreversible por el alto costo de los medios para hacerlo. Está demostrado que los intentos para reparar el daño producido por contaminación a un acuífero para lograr, de nuevo, niveles de potabilidad del agua no han tenido éxito, las tecnologías para su limpieza han contribuido poco a reducir el daño y los métodos son económicamente muy elevados. A lo anterior debe agregarse la falta de infraestructura organizacional, recursos materiales, financieros y humanos, en este último caso, debidamente capacitados para evaluar, medir y, en general, monitorear la calidad de esta agua y la dimensión exacta de su contaminación. La degradación y contaminación de los mantos acuíferos le impone al legislador y a las administraciones públicas la tarea urgente e impostergable de protegerlos. La contaminación de las aguas subterráneas puede ser directa o indirecta, lo es del primer tipo cuando se introducen directamente las sustancias contaminantes en el acuífero como el caso de los pozos negros o pozos de inyección, lo es del segundo tipo cuando con dilución se produce por contaminación de la recarga natural. Los agentes de contaminación pueden ser de muy diversa índole, esto es, minerales, orgánicos degradables (excretas y purinas), órganicos poco o no degradables (pesticidas, detergentes, hidrocarburos), biológicos (bacterias, virus, algas), radioactivos y gaseosos. La contaminación de los acuíferos depende de los condicionantes geológicos, hidráulicos y químicos de cada lugar o emplazamiento, por lo que está en función de factores locales razón por la cual se precisa del conocimiento de cada zona y del estudio de casos similares. Los orígenes de la contaminación de los acuíferos pueden ser de muy diversa índole, tales como los siguientes: a) contaminación por actividad doméstica, la cual es orgánica y biológica y nace de tanques sépticos, fugas del sistema de alcantarillado, vertido de aguas negras, a lo que se debe agregar el aumento de productos químicos de uso doméstico como los detergentes; b) contaminación por actividades agrícolas, tenemos aquí el uso de abonos artificiales a base de nitratos, fosfatos y potasa o naturales -a base de estiércol-, el riego con aguas residuales y de alta salinidad y el uso de pesticidas (insecticidas, herbicidas y plaguicidas); c) contaminación por la ganadería, esencialmente, es orgánica y biológica, similar a la doméstica pero más intensa cuando se trata de granjas intensivas; d) contaminación por aguas superficiales, cuando recargan y se encuentran, a su vez, contaminadas; e) contaminación por intrusión salina, se produce cuando las aguas marinas y saladas se introducen en las regiones costeras por la sobreexplotación, a través de pozos, de los acuíferos costeros; f) contaminación por actividades mineras – mineral –, se relaciona con evacuaciones de aguas de mina y lavaderos de mineral; g) contaminación por actividades industriales, este tipo es tan variado como el tipo de industria que la origina, siendo especialmente nocivas las provocadas por metales pesados provenientes de la industria metalúrgica, así como de las industrias químicas, petroquímicas de alimentos (sustancias orgánicas) y bebidas (detergentes); h) contaminación por actividades nucleares, aunque excepcional en nuestro medio, puede provenir de plantas de tratamiento de combustibles irradiados y de minerales radioactivos y de la actividad médica; i) contaminación a través de pozos mal construidos, los pozos pueden intercomunicar varios mantos acuíferos y cuando tienen entubamientos rotos o corroídos en niveles de aguas de mala calidad o que permiten la entrada de aguas superficiales pueden provocarla; j) contaminación a través del vertido de aguas residuales a través de pozos negros, tanques sépticos, fugas de la red de alcantarillado o vertido indiscriminado a las cuencas hidrográficas; k) contaminación por vertido de desechos sólidos, se produce cuando se construye un relleno sanitario en terrenos permeables o no impermeabilizados a través de los lixiviados; l) contaminación por pozos de inyección -forma de utilización del subsuelo como almacén de residuales- mal proyectados, construidos o utilizados…

… PROTECCIÓN DE LAS AGUAS SUBTERRÁNEAS. Por las características de la contaminación de los mantos acuíferos destinados al abastecimiento público y su difícil regeneración, las medidas para evitar la contaminación deben ser preventivas y protectoras, mediante la prohibición de ciertas actividades humanas en determinadas zonas u ordenando medidas de seguridad sobre ciertas actividades potencialmente contaminantes. Nuestro ordenamiento jurídico-administrativo (legislación, reglamentos y decretos) carece, lamentablemente, de una regulación precisa, clara y completa para la protección de los mantos acuíferos, zonas de recarga y áreas de captación de aguas subterráneas. En la legislación extranjera (v. gr. Ley de Aguas española 29/1985 del 2 de agosto) se prevén algunas potestades extraordinarias de intervención administrativa en la economía del agua que atañen directamente a la protección de los mantos acuíferos, en aras de lograr un aprovechamiento sostenido de los recursos hídricos, esto es, para garantizar una disponibilidad de agua en cantidad suficiente y calidad requerida para atender la necesidades humanas y ecológicas presentes y futuras.

Estas potestades administrativas extraordinarias, que deben ser admitidas en nuestro ordenamiento jurídico -pese a su falta de regulación- como implícitas en la competencia expresa y general de protección y conservación de las aguas subterráneas que tienen atribuidas el Estado y los entes descentralizados del sector hídrico, tienen sustento en la necesidad de lograr una utilización racional y equilibrada del agua. La escasez y degradación de las condiciones naturales del recurso hídrico imponen la posibilidad administrativa de adoptar tales medidas para evitar su agotamiento o deterioro irreversible y de superar, temporalmente, los efectos nocivos que pueda generar una crisis hídrica. Este tipo de medidas administrativas suponen diversas restricciones y controles drásticos sobre los múltiples usos o aprovechamientos de agua –en especial los generales o especiales de carácter privado- y sobre las actividades preexistentes que puedan afectar el recurso en cuanto se justifican en un interés público, por lo que no afectan el derecho de propiedad o la integridad del patrimonio.

En esencia, tales medidas deben ser reputadas como limitaciones de interés social que no vacían de contenido el derecho de propiedad o amplían el dominio público sobre las aguas subterráneas sin previa indemnización sino que moldean su contenido esencial por lo que deben ser soportadas, al tratarse de un sacrificio o una carga general, por todos los usuarios, los que, en último término, son los beneficiarios de éstas, en tanto están orientadas a corregir una situación coyuntural de carestía o contaminación inminente que afecta la economía del recurso hídrico en una zona determinada. Tales medidas administrativas de intervención, virtualmente contenidas en los artículos 32 de la Ley de Aguas de 1942 y 10° del Reglamento de Perforación y Explotación de Aguas Subterráneas (Decreto Ejecutivo No. 30387 del 29 de abril del 2002), pueden ser las siguientes:

  • a)Perímetros de protección de los mantos acuíferos: Una de los instrumentos más novedosos en la protección de los recursos hídricos es la definición de perímetros de protección para la conservación del recurso y de su entorno. Esta medida de intervención administrativa busca preservar la calidad y cantidad del agua contenida pero también de su continente, esto es, de la formación geológica denominada acuífero. Esa actividad consiste en proyectar y trazar sobre la superficie una demarcación bajo la que se asienta un acuífero o parte de éste, en la que se establece un régimen específico de utilización del dominio hidráulico –ordenación y restricción de las concesiones de agua preexistentes, impedimento de otorgar nuevas- y de control de las actividades e instalaciones que puedan afectarlo –a través de autorizaciones- (v. gr. minas, canteras; actividades urbanas que incluyan tanques sépticos, cementerios, rellenos sanitarios –almacenamiento, transporte y tratamiento de residuos sólidos y líquidos-; actividades agrícolas y ganaderas con depósito y distribución de fertilizantes y plaguicidas, riego con aguas residuales y granjas; actividades industriales con almacenamiento, transporte y tratamiento de hidrocarburos líquidos o gaseosos, productos químicos, farmacéuticos y radiactivos, industrias alimentarias y mataderos, etc.).

Evidentemente, la definición de perímetros por las autoridades nacionales –MINAE e ICAA- debe ser respetada por los gobiernos locales (Municipalidades) y el INVU (dada su competencia residual en materia de planificación urbana en ausencia de planes reguladores locales) para compatibilizar, desarrollar y reflejar efectivamente los condicionamientos establecidos en la definición de los perímetros de protección en la normativa contenida en los respectivos Planes Reguladores sobre los usos de suelo o de ordenación del territorio (v. gr. reglamento de zonificación, de construcciones, etc.). Obviamente, a lo anterior debe añadirse la protección alrededor de las áreas de captación (pozos -PPP: perímetros de protección de los pozos-, manantiales, nacientes, etc.-), mediante la definición de una zona alrededor en la que se prohíban o limiten determinadas actividades humanas regulándose o controlándose el uso del suelo.

La determinación del perímetro depende de la zona de captura o de carga del pozo (ZOC) y su extensión depende de las características y propiedades del área de captación y del terreno de recarga, puesto que, las normas no pueden ser iguales para el caso de terrenos permeables o fisurados que para los que tengan formaciones impermeables. La definición de perímetros debe conjugarse con la cartografía de vulnerabilidad o susceptibilidad natural de los mantos acuíferos de abastecimiento a las cargas de contaminación antrópica, en función de sus características hidrogeológicas y geoquímicas, ante problemas de contaminación antropogénica, lo que se logra mediante el levantado de mapas. Sendas medidas, perímetros de protección y la cartografía de vulnerabilidad son idóneas para poder reubicar a tiempo un determinado tipo de actividad, la fuente de abastecimiento o, en último término, introducir métodos e instrumentos técnicos para el tratamiento y disposición de los agentes contaminantes.

Las medidas a tomar a partir de los perímetros y cartografía de vulnerabilidad varían según se trate de una (a) área sin ocupación territorial, siendo útil para definir las actividades que en el futuro puedan instalarse o no; (b) áreas ya ocupadas, en cuyo caso se efectúa un mapeo de la vulnerabilidad natural y de las áreas con mayor susceptibilidad a la contaminación, pudiéndose, ante la amenaza de un índice elevado de contaminación, reubicar las actividades, las fuentes de abastecimiento e introducir tecnología para el tratamiento y disposición de contaminantes; (c) áreas ya contaminadas, para lo cual se podrán buscar fuentes alternas, evitar la propagación de las plumas de contaminación y, de ser posible, por su elevado costo, tratar las aguas del acuífero después de su extracción; (d) áreas para nuevas captaciones, supuesto en el cual se debe inventariar las actividades potencialmente contaminantes y el área de impacto de cada una de éstas…" A lo anterior cabe agregar, que a tono con la más moderna doctrina y los principios ambientales en boga, la legislación costarricense -entre las que están la Ley Orgánica del Ambiente y la Ley de Biodiversidad, por citar sólo las más recientes-, recoge una serie de criterios de interpretación, como el preventivo, el precautorio o indubio pro natura, el del interés público ambiental, y el de integración. De ellos, resultan especialmente significativos los dos primeros, y sobre los cuales se ha indicado lo siguiente:

"…Uno de los principios rectores del Derecho Ambiental lo constituye el precautorio o de evitación prudente. Este principio se encuentra recogido en la Conferencia de las Naciones Unidas sobre el Medio Ambiente y el Desarrollo o Declaración de Río, la cual literalmente indica “Principio 15.- Con el fin de proteger el medio ambiente, los Estados deberán aplicar ampliamente el criterio de precaución conforme a sus capacidades. Cuando haya peligro de daño grave e irreversible, la falta de certeza científica absoluta no deberá utilizarse como razón para postergar la adopción de medidas eficaces en función de los costos para impedir la degradación del medio ambiente”. En el ordenamiento jurídico interno la Ley de Biodiversidad (No. 7788 del 30 de abril de 1998), en su artículo 11 recoge como parámetros hermenéuticos los siguientes principios: “1.- Criterio preventivo: Se reconoce que es de vital importancia anticipar, prevenir y atacar las causas de la pérdida de biodiversidad o sus amenazas. 2.- Criterios precautorio o indubio pro natura: Cuando exista peligro o amenaza de daños graves o inminentes a los elementos de la biodiversidad y al conocimiento asociado con estos, la ausencia de certeza científica no deberá utilizarse como razón para postergar la adopción de medidas eficaces de protección”.

En el Voto de esta Sala No. 1250-99 de las 11:24 horas del 19 de febrero de 1999 (reiterado en los Votos Nos. 9773-00 de las 9:44 horas del 3 de noviembre del 2000, 1711-01 de las 16:32 horas del 27 de febrero del 2001 y 6322-03 de las 14:14 horas del 3 de julio del 2003) este Tribunal estimó lo siguiente: “(...) La prevención pretende anticiparse a los efectos negativos, y asegurar la protección, conservación y adecuada gestión de los recursos. Consecuentemente, el principio rector de prevención se fundamenta en la necesidad de tomar y asumir todas las medidas precautorias para evitar contener la posible afectación del ambiente o la salud de las personas. De esta forma, en caso de que exista un riesgo de daño grave o irreversible –o una duda al respecto-, se debe adoptar una medida de precaución e inclusive posponer la actividad de que se trate. Lo anterior debido a que en materia ambiental la coacción a posteriori resulta ineficaz, por cuanto de haberse producido ya las consecuencias biológicas socialmente nocivas, la represión podrá tener una trascendencia moral, pero difícilmente compensará los daños ocasionados en el ambiente”.

Posteriormente, en el Voto No. 3480-03 de las 14:02 horas del 2 de mayo del 2003, este Tribunal indicó que “Bien entendido el principio precautorio, el mismo se refiere a la adopción de medidas no ante el desconocimiento de hechos generadores de riesgo, sino ante la carencia de certeza respecto de que tales hechos efectivamente producirán efectos nocivos en el ambiente”. Para el caso de las aguas subterráneas contenidas en los mantos acuíferos y áreas de carga y descarga, el principio precautorio o de indubio pro natura, supone que cuando no existan estudios o informes efectuados conforme a las regla unívocas y de aplicación exacta de la ciencia y de la técnica que permitan arribar a un estado de certeza absoluta acerca de la inocuidad de la actividad que se pretende desarrollar sobre el medio ambiente o éstos sean contradictorios entre sí, los entes y órganos de la administración central y descentralizada deben abstenerse de autorizar, aprobar o permitir toda solicitud nueva o de modificación, suspender las que estén en curso hasta que se despeje el estado dubitativo y, paralelamente, adoptar todas las medidas tendientes a su protección y preservación con el objeto de garantizar el derecho a un ambiente sano y ecológicamente equilibrado.

En esencia, una gestión ambiental segura de las aguas subterráneas pasa por proteger el recurso antes de su contaminación o degradación" (Sala Constitucional, sentencia 2004-1923, ya citada).- Lo expuesto permite afirmar que en la especie, sí está de por medio un interés público preponderante, que se manifiesta en la necesidad de proteger el recurso hídrico, con todos los medio al alcance del país, y mediante la imposición de medidas razonables y pertinentes para evitar su deterioro o contaminación.- IX).- A estas alturas, la cuestión radica en determinar si es posible permitir cautelarmente, la continuación de todas o algunas de las labores extractivas en el Tajo Pedregal, o si por el contrario, con vistas a la protección de los mantos acuíferos que atraviesan el terreno y el interés público que ello encierra, debe denegarse.- La empresa presentó un Plan de Extracción Minero, elaborado por un geólogo; dos estudios hidrogeológicos (Losilla & Agudelo -2001- y Rodríguez y Gómez -2001), así como un "Plan de Gestión Ambiental" y su complementación, conforme a los cuales, señalan, se pueden mantener la explotación de la cantera, sin peligro para el recurso hídrico involucrado.- El último documento que se citó, contiene un "Mapa de Zonificación de áreas según su factibilidad de investigaciones hidrogeológicas de Rodríguez & Gómez (2001)", que es el siguiente:

Allí se indica que: "Zonas A, E y F sin inconvenientes para la explotación, Zonas C y G- Sujeta a investigación adicional; Zona B Sin inconveniente si se brinda fuente adicional de agua temporalmente; Zona D No se recomienda la explotación" (ver figura N º 3, folio 702 y explicación a folio 700, ambos de la medida cautelar).- Por tratarse de una materia altamente especializada y técnica, se optó por solicitar una terna de expertos al Colegio de Geólogos de Costa Rica, y de ella, se designó como perito, a un geólogo especialista en hidrogeología, para que con vista de esos documentos y del estudio del lugar, diera luz al respecto.- El profesional nombrado, licenciado Ernesto Echandi Echeverría, rindió su dictamen a finales de junio pasado, y en lo que interesa dijo:

"4- CONCLUSIONES: 4.1- En la zona donde se ubica el tajo del proyecto minero No. 1547 existen recursos de agua subterránea muy importante representados por los acuíferos Colima Superior y Colima Inferior. En ese sitio, el acuífero Colima Superior se encuentra muy cerca de la superficie y da origen a los manantiales de Puente Mulas, los que están siendo captados por el A y A. Este mismo acuífero es captado también en el sitio Puente Mulas, por medio de túneles y galerías. 4.2- Desde hace muchos años se comprobó que la extracción de materiales en el sector sur del tajo, estaba provocando el afloramiento del agua del acuífero Colima Superior. Existen informes al respecto desde el año 1978 realizados por SENAS y en el año 1980 por el Hidrogeólogo Daniel Mora, sin embargo, ni las instituciones estatales directamente involucradas en la problemática, ni las autoridades competentes, dieron seguimiento a las denuncias formuladas en esos momentos.

El A y A cuando se percató de la cantidad enorme de agua que afloraba en el tajo debido al desplazamiento de la cubierta superior del acuífero, se limitó a explotar el agua construyendo la infraestructura necesaria, pero sin tomar otras medidas de prevención futuras. 4.3- El acuífero Colima Superior mostraba naturalmente una vulnerabilidad alta en la zona de San Antonio de Belén, incluyendo el tajo Pedregal y Puente Mulas. La explotación de materiales rocosos desde el tajo, aumentó el grado de vulnerabilidad al eliminar parte de la cobertura natural del acuífero, además de los probables riesgos que aporta cualquier actividad antropogénica en el medio. 4.4- Debió de ocurrir un problema muy serio derivado por la contaminación del agua que se explota en Puente Mulas, bajo circunstancias que aún no están totalmente aclaradas, para que se tomara conciencia sobre la problemática existente en ese sitio y se iniciaran las acciones correctivas. 4.5- Como primera medida se suspendió el suministro de agua derivado de la Fuente Zamora obtenida de la galería construida en el tajo así como de la fuente 3; además se detuvo la explotación del tajo.

Además se realizaron diversos trabajos de investigación, que incluyeron los estudios hidrogeológicos de Losilla & Agudelo y de Rodríguez y Gómez. Los dos trabajos se apegan con rigurosidad al método científico, son muy acertados y completos, y permiten identificar las condiciones hidrogeológicas que prevalecen en la zona comprendida entre el tajo de Pedregal y Puente Mulas. Además explican con detalle las causas por las que afloró de manera artificial el agua en el tajo, y la alta vulnerabilidad que presenta el acuífero Colima Superior en esa zona. Las recomendaciones emanadas de ambos trabajos deberían de ser cumplidas en su totalidad, máxime si se considera la posibilidad de continuar con la explotación del tajo. 4.6. El Plan de Gestión Ambiental elaborado por el Dr. Allan Astorga Gatgens lo considero como muy acertado en la mayor parte de su contenido. De hecho, en lo que a la protección del recurso hídrico se refiere, acepta las recomendaciones emanadas de los estudios de los profesionales Losilla & Agudelo y Rodríguez y Gómez que son · Aislar el piso del tajo sobre el área de influencia de la galería de infiltración de Fuente Zamora con algún material impermeable que garantice la no infiltración de aguas de lluvia o encharcamientos sobre esa área mostradoa en el mapa de la figura Nº4: Zonas de vulnerabilidad a las captaciones de PM.

El material aislante puede ser un material geotextil de alta densidad y/o planche de concreto sobre una base de material arcilloso compactado. · Entubar o canalizar en concreto todas las aguas de escorrentía que lleguen y corran sobre el piso del tajo. El piso del tajo debe nivelarse adecuadamente para evitar encharcamientos de agua y cualquier otro líquido. La nivelación debe conducir las aguas de escorrentía o de derrames accidentales a cunetas de concreto que conduzcan el agua a uno o dos sitios de descarga al río Virilla. Éstos sitios de descarga al río deben hacerse a través de una estructura que disipe la energía hidráulica del agua y evite la erosión de la margen y cauce del río. · Debe garantizarse que todas las actividades de proceso y domésticas (aguas negras y servidas) que se utilizan en el tajo no produzcan desechos sólidos ni líquidos que estén en contacto con el área de influencia de captación de aguas de la galería de infiltración de Fuente Zamora.

Si esto no se puede garantizar, la actividad deberá trasladarse fuera del área de influencia delimitada en la figura Nº4. · Ninguna actividad contaminante doméstica o industrial debe ubicarse en la esquina NO del patio del tajo, en la base del nuevo frente de explotación, donde hay indicios por la red de flujos local de la figura Nº12, que existe una dirección de flujo de aguas subterráneas hacia las captaciones de PM. · El canal Oeste que descarga las aguas subterráneas que afloran en el frente de explotación central y Este del tajo, deben protegerse, y ninguna actividad de servicios (cargar o descargar agua de camiones cisterna), proceso industrial o doméstica debe hacerse en una franja de 10 m del borde de su cauce, hasta unos 50 m antes de su descarga en el río Virilla, a partir de donde debe entubarse para su descarga al río a través de una estructura disipadora de energía hidráulica adecuada.

Debe garantizarse que las aguas de escorrentía no lleguen al canal de descarga de aguas subterráneas. Las aguas subterráneas que descargan al canal podrían captarse posteriormente para su uso en consumo humano. · Estudiar y diseñar un escudo y dique protector del talud de la margen derecha del río Virilla al lado Este del patio del tajo para evitar la erosión del talud del río y la inundación del sector Este del patio durante las crecidas del río Virilla. La altura de este escudo / dique, debe ser al menos hasta la cota 876 m snm, pensando en una avenida extraordinaria del río que pueda contaminar subterráneamente la galería de infiltración de Fuente Zamora y los nuevos afloramientos en el frente de Todas estas obras deben tener estudios hidrogeológicos, hidrológicos y geológicos y tener planos de diseño antes de su construcción. No deben improvisarse. · Las aguas de la galería de infiltración de la Fuente Zamora deben monitorearse en calidad y cantidad, así como tratarse (desinfección y filtrado para retener /absorber otras posibles sustancias tóxicas) en forma independiente de las demás fuentes de la estación de bombeo de PM. · El tanque de captación de la galería de Fuente Zamora y su acceso debe ser restringido y protegido. · Los pozos de la red de piezómetros ejecutados deben ser idos con la construcción de un pequeño brocal de cemento y tapa, para evitar la entrada de agua de escorrentía y otra sustancias que puedan contaminar el acuífero y para su uso en estudios posteriores; o deben ser rellenados con arena fina cuando estos ya no sean necesarios. 4.7- Al evaluar la información relativa al Plan de extracción preparado por el Geólogo Emilio Garro Rojas, así como el documento técnico preparado por el Dr. Allan Astorga Gatgens (2003), llamado Complementación Ambiental del Plan de Extracción del Tajo Pedregal, compruebo que se propone una explotación por etapas, explotando al inicio los bloques A, E, y F y que en los demás casos, se irá desarrollando estudios hidrogeológicos detallados para descartar o incluir otros bloques, según se vaya concluyendo.

No obstante considero y recomiendo lo siguiente: Primero: Conforme a mi criterio profesional, es posible explotar el tajo sin riesgo de daño al recurso hídrico, siempre y cuando en la continuación de los trabajos de explotación del tajo se apliquen rigurosamente y desde el inicio las recomendaciones emanadas de los estudios hidrogeológicos de Losilla & Agudelo y Rodríguez Gómez. Segundo: Para cada sitio de extracción propuesto por Rodríguez y Gómez, se debe de efectuar un estudio detallado relacionado con las condiciones hidrogeológicas que señala el estudio de Losilla & Agudelo, considerando entre otros aspectos la profundidad del nivel freático, la dirección de las líneas de flujo y los riesgos de afección de la calidad del agua, de manera que se garantice una protección permanente del recurso hídrico con relación a las captaciones que mantiene el Instituto Costarricense de Acueductos y Alcantarillados en Puente Mulas" Al Tribunal le merece fe ese informe, por provenir de un experto calificado en la materia, y además, porque éste pudo explicar personalmente sus observaciones durante el reconocimiento judicial efectuado en autos, tal y como consta en el vídeo que se elaboró al efecto, cuya copia se encuentra en poder de cada una de las partes, y a cuyo contenido pudieron referirse también en su oportunidad.- Las apreciaciones del perito, además, están respaldadas por estudios hidrogeológicos de data reciente, efectuados por otros profesionales del ramo, de manera que sí constituyen un sustento técnico y científico suficiente, para decidir la cuestión planteada.- Es criterio del Despacho, que si se cumplen a cabalidad las condiciones establecidas en tales estudios, más las recomendaciones del licenciado Echandi, sí es posible conceder, al menos en parte, la cautelar pedida, según se explica de seguido..- X).- Partiendo de la zonificación indicada en el Considerando anterior, se advierte que la los estudios que constan en autos-, sólo podría darse en las zonas designadas como A, E y F, pero este órgano estima que para mayor seguridad, y para los efectos de esta medida, debe tomarse en cuenta que las labores de extracción deben darse lo más lejos posible del afloramiento y de la Fuente Zamora, y además, a la mayor distancia de la margen del Río Virilla.

Con lo cual, los trabajos deberán reducirse a la zona del Sector Oeste de la concesión, denominada como "F", únicamente, y de acuerdo con los Planes y estudios indicados.- Tal y como lo la eficacia de la cautelar queda sujeta, en beneficio del interés público, a las siguientes condiciones: i. El cumplimiento del Plan de Gestión Ambiental que de forma voluntaria diseñaron las actoras (ASTORGA 2003); ii. El cumplimiento del Plan de Extracción minero planteado por la actora, Productos Pedregal.S.A. (Garro 2002)".- Las accionantes deberán permitir de forma irrestricta, el acceso a los funcionarios de la Dirección de Geología y Minas o cualesquiera otra Oficina del Ministerio de Ambiente y Energía, del Servicio de Aguas Subterráneas, Riego y Avenamiento (SENARA) y del Instituto Costarricense de Acueductos y Alcantarillados, a sus instalaciones, a fin de verificar el respeto de las condiciones indicadas, y quienes en caso de incumplimiento de cualesquiera de las condiciones aquí previstas, deberán hacerlo saber fundadamente al Tribunal, para determinar lo que corresponda respecto de la actividad indicada.- La empresa deberá además, rendir a esos órganos, un informe mensual sobre el avance de los trabajos que se lleven a cabo, a fin de prevenir cualquier riesgo de contaminación.- Adicionalmente se aclara que el inicio de cualquier labor queda sujeto no sólo al cumplimiento de lo ya indicado, sino también a la existencia de los permisos de funcionamiento del Ministerio de Salud, conforme a la legislación sanitaria correspondiente.-

POR TANTO:

Se declara parcialmente con lugar la solicitud de medida cautelar interpuesta por las demandantes.- Se suspende la ejecución de las resoluciones de la Dirección de Geología y Minas, Registro Nacional Minero, números 590 de las quince horas treinta minutos del tres de agosto de dos mil uno -en cuanto ordenó la paralización de toda actividad en los terrenos de la concesión minera Nº1547-, y 451 de las trece horas diez minutos del dieciséis de julio del dos mil dos -que canceló esa concesión-, así como las que de ellas dependen.- Se autoriza a la concesionaria para realizar labores de extracción en el inmueble, únicamente en la "Zona F" del Sector Oeste, según consta en el "Mapa de Zonificación de áreas según factibilidad de explotación mineral en el Tajo Pedregal, obtenido a partir de las investigaciones hidrogeológicas de RODRÍGUEZ & GÓMEZ (2001)", siempre y cuando ello se haga con absoluto arreglo a los estudios hidrogeológicos de Losilla & Agudelo (2001), Rodríguez & Gómez (2001), "Plan de Extracción Minero" (Garro 2002), y el "Plan de Gestión Ambiental y su Complementación" Astorga (2003), y las siguientes disposiciones, que deberán cumplir por su cuenta las empresas, en protección del recurso hídrico:

  • a)Aislar el piso del tajo sobre el área de influencia de la galería de la Fuente Zamora con algún material impermeable que garantice la no infiltración de aguas de lluvia o encharcamientos sobre esa área mostrada en el mapa de la figura Nº 4: Zonas de vulnerabilidad a las captaciones de PM. El material aislante puede ser un material geotextil de alta densidad y/o planche de concreto sobre una base de material arcilloso compactado.
  • b)Entubar o canalizar en concreto todas las aguas de escorrentía que lleguen y corran sobre el piso del tajo, el que debe aplanarse adecuadamente para evitar encharcamientos de agua y cualquier otro líquido. La nivelación debe conducir las aguas de escorrentía o de derrames accidentales a cunetas de concreto que conduzcan el agua a uno o dos sitios de descarga al río Virilla. Éstos sitios de descarga al río deben hacerse a través de una estructura que disipe la energía hidráulica del agua y evite la erosión de la margen y cauce del río.
  • c)Debe garantizarse que todas las actividades de proceso y domésticas (aguas negras y servidas) que se utilizan en el tajo no produzcan desechos sólidos ni líquidos que estén en contacto con el área de influencia de captación de aguas de la galería de infiltración de Fuente Zamora.
  • d)Ninguna actividad contaminante doméstica o industrial debe ubicarse en la esquina Noroeste del patio del tajo, en la base del nuevo frente de explotación, donde hay indicios por la red de flujos local de la figura Nº12, que existe una dirección de flujo de aguas subterráneas hacia las captaciones de PM.
  • e)El canal Oeste que descarga las aguas subterráneas que afloran en el frente de explotación central y Este del tajo, deben protegerse, y ninguna actividad de servicios (cargar o descargar agua de camiones cisterna), proceso industrial o doméstica debe hacerse en una franja de 10 m del borde de su cauce, hasta unos 50 m antes de su descarga en el río Virilla, a partir de donde debe entubarse para su descarga al río a través de una estructura disipadora de energía hidráulica adecuada. Debe garantizarse que las aguas de escorrentía no lleguen al canal de descarga de aguas subterráneas. Las aguas subterráneas que descargan al canal podrían captarse posteriormente para su uso en consumo humano.
  • f)Estudiar y diseñar un escudo y dique protector del talud de la margen derecha del río Virilla al lado Este del patio del tajo para evitar la erosión de la ladera del río y la inundación del sector Este del patio durante las crecidas del río Virilla. La altura de este escudo / dique, debe ser al menos hasta la cota 876 m snm, pensando en una avenida extraordinaria del río que pueda contaminar subterráneamente la galería de infiltración de Fuente Zamora y los nuevos afloramientos en el frente de explotación Este del tajo.
  • g)Todas estas obras deben tener estudios hidrogeológicos, hidrológicos y geológicos y tener planos de diseño antes de su construcción. No deben improvisarse.
  • h)Las aguas de la galería de infiltración de la Fuente Zamora deben monitorearse en calidad y cantidad, así como tratarse (desinfección y filtrado para retener /absorber otras posibles sustancias tóxicas) en forma independiente de las demás fuentes de la estación de bombeo de PM.
  • i)El tanque de captación de la galería de Fuente Zamora y su acceso debe ser restringido y protegido.
  • j)Los pozos de la red de piezómetros ejecutados deben ser protegidos con la construcción de un pequeño brocal de cemento y tapa, para evitar la entrada de agua de escorrentía y otra sustancias que puedan contaminar el acuífero y para su uso en estudios posteriores; o deben ser rellenados con arena fina cuando estos ya no sean necesarios.
  • k)Para el sitio de extracción propuesto por Rodríguez y Gómez, para la "Zona F" indicada -única en la que se permite la extracción de material no metálico-, se debe de efectuar un estudio detallado relacionado con las condiciones hidrogeológicas que señala el estudio de Losilla & Agudelo, considerando entre otros aspectos la profundidad del nivel freático, la dirección de las líneas de flujo y los riesgos de afección de la calidad del agua, de manera que se garantice una protección permanente del recurso hídrico con relación a las captaciones que mantiene el Instituto Costarricense de Acueductos y Alcantarillados en Puente Mulas.

Adicionalmente, las empresas deberán permitir de forma irrestricta, el acceso a los funcionarios de la Dirección de Geología y Minas o cualesquiera otra Oficina del Ministerio de Ambiente y Energía, del Servicio de Aguas Subterráneas, Riego y Avenamiento (SENARA) y del Instituto Costarricense de Acueductos y Alcantarillados, a todas sus instalaciones, en cualquier momento, a fin de verificar el respeto de las condiciones indicadas, y quienes en caso de incumplimiento de cualesquiera de ellas, deberán hacerlo saber fundadamente al Tribunal, para determinar lo que corresponda respecto de la actividad indicada.- Deberán las demandantes, además, rendir a esos órganos, un informe mensual sobre el avance de las actividades que se lleven a cabo, a fin de prevenir cualquier riesgo de contaminación.- Finalmente, se aclara, que el inicio de cualquier labor queda sujeto no sólo al cumplimiento de lo ya indicado, sino también a la existencia de los permisos de funcionamiento del Ministerio de Salud, conforme a la legislación sanitaria correspondiente y que lo aquí dispuesto es sin perjuicio de las potestades generales que confiere la legislación nacional a todas las entidades y órganos encargados de velar por la protección de los recursos ambientales de la Nación.- Notifíquese esta resolución a las partes y comuníquese íntegramente al Ministro de Ambiente y Energía, a la Secretaría Técnica Nacional Ambiental (SETENA), a la Dirección de Geología y Minas, Registro Nacional Minero, al Servicio Nacional de Aguas Subterráneas, Riego y Avenamiento (SENARA) y al Presidente Ejecutivo del Instituto Costarricense de Acueductos y Alcantarillados (ICAA).- Sonia Ferrero Aymerich Cristina Víquez Cerdas Hubert Fernández Argüello Incidente de Medida Cautelar Productos Pedregal S.A. c/ El Estado Aartavia

Document not found. Documento no encontrado.

Implementing decreesDecretos que afectan

    TopicsTemas

      Concept anchorsAnclajes conceptuales

        Spanish key termsTérminos clave en español

        This document cites

        • Ley 6227 General Public Administration Law
        • Ley 3667 Law Regulating the Contentious-Administrative Jurisdiction

        Este documento cita

        • Ley 6227 Ley General de la Administración Pública
        • Ley 3667 Ley Reguladora de la Jurisdicción Contencioso Administrativa

        News & Updates Noticias y Actualizaciones

        All articles → Todos los artículos →

        Weekly Dispatch Boletín Semanal

        Field reporting and policy analysis from Costa Rica's forests. Reportajes y análisis de política desde los bosques de Costa Rica.

        ✓ Subscribed. ✓ Suscrito.

        One email per week. No spam. Unsubscribe in one click. Un correo por semana. Sin spam. Cancela en un clic.

        Or WhatsApp channelO canal de WhatsApp →
        Coalición Floresta © 2026 · All rights reserved © 2026 · Todos los derechos reservados

        Stay Informed Mantente Informado

        Conservation news and action alerts, straight from the field Noticias de conservación y alertas de acción, directo desde el campo

        Email Updates Actualizaciones por Correo

        Weekly updates, no spam Actualizaciones semanales, sin spam

        Successfully subscribed! ¡Suscripción exitosa!

        WhatsApp Channel Canal de WhatsApp

        Join to get instant updates on your phone Únete para recibir actualizaciones instantáneas en tu teléfono

        Join Channel Unirse al Canal
        Coalición Floresta Coalición Floresta © 2026 Coalición Floresta. All rights reserved. © 2026 Coalición Floresta. Todos los derechos reservados.
        🙏