Res. 16900-2026 Sala Constitucional · Sala Constitucional · 15/05/2026
OutcomeResultado
The amparo is partially granted: it is granted for the Municipality of Golfito's failure to respond to the petitioner's request, ordering a response within 10 days. The substantive claim to order the incorporation of the environmental variable into the existing coastal regulatory plans of Pavones is denied, because a new comprehensive plan is being formulated that will repeal them and include environmental requirements, and a warning is issued regarding the duty to include them in the new plan.Se declara parcialmente con lugar el amparo: se concede por la falta de respuesta de la Municipalidad de Golfito a la solicitud del recurrente, ordenando contestar en 10 días. Se deniega la pretensión sustantiva de ordenar la incorporación de la variable ambiental en los planes reguladores costeros vigentes de Pavones, por estar en formulación un nuevo plan integral que los derogará e incluirá los requisitos ambientales, y se advierte sobre el deber de incorporarlos en el nuevo plan.
SummaryResumen
The Constitutional Chamber hears an amparo filed by a development association against the Municipality of Golfito for failure to respond to a request to incorporate environmental considerations into the coastal regulatory plans for Pavones. The Chamber determines that the plans were approved between 2000 and 2004, before the regulations requiring environmental viability (Executive Decree 32967 of 2006). Based on prior case law, it notes that even earlier plans must be environmentally assessed. However, given that a Comprehensive Regulatory Plan for Pavones is being formulated, which will repeal the partial plans and incorporate current environmental requirements, the Court denies the substantive claim, deeming it useless and inefficient to require incorporation into plans soon to be repealed. The amparo is partially granted for the lack of timely response to the initial request, ordering the Municipality to reply within ten days and warning about the duty to include the environmental variable in the new plan.La Sala Constitucional conoce un amparo interpuesto por una asociación de desarrollo contra la Municipalidad de Golfito por la falta de respuesta a una solicitud de incorporación de la variable ambiental en los planes reguladores costeros de Pavones. La Sala determina que los planes fueron aprobados entre 2000 y 2004, antes de la normativa que exige la viabilidad ambiental (Decreto Ejecutivo 32967 del 2006). Sin embargo, con base en jurisprudencia previa, señala que incluso los planes anteriores deben ser evaluados ambientalmente. No obstante, al constatar que existe un proyecto en formulación para un Plan Regulador Integral de Pavones que derogará los parciales y que incluirá los requisitos ambientales vigentes, declara sin lugar el reclamo sustantivo, considerando que sería inútil e ineficiente exigir la incorporación a los planes actuales próximos a ser derogados. Concede parcialmente el amparo por la falta de respuesta oportuna a la gestión inicial, ordenando a la Municipalidad contestar en diez días y previniendo sobre el deber de incorporar la variable ambiental en el nuevo plan.
Key excerptExtracto clave
Note that the Chamber is very clear and conclusive in pointing out —as indicated above— that regulatory plans that do not have the integrated environmental variable must be environmentally assessed, so that the execution of those regulatory plans approved prior to the adoption of the aforementioned regulations is subject to compliance with that requirement, and therefore, the Chamber indicates that any works that could cause environmental harm cannot be carried out until they are submitted for review to determine their potential impact on the environment (…) In accordance with the partially transcribed resolution and based on the analysis of the facts deemed proven in this case, we can note that: 1) the regulatory plans challenged by the petitioner came into legal effect prior to the entry into force of Executive Decree No. 32967 called “Manual of Technical Instruments for the Environmental Impact Assessment Process”, 2) this Chamber has held that regulatory plans lacking the integrated environmental variable must be environmentally assessed, even if they were approved previously, and 3) the Comprehensive Regulatory Plan for Pavones (PRI) project is currently under development, which will replace the regulatory plans mentioned in the appeal. Thus, this Chamber considers that, although it has been indicated that environmental assessment must be carried out on regulatory plans approved earlier, in the case under study, we have a particular situation, namely that a new Regulatory Plan is currently under discussion and development for the areas questioned in the appeal, so it would be wrong for this Chamber to order the incorporation of the environmental variable into an instrument that will soon be repealed, and at the same time, it would be premature to refer to the incorporation of said variable into a plan that is currently under development and whose content is still unknown, and which, according to current regulations, is obligated to include this variable and be duly reviewed to confirm its inclusion by the competent institutions.Obsérvese que la Sala es muy clara y contundente al señalar ‒como se indicó supra‒ que los planes reguladores que no cuenten con la variable ambiental integrada deben ser evaluados ambientalmente, de manera que la ejecución de esos planes reguladores aprobados con anterioridad a la adopción de la normativa señalada queda supeditada al cumplimiento de dicho requisito y, por tanto, la Sala indica que las eventuales obras que pudieren producir una lesión al ambiente no se pueden llevar a cabo hasta que sean sometidas a conocimiento para que se determine la posible afectación que podrían tener sobre el ambiente (…) En congruencia con la resolución parcialmente transcrita y en virtud del análisis de los hechos que se tuvieron como probados en este caso, podemos acotar que: 1) los planes reguladores cuestionados por el recurrente nacieron a la vida jurídica de previo a la entrada en vigencia del Decreto Ejecutivo No. 32967 denominado “Manual de Instrumentos Técnicos para el Proceso de Evaluación del Impacto Ambiental”, 2) esta Sala ha sostenido que los planes reguladores que no cuenten con la variable ambiental integrada deben ser evaluados ambientalmente, aunque hayan sido aprobados con anterioridad y 3) en este momento se encuentra en desarrollo el proyecto del Plan Regulador Integral de Pavones (PRI), el cual sustituirá los planes reguladores mencionados en el recurso. De esta forma, considera esta Sala que, si bien se ha indicado que se debe realizar la evaluación ambiental en los planes reguladores aprobados con anterioridad, en el caso bajo estudio, tenemos un situación particular, y es que en este momento se encuentra en discusión y desarrollo un nuevo Plan Regular para las zonas cuestionadas en el recurso, por lo que, mal haría esta Sala ordenando que se realice la incorporación de la variable ambiental en un instrumento que quedará derogado próximamente y a la vez, sería prematuro referirse a la incorporación de dicha variable en un plan que en este momento se encuentra en desarrollo y que aún no se tiene conocimiento de su contenido y que, según establece la normativa vigente tiene la obligación de contar con esta variable y ser debidamente revisado que la contenga por parte de las instituciones competentes.
Pull quotesCitas destacadas
"los planes reguladores que no cuenten con la variable ambiental integrada deben ser evaluados ambientalmente, de manera que la ejecución de esos planes reguladores aprobados con anterioridad a la adopción de la normativa señalada queda supeditada al cumplimiento de dicho requisito"
"Regulatory plans that do not have the integrated environmental variable must be environmentally assessed, so that the execution of those regulatory plans approved prior to the adoption of the aforementioned regulations is subject to compliance with that requirement"
Considerando IV
"los planes reguladores que no cuenten con la variable ambiental integrada deben ser evaluados ambientalmente, de manera que la ejecución de esos planes reguladores aprobados con anterioridad a la adopción de la normativa señalada queda supeditada al cumplimiento de dicho requisito"
Considerando IV
"resulta menester recordarles a las autoridades recurridas su obligación de realizar las evaluaciones ambientales que correspondan e incorporar debidamente la variable ambiental en el nuevo proyecto del Plan Regulador Integral de Pavones"
"It is necessary to remind the respondent authorities of their obligation to carry out the corresponding environmental assessments and to duly incorporate the environmental variable into the new Comprehensive Regulatory Plan of Pavones project"
Considerando V
"resulta menester recordarles a las autoridades recurridas su obligación de realizar las evaluaciones ambientales que correspondan e incorporar debidamente la variable ambiental en el nuevo proyecto del Plan Regulador Integral de Pavones"
Considerando V
"en caso de no prosperar el nuevo proyecto de plan regulador, los planes reguladores vigentes deberán adecuarse a la normativa ambiental vigente"
"In the event that the new regulatory plan project does not succeed, the current regulatory plans must be adapted to the environmental regulations in force"
Considerando V
"en caso de no prosperar el nuevo proyecto de plan regulador, los planes reguladores vigentes deberán adecuarse a la normativa ambiental vigente"
Considerando V
Full documentDocumento completo
Review of the Document CONSTITUTIONAL CHAMBER OF THE SUPREME COURT OF JUSTICE. San José, at nine hours twenty minutes on the fifteenth of May two thousand twenty-six.
Amparo action processed under case file No. 25-022270-0007-CO, filed by Nombre01, identity card CED01, on behalf of the ASOCIACIÓN INTEGRAL DE RÍO CLARO DE PAVONES, against the MUNICIPALIDAD DE GOLFITO.
Findings of Fact:
Drafted by Magistrate Araya García; and,
Considering:
I.Preliminary Matter. Before analyzing the merits of the case—concerning the alleged violation of the right to a prompt and completed procedure—it must be clarified that, based on ruling No. 2008-02545 at 8:55 hours on February 22, 2008, this Chamber has referred to the contentious-administrative jurisdiction—with some exceptions—those matters in which it is debated whether the public administration has or has not complied with the deadlines set by the Ley General de la Administración Pública (Articles 261 and 325) or sectoral laws for special administrative procedures, to resolve by final act an administrative procedure—initiated ex officio or at the request of a party—or to hear the corresponding administrative appeals. Precisely, in this case, an exception is raised, as it involves a claim to incorporate the environmental variable into the Pavones coastal regulatory plans, which has presumably not been resolved within a reasonable time by the respondent authorities. Having clarified this point, we proceed to resolve the specific situation raised in this amparo.
II.Object of the action. The petitioner alleges that on May 26, 2025, the protected Association sent via email a request to the Municipality and the Municipal Council of Golfito, in which it requested that the respondent authority integrate environmental considerations into all its actions, specifically in the regulatory plan. However, he claims that, as of the date this action was filed, the respondent authority has not provided a response to the filed claim, which he deems harmful to his fundamental rights.
III.Proven facts. Of importance for the decision in this matter, the following facts are deemed duly proven, because they have been accredited as such:
IV.On the specific case. In the sub lite, the petitioner claims that on May 26, 2025, the protected Association sent via email a claim to the Municipality and the Municipal Council of Golfito, in which it requested that the respondent authority integrate environmental considerations into all its actions, specifically in the regulatory plan. However, he claims that, as of the date this action was filed, the respondent authority has not provided a response to the filed claim, which he deems harmful to his fundamental rights.
In this regard, first, it must be noted that, according to the case record, the request referred to by the protected party was received by the Municipal Council of Golfito at an email address considered an official means for receiving communications from that body, since, although they did not indicate so in the report rendered to this Chamber, it is recorded that the respondents acknowledged receipt to the petitioner and, furthermore, it was verified that they processed the request of the protected party and took cognizance of it in ordinary session 58-2025 of June 2, 2025, where it was ordered to forward it to the Municipal Administration. Similarly, although the Mayor and the Acting Head (a.i.) of the Maritime-Terrestrial Zone Department assert that the request in question was not sent to them, it is no less true that it is recorded that said request was forwarded by the Municipal Council through agreement 26-ORD 58.-2025.
From a detailed reading of the petitioner's request, this Chamber considers that the petitioner's underlying claim is the omission, per se, of including the environmental variable in the Coastal Regulatory Plans of Pavones, specifically those corresponding to Sections A, B, and C of Bahía Pavón (Río Claro Sector) and the El Macho-El Higo Streams, which implies a presumed infringement of Article 50 of the Constitution, and it is on said claim specifically that the resolution of this action will focus.
It is worth noting that the Pavones coastal regulatory plans, specifically those corresponding to Sections A, B, and C of Bahía Pavón (Río Claro sector) and the El Macho – El Higo streams, have been duly approved and in operation by the Municipalidad de Golfito as the entity responsible for the administration of the maritime-terrestrial zone since the years 2000 and 2004. The foregoing implies that, at the time this planning instrument was prepared and had legal effect, Decreto Ejecutivo No. 32967 called “Manual de Instrumentos Técnicos para el Proceso de Evaluación del Impacto Ambiental” (Manual de EIA), dated May 4, 2006, had not yet entered into force. This does not mean that no type of environmental analysis was conducted for these regulatory plans at the time of their entry into force, since, as the authorities of the Municipalidad de Golfito rightly state under oath, these contemplated “protection zones, conditional uses, and restrictions in conservation strips.” Likewise, it was verified that, as of the date reports were rendered in this action by ICT and SETENA, i.e., in February 2026, it was established that the project for the Plan Regulador Integral de Pavones (PRI) is under development, where the maritime-terrestrial zone regulatory plan for the entire district will be drafted, which is in the formulation phase, in coordination with the Instituto Costarricense de Turismo (ICT), as part of a first stage of the process, and that the current environmental requirements will be incorporated into this, which will have the effect of expressly repealing the currently valid partial regulatory plans, establishing an integral, unified, and updated planning model for the Maritime-Terrestrial Zone of the district of Pavones.
In this regard, this Constitutional Chamber established in ruling No. 2025-3640 at 13:35 hours on February 5, 2025, a criterion reiterated in ruling No. 2025-31954 at 9:20 hours on October 3, 2025, regarding what is relevant, the following:
(…) This Tribunal has also stated that the issuance of a regulatory plan (plan regulador) implies that the technical studies to determine the suitability of each area have been carried out, and that its execution —even when prior to the regulations that required the incorporation of the environmental variable— is subject to compliance with those requirements (see judgments 2006-006346 and 2013-012973), as well as to the completion of the established procedures, such as those set forth in the challenged sections 13.6, 13.7, 14.6, 14.12, and 14.13 of the cited Manual. Finally, a very valid reason is the recognition that this Tribunal has made of the principle of the protection of environmental law by the State, derived from what is indicated in constitutional section 50, by establishing the State's obligation to guarantee, defend, and protect this right, thereby making it the guarantor of the protection and defense of the environment and natural resources (…)
It should be noted that the Chamber is very clear and forceful in pointing out —as indicated supra— that regulatory plans that do not have the environmental variable integrated must be environmentally assessed, so that the execution of those regulatory plans approved prior to the adoption of the indicated regulations is subject to compliance with that requirement, and, therefore, the Chamber indicates that any works that could cause harm to the environment cannot be carried out until they are submitted for review to determine the possible impact they could have on the environment (…)” (highlighting not in original).
In congruence with the partially transcribed ruling and by virtue of the analysis of the facts that were taken as proven in this case, we can note that:
V.In any case, it is necessary to remind the respondent authorities of their obligation to carry out the corresponding environmental impact assessments and duly incorporate the environmental variable into the new Integrated Regulatory Plan of Pavones project, in order to guarantee the proper protection of the environment, as established in Article 50 of the Political Constitution. Likewise, they are warned that, should the new regulatory plan project not succeed, the current regulatory plans must be adapted to the environmental regulations in force.
VI.Finally, this Chamber could not verify that the claim filed by the petitioner on May 26, 2025 was duly answered by the authorities of the Municipality of Golfito, despite the fact that a period exceeding two months had elapsed when he filed for amparo, and the proper course is that he be provided with the explanation that was given in the report submitted to this Chamber. Thus, the petition is partially granted, solely with respect to this point and with the considerations that will be stated in the operative part of this judgment.
VII.Note by Judge Castillo Víquez, regarding prompt and complete administrative justice. I have supported this Tribunal's thesis that, when a claimant alleges a violation of the right to prompt and complete justice in an administrative venue, those who must hear the legal dispute are the Administrative-Contentious Tribunals and not this Chamber. However, with the recent enactment of Law No. 9097, Law Regulating the Right of Petition, it has been established that this right is susceptible to judicial protection through the amparo remedy established by Article 32 of the Law of Constitutional Jurisdiction, in relation to Article 27 of the Political Constitution of the Republic of Costa Rica, in those cases where the petitioner considers that the material actions of the Administration, its administrative acts, or its response are affecting their fundamental rights. In my view, the newly enacted regulations do not imply that this Tribunal must modify its jurisprudential line, which, based on section 7 of its Law, is exclusively responsible for defining its own competence.
Therefore, except for those legal-constitutional disputes that have been recognized by this same Chamber as exceptional cases, which are properly heard in this jurisdiction through the constitutional procedure guaranteeing amparo, in other cases, and for the reasons given by this Tribunal (judgment No. 2008-02545 of 8:55 a.m. on February 22, 2008), the competent bodies are the Judges of the administrative-contentious jurisdiction, all of which is in accordance with section 25 of the American Convention on Human Rights, Constitutional Law (values, principles, and norms), and the corresponding legal norms based on a logical, systemic, and teleological interpretation of the legal system.
VIII.Note by Judge Rueda Leal. I must warn that since judgment No. 2019002355 of 9:30 a.m. on February 12, 2019, my position has been the following in relation to amparo petitions when they have been filed on behalf of a legal entity:
“…in Advisory Opinion 22-16 of February 26, 2016, the Inter-American Court of Human Rights indicated that although some States recognize the right of petition for legal entities with special conditions, such as unions, political parties, or representatives of indigenous peoples, Afro-descendant communities, or specific groups, the truth is that “Article 1.2 of the American Convention only enshrines rights in favor of natural persons, so legal entities are not holders of the rights enshrined in said treaty.” On the other hand, in the same advisory opinion, the Inter-American Court provided that, in certain specific contexts, natural persons can exercise their rights through legal entities (for example, through a media outlet, as happened in the case Nombre03 et al. v. Venezuela); however, for this to be actionable before the inter-American system, “the exercise of the right through a legal entity must involve an essential and direct relationship between the natural person who requires protection from the inter-American system and the legal entity through which the violation occurred, because a simple link between both persons is not enough to conclude that the rights of natural persons are indeed being protected and not those of the legal entities.
Indeed, proof must go beyond the simple participation of the natural person in the activities typical of the legal entity, such that said participation is substantially related to the rights alleged to have been violated.” (emphasis added) (AO. 22/16)”.
Community development associations, such as the one represented by the petitioner, are an organized group of people within a community that seeks to carry out all types of actions to improve the social, economic, cultural, and environmental conditions of the area where they live, which can receive resources from the State, provided they are registered as such with Dinadeco, in accordance with Law No. 3859. By virtue of the foregoing, I consider that, due to its legal nature, there is an essential relationship between the natural person and the legal entity that in the sub examine merits an analysis of the merits of the matter in order to determine whether or not the fundamental right allegedly aggrieved was violated.
IX.Documentation provided to the case file. The parties are forewarned that, if they have provided any paper document, as well as objects or evidence contained in any additional electronic, computer, magnetic, optical, telematic device, or one produced by new technologies, these must be withdrawn from the office within a maximum period of 30 business days counted from the notification of this judgment. Otherwise, all material that is not removed within this period will be destroyed, as provided in the "Reglamento sobre Expediente Electrónico ante el Poder Judicial", approved by the Full Court in Session No. 27-11 of August 22, 2011, Article XXVI and published in Judicial Bulletin Number 19 of January 26, 2012, as well as in the agreement approved by the Superior Council of the Judicial Branch, in Session No. 43-12 held on May 3, 2012, Article LXXXI.
Therefore:
The petition is partially granted, solely regarding the lack of response to the claim filed by the petitioner before the Municipality of Golfito. Elvia Cedeño Chavarría, Jhon Genry Sandí Castillo, and Alfonso Rojas Loría, in their respective capacities as Mayor, Acting Head of the Maritime Terrestrial Zone Department, and Council President, all of the Municipality of Golfito, or whoever occupies those positions in their stead, are ordered to take the actions within the scope of their competencies so that, within a maximum period of ten days counted from the notification of this judgment, a response is provided to the claim filed by the petitioner on May 26, 2025. The respondent authorities are warned that, should they fail to comply with said order, they will incur the crime of disobedience and that, in accordance with Article 71 of the Law of this jurisdiction, whoever receives an order that must be complied with or enforced, issued in an amparo proceeding, and does not comply with it or does not enforce it, shall be sentenced to imprisonment from three months to two years, or a fine of twenty to sixty days, provided the offense is not more severely penalized.
The Municipality of Golfito is ordered to pay the costs, damages, and losses caused by the acts that serve as the basis for this declaration, which shall be liquidated in an enforcement of judgment proceeding in the administrative-contentious jurisdiction. The respondent authorities shall take note of what is indicated in Considerando V of this judgment. In all other respects, the petition is dismissed. Judge Castillo Víquez records a note. Judge Rueda Leal records a note. Notify.- Fernando Castillo V. President Fernando Cruz C.
Paul Rueda L. Luis Fdo. Salazar A.
Jorge Araya G. Anamari Garro V.
Ingrid Hess H.
Telephones: Telf01/ ALA-4TA (Telf02). Fax: Telf03 / Telf04. Email: www.poder-judicial.go.cr/salaconstitucional. Address: (Dirección01, Dirección02, 100 mts. Sur de la iglesia del Perpetuo Socorro).
Revisión del Documento SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del quince de mayo de dos mil veintiseis .
Recurso de amparo que se tramita en el expediente No. 25-022270-0007-CO, interpuesto por Nombre01, cédula de identidad CED01, a favor de ASOCIACIÓN INTEGRAL DE RÍO CLARO DE PAVONES, contra la MUNICIPALIDAD DE GOLFITO.
Resultandos:
Redacta el Magistrado Araya García; y,
Considerando:
I.Cuestión Preliminar. De previo a analizar el fondo del asunto -por la presunta violación del derecho a un procedimiento pronto y cumplido- debe aclararse que, a partir de la sentencia No. 2008-02545 de las 8:55 horas de 22 de febrero de 2008, esta Sala ha remitido a la jurisdicción contencioso administrativa -con algunas excepciones-, aquellos asuntos en los que se discute si la administración pública ha cumplido o no los plazos pautados por la Ley General de la Administración Pública (artículos 261 y 325) o las leyes sectoriales para los procedimientos administrativos especiales, para resolver por acto final un procedimiento administrativo -instruido de oficio o a instancia de parte- o conocer de los recursos administrativos procedentes. Precisamente, en este caso, se plantea un supuesto de excepción, pues, se está ante un reclamo para que se incorpore la variable ambiental en los planes reguladores costeros Pavones, el cual, presuntamente, no ha sido resuelto dentro de un plazo razonable por parte de las autoridades recurridas. Aclarado el punto, se entra a resolver la situación concreta planteada en este amparo.
II.Objeto del recurso. Alega el recurrente que el 26 de mayo de 2025, la Asociación amparada remitió vía correo electrónico una solicitud ante la Municipalidad y el Concejo Municipal de Golfito, en el cual requirió que la autoridad recurrida integrara consideraciones ambientales en todas sus actuaciones, específicamente en el plan regulador. Sin embargo, acusa que, a la fecha de presentación de este recurso, la autoridad recurrida no ha brindado respuesta del reclamo planteado, lo que estima lesivo de sus derechos fundamentales.
III.Hechos probados. De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos, porque así han sido acreditados:
IV.Sobre el caso concreto. En el sub lite, reclama el recurrente que el 26 de mayo de 2025, la Asociación amparada remitió vía correo electrónico un reclamo ante la Municipalidad y el Concejo Municipal de Golfito, en el cual requirió que la autoridad recurrida integrara consideraciones ambientales en todas sus actuaciones, específicamente en el plan regulador. Sin embargo, acusa que, a la fecha de presentación de este recurso, la autoridad recurrida no ha brindado respuesta del reclamo planteado, lo que estima lesivo de sus derechos fundamentales.
Sobre el particular, en primer lugar, debe indicarse que, según consta en los autos la gestión referida por el amparado fue recibida por el Concejo Municipal de Golfito a un correo electrónico que se considera un medio oficial para recibir comunicaciones por parte de ese órgano, ya que, si bien no lo indicaron en el informe rendido ante esta Sala, consta que los recurridos dieron acuse de recibo al recurrente y además, se comprobó que dieron trámite a la solicitud del tutelado y la conocieron en la sesión ordinaria 58-2025 de 2 de junio de 2025, en donde se ordenó trasladarla a la Administración Municipal. De igual forma, si bien el Alcalde y el Encargado a.i. del Departamento de Zona Marítimo Terrestre aseguran que no se les remitió la solicitud en cuestión, no menos cierto es que, consta que dicha gestión fue trasladada por el Concejo Municipal mediante el acuerdo 26-ORD 58.-2025.
De la lectura detallada de la solicitud del recurrente, esta Sala considera que el reclamo de fondo del recurrente es la omisión, per se, de incluir la variable ambiental en los Planes Reguladores Costeros de Pavones, específicamente los correspondientes a la Sección A, B, C, de la Bahía Pavón (Sector Río Claro) y las Quebradas El Macho-El Higo, lo cual implica una presunta infracción al artículo 50 Constitucional y es sobre dicho reclamo específicamente sobre el que versará la resolución de este recurso.
Conviene destacar que los planes reguladores costeros Pavones, específicamente los correspondientes a la Sección A, B y C de la Bahía Pavón (sector Río Claro) y las quebradas El Macho – El Higo se encuentran debidamente aprobados y en funcionamiento por parte de la Municipalidad de Golfito como responsable de la administración de la zona marítimo terrestre desde los años 2000 y 2004. Lo anterior implica que, al momento en que se confeccionó y surtió efectos jurídicos dicho instrumento de planificación, aún no había entrado en vigencia el Decreto Ejecutivo No. 32967 denominado “Manual de Instrumentos Técnicos para el Proceso de Evaluación del Impacto Ambiental” (Manual de EIA), que data del 4 de mayo del 2006. Esto no significa que para la entrada en vigencia de los planes reguladores en cuestión no se realizara ningún tipo de análisis ambiental en ellos, pues, como bien lo señalan bajo juramento las autoridades de la Municipalidad de Golfito, en estos se contempló “zonas de protección, usos condicionados y restricciones en franjas de conservación”.
Asimismo, se comprobó que, a la fecha en que se rindieron informes en este recurso por parte del ICT y del SETENA, sea en febrero de 2026, se estableció que se encuentra en desarrollo el proyecto del Plan Regulador Integral de Pavones (PRI), donde se elaborará el plan regulador de zona marítimo terrestre del distrito completo, el cual está en fase de formulación, en coordinación con el Instituto Costarricense de Turismo (ICT), como parte de una primera etapa del proceso y en estos se incorporarán los requisitos ambientales vigentes y tendrá como efecto la derogatoria expresa de los planes reguladores parciales actualmente vigentes, estableciendo un modelo de planificación integral, unificado y actualizado para la Zona Marítimo Terrestre del distrito de pavones.
Al respecto, esta Sala Constitucional estableció en la sentencia No. 2025-3640 de las 13:35 horas de 5 de febrero de 2025, criterio reiterado en la sentencia No. 2025-31954 de las 9:20 horas de 3 de octubre de 2025, en lo que interesa, lo siguiente:
“(…) Este Tribunal también ha manifestado que la emisión de un plan regulador supone que se han realizado los estudios técnicos para determinar la aptitud de cada área, y que su ejecución ‒aun cuando sean anteriores a la normativa que exigía la incorporación de la variable ambiental‒ queda supeditada al cumplimiento de esos requisitos (ver sentencias 2006-006346 y 2013-012973), así como también a que se realicen los procedimientos establecidos, como serían los dispuestos en los numerales impugnados 13.6, 13.7, 14.6, 14.12 y 14.13 del Manual de cita. Finalmente, una razón muy válida es el reconocimiento que ha hecho este Tribunal del principio de la tutela del derecho ambiental a cargo del Estado y que se deriva de lo indicado en el numeral 50 constitucional, al establecer la obligación del Estado de garantizar, defender y tutelar este derecho, con lo cual se constituye en el garante de la protección y tutela del medio ambiente y de los recursos naturales (…)
Obsérvese que la Sala es muy clara y contundente al señalar ‒como se indicó supra‒ que los planes reguladores que no cuenten con la variable ambiental integrada deben ser evaluados ambientalmente, de manera que la ejecución de esos planes reguladores aprobados con anterioridad a la adopción de la normativa señalada queda supeditada al cumplimiento de dicho requisito y, por tanto, la Sala indica que las eventuales obras que pudieren producir una lesión al ambiente no se pueden llevar a cabo hasta que sean sometidas a conocimiento para que se determine la posible afectación que podrían tener sobre el ambiente (…)” (el resaltado no pertenece al original).
En congruencia con la resolución parcialmente transcrita y en virtud del análisis de los hechos que se tuvieron como probados en este caso, podemos acotar que:
V.De todas formas, resulta menester recordarles a las autoridades recurridas su obligación de realizar las evaluaciones ambientales que correspondan e incorporar debidamente la variable ambiental en el nuevo proyecto del Plan Regulador Integral de Pavones, en aras de garantizar la debida protección del medio ambiente, tal y como se establece en el artículo 50 de la Constitución Política. Asimismo, se les advierte que, en caso de no prosperar el nuevo proyecto de plan regulador, los planes reguladores vigentes deberán adecuarse a la normativa ambiental vigente.
VI.Finalmente, esta Sala no pudo comprobar que el reclamo planteado por el recurrente el 26 de mayo de 2025 fuera debidamente contestado por parte de las autoridades de la Municipalidad de Golfito, pese a que había transcurrido un plazo superior a dos meses cuando acudió en amparo y lo procedente es que se le brindara la explicación que fue realizada en el informe rendido a esta Sala. Así las cosas, se declara con lugar el recurso, únicamente en cuanto a este extremo y con las consideraciones que se dirán en la parte dispositiva de esta sentencia.
VII.Nota del magistrado Castillo Víquez, en cuanto a la justicia administrativa pronta y cumplida. He apoyado la tesis de este Tribunal, de que cuando el justiciable alega una vulneración al derecho a una justicia pronta y cumplida en sede administrativa, quienes deben conocer la controversia jurídica son los Tribunales de lo Contencioso-Administrativo y no esta Sala. Ahora bien, con la reciente promulgación de la Ley n.° 9097, Ley de Regulación del Derecho de Petición, se ha establecido que ese derecho es susceptible de tutela judicial por medio del recurso de amparo establecido por el artículo 32 de la Ley de la Jurisdicción Constitucional, en relación con el artículo 27 de la Constitución Política de la República de Costa Rica, en aquellos casos en que el peticionario considere que las actuaciones materiales de la Administración, sus actos administrativos o su respuesta le estén afectando sus derechos fundamentales.
A mi modo de ver, la normativa recién promulgada no implica que este Tribunal deba modificar su línea jurisprudencial, quien, con base en el numeral 7 de su Ley, le corresponde definir exclusivamente su propia competencia. Por ende, salvo aquellas controversias jurídico-constitucionales que han sido reconocidas por esta misma Sala como supuestos de excepción, que sí proceden ser conocidas en esta jurisdicción a través del proceso constitucional de garantía del amparo, en los demás casos, y por las razones que ha dado este Tribunal (sentencia N° 2008-02545 de las 8:55 horas de 22 de febrero de 2008), los competentes son los Jueces de la jurisdicción de lo contencioso-administrativo, todo lo cual es conforme al numeral 25, de la Convención Americana sobre Derechos Humanos, el Derecho de la Constitución (valores, principios y normas) y las normas legales correspondientes con base en una interpretación lógica, sistémica y teleológica del ordenamiento jurídico.
VIII.Nota del magistrado Rueda Leal. Debo advertir que desde la sentencia nro. 2019002355 de las 9:30 de 12 de febrero de 2019, mi postura ha sido la siguiente en relación con los recursos de amparo cuando estos han sido planteados a favor de una persona jurídica:
“…en la Opinión Consultiva 22-16 del 26 de febrero de 2016, la Corte Interamericana de Derechos Humanos indicó que si bien algunos Estados reconocen el derecho de petición a personas jurídicas con condiciones especiales, como lo son los sindicatos, partidos políticos o representantes de pueblos indígenas, comunidades afrodescendientes o grupos específicos, lo cierto es que “El artículo 1.2 de la Convención Americana sólo consagra derechos a favor de personas físicas, por lo que las personas jurídicas no son titulares de los derechos consagrados en dicho tratado”. Por otro lado, en la misma opinión consultiva, la Corte Interamericana dispuso que, en ciertos contextos particulares, las personas físicas pueden llegar a ejercer sus derechos a través de personas jurídicas (verbigracia, a través de un medio de comunicación, como acaeció en el caso Nombre03 y otros contra Venezuela); empero, a efectos de que ello sea tutelable ante el sistema interamericano, “el ejercicio del derecho a través de una persona jurídica debe involucrar una relación esencial y directa entre la persona natural que requiere protección por parte del sistema interamericano y la persona jurídica a través de la cual se produjo la violación, por cuanto no es suficiente con un simple vínculo entre ambas personas para concluir que efectivamente se están protegiendo los derechos de personas físicas y no de las personas jurídicas.
En efecto, se debe probar más allá de la simple participación de la persona natural en las actividades propias de la persona jurídica, de forma que dicha participación se relacione de manera sustancial con los derechos alegados como vulnerados.” (énfasis agregado) (OC. 22/16)”.
Las asociaciones de desarrollo comunal, tal como la que representa el recurrente, es un grupo organizado de personas dentro de una comunidad que busca realizar todo tipo de acciones para mejorar las condiciones sociales, económicas, culturales, y ambientales del área en que conviven, las cuales pueden recibir recursos por parte del Estado, siempre que se encuentren inscritas como tales ante Dinadeco, conforme lo dispuesto en la Ley nro. 3859. En virtud de lo anterior, considero que, por su naturaleza jurídica, existe una relación esencial entre la persona natural y la persona jurídica que en el sub examine amerita analizar por el fondo el asunto a fin de determinar la vulneración o no del derecho fundamental presuntamente agraviado.
IX.Documentación aportada al expediente. Se previene a las partes que, de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, éstos deberán ser retirados del despacho en un plazo máximo de 30 días hábiles contados a partir de la notificación de esta sentencia. De lo contrario, será destruido todo aquel material que no sea retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en sesión N° 27-11 del 22 de agosto del 2011, artículo XXVI y publicado en el Boletín Judicial número 19 del 26 de enero del 2012, así como en el acuerdo aprobado por el Consejo Superior del Poder Judicial, en la sesión N° 43-12 celebrada el 3 de mayo del 2012, artículo LXXXI.
Por tanto:
Se declara parcialmente con lugar el recurso, únicamente en cuanto a la falta de respuesta del reclamo planteado por el recurrente ante la Municipalidad de Golfito. Se ordena a Elvia Cedeño Chavarría, Jhon Genry Sandí Castillo y Alfonso Rojas Loría, por su orden Alcaldesa, Encargado a.i. del Departamento de Zona Marítimo Terrestre y Presidente del Concejo, todos de la Municipalidad de Golfito, o a quienes en su lugar ocupen dichos cargos, que realicen las actuaciones que estén dentro del ámbito de sus competencias, para que, en el plazo máximo de diez días contados a partir de la notificación de esta sentencia, se brinde respuesta al reclamo planteado por el recurrente el 26 de mayo de 2025. Se le advierte a las autoridades recurridas que, de no acatar la orden dicha, incurrirán en el delito de desobediencia y, que de conformidad con el artículo 71 de la Ley de esta jurisdicción, se le impondrá prisión de tres meses a dos años, o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada en un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado.
Se condena a la Municipalidad de Golfito al pago de las costas, daños y perjuicios causados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso administrativo. Tomen nota las autoridades recurridas de lo indicado en el V considerando de esta sentencia. En lo demás, se declara sin lugar el recurso. El magistrado Castillo Víquez consigna nota. El magistrado Rueda Leal consigna nota. Notifíquese.- Fernando Castillo V.
Fernando Cruz C.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.