Res. 34759-2026 Sala Constitucional · Sala Constitucional · 10/09/2026
OutcomeResultado
The Chamber ordered the Municipality of Quepos to deliver, within a non-extendable ten-day period, the copy of the file requested on 15 June 2026, subject to protection of restricted data and payment of reproduction costs by the requester; it ordered that municipality to pay costs and damages, rejected the claim concerning information already supplied, and denied the amparo as to the Municipality of Pérez Zeledón.La Sala ordenó a la Municipalidad de Quepos entregar en diez días improrrogables la copia del expediente solicitada el 15 de junio de 2026, con resguardo de datos protegidos y a costo del interesado, condenó a esa municipalidad al pago de costas, daños y perjuicios, rechazó el reclamo sobre la información ya suministrada y declaró sin lugar el recurso respecto de la Municipalidad de Pérez Zeledón.
SummaryResumen
The Constitutional Chamber (Sala Constitucional) partially granted an amparo proceeding concerning a request for information about the Puente Pico project in Lagunas de Savegre, Quepos. The request covered construction permits, terracing, earthworks, land-use changes, inspections, studies, technical opinions, and a copy of the file linked to CFIA code OC-1202623. The Chamber found the claim concerning the general information inadmissible because the Municipality of Quepos had supplied that information before being notified of the order admitting the amparo for processing. However, when judgment was issued, the record did not establish that the municipality had actually delivered the copy of the file requested on 15 June 2026. The Chamber therefore ordered the mayor of Quepos to provide it within a non-extendable ten-day period, protecting sensitive and restricted-access data; the requester must bear any reproduction costs. It also ordered the municipality to pay costs and resulting damages, to be assessed in enforcement proceedings before the administrative-litigation jurisdiction. The amparo was denied as to the Municipality of Pérez Zeledón.La Sala Constitucional declaró parcialmente con lugar el recurso de amparo relacionado con una solicitud de información sobre el proyecto Puente Pico, en Lagunas de Savegre, Quepos. La gestión comprendía permisos de construcción, terraceos, movimientos de tierra, cambios de uso del suelo, inspecciones, estudios, pronunciamientos técnicos y una copia del expediente vinculado al código CFIA OC-1202623. La Sala consideró improcedente el reclamo relativo a la información general porque la Municipalidad de Quepos la había suministrado antes de ser notificada de la resolución que dio curso al amparo. Sin embargo, al momento de dictarse la sentencia no constaba la entrega efectiva de la copia del expediente solicitada el 15 de junio de 2026. Por ello, ordenó a la alcaldesa de Quepos entregarla en diez días improrrogables, salvaguardando datos sensibles y de acceso restringido; los costos de reproducción corresponden al interesado. Además, condenó a esa municipalidad al pago de costas, daños y perjuicios. El recurso fue declarado sin lugar respecto de la Municipalidad de Pérez Zeledón.
Key excerptExtracto clave
As to the copy of the file requested on 15 June 2026, the amparo is well-founded because, to date, there is no evidence that it has been delivered; this is so even though, since 23 July of this year, the respondent authority had informed the amparo applicant that “a copy of the administrative file will be prepared because it must be certified by the secretary of the Municipal Council, No. MQ-UDI-CONST-PC-327-2025, associated with CFIA project OC-1 CED01 and MQ-UDI-PC-098-2026.” Accordingly, the amparo is granted, with the consequences specified in the operative part of this judgment. As to the Municipality of Pérez Zeledón, the amparo is inadmissible because, at the applicant’s request, the amparo proceeding was directed solely against the Municipality of Quepos. The amparo is granted solely with respect to the copy of the file requested on 15 June 2026. Patricia Bolaños Murillo, in her capacity as mayor of the Municipality of Quepos, or whoever holds that office, is ordered to provide the person protected by the amparo with the copy of the file requested on 15 June 2026, within the non-extendable period of TEN DAYS counted from notification of this judgment. If the requested copies entail any cost, it shall be borne by the interested party. The information must be provided while safeguarding any sensitive and restricted-access data protected by Article 24 of the Political Constitution and the Law on the Protection of Individuals regarding the Processing of their Personal Data, Law No. 8968.En cuanto a la copia del expediente que solicitó el 15 de junio de 2026 el recurso deviene procedente toda vez que a la fecha no consta que le haya sido entregado; lo anterior a pesar de que desde el 23 de julio del año en curso la autoridad recurrida le indicó al recurrente que “se estará preparando copia del expediente administrativo en virtud de que este debe ser certificado por la secretaria del Concejo Municipal N° MQ-UDI-CONST-PC-327-2025, asociado al proyecto CFIA OC-1 CED01 el MQ-UDI-PC-098-2026”. Así las cosas se declara con lugar el recurso con las consecuencias que se indican en la parte dispositiva de esta sentencia. En cuanto a la Municipalidad de Pérez Zeledón el recurso deviene improcedente; lo anterior porque a solicitud del recurrente el recurso de amparo era dirigido únicamente contra la Municipalidad de Quepos. Se declara con lugar el recurso únicamente por la copia del expediente solicitado el 15 de junio de 2026 . Se ordena a Patricia Bolaños Murillo, en su condición de Alcaldesa de la Municipalidad de Quepos o a quien ocupe el cargo que, dentro del plazo improrrogable de DIEZ DÍAS contado a partir de la notificación de esta sentencia, le brinde al amparado la copia del expediente solicitado el 15 de junio de 2026. En caso de incurrirse en algún costo producto de las copias requeridas, el mismo correrá a cargo de la parte interesada. La información deberá facilitarse salvaguardando eventuales datos sensibles y de acceso restringido protegidos por el artículo 24 de la Constitución Política, y la Ley de Protección de la Persona frente al Tratamiento de sus Datos Personales, Ley Nº 8968.
Pull quotesCitas destacadas
"Improcedente en cuanto a la solicitud de información referente a la existencia de permisos de construcción, terraceo, movimientos de tierra, cambios en uso de suelo, entre otros toda vez que se demostró que la información fue dada con antelación a la notificación de la resolución de curso del presente amparo."
"The claim concerning the request for information about construction permits, terracing, earthworks, land-use changes, and related matters is inadmissible because it was established that the information had been supplied before notification of the order admitting this amparo for processing."
Considerando III
"Improcedente en cuanto a la solicitud de información referente a la existencia de permisos de construcción, terraceo, movimientos de tierra, cambios en uso de suelo, entre otros toda vez que se demostró que la información fue dada con antelación a la notificación de la resolución de curso del presente amparo."
Considerando III
"En cuanto a la Municipalidad de Pérez Zeledón se declara sin lugar el recurso."
"As to the Municipality of Pérez Zeledón, the amparo is denied."
Por tanto
"En cuanto a la Municipalidad de Pérez Zeledón se declara sin lugar el recurso."
Por tanto
"Se condena a la Municipalidad de Quepos al pago de las costas, daños y perjuicios causados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso administrativo."
"The Municipality of Quepos is ordered to pay the costs and damages caused by the facts underlying this ruling, which shall be assessed in enforcement proceedings before the administrative-litigation jurisdiction."
Por tanto
"Se condena a la Municipalidad de Quepos al pago de las costas, daños y perjuicios causados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso administrativo."
Por tanto
Full documentDocumento completo
EV Template Generation: D:\Gestion-Judicial\Servidor de Archivos\MODELOS\S4SENAMH001.dpj Case: 26-025386-0007-CO Decision No. 2026034759 CONSTITUTIONAL CHAMBER (SALA CONSTITUCIONAL) OF THE SUPREME COURT OF JUSTICE. San José, at 9:20 a.m. on 10 September 2026.
Amparo proceeding filed by Nombre01, identity card CED02, against the MUNICIPALITY OF PÉREZ ZELEDÓN and the MUNICIPALITY OF QUEPOS.
Background:
Justice Cruz Castro drafts the decision; and, Reasons:
The applicant alleges that, on 10 November 2025, he submitted an information request addressed to the local governments of Pérez Zeledón and Quepos, in which he requested the following: “(...) information concerning the existence of construction permits, terracing, earthworks, land-use changes, among other matters. We would also appreciate being informed whether there are any pending procedures, records of inspections, studies, or technical opinions issued by these municipalities in relation to those properties (sic) (...)”. The foregoing concerned the project called “Puente Pico,” developed on the properties identified by cadastral plan P-0583839- 1985, in the area of Lagunas, Savegre, Quepos. In the absence of a response, a follow-up email was sent on 6 February 2026 to the respondent municipalities at the following addresses: ...04 and ...03. On 15 June 2026, a second follow-up email was sent by the same means to the same addresses.
It again requested that updated information be sent and further specified that the administrative case file processed before the Secretaría Técnica Nacional Ambiental (SETENA) showed that the property addressed in the inquiry is registered in Puntarenas and therefore falls within the jurisdiction of the Municipality of Quepos. Consequently, a copy of the construction case file identified as No. OC-1202623 was expressly requested, and the initial request concerning the entire property was also reiterated. He complains that, as of the date this proceeding was filed, he had received neither a response to his request nor access to the requested information.
The following facts are deemed duly established and relevant to the decision in this matter, either because they have been proven or because the respondent authority failed to address them:
The reports submitted by the respondent authorities, which were given under the solemnity of an oath and with the legal consequences that this entails, show that on 10 November 2025—reiterated on 06 February 2026—the applicant sent an information request addressed to the local governments of Pérez Zeledón and Quepos, in which he requested the following: “(...) information concerning the existence of construction permits, terracing, earthworks, land-use changes, among other matters. We would also appreciate being informed whether there are any pending procedures, records of inspections, studies, or technical opinions issued by these municipalities in relation to those properties (sic) (...)”—information concerning the project called “Puente Pico,” developed on the properties identified by cadastral plan PRN01, in the area of Lagunas, Savegre, Quepos. It was established that, through official letter MQ-AJ-ALC-OAJ-326-2026, served on 23 July 2026, the Municipality of Quepos responded to the information request made by the applicant, attaching official letters MQ-UBI-098-2026 from the Real Property Unit and MQ-UDI-124- 2026 from the Infrastructure Management Department.
It was shown that, through official letter OFI-0714-25-ACO dated 17 November 2026, Yendry Quesada Sancho, Acting Coordinator, informed the Mayor as follows: “SUBJECT: RESPONSE TO OFI-3078-25-DAM, INQUIRY FROM Nombre01. Dear Sir: Please accept my cordial greetings. In response to the inquiry submitted by the person subject to the Administration and to the matter stated in the subject line, requesting information concerning procedures related to: Land-Use Certificates Municipal Alignments Construction Permits Closures Other Matters Concerning the property: PRN02, bearing cadastral plan PRN03. We hereby inform you as follows: No Municipal Construction Licenses are recorded. No Land-Use Certificates are recorded. No Municipal Alignments are recorded. Pending proceedings for violations of Ley de Construcciones No. 833 are recorded under case file ADM-0316-25-ACO. The foregoing is provided as information to be furnished to the person subject to the Administration under the parameters of the submitted inquiry.” It was verified that, through official letter OFI3178-25-DAM dated 20 November 2025, the Municipality of Pérez Zeledón responded to the applicant, stating: “I refer to the communication that you submitted to this Office concerning a request for information regarding the Puente Pico project.
In that regard, document OFI-0714-25-ACO, signed by Ms. Yendry Quesada Sancho, Acting Construction Control Coordinator, is hereby forwarded”—email sent on 20 November 2025 to email addresses ...01 and ...02, the addresses for service provided by the applicant. It was verified that, on 15 June 2026, the applicant sent the following request by email: “I am sending this communication to follow up on this matter because we have received no response since it was submitted in early November of last year or to the follow-up email sent in February. In view of the evident delay, we request that the requested information, updated as of the present date, be sent to us. Furthermore, based on information submitted to the SETENA case file by the project developer, we have learned that the property addressed in the inquiry was allegedly registered in the Province of Puntarenas and therefore falls entirely within this Municipality’s authority.
In view of the foregoing and the existence of a construction case file numbered OC-1202623, we would appreciate receiving a copy thereof. Likewise, in view of the foregoing, we would appreciate receiving the information initially requested concerning the entire property”—request sent to email addresses ...04 and ...03. It was verified that, through official letter MQ-UDI-124-2026 dated 17 July 2026, the Development and Infrastructure Department of the Municipality of Quepos informed the applicant as follows: “In response to your request submitted on 10 November 2025, as well as the follow-up emails sent on 06 February 2026 and 15 June 2026, through which you request information related to the property identified by cadastral plan PRN03 and owned by Puente Pico Limitada, this department reviewed the institutional records, the Integrated Municipal Management System (SIGRAMU), and the Construction Project Administration system (APC) of the Colegio Federado de Ingenieros y de Arquitectos de Costa Rica (CFIA).
As a result of that review, it is reported that the following construction permits are recorded for the aforementioned property: 1. Construction permit processed through APC (CFIA): Municipal permit: MQ-UDI-CONST-PC-327-2025. CFIA project code: OC-1202623. Approval date: 02 December 2025. Cadastral plan: P-583839-1 985. Authorized work: Construction of storage facilities using containers. Construction area: 60,00 m2. 2. Construction permit processed physically as minor work: Municipal permit: MQ-UDI-PC-098-2026. Approval date: 19 May 2026. Cadastral piano: P-583839-1985. Authorized work: Construction of a dry toilet. Construction area: 6,70 m2. You are further advised that, after reviewing the records administered by this unit, no permits, procedures, or case files were found concerning earthworks, terracing, modifications to land use, inspections, technical opinions, or additional administrative proceedings associated with the property addressed in the inquiry, other than the construction permits described above.
In response to your request for access to administrative information, a copy of the administrative case file will be prepared because it must be certified by the secretary of the Municipal Council, N° MQ-UDI-CONST-PC-327-2025, associated with CFIA project OC-1 CED01, and MQ-UDI-PC-098-2026, which is contained in this unit’s records. The foregoing responds to the requested information contained in the administrative records within this unit’s authority, in accordance with the documentation existing as of the date this official letter was issued”—official letter served on the applicant on 23 July 2026. It was verified that, on 21 August 2026, the decision admitting the proceeding was served on the respondent authorities. In conclusion, it is true that the applicant submitted a request to the Municipality of Pérez Zeledón for information related to the project called “Puente Pico.” For its part, the respondent authority demonstrated that, through official letter MQ-UDI-124-2026 dated 17 July 2026, it provided the applicant with the requested information.
Specifically, the applicant requested “information concerning the existence of construction permits, terracing, earthworks, land-use changes, among other matters. We would also appreciate being informed whether there are any pending procedures, records of inspections, studies, or technical opinions issued by these municipalities in relation to those properties (sic) (...)” and subsequently requested a copy of case file number OC-1202623. Based on the foregoing and taking into account that the respondent authority informed the applicant that “the following construction permits are recorded for the aforementioned property: 1. Construction permit processed through APC (CFIA): Municipal permit: MQ-UDI-CONST-PC-327-2025. CFIA project code: OC-1202623. Approval date: 02 December 2025. Cadastral plan: P-583839-1 985. Authorized work: Construction of storage facilities using containers. Construction area: 60,00 m2. 2.
Construction permit processed physically as minor work: Municipal permit: MQ-UDI-PC-098-2026. Approval date: 19 May 2026. Cadastral piano: P-583839-1985. Authorized work: Construction of a dry toilet. Construction area: 6,70 m2. You are further advised that, after reviewing the records administered by this unit, no permits, procedures, or case files were found concerning earthworks, terracing, modifications to land use, inspections, technical opinions, or additional administrative proceedings associated with the property addressed in the inquiry, other than the construction permits described above,” and that “In response to your request for access to administrative information, a copy of the administrative case file will be prepared because it must be certified by the secretary of the Municipal Council, N° MQ-UDI-CONST-PC-327-2025, associated with CFIA project OC-1 CED01, and MQ-UDI-PC-098-2026, which is contained in this unit’s records,” the proceeding is partially well-founded.
It is unfounded insofar as it concerns the request for information regarding the existence of construction permits, terracing, earthworks, land-use changes, among other matters, because it was demonstrated that the information was provided before service of the decision admitting this amparo proceeding. As to the copy of the case file requested on 15 June 2026, the proceeding is well-founded because the record does not show that it has been delivered to him as of this date, despite the fact that, since 23 July of this year, the respondent authority had informed the applicant that “a copy of the administrative case file will be prepared because it must be certified by the secretary of the Municipal Council, N° MQ-UDI-CONST-PC-327-2025, associated with CFIA project OC-1 CED01, and MQ-UDI-PC-098-2026.” Accordingly, the proceeding is granted, with the consequences stated in the operative portion of this judgment. As to the Municipality of Pérez Zeledón, the proceeding is unfounded because, at the applicant’s request, the amparo proceeding was directed solely against the Municipality of Quepos.
The applicant is advised that, if any paper document was submitted, as well as any objects or evidence contained on an additional electronic, computer, magnetic, optical, or telematic device or produced through new technologies, these must be retrieved from the court office within a maximum period of 30 business days following service of this judgment. Otherwise, any material not retrieved within that period will be destroyed pursuant to the «Reglamento sobre Expediente Electrónico ante el Poder Judicial», approved by the Full Court at session No. 27-11 of 22 August 2011, Article XXVI, and published in Boletín Judicial No. 19 of 26 January 2012, as well as the resolution approved by the Consejo Superior del Poder Judicial at session No. 43-12 held on 3 May 2012, Article LXXXI.
Therefore:
The proceeding is granted solely with respect to the copy of the case file requested on 15 June 2026. Patricia Bolaños Murillo, in her capacity as Mayor of the Municipality of Quepos, or whoever holds that office, is ordered, within the non-extendable period of TEN DAYS following service of this judgment, to provide the person whose rights are protected by the amparo with the copy of the case file requested on 15 June 2026. If the required copies entail any cost, it shall be borne by the interested party. The information must be provided while safeguarding any sensitive and restricted-access data protected by Article 24 of the Political Constitution and the Ley de Protección de la Persona frente al Tratamiento de sus Datos Personales, Ley Nº 8968. The respondent authority is warned that, pursuant to Article 71 of the Ley de esta Jurisdicción, any person who receives an order issued in an amparo proceeding that the person must comply with or enforce and who fails to comply with or enforce it shall be punished by imprisonment for three months to two years or by a fine of twenty to sixty days, provided that the offense is not subject to a more severe penalty.
The Municipality of Quepos is ordered to pay the legal costs and the damages and losses caused by the facts underlying this ruling, which shall be quantified in enforcement-of-judgment proceedings before the administrative-litigation jurisdiction. As to the Municipality of Pérez Zeledón, the proceeding is denied. Let notice be given.
Fernando Castillo V.
President Fernando Cruz C.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.
CASE N° 26-025386-0007-CO Telephone numbers: 2549-1500 / 800-SALA-4TA (800-7252-482). Fax: 2220-4607 / 2220-4844. Website: www.poder-judicial.go.cr/salaconstitucional. Address: (Dirección01).
EV Generación de Machote: D:\Gestion-Judicial\Servidor de Archivos\MODELOS\S4SENAMH001.dpj SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del diez de setiembre de dos mil veintiseis .
Recurso de amparo presentado por Nombre01, cédula de identidad CED02, contra la MUNICIPALIDAD DE PÉREZ ZELEDÓN y la MUNICIPALIDAD DE QUEPOS.
Resultando:
Redacta el Magistrado Cruz Castro; y,
Considerando:
El recurrente alega que el 10 de noviembre de 2025, aportó una gestión de información dirigida a las gobiernos locales de Pérez Zeledón y Quepos, en la que requirió, lo siguiente: "(...) información referente a la existencia de permisos de construcción, terraceo, movimientos de tierra, cambios en uso de suelo, entre otros. Asimismo, se agradece se indique si existen trámites en curso, antecedentes de inspecciones, estudios o pronunciamientos técnicos emitidos por estas municipalidades en relación con dichas propiedades (sic) (...)". Lo anterior, en relación con el proyecto denominado "Puente Pico", desarrollado sobre las propiedades identificadas con plano catastrado P-0583839- 1985, en la zona de Lagunas, Savegre, Quepos. Ante la falta de respuesta, el 6 de febrero de 2026, se remitió correo electrónico de seguimiento dirigido a las municipalidades recurridas, a las direcciones: ...04 y ...03.
El 15 de junio de 2026, por el mismo medio, fue remitido a las mismas direcciones un segundo correo electrónico de seguimiento. En este, se solicitó nuevamente se remitiera la información actualizada y, además, se precisó que del expediente administrativo tramitado ante la Secretaría Técnica Nacional Ambiental (SETENA) se desprendía que el inmueble objeto de consulta pertenece registralmente a Puntarenas y, por ende, a la jurisdicción de la Municipalidad de Quepos. En consecuencia, se solicitó expresamente copia del expediente de construcción identificado con el No. OC-1202623, reiterando además la petición inicial respecto de la totalidad del inmueble. Acusa que, a la fecha de interposición del presente recurso, no ha recibido respuesta, a su gestión, ni acceso a la información solicitada.
De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos, sea porque así han sido acreditados o bien porque la autoridad recurrida haya omitido referirse a ellos:
De los informes rendidos por las autoridades recurridas los cuales son dados bajo la solemnidad del juramento con las consecuencias legales que ello implica se desprende que en fecha 10 de noviembre de 2025 -reiterada el 06 de febrero de 2026- el recurrente remitió una gestión de información dirigida a las gobiernos locales de Pérez Zeledón y Quepos, en la que requirió, lo siguiente: "(...) información referente a la existencia de permisos de construcción, terraceo, movimientos de tierra, cambios en uso de suelo, entre otros. Asimismo, se agradece se indique si existen trámites en curso, antecedentes de inspecciones, estudios o pronunciamientos técnicos emitidos por estas municipalidades en relación con dichas propiedades (sic) (...)" – información referente al proyecto denominado "Puente Pico", desarrollado sobre las propiedades identificadas con plano catastrado PRN01, en la zona de Lagunas, Savegre, Quepos-.
Se acreditó que mediante oficio MQ-AJ-ALC-OAJ-326-2026, notificado el 23 de julio del 2026 la Municipalidad de Quepos le brindó respuesta a la solicitud de información hecha por el recurrente, adjuntando los oficios MQ-UBI-098-2026 de la Unidad de Bienes Inmuebles, MQ-UDI-124- 2026 del Departamento de Gestión de Infraestructura. Se demostró que mediante oficio OFI-0714-25-ACO de fecha 17 de noviembre de 2026 Yendry Quesada Sancho Coordinadora a.i. le indicó al Alcalde lo siguiente: “ASUNTO: RESPUESTA A OFI-3078-25-DAM, CONSULTA DE Nombre01. Estimado señor: Reciba un cordial saludo, en atención a la consulta presentada por el administrado y lo mencionado en la línea de asunto, en donde solicitan información sobre trámites relacionados a: Certificados de Uso de Suelo Alineamiento Municipal Permisos de Construcción Clausuras Otros Sobre la finca: PRN02, con el plano catastrado PRN03. A lo que le indicamos lo siguiente: No se registra Licencias Municipales de Construcción.
No se registra Certificados de Uso de Suelo No se registra Alineamientos Municipales Se registra procedimientos en curso por infracción a la Ley de Construcciones No. 833, seguidos en expediente ADM-0316-25-ACO Lo anterior como información para aportar al administrado bajo los parámetros de la consulta presentada”. Se constató que mediante oficio OFI3178-25-DAM de fecha 20 de noviembre de 2025 la Municipalidad de Pérez Zeledón brindó respuesta al recurrente indicándole: “Me refiero a nota emitida por su persona a este Despacho, referente a requerimiento de información sobre proyecto Puente Pico. Al respecto, se procede a remitir el documento OFI-0714-25-ACO, suscrito por la señora Yendry Quesada Sancho, Coordinadora a.i Control Constructivo” -correo enviado el 20 de noviembre de 2025 a las direcciones de correo electrónico ...01 y ...02, medios de notificaciones aportados por el recurrente-.
Se verificó que en fecha 15 de junio de 2026 el recurrente remitió vía correo electrónico la siguiente solicitud “Remito la presente para dar seguimiento a esta gestión, puesto que no hemos recibido respuesta desde su remisión a inicios de noviembre del año pasado y del correo de seguimiento enviado en febrero. En vista del evidente retraso, solicitamos se nos remita la solicitada información actualizada a la fecha. Por otro lado, según hemos tenido conocimiento por información aportada al expediente de SETENA por parte de la desarrolladora del proyecto, presuntamente la propiedad consultada fue inscrita en la Provincia de Puntarenas y, por ende pertenece en su totalidad al conocimiento de esta Municipalidad. En vista de lo anterior, y de la existencia de un expediente de construcciones con número OC-1202623, agradecemos se nos remita copia de este. De igual manera, en vista de lo señalado, agradecemos se nos remita la información inicialmente solicitada en relación a la totalidad del inmueble” -solicitud remitida a los correos electrónicos: ...04 y ...03.
Se verificó que mediante oficio MQ-UDI-124-2026 de fecha 17 de julio de 2026 el Departamento de Desarrollo e Infraestructura de la Municipalidad de Quepos le indicó al recurrente lo siguiente: “En atención a su gestión presentada el 10 de noviembre de 2025, así como a los correos electrónicos de seguimiento remitidos el 06 de febrero de 2026 y el 15 de junio de 2026, mediante los cuales solicita información relacionada con la propiedad identificada con el plano catastrado PRN03, propiedad de la sociedad Puente Pico Limitada, este departamento procedió a revisar los registros institucionales, el Sistema Integrado de Gestión Municipal (SIGRAMU) y el sistema Administración de Proyectos de Construcción (APC) del Colegio Federado de Ingenieros y de Arquitectos de Costa Rica (CFIA). Producto de dicha revisión, se informa que para la propiedad antes indicada constan los siguientes permisos de construcción: 1.
Permiso de construcción tramitado mediante APC (CFIA): Permiso municipal: MQ-UDI-CONST-PC-327-2025. Código del proyecto CFIA: OC-1202623. Fecha de aprobación: 02 de diciembre de 2025. Plano catastro: P-583839-1 985. Obra autorizada: Construcción de bodegas en contenedores. Área de construcción: 60,00 m2. 2. Permiso de construcción por trámite físico de obra menor: Permiso municipal: MQ-UDI-PC-098-2026. Fecha de aprobación: 19 de mayo de 2026. Piano catastro: P-583839-1985. Obra autorizada: Construcción de un baño seco. Área de construcción: 6,70 m2. Asimismo, se hace de su conocimiento que, una vez revisados los registros que administra esta unidad, no se localizaron permisos trámites o expedientes relacionados con movimientos de tierra, terraceos, modificaciones al uso de suelo inspecciones, pronunciamientos técnicos o procedimientos administrativos adicionales asociados al inmueble consultado, distintos de los permisos de construcción anteriormente descritos.
En atención a su solicitud de acceso a la información administrativa, se estará preparando copia del expediente administrativo en virtud de que este debe ser certificado por la secretaria del Concejo Municipal N° MQ-UDI-CONST-PC-327-2025, asociado al proyecto CFIA OC-1 CED01 el MQ-UDI-PC-098-2026 el cual consta en los archivos de esta unidad. Con lo anterior, se da respuesta a la información solicitada que consta en los registros administrativos bajo su competencia, conforme a la documentación existente a la fecha de emisión del presente oficio” -oficio notificado al recurrente el 23 de julio de 2026-. Se constató que en fecha 21 de agosto de 2026 se notificó la resolución de curso a las autoridades recurridas. En conclusión, es cierto que el recurrente presentó ante la Municipalidad de Pérez Zeledón una solicitud de información relacionada con el proyecto denominado "Puente Pico". Por su parte la autoridad recurrida demostró que mediante oficio MQ-UDI-124-2026 de fecha 17 de julio de 2026 le brindó al recurrente la información requerida.
Puntualmente el recurrente solicitó “información referente a la existencia de permisos de construcción, terraceo, movimientos de tierra, cambios en uso de suelo, entre otros. Asimismo, se agradece se indique si existen trámites en curso, antecedentes de inspecciones, estudios o pronunciamientos técnicos emitidos por estas municipalidades en relación con dichas propiedades (sic) (...)" y posteriormente solicitó copia del expediente número OC-1202623. Partiendo de lo anterior y tomando en cuenta que la autoridad recurrida le indicó al recurrente que “para la propiedad antes indicada constan los siguientes permisos de construcción: 1. Permiso de construcción tramitado mediante APC (CFIA): Permiso municipal: MQ-UDI-CONST-PC-327-2025. Código del proyecto CFIA: OC-1202623. Fecha de aprobación: 02 de diciembre de 2025. Plano catastro: P-583839-1 985. Obra autorizada: Construcción de bodegas en contenedores.
Área de construcción: 60,00 m2. 2. Permiso de construcción por trámite físico de obra menor: Permiso municipal: MQ-UDI-PC-098-2026. Fecha de aprobación: 19 de mayo de 2026. Piano catastro: P-583839-1985. Obra autorizada: Construcción de un baño seco. Área de construcción: 6,70 m2. Asimismo, se hace de su conocimiento que, una vez revisados los registros que administra esta unidad, no se localizaron permisos trámites o expedientes relacionados con movimientos de tierra, terraceos, modificaciones al uso de suelo inspecciones, pronunciamientos técnicos o procedimientos administrativos adicionales asociados al inmueble consultado, distintos de los permisos de construcción anteriormente descritos” y que “En atención a su solicitud de acceso a la información administrativa, se estará preparando copia del expediente administrativo en virtud de que este debe ser certificado por la secretaria del Concejo Municipal N° MQ-UDI-CONST-PC-327-2025, asociado al proyecto CFIA OC-1 CED01 el MQ-UDI-PC-098-2026 el cual consta en los archivos de esta unidad” el recurso deviene parcialmente procedente.
Improcedente en cuanto a la solicitud de información referente a la existencia de permisos de construcción, terraceo, movimientos de tierra, cambios en uso de suelo, entre otros toda vez que se demostró que la información fue dada con antelación a la notificación de la resolución de curso del presente amparo. En cuanto a la copia del expediente que solicitó el 15 de junio de 2026 el recurso deviene procedente toda vez que a la fecha no consta que le haya sido entregado; lo anterior a pesar de que desde el 23 de julio del año en curso la autoridad recurrida le indicó al recurrente que “se estará preparando copia del expediente administrativo en virtud de que este debe ser certificado por la secretaria del Concejo Municipal N° MQ-UDI-CONST-PC-327-2025, asociado al proyecto CFIA OC-1 CED01 el MQ-UDI-PC-098-2026”. Así las cosas se declara con lugar el recurso con las consecuencias que se indican en la parte dispositiva de esta sentencia.
En cuanto a la Municipalidad de Pérez Zeledón el recurso deviene improcedente; lo anterior porque a solicitud del recurrente el recurso de amparo era dirigido únicamente contra la Municipalidad de Quepos.
Se previene a la parte recurrente que, de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, deberá retirarlos del despacho en un plazo máximo de 30 días hábiles contados a partir de la notificación de esta sentencia. De lo contrario, será destruido todo aquel material que no sea retirado dentro de este plazo, según lo dispuesto en el «Reglamento sobre Expediente Electrónico ante el Poder Judicial», aprobado por la Corte Plena en sesión No. 27-11 del 22 de agosto del 2011, artículo XXVI y publicado en el Boletín Judicial No. 19 del 26 de enero del 2012, así como en el acuerdo aprobado por el Consejo Superior del Poder Judicial, en la sesión No. 43-12 celebrada el 3 de mayo del 2012, artículo LXXXI.
Por tanto:
Se declara con lugar el recurso únicamente por la copia del expediente solicitado el 15 de junio de 2026 . Se ordena a Patricia Bolaños Murillo, en su condición de Alcaldesa de la Municipalidad de Quepos o a quien ocupe el cargo que, dentro del plazo improrrogable de DIEZ DÍAS contado a partir de la notificación de esta sentencia, le brinde al amparado la copia del expediente solicitado el 15 de junio de 2026. En caso de incurrirse en algún costo producto de las copias requeridas, el mismo correrá a cargo de la parte interesada. La información deberá facilitarse salvaguardando eventuales datos sensibles y de acceso restringido protegidos por el artículo 24 de la Constitución Política, y la Ley de Protección de la Persona frente al Tratamiento de sus Datos Personales, Ley Nº 8968. Se advierte a la autoridad recurrida que de conformidad con el artículo 71 de la Ley de esta Jurisdicción, se impondrá prisión de tres meses a dos años, o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada en un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado.
Se condena a la Municipalidad de Quepos al pago de las costas, daños y perjuicios causados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso administrativo. En cuanto a la Municipalidad de Pérez Zeledón se declara sin lugar el recurso. Notifíquese.
Fernando Castillo V.
Fernando Cruz C.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.
EXPEDIENTE N° 26-025386-0007-CO