Res. 33798-2026 Sala Constitucional · Sala Constitucional · 03/09/2026

Technical Water-Service Denial and Sealing of Unauthorized WellDenegatoria técnica de agua y sellado de pozo no autorizado

View document ↓ Ver documento ↓ View original source ↗ Ver fuente original ↗

Loading…Cargando…

OutcomeResultado

DeniedSin lugar

The Chamber denied the amparo application because the denial of water availability rested on technical limitations and the well concession never authorized population supply, so neither ICAA’s denial nor MINAE’s action culminating in the sealing order was deemed arbitrary.La Sala declaró sin lugar el amparo porque la denegatoria de disponibilidad de agua respondió a limitaciones técnicas y la concesión del pozo nunca autorizó su uso poblacional, por lo que no consideró arbitrarias la negativa del ICAA ni la actuación del MINAE que culminó en la orden de sellado.

SummaryResumen

The Constitutional Chamber (Sala Constitucional) denied the amparo application filed on behalf of residents of Bosques de Brasil, Mora, who alleged that sealing well AB-1719 would deprive them of their only source of drinking water and that the Instituto Costarricense de Acueductos y Alcantarillados (ICAA) had unjustifiably denied service availability. The Chamber recognized the fundamental right to water but reiterated that it does not entail unrestricted access: a provider may deny a connection for objective technical or legal reasons. It found that the property lay outside the area directly operated by ICAA and that distribution infrastructure and sufficient water and hydraulic capacity were absent, with additional topographical limitations. As to MINAE, the Chamber determined that the concession issued to Pueblo Mediterráneo S.A. authorized the well solely for domestic use on one specified property, not for population supply to subdivided lots. It therefore found the concession denial and sealing order justified and rejected claims of arbitrariness or breach of legitimate expectations.La Sala Constitucional declaró sin lugar el recurso de amparo promovido en favor de residentes de Bosques de Brasil, Mora, quienes alegaron que el sellado del pozo AB-1719 los dejaría sin su única fuente de agua potable y que el ICAA había negado injustificadamente la disponibilidad del servicio. La Sala reconoció el carácter fundamental del derecho al agua, pero reiteró que no implica acceso irrestricto: el prestador puede denegar una conexión cuando existan razones técnicas o legales objetivas. Consideró acreditado que el inmueble estaba fuera del área operada directamente por el ICAA y que faltaban infraestructura de distribución y capacidad hídrica e hidráulica, además de existir limitaciones topográficas. Respecto del MINAE, determinó que la concesión otorgada a Pueblo Mediterráneo S.A. autorizaba el pozo únicamente para uso doméstico en una finca específica, no para abastecimiento poblacional de lotes segregados. Por ello, estimó justificadas la denegatoria de la concesión y la orden de sellado, y descartó arbitrariedad o lesión de la confianza legítima.

Key excerptExtracto clave

In this regard, this Chamber has repeatedly held that, although the fundamental right to water and access to it under equal conditions are recognized because water is an essential service for life and health, that right does not entail unrestricted access to water, since service providers may validly establish general conditions and requirements for access. Likewise, entities—whether public or private—that administer the service may deny applications for water service or for a water-availability letter when the applicant does not meet the requirements or when technical or legal reasons justify the denial. Those considerations are fully applicable to this case, in which water availability was denied for technical reasons. Consequently, this Court finds that the denial of water availability is supported by technical reasons and therefore does not constitute arbitrary action. Against this background, the amparo application must be denied because no arbitrary action by the authorities of the MINAE Water Directorate is apparent to the detriment of the protected parties’ fundamental rights. This is because, from the outset, the well was not authorized for population supply or for properties other than the one recorded under real-property folio PRN01.Al respecto, en reiteradas ocasiones, esta Sala ha sostenido que si bien se reconoce el derecho fundamental al agua y su acceso en igualdad de condiciones, por cuanto se trata de un servicio esencial para la vida y la salud; también, ha indicado que este derecho no implica un acceso irrestricto al agua, toda vez que, los prestadores del servicio pueden válidamente, establecer condiciones y requisitos generales para acceder a este servicio. Asimismo, resulta válido que las entidades -públicas o privadas- que administren el servicio, puedan rechazar las solicitudes de agua, o bien, de la carta de disponibilidad de agua, cuando el interesado no cumple los requisitos o cuando existen razones técnicas o legales que los justifiquen. Tales argumentos resultan plenamente aplicables al caso concreto en el cual se denegó la disponibilidad de agua, por razones técnicas. En consecuencia, estima este Tribunal que la negativa de disponibilidad de agua se encuentra sustentada en razones técnicas, por lo que el acto no constituye una actuación arbitraria. Desde este panorama, lo correspondiente es declarar sin lugar el recurso, pues no se observa actuación arbitraria alguna por parte de las autoridades de la Dirección de Aguas en perjuicio de los derechos fundamentales de la parte amparada. Lo anterior en tanto que el pozo desde el inicio no se autorizó para uso poblacional ni para fincas distintas a la inscrita en matrícula de folio real PRN01.

Pull quotesCitas destacadas

  • "En otras palabras, siempre que la falta de dotación del servicio de agua potable no sea una actuación antojadiza, arbitraria o sin fundamento, sino que esté justificada en la imposibilidad jurídica o material no estamos frente a la violación de derechos fundamentales."

    "In other words, when the failure to provide drinking-water service is not capricious, arbitrary, or unfounded, but is justified by a legal or material impossibility, there is no violation of fundamental rights."

    Considerando III, jurisprudencia citada

  • "En otras palabras, siempre que la falta de dotación del servicio de agua potable no sea una actuación antojadiza, arbitraria o sin fundamento, sino que esté justificada en la imposibilidad jurídica o material no estamos frente a la violación de derechos fundamentales."

    Considerando III, jurisprudencia citada

  • "La procedencia o no de la disponibilidad de agua, así como la pertinencia de las razones técnicas que sustentaron la decisión de la parte recurrida, no son cuestiones que deban discutirse en esta Jurisdicción, por tratarse de un conflicto de legalidad ordinaria ajeno al ámbito de competencia de esta Sala."

    "Whether water availability should be granted, as well as the soundness of the technical reasons supporting the respondent’s decision, are not matters to be litigated in this jurisdiction because they constitute an ordinary-legality dispute outside this Chamber’s jurisdiction."

    Considerando III

  • "La procedencia o no de la disponibilidad de agua, así como la pertinencia de las razones técnicas que sustentaron la decisión de la parte recurrida, no son cuestiones que deban discutirse en esta Jurisdicción, por tratarse de un conflicto de legalidad ordinaria ajeno al ámbito de competencia de esta Sala."

    Considerando III

  • "Así, nótese que la concesión del pozo, desde un inicio, fue autorizada únicamente a favor de Pueblo Mediterráneo S.A. para utilizarlo en la finca PRN01 y solo para uso doméstico. Empero, tal concesionario realizó un uso indebido del pozo, se segregaron fincas y se utilizó el pozo para un destino no autorizado, sea, el desarrollo habitacional."

    "Thus, the well concession was authorized from the outset solely in favor of Pueblo Mediterráneo S.A., for use on property PRN01 and only for domestic purposes. Nevertheless, that concession holder misused the well: properties were subdivided and the well was used for an unauthorized purpose, namely residential development."

    Considerando IV

  • "Así, nótese que la concesión del pozo, desde un inicio, fue autorizada únicamente a favor de Pueblo Mediterráneo S.A. para utilizarlo en la finca PRN01 y solo para uso doméstico. Empero, tal concesionario realizó un uso indebido del pozo, se segregaron fincas y se utilizó el pozo para un destino no autorizado, sea, el desarrollo habitacional."

    Considerando IV

  • "Se declara sin lugar el recurso."

    "The amparo application is denied."

    Por tanto

  • "Se declara sin lugar el recurso."

    Por tanto

Full documentDocumento completo

Sections

Procedural marks

Document Review Decision No. 2026033798 CONSTITUTIONAL CHAMBER (SALA CONSTITUCIONAL) OF THE SUPREME COURT OF JUSTICE. San José, at 9:20 a.m. on 3 September 2026.

Amparo proceeding processed under case number 26-021424-0007-CO, filed by Nombre05, identity card CED03, on behalf of Nombre01, identity card CED04, Nombre02, identity card CED05, and Nombre04, identity card CED06, against the INSTITUTO COSTARRICENSE DE ACUEDUCTOS Y ALCANTARILLADOS (ICAA) and the MINISTERIO DE AMBIENTE Y ENERGÍA (MINAE).

Background:

  1. 1In a filing added to the digital case file on 15 June 2026, the amparo applicant filed an amparo application. The applicant alleges that the persons on whose behalf the application was filed reside in San José, Mora, Colon, Barrio Bosques de Brasil. The applicant states that eight families live in that neighborhood and built their homes in good faith. The applicant indicates that both the protected persons and the other families in the area depend exclusively on well AB-1719 as their sole source of drinking water. The applicant clarifies that some lot owners cannot undertake residential projects for the same reason, thereby worsening the collective impact. The applicant states that well AB-1719 has been under concession since May 1997 pursuant to decision R-106-97 and that the concession was renewed in January 2014 by decision R-109-2014. The applicant contends that, relying on that state concession, the families built their homes and established their lives in the neighborhood over the course of decades, legitimately relying on the authorizations issued by the State.The applicant contends that the concession expired in January 2024 without being renewed in a timely manner by the original concession holder; however, in January 2026 MINAE formally denied renewal of the well authorization through decision R-038-2026-MINAE. The applicant asserts that the technical irregularities originating from the construction of the well predated the resident neighbors’ acquisition of the properties; those residents did not participate at any time in the construction or siting of the well and acted in good faith, relying on the state authorizations then in force. The applicant alleges that, irrespective of the original developer’s responsibility, the State has a nonwaivable constitutional obligation to guarantee the current residents’ human right to water, an obligation that cannot be transferred to private third parties. The applicant indicates that, by certificate SIGDD-2025-00103885-1-2-NAP of 31 October 2025, the Instituto Costarricense de Acueductos y Alcantarillados denied the availability of drinking water for the neighborhood, citing the absence of distribution infrastructure in front of the property.Nevertheless, the applicant states that a field-verified GPS measurement taken on 9 June 2026 established that ICAA’s Estación de Desinfección Retana is located only 178 meters in a straight line from the Bosques de Brasil river, which, the applicant contends, demonstrates that the lack of service is not an insurmountable geographic or technical impossibility but rather the result of an infrastructure-investment decision that ICAA has not made. The applicant indicates that drinking-water service was requested from ASADA Barrio La Trinidad de Mora, but on 26 May 2026 it issued a “No Water Availability” certificate on the ground that the neighborhood lies outside the boundaries of its Delegation Agreement granted by ICAA itself. The applicant alleges that this situation seriously affects the families in the area because, first, MINAE’s Dirección de Aguas recommended sealing the neighborhood’s only well and, second, the Instituto Costarricense de Acueductos y Alcantarillados does not authorize the nearest ASADA to provide service for jurisdictional reasons that ICAA itself defines and controls.The applicant states that in April 2026 an urgent complaint was filed concerning the imminent public-health risk posed by sealing well AB-1719 when no alternative drinking-water supply exists for the resident families. The applicant states that the complaint is currently pending because the Ministerio de Salud has begun the risk-assessment process.
  2. 2By decision of the Presidency of the Chamber issued at 17:08 on 6 July 2026, this proceeding was admitted for processing.
  3. 3José Miguel Zeledón Calderón, in his capacity as director of Aguas of the Ministerio de Ambiente y Energía, reports as follows: “FACTS a) The applicants state that they reside in San José, Mora, Colon, Barrio Bosques de Brasil. Response/ This Directorate has no knowledge of the applicants’ domicile. b) They state that eight families currently live in that neighborhood and that they built their homes in good faith under authorizations granted by the Costa Rican State itself. Response/ This Directorate has no knowledge of the population at the cited location. c) They indicate that both the protected persons and the other families in the area depend exclusively on well AB-1719 as their sole source of drinking water. Response/ Well AB-1719 corresponds to case file 8203-P, processed by the Dirección de Agua in the name of Pueblo Mediterráneo S.A., corporate identification number 3-101-243294, for domestic, NON-population use. d) They additionally indicate that some lot owners cannot undertake residential projects for the same reason—as in their case—which worsens the collective impact.Response/ This Directorate has no knowledge of any limitations the applicants may face in undertaking projects. e) They state that well AB-1719 (case file 8203-P, MINAE) has been under concession since May 1997 pursuant to decision R-106-97 and that the concession was renewed in January 2014 by decision R-109-2014. Response/ This fact is true insofar as decision R-109-2014-AGUAS-MINAE dated 30 January 2014 granted Pueblo Mediterráneo S.A., corporate identification number 3-101-243294, a ten-year concession to exploit groundwater from the aquifer through well AB-1719 for use on its property recorded under real-property folio PRN01 in the province of San José, for domestic, NON-population use. f) They contend that, relying on that state concession, the families built their homes and established their lives in the neighborhood over the course of decades, legitimately relying on the State’s authorizations.Response/ On this point, a request to change the real-property folio number of the property for which the water-use concession in case file 8203-P had been granted was filed with the Dirección de Agua on 9 June 2018, requesting that property PRN02 be treated as the new property. After consulting the certification system of the Registro Nacional de la Propiedad, it was found that property real-property folio PRN01 in the province of San José, for which the concession had been granted to Pueblo Mediterráneo S.A., corporate identification number 3-101-243294, had undergone subdivisions (segregaciones). The concession-holding company was therefore asked to inform the Dirección de Agua whether water from well PRN03 was being drawn for the subdivided properties, but no response was received. g) They contend that the concession expired in January 2024 without being renewed in a timely manner by the original concession holder; however, in January 2026 MINAE formally denied renewal of the well authorization through decision R-038-2026-MINAE.Response/ On this point, in accordance with the foregoing, decision R-0155-2021-AGUAS-MINAE dated 2 February 2021 addressed the situation identified in connection with the concession and stated, insofar as relevant: ( ) ‘THIRD: As a result of that request, by official letter AL-0432-2016 of 09 August 2016, the Dirección de Agua directed the owners of property real-property folio PRN02 and Stefan Karl Kuhn, representative of the concession-holding company PUEBLO MEDITERRÁNEO S. A., to respond concerning the fact that the Public Registry had been consulted regarding the property number for which the concession was originally granted and that the property had undergone further subdivisions. They were therefore asked to state whether water was being drawn from well AB-1719 for those properties or to indicate the source from which water was being drawn; however, no response appears in case file 8203-P.FOURTH: In official letter DA-UHTPCOSJ-0739-2018 of 20 March 2018, Engineer Mariel Celeste González Artavia, an official of the Unidad Hidrológica Tárcoles Pacífico Central of the Dirección de Agua, states that, in response to the request to follow up on official letter AL-0432-2016 and after reviewing the background, “Mr. Karl Kuhn (representative of PUEBLO MEDITERRÁNEO S. A.) was contacted by email (...01) and by telephone … Mr. Kuhn stated that he was then holding discussions with A y A concerning the donation of the well and the land, but that there was opposition from certain neighbors who wanted to obtain their water supply from that well. Mr. Kuhn indicates that, through official letter SGG-2015-0132 (dated 27/02/2018), AyA states that it is analyzing the request….” FIFTH: Memorandum No. UEN-OS-GAM-2018-00171 of 23 July 2018 appears in case file 8203-P. In it, an official of AyA’s UEN Optimización de Sistemas GAM, writing to that institution’s Legal Directorate concerning the Sociedad Pueblo Mediterráneo S. A. well, states: “…because of the location of the well and the area it supplies, as well as this source’s topographic elevation relative to the nearest supply systems of the AyA Metropolitan Aqueduct, it is not technically feasible for A y A to assume responsibility for this system.It is recommended that this system be assumed by the ASADA de la Trinidad de Mora and that, to access the well and the area it supplies, part of the coverage area of that ASADA must be crossed.” SIXTH: Through official letter AL-0356-2018 of 24 August 2018, the legal advisory office of the Dirección de Agua informed Karl Kuhn, representative of Pueblo Mediterráneo S. A., that the concession had erroneously been granted for property PRN01 when it should have been granted for property PRN04. It also informed him of Nombre03’s request to transfer the concession to property PRN02, but that the request could not proceed because she was not a representative of the concession holder. He was also informed that a review of the Registro Nacional de la Propiedad showed that this was a residential development and that the concession did not authorize population-level human-consumption uses of the water.He was therefore required, in accordance with the official letter cited in the preceding paragraph, to apply to ASADA de la Trinidad de Mora for provision of the public service, and he was granted a period of six months. SEVENTH: On 10 October 2018, Karl Kuhn, representative of Pueblo Mediterráneo S. A., replied to official letter AL-0356-2018. He attached the response from ASADA Barrio La Trinidad de Mora and stated that he had requested clarification of that communication from AyA’s Dirección Regional Oeste de Asadas because no other ASADA existed in the area where the well was located. The official letter to which he refers is dated 21 September 2018 and declines to assume responsibility for the well because it lies outside La Trinidad’s jurisdiction and because the ASADA lacks sufficient water capacity for a development. The document was signed by Karen Arias Retana, identity card CED01, without indicating her authority or any technical assessment.EIGHTH: Through official letter DA-1530-2018 of 04 October 2018, addressed to the Executive President of A y A and served on 9 October 2018, the Director of Agua reported the situation described and stated: “Because this involves population-level human consumption and, under Ley 2726, that institution is responsible for providing this service, the matter is brought to its attention so that it may take the appropriate action. It goes without saying that the Municipalidad del cantón de Mora is being copied so that it does not approve any further construction permits on that property. Once the matter has been addressed, please inform this Directorate so that it may notify the interested party before the sealing order is issued.” NINTH: On 14 November, the Dirección de Agua received, through an official letter signed by Mr. Stefan Karl Kuhn, legal representative of Pueblo Mediterráneo S. A., AyA Site Visit Report UEN-GAR-2018-04520, signed by Engineer Esteban Ramírez Gutiérrez of UEN Gestión de Acueductos Rurales.By submitting that official letter to the Dirección de Agua, he acknowledged and was deemed notified of its contents, as well as of the fact that this was a matter to be resolved through AyA. As relevant to this action, the following may be quoted from section 2, RELEVANT MATTERS, of that official letter: “In the first instance, what was requested of the members of the ASADA de barrio la Trinidad was that they take us to the area where Mr. Stefan’s supply system is located (…).” “…it is located directly on the boundary between the Brasil de Mora Aqueduct (AyA) and the ASADA de Barrio La Trinidad aqueduct.” Likewise, section 3, CONCLUSIONS, states: ° The supply system does not fall within the definition of an authorized operating entity, and regularization of that situation is therefore extremely important. ° The supply system is located on the boundary between the Brasil de Mora Aqueducts, administered by AyA, and Dirección01; accordingly, either of the two aqueducts could assume its administration, provided it has the necessary technical capacity. ° The characteristics of the supply system are entirely unknown, and a technical study must therefore be performed describing the system, the characteristics of its infrastructure, verification of well output, pressure testing of the distribution network, and a water balance between production and demand. ° If the study determines that the system requires improvements, the interested party must carry them out, and the ASADA may begin operating the system only after they have been completed.Likewise, when the ASADA begins operating the system, the land on which the well and storage tank are located and the pipeline easements (servidumbres de paso de tubería) must be duly registered in the ASADA’s name. TENTH: Through official letter AL-0465-2018 of 20 November 2018, the Legal Coordinator of the Dirección de Agua asked the representative of Pueblo Mediterráneo S. A. to indicate the approximate date on which AyA would assume provision of service at the site so that the well in question could be sealed and the ongoing unlawful exploitation brought to an end, or to clarify whether the well would be assumed by any of the ASADAS mentioned in official letter UEN-GAR-2018-04520 so that registration of the source could be ordered. A period of 10 days was granted for that purpose pursuant to Article 264 of the Ley General de la Administración Pública.’ ( ) ‘THIRD: According to the account of facts set forth in the Background of this decision, case file 8203-P presents two situations involving different procedural remedies.First, there was a change in the use of the groundwater-use concession granted in that case file by decision R-0109-2014-AGUAS-MINAE, issued at 8:57 a.m. on 30 January 2014, to population use. Not only was this change made without notice to MINAE, but follow-up was also provided to the user in coordination with AyA regarding the measures required so that either that institution or an ASADA would provide the service or assume responsibility for well source AB-1719. This was because it was demonstrated, and was more than sufficiently acknowledged by PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, through its representative Stefan Karl Kuhn, resident identification card CED02, that the concession supplies a residential development, and because he had been adequately informed of what he must do before AyA and that the supply issue could not be resolved through a water concession for human-consumption (domestic) use.As a consequence of the foregoing, the Director of Agua sent the following official letter to the Executive President of AyA: “Because this involves population-level human consumption and, under Ley 2726, that institution is responsible for providing this service, the matter is brought to its attention so that it may take the appropriate action. It goes without saying that the Municipalidad del cantón de Mora is being copied so that it does not approve any further construction permits on that property.”’ ( ) ‘THEREFORE, THE MINISTER OF AMBIENTE Y ENERGIA ORDERS I PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, through its representative Stefan Karl Kuhn, resident identification card 175-000006505, IS HEREBY DIRECTED FOR THE FIRST TIME TO COMPLY, because the change in the use of the groundwater-use concession granted by decision R-0109-2014-AGUAS-MINAE, issued at 8:57 a.m. on 30 January 2014, for drilled well number AB-1719, from domestic to population use, is grounds for expiration of the water concession because it contravenes Article 26, subsection II, of the Ley de Aguas.This has been more than sufficiently established in the account of facts set out in the Operative Part and in light of the laws and considerations in the Reasons portion of this decision.’ Accordingly, because of the change made by the concession holder in the use of the groundwater drawn from well AB-1719, the concession expired, with the well-sealing order constituting an unavoidable consequence. By decision R-2606-2025-AGUAS-MINAE dated 21 November 2025, and in view of the conditions and facts established by the Dirección de Agua, the groundwater-use concession sought by PUEBLO MEDITERRÁNEO S. A. was denied. Insofar as relevant, that decision stated: ( ) ‘SEVENTH: On 10 August 2025, Pueblo Mediterráneo S. A. states that, “in view of the request to seal well AB-1719,” it requests that the sealing order be suspended until A y A assumes control of the aqueduct or an ASADA does so, because approximately 12 homes obtain water from it for domestic use.EIGHTH: The water-concession application involving drilled well AB-1719 is being processed in administrative case file 8203-P. That case file contains decision R-0155-2021-AGUAS-MINAE, which ordered well PRN05 sealed because it is used for population supply, a use that does not fall within MINAE’s authority. The administrative case file contains no record that well AB-2552 was sealed; a criminal complaint for Disobedience, an offense defined in Article 314 of the Código Penal, must therefore be filed.’ ‘THEREFORE, THE MINISTER OF AMBIENTE Y ENERGIA ORDERS I TO DENY PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, represented by Mr. Stefan Karl Kuhn, resident identification card 175600006505, a groundwater-use concession because well number AB-1719 does not comply with the 40-meter setback from the ROP or the 100-meter setback required by the Ley Forestal. II TO ORDER PUEBLO MEDITERRÁNEO S. A. TO SEAL WELL NUMBER AB-1719 WITHIN ONE MONTH in accordance with the guidelines established by Decreto N° 45053-MINAE and, within the same period, to notify the Dirección de Agua of the sealing so that it may be verified in the field.III TO ORDER THE DIRECCIÓN DE AGUA TO FILE A CRIMINAL COMPLAINT FOR THE OFFENSE OF DISOBEDIENCE, defined in Article 314 of the Código Penal, for FAILURE TO COMPLY WITH THE ORDER TO SEAL WELL number AB-2552 issued by Decision R-0155-2021-AGUAS-MINAE at 2:22 p.m. on 2 February 2021.’ h) The applicants assert that the technical irregularities originating from the construction of the well predated the resident neighbors’ acquisition of the properties; those residents did not participate at any time in the construction or siting of the well and acted in good faith, relying on the state authorizations then in force. Response/ The Dirección de Agua has no knowledge of this matter. i) They allege that, irrespective of the original developer’s responsibility, the State has a nonwaivable constitutional obligation to guarantee the current residents’ human right to water, an obligation that cannot be transferred to private third parties.Response/ On this point, in accordance with what has already been stated concerning the concession for well AB-1719, the Instituto Costarricense de Acueductos y Alcantarillados must address the matter. j) They indicate that, by certificate SIGDD-2025 -00103 885-1-2-NAP of 31 October 2025, the Instituto Costarricense de Acueductos y Alcantarillados denied the availability of drinking water for the neighborhood, citing the absence of distribution infrastructure in front of the property. Response/ The Instituto Costarricense de Acueductos y Alcantarillados must address this matter because, pursuant to Law No. 2726, that institute is responsible for deciding all matters related to the supply of drinking water. k) Nevertheless, they indicate that a field-verified GPS measurement taken on 09 June 2026 established that AyA’s Estación de Desinfección Retana is located only 178 meters in a straight line from the Bosques de Brasil river, which, they contend, demonstrates that the lack of service is not an insurmountable geographic or technical impossibility but rather the result of an infrastructure-investment decision that AyA has not made, creating an area without coverage that directly affects families who already reside in the neighborhood and currently enjoy water as a right.Response/ The Instituto Costarricense de Acueductos y Alcantarillados must address this matter concerning Mora, but on 26 May 2026 a ‘No Water Availability’ certificate was issued to the applicant on the ground that the neighborhood lies outside the boundaries of its Delegation Agreement granted by AyA itself. Response/ The Instituto Costarricense de Acueductos y Alcantarillados must address this matter. m) They allege that this situation seriously affects the families in the area because, first, MINAE’s Dirección de Aguas recommended sealing the neighborhood’s only well and, second, the Instituto Costarricense de Acueductos y Alcantarillados does not authorize the nearest ASADA to provide service for jurisdictional reasons that AyA itself defines and controls. Response/ The Instituto Costarricense de Acueductos y Alcantarillados must address this matter. n) They contend that the result is that the State, through its own uncoordinated institutional decisions, has created and maintains an area in which the families already living there will have no possibility of access to drinking water once the well is sealed.Response/ The Instituto Costarricense de Acueductos y Alcantarillados must address this matter; however, it is important to note the developer’s direct responsibility for having created a residential development without public water service. ñ) They state that the Ministerio de Salud is examining the serious health implications because, in April 2026, an urgent complaint was filed concerning the imminent public-health risk posed by sealing well AB-1719 when no alternative drinking-water supply exists for the resident families. Response/ The Ministerio de Salud must address this matter. o) They state that the complaint is currently pending because the Ministerio de Salud has begun the risk-assessment process. They request the intervention of this Chamber. Response/ The Ministerio de Salud must address this matter. ON THE MERITS As is apparent from the actions of the Dirección de Agua described above, the matter alleged by the applicants concerning the supply of water to their community does not fall within this Directorate’s authority or responsibility.It has already been demonstrated that the exploitation of groundwater from well AB-1719 was authorized for domestic use in favor of PUEBLO MEDITERRÁNEO S.A. for use on property real-property folio PRN01 in the province of San José, with the warning that failure to comply with the conditions of the grant would result in cancellation of the concession. It has been established that this occurred, and the concession holder itself acknowledged it, because the water was being used for population purposes by unauthorized persons. The Dirección de Agua therefore acted as required by the legislation governing the matter. It is appropriate to cite an excerpt from a decision of the Constitutional Chamber in cases involving similar circumstances: ‘The foregoing therefore clearly supports the action of MINAE’s Dirección de Agua, specifically the provisions of official letter No. DA-UHTPCOSJ-2123-20 of 28 September 2020 challenged by the applicant in his capacity as President of [...].It should further be emphasized that this official letter specifically sets out all the legal and factual grounds supporting the closure in question, principally including, as stated, the unlawful operation of the well and its use for human consumption rather than as a watering place for 20 head of cattle, as was stated and requested years later, specifically in March 2020, when the aforementioned company filed an application to legalize the well under Decreto Ejecutivo No. 41851-MP-MINAE-MAG of 18 July 2019, entitled Reglamento de registro de pozos sin número y habilitación del trámite de concesión de aguas subterráneas (the latter procedure having been processed under case file No. [Valor 003]). Accordingly, it is evident that the owners of the properties located in the cited residential complex obtained water unlawfully for several years and that the authorities of MINAE’s Dirección de Agua merely sought to regularize the situation and bring it into compliance with the law, as the legal system itself establishes and requires.From that perspective, it cannot be asserted that the action of closing and sealing the well in question infringes the fundamental right of access to drinking water. To the contrary, under the provisions of that legal system, such action seeks to protect the water resource.’ ‘In parallel with the foregoing, it must be clear in this matter that MINAE’s Dirección de Agua is not, and does not act as, the provider of drinking-water service in the residential complex under examination. It has never entered into any type of relationship on that basis with any of the owners of the 100 properties mentioned by the protected person; indeed, our legal system grants it no authority whatsoever in that regard. Consequently, that Directorate cannot be charged with an obligation to notify each of those owners, in their alleged capacity as beneficiaries of the water-supply service, of the provisions of official letter No. DA-UHTPCOSJ-2123-20.It is evident that the Dirección de Agua merely brought the use of the well into compliance with the law and, from that perspective, its work was limited to notifying the owner of the property on which the well was located of the closure and sealing order in question, as was in fact done. Accordingly, it cannot be asserted in this case that the rights of defense and due process of the owners of the cited properties comprising the residential development were violated.’ CONSTITUTIONAL CHAMBER. Decision No. 25091-2023. Decision date: 06 October 2023, case file: 20-021447-0007-CO. RELIEF REQUESTED In view of the foregoing, it is clear that the Dirección de Agua addressed the applications falling within its authority and responsibility and even provided the concession holder with the means to act before the competent entities that provide the public water-supply service. Nevertheless, the alleged facts reveal no violation of constitutional provisions through the regulations enforced by the Dirección de Agua. The Court is therefore requested to deny the application against this Directorate.”
  4. 4Lourdes María Sáurez Barboza, in her capacity as executive president of the Instituto Costarricense de Acueductos y Alcantarillados, reports as follows: “I. CONCERNING THE FACTS ALLEGED BY THE APPLICANT Based on memorandum UEN-SCMED-GAM-2026-01350 and Addendum UEN-SCMED-GAM-2026-01351, signed by Lic. Carlos Quirós Mora, an official of UEN Servicio al Cliente Medición GAM, and memorandum GSD-UENGAR- 2026-03130, prepared by Lic. Giovanni García Flores of UEN Gestión de Acueductos Rurales, which are attached as evidence and form an integral part of the administrative case file, the following has been demonstrated: On 24 October 2025, Nombre05 submitted a request for drinking-water availability for the property registered under real-property folio PRN06, cadastral plan 1-1801073-2015, located in the area known as Bosques de Brasil de Mora. The request was analyzed by the Institute’s competent technical departments, which determined that the property lies outside the supply area of the system directly administered by AyA and that no distribution infrastructure in front of the property would permit the requested availability to be granted.The request was therefore denied by decision N°SIGDD-2025- 00103885-1-2-NAP dated 31 October 2025, which was served at email address ...02, the address designated for receipt of notices. (See memorandum UEN-SCMED-GAM-2026-01350.) The applicant maintains that institutional infrastructure exists approximately one hundred seventy-eight meters from the property and that this circumstance alone obligates the Institute to provide service. Nevertheless, the Administration’s technical analysis established that this infrastructure does not have conditions making it technically feasible to supply the area because the differences in topographic elevation between the institutional tanks and the community of Bosques de Brasil prevent the necessary pressure and continuity from being guaranteed for adequate service. Indeed, the existing infrastructure is located at lower and higher elevations that make it hydraulically impossible to supply the area, namely: ‘…the Los Rodríguez tank is located at an elevation of 863 meters above sea level, and the Retana tank at an elevation of 832 meters above sea level.Meanwhile, the community identified as Dirección03 is located at elevations ranging from 840 to 883 meters above sea level….’ In addition, the area in which the community is located corresponds to a system administered under a delegation agreement by ASADA Barrio La Trinidad de Ciudad Colón. (See addendum UEN-SCMED-GAM-2026-01351.) Likewise, regarding the applicant’s argument concerning the technical report issued in 2018, it must be clarified that this document never constituted an authorization of service availability or an instruction to incorporate that area automatically into the operation of ASADA Barrio La Trinidad de Mora. To the contrary, that report was a preliminary technical assessment indicating that the possible assumption by that ASADA of the administration of the existing supply system was subject to prior compliance with a series of technical, legal, and administrative requirements essential to ensuring adequate service.Those requirements included the preparation of a comprehensive technical study to determine the characteristics of the existing system, the aqueduct’s water and hydraulic capacity, well output, infrastructure conditions, and the improvements required to bring it into compliance. It was also expressly stated that the well concession had to be transferred to ASADA Barrio La Trinidad, a process requiring approval from the Dirección de Aguas of the Ministerio de Ambiente y Energía (MINAE). The land on which the well, tank, and other system infrastructure were located, together with the corresponding easements (servidumbres), also had to be transferred to the ASADA; the improvements identified by the technical study had to be implemented; and the study had to be submitted to the Institute for review and approval. Finally, more than seven years have elapsed since that technical assessment, and there is no record that the interested parties satisfied those conditions.Accordingly, that preliminary assessment cannot be construed as an authorization of availability or as a current and immediate obligation of the Institute to expand the coverage of the ASADA’s system or provide the requested service. (See memorandum GSD-UEN-GAR-2026-03130.) II. APPLICABLE LAW In support of the foregoing, it is necessary to indicate the relevant provisions of the Reglamento para la Prestación de los Servicios de AyA, published in the Official Gazette La Gaceta No. 27, Supplement No. 29, on 9 February 2021, and Articles 11, 13, and 16 of the Ley General de la Administración Pública, respectively: Reglamento para la Prestación de los Servicios de de AyA Article 7—Definitions. For purposes of these Regulations, the following terms shall mean: (…) 12. Technical-feasibility assessment for granting services: The process of verifying the actual and current existence of sufficient water, hydraulic, material, technical, legal, and environmental resources to grant availability and eventual service connection.For those purposes, the following conditions must be observed: a. The distribution and collection networks must pass in front of the boundaries of the property or have direct access by public road or a right-of-way easement (servidumbre de paso) serving the property for which service is requested. b. The systems must have sufficient water, hydraulic, drinking-water treatment, and wastewater-treatment capacity to grant new services. c. The system must satisfy the established quality standards. d. The applicable environmental regulations must be satisfied. Article 8—Services. AyA shall provide population water-supply and wastewater-sanitation services within the coverage area, provided the area has technical and legal feasibility. The internal systems and installations necessary to receive the services are the user’s responsibility. Article 9—Technical conditions for the provision of services.The provider of drinking-water and sanitation services is required to provide them in accordance with optimal service parameters concerning quality, quantity, continuity, reliability, equality, universal access, efficiency, timeliness, and sustainability, and under a human-rights-based approach, except in cases of force majeure, fortuitous event, or duly publicized maintenance periods affecting the coverage area in which the property is located. Regarding the minimum dynamic-pressure parameter for each service, the optimal service that the provider must guarantee is 10 meters of water column (m.c.a.) at the connection point where the metering system is located. In this analytical context, it is important to emphasize the provisions of Articles 11, 13, and 16, subsection 1 in each case, of the Ley General de la Administración Pública, which provide: ‘1. The Public Administration shall act subject to the legal system and may perform only those acts or provide only those public services authorized by that system, according to the hierarchical order of its sources.’ ‘1.The Administration shall generally be subject to all written and unwritten rules of administrative law and to the private law supplementing it, and may not derogate from or decline to apply them in individual cases.’ Article 16. ‘1. Under no circumstances may acts be issued that are contrary to unequivocal rules of science or technology, or to elementary principles of justice, logic, or appropriateness….’ III. CONCLUSIONS In this case, no violation of the fundamental rights invoked by the applicant has been established because, as demonstrated by the technical reports forming an integral part of the submission presented herein, ICAA timely received, analyzed, and decided the request for drinking-water availability submitted for the property at issue in this amparo proceeding, issuing a duly reasoned decision based on objective technical criteria and the institutional regulations in force.Availability was not denied because of arbitrary, capricious, or discriminatory action by the Administration but because of the current technical impossibility of guaranteeing service. It was determined that the property lies outside the supply area of the system directly administered by the Institute and that the existing hydraulic, topographic, and infrastructure conditions do not permit service to be provided under the parameters of quality, quantity, continuity, pressure, and sustainability required by the Institute’s internal regulations. It was also duly established that the presence of institutional infrastructure near the property is not, in itself, sufficient to grant service availability because the provision of service depends on a comprehensive verification of the system’s technical, hydraulic, and operational feasibility, matters that were thoroughly analyzed by the competent technical departments.Likewise, concerning the technical assessment performed in 2018 regarding the possible incorporation of the system into the operation of ASADA Barrio La Trinidad de Mora, it was established that this assessment consisted solely of an analysis of an alternative conditioned upon compliance with multiple technical, legal, and administrative requirements. These included the preparation of specialized studies, verification of the system’s water and hydraulic capacity, infrastructure improvements, transfer of the well concession with the approval of the Dirección de Aguas of the Ministerio de Ambiente y Energía, transfer of the relevant land and infrastructure to the ASADA, and final approval by the Institute. Nevertheless, as stated in the technical report included in the case file, those conditions were not fulfilled. That preliminary assessment therefore created neither a vested right nor an immediate obligation for the Institute to grant the requested availability.Consequently, the Institute’s actions fully conform to the principle of legality and the technical authority conferred upon it by the legal system, and no arbitrary action, administrative omission, or constitutional injury attributable to this Institution has been established. None of the protected person’s fundamental rights has been violated. IV. RELIEF REQUESTED In view of the foregoing concerning the facts alleged in this amparo proceeding, it has been demonstrated that our actions were proper under the regulations governing us. We request that this application be DENIED, that the case file be closed, and that the Instituto Costarricense de Acueductos y Alcantarillados be relieved of all liability.”
  5. 5In a filing added to the digital case file on 31 August 2026, the applicant submitted a request for a prompt decision.
  6. 6The legal requirements have been observed in the proceedings conducted.

Justice Hess Herrera writes for the Court; and, Reasons:

I. SUBJECT MATTER OF THE AMPARO PROCEEDING

The amparo applicant alleges that the persons on whose behalf the application was filed reside in San José, Mora, Colón, Barrio Bosques de Brasil. The applicant states that 8 families live in that neighborhood and built homes in good faith. The applicant states that both the protected persons and the other families in the area depend exclusively on well AB-1719 as their sole source of drinking water. The applicant clarifies that some lot owners cannot develop housing projects for the same reason, which exacerbates the collective impact. The applicant explains that well PRN03 has been under concession since May 1997, pursuant to resolution R-106-97, and that the concession was renewed in January 2014 through resolution R-109-2014. The applicant contends that, based on that State concession, the families built their homes and established their lives in the neighborhood over the course of decades, legitimately relying on the State’s authorizations.

The applicant contends that the concession expired in January 2024 without being renewed in a timely manner by the original concession holder; however, in January 2026 MINAE formally denied renewal of the well concession through resolution R-038-2026-MINAE. The applicant asserts that the technical irregularities originating during construction of the well predated the resident neighbors’ acquisition of the properties; those neighbors did not participate at any time in constructing or locating the well and acted in good faith in reliance on the State authorizations then in force. The applicant alleges that, regardless of the original developer’s responsibility, the State has a nonwaivable constitutional obligation to guarantee the current residents’ human right to water, an obligation that cannot be transferred to private third parties. The applicant states that, through certificate SIGDD-2025-00103885-1-2-NAP dated 31 October 2025, the Instituto Costarricense de Acueductos y Alcantarillados denied the availability of drinking water for the neighborhood, citing the absence of distribution infrastructure in front of the property.

Nevertheless, the applicant indicates that a GPS measurement verified in the field on 9 June 2026 established that the Estación de Desinfección Retana of the ICAA is located only 178 meters in a straight line from the Bosques de Brasil river, which the applicant contends demonstrates that the absence of service is not an insurmountable geographic or technical impossibility, but rather results from an infrastructure-investment decision that the ICAA has not made. The applicant states that drinking-water service was requested from ASADA Barrio La Trinidad de Mora, but on 26 May 2026 it issued a “Certificate of No Water Availability,” on the ground that the neighborhood lies outside the perimeter of its Delegation Agreement granted by the ICAA itself. The applicant alleges that the situation described seriously affects the families in the area because, first, the Dirección de Aguas del MINAE recommended sealing the neighborhood’s only well and, second, the Instituto Costarricense de Acueductos y Alcantarillados does not authorize the nearest ASADA to provide service for jurisdictional reasons that the ICAA itself defines and controls.

The applicant states that an urgent complaint was filed in April 2026 concerning the imminent public-health risk posed by sealing well PRN03 when no alternative drinking-water supply exists for the resident families.

II. PROVEN FACTS

The following facts are deemed duly established and relevant to the determination of this matter:

Regarding the Instituto Costarricense de Acueductos y Alcantarillados:

  • a)In report UEN-GAR-2018-04520 dated 13 November 2018, an engineer from the ICAA’s UEN Gestión de Acueductos Rurales stated: “BACKGROUND Ms. Olga Jiménez, a civil engineer and representative of Mr. Stefan Karl Kuhn, appeared before the ORAC Metropolitana. They had asked ASADA Barrio La Trinidad de Mora to assume operation of a small private drinking-water supply system serving approximately 17 houses; however, that operating entity rejected the request. According to the information provided by Engineer Jiménez, the 17 properties sold at the time by Mr. Stefan are supplied by a well that was legally drilled and for which the corresponding concession was granted, although not for the purpose of carrying out urban-development activities. Accordingly, the Dirección de Agua del MINAE notified Mr. Stefan of that irregularity and invited him to complete the appropriate formalities so that the nearest operator could assume operation of this small system. The nearest operator is ASADA Barrio La Trinidad de Mora, which rejected the request on the grounds that the system is outside its jurisdiction and that it lacks the water capacity to supply it. In view of the foregoing, Engineer Jiménez requested AyA’s intervention to clarify the situation, and this office coordinated a visit to ASADA Barrio La Trinidad to assess the situation and obtain its views. The visit was scheduled for 26 October 2018, with the participation of Mr. Nombre06, President of the Board, and Ms. Xinia Retana, Treasurer of the Board. RELEVANT MATTERS First, the members of ASADA Barrio La Trinidad were asked to take us to the area where Mr. Stefan’s supply system is located, which may be seen in the following image: According to the measurements taken, Mr. Stefan’s water-supply system is located 615 m from the ASADA’s office and lies precisely on the boundary between the Acueducto de Brasil de Mora (AyA) and ASADA Barrio La Trinidad. The infrastructure existing within Mr. Stefan’s system is unknown, and the property was not entered during that visit. Regarding ASADA Barrio La Trinidad’s willingness to assume operation and administration of that system, its representatives state that they are not opposed; however, they emphasize that they lack sufficient water resources to meet the new needs and that the entity would assume administration of the system only if the well’s output is guaranteed and the situation is assessed and their views obtained. The visit was scheduled for 26 October 2018, with the participation of Mr. Nombre06, President of the Board, and Ms. Xinia Retana, Treasurer of the Board. RELEVANT MATTERS First, the members of ASADA Barrio La Trinidad were asked to take us to the area where Mr. Stefan’s supply system is located, which may be seen in the following image: According to the measurements taken, Mr. Stefan’s water-supply system is located 615 m from the ASADA’s office and lies precisely on the boundary between the Acueducto de Brasil de Mora (AyA) and ASADA Barrio La Trinidad. The infrastructure existing within Mr. Stefan’s system is unknown, and the property was not entered during that visit. Regarding ASADA Barrio La Trinidad’s willingness to assume operation and administration of that system, its representatives state that they are not opposed; however, they emphasize that they lack sufficient water resources to meet the new needs and that the entity would assume administration of the system only if the well’s output is guaranteed and RECOMMENDATIONS Based on the information supplied by ASADA Barrio La Trinidad, the information provided by Engineer Olga Jiménez, and the visit conducted, it is recommended that both parties enter into discussions and coordinate the preparation of a technical study to determine the feasibility and possibility of ASADA Barrio La Trinidad assuming operation of that small supply system, all in accordance with Art. 5 and 21 of the ASADA regulations. I further note that this study must be submitted to this ORAC Metropolitana for the corresponding review and approval.” (See documentary evidence).
  • b)In official letter UEN-SCMED-GAM-2026-01350 dated 9 July 2026, the ICAA’s UEN Servicio al Cliente Medición GAM clarified: “FOURTH: The legal and technical grounds for rejecting application number SIGDD-2025-00103885-1-2-NAP are related to the following: It is important to note that the purpose of issuing administrative acts granting or denying services in a particular area is to inform the administered person of the existing circumstances regarding water capacity, collection capacity, and the environmental conditions offered or experienced by AyA systems at a particular location. The foregoing is based on ‘basic studies’ and even more specific studies, depending on the nature of the project, which form the basis for issuing the act and must address, among other matters: the project’s location, analysis of the area’s water-resource inventory, the project’s vulnerability, dimensions, nature, projected liters per second, type of activity, population growth, environmental factors that could be affected, and any other matters requiring technical assessment. According to certificates SIGDD-2025-00103885-1-2-NAP (Certificate of Unavailability of Water-Supply and Sewerage Services) and 2025-00103885-1-AP (Technical Drinking-Water Assessment), the following is stated: ‘(...) No distribution and collection infrastructure exists in front of the property for which availability was requested. Images 6 and 7. (...) Accordingly, it is important to clarify that a request for water availability is not rejected arbitrarily or capriciously; rather, the rejection is based on technical grounds demonstrating the REAL AND CURRENT LACK of the water-supply system’s water and/or hydraulic capacity. Consequently, it may be stated that there is no technical feasibility for issuing a positive drinking-water-supply availability determination because of a technical impediment: there is currently no production and distribution infrastructure in front of the property, and granting it would contravene Articles 7 (subsection 12), 8, and 14 of the Reglamento de Prestación de Servicios de AyA. Moreover, based on the technical assessment performed, the Certificate of Water Capacity (CCH) cannot be issued because no distribution pipeline exists near the property through which a connection to the supply system could be made. Likewise, the water-supply system does not possess the water and hydraulic capacity required to meet new demand; therefore, service cannot feasibly be guaranteed under current conditions. Article 7—Definitions. For purposes of these Regulations, the following shall mean: 12. Technical feasibility for granting service: Where distribution and collection networks exist in front of the property boundaries, or the property for which service is requested has direct access by means of a public road or right-of-way (servidumbre de paso). Where the systems have sufficient water, hydraulic, purification, and treatment capacity to accommodate new services. Where the system meets the established quality criteria. Where it is legally and environmentally possible. Where the applicant or applicants comply with urban-planning regulations and the established requirements. (EMPHASIS NOT IN ORIGINAL TEXT) Article 8—Services. AyA shall provide water-supply services for population use and wastewater sanitation within its service area, provided that the area has technical and legal feasibility. (EMPHASIS NOT IN ORIGINAL TEXT). The user is responsible for the internal systems and installations necessary to receive the services. Article 9—Technical conditions for the provision of services. The provider of drinking-water and sanitation services is required to provide them within optimal service parameters concerning quality, quantity, continuity, reliability, equality, universal access, efficiency, timeliness, sustainability, and a human-rights-based approach, except in cases of force majeure, unforeseeable circumstances, or duly publicized maintenance periods affecting the service area where the property is located. (EMPHASIS NOT IN ORIGINAL TEXT) As to the minimum dynamic-pressure parameter per service connection, the optimal service that the provider must guarantee is 10 meters of water column (m.c.a.) at the connection point where the metering system is located. Article 14—Conditions for the provision of services. AyA shall provide its services once technical feasibility has been verified for existing or planned structures devoted to residential, commercial, or industrial activities that meet the requirements and authorized uses under these Regulations. AyA shall grant drinking-water and sanitation services along a street or public road, or along a pipeline easement (servidumbre de tubería) and right-of-way registered in favor of AyA or third parties, as applicable under Article 16 of these Regulations. The foregoing shall apply provided that operational AyA networks exist. (...) In addition, it should be recalled that the Reglamento para la Prestación de los Servicios de Acueducto, Alcantarillado Sanitario e Hidrantes, AR-PSAYA-2013, resolution N° 54-2014, of 18 September 2014, published in Alcance N°50, and its amendment entitled ‘Prestación de los Servicios de Acueducto, Alcantarillado e hidrantes AR-PSAYA-2015,’ adopted by resolution N° RJD-053-2016 in Alcance 55 of La Gaceta N°69 on 12 April 2016, provides as follows in section 9: ‘...under no circumstances shall expansions be authorized that jeopardize existing water resources or the capacity and treatment of the Sewerage System, to the detriment of the community served or the residents of potential new developments....’ (EMPHASIS NOT IN ORIGINAL TEXT) It is important to mention that drinking-water systems are dynamic; that is, they cannot be conceptualized as static over time. For that reason, it may be stated that water balances progressively restrict their water capacity in relation to the supply and demand reflected by requests received in a particular sector, such that each request is analyzed according to the system conditions existing at that time. It is clear that we must comply with the existing regulations. Although the supply of drinking water is a public service, it is also clear that we must ensure compliance with the principle of legality governing the Public Administration and with the Political Constitution, under which the Institution must comply with its own Regulations and may make no exception. Accordingly, the right to water does not exempt anyone from complying with the requirements established in the Reglamento de Prestación de Servicios de AyA. Finally, it is important to mention Article 11 of the Political Constitution of Costa Rica, which states verbatim: ‘Public officials are mere custodians of authority. They are required to perform the duties imposed on them by law and may not arrogate powers not conferred upon them. They must swear to observe and comply with this Constitution and the laws (...).’ FIFTH: According to the information available in AyA’s institutional viewers, the property lies outside the service area administered by that institution. Likewise, according to the information submitted, ASADA La Trinidad operates in the area and could be the entity responsible for administering the water-supply system providing service to the property. SIXTH: Regarding the denial of Certificate of Service Availability N.° SIGDD-2025-00103885-1-2-NAP, a submission by Mr. Nombre05 was received on 3 November 2025 and was addressed through Resolution N.° UEN-SCMED-GAM-DyNS-2025-00842, issued on 23 December 2025. Subsequently, on 29 December 2025, a hierarchical administrative appeal (recurso jerárquico) was received against Resolution N.° UEN-SCMED-GAM-DyNS-2025-00842 and was forwarded to the Gerencia General through Memorandum N.° UEN-SCMED-GAM-DyNS-2026-00129 for consideration and resolution. The response to the hierarchical administrative appeal was issued through resolution number GG-R-2026-0400, notice of which was given on 9 July 2026. Conclusions: The denial of water availability was supported by technical and regulatory criteria. AyA determined that no distribution infrastructure exists in front of the property and that there is insufficient water and hydraulic capacity for a new connection; it therefore concluded that the technical-feasibility requirements established in the Reglamento para la Prestación de los Servicios de Acueducto, Alcantarillado Sanitario e Hidrantes were not met. Consequently, the denial was not based on a discretionary decision but on verified technical limitations. The property is outside the service area administered by AyA. According to the institutional viewers, the property located in the canton of Mora, district of Colón, is not within the coverage of AyA services. It was also stated that ASADA La Trinidad operates in that area and could be the entity competent to provide drinking-water service. The administrative procedure complied with the stages for challenges and responses to the administered person. After the certificate of unavailability was issued, the applicant filed a request for reconsideration and subsequently a hierarchical administrative appeal. Both were processed by the Administration in accordance with the established procedure, culminating in the issuance and notification of the corresponding resolution on 9 July 2026, demonstrating that the interested party was afforded the opportunity to pursue the administrative remedies provided by the regulations.” (See documentary evidence).
  • c)Memorandum UEN-SCMED-GAM-2026-01351 dated 9 July 2026 stated: “In addition to the foregoing, infrastructure administered and operated by AyA is located in the area, but supplying the community from it is not technically feasible because of topographic elevation criteria. The Los Rodríguez tank is located at an elevation of 863 meters above sea level, and the Retana tank at an elevation of 832 meters above sea level. Meanwhile, the community identified as Dirección03 is located at elevations ranging from 840 to 883 meters above sea level, which constitutes a sufficient technical reason for denying availability from the infrastructure associated with those tanks. Based on the foregoing, technical impediments prevent the supply of flow to the sector. First, because of elevation; second, because of infrastructure and the investment project that it would entail; and third and most importantly, because the area is not operated by AyA but by an ASADA. Conclusion Based on the technical information provided, it is concluded that it is not feasible for AyA to provide drinking-water service to the property because the sector is supplied by ASADA Barrio La Trinidad de Ciudad Colón de Mora, lies outside AyA’s operational area, and cannot be supplied by the existing institutional infrastructure because of topographic-elevation limitations and the absence of the required infrastructure. Consequently, the denial of water availability is technically justified.” (See documentary evidence).

    Regarding the Dirección de Aguas del MINAE

  • d)Through resolution no. R-0109-2014-AGUAS-MINAE dated 30 January 2014, the Dirección de Aguas del MINAE granted Pueblo Mediterráneo S.A. the concession for well AB-1719 for its use on property PRN01 and solely for domestic purposes. (See documentary evidence).
  • e)The Dirección de Aguas del MINAE did not authorize the well for population use. (See documentary evidence).
  • f)On 9 June 2018, an application was submitted to the Dirección de Aguas to designate property PRN02 as the new property holding the well concession. In response to that application, the authority consulted the certification system of the Registro Nacional de la Propiedad and detected that property PRN01, for which the concession had been granted to Pueblo Mediterráneo S.A., had undergone subdivisions (segregaciones). The concession-holding company was therefore asked to inform the Dirección de Agua whether water from well AB-1719 was being captured for the subdivided properties, but no response was received. (See documentary evidence).
  • g)Resolution R-0155-2021-AGUAS-MINAE dated 2 February 2021 stated: “THIRD: In connection with that application, through official letter AL-0432-2016 dated 09 August 2016, the Dirección de Agua issued a formal request to the owners of property recorded under real-property folio PRN02 and to Stefan Karl Kuhn, representative of the concession-holding company PUEBLO MEDITERRÁNEO S. A. It stated that the Public Registry had been consulted regarding the property number for which the concession was originally granted, that the property had undergone further subdivisions, and that they were therefore asked to indicate whether water was being captured from well AB-1719 for those properties or otherwise to indicate where their water was obtained; however, no response appears in expediente 8203-P. FOURTH: Engineer Mariel Celeste González Artavia, an official of the Unidad Hidrológica Tárcoles Pacífico Central of the Dirección de Agua, stated in official letter DA-UHTPCOSJ-0739-2018 dated 20 March 2018 that, in response to the request to follow up on official letter AL-0432-2016 and after reviewing the background, ‘Mr. Karl Kuhn (representative of PUEBLO MEDITERRÁNEO S. A.) was contacted by email (...01) and by telephone.... Mr. Kuhn stated that he was then engaged in discussions with A y A concerning donation of the well and the land, but that there was opposition from certain neighbors who wished to obtain their water from that well. Mr. Kuhn stated that through official letter SGG-2015-0132 (dated 27/02/2018), AyA indicated that the request was under analysis....’ FIFTH: Expediente 8203-P contains Memorandum N° UEN-OS-GAM-2018-00171 dated 23 July 2018, in which an official of AyA’s UEN Optimización de Sistemas GAM, addressing that Institution’s Dirección Jurídica regarding the well of Sociedad Pueblo Mediterráneo S. A., stated that ‘...because of the well’s location and the sector it supplies, as well as the topographic elevation of this source relative to the nearest AyA Acueducto Metropolitano supply systems, it is not technically feasible for A y A to assume responsibility for this system. It is recommended that ASADA La Trinidad de Mora assume responsibility for the system, and access to the well and the sector it supplies must pass through part of that ASADA’s service area.’ SIXTH: Through official letter AL-0356-2018 dated 24 August 2018, the Dirección de Agua’s legal office informed Karl Kuhn, representative of Pueblo Mediterráneo S. A., that the concession had erroneously been granted for property PRN01 when it should have been granted for property PRN04. It also informed him of Ms. Nombre03’s request that the concession be transferred to property PRN02, which was improper because she was not a representative of the concession holder. He was also informed that a review of the Registro Nacional de la Propiedad showed that this was a residential development and that the population’s human-consumption uses of the water had not been authorized under the concession. Therefore, in accordance with the official letter cited in the preceding paragraph, he was required to submit a request for provision of the public service to ASADA La Trinidad de Mora, and was granted a period of 6 months to do so. SEVENTH: On 10 October 2018, Karl Kuhn, representative of Pueblo Mediterráneo S. A., responded to official letter AL-0356-2018, attaching ASADA Barrio La Trinidad de Mora’s response and stating that he had asked AyA’s Dirección Regional Oeste de Asadas to clarify that communication because no other ASADA operated in the area where the well was located. The referenced official letter is dated 21 September 2018 and rejects assuming responsibility for the well because it lies outside La Trinidad’s jurisdiction and because La Trinidad lacks the water capacity for a development. That document was signed by Karen Arias Retana, identity card CED01, without indicating her authority or any technical assessment. EIGHTH: Through official letter DA-1530-2018 dated 04 October 2018, addressed to the Executive President of A y A and notified on 9 October 2018, the Director de Agua reported the situation described and stated: ‘Given that this concerns water for the population’s human consumption and, pursuant to Ley 2726, it falls within that institution’s authority to provide this service, the matter is brought to its attention so that it may proceed as appropriate. Needless to say, the Municipalidad del cantón de Mora is being copied so that it does not approve any further construction permits on that property. Once the matter has been addressed, please inform this Directorate so that the interested party may be notified before an order to seal the well is issued.’ NINTH: On 14 November, the Dirección de Agua received, through an official letter signed by Mr. Stefan Karl Kuhn, legal representative of Pueblo Mediterráneo S. A., AyA Visit Report UEN-GAR-2018-04520, signed by Engineer Esteban Ramírez Gutiérrez of the UEN Gestión de Acueductos Rurales. Thus, by submitting that official letter to the Dirección de Agua, he acknowledged and was notified of its contents, as well as of the fact that the matter must be resolved through AyA. As relevant to this act, paragraph 2, RELEVANT MATTERS, of that official letter may be quoted: ‘First, the members of ASADA Barrio La Trinidad were asked to take us to the area where Mr. Stefan’s supply system is located (...).’ ‘...it lies precisely on the boundary between the Acueducto de Brasil de Mora (AyA) and ASADA Barrio La Trinidad.’ Likewise, paragraph 3, CONCLUSIONS, states as follows: ° The supply system does not fall within the definition of an authorized operating entity, and regularizing that situation is therefore of the utmost importance. ° The supply system is located on the boundary between Acueducto de Brasil de Mora, which is administered by AyA, and Dirección01; either water-supply system could therefore assume its administration, provided it possesses the necessary technical capacity. ° The characteristics of the supply system are entirely unknown; a technical study must therefore be conducted describing the system, the characteristics of its component infrastructure, verification of the well’s output, pressure tests on the distribution network, and a water balance between output and demand. ° If the study determines that the system requires improvements, the interested party must carry them out, and the ASADA may begin operating the system only after they have been completed. Likewise, the land on which the well and storage tank are located, together with the pipeline rights-of-way, must be duly registered in the ASADA’s name when it begins operating the system. TENTH: Through official letter AL-0465-2018 dated 20 November 2018, the Legal Coordinator of the Dirección de Agua asked the representative of Pueblo Mediterráneo S. A. to indicate the approximate date when AyA would assume provision of the service at the site and the well in question could be sealed, so that the ongoing unlawful use would not continue. Alternatively, he was asked to clarify whether one of the ASADAs mentioned in official letter UEN-GAR-2018-04520 would assume responsibility for the well, so that registration of the source could be ordered, within a period of 10 days pursuant to Article 264 of the Ley General de la Administración Pública.” ( ) “THIRD: According to the account of facts set forth in the Background section of this resolution, expediente 8203-P presents two situations with different procedural remedies. First, the use under the groundwater-extraction concession granted in that expediente through resolution R-0109-2014-AGUAS-MINAE at 8:57 a.m. on 30 January 2014 was changed to population use. Not only was this done without informing MINAE, but coordinated follow-up concerning the user was also undertaken with AyA regarding what must be done so that either that Institution or an ASADA provides the service or assumes responsibility for the well source PRN03. This was because it was demonstrated, and was more than sufficiently acknowledged by PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, through its representative Stefan Karl Kuhn, resident identification number 175-000006505, that a residential development is supplied under that concession; he has been sufficiently informed of what he must do before AyA and that the supply issue cannot be resolved through a water concession for human consumption (domestic use). As a consequence of the foregoing, the Director de Agua’s official letter to the Executive President of AyA states: ‘Given that this concerns water for the population’s human consumption and, pursuant to Ley 2726, it falls within that institution’s authority to provide this service, the matter is brought to its attention so that it may proceed as appropriate. Needless to say, the Municipalidad del cantón de Mora is being copied so that it does not approve any further construction permits on that property.’” ( ) “THEREFORE, THE MINISTER OF ENVIRONMENT AND ENERGY RESOLVES: I PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, through its representative Stefan Karl Kuhn, resident identification number 175-000006505, IS HEREBY FORMALLY ORDERED FOR THE FIRST TIME to take notice that the change in use under the groundwater-extraction concession granted through resolution R-0109-2014-AGUAS-MINAE at 8:57 a.m. on 30 January 2014 for drilled well number AB-1719, from domestic use to population use, constitutes grounds for termination of the water concession because it contravenes Article 26 subsection II of the Ley de Aguas, as has been more than sufficiently established in the account of facts contained in the Operative section and in light of the provisions and analysis in the Reasons section of this resolution.” (See documentary evidence).
  • h)Through resolution R-2606-2025-AGUAS-MINAE dated 21 November 2025, the following was ordered in response to Pueblo Mediterráneo S.A.’s application to extend the concession: “SEVENTH: On 10 August 2025, Pueblo Mediterráneo S. A. stated that, ‘in view of the request to seal well AB-1719,’ it requested that the sealing order be stayed until A y A or an ASADA assumes responsibility for the water-supply system because approximately 12 homes obtain water from it for domestic use. EIGHTH: The water-concession application for drilled well AB-1719 is being processed in administrative expediente 8203-P. The same expediente contains resolution R-0155-2021-AGUAS-MINAE, which ordered the sealing of well AB-2552 because it is used for population supply, a use that does not fall within MINAE’s authority. The administrative expediente contains no record that well AB-2552 was sealed; a criminal complaint must therefore be filed for Disobedience, an offense defined in section 314 of the Código Penal.” “THEREFORE, THE MINISTER OF ENVIRONMENT AND ENERGY RESOLVES: I TO DENY a groundwater-extraction concession to PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, represented by Mr. Stefan Karl Kuhn, residence identification card CED07, because well number AB-1719 does not comply with the 40-meter setback from the ROP or the 100-meter setback required by the Ley Forestal. II TO ORDER PUEBLO MEDITERRÁNEO S. A. TO SEAL WELL NUMBER AB-1719 WITHIN ONE MONTH, in accordance with the guidelines established in Decreto N° 45053-MINAE, and, within the same period, to notify the Dirección de Agua of the sealing for field verification. III TO ORDER THE DIRECCIÓN DE AGUA TO FILE A CRIMINAL COMPLAINT FOR THE OFFENSE OF DISOBEDIENCE, defined in Article 314 of the Código Penal, for FAILURE TO COMPLY WITH THE ORDER TO SEAL well number AB-2552 issued through Resolution R-0155-2021-AGUAS-MINAE at 2:22 p.m. on 2 February 2021.” (See documentary evidence).

III. THE SPECIFIC CASE

In the matter before the Chamber, the amparo applicant alleges that the persons on whose behalf the application was filed reside in San José, Mora, Colón, Barrio Bosques de Brasil. The applicant states that 8 families live in that neighborhood and built homes in good faith. The applicant states that both the protected persons and the other families in the area depend exclusively on well AB-1719 as their sole source of drinking water. The applicant clarifies that some lot owners cannot develop housing projects for the same reason, which exacerbates the collective impact. The applicant explains that well AB-1719 has been under concession since May 1997, pursuant to resolution R-106-97, and that the concession was renewed in January 2014 through resolution R-109-2014. The applicant contends that, based on that State concession, the families built their homes and established their lives in the neighborhood over the course of decades, legitimately relying on the State’s authorizations.

The applicant contends that the concession expired in January 2024 without being renewed in a timely manner by the original concession holder; however, in January 2026 MINAE formally denied renewal of the well concession through resolution R-038-2026-MINAE. The applicant asserts that the technical irregularities originating during construction of the well predated the resident neighbors’ acquisition of the properties; those neighbors did not participate at any time in constructing or locating the well and acted in good faith in reliance on the State authorizations then in force. The applicant alleges that, regardless of the original developer’s responsibility, the State has a nonwaivable constitutional obligation to guarantee the current residents’ human right to water, an obligation that cannot be transferred to private third parties. The applicant states that, through certificate SIGDD-2025-00103885-1-2-NAP dated 31 October 2025, the Instituto Costarricense de Acueductos y Alcantarillados denied the availability of drinking water for the neighborhood, citing the absence of distribution infrastructure in front of the property.

Nevertheless, the applicant indicates that a GPS measurement verified in the field on 9 June 2026 established that the Estación de Desinfección Retana of the ICAA is located only 178 meters in a straight line from the Bosques de Brasil river, which the applicant contends demonstrates that the absence of service is not an insurmountable geographic or technical impossibility, but rather results from an infrastructure-investment decision that the ICAA has not made. The applicant states that drinking-water service was requested from ASADA Barrio La Trinidad de Mora, but on 26 May 2026 it issued a “Certificate of No Water Availability,” on the ground that the neighborhood lies outside the perimeter of its Delegation Agreement granted by the ICAA itself. The applicant alleges that the situation described seriously affects the families in the area because, first, the Dirección de Aguas del MINAE recommended sealing the neighborhood’s only well and, second, the Instituto Costarricense de Acueductos y Alcantarillados does not authorize the nearest ASADA to provide service for jurisdictional reasons that the ICAA itself defines and controls.

The applicant states that an urgent complaint was filed in April 2026 concerning the imminent public-health risk posed by sealing well PRN03 when no alternative drinking-water supply exists for the resident families.

Now, with respect to the Instituto Costarricense de Acueductos y Alcantarillados, it has been established that, in report UEN-GAR-2018-04520 of 13 November 2018, the engineer from the ICAA’s UEN Gestión de Acueductos Rurales stated: “BACKGROUND Ms. Olga Jiménez, a civil engineer and representative of Mr. Stefan Karl Kuhn, appeared before the ORAC Metropolitana. They requested that the ASADA de Barrio La Trinidad de Mora assume operation of a small private drinking-water supply system serving approximately 17 homes; however, that operating entity denied the request. According to the information provided by Engineer Jiménez, the 17 properties that were sold at the time by Mr. Stefan are supplied by a well that was lawfully drilled and for which the respective concession was granted, although not for the purpose of carrying out urban-development activities. Accordingly, the Dirección de Agua del MINAE advised Mr.

Stefan of that irregularity and invited him to complete the appropriate procedures so that the nearest operator could assume operation of this small system. The nearest operator is the ASADA de Barrio La Trinidad de Mora, which denied the request on the grounds that the system is outside its jurisdiction and that it lacks the water-supply capacity to serve it. In light of the foregoing, Engineer Jiménez requested AyA’s intervention to clarify the situation, and this office coordinated a visit to the ASADA de Barrio La Trinidad to assess the situation and obtain its views. The visit was scheduled for 26 October 2018, with the participation of Mr. Nombre06, President of the Board, and Ms. Xinia Retana, Treasurer of the Board. RELEVANT ASPECTS First, what was requested of the members of the ASADA de Barrio La Trinidad was that they take us to the area where Mr. Stefan’s supply system is located, which can be seen in the following image: According to the measurements taken, Mr.

Stefan’s water-supply system is located 615 m from the ASADA’s office and lies precisely on the boundary between the Acueducto de Brasil de Mora (AyA) and the ASADA de Barrio La Trinidad system. The infrastructure existing in Mr. Stefan’s system is unknown, and the property was not entered during that visit. Regarding the willingness of the ASADA de Barrio La Trinidad to assume the operation and administration of that system, its representatives state that they are not opposed; however, they emphasize that they do not have sufficient water resources to meet the new needs and that the entity would assume administration of the system only if the well’s production is guaranteed and the situation is assessed and its views obtained. The visit was scheduled for 26 October 2018, with the participation of Mr. Nombre06, President of the Board, and Ms. Xinia Retana, Treasurer of the Board. RELEVANT ASPECTS First, what was requested of the members of the ASADA de Barrio La Trinidad was that they take us to the area where Mr.

Stefan’s supply system is located, which can be seen in the following image: According to the measurements taken, Mr. Stefan’s water-supply system is located 615 m from the ASADA’s office and lies precisely on the boundary between the Acueducto de Brasil de Mora (AyA) and the ASADA de Barrio La Trinidad system. The infrastructure existing in Mr. Stefan’s system is unknown, and the property was not entered during that visit. Regarding the willingness of the ASADA de Barrio La Trinidad to assume the operation and administration of that system, its representatives state that they are not opposed; however, they emphasize that they do not have sufficient water resources to meet the new needs and that the entity would assume administration of the system only if the well’s production is guaranteed and RECOMMENDATIONS Based on the information supplied by the ASADA de Barrio La Trinidad, the information provided by Engineer Olga Jiménez, and the visit conducted, it is recommended that both parties establish contact and coordinate the preparation of a technical study to determine the feasibility and possibility of the ASADA de Barrio La Trinidad assuming operation of that small supply system, all in accordance with Art. 5 and 21 of the ASADAS regulations.

I must also indicate that the study must be submitted to this ORAC Metropolitana for the corresponding review and approval.” Furthermore, in official letter UEN-SCMED-GAM-2026-01350 of 9 July 2026, the ICAA’s UEN Servicio al Cliente Medición GAM clarified: “FOURTH: The legal and technical grounds for denying application number SIGDD-2025-00103885-1-2-NAP are associated with the following: It is important to indicate that the purpose of issuing administrative acts granting or denying services in a given area is to inform the person concerned of the existing circumstances regarding water-supply capacity, collection capacity, and environmental conditions offered or experienced by AyA systems at a particular location. The foregoing is based on ‘basic studies’ and even more specialized studies depending on the nature of the project, which constitute the basis for issuing the act and must address, among other matters: the project’s location, an analysis in relation to the area’s water inventory, the project’s vulnerability, size, projected liters per second, type of activity, population growth, environmental factors that could be affected, and any other matters requiring technical assessment.

According to certificates SIGDD-2025-00103885-1-2-NAP (Certificate of Unavailability of Water-Supply and Sewerage Services), as well as 2025-00103885-1-AP (Technical Drinking-Water Assessment), it is stated that: ‘(...) No distribution or collection infrastructure exists in front of the property for which availability was requested. Images 6 and 7. (...)’ Accordingly, it is important to clarify that a request for water availability is not denied arbitrarily or capriciously, but on technical grounds demonstrating the REAL AND CURRENT LACK of water-supply and/or hydraulic capacity in the water-supply system. Consequently, it may be stated that there is no technical feasibility for granting a favorable determination of availability for drinking-water supply because of a technical impediment, since no production and distribution infrastructure currently exists in front of the property, and granting it would contravene Articles 7 (subsection 12), 8, and 14 of the Reglamento de Prestación de Servicios de AyA.

Furthermore, based on the technical assessment conducted, it is not possible to issue the Certificate of Water-Supply Capacity (Constancia de Capacidad Hídrica, CCH), because there is no distribution pipeline in the vicinity of the property through which a connection to the supply system could be made. Likewise, the water-supply system lacks the water-supply and hydraulic capacity required to meet new demand, and therefore service cannot feasibly be guaranteed under current conditions. Article 7—Definitions. For purposes of these Regulations, the following shall mean: 12. Technical feasibility for granting a service: When distribution and collection networks exist in front of the boundaries of the property, or there is direct access by means of a public road or right-of-way easement (servidumbre de paso) to the property for which service is requested. The systems must have sufficient water-supply, hydraulic, purification, and treatment capacity to provide new services.

The system must satisfy the established quality attributes. It must be legally and environmentally possible. The applicant or applicants must comply with urban-development regulations and the established requirements. (EMPHASIS NOT IN ORIGINAL TEXT) Article 8—Services. AyA shall provide water-supply services for population use and wastewater sanitation within the coverage area, provided that the area has technical and legal feasibility. (EMPHASIS NOT IN ORIGINAL TEXT). The internal systems and installations necessary for the use of the services are the user’s responsibility. Article 9—Technical conditions for providing services. The provider of drinking-water and sanitation services is required to provide them within optimal service parameters in terms of quality, quantity, continuity, reliability, equality, universal access, efficiency, timeliness, sustainability, and a human-rights-based approach, except in cases of force majeure, unforeseen events, or duly publicized maintenance periods affecting the coverage area where the property is located.

(EMPHASIS NOT IN ORIGINAL TEXT) Regarding the minimum dynamic-pressure parameter per service, the optimal service that the provider must guarantee is 10 meters of water column (m.c.a.) at the connection point where the metering system is located. Article 14—Conditions for providing services. AyA shall provide its services once technical feasibility has been verified for constructed properties or properties to be developed that are used as residences or for commercial or industrial activities and that satisfy the requirements and authorized uses under these Regulations. AyA shall provide drinking-water and sanitation services along a street or public road, or over a pipeline and right-of-way easement registered in favor of AyA or third parties, as applicable under Article 16 of these Regulations. The foregoing shall apply provided that operational AyA networks exist. (...) In addition to the foregoing, it is appropriate to recall that the Reglamento para la Prestación de los Servicios de Acueducto, Alcantarillado Sanitario e Hidrantes.

AR-PSAYA-2013, Resolution N° 54-2014 of 18 September 2014, published through Supplement N°50, and its amendment entitled ‘Prestación de los Servicios de Acueducto, Alcantarillado e hidrantes AR-PSAYA-2015,’ adopted through Resolution N° RJD-053-2016 in Supplement 55 of La Gaceta N°69 on 12 April 2016, provides as follows in Section 9: ‘... under no circumstances shall expansions be authorized that jeopardize existing water resources or the capacity of the Sewerage System and its treatment facilities, to the detriment of the community served or the inhabitants of potential new developments....’ (EMPHASIS NOT IN ORIGINAL TEXT) It is important to mention that drinking-water systems are dynamic; that is, they cannot be conceptualized as remaining static over time. Accordingly, water balances progressively limit their water-supply capacity in relation to the supply and demand arising from applications received in a given sector, such that each application is analyzed according to the system’s conditions at that time.

It is clear that we must comply with existing regulations and, although the supply of drinking water is indeed a public service, it is also clear that we must ensure compliance with the principle of legality governing the Public Administration and with the Political Constitution, under which the Institution must comply with its own Regulations and may make no exception. Accordingly, the right to water does not exempt anyone from complying with the requirements established in the Reglamento de Prestación de Servicios de AyA. Lastly, it is important to mention Article 11 of the Political Constitution of Costa Rica, which states verbatim: ‘Public officials are mere custodians of authority. They are required to perform the duties imposed on them by law and may not arrogate powers not granted therein. They must swear to observe and comply with this Constitution and the laws (...).’ FIFTH: According to the information available in AyA’s institutional map viewers, the property is located outside the coverage area of the services administered by that institution.

Likewise, according to the information submitted, the ASADA La Trinidad operates in the area and could be the entity administering the water-supply system that serves the property. SIXTH: Regarding the denial of Certificate of Service Availability N.° SIGDD-2025-00103885-1-2-NAP, on 3 November 2025 a submission filed by Mr. Nombre05 was received and was addressed through Resolution N.° UEN-SCMED-GAM-DyNS-2025-00842, issued on 23 December 2025. Subsequently, on 29 December 2025, a hierarchical administrative appeal (recurso jerárquico) against Resolution N.° UEN-SCMED-GAM-DyNS-2025-00842 was received and forwarded to the Gerencia General through Memorandum N.° UEN-SCMED-GAM-DyNS-2026-00129 for review and resolution. The response to the hierarchical administrative appeal was issued through Resolution number GG-R-2026-0400, notice of which was given on 9 July 2026. Conclusions: The denial of water availability was supported by technical and regulatory criteria.

AyA determined that there was no distribution infrastructure in front of the property and insufficient water-supply and hydraulic capacity to serve a new connection, and therefore concluded that the technical-feasibility requirements established in the Reglamento para la Prestación de los Servicios de Acueducto, Alcantarillado Sanitario e Hidrantes were not met. Consequently, the denial was not based on a discretionary decision, but on verified technical limitations. The property is outside the coverage area administered by AyA. According to the institutional map viewers, the property located in the canton of Mora, district of Colón, does not fall within the coverage of AyA’s services. It was further stated that the ASADA La Trinidad operates in that area and could be the entity with authority to provide drinking-water service. The administrative procedure complied with the stages for challenge and response to the person concerned.

After the certificate of unavailability was issued, the applicant filed a request for reconsideration and subsequently a hierarchical administrative appeal. Both were processed by the Administration in accordance with the established procedure, culminating in the issuance of the corresponding resolution and notice thereof on 9 July 2026, demonstrating that the interested party was afforded the opportunity to exercise the administrative remedies provided by the regulations.” For its part, Memorandum UEN-SCMED-GAM-2026-01351 of 9 July 2026 stated: “In addition to the foregoing, infrastructure administered and operated by AyA is located in the area, but supplying the community from it is not technically feasible because of topographic-elevation criteria. The Los Rodríguez tank is located at an elevation of 863 meters above sea level, and the Retana tank at an elevation of 832 meters above sea level.

Meanwhile, the community identified as Dirección03 is located at elevations ranging from 840 meters above sea level to 883 meters above sea level, which constitutes sufficient technical grounds for denying availability from the infrastructure associated with those tanks. Based on the foregoing, there are technical impediments to supplying flow in the sector. First, because of elevation; second, because of infrastructure and the investment project this would entail; and third and most importantly, because the area is operated not by AyA but by an ASADA. Conclusion Based on the technical information provided, it is concluded that it is not feasible for AyA to provide drinking-water service to the property because the sector is supplied by the ASADA Barrio La Trinidad de Ciudad Colón de Mora, is outside AyA’s operational area, and the existing institutional infrastructure cannot supply the area because of topographic-elevation limitations and the absence of the required infrastructure.

Consequently, the denial of water availability is technically justified.” In this regard, this Chamber has repeatedly held that, although the fundamental right to water and to equal access thereto is recognized because water is an essential service for life and health, that right does not entail unrestricted access to water, since service providers may validly establish general conditions and requirements for access to that service. It is likewise valid for the entities—public or private—that administer the service to deny requests for water or for a water-availability letter when the interested party does not satisfy the requirements or when technical or legal reasons justify the denial. Thus, for example, in Judgment number 2016-006027 at 09:05 on 6 May 2016, this Chamber held as follows:

“In Judgment 2014-9134 at 14:05 on 19 June 2014, which addressed an issue very similar to the one raised in this amparo proceeding, this Constitutional Court ruled: ‘(...) In repeated judgments on this matter, this Chamber has stated that the supply of drinking water is considered a public service under the Costa Rican legal system and that, as such, every provider of public services—whether a public or private entity—is required to provide the service continuously, efficiently, under conditions of equality, and with adaptation to technological changes (see, in this regard, Judgment 2001-09676 at eleven twenty-five on 26 September 2001 and Judgment 2004-08161 at ten fifty-three on 23 July 2004). It is therefore clear that the Instituto Costarricense de Acueductos y Alcantarillados, as one of the State entities charged with providing the public drinking-water service, is also required to provide that service continuously, adaptably, efficiently, and equally to all inhabitants.

However, the case law of this Constitutional Court has also stated that, where there is a legal impediment (meaning failure to comply with requirements established in the applicable regulations) or a formal impediment (meaning the absence of a Water-Distribution Network), it is reasonable not to grant service applications or to require the interested party to bear installation costs when there is no drinking-water distribution network and infrastructure must be constructed. Thus, in these cases, it has been made clear that this is not a denial of access to drinking-water service, but rather an inability to provide it or the necessary participation of the interested party in overcoming a technical impediment, namely, the lack of infrastructure. In other words, provided that the failure to furnish drinking-water service is not capricious, arbitrary, or unfounded, but is justified by a legal or material impediment, there is no violation of fundamental rights.

In the specific case, the evidence submitted and the report given under oath confirm that AyA did not arbitrarily deny the application filed by the amparo applicant, but did so because of the failure to satisfy all the technical and legal requirements established by the Reglamento de Prestación de Servicios a los Clientes de Instituto Costarricense de Acueductos y Alcantarillados for the approval of new services.’” Those arguments are fully applicable to the specific case, in which water availability was denied for technical reasons. Consequently, this Court considers that the denial of water availability is supported by technical grounds and therefore does not constitute arbitrary conduct.

Furthermore, it must be noted that whether water availability should be granted, as well as the soundness of the technical reasons supporting the respondent party’s decision, are not matters to be litigated in this Jurisdiction, because they constitute a dispute of ordinary legality falling outside this Chamber’s jurisdiction. Nor may this Court act as a mediator before a particular natural or legal person—whether the latter is governed by public or private law—to intercede on behalf of a third person so that the requested relief may be granted. The amparo applicant’s request that availability be granted is therefore improper and outside this Court’s authority. Accordingly, the amparo applicant may, if he sees fit, submit his objections or claims to the respondent authorities or through the competent judicial proceedings, in which he may fully litigate the merits of the matter and assert his claims.

Consequently, this aspect of the application must be denied.

IV. WITH RESPECT TO THE DIRECCIÓN DE AGUAS DEL MINAE

Regarding this aspect, the Chamber finds it established that, through Resolution nro. R-0109-2014-AGUAS-MINAE of 30 January 2014, the Dirección de Aguas del MINAE granted Pueblo Mediterráneo S.A. a concession for well PLA01 for use on property PRN01 and solely for domestic use.

For its part, the evidence submitted and the report given under oath show that the Dirección de Aguas del MINAE did not authorize the well for population use.

Subsequently, on 9 June 2018, an application was filed with the Dirección de Aguas seeking to designate property PRN02 as the new property benefiting from the well concession. In response to that application, the authority consulted the certification system of the Registro Nacional de la Propiedad and detected that property PRN01, for which the concession had been granted to Pueblo Mediterráneo S.A., had undergone subdivisions (segregaciones). The concessionaire company was therefore asked to inform the Dirección de Agua whether water was being drawn from well PLA01 for the subdivided properties, but no response was received.

Thus, Resolution R-0155-2021-AGUAS-MINAE of 2 February 2021 stated: “THIRD: In connection with that application, through official letter AL-0432-2016 of 09 August 2016, the Dirección de Agua ordered the owners of real-property folio PRN02 and Stefan Karl Kuhn, representative of the concessionaire company PUEBLO MEDITERRÁNEO S. A., to provide information, stating that the property number for which the concession was originally granted had been checked in the Registro Público and showed further subdivisions, and therefore requesting that they indicate whether water was being drawn from well PRN03 for those properties or state where their water was being drawn from; however, no response appears in expediente 8203-P. FOURTH: Engineer Mariel Celeste González Artavia, an official of the Unidad Hidrológica Tárcoles Pacífico Central of the Dirección de Agua, stated in official letter DA-UHTPCOSJ-0739-2018 of 20 March 2018, in response to the request to follow up on official letter AL-0432-2016, that after reviewing the background, ‘Mr.

Karl Kuhn (representative of PUEBLO MEDITERRÁNEO S. A.) was contacted by email (...01) and by telephone.... Mr. Kuhn stated that he was currently in discussions with A y A regarding donation of the well and the land, but that there was opposition from some neighbors who wished to obtain their water from that well. Mr. Kuhn indicates that, through official letter SGG-2015-0132 (dated 27/02/2018), AyA stated that it was analyzing the request....’ FIFTH: Memorandum N° UEN-OS-GAM-2018-00171 of 23 July 2018 appears in expediente 8203-P. In that memorandum, an official of AyA’s UEN Optimización de Sistemas GAM, writing to that Institution’s Dirección Jurídica regarding the well of Sociedad Pueblo Mediterráneo S. A., stated that ‘...because of the well’s location and the sector it supplies, as well as this source’s topographic elevation relative to the nearest supply systems of the Acueducto Metropolitano AyA, it is not technically feasible for A y A to assume this system.

It is recommended that the system be assumed by the ASADA de la Trinidad de Mora, and access to the well and the sector it supplies requires crossing part of that ASADA’s coverage area.’ SIXTH: Through official letter AL-0356-2018 of 24 August 2018, the legal advisory office of the Dirección de Agua informed Karl Kuhn, representative of Pueblo Mediterráneo S. A., that the concession had mistakenly been granted to property PRN01 when it should have been granted to property PRN04. It also informed him of Ms. Nombre03’s request to transfer the concession to property PRN02, which was improper because she was not a representative of the concessionaire. He was further informed that a review of the Registro Nacional de la Propiedad showed that the matter involved a residential development and population-based human-consumption uses of water that were not authorized by the concession; accordingly, pursuant to the official letter cited in the preceding paragraph, he was required to apply to the ASADA de la Trinidad de Mora for the provision of the public service and was granted a period of 6 months.

SEVENTH: On 10 October 2018, Karl Kuhn, representative of Pueblo Mediterráneo S. A., responded to official letter AL-0356-2018, attaching a response from the ASADA Barrio La Trinidad de Mora and stating that he had asked AyA’s Dirección Regional Oeste de Asadas to clarify that response because no other ASADA existed in the area where the well was located. The official letter to which he referred was dated 21 September 2018 and declined to assume the well because it was outside La Trinidad’s jurisdiction and the ASADA lacked the water-supply capacity for a development. That document was signed by Karen Arias Retana, identity card CED01, without specifying her authority or any technical assessment. EIGHTH: Through official letter DA-1530-2018 of 04 October 2018, addressed to the Presidenta Ejecutiva of A y A and served on 9 October 2018, the Director de Agua reported the situation described and stated as follows: ‘Because this concerns population-based human consumption and, under Ley 2726, it falls within that institution’s authority to provide that service, the case is brought to its attention so that it may proceed as appropriate.

It goes without saying that the Municipalidad del cantón de Mora is being copied so that it does not approve further construction permits on that property. Once the case has been addressed, you are requested to notify this Directorate so that it may inform the interested party before the sealing order is issued.’ NINTH: On 14 November, the Dirección de Agua received, by means of an official letter signed by Mr. Stefan Karl Kuhn, legal representative of Pueblo Mediterráneo S. A., AyA Site Visit Report UEN-GAR-2018-04520, signed by Engineer Esteban Ramírez Gutiérrez of the UEN Gestión de Acueductos Rurales. Thus, by submitting that official letter to the Dirección de Agua, he acknowledged and received notice of its contents, including that the matter had to be resolved through AyA. As relevant for purposes of this act, the following may be quoted from Section 2. RELEVANT ASPECTS of that letter: ‘First, what was requested of the members of the ASADA de Barrio La Trinidad was that they take us to the area where Mr.

Stefan’s supply system is located (...).’ ‘...it lies precisely on the boundary between the Acueducto de Brasil de Mora (AyA) and the ASADA de Barrio La Trinidad system.’ Likewise, Section 3. CONCLUSIONS states as follows: ° The supply system does not fall within the definition of an authorized operating entity, and regularizing this situation is therefore of the utmost importance. ° The supply system is located on the boundary between the Acueductos de Brasil de Mora, which is administered by AyA, and Dirección01; accordingly, either of the two water-supply systems could assume its administration, provided that it has the necessary technical capacity. ° The characteristics of the supply system are completely unknown, making it necessary to conduct a technical study describing the system, the characteristics of its component infrastructure, verification of well production, pressure tests on the distribution network, and a water balance between production and demand. ° If the study determines that the system requires improvements, they must be made by the interested party, and the ASADA may begin operating the system only after they have been completed.

Likewise, the land on which the well and storage tank are located and the pipeline rights-of-way must be duly registered in the ASADA’s name when it begins operating the system. TENTH: Through official letter AL-0465-2018 of 20 November 2018, the Legal Coordinator of the Dirección de Agua asked the representative of Pueblo Mediterráneo S. A. to indicate the approximate date on which AyA would assume provision of the service at the site and the well in question could be sealed, so that the ongoing unlawful use would not continue. Alternatively, he was asked to clarify whether the well would be assumed by any of the ASADAS mentioned in official letter UEN-GAR-2018-04520 so that registration of the source could be ordered, all within a period of 10 days pursuant to Article 264 of the Ley General de la Administración Pública.” ( ) “THIRD: According to the statement of facts set out in the Background section of this resolution, expediente 8203-P presents two situations with different procedural remedies.

First, the change to population use of the concession for the use of groundwater granted in that expediente through Resolution R-0109-2014-AGUAS-MINAE at eight fifty-seven on 30 January 2014. Not only was that change made without notifying MINAE, but the user was also given coordinated follow-up with AyA concerning the steps required so that either that Institution or an ASADA would provide the service or assume source well PRN03, because it was demonstrated and has been more than sufficiently acknowledged by PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, through its representative Stefan Karl Kuhn, resident identification number 175-000006505, that a residential development is supplied from that concession. He has been sufficiently informed of the steps he must take before AyA and that the supply issue cannot be resolved through a water concession for human consumption (domestic use).

As a consequence of the foregoing, the Director de Agua’s official letter to the Presidenta Ejecutiva of AyA states: ‘Because this concerns population-based human consumption and, under Ley 2726, it falls within that institution’s authority to provide that service, the case is brought to its attention so that it may proceed as appropriate. It goes without saying that the Municipalidad del cantón de Mora is being copied so that it does not approve further construction permits on that property.’” ( ) “THEREFORE, THE MINISTER OF ENVIRONMENT AND ENERGY RULES: I. PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, through its representative Stefan Karl Kuhn, resident identification number 175-000006505, IS HEREBY FORMALLY ORDERED FOR THE FIRST TIME to take notice that the change in use of the groundwater-use concession granted through Resolution R-0109-2014-AGUAS-MINAE at eight fifty-seven on 30 January 2014 for drilled well number AB-1719, from domestic use to population use, constitutes grounds for expiration of the water concession because it contravenes Article 26, subsection II, of the Ley de Aguas, as has been more than sufficiently established by the statement of facts set out in the Operative section and in light of the regulations and reasoning contained in the Reasons section of this resolution.” Finally, in Resolution R-2606-2025-AGUAS-MINAE of 21 November 2025, in response to Pueblo Mediterráneo S.A.’s application to extend the concession, it was ruled: “SEVENTH: On 10 August 2025, Pueblo Mediterráneo S. A. stated that, ‘in view of the request to seal well AB-1719,’ it requested that the sealing order remain stayed until A y A or an ASADA assumes the water-supply system, because approximately 12 homes obtain water from it for domestic use.

EIGHTH: The application for a water concession through drilled well AB-1719 is being processed in expediente administrativo 8203-P. The same expediente contains Resolution R-0155-2021-AGUAS-MINAE, which ordered well AB-2552 sealed because it is used for population supply, a use falling outside MINAE’s authority. The administrative expediente contains no record that well AB-2552 was sealed; accordingly, a criminal complaint must be filed for Disobedience, an offense defined in Section 314 of the Código Penal.” “THEREFORE, THE MINISTER OF ENVIRONMENT AND ENERGY RULES: I. TO DENY PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, represented by Mr. Stefan Karl Kuhn, residence identification number CED07, a concession for the use of groundwater because well number AB-1719 does not comply with the 40-meter setback from the ROP or the 100-meter setback required by the Ley Forestal.

II. TO ORDER PUEBLO MEDITERRÁNEO S. A. TO SEAL WELL NUMBER AB-1719 WITHIN ONE MONTH in accordance with the guidelines established in Decreto N° 45053-MINAE and, within the same period, to report the sealing to the Dirección de Agua for field verification. III. TO ORDER THE DIRECCIÓN DE AGUA TO FILE A CRIMINAL COMPLAINT FOR THE OFFENSE OF DISOBEDIENCE, defined in Article 314 of the Código Penal, for FAILURE TO COMPLY WITH THE ORDER TO SEAL well number AB-2552 issued through Resolution R-0155-2021-AGUAS-MINAE at fourteen twenty-two on 2 February 2021.” Thus, it should be noted that, from the outset, the well concession was granted solely to Pueblo Mediterráneo S.A. for use on property PRN01 and solely for domestic use. Nevertheless, that concessionaire improperly used the well, properties were subdivided, and the well was used for an unauthorized purpose, namely, the residential development.

It was precisely for that reason that Resolution R-0155-2021-AGUAS-MINAE of 2 February 2021 stated: “PUEBLO MEDITERRÁNEO S. A., corporate identification number 3-101-243294, through its representative Stefan Karl Kuhn, resident identification number 175-000006505, IS HEREBY FORMALLY ORDERED FOR THE FIRST TIME to take notice that the change in use of the groundwater-use concession granted through Resolution R-0109-2014-AGUAS-MINAE at eight fifty-seven on 30 January 2014 for drilled well number AB-1719, from domestic use to population use, constitutes grounds for expiration of the water concession because it contravenes Article 26, subsection II, of the Ley de Aguas, as has been more than sufficiently established by the statement of facts set out in the Operative section and in light of the regulations and reasoning contained in the Reasons section of this resolution.” Subsequently, in Resolution R-2606-2025-AGUAS-MINAE of 21 November 2025, the concession was denied because the requirements had not been met, and the sealing of well AB-1719 was ordered.

Against this background, the application must be denied because no arbitrary conduct by the authorities of the Dirección de Aguas is apparent to the detriment of the protected party’s fundamental rights. This is because, from the outset, the well was not authorized for population use or for properties other than the one recorded under real-property folio PRN01.

It is therefore improper for this Chamber to endorse the applicant party’s contention that legitimate expectations were infringed when, instead, third parties, such as the protected persons, have used a well not authorized for their water supply, notwithstanding even the existence of the aforementioned Resolutions R-0155-2021-AGUAS-MINAE of 2 February 2021 and R-2606-2025-AGUAS-MINAE of 21 November 2025.

V. DOCUMENTATION SUBMITTED TO THE CASE FILE

The parties are hereby advised that, if they submitted any paper document, as well as objects or evidence contained on any electronic, computer, magnetic, optical, or telematic device or produced using new technologies, such items must be collected from the Chamber’s offices within a maximum period of 30 business days from notice of this judgment. Notice is given that any material not collected within that period will be destroyed, pursuant to the “Reglamento sobre Expediente Electrónico ante el Poder Judicial,” approved by the Corte Plena in Article XXVI of Session nro. 27-11 of 22 August 2011, published in Boletín Judicial nro. 19 of 26 January 2012, as well as the decision of the Consejo Superior del Poder Judicial approved in Article LXXXI of Session nro. 43-12 held on 3 May 2012.

Therefore:

The amparo application is denied.

Fernando Castillo V.

President Fernando Cruz C.

Paul Rueda L.

Luis Fdo. Salazar A.

Jorge Araya G.

Anamari Garro V.

Ingrid Hess H.

EXPEDIENTE N° 26-021424-0007-CO Telephone numbers: 2549-1500 / 800-SALA-4TA (800-7252-482). Fax: 2220-4607 / 2220-4844. Website: www.poder-judicial.go.cr/salaconstitucional. Address: (Dirección02).

Secciones

Marcadores

Revisión del Documento SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del tres de setiembre de dos mil veintiseis .

Recurso de amparo que se tramita en expediente número 26-021424-0007-CO, interpuesto por Nombre05, cédula de identidad CED03, a favor de Nombre01, cédula de identidad CED04, Nombre02, cédula de identidad CED05 y Nombre04, cédula de identidad CED06, contra el INSTITUTO COSTARRICENSE DE ACUEDUCTOS Y ALCANTARILLADOS (ICAA) y el MINISTERIO DE AMBIENTE Y ENERGÍA (MINAE).

Resultando:

  1. 1Por escrito incorporado al expediente digital el 15 de junio de 2026, la parte recurrente interpone recurso de amparo. Alega que los tutelados residen en San José, Mora, Colon, Barrio Bosques de Brasil. Comenta que en ese barrio viven 8 familias que construyeron viviendas de buena fe. Señala que, tanto los tutelados como las demás familias de la zona, dependen exclusivamente del pozo AB-1719 como única fuente de agua potable. Aclara que existen propietarios de lotes que no pueden desarrollar proyectos habitacionales por la misma causa, lo que agrava el impacto colectivo. Expone que el pozo AB-1719 fue concesionado desde mayo de 1997, mediante la resolución R-106-97 y fue renovado en enero de 2014, en la resolución R-109-2014. Aduce que, con base en esa concesión estatal, las familias construyeron sus viviendas y establecieron su vida en el barrio durante décadas, confiando legítimamente en las autorizaciones del Estado.Aduce que la concesión venció en enero de 2024 sin ser renovada oportunamente por el concesionario original; sin embargo, en enero de 2026 el MINAE rechazo formalmente la renovación del pozo mediante la resolución R-038-2026-MINAE. Afirma que las irregularidades técnicas que se originaron en la construcción del pozo fueron anteriores a la adquisición de los inmuebles por parte de los vecinos residentes, quienes en ningún momento participaron en la construcción ni ubicación del pozo, y actuaron de buena fe confiando en las autorizaciones estatales vigentes. Alega que, independientemente de la responsabilidad del desarrollador original, el Estado tiene la obligación constitucional e irrenunciable de garantizar el derecho humano al agua a los residentes actuales, obligación que no puede trasladarse a terceros privados. Señala que, mediante constancia SIGDD-2025-00103885-1-2-NAP del 31 de octubre de 2025, el Instituto Costarricense de Acueductos y Alcantarillados negó la disponibilidad de agua potable para el barrio, argumentando ausencia de infraestructura de distribución frente al inmueble.No obstante, indica que, mediante medición GPS verificada en campo el 9 de junio de 2026, se constató que la Estación de Desinfección Retana del ICAA se ubica a solo 178 metros en línea recta del rio Bosques de Brasil, lo que aduce demuestra que la ausencia de servicio no es una imposibilidad geográfica o técnica insuperable, sino una decisión de inversión en infraestructura que el ICAA no ha realizado. Señala que se gestionó el servicio de agua potable ante la ASADA Barrio La Trinidad de Mora, pero el 26 de mayo de 2026 se le emitió certificación de "No Disponibilidad Hídrica", con el argumento de que el barrio se encuentra fuera del perímetro de su Convenio de Delegación otorgado por el propio ICAA. Alega que la situación expuesta afecta gravemente a las familias de la zona, ya que, en primer lugar, la Dirección de Aguas del MINAE recomendó sellar el único pozo del barrio y, en segundo lugar, el Instituto Costarricense de Acueductos y Alcantarillados no autoriza a la ASADA más cercana a prestar el servicio por razones de jurisdicción que el propio ICAA define y controla.Señala que en abril de 2026 se interpuso una denuncia urgente ante el riesgo inminente a la salud pública que representa el sellado del pozo AB-1719, sin que exista una alternativa de suministro de agua potable para las familias residentes. Refiere que dicha denuncia que actualmente se encuentra en trámite, pues el Ministerio de Salud ha iniciado el proceso de valoración del riesgo.
  2. 2Por resolución de la Presidencia de la Sala de las 17:08 horas de 6 de julio de 2026, se le dio curso a este proceso.
  3. 3Informa José Miguel Zeledón Calderón, en su condición de director de Aguas del Ministerio de Ambiente y Energía. Expone: “HECHOS a) Mencionan los recurrentes que residen en San José, Mora, Colon, Barrio Bosques de Brasil. R/ Sobre este hecho, no le consta a esta Dirección el domicilio de los recurrentes b) Comentan que en dicho barrio actualmente viven 8 familias, quienes han construido sus viviendas de buena fe, al amparo de autorizaciones otorgadas por el propio Estado costarricense. R/ Sobre este hecho, no le consta a esta Dirección la población en el lugar citado. c) Señalan que, tanto los tutelados, como las demás familias de la zona, dependen exclusivamente del pozo AB-1719 como única fuente de agua potable. R/ Sobre este hecho, el pozo AB-1719, corresponde al expediente 8203-P tramitado en la Dirección de Agua a nombre de la sociedad Pueblo Mediterráneo S.A cédula jurídica 3-101-243294 para uso doméstico NO poblacional. d) Adicionalmente, indican que existen propietarios de lotes que no pueden desarrollar proyectos habitacionales por la misma causa -como es su caso-, lo que agrava el impacto colectivo.R/ No le consta esta Dirección las limitantes que tengan los recurrentes para el desarrollo de proyectos. e) Exponen que, el pozo AB-1719 (expediente 8203-P, MINAE) fue concesionado desde mayo de 1997, mediante la resolución R-106-97, y fue renovado en enero de 2014, en la resolución R-109-2014. R/ Este hecho es cierto en el tanto que, mediante resolución R-109-2014-AGUAS-MINAE de fecha 30 de Enero del 2014, se otorgó concesión de aprovechamiento de aguas subterráneas del acuífero por medio del pozo AB-1719 por un plazo de 10 años a favor Pueblo Mediterráneo S.A cédula jurídica 3-101-243294 para ser utilizado en la finca de su propiedad folio real PRN01 del partido de San José, para uso doméstico NO poblacional. f) Aducen que, con base en esa concesión estatal, las familias construyeron sus viviendas y establecieron su vida en el barrio durante décadas, confiando legítimamente en las autorizaciones del Estado.R/ Sobre este punto, la Dirección de Agua, mediante solicitud de cambio de numero de folio real para la finca sobre la que se otorgó la concesión de aprovechamiento de agua del expediente 8203-P presentada el día 9 de junio del 2018, para que se tuviera la finca PRN02 como la nueva finca, una vez consultado el sistema de certificaciones del Registro Nacional de la Propiedad, se detecta que la finca folio real PRN01 del partido de San José, sobre la cual se otorgó la concesión a favor de Pueblo Mediterráneo S.A cédula jurídica 3-101-243294 presenta segregaciones, razón por la cual se solicita a la empresa concesionaria indicar a la Dirección de Agua, si del pozo PRN03 se está captando agua para las fincas segregadas, más no se obtuvo respuesta. g) Aducen que la concesión venció en enero de 2024 sin ser renovada oportunamente por el concesionario original; sin embargo, en enero de 2026 el MINAE rechazo formalmente la renovación del pozo mediante la resolución R-038-2026-MINAE.R/ Sobre este punto, de acuerdo a lo expuesto supra, mediante resolución R-0155-2021-AGUAS-MINAE de fecha 2 de febrero 2021, respecto a la situación detectada en la concesión, y en lo conducente se indicó: ( ) “TERCERO: Que la Dirección de Agua con motivo de esa solicitud, previno a los propietarios de la finca folio real PRN02 y al representante de la sociedad concesionaria PUEBLO MEDITERRÁNEO S. A., Stefan Karl Kuhn, mediante oficio AL-0432-2016 del 09 de agosto de 2016, que se consultó en el Registro Público el número de finca para la cual se otorgó originalmente la concesión, la cual presenta más segregaciones, por lo que se solicita indicar si del pozo AB-1719 se está captando agua para esas propiedades o bien indicar de dónde se están captando el agua, sin embargo no consta respuesta en el expediente 8203-P. CUARTO: Que la Ingeniera Mariel Celeste González Artavia, funcionaria de la Unidad Hidrológica Tárcoles Pacífico Central, de la Dirección de Agua, en oficio DA-UHTPCOSJ-0739-2018 del 20 de marzo de 2018, indica que en atención a la solicitud para darle seguimiento al oficio AL-0432-2016, revisados los antecedentes, “vía correo electrónico (...01) se contactó con el señor Karl Kuhn (representante de PUEBLO MEDITERRÁNEO S. A.) y vía telefónica …El señor Kuhn señaló que actualmente se encuentra en conversaciones con el A y A para la donación del pozo y el terreno, pero que hay oposición por parte de algunos vecinos que quieren abastecerse de dicho pozo. El señor Kuhn indica que mediante el oficio SGG-2015-0132 (con fecha 27/02/2018), el AyA señala que se encuentra con el análisis de la solicitud…”. QUINTO: Que consta en expediente 8203-P Memorando N° UEN-OS-GAM-2018-00171 de 23 de julio de 2018 en el cual el funcionario de la UEN Optimización de Sistemas GAM del AyA dirigido a la Dirección Jurídica de esa Institución, respecto al Pozo Sociedad Pueblo Mediterráneo S. A., indica que “…por ubicación del pozo y por el sector que abastece, así como por la elevación topográfica de esta fuente con respecto a los sistemas más cercanos de abastecimiento del Acueducto Metropolitano AyA; no es factible técnicamente que este sistema sea asumido por A y A. Se recomienda que este sistema sea asumido por la ASADA de la Trinidad de Mora y que para acceder al pozo y al sector que abastece, se debe atravesar por parte de la zona de cobertura de dicha ASADA”.SEXTO: Que la asesoría legal de la Dirección de Agua, mediante oficio AL-0356-2018 del 24 de agosto de 2018, comunica a Karl Kuhn representante de Pueblo Mediterráneo S. A., que erróneamente se otorgó la concesión a la finca PRN01 debiendo de otorgarse a la finca PRN04, además le informa de la solicitud de la señora Nombre03 para que se traspase la concesión a la finca PRN02, mas no siendo representante de la concesionaria no es procedente. Se le informa también que, de la revisión en el Registro Nacional de la Propiedad, se evidencia que se está en presencia de una urbanización y los usos del agua para consumo humano poblacional no autorizados en la concesión, por lo que debe tramitar ante la ASADA de la Trinidad de Mora conforme el oficio citado en el punto anterior, la solicitud para la prestación del servicio público, concediéndole un plazo de 6 meses. SÉTIMO: Que en fecha 10 de octubre de 2018, Karl Kuhn representante de Pueblo Mediterráneo S. A., contesta el oficio AL-0356-2018, adjunta respuesta de la ASADA Barrio La Trinidad de Mora y que solicitó a la Dirección Regional Oeste de Asadas de AyA una aclaración de esa nota, ya que en la zona donde se ubica el pozo no hay otra ASADA.El oficio al que hace referencia está fechado 21 de setiembre de 2018 y rechaza asumir el pozo por estar fuera de la jurisdicción de La Trinidad y no contar con capacidad hídrica para un desarrollo. Ese documento lo suscribe Karen Arias Retana, cédula CED01 sin indicar sus facultades ni criterio técnico. OCTAVO: El Director de Agua mediante oficio DA-1530-2018 del 04 de octubre de 2018 dirigido a la Presidenta Ejecutiva del A y A, notificado el 9 de octubre de 2018, informa de la situación descrita e indica lo siguiente: “Siendo que se trata de consumo humano poblacional, y dado que de conformidad con la Ley 2726 es competencia de esa institución dar ese servicio, se pone en su conocimiento el caso a fin de que se proceda como corresponda. Demás está indicar que se le está copiando a la Municipalidad del cantón de Mora para que no apruebe más permisos de construcción en dicha propiedad. Una vez atendido el caso, se agradecería se sirvan comunicarlo a esta Dirección a fin de poner en conocimiento a la parte interesada, previo la orden de sellado”.NOVENO: En fecha 14 de noviembre se recibe en la Dirección de Agua, mediante oficio suscrito por el señor Stefan Karl Kuhn, representante legal de Pueblo Mediterráneo S. A., el Informe de Visita del AyA UEN-GAR-2018-04520, suscrito por el Ingeniero Esteban Ramírez Gutiérrez UEN Gestión de Acueductos Rurales. De manera que al hacer llegar a la Dirección de Agua ese oficio, se está dando por enterado y notificado de su contenido, así como que se trata de una cuestión que debe resolver a través del AyA. En cuanto a lo relevante para efectos de este acto, puede citarse de dicho oficio, el punto 2. ASPECTOS RELEVANTES “en primera instancia, lo que solicitó a los miembros de la ASADA de barrio la Trinidad fue llevarnos hasta la zona donde se encuentra el sistema de abastecimiento del Sr. Stefan (…).” “…se ubica justo en el límite entre el Acueducto de Brasil de Mora (AyA) y el de la ASADA de Barrio La Trinidad”.Asimismo, el punto 3. CONCLUSIONES en el que se indica lo siguiente:  El sistema de abastecimiento no se enmarca dentro de lo que se define como un ente operador autorizado, por lo que es de suma importancia regularizar dicha situación.  El sistema de abastecimiento se encuentra en el límite entre los Acueductos de Brasil de Mora, el cual es administrado por AyA, y el Dirección01, por lo que cualquiera de los dos acueductos podría suministrar su administración, siempre y cuando se encuentren con la capacidad técnica necesaria.  Se desconoce completamente las características del sistema de abastecimiento, por lo que es necesario realizar un estudio técnico, donde se describa el sistema, las características de la infraestructura que lo conforma, comprobación de la producción del pozo, pruebas de presión en la red de distribución, y un balance hídrico entre la producción y la demanda.  En caso de que en el estudio se determine que el sistema requiere mejoras, estas deberán ser realizadas por el interesado y hasta que las mismas estén concluidas la ASADA podrá entrar en operación del sistema.Asimismo, los terrenos donde se ubiquen el pozo y tanque de almacenamiento, y las servidumbres de paso de tubería deberán estar debidamente a nombre de la ASADA a la hora de entrar en operación el sistema. DÉCIMO: Que mediante oficio AL-0465-2018 del 20 de noviembre de 2018, la Coordinadora legal de la Dirección de Agua, dirigido al representante de la sociedad Pueblo Mediterráneo S. A., solicita indique la fecha aproximada para que el AyA, asuma la prestación del servicio en el sitio y se proceda a sellar el pozo en cuestión, a fin de que no continúe con el aprovechamiento ilegal que se viene dando. O se aclare si el pozo va a ser asumido por alguna de las ASADAS mencionadas en el oficio UEN-GAR-2018-04520 y poder prevenir la inscripción de la fuente, lo anterior en un plazo de 10 días de conformidad con el artículo 264 de la Ley General de la Administración Pública.” ( ) “TERCERO: Que, según la relación de hechos expuesta en los resultandos de esta resolución, se presentan en expediente 8203-P dos situaciones con remedios procesales distintas.En primer lugar, el cambio de uso de la concesión de aprovechamiento de aguas subterráneas otorgada en ese expediente, mediante resolución R-0109-2014-AGUAS-MINAE de las ocho horas cincuenta y siete minutos del treinta de enero de dos mil catorce, a uso poblacional, el cual no sólo se realizó sin comunicarlo al MINAE, sino además se dio el seguimiento al usuario coordinado con AyA para lo que corresponde hacer con el fin que sea esa Institución o una ASADA la que se encargue de brindar el servicio o asumir la fuente pozo AB-1719, porque se demostró y está de sobra aceptado por la sociedad PUEBLO MEDITERRÁNEO S. A., cédula jurídica 3-101-243294 a través de su mismo representante Stefan Karl Kuhn cédula de residente CED02, que de esa concesión se abastece una urbanización y está suficientemente informado sobre lo que debe hacer ante el AyA y que no es mediante una concesión de agua para uso consumo humano (doméstico) que puede solucionar la cuestión del abastecimiento.Consecuencia de lo anterior, el oficio del Director de Agua a la Presidenta Ejecutiva del AyA en la que indica: “Siendo que se trata de consumo humano poblacional, y dado que de conformidad con la Ley 2726 es competencia de esa institución dar ese servicio, se pone en su conocimiento el caso a fin de que se proceda como corresponda. Demás está indicar que se le está copiando a la Municipalidad del cantón de Mora para que no apruebe más permisos de construcción en dicha propiedad.” ( ) “POR TANTO EL MINISTRO DE AMBIENTE Y ENERGIA RESUELVE I SE INTIMA POR PRIMERA VEZ a PUEBLO MEDITERRÁNEO S. A., cédula jurídica 3-101-243294 a través de su mismo representante Stefan Karl Kuhn cédula de residente 175-000006505, que el cambio de uso de la concesión de aprovechamiento de aguas subterráneas otorgada mediante resolución R-0109-2014-AGUAS-MINAE de las ocho horas cincuenta y siete minutos del treinta de enero de dos mil catorce, del pozo perforado número AB-1719 de uso doméstico a poblacional, es causal de caducidad de la concesión de aguas, por contravenir lo dispuesto en el artículo 26 inciso II de la Ley de Aguas, lo que está de sobra comprobado en la relación de hechos efectuada en la parte Resolutiva y a la luz de la normativa y consideraciones de la parte Considerativa de esta resolución.” Así las cosas, en razón del cambio de uso que el concesionario dio al aprovechamiento de las aguas subterráneas provenientes del pozo AB-1719, se generó la caducidad de la concesión y consecuentemente como una acción ineludible la orden del sellado del pozo.Mediante resolución R-2606-2025-AGUAS-MINAE de fecha 21 de Noviembre del 2025, en razón de las condiciones y los hechos comprobados por la Dirección de Agua, se denegó la concesión de aprovechamiento de aguas subterráneas a PUEBLO MEDITERRÁNEO S. A., resolución que en lo conducente expuso: ( ) “SÉTIMO: Que en fecha 10 de agosto de 2025 la sociedad Pueblo Mediterráneo S. A., manifiesta que “ante la solicitud de sellado del pozo AB-1719”, solicita mantener en suspenso la orden de sellado hasta que el A y A tome el acueducto o bien una ASADA, porque de él se abastecen para uso doméstico aproximadamente 12 casas de habitación. OCTAVO: Que en expediente administrativo 8203-P se tramita la solicitud de concesión de aguas mediante el pozo perforado AB-1719. En el mismo expediente consta la resolución R-0155-2021-AGUAS-MINAE que ordenó el sellado del pozo PRN05 porque se utiliza para abastecimiento poblacional, uso que no es competencia del MINAE.No consta en el expediente administrativo el sellado del pozo AB-2552 por lo que procede presentar denuncia penal por Desobediencia, delito tipificado en el numeral 314 del Código Penal.” “POR TANTO EL MINISTRO DE AMBIENTE Y ENERGIA RESUELVE I DENEGAR concesión de aprovechamiento de aguas subterráneas a PUEBLO MEDITERRÁNEO S. A. cédula jurídica 3-101-243294, representado por el señor Stefan Karl Kuhn, cédula de residencia 175600006505, por no cumplir el pozo número AB-1719 con el retiro de 40 metros de distancia del ROP ni el retiro de 100 metros de la Ley Forestal. II ORDENAR A PUEBLO MEDITERRÁNEO S. A. PROCEDER EN EL PLAZO DE UN MES A SELLAR EL POZO NÚMERO AB-1719 con los lineamientos que dispone el Decreto N° 45053-MINAE y dentro del mismo plazo, informar a la Dirección de Agua sobre el sellado para verificación en campo. III ORDENAR A LA DIRECCIÓN DE AGUA PRESENTAR LA DENUNCIA PENAL POR EL DELITO DE DESOBEDIENCIA, tipificado en el artículo 314 del Código Penal, por el INCUMPLIMIENTO DE LA ORDEN DE SELLADO DE POZO número AB-2552 impartida mediante Resolución R-0155-2021-AGUAS-MINAE, de las catorce horas veintidós minutos del dos de febrero de dos mil veintiuno.” h) Afirma que las irregularidades técnicas que se originaron en la construcción del pozo fueron anteriores a la adquisición de los inmuebles por parte de los vecinos residentes, quienes en ningún momento participaron en la construcción ni ubicación del pozo, y actuaron de buena fe confiando en las autorizaciones estatales vigentes.R/ Sobre este punto, la Dirección de Agua no tiene conocimiento. i) Alega que, independientemente de la responsabilidad del desarrollador original, el Estado tiene la obligación constitucional e irrenunciable de garantizar el derecho humano al agua a los residentes actuales, obligación que no puede trasladarse a terceros privados. R/ Sobre este punto, de acuerdo a lo ya expuesto respecto a la concesión del pozo AB-1719, le corresponde al Instituto Costarricense de Acueductos y Alcantarillados pronunciarse j) Señala que, mediante constancia SIGDD-2025 -00103 885-1-2-NAP del 31 de octubre de 2025, el Instituto Costarricense de Acueductos y Alcantarillados negó la disponibilidad de agua potable para el barrio, argumentando ausencia de infraestructura de distribución frente al inmueble. R/ Sobre este punto, le corresponde al Instituto Costarricense de Acueductos y Alcantarillados pronunciarse, toda vez que conforme a la ley N°2726 le corresponde a dicho instituto, resolver todo lo relacionado con el suministro del agua potable. k) No obstante, indica que, mediante medición GPS verificada en campo el 09 de junio de 2026, se constató que la Estación de Desinfección Retana del AyA se ubica a solo 178 metros en línea recta del rio Bosques de Brasil, lo que aduce demuestra que la ausencia de servicio no es una imposibilidad geográfica o técnica insuperable, sino una decisión de inversión en infraestructura que el AyA no ha realizado, generando una zona sin cobertura que afecta directamente a familias que ya residen en el barrio y que ya gozan actualmente del agua como derecho.R/ Sobre este punto, le corresponde al Instituto Costarricense de Acueductos y Alcantarillados Pronunciarse de Mora, pero el 26 de mayo de 2026 se le emitió certificación de "No Disponibilidad Hídrica", con el argumento de que el barrio se encuentra fuera del perímetro de su Convenio de Delegación otorgado por el propio AyA. R/ Sobre este punto, le corresponde al Instituto Costarricense de Acueductos y Alcantarillados pronunciarse m) Alega que la situación expuesta afecta gravemente a las familias de la zona, ya que, en primer lugar, la Dirección de Aguas del MINAE recomendó sellar el único pozo del barrio y, en segundo lugar, el Instituto Costarricense de Acueductos y Alcantarillados no autoriza a la ASADA más cercana a prestar el servicio por razones de jurisdicción que el propio AyA define y controla. R/ Sobre este punto, le corresponde al Instituto Costarricense de Acueductos y Alcantarillados pronunciarse n) Aducen que tal situación da como resultado que Estado, mediante sus propias decisiones institucionales descoordinadas, ha creado y mantiene una zona donde las familias que ya viven no tienen ninguna posibilidad de acceso al agua potable una vez ejecutado el sellado del pozo.R/ Sobre este punto, le corresponde al Instituto Costarricense de Acueductos y Alcantarillados pronunciarse, sin embargo es importante señalar la responsabilidad directa del desarrollador por haber realizado una urbanización sin contar con el servicio público del agua. ñ) Menciona que la gravedad sanitaria está siendo conocida por el Ministerio de Salud, toda vez que, en abril de 2026 se interpuso una denuncia urgente ante el riesgo inminente a la salud pública que representa el sellado del pozo AB-1719 sin que exista una alternativa de suministro de agua potable para las familias residentes. R/ Sobre este punto, le corresponde al Ministerio de Salud pronunciarse o) Refieren que dicha denuncia que actualmente se encuentra en trámite, pues el Ministerio de Salud ha iniciado el proceso de valoración del riesgo. Solicita la intervención de esta Sala. R/ Sobre este punto, le corresponde al Ministerio de Salud pronunciarse SOBRE EL FONDO Tal y como se desprende de las actuaciones de la Dirección de Agua anotadas, el tema que alegan los recurrentes sobre el suministro de agua para su comunidad, no recae en la competencia y responsabilidad de esta, ya quedó demostrado, que el aprovechamiento de las aguas subterráneas provenientes del pozo AB-1719 se otorgó para uso doméstico a favor de la sociedad PUEBLO MEDITERRÁNEO S.A para ser utilizada en la finca folio real PRN01 del partido de San José, apercibidos que de incumplir las condiciones de otorgamiento daría lugar a la cancelación de la concesión, lo que se ha demostrado ocurrió y así lo aceptó el mismo concesionario, al estarse dándole al agua un uso poblacional por personas no autorizadas, razón por la cual la Dirección de Agua procedió conforme lo exige la legislación que rige la materia.Valga traer a colación, un extracto de lo resuelto por la Sala Constitucional en casos en similares condiciones: “Lo anterior, sustenta entonces, claramente, la actuación de la Dirección de Agua del MINAE, concretamente, lo dispuesto en el oficio No. DA-UHTPCOSJ-2123-20 de 28 de septiembre de 2020 impugnado por el promovente, en su condición de Presidente de [...]. Oficio que, además, cabe destacar, señala puntualmente todos los motivos de derecho y de hecho que fundamentan el cierre en cuestión, entre los que figuran, principalmente, como se dijo, el funcionamiento del pozo de manera ilegal y su uso para consumo humano y no como abrevadero para 20 reses, tal y como se señaló y solicitó años después, concretamente en marzo de 2020, al ser presentada una gestión por la referida sociedad para legalizar el pozo, a tenor de lo dispuesto en el Decreto Ejecutivo No. 41851-MP-MINAE-MAG de 18 de julio de 2019 denominado Reglamento de registro de pozos sin número y habilitación del trámite de concesión de aguas subterráneas (procedimiento último tramitado conforme el expediente No. [Valor 003]).Siendo así, es evidente que los propietarios de las fincas ubicadas en el citado complejo residencial se han proveído de agua de forma irregular por varios años y que las autoridades de la Dirección de Agua del MINAE, únicamente se ha abocado a regularizar y poner a derecho esa situación conforme lo establece y exige, a su vez el ordenamiento jurídico; de ahí que, bajo esa perspectiva, no podría afirmarse que la actuación de cierre y sellado del pozo en cuestión atente contra el derecho fundamental de acceso al agua potable. Por el contrario, a tenor de lo estipulado en dicho ordenamiento jurídico, tal actuación busca proteger el recurso hídrico.” “Paralelamente a lo anterior, debe tenerse claro en este asunto que la Dirección de Agua del MINAE no es o figura como el proveedor de servicio de agua potable en el complejo residencial bajo estudio. En ningún momento ha suscrito alguna especie de relación por ese concepto con ninguno de los propietarios de las 100 fincas a las que hace referencia el tutelado; de hecho, no tiene competencia alguna al respecto dotada por nuestro ordenamiento jurídico.Por consiguiente, no podría imputársele a esta dirección la obligación de notificarle a cada uno de estos propietarios (en presunta calidad de beneficiarios del servicio de suministro de agua), lo dispuesto en el citado oficio No. DA-UHTPCOSJ-2123-20. Resulta evidente que la Dirección de Agua se limitó a poner a derecho el uso del pozo y, desde esa perspectiva, su labor se reducía a notificarle al propietario del inmueble donde este se hallaba, la orden de cierre y sellado en cuestión, tal y como así efectivamente se hizo. Así las cosas, en este caso, no es factible afirmar que a los dueños de los citados inmuebles que conforman el citado residencial, se les vulneraron sus derechos a la defensa y al debido proceso.” SALA CONSTITUCIONAL. Resolución Nº25091-2023. Fecha de la Resolución: 06 de Octubre del 2023, expediente: 20-021447-0007-CO. PETITORIA Conforme lo señalado es claro que la Dirección de Agua, ha atendido las gestiones dentro de su competencia y responsabilidad, inclusive otorgando al concesionario los medios para que actuara ante los entes competentes prestatarios del servicio público de suministro de agua, no obstante de los hechos reclamados, no se determinó alguna violación a los preceptos constitucionales mediante las regulaciones que tutela la Dirección de Agua, por lo que se solicita se declare sin lugar el recurso contra esta Dirección”.
  4. 4Informa Lourdes María Sáurez Barboza, en su condición de presidenta ejecutiva del Instituto Costarricense de Acueductos y Alcantarillados. Expone: “I. EN CUANTO A LOS HECHOS ALEGADOS POR EL RECURRENTE Con fundamento en el memorando UEN-SCMED-GAM-2026-01350, así como en la Adenda UEN-SCMED-GAM-2026-01351, suscritos por el Lic. Carlos Quirós Mora, funcionario de la UEN Servicio al Cliente Medición GAM, y en el memorando GSD-UENGAR- 2026-03130, elaborado por el Lic. Giovanni García Flores, de la UEN Gestión de Acueductos Rurales, los cuales se adjuntan como prueba y forman parte integral del expediente administrativo, queda demostrado que: En fecha 24 de octubre de 2025 el señor Nombre05 presentó solicitud de disponibilidad de agua potable para el inmueble matrícula de folio real PRN06, plano catastrado 1-1801073-2015, ubicado en el sector conocido como Bosques de Brasil de Mora. Dicha gestión fue analizada por las dependencias técnicas competentes del Instituto, las cuales determinaron que el inmueble se ubica fuera del área de abastecimiento del sistema administrado directamente por el AyA, sin infraestructura de distribución frente al inmueble que permita otorgar la disponibilidad solicitada de manera positiva, razón por la cual la gestión fue resuelta de forma negativa mediante la resolución N°SIGDD-2025- 00103885-1-2-NAP de fecha 31 de octubre del 2025, notificada a la dirección de correo electrónico ...02, medio señalado para recibir notificaciones.(ver memorando UEN-SCMED-GAM-2026-01350) Ahora bien, el recurrente sostiene que existe infraestructura institucional ubicada aproximadamente a ciento setenta y ocho metros del inmueble y que, por esa sola circunstancia, el Instituto se encuentra obligado a suministrar el servicio. No obstante, el análisis técnico efectuado por la Administración permitió establecer que dicha infraestructura no posee condiciones que hagan técnicamente viable el abastecimiento del sector, toda vez que las diferencias de elevación topográfica entre los tanques institucionales y la comunidad de Bosques de Brasil impiden garantizar la presión y continuidad necesarias para una adecuada prestación del servicio. En efecto, la infraestructura existente se encuentra a cotas inferiores y superiores que imposibilitan hidráulicamente abastecer el sector, a saber:” … el tanque Los Rodríguez se localiza a una elevación de 863 msnm, el tanque Retana a una elevación de 832 msnm.Mientras que la comunidad indicada como Dirección03 se localiza a una elevación desde los 840 msnm a los 883 msnm “… aunado a lo anterior, el sector donde se ubica la localidad corresponde a un sistema administrado mediante convenio de delegación por la ASADA Barrio La Trinidad de Ciudad Colón. (ver adenda UEN-SCMED-GAM-2026-01351) Asimismo, en relación con el argumento del recurrente referente al informe técnico emitido en el año 2018, debe precisarse que dicho documento nunca constituyó una autorización de disponibilidad del servicio ni una instrucción para incorporar automáticamente ese sector a la operación de la ASADA Barrio La Trinidad de Mora. Por el contrario, el referido informe correspondió a una valoración técnica preliminar, en la cual se indicó que la eventual posibilidad de que dicha ASADA asumiera la administración del sistema de abastecimiento existente se encontraba supeditada al cumplimiento previo de una serie de requisitos técnicos, legales y administrativos indispensables para garantizar una prestación adecuada del servicio.Entre dichos requisitos se estableció la necesidad de elaborar un estudio técnico integral que permitiera determinar las características del sistema existente, la capacidad hídrica e hidráulica del acueducto, la producción del pozo, las condiciones de la infraestructura y las mejoras necesarias para su adecuación; además, se indicó expresamente que la concesión del pozo debía ser traspasada a la ASADA Barrio La Trinidad, gestión que requería la aprobación de la Dirección de Aguas del Ministerio de Ambiente y Energía (MINAE); igualmente, debían traspasarse a la ASADA los terrenos donde se ubican el pozo, el tanque y demás infraestructura del sistema, así como las servidumbres correspondientes, implementarse las mejoras determinadas por el estudio técnico y someter dicho estudio a revisión y aprobación por parte del Instituto. Finalmente, han transcurridos más de siete años desde aquella valoración técnica, y no consta que tales condiciones hubiesen sido cumplidas por los interesados, razón por la cual dicha valoración preliminar no puede interpretarse como una autorización de disponibilidad ni como una obligación actual e inmediata para el Instituto de ampliar la cobertura del sistema de la ASADA o suministrar el servicio solicitado.(ver memorando GSD-UEN-GAR-2026-03130) II. NORMATIVA APLICABLE En respaldo de lo anteriormente señalado, es menester indicar lo que al respecto establecen el Reglamento para la Prestación de los Servicios de AyA, publicado en el Diario Oficial La Gaceta N°27, Alcance N°29 del 9 de febrero de 2021 y la Ley General de la Administración Pública, artículos 11, 13 y 16, respectivamente: Reglamento para la Prestación de los Servicios de de AyA Artículo 7- Definiciones. Para los efectos de este Reglamento se entenderá por: (…) 12. Análisis de factibilidad técnica para el otorgamiento de los servicios: Proceso de verificación de la existencia real y actual de los recursos hídricos, hidráulicos, materiales, técnicos, legales y ambientales suficientes para otorgar la disponibilidad y eventual conexión del servicio. Para tales efectos se deberán de observar las siguientes condiciones: a. Que las redes de distribución y de recolección pasan frente a linderos del inmueble o tenga acceso directo por vía pública o servidumbre de paso del inmueble para el cual se solicita un servicio. b. Que los sistemas cuenten con capacidad hídrica, hidráulica, de potabilización y de tratamiento, suficientes para otorgar nuevos servicios. c. Que el sistema cumple con los atributos de calidad establecidos. d. Que cumple con la normativa ambiental correspondiente.Artículo 8- De los servicios. AyA prestará los servicios de abastecimiento de agua para uso poblacional y saneamiento de aguas residuales dentro de la zona de cobertura, siempre que el área cuente con factibilidad técnica y legal. Los sistemas e instalaciones internos necesarios para el disfrute de los servicios son responsabilidad del usuario. Artículo 9- De las condiciones técnicas para la prestación de los servicios. Es obligación del prestador de los servicios de agua potable y saneamiento brindarlos dentro de los parámetros de prestación óptima en cuanto a calidad, cantidad, continuidad, confiabilidad, igualdad, acceso universal, eficiencia, oportunidad, sostenibilidad y con un enfoque de derechos humanos, salvo en casos de fuerza mayor, caso fortuito o periodos de mantenimiento debidamente divulgados que afecten la zona de cobertura donde está localizada la propiedad. En cuanto al parámetro de presión dinámica mínima por servicio, la prestación óptima que el prestador deberá de garantizar es de 10 metros columna de agua (m.c.a.) en el punto de conexión en donde se ubique el sistema de medición.Bajo esta línea analítica, es importante destacar lo dispuesto por los artículos 11, 13 y 16 de la Ley General de la Administración Pública, incisos 1 respectivamente, los cuales disponen: “1. La Administración Pública actuará sometida al ordenamiento jurídico y sólo podrá realizar aquellos actos o prestar aquellos servicios públicos que autorice dicho ordenamiento, según la escala jerárquica de sus fuentes. “1. La Administración estará sujeta, en general, a todas las normas escritas y no escritas del ordenamiento administrativo, y al derecho privado supletorio del mismo, sin poder derogarlos ni desaplicarlos para casos concretos. Artículo 16. “1. En ningún caso podrán dictarse actos contrarios a reglas unívocas de la ciencia o de la técnica, o a principios elementales de justicia, lógica o conveniencia…” III. CONCLUSIONES En el presente caso no se logra acreditar vulneración alguna de los derechos fundamentales invocados por el recurrente, toda vez que, conforme se desprende de los informes técnicos que forman parte integral del libelo que se presenta en este acto, el ICAA conoció, analizó y resolvió oportunamente la solicitud de disponibilidad de agua potable presentada para el inmueble objeto del presente recurso, emitiendo una resolución debidamente motivada con fundamento en criterios técnicos objetivos y en la normativa Institucional vigente.La denegatoria de la disponibilidad no obedeció a una actuación arbitraria, caprichosa o discriminatoria por parte de la Administración, sino a la imposibilidad técnica actual de garantizar la prestación del servicio, al determinarse que el inmueble se encuentra fuera del área de abastecimiento del sistema administrado directamente por el Instituto y que las condiciones hidráulicas, topográficas y de infraestructura existentes no permiten brindar el servicio bajo los parámetros de calidad, cantidad, continuidad, presión y sostenibilidad exigidos por la normativa interna Institucional. Asimismo, quedó debidamente acreditado que la existencia de infraestructura institucional en las cercanías del inmueble no constituye, por sí sola, un elemento suficiente para otorgar disponibilidad del servicio, por cuanto la prestación de este depende de la verificación integral de las condiciones de factibilidad técnica, hidráulica y operativa del sistema, aspectos que fueron ampliamente analizados por las dependencias técnicas competentes.De igual forma, respecto de la valoración técnica realizada en el año 2018 sobre una eventual incorporación del sistema a la operación de la ASADA Barrio La Trinidad de Mora, quedó demostrado que dicha valoración correspondió únicamente al análisis de una alternativa condicionada al cumplimiento de múltiples requisitos técnicos, legales y administrativos, entre ellos la elaboración de estudios especializados, la verificación de la capacidad hídrica e hidráulica del sistema, la realización de mejoras a la infraestructura, el traspaso de la concesión del pozo con la aprobación de la Dirección de Aguas del Ministerio de Ambiente y Energía, el traspaso de los terrenos e infraestructura correspondientes a la ASADA y la aprobación final por parte del Instituto. No obstante, según consta en el informe técnico incorporado al expediente, tales condiciones no fueron materializadas, razón por la cual aquella valoración preliminar no generó un derecho adquirido ni una obligación inmediata para el Instituto de otorgar la disponibilidad solicitada.En consecuencia, las actuaciones desplegadas por el Instituto se ajustan plenamente al principio de legalidad y a las competencias técnicas que le han sido conferidas por el ordenamiento jurídico, sin que se configure actuación arbitraria, omisión administrativa o lesión constitucional alguna atribuible a esta Institución. Sin que se haya violentado ninguno de los derechos fundamentales del amparado. IV. PETITORIA Por lo antes expuesto sobre los hechos alegados mediante este recurso de amparo, queda demostrado que nuestras actuaciones han sido las correctas de conformidad con la normativa que nos rige, solicitamos se DECLARE SIN LUGAR el presente recurso, se ordene archivar el expediente y se exima de toda responsabilidad al Instituto Costarricense de Acueductos y Alcantarillados”.
  5. 5Por escrito incorporado al expediente digital el 31 de agosto de 2026, la parte accionante formula una gestión de pronto despacho.
  6. 6En los procedimientos seguidos se ha observado las prescripciones legales.

Redacta la Magistrada Hess Herrera; y,

Considerando:

I. OBJETO DEL RECURSO

La parte recurrente alega que los tutelados residen en San José, Mora, Colón, Barrio Bosques de Brasil. Comenta que en ese barrio viven 8 familias que construyeron viviendas de buena fe. Señala que, tanto los tutelados como las demás familias de la zona, dependen exclusivamente del pozo AB-1719 como única fuente de agua potable. Aclara que existen propietarios de lotes que no pueden desarrollar proyectos habitacionales por la misma causa, lo que agrava el impacto colectivo. Expone que el pozo PRN03 fue concesionado desde mayo de 1997, mediante la resolución R-106-97 y fue renovado en enero de 2014, en la resolución R-109-2014. Aduce que, con base en esa concesión estatal, las familias construyeron sus viviendas y establecieron su vida en el barrio durante décadas, confiando legítimamente en las autorizaciones del Estado. Aduce que la concesión venció en enero de 2024 sin ser renovada oportunamente por el concesionario original; sin embargo, en enero de 2026 el MINAE rechazo formalmente la renovación del pozo mediante la resolución R-038-2026-MINAE.

Afirma que las irregularidades técnicas que se originaron en la construcción del pozo fueron anteriores a la adquisición de los inmuebles por parte de los vecinos residentes, quienes en ningún momento participaron en la construcción ni ubicación del pozo, y actuaron de buena fe confiando en las autorizaciones estatales vigentes. Alega que, independientemente de la responsabilidad del desarrollador original, el Estado tiene la obligación constitucional e irrenunciable de garantizar el derecho humano al agua a los residentes actuales, obligación que no puede trasladarse a terceros privados. Señala que, mediante constancia SIGDD-2025-00103885-1-2-NAP del 31 de octubre de 2025, el Instituto Costarricense de Acueductos y Alcantarillados negó la disponibilidad de agua potable para el barrio, argumentando ausencia de infraestructura de distribución frente al inmueble. No obstante, indica que, mediante medición GPS verificada en campo el 9 de junio de 2026, se constató que la Estación de Desinfección Retana del ICAA se ubica a solo 178 metros en línea recta del río Bosques de Brasil, lo que aduce demuestra que la ausencia de servicio no es una imposibilidad geográfica o técnica insuperable, sino una decisión de inversión en infraestructura que el ICAA no ha realizado.

Señala que se gestionó el servicio de agua potable ante la ASADA Barrio La Trinidad de Mora, pero el 26 de mayo de 2026 se le emitió certificación de "No Disponibilidad Hídrica", con el argumento de que el barrio se encuentra fuera del perímetro de su Convenio de Delegación otorgado por el propio ICAA. Alega que la situación expuesta afecta gravemente a las familias de la zona, ya que, en primer lugar, la Dirección de Aguas del MINAE recomendó sellar el único pozo del barrio y, en segundo lugar, el Instituto Costarricense de Acueductos y Alcantarillados no autoriza a la ASADA más cercana a prestar el servicio por razones de jurisdicción que el propio ICAA define y controla. Señala que en abril de 2026 se interpuso una denuncia urgente ante el riesgo inminente a la salud pública que representa el sellado del pozo PRN03, sin que exista una alternativa de suministro de agua potable para las familias residentes.

II. HECHOS PROBADOS

De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos:

En relación con el Instituto Costarricense de Acueductos y Alcantarillados:

  • a)Por informe UEN-GAR-2018-04520 del 13 de noviembre de 2018, el ingeniero de la UEN Gestión de Acueductos Rurales del ICAA consignó: “ANTECEDENTES Se presenta ante la ORAC Metropolitana el Sra. Olga Jiménez, la cual es ingeniera civil y representante del Sr. Stefan Karl Kuhn, mismos que solicitaron a la ASADA de Barrio La Trinidad de Mora asumir la operación de un pequeño sistema de abastecimiento de agua potable privado que da servicio a aproximadamente 17 casas, sin embargo, dicho ente operador rechazó tal solicitud. De acuerdo a la información proporcionada por la Ing. Jiménez, las 17 propiedades de en su momento fueron vendidas por el Sr. Stefan, se abastecen de un pozo el cual fue perforado legalmente y se le otorgo la respectiva concesión, sin embargo, no con el objetivo de realizar actividades urbanísticas. De esta manera, la Dirección de Agua del MINAE advierte al sr. Stefan de dicha irregularidad y le invita a realizar los trámites respectivos para que el operador más cercano asuma la operación de este pequeño sistema. El operador más cercano es la ASADA de Barrio La Trinidad de Mora, la cual rechaza la petición aduciendo que dicho sistema se encuentra fuera de su jurisdicción y que no cuentan con capacidad hídrica para abastecerlos. Ante lo mencionado, la Ing. Jiménez solicita la intervención del AyA para aclarar la situación y por medio de esta oficina se coordina una visita a la ASADA de Barrio La Trinidad para evaluar la situación y tomar su parecer al respecto. La visita se programa para el día 26 de octubre del 2018, contando con la participación del Sr. Nombre06, presidente de la Junta y la Sra. Xinia Retana, tesorera de la Junta ASPECTOS RELEVANTES En primera instancia, lo que solicitó a los miembros de la ASADA de barrio la Trinidad fue llevarnos hasta la zona donde se encuentra el sistema de abastecimiento del Sr. Stefan, la cual se puede ubicar en la siguiente imagen: De acuerdo a las mediciones realizadas, el sistema de abastecimiento de agua del Sr. Stefan se encuentra a 615 m de distancia de la oficina de la ASADA, y se ubica justo en el límite entre el Acueducto de Brasil de Mora (AyA) y el de la ASADA de Barrio La Trinidad. Se desconoce la infraestructura existente en el sistema del Sr. Stefan y en dicha visita no se ingresó a la propiedad. Con respecto a la anuencia de la ASADA de Barrio la Trinidad en asumir la operación y administración de dicho sistema, ellos manifiestan no estar en contra, sin embargo, recalcan no tener suficiente recurso hídrico para atender las nuevas necesidades y que dicho ente solo asumiría la administración de ese sistema si se garantiza la producción del pozo y se evaluar la situación y tomar su parecer al respecto. La visita se programa para el día 26 de octubre del 2018, contando con la participación del Sr. Nombre06, presidente de la Junta y la Sra. Xinia Retana, tesorera de la Junta ASPECTOS RELEVANTES En primera instancia, lo que solicitó a los miembros de la ASADA de barrio la Trinidad fue llevarnos hasta la zona donde se encuentra el sistema de abastecimiento del Sr. Stefan, la cual se puede ubicar en la siguiente imagen: De acuerdo a las mediciones realizadas, el sistema de abastecimiento de agua del Sr. Stefan se encuentra a 615 m de distancia de la oficina de la ASADA, y se ubica justo en el límite entre el Acueducto de Brasil de Mora (AyA) y el de la ASADA de Barrio La Trinidad. Se desconoce la infraestructura existente en el sistema del Sr. Stefan y en dicha visita no se ingresó a la propiedad. Con respecto a la anuencia de la ASADA de Barrio la Trinidad en asumir la operación y administración de dicho sistema, ellos manifiestan no estar en contra, sin embargo, recalcan no tener suficiente recurso hídrico para atender las nuevas necesidades y que dicho ente solo asumiría la administración de ese sistema si se garantiza la producción del pozo y se RECOMENDACIONES De acuerdo a la información suministrada por la ASADA de Barrio la Trinidad, así como la información proporcionada por la Ing. Olga Jiménez y a la visita realizada, se recomienda a ambas partes generar un acercamiento y coordinar el desarrollo de un estudio técnico para determinar la viabilidad y la posibilidad de que la ASADA de Barrio La Trinidad pueda asumir la operación de ese pequeño sistema de abastecimiento, todo lo anterior de acuerdo a lo establecido en el Art. 5 y 21 del reglamento de ASADAS. No omito indicar, que dicho estudio deberá ser remitido a esta ORAC Metropolitana para su respectiva revisión y aprobación”. (Ver prueba documental).
  • b)Por oficio UEN-SCMED-GAM-2026-01350 del 9 de julio de 2026, la UEN Servicio al Cliente Medición GAM del ICAA aclaró: “CUARTO: El motivo legal y técnico de rechazo de la gestión número SIGDD-2025-00103885-1-2-NAP se asocia a lo siguiente: Es importante indicar que el objetivo de la emisión de actos administrativos que otorgan o deniegan servicios en una zona determinada, es informar al administrado sobre la realidad existente en cuanto a capacidad hídrica, capacidad de recolección y condiciones de orden ambiental que ofrecen o padecen los sistemas de AyA en un punto determinado. Lo anterior tomando como fundamento los “estudios básicos” e incluso estudios de naturaleza más específica dependiendo de la naturaleza del proyecto, los cuales se constituyen en la base para dictar el acto y que debe contemplar entre otros aspectos: ubicación del proyecto, análisis en relación con el inventario hídrico de la zona, vulnerabilidad del proyecto, dimensión, naturaleza, proyección en litros por segundo, tipo de actividad, crecimiento poblacional, factores de orden ambiental que podrían afectarse y demás aspectos que se deban valorar a nivel técnico. De acuerdo con las constancias SIGDD-2025-00103885-1-2-NAP (Constancia de No Disponibilidad de Servicios de Acueducto y Alcantarillado), así como en 2025-00103885-1-AP (Criterio técnico de Agua Potable) se indica que: “(…) Inexistencia de infraestructura de distribución y recolección frente al inmueble solicitante de disponibilidad. Imagen 6 y 7. (…) Así las cosas, es importante aclarar que cuando se rechaza una solicitud de disponibilidad de agua no se hace de forma arbitraria o antojadiza, sino que obedece a un fundamento técnico, donde se evidencia LA FALTA REAL Y ACTUAL de capacidad hídrica y/o hidráulica del acueducto. Por consiguiente, es posible afirmar que, no existe factibilidad técnica para otorgar la disponibilidad positiva para abastecimiento de agua potable debido a un impedimento técnico pues actualmente no existe infraestructura de producción y distribución frente a la propiedad y se contravendría lo indicado en los artículos 7 (inciso 12), 8, 14 del Reglamento de Prestación de Servicios de AyA. Además, con fundamento en la evaluación técnica realizada, no es posible emitir la Constancia de Capacidad Hídrica (CCH), debido a que en las inmediaciones del inmueble no existe una tubería de distribución que permita la conexión al sistema de abastecimiento. Asimismo, el sistema de acueducto no dispone de la capacidad hídrica e hidráulica requerida para atender una nueva demanda, por lo que no es factible garantizar la prestación del servicio en las condiciones actuales Artículo 7- Definiciones. Para los efectos de este Reglamento se entenderá por: 12. Factibilidad técnica para el otorgamiento de un servicio: Cuando existan redes de distribución y de recolección frente a linderos del inmueble o tenga acceso directo por vía pública o servidumbre de paso del inmueble para el cual se solicita un servicio. Que los sistemas cuenten con capacidad hídrica, hidráulica, de potabilización y de tratamiento, suficientes para atender nuevos servicios. Que el sistema cumple con los atributos de calidad establecidos. Que es legal y ambientalmente posible. Que el o los solicitantes cumplan con la normativa urbanística y los requisitos establecidos. (RESALTADO NO CORRESPONDE A TEXTO ORIGINAL) Artículo 8- De los servicios. AyA prestará los servicios de abastecimiento de agua para uso poblacional y saneamiento de aguas residuales dentro del área de cobertura, siempre que el área cuente con factibilidad técnica y legal. (RESALTADO NO CORRESPONDE A TEXTO ORIGINAL). Los sistemas e instalaciones internos necesarios para el disfrute de los servicios son responsabilidad del usuario. Artículo 9- De las condiciones técnicas para la prestación de los servicios. Es obligación del prestador de los servicios de agua potable y saneamiento brindarlos dentro de los parámetros de prestación óptima en cuanto a calidad, cantidad, continuidad, confiabilidad, igualdad, acceso universal, eficiencia, oportunidad, sostenibilidad y con un enfoque de derechos humanos, salvo en casos de fuerza mayor, caso fortuito o periodos de mantenimiento debidamente divulgados que afecten la zona de cobertura donde está localizada la propiedad. (RESALTADO NO CORRESPONDE A TEXTO ORIGINAL) En cuanto al parámetro de presión dinámica mínima por servicio, la prestación óptima que el prestador deberá de garantizar es de 10 metros columna de agua (m.c.a.) en el punto de conexión en donde se ubique el sistema de medición. Artículo 14- De las condiciones para la prestación de los servicios. AyA prestará sus servicios una vez comprobada la factibilidad técnica en inmuebles construidos o por edificar, dedicados a la residencia de personas, para actividades comerciales o industriales que cumplan con los requisitos y usos autorizados en este reglamento. Los servicios de agua potable y de saneamiento los otorgará el AyA sobre calle o vía pública o sobre servidumbre de tubería y de paso inscrita a favor del AyA o inscrita a favor de terceros, según aplique de acuerdo con lo establecido en el artículo 16 de este reglamento. Lo anterior, siempre que existan redes del AyA en funcionamiento. (…) Aunado a lo anterior, es conveniente recordar que el Reglamento para la Prestación de los Servicios de Acueducto, Alcantarillado Sanitario e Hidrantes. AR-PSAYA-2013 resolución N° 54-2014, del 18 de setiembre del 2014 mediante el Alcance N°50 y su modificación llamada “Prestación de los Servicios de Acueducto, Alcantarillado e hidrantes AR-PSAYA-2015 mediante resolución N° RJD-053-2016 por Alcance 55 por LA Gaceta N°69 el 12 de abril del 2016, establece en su numeral 9 lo siguiente: “… en ningún caso se autorizarán expansiones que comprometan el recurso hídrico existente o la capacidad del Sistema de Alcantarillado y su tratamiento, en perjuicio de la comunicad servida o de los habitantes de los eventuales nuevos desarrollos…”. (RESALTADO NO CORRESPONDE AL TEXTO ORIGINAL) Es importante mencionar que los sistemas de agua potable son dinámicos, es decir, no se les puede conceptualizar como estáticos en el tiempo, por tal motivo, podemos indicar que los balances hídricos van limitando su capacidad hídrica, con respecto a la oferta y demanda de solicitudes que se van recibiendo en un sector determinado, de manera que cada solicitud es analizada de conformidad con las condiciones del sistema en ese momento. Es claro que debemos ser observadores de la normativa existente y, si bien es cierto el suministro de agua potable es un servicio público, también es claro que debemos velar por el cumplimiento al principio de legalidad que rige a la Administración Pública y la Constitución Política en donde la Institución tiene que acatar su propia Reglamentación y no podrá hacer salvedad alguna. Así las cosas, el derecho de agua no exime de cumplir con los requisitos definidos en el Reglamento de Prestación de Servicios de AyA Por último, es importante mencionar el artículo 11 de la Constitución Política de Costa Rica, el cual cita textualmente: “Los funcionarios públicos son simples depositarios de la autoridad. Están obligados a cumplir los deberes que la ley les impone y no pueden arrogarse facultades no concedidas en ella. Deben prestar juramento de observar y cumplir esta Constitución y las leyes (…)”. QUINTO: Según la información disponible en los visores institucionales del AyA, el inmueble se localiza fuera del área de cobertura de los servicios administrados por esa institución. Asimismo, de acuerdo con la información remitida, en la zona opera la ASADA La Trinidad, la cual podría ser la entidad administradora del sistema de acueducto que brinda el servicio al inmueble. SEXTO: Sobre la denegatoria de la Constancia de Disponibilidad de Servicios N.° SIGDD-2025-00103885-1-2-NAP, el 3 de noviembre de 2025 se recibió una nota presentada por el señor Nombre05, la cual fue atendida mediante la Resolución N.° UEN-SCMED-GAM-DyNS-2025-00842, emitida el 23 de diciembre de 2025. Posteriormente, el 29 de diciembre de 2025 se recibió un recurso jerárquico contra la Resolución N.° UEN-SCMED-GAM-DyNS-2025-00842, el cual fue trasladado a la Gerencia General mediante el Memorando N.° UEN-SCMED-GAM-DyNS-2026-00129 para su conocimiento y resolución. La respuesta al recurso jerárquico fue emitida mediante la resolución número GG-R-2026-0400 notificada el 9 de julio de 2026. Conclusiones: La denegatoria de la disponibilidad de agua estuvo sustentada en criterios técnicos y normativos. El AyA determinó que no existe infraestructura de distribución frente al inmueble ni capacidad hídrica e hidráulica suficiente para atender una nueva conexión, por lo que concluyó que no se cumple con los requisitos de factibilidad técnica establecidos en el Reglamento para la Prestación de los Servicios de Acueducto, Alcantarillado Sanitario e Hidrantes. En consecuencia, la negativa no obedeció a una decisión discrecional, sino a limitaciones técnicas verificadas. El inmueble se encuentra fuera del área de cobertura administrada por el AyA. De acuerdo con los visores institucionales, la propiedad ubicada en el cantón de Mora, distrito Colón, no forma parte de la cobertura de los servicios del AyA. Además, se indicó que en esa zona opera la ASADA La Trinidad, la cual podría ser la entidad competente para la prestación del servicio de agua potable. El procedimiento administrativo respetó las etapas de impugnación y respuesta al administrado. Tras la emisión de la constancia de no disponibilidad, el solicitante presentó una gestión de reconsideración y posteriormente un recurso jerárquico. Ambos fueron tramitados por la Administración conforme al procedimiento establecido, culminando con la emisión y notificación de la resolución correspondiente el 9 de julio de 2026, lo que evidencia que se brindó al interesado la posibilidad de ejercer los recursos administrativos previstos por la normativa”. (Ver prueba documental).
  • c)En memorando UEN-SCMED-GAM-2026-01351 del 9 de julio de 2026, se consignó: “Adicional a lo anterior, se localiza infraestructura administrada y operada por AyA de la cual no es técnicamente factible abastecer a la comunidad por criterios de elevación topográfica. El caso del tanque Los Rodríguez se localiza a una elevación de 863 msnm, el tanque Retana a una elevación de 832 msnm. Mientras que la comunidad indicada como Dirección03 se localiza a una elevación desde los 840 msnm a los 883 msnm, razón técnica suficiente para rechazar la disponibilidad desde esa infraestructura a partir de los tanques indicados. Con base a lo anterior, existen imposibilidades técnicas para suministrar caudal en el sector. Primero por elevación, segundo por infraestructura y lo que conlleva un proyecto de inversión y tercero y más importante, no es una zona operada por AyA, sino por una ASADA. Conclusión Con base en la información técnica aportada, se concluye que no es factible que el AyA otorgue el servicio de agua potable al inmueble, debido a que el sector es abastecido por la ASADA Barrio La Trinidad de Ciudad Colón de Mora, se encuentra fuera del área de operación del AyA y la infraestructura institucional existente no permite abastecer la zona por limitaciones de elevación topográfica, además de la ausencia de la infraestructura requerida. En consecuencia, la denegatoria de la disponibilidad de agua se encuentra técnicamente justificada”. (Ver prueba documental).

    En relación con la Dirección de Aguas del MINAE

  • d)Mediante resolución nro. R-0109-2014-AGUAS-MINAE del 30 de enero de 2014, la Dirección de Aguas del MINAE autorizó a favor de Pueblo Mediterráneo S.A. la concesión del pozo AB-1719 para utilizarlo en la finca PRN01 y solo para uso doméstico. (Ver prueba documental).
  • e)La Dirección de Aguas del MINAE no autorizó el pozo para uso poblacional. (Ver prueba documental).
  • f)El 9 de junio del 2018 se formuló una gestión ante la Dirección de Aguas para que se tuviera la finca PRN02 como la nueva finca concesionaria del pozo. Ante esa gestión, la autoridad realizó una consulta al sistema de certificaciones del Registro Nacional de la Propiedad y se detectó que la finca PRN01, sobre la cual se otorgó la concesión a favor de Pueblo Mediterráneo S.A. presenta segregaciones, razón por la cual se solicitó a la empresa concesionaria indicar a la Dirección de Agua si del pozo AB-1719 se está captando agua para las fincas segregadas, mas no se obtuvo respuesta. (Ver prueba documental).
  • g)En resolución R-0155-2021-AGUAS-MINAE del 2 de febrero de 2021, se indicó: “TERCERO: Que la Dirección de Agua con motivo de esa solicitud, previno a los propietarios de la finca folio real PRN02 y al representante de la sociedad concesionaria PUEBLO MEDITERRÁNEO S. A., Stefan Karl Kuhn, mediante oficio AL-0432-2016 del 09 de agosto de 2016, que se consultó en el Registro Público el número de finca para la cual se otorgó originalmente la concesión, la cual presenta más segregaciones, por lo que se solicita indicar si del pozo AB-1719 se está captando agua para esas propiedades o bien indicar de dónde se están captando el agua, sin embargo no consta respuesta en el expediente 8203-P. CUARTO: Que la Ingeniera Mariel Celeste González Artavia, funcionaria de la Unidad Hidrológica Tárcoles Pacífico Central, de la Dirección de Agua, en oficio DA-UHTPCOSJ-0739-2018 del 20 de marzo de 2018, indica que en atención a la solicitud para darle seguimiento al oficio AL-0432-2016, revisados los antecedentes, “vía correo electrónico (...01) se contactó con el señor Karl Kuhn (representante de PUEBLO MEDITERRÁNEO S. A.) y vía telefónica … El señor Kuhn señaló que actualmente se encuentra en conversaciones con el A y A para la donación del pozo y el terreno, pero que hay oposición por parte de algunos vecinos que quieren abastecerse de dicho pozo. El señor Kuhn indica que mediante el oficio SGG-2015-0132 (con fecha 27/02/2018), el AyA señala que se encuentra con el análisis de la solicitud…”. QUINTO: Que consta en expediente 8203-P Memorando N° UEN-OS-GAM-2018-00171 de 23 de julio de 2018 en el cual el funcionario de la UEN Optimización de Sistemas GAM del AyA dirigido a la Dirección Jurídica de esa Institución, respecto al Pozo Sociedad Pueblo Mediterráneo S. A., indica que “…por ubicación del pozo y por el sector que abastece, así como por la elevación topográfica de esta fuente con respecto a los sistemas más cercanos de abastecimiento del Acueducto Metropolitano AyA; no es factible técnicamente que este sistema sea asumido por A y A. Se recomienda que este sistema sea asumido por la ASADA de la Trinidad de Mora y que para acceder al pozo y al sector que abastece, se debe atravesar por parte de la zona de cobertura de dicha ASADA”. SEXTO: Que la asesoría legal de la Dirección de Agua, mediante oficio AL-0356-2018 del 24 de agosto de 2018, comunica a Karl Kuhn representante de Pueblo Mediterráneo S. A., que erróneamente se otorgó la concesión a la finca PRN01 debiendo de otorgarse a la finca PRN04, además le informa de la solicitud de la señora Nombre03 para que se traspase la concesión a la finca PRN02, mas no siendo representante de la concesionaria no es procedente. Se le informa también que, de la revisión en el Registro Nacional de la Propiedad, se evidencia que se está en presencia de una urbanización y los usos del agua para consumo humano poblacional no autorizados en la concesión, por lo que debe tramitar ante la ASADA de la Trinidad de Mora conforme el oficio citado en el punto anterior, la solicitud para la prestación del servicio público, concediéndole un plazo de 6 meses. SÉTIMO: Que en fecha 10 de octubre de 2018, Karl Kuhn representante de Pueblo Mediterráneo S. A., contesta el oficio AL-0356-2018, adjunta respuesta de la ASADA Barrio La Trinidad de Mora y que solicitó a la Dirección Regional Oeste de Asadas de AyA una aclaración de esa nota, ya que en la zona donde se ubica el pozo no hay otra ASADA. El oficio al que hace referencia está fechado 21 de setiembre de 2018 y rechaza asumir el pozo por estar fuera de la jurisdicción de La Trinidad y no contar con capacidad hídrica para un desarrollo. Ese documento lo suscribe Karen Arias Retana, cédula CED01 sin indicar sus facultades ni criterio técnico. OCTAVO: El Director de Agua mediante oficio DA-1530-2018 del 04 de octubre de 2018 dirigido a la Presidenta Ejecutiva del A y A, notificado el 9 de octubre de 2018, informa de la situación descrita e indica lo siguiente: “Siendo que se trata de consumo humano poblacional, y dado que de conformidad con la Ley 2726 es competencia de esa institución dar ese servicio, se pone en su conocimiento el caso a fin de que se proceda como corresponda. Demás está indicar que se le está copiando a la Municipalidad del cantón de Mora para que no apruebe más permisos de construcción en dicha propiedad. Una vez atendido el caso, se agradecería se sirvan comunicarlo a esta Dirección a fin de poner en conocimiento a la parte interesada, previo la orden de sellado”. NOVENO: En fecha 14 de noviembre se recibe en la Dirección de Agua, mediante oficio suscrito por el señor Stefan Karl Kuhn, representante legal de Pueblo Mediterráneo S. A., el Informe de Visita del AyA UEN-GAR-2018-04520, suscrito por el Ingeniero Esteban Ramírez Gutiérrez UEN Gestión de Acueductos Rurales. De manera que al hacer llegar a la Dirección de Agua ese oficio, se está dando por enterado y notificado de su contenido, así como que se trata de una cuestión que debe resolver a través del AyA. En cuanto a lo relevante para efectos de este acto, puede citarse de dicho oficio, el punto 2. ASPECTOS RELEVANTES “en primera instancia, lo que solicitó a los miembros de la ASADA de barrio la Trinidad fue llevarnos hasta la zona donde se encuentra el sistema de abastecimiento del Sr. Stefan (…).” “…se ubica justo en el límite entre el Acueducto de Brasil de Mora (AyA) y el de la ASADA de Barrio La Trinidad”. Asimismo, el punto 3. CONCLUSIONES en el que se indica lo siguiente:  El sistema de abastecimiento no se enmarca dentro de lo que se define como un ente operador autorizado, por lo que es de suma importancia regularizar dicha situación.  El sistema de abastecimiento se encuentra en el límite entre los Acueductos de Brasil de Mora, el cual es administrado por AyA, y el Dirección01, por lo que cualquiera de los dos acueductos podría suministrar su administración, siempre y cuando se encuentren con la capacidad técnica necesaria.  Se desconoce completamente las características del sistema de abastecimiento, por lo que es necesario realizar un estudio técnico, donde se describa el sistema, las características de la infraestructura que lo conforma, comprobación de la producción del pozo, pruebas de presión en la red de distribución, y un balance hídrico entre la producción y la demanda.  En caso de que en el estudio se determine que el sistema requiere mejoras, estas deberán ser realizadas por el interesado y hasta que las mismas estén concluidas la ASADA podrá entrar en operación del sistema. Asimismo, los terrenos donde se ubiquen el pozo y tanque de almacenamiento, y las servidumbres de paso de tubería deberán estar debidamente a nombre de la ASADA a la hora de entrar en operación el sistema. DÉCIMO: Que mediante oficio AL-0465-2018 del 20 de noviembre de 2018, la Coordinadora legal de la Dirección de Agua, dirigido al representante de la sociedad Pueblo Mediterráneo S. A., solicita indique la fecha aproximada para que el AyA, asuma la prestación del servicio en el sitio y se proceda a sellar el pozo en cuestión, a fin de que no continúe con el aprovechamiento ilegal que se viene dando. O se aclare si el pozo va a ser asumido por alguna de las ASADAS mencionadas en el oficio UEN-GAR-2018-04520 y poder prevenir la inscripción de la fuente, lo anterior en un plazo de 10 días de conformidad con el artículo 264 de la Ley General de la Administración Pública.” ( ) “TERCERO: Que, según la relación de hechos expuesta en los resultandos de esta resolución, se presentan en expediente 8203-P dos situaciones con remedios procesales distintas. En primer lugar, el cambio de uso de la concesión de aprovechamiento de aguas subterráneas otorgada en ese expediente, mediante resolución R-0109-2014-AGUAS-MINAE de las ocho horas cincuenta y siete minutos del treinta de enero de dos mil catorce, a uso poblacional, el cual no sólo se realizó sin comunicarlo al MINAE, sino además se dio el seguimiento al usuario coordinado con AyA para lo que corresponde hacer con el fin que sea esa Institución o una ASADA la que se encargue de brindar el servicio o asumir la fuente pozo PRN03, porque se demostró y está de sobra aceptado por la sociedad PUEBLO MEDITERRÁNEO S. A., cédula jurídica 3-101-243294 a través de su mismo representante Stefan Karl Kuhn cédula de residente 175-000006505, que de esa concesión se abastece una urbanización y está suficientemente informado sobre lo que debe hacer ante el AyA y que no es mediante una concesión de agua para uso consumo humano (doméstico) que puede solucionar la cuestión del abastecimiento. Consecuencia de lo anterior, el oficio del Director de Agua a la Presidenta Ejecutiva del AyA en la que indica: “Siendo que se trata de consumo humano poblacional, y dado que de conformidad con la Ley 2726 es competencia de esa institución dar ese servicio, se pone en su conocimiento el caso a fin de que se proceda como corresponda. Demás está indicar que se le está copiando a la Municipalidad del cantón de Mora para que no apruebe más permisos de construcción en dicha propiedad.” ( ) “POR TANTO EL MINISTRO DE AMBIENTE Y ENERGIA RESUELVE I SE INTIMA POR PRIMERA VEZ a PUEBLO MEDITERRÁNEO S. A., cédula jurídica 3-101-243294 a través de su mismo representante Stefan Karl Kuhn cédula de residente 175-000006505, que el cambio de uso de la concesión de aprovechamiento de aguas subterráneas otorgada mediante resolución R-0109-2014-AGUAS-MINAE de las ocho horas cincuenta y siete minutos del treinta de enero de dos mil catorce, del pozo perforado número AB-1719 de uso doméstico a poblacional, es causal de caducidad de la concesión de aguas, por contravenir lo dispuesto en el artículo 26 inciso II de la Ley de Aguas, lo que está de sobra comprobado en la relación de hechos efectuada en la parte Resolutiva y a la luz de la normativa y consideraciones de la parte Considerativa de esta resolución”. (Ver prueba documental).
  • h)Por resolución R-2606-2025-AGUAS-MINAE del 21 de noviembre de 2025, ante la solicitud de Pueblo Mediterráneo S.A. de prorrogar la concesión, se dispuso: “SÉTIMO: Que en fecha 10 de agosto de 2025 la sociedad Pueblo Mediterráneo S. A., manifiesta que “ante la solicitud de sellado del pozo AB-1719”, solicita mantener en suspenso la orden de sellado hasta que el A y A tome el acueducto o bien una ASADA, porque de él se abastecen para uso doméstico aproximadamente 12 casas de habitación. OCTAVO: Que en expediente administrativo 8203-P se tramita la solicitud de concesión de aguas mediante el pozo perforado AB-1719. En el mismo expediente consta la resolución R-0155-2021-AGUAS-MINAE que ordenó el sellado del pozo AB-2552 porque se utiliza para abastecimiento poblacional, uso que no es competencia del MINAE. No consta en el expediente administrativo el sellado del pozo AB-2552 por lo que procede presentar denuncia penal por Desobediencia, delito tipificado en el numeral 314 del Código Penal.” “POR TANTO EL MINISTRO DE AMBIENTE Y ENERGIA RESUELVE I DENEGAR concesión de aprovechamiento de aguas subterráneas a PUEBLO MEDITERRÁNEO S. A. cédula jurídica 3-101-243294, representado por el señor Stefan Karl Kuhn, cédula de residencia CED07, por no cumplir el pozo número AB-1719 con el retiro de 40 metros de distancia del ROP ni el retiro de 100 metros de la Ley Forestal. II ORDENAR A PUEBLO MEDITERRÁNEO S. A. PROCEDER EN EL PLAZO DE UN MES A SELLAR EL POZO NÚMERO AB-1719 con los lineamientos que dispone el Decreto N° 45053-MINAE y dentro del mismo plazo, informar a la Dirección de Agua sobre el sellado para verificación en campo. III ORDENAR A LA DIRECCIÓN DE AGUA PRESENTAR LA DENUNCIA PENAL POR EL DELITO DE DESOBEDIENCIA, tipificado en el artículo 314 del Código Penal, por el INCUMPLIMIENTO DE LA ORDEN DE SELLADO DE POZO número AB-2552 impartida mediante Resolución R-0155-2021-AGUAS-MINAE, de las catorce horas veintidós minutos del dos de febrero de dos mil veintiuno”. (Ver prueba documental).

III. SOBRE EL CASO CONCRETO

En el sub lite, la parte recurrente alega que los tutelados residen en San José, Mora, Colón, Barrio Bosques de Brasil. Comenta que en ese barrio viven 8 familias que construyeron viviendas de buena fe. Señala que, tanto los tutelados como las demás familias de la zona, dependen exclusivamente del pozo AB-1719 como única fuente de agua potable. Aclara que existen propietarios de lotes que no pueden desarrollar proyectos habitacionales por la misma causa, lo que agrava el impacto colectivo. Expone que el pozo AB-1719 fue concesionado desde mayo de 1997, mediante la resolución R-106-97 y fue renovado en enero de 2014, en la resolución R-109-2014. Aduce que, con base en esa concesión estatal, las familias construyeron sus viviendas y establecieron su vida en el barrio durante décadas, confiando legítimamente en las autorizaciones del Estado. Aduce que la concesión venció en enero de 2024 sin ser renovada oportunamente por el concesionario original; sin embargo, en enero de 2026 el MINAE rechazo formalmente la renovación del pozo mediante la resolución R-038-2026-MINAE.

Afirma que las irregularidades técnicas que se originaron en la construcción del pozo fueron anteriores a la adquisición de los inmuebles por parte de los vecinos residentes, quienes en ningún momento participaron en la construcción ni ubicación del pozo, y actuaron de buena fe confiando en las autorizaciones estatales vigentes. Alega que, independientemente de la responsabilidad del desarrollador original, el Estado tiene la obligación constitucional e irrenunciable de garantizar el derecho humano al agua a los residentes actuales, obligación que no puede trasladarse a terceros privados. Señala que, mediante constancia SIGDD-2025-00103885-1-2-NAP del 31 de octubre de 2025, el Instituto Costarricense de Acueductos y Alcantarillados negó la disponibilidad de agua potable para el barrio, argumentando ausencia de infraestructura de distribución frente al inmueble. No obstante, indica que, mediante medición GPS verificada en campo el 9 de junio de 2026, se constató que la Estación de Desinfección Retana del ICAA se ubica a solo 178 metros en línea recta del río Bosques de Brasil, lo que aduce demuestra que la ausencia de servicio no es una imposibilidad geográfica o técnica insuperable, sino una decisión de inversión en infraestructura que el ICAA no ha realizado.

Señala que se gestionó el servicio de agua potable ante la ASADA Barrio La Trinidad de Mora, pero el 26 de mayo de 2026 se le emitió certificación de "No Disponibilidad Hídrica", con el argumento de que el barrio se encuentra fuera del perímetro de su Convenio de Delegación otorgado por el propio ICAA. Alega que la situación expuesta afecta gravemente a las familias de la zona, ya que, en primer lugar, la Dirección de Aguas del MINAE recomendó sellar el único pozo del barrio y, en segundo lugar, el Instituto Costarricense de Acueductos y Alcantarillados no autoriza a la ASADA más cercana a prestar el servicio por razones de jurisdicción que el propio ICAA define y controla. Señala que en abril de 2026 se interpuso una denuncia urgente ante el riesgo inminente a la salud pública que representa el sellado del pozo PRN03, sin que exista una alternativa de suministro de agua potable para las familias residentes.

Ahora bien, en relación con el Instituto Costarricense de Acueductos y Alcantarillados, se tiene por acreditado que, por informe UEN-GAR-2018-04520 del 13 de noviembre de 2018, el ingeniero de la UEN Gestión de Acueductos Rurales del ICAA consignó: “ANTECEDENTES Se presenta ante la ORAC Metropolitana el Sra. Olga Jiménez, la cual es ingeniera civil y representante del Sr. Stefan Karl Kuhn, mismos que solicitaron a la ASADA de Barrio La Trinidad de Mora asumir la operación de un pequeño sistema de abastecimiento de agua potable privado que da servicio a aproximadamente 17 casas, sin embargo, dicho ente operador rechazó tal solicitud. De acuerdo a la información proporcionada por la Ing. Jiménez, las 17 propiedades de en su momento fueron vendidas por el Sr. Stefan, se abastecen de un pozo el cual fue perforado legalmente y se le otorgo la respectiva concesión, sin embargo, no con el objetivo de realizar actividades urbanísticas.

De esta manera, la Dirección de Agua del MINAE advierte al sr. Stefan de dicha irregularidad y le invita a realizar los trámites respectivos para que el operador más cercano asuma la operación de este pequeño sistema. El operador más cercano es la ASADA de Barrio La Trinidad de Mora, la cual rechaza la petición aduciendo que dicho sistema se encuentra fuera de su jurisdicción y que no cuentan con capacidad hídrica para abastecerlos. Ante lo mencionado, la Ing. Jiménez solicita la intervención del AyA para aclarar la situación y por medio de esta oficina se coordina una visita a la ASADA de Barrio La Trinidad para evaluar la situación y tomar su parecer al respecto. La visita se programa para el día 26 de octubre del 2018, contando con la participación del Sr. Nombre06, presidente de la Junta y la Sra. Xinia Retana, tesorera de la Junta ASPECTOS RELEVANTES En primera instancia, lo que solicitó a los miembros de la ASADA de barrio la Trinidad fue llevarnos hasta la zona donde se encuentra el sistema de abastecimiento del Sr. Stefan, la cual se puede ubicar en la siguiente imagen: De acuerdo a las mediciones realizadas, el sistema de abastecimiento de agua del Sr. Stefan se encuentra a 615 m de distancia de la oficina de la ASADA, y se ubica justo en el límite entre el Acueducto de Brasil de Mora (AyA) y el de la ASADA de Barrio La Trinidad.

Se desconoce la infraestructura existente en el sistema del Sr. Stefan y en dicha visita no se ingresó a la propiedad. Con respecto a la anuencia de la ASADA de Barrio la Trinidad en asumir la operación y administración de dicho sistema, ellos manifiestan no estar en contra, sin embargo, recalcan no tener suficiente recurso hídrico para atender las nuevas necesidades y que dicho ente solo asumiría la administración de ese sistema si se garantiza la producción del pozo y se evaluar la situación y tomar su parecer al respecto. La visita se programa para el día 26 de octubre del 2018, contando con la participación del Sr. Nombre06, presidente de la Junta y la Sra. Xinia Retana, tesorera de la Junta ASPECTOS RELEVANTES En primera instancia, lo que solicitó a los miembros de la ASADA de barrio la Trinidad fue llevarnos hasta la zona donde se encuentra el sistema de abastecimiento del Sr. Stefan, la cual se puede ubicar en la siguiente imagen: De acuerdo a las mediciones realizadas, el sistema de abastecimiento de agua del Sr. Stefan se encuentra a 615 m de distancia de la oficina de la ASADA, y se ubica justo en el límite entre el Acueducto de Brasil de Mora (AyA) y el de la ASADA de Barrio La Trinidad.

Se desconoce la infraestructura existente en el sistema del Sr. Stefan y en dicha visita no se ingresó a la propiedad. Con respecto a la anuencia de la ASADA de Barrio la Trinidad en asumir la operación y administración de dicho sistema, ellos manifiestan no estar en contra, sin embargo, recalcan no tener suficiente recurso hídrico para atender las nuevas necesidades y que dicho ente solo asumiría la administración de ese sistema si se garantiza la producción del pozo y se RECOMENDACIONES De acuerdo a la información suministrada por la ASADA de Barrio la Trinidad, así como la información proporcionada por la Ing. Olga Jiménez y a la visita realizada, se recomienda a ambas partes generar un acercamiento y coordinar el desarrollo de un estudio técnico para determinar la viabilidad y la posibilidad de que la ASADA de Barrio La Trinidad pueda asumir la operación de ese pequeño sistema de abastecimiento, todo lo anterior de acuerdo a lo establecido en el Art. 5 y 21 del reglamento de ASADAS. No omito indicar, que dicho estudio deberá ser remitido a esta ORAC Metropolitana para su respectiva revisión y aprobación”.

Además, por oficio UEN-SCMED-GAM-2026-01350 del 9 de julio de 2026, la UEN Servicio al Cliente Medición GAM del ICAA aclaró: “CUARTO: El motivo legal y técnico de rechazo de la gestión número SIGDD-2025-00103885-1-2-NAP se asocia a lo siguiente: Es importante indicar que el objetivo de la emisión de actos administrativos que otorgan o deniegan servicios en una zona determinada, es informar al administrado sobre la realidad existente en cuanto a capacidad hídrica, capacidad de recolección y condiciones de orden ambiental que ofrecen o padecen los sistemas de AyA en un punto determinado. Lo anterior tomando como fundamento los “estudios básicos” e incluso estudios de naturaleza más específica dependiendo de la naturaleza del proyecto, los cuales se constituyen en la base para dictar el acto y que debe contemplar entre otros aspectos: ubicación del proyecto, análisis en relación con el inventario hídrico de la zona, vulnerabilidad del proyecto, dimensión, naturaleza, proyección en litros por segundo, tipo de actividad, crecimiento poblacional, factores de orden ambiental que podrían afectarse y demás aspectos que se deban valorar a nivel técnico.

De acuerdo con las constancias SIGDD-2025-00103885-1-2-NAP (Constancia de No Disponibilidad de Servicios de Acueducto y Alcantarillado), así como en 2025-00103885-1-AP (Criterio técnico de Agua Potable) se indica que: “(…) Inexistencia de infraestructura de distribución y recolección frente al inmueble solicitante de disponibilidad. Imagen 6 y 7. (…) Así las cosas, es importante aclarar que cuando se rechaza una solicitud de disponibilidad de agua no se hace de forma arbitraria o antojadiza, sino que obedece a un fundamento técnico, donde se evidencia LA FALTA REAL Y ACTUAL de capacidad hídrica y/o hidráulica del acueducto. Por consiguiente, es posible afirmar que, no existe factibilidad técnica para otorgar la disponibilidad positiva para abastecimiento de agua potable debido a un impedimento técnico pues actualmente no existe infraestructura de producción y distribución frente a la propiedad y se contravendría lo indicado en los artículos 7 (inciso 12), 8, 14 del Reglamento de Prestación de Servicios de AyA.

Además, con fundamento en la evaluación técnica realizada, no es posible emitir la Constancia de Capacidad Hídrica (CCH), debido a que en las inmediaciones del inmueble no existe una tubería de distribución que permita la conexión al sistema de abastecimiento. Asimismo, el sistema de acueducto no dispone de la capacidad hídrica e hidráulica requerida para atender una nueva demanda, por lo que no es factible garantizar la prestación del servicio en las condiciones actuales Artículo 7- Definiciones. Para los efectos de este Reglamento se entenderá por: 12. Factibilidad técnica para el otorgamiento de un servicio: Cuando existan redes de distribución y de recolección frente a linderos del inmueble o tenga acceso directo por vía pública o servidumbre de paso del inmueble para el cual se solicita un servicio. Que los sistemas cuenten con capacidad hídrica, hidráulica, de potabilización y de tratamiento, suficientes para atender nuevos servicios.

Que el sistema cumple con los atributos de calidad establecidos. Que es legal y ambientalmente posible. Que el o los solicitantes cumplan con la normativa urbanística y los requisitos establecidos. (RESALTADO NO CORRESPONDE A TEXTO ORIGINAL) Artículo 8- De los servicios. AyA prestará los servicios de abastecimiento de agua para uso poblacional y saneamiento de aguas residuales dentro del área de cobertura, siempre que el área cuente con factibilidad técnica y legal. (RESALTADO NO CORRESPONDE A TEXTO ORIGINAL). Los sistemas e instalaciones internos necesarios para el disfrute de los servicios son responsabilidad del usuario. Artículo 9- De las condiciones técnicas para la prestación de los servicios. Es obligación del prestador de los servicios de agua potable y saneamiento brindarlos dentro de los parámetros de prestación óptima en cuanto a calidad, cantidad, continuidad, confiabilidad, igualdad, acceso universal, eficiencia, oportunidad, sostenibilidad y con un enfoque de derechos humanos, salvo en casos de fuerza mayor, caso fortuito o periodos de mantenimiento debidamente divulgados que afecten la zona de cobertura donde está localizada la propiedad.

(RESALTADO NO CORRESPONDE A TEXTO ORIGINAL) En cuanto al parámetro de presión dinámica mínima por servicio, la prestación óptima que el prestador deberá de garantizar es de 10 metros columna de agua (m.c.a.) en el punto de conexión en donde se ubique el sistema de medición. Artículo 14- De las condiciones para la prestación de los servicios. AyA prestará sus servicios una vez comprobada la factibilidad técnica en inmuebles construidos o por edificar, dedicados a la residencia de personas, para actividades comerciales o industriales que cumplan con los requisitos y usos autorizados en este reglamento. Los servicios de agua potable y de saneamiento los otorgará el AyA sobre calle o vía pública o sobre servidumbre de tubería y de paso inscrita a favor del AyA o inscrita a favor de terceros, según aplique de acuerdo con lo establecido en el artículo 16 de este reglamento. Lo anterior, siempre que existan redes del AyA en funcionamiento.

(…) Aunado a lo anterior, es conveniente recordar que el Reglamento para la Prestación de los Servicios de Acueducto, Alcantarillado Sanitario e Hidrantes. AR-PSAYA-2013 resolución N° 54-2014, del 18 de setiembre del 2014 mediante el Alcance N°50 y su modificación llamada “Prestación de los Servicios de Acueducto, Alcantarillado e hidrantes AR-PSAYA-2015 mediante resolución N° RJD-053-2016 por Alcance 55 por LA Gaceta N°69 el 12 de abril del 2016, establece en su numeral 9 lo siguiente: “… en ningún caso se autorizarán expansiones que comprometan el recurso hídrico existente o la capacidad del Sistema de Alcantarillado y su tratamiento, en perjuicio de la comunicad servida o de los habitantes de los eventuales nuevos desarrollos…”. (RESALTADO NO CORRESPONDE AL TEXTO ORIGINAL) Es importante mencionar que los sistemas de agua potable son dinámicos, es decir, no se les puede conceptualizar como estáticos en el tiempo, por tal motivo, podemos indicar que los balances hídricos van limitando su capacidad hídrica, con respecto a la oferta y demanda de solicitudes que se van recibiendo en un sector determinado, de manera que cada solicitud es analizada de conformidad con las condiciones del sistema en ese momento.

Es claro que debemos ser observadores de la normativa existente y, si bien es cierto el suministro de agua potable es un servicio público, también es claro que debemos velar por el cumplimiento al principio de legalidad que rige a la Administración Pública y la Constitución Política en donde la Institución tiene que acatar su propia Reglamentación y no podrá hacer salvedad alguna. Así las cosas, el derecho de agua no exime de cumplir con los requisitos definidos en el Reglamento de Prestación de Servicios de AyA Por último, es importante mencionar el artículo 11 de la Constitución Política de Costa Rica, el cual cita textualmente: “Los funcionarios públicos son simples depositarios de la autoridad. Están obligados a cumplir los deberes que la ley les impone y no pueden arrogarse facultades no concedidas en ella. Deben prestar juramento de observar y cumplir esta Constitución y las leyes (…)”.

QUINTO: Según la información disponible en los visores institucionales del AyA, el inmueble se localiza fuera del área de cobertura de los servicios administrados por esa institución. Asimismo, de acuerdo con la información remitida, en la zona opera la ASADA La Trinidad, la cual podría ser la entidad administradora del sistema de acueducto que brinda el servicio al inmueble. SEXTO: Sobre la denegatoria de la Constancia de Disponibilidad de Servicios N.° SIGDD-2025-00103885-1-2-NAP, el 3 de noviembre de 2025 se recibió una nota presentada por el señor Nombre05, la cual fue atendida mediante la Resolución N.° UEN-SCMED-GAM-DyNS-2025-00842, emitida el 23 de diciembre de 2025. Posteriormente, el 29 de diciembre de 2025 se recibió un recurso jerárquico contra la Resolución N.° UEN-SCMED-GAM-DyNS-2025-00842, el cual fue trasladado a la Gerencia General mediante el Memorando N.° UEN-SCMED-GAM-DyNS-2026-00129 para su conocimiento y resolución.

La respuesta al recurso jerárquico fue emitida mediante la resolución número GG-R-2026-0400 notificada el 9 de julio de 2026. Conclusiones: La denegatoria de la disponibilidad de agua estuvo sustentada en criterios técnicos y normativos. El AyA determinó que no existe infraestructura de distribución frente al inmueble ni capacidad hídrica e hidráulica suficiente para atender una nueva conexión, por lo que concluyó que no se cumple con los requisitos de factibilidad técnica establecidos en el Reglamento para la Prestación de los Servicios de Acueducto, Alcantarillado Sanitario e Hidrantes. En consecuencia, la negativa no obedeció a una decisión discrecional, sino a limitaciones técnicas verificadas. El inmueble se encuentra fuera del área de cobertura administrada por el AyA. De acuerdo con los visores institucionales, la propiedad ubicada en el cantón de Mora, distrito Colón, no forma parte de la cobertura de los servicios del AyA.

Además, se indicó que en esa zona opera la ASADA La Trinidad, la cual podría ser la entidad competente para la prestación del servicio de agua potable. El procedimiento administrativo respetó las etapas de impugnación y respuesta al administrado. Tras la emisión de la constancia de no disponibilidad, el solicitante presentó una gestión de reconsideración y posteriormente un recurso jerárquico. Ambos fueron tramitados por la Administración conforme al procedimiento establecido, culminando con la emisión y notificación de la resolución correspondiente el 9 de julio de 2026, lo que evidencia que se brindó al interesado la posibilidad de ejercer los recursos administrativos previstos por la normativa”.

Por su parte, en memorando UEN-SCMED-GAM-2026-01351 del 9 de julio de 2026, se consignó: “Adicional a lo anterior, se localiza infraestructura administrada y operada por AyA de la cual no es técnicamente factible abastecer a la comunidad por criterios de elevación topográfica. El caso del tanque Los Rodríguez se localiza a una elevación de 863 msnm, el tanque Retana a una elevación de 832 msnm. Mientras que la comunidad indicada como Dirección03 se localiza a una elevación desde los 840 msnm a los 883 msnm, razón técnica suficiente para rechazar la disponibilidad desde esa infraestructura a partir de los tanques indicados. Con base a lo anterior, existen imposibilidades técnicas para suministrar caudal en el sector. Primero por elevación, segundo por infraestructura y lo que conlleva un proyecto de inversión y tercero y más importante, no es una zona operada por AyA, sino por una ASADA. Conclusión Con base en la información técnica aportada, se concluye que no es factible que el AyA otorgue el servicio de agua potable al inmueble, debido a que el sector es abastecido por la ASADA Barrio La Trinidad de Ciudad Colón de Mora, se encuentra fuera del área de operación del AyA y la infraestructura institucional existente no permite abastecer la zona por limitaciones de elevación topográfica, además de la ausencia de la infraestructura requerida. En consecuencia, la denegatoria de la disponibilidad de agua se encuentra técnicamente justificada”.

Al respecto, en reiteradas ocasiones, esta Sala ha sostenido que si bien se reconoce el derecho fundamental al agua y su acceso en igualdad de condiciones, por cuanto se trata de un servicio esencial para la vida y la salud; también, ha indicado que este derecho no implica un acceso irrestricto al agua, toda vez que, los prestadores del servicio pueden válidamente, establecer condiciones y requisitos generales para acceder a este servicio. Asimismo, resulta válido que las entidades -públicas o privadas- que administren el servicio, puedan rechazar las solicitudes de agua, o bien, de la carta de disponibilidad de agua, cuando el interesado no cumple los requisitos o cuando existen razones técnicas o legales que los justifiquen. Así por ejemplo, en sentencia número 2016-006027 de las 09:05 horas del 6 de mayo de 2016, esta Sala consideró lo siguiente:

“Este Tribunal Constitucional en la sentencia 2014-9134 de las 14:05 horas del 19 de junio de 2014, que abordó una cuestión muy similar a la expuesta en el presente recurso, dispuso: '(...) Esta Sala ha indicado en reiteradas sentencias sobre el tema que el suministro de agua potable es considerado dentro del ordenamiento jurídico costarricense como un servicio público, y que como tal, todo prestador de servicios públicos -sea sujeto público o sujeto privado está obligado a prestar el servicio de forma continua, eficiente, en condiciones de igualdad y debiendo adaptarse a los cambios tecnológicos (véase al respecto la sentencia 2001-09676 de las once horas veinticinco minutos del veintiséis de setiembre del dos mil uno y la sentencia 2004-08161 de las diez horas con cincuenta y tres minutos del veintitrés de julio del dos mil cuatro). Resulta claro entonces concluir que el Instituto Costarricense de Acueductos y Alcantarillados, al ser uno de los entes estatales encargados de la prestación del servicio público de agua potable, está obligado también a prestar este servicio de forma continua, adaptable, eficiente y por igual a todos los habitantes.

Ahora bien, también la jurisprudencia de este Tribunal Constitucional ha indicado que, frente a la imposibilidad jurídica (que es la falta de cumplimiento de requisitos establecidos en la reglamentación respectiva) o frente a la imposibilidad formal (que es la falta de una Red de Distribución de Aguas), es razonable no atender las solicitudes de servicio o solicitar que el interesado asuma los costos de instalación cuando no exista red de distribución de agua potable y se necesite la construcción de infraestructura. Así, en estos casos se ha tenido claro que no es que se trate de una negativa al acceso al servicio de agua potable, sino de la imposibilidad para brindarlo o de la necesaria participación del interesado en el levantamiento de una imposibilidad técnica, cual es, la falta de infraestructura. En otras palabras, siempre que la falta de dotación del servicio de agua potable no sea una actuación antojadiza, arbitraria o sin fundamento, sino que esté justificada en la imposibilidad jurídica o material no estamos frente a la violación de derechos fundamentales.

En el caso concreto, de la prueba aportada y del informe rendido bajo juramento, se corrobora que el AyA no ha rechazado arbitrariamente la solicitud planteada por la recurrente, sino por la falta del cumplimiento de la totalidad de los requisitos técnico-legales que existe el Reglamento de Prestación de Servicios a los Clientes de Instituto Costarricense de Acueductos y Alcantarillados para aprobar nuevos servicios”.

Tales argumentos resultan plenamente aplicables al caso concreto en el cual se denegó la disponibilidad de agua, por razones técnicas. En consecuencia, estima este Tribunal que la negativa de disponibilidad de agua se encuentra sustentada en razones técnicas, por lo que el acto no constituye una actuación arbitraria.

Por otra parte, se debe señalar que la procedencia o no de la disponibilidad de agua, así como la pertinencia de las razones técnicas que sustentaron la decisión de la parte recurrida, no son cuestiones que deban discutirse en esta Jurisdicción, por tratarse de un conflicto de legalidad ordinaria ajeno al ámbito de competencia de esta Sala. Tampoco, puede este Tribunal fungir como mediador ante una determinada persona física o jurídica -ya sea ésta última de derecho público o privado-, para interceder por una tercera persona a fin de que se le conceda lo que pretende, por lo que, la solicitud del recurrente para que se otorgue la disponibilidad resulta improcedente y ajena a las competencias de este Tribunal. Por ello, deberá el recurrente si a bien lo tiene, plantear sus inconformidades o reclamos ante las autoridades recurridas o en la vía jurisdiccional competente, vías en las cuales podrá, en forma amplia, discutir el fondo del asunto y hacer valer sus pretensiones.

En consecuencia, este extremo del recurso se debe declarar sin lugar.

IV. EN RELACIÓN CON LA DIRECCIÓN DE AGUAS DEL MINAE

Sobre este extremo, la Sala tiene por acreditado que mediante resolución nro. R-0109-2014-AGUAS-MINAE del 30 de enero de 2014, la Dirección de Aguas del MINAE autorizó a favor de Pueblo Mediterráneo S.A. la concesión del pozo PLA01 para utilizarlo en la finca PRN01 y solo para uso doméstico.

Por su parte, de las pruebas aportadas y del informe rendido bajo juramento, se desprende que la Dirección de Aguas del MINAE no autorizó el pozo para uso poblacional.

Posteriormente, el 9 de junio del 2018 se formuló una gestión ante la Dirección de Aguas para que se tuviera la finca PRN02 como la nueva finca concesionaria del pozo. Ante esa gestión, la autoridad realizó una consulta al sistema de certificaciones del Registro Nacional de la Propiedad y se detectó que la finca PRN01, sobre la cual se otorgó la concesión a favor de Pueblo Mediterráneo S.A. presenta segregaciones, razón por la cual se solicitó a la empresa concesionaria indicar a la Dirección de Agua si del pozo PLA01 se está captando agua para las fincas segregadas, mas no se obtuvo respuesta.

Así, en resolución R-0155-2021-AGUAS-MINAE del 2 de febrero de 2021, se indicó: “TERCERO: Que la Dirección de Agua con motivo de esa solicitud, previno a los propietarios de la finca folio real PRN02 y al representante de la sociedad concesionaria PUEBLO MEDITERRÁNEO S. A., Stefan Karl Kuhn, mediante oficio AL-0432-2016 del 09 de agosto de 2016, que se consultó en el Registro Público el número de finca para la cual se otorgó originalmente la concesión, la cual presenta más segregaciones, por lo que se solicita indicar si del pozo PRN03 se está captando agua para esas propiedades o bien indicar de dónde se están captando el agua, sin embargo no consta respuesta en el expediente 8203-P. CUARTO: Que la Ingeniera Mariel Celeste González Artavia, funcionaria de la Unidad Hidrológica Tárcoles Pacífico Central, de la Dirección de Agua, en oficio DA-UHTPCOSJ-0739-2018 del 20 de marzo de 2018, indica que en atención a la solicitud para darle seguimiento al oficio AL-0432-2016, revisados los antecedentes, “vía correo electrónico (...01) se contactó con el señor Karl Kuhn (representante de PUEBLO MEDITERRÁNEO S. A.) y vía telefónica …

El señor Kuhn señaló que actualmente se encuentra en conversaciones con el A y A para la donación del pozo y el terreno, pero que hay oposición por parte de algunos vecinos que quieren abastecerse de dicho pozo. El señor Kuhn indica que mediante el oficio SGG-2015-0132 (con fecha 27/02/2018), el AyA señala que se encuentra con el análisis de la solicitud…”. QUINTO: Que consta en expediente 8203-P Memorando N° UEN-OS-GAM-2018-00171 de 23 de julio de 2018 en el cual el funcionario de la UEN Optimización de Sistemas GAM del AyA dirigido a la Dirección Jurídica de esa Institución, respecto al Pozo Sociedad Pueblo Mediterráneo S. A., indica que “…por ubicación del pozo y por el sector que abastece, así como por la elevación topográfica de esta fuente con respecto a los sistemas más cercanos de abastecimiento del Acueducto Metropolitano AyA; no es factible técnicamente que este sistema sea asumido por A y A. Se recomienda que este sistema sea asumido por la ASADA de la Trinidad de Mora y que para acceder al pozo y al sector que abastece, se debe atravesar por parte de la zona de cobertura de dicha ASADA”.

SEXTO: Que la asesoría legal de la Dirección de Agua, mediante oficio AL-0356-2018 del 24 de agosto de 2018, comunica a Karl Kuhn representante de Pueblo Mediterráneo S. A., que erróneamente se otorgó la concesión a la finca PRN01 debiendo de otorgarse a la finca PRN04, además le informa de la solicitud de la señora Nombre03 para que se traspase la concesión a la finca PRN02, mas no siendo representante de la concesionaria no es procedente. Se le informa también que, de la revisión en el Registro Nacional de la Propiedad, se evidencia que se está en presencia de una urbanización y los usos del agua para consumo humano poblacional no autorizados en la concesión, por lo que debe tramitar ante la ASADA de la Trinidad de Mora conforme el oficio citado en el punto anterior, la solicitud para la prestación del servicio público, concediéndole un plazo de 6 meses. SÉTIMO: Que en fecha 10 de octubre de 2018, Karl Kuhn representante de Pueblo Mediterráneo S. A., contesta el oficio AL-0356-2018, adjunta respuesta de la ASADA Barrio La Trinidad de Mora y que solicitó a la Dirección Regional Oeste de Asadas de AyA una aclaración de esa nota, ya que en la zona donde se ubica el pozo no hay otra ASADA.

El oficio al que hace referencia está fechado 21 de setiembre de 2018 y rechaza asumir el pozo por estar fuera de la jurisdicción de La Trinidad y no contar con capacidad hídrica para un desarrollo. Ese documento lo suscribe Karen Arias Retana, cédula CED01 sin indicar sus facultades ni criterio técnico. OCTAVO: El Director de Agua mediante oficio DA-1530-2018 del 04 de octubre de 2018 dirigido a la Presidenta Ejecutiva del A y A, notificado el 9 de octubre de 2018, informa de la situación descrita e indica lo siguiente: “Siendo que se trata de consumo humano poblacional, y dado que de conformidad con la Ley 2726 es competencia de esa institución dar ese servicio, se pone en su conocimiento el caso a fin de que se proceda como corresponda. Demás está indicar que se le está copiando a la Municipalidad del cantón de Mora para que no apruebe más permisos de construcción en dicha propiedad. Una vez atendido el caso, se agradecería se sirvan comunicarlo a esta Dirección a fin de poner en conocimiento a la parte interesada, previo la orden de sellado”.

NOVENO: En fecha 14 de noviembre se recibe en la Dirección de Agua, mediante oficio suscrito por el señor Stefan Karl Kuhn, representante legal de Pueblo Mediterráneo S. A., el Informe de Visita del AyA UEN-GAR-2018-04520, suscrito por el Ingeniero Esteban Ramírez Gutiérrez UEN Gestión de Acueductos Rurales. De manera que al hacer llegar a la Dirección de Agua ese oficio, se está dando por enterado y notificado de su contenido, así como que se trata de una cuestión que debe resolver a través del AyA. En cuanto a lo relevante para efectos de este acto, puede citarse de dicho oficio, el punto 2. ASPECTOS RELEVANTES “en primera instancia, lo que solicitó a los miembros de la ASADA de barrio la Trinidad fue llevarnos hasta la zona donde se encuentra el sistema de abastecimiento del Sr. Stefan (…).” “…se ubica justo en el límite entre el Acueducto de Brasil de Mora (AyA) y el de la ASADA de Barrio La Trinidad”.

Asimismo, el punto 3. CONCLUSIONES en el que se indica lo siguiente:  El sistema de abastecimiento no se enmarca dentro de lo que se define como un ente operador autorizado, por lo que es de suma importancia regularizar dicha situación.  El sistema de abastecimiento se encuentra en el límite entre los Acueductos de Brasil de Mora, el cual es administrado por AyA, y el Dirección01, por lo que cualquiera de los dos acueductos podría suministrar su administración, siempre y cuando se encuentren con la capacidad técnica necesaria.  Se desconoce completamente las características del sistema de abastecimiento, por lo que es necesario realizar un estudio técnico, donde se describa el sistema, las características de la infraestructura que lo conforma, comprobación de la producción del pozo, pruebas de presión en la red de distribución, y un balance hídrico entre la producción y la demanda.  En caso de que en el estudio se determine que el sistema requiere mejoras, estas deberán ser realizadas por el interesado y hasta que las mismas estén concluidas la ASADA podrá entrar en operación del sistema.

Asimismo, los terrenos donde se ubiquen el pozo y tanque de almacenamiento, y las servidumbres de paso de tubería deberán estar debidamente a nombre de la ASADA a la hora de entrar en operación el sistema. DÉCIMO: Que mediante oficio AL-0465-2018 del 20 de noviembre de 2018, la Coordinadora legal de la Dirección de Agua, dirigido al representante de la sociedad Pueblo Mediterráneo S. A., solicita indique la fecha aproximada para que el AyA, asuma la prestación del servicio en el sitio y se proceda a sellar el pozo en cuestión, a fin de que no continúe con el aprovechamiento ilegal que se viene dando. O se aclare si el pozo va a ser asumido por alguna de las ASADAS mencionadas en el oficio UEN-GAR-2018-04520 y poder prevenir la inscripción de la fuente, lo anterior en un plazo de 10 días de conformidad con el artículo 264 de la Ley General de la Administración Pública.” ( ) “TERCERO: Que, según la relación de hechos expuesta en los resultandos de esta resolución, se presentan en expediente 8203-P dos situaciones con remedios procesales distintas.

En primer lugar, el cambio de uso de la concesión de aprovechamiento de aguas subterráneas otorgada en ese expediente, mediante resolución R-0109-2014-AGUAS-MINAE de las ocho horas cincuenta y siete minutos del treinta de enero de dos mil catorce, a uso poblacional, el cual no sólo se realizó sin comunicarlo al MINAE, sino además se dio el seguimiento al usuario coordinado con AyA para lo que corresponde hacer con el fin que sea esa Institución o una ASADA la que se encargue de brindar el servicio o asumir la fuente pozo PRN03, porque se demostró y está de sobra aceptado por la sociedad PUEBLO MEDITERRÁNEO S. A., cédula jurídica 3-101-243294 a través de su mismo representante Stefan Karl Kuhn cédula de residente 175-000006505, que de esa concesión se abastece una urbanización y está suficientemente informado sobre lo que debe hacer ante el AyA y que no es mediante una concesión de agua para uso consumo humano (doméstico) que puede solucionar la cuestión del abastecimiento.

Consecuencia de lo anterior, el oficio del Director de Agua a la Presidenta Ejecutiva del AyA en la que indica: “Siendo que se trata de consumo humano poblacional, y dado que de conformidad con la Ley 2726 es competencia de esa institución dar ese servicio, se pone en su conocimiento el caso a fin de que se proceda como corresponda. Demás está indicar que se le está copiando a la Municipalidad del cantón de Mora para que no apruebe más permisos de construcción en dicha propiedad.” ( ) “POR TANTO EL MINISTRO DE AMBIENTE Y ENERGIA RESUELVE I SE INTIMA POR PRIMERA VEZ a PUEBLO MEDITERRÁNEO S. A., cédula jurídica 3-101-243294 a través de su mismo representante Stefan Karl Kuhn cédula de residente 175-000006505, que el cambio de uso de la concesión de aprovechamiento de aguas subterráneas otorgada mediante resolución R-0109-2014-AGUAS-MINAE de las ocho horas cincuenta y siete minutos del treinta de enero de dos mil catorce, del pozo perforado número AB-1719 de uso doméstico a poblacional, es causal de caducidad de la concesión de aguas, por contravenir lo dispuesto en el artículo 26 inciso II de la Ley de Aguas, lo que está de sobra comprobado en la relación de hechos efectuada en la parte Resolutiva y a la luz de la normativa y consideraciones de la parte Considerativa de esta resolución”.

Finalmente, por resolución R-2606-2025-AGUAS-MINAE del 21 de noviembre de 2025, ante la solicitud de Pueblo Mediterráneo S.A. de prorrogar la concesión, se dispuso: “SÉTIMO: Que en fecha 10 de agosto de 2025 la sociedad Pueblo Mediterráneo S. A., manifiesta que “ante la solicitud de sellado del pozo AB-1719”, solicita mantener en suspenso la orden de sellado hasta que el A y A tome el acueducto o bien una ASADA, porque de él se abastecen para uso doméstico aproximadamente 12 casas de habitación. OCTAVO: Que en expediente administrativo 8203-P se tramita la solicitud de concesión de aguas mediante el pozo perforado AB-1719. En el mismo expediente consta la resolución R-0155-2021-AGUAS-MINAE que ordenó el sellado del pozo AB-2552 porque se utiliza para abastecimiento poblacional, uso que no es competencia del MINAE. No consta en el expediente administrativo el sellado del pozo AB-2552 por lo que procede presentar denuncia penal por Desobediencia, delito tipificado en el numeral 314 del Código Penal.” “POR TANTO EL MINISTRO DE AMBIENTE Y ENERGIA RESUELVE I DENEGAR concesión de aprovechamiento de aguas subterráneas a PUEBLO MEDITERRÁNEO S. A. cédula jurídica 3-101-243294, representado por el señor Stefan Karl Kuhn, cédula de residencia CED07, por no cumplir el pozo número AB-1719 con el retiro de 40 metros de distancia del ROP ni el retiro de 100 metros de la Ley Forestal.

II ORDENAR A PUEBLO MEDITERRÁNEO S. A. PROCEDER EN EL PLAZO DE UN MES A SELLAR EL POZO NÚMERO AB-1719 con los lineamientos que dispone el Decreto N° 45053-MINAE y dentro del mismo plazo, informar a la Dirección de Agua sobre el sellado para verificación en campo. III ORDENAR A LA DIRECCIÓN DE AGUA PRESENTAR LA DENUNCIA PENAL POR EL DELITO DE DESOBEDIENCIA, tipificado en el artículo 314 del Código Penal, por el INCUMPLIMIENTO DE LA ORDEN DE SELLADO DE POZO número AB-2552 impartida mediante Resolución R-0155-2021-AGUAS-MINAE, de las catorce horas veintidós minutos del dos de febrero de dos mil veintiuno”.

Así, nótese que la concesión del pozo, desde un inicio, fue autorizada únicamente a favor de Pueblo Mediterráneo S.A. para utilizarlo en la finca PRN01 y solo para uso doméstico. Empero, tal concesionario realizó un uso indebido del pozo, se segregaron fincas y se utilizó el pozo para un destino no autorizado, sea, el desarrollo habitacional. Justamente, por ese motivo es que mediante la resolución R-0155-2021-AGUAS-MINAE del 2 de febrero de 2021, se indicó: “SE INTIMA POR PRIMERA VEZ a PUEBLO MEDITERRÁNEO S. A., cédula jurídica 3-101-243294 a través de su mismo representante Stefan Karl Kuhn cédula de residente 175-000006505, que el cambio de uso de la concesión de aprovechamiento de aguas subterráneas otorgada mediante resolución R-0109-2014-AGUAS-MINAE de las ocho horas cincuenta y siete minutos del treinta de enero de dos mil catorce, del pozo perforado número AB-1719 de uso doméstico a poblacional, es causal de caducidad de la concesión de aguas, por contravenir lo dispuesto en el artículo 26 inciso II de la Ley de Aguas, lo que está de sobra comprobado en la relación de hechos efectuada en la parte Resolutiva y a la luz de la normativa y consideraciones de la parte Considerativa de esta resolución”.

Y, posteriormente, en la resolución R-2606-2025-AGUAS-MINAE del 21 de noviembre de 2025 fue que se denegó la concesión al incumplirse con los requisitos, se ordenó el sellado del pozo AB-1719.

Desde este panorama, lo correspondiente es declarar sin lugar el recurso, pues no se observa actuación arbitraria alguna por parte de las autoridades de la Dirección de Aguas en perjuicio de los derechos fundamentales de la parte amparada. Lo anterior en tanto que el pozo desde el inicio no se autorizó para uso poblacional ni para fincas distintas a la inscrita en matrícula de folio real PRN01.

De ahí que resulta improcedente que esta Sala avale, como pretende la parte accionante, que ha existido una lesión a la confianza legítima cuando más bien han sido terceros, como el caso de los tutelados, quienes han hecho uso de un pozo no autorizado para abastecerse de agua, pese incluso a la existencia de las supracitadas resoluciones R-0155-2021-AGUAS-MINAE del 2 de febrero de 2021 y R-2606-2025-AGUAS-MINAE del 21 de noviembre de 2025.

V. DOCUMENTACIÓN APORTADA AL EXPEDIENTE

Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidos en algún dispositivo de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, estos deberán ser retirados del despacho en el plazo máximo de 30 días hábiles contado a partir de la notificación de esta sentencia. Se advierte que será destruido todo aquel material no retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en el artículo XXVI de la sesión nro. 27-11 del 22 de agosto de 2011, publicado en el Boletín Judicial nro. 19 del 26 de enero de 2012, así como en el acuerdo de Consejo Superior del Poder Judicial, aprobado en el artículo LXXXI de la sesión nro. 43-12 celebrada el 3 de mayo de 2012.

Por tanto:

Se declara sin lugar el recurso.

Fernando Castillo V.

Fernando Cruz C.

Paul Rueda L.

Luis Fdo. Salazar A.

Jorge Araya G.

Anamari Garro V.

Ingrid Hess H.

EXPEDIENTE N° 26-021424-0007-CO

Document not found. Documento no encontrado.

Implementing decreesDecretos que afectan

    TopicsTemas

      Concept anchorsAnclajes conceptuales

        Spanish key termsTérminos clave en español

        News & Updates Noticias y Actualizaciones

        All articles → Todos los artículos →

        Weekly Dispatch Boletín Semanal

        Field reporting and policy analysis from Costa Rica's forests. Reportajes y análisis de política desde los bosques de Costa Rica.

        ✓ Subscribed. ✓ Suscrito.

        One email per week. No spam. Unsubscribe in one click. Un correo por semana. Sin spam. Cancela en un clic.

        Or WhatsApp channelO canal de WhatsApp →
        Coalición Floresta © 2026 · All rights reserved © 2026 · Todos los derechos reservados

        Stay Informed Mantente Informado

        Conservation news and action alerts, straight from the field Noticias de conservación y alertas de acción, directo desde el campo

        Email Updates Actualizaciones por Correo

        Weekly updates, no spam Actualizaciones semanales, sin spam

        Successfully subscribed! ¡Suscripción exitosa!

        WhatsApp Channel Canal de WhatsApp

        Join to get instant updates on your phone Únete para recibir actualizaciones instantáneas en tu teléfono

        Join Channel Unirse al Canal
        Coalición Floresta Coalición Floresta © 2026 Coalición Floresta. All rights reserved. © 2026 Coalición Floresta. Todos los derechos reservados.
        🙏