Res. 16897-2026 Sala Constitucional · Sala Constitucional · 15/05/2026
OutcomeResultado
The Constitutional Chamber granted the amparo and ordered the immediate precautionary suspension of the environmental viability and municipal construction permit for the “Condominio Di” project, finding a serious and current threat of environmental damage to the Quebrada Los Negritos and its protection zone, violating Article 50 of the Constitution and Articles 33 and 58 of the Forestry Law.La Sala Constitucional concedió el amparo y ordenó la suspensión cautelar inmediata de la viabilidad ambiental y el permiso municipal de construcción del proyecto “Condominio Di” por verificarse una amenaza grave y actual de daño ambiental a la Quebrada Los Negritos y su zona de protección, en violación del artículo 50 constitucional y los artículos 33 y 58 de la Ley Forestal.
SummaryResumen
The Constitutional Chamber granted the amparo and ordered the immediate precautionary suspension of the environmental viability granted to the “Condominio Di” project and municipal construction permit N° 067-2022-CFIA-920253. The court found that, although SETENA formally closed the environmental complaint, it failed to ensure the technical definition of the Quebrada Los Negritos protection zone before works began, violating the principles of prevention and precaution. The Chamber retained jurisdiction because a concrete, current, and serious threat of irreversible environmental damage to a public-domain water body and its protection zone was verified, in breach of Article 50 of the Constitution and Articles 33 and 58 of the Forestry Law.La Sala Constitucional acoge el amparo y ordena la suspensión cautelar inmediata de la viabilidad ambiental otorgada al proyecto “Condominio Di” y del permiso de construcción municipal N° 067-2022-CFIA-920253. El tribunal determinó que, pese a que existe un procedimiento de denuncia ambiental formalmente cerrado por SETENA, se omitió garantizar la definición técnica del área de protección de la Quebrada Los Negritos antes de iniciar obras, vulnerando los principios de prevención y precautorio. La Sala retuvo su competencia por verificarse una amenaza concreta, actual y grave de daño ambiental irreversible sobre un cuerpo de agua de dominio público y su área de protección, lo que viola el artículo 50 de la Constitución Política y los artículos 33 y 58 de la Ley Forestal.
Key excerptExtracto clave
In this specific case, this Chamber finds that a serious and imminent threat of environmental damage to the channel and the protection zone of the Quebrada Los Negritos has been confirmed. It is not necessary to wait for the damage to materialize to adopt protective measures, since the protection of the environment requires preventive and precautionary action. [...] Consequently, the immediate precautionary suspension – while the merits are decided – of both the environmental viability granted by resolution N° 682‑2018‑SETENA and the construction permit N° 067‑2022‑CFIA‑920253 issued by the Municipality of San José for the project called “Condominio Di” or “Escalante Verde” is ordered.En este caso concreto, esta Sala estima que se ha constatado una amenaza grave e inminente de daño ambiental sobre el cauce y el área de protección de la Quebrada Los Negritos. No es necesario esperar que el daño se materialice para adoptar medidas de protección, pues la tutela del ambiente exige una actuación preventiva y precautoria. [...] En consecuencia, lo que procede es ordenar la suspensión inmediata –de forma cautelar mientras se resuelve el fondo– de la viabilidad ambiental otorgada mediante resolución N° 682‑2018‑SETENA y del permiso de construcción N° 067‑2022‑CFIA‑920253, girado por la Municipalidad de San José, para el proyecto denominado “Condominio Di” o “Escalante Verde”.
Pull quotesCitas destacadas
"La omisión de las autoridades al otorgar permisos y viabilidades ambientales sin considerar estos riesgos constituye una violación a los principios de precaución y prevención ambiental."
"The omission of the authorities in granting permits and environmental viabilities without considering these risks constitutes a violation of the principles of precaution and environmental prevention."
Considerando VI
"La omisión de las autoridades al otorgar permisos y viabilidades ambientales sin considerar estos riesgos constituye una violación a los principios de precaución y prevención ambiental."
Considerando VI
"Precisamente, en este caso, se plantea un supuesto de excepción, pues, se está ante unas denuncias y situaciones de índole ambiental, las cuales, presuntamente, no han sido resueltas dentro de un plazo razonable por parte de las autoridades recurridas."
"Precisely, in this case, an exception arises because we are dealing with complaints and situations of an environmental nature that have allegedly not been resolved within a reasonable time by the respondent authorities."
Considerando I
"Precisamente, en este caso, se plantea un supuesto de excepción, pues, se está ante unas denuncias y situaciones de índole ambiental, las cuales, presuntamente, no han sido resueltas dentro de un plazo razonable por parte de las autoridades recurridas."
Considerando I
Full documentDocumento completo
Document Review CONSTITUTIONAL CHAMBER OF THE SUPREME COURT OF JUSTICE. San José, at nine hours and twenty minutes on the fifteenth of May, two thousand twenty-six.
Amparo action filed by [Nombre 001], in his capacity as municipal councilor of San José, identity card [Valor 001], [Nombre 002], in his capacity as substitute municipal syndic of San José, identity card [Valor 002], and [Nombre 003], in her capacity as principal municipal syndic of San José, identity card [Valor 003], against the NATIONAL ENVIRONMENTAL TECHNICAL SECRETARIAT (SETENA), THE MUNICIPALITY OF SAN JOSÉ, AND OTHERS.
Whereas:
Drafted by Magistrate Araya García; and,
Considering:
I.Preliminary Matter. Before analyzing the merits of the matter — for the alleged violation of the right to a prompt and fulfilled procedure — it must be clarified that, based on ruling No. 2008-02545 of 8:55 hours on February 22, 2008, this Chamber has referred to the contentious-administrative jurisdiction — with some exceptions — those matters in which it is discussed whether the public administration has complied or not with the timeframes set by the General Law of Public Administration (Articles 261 and 325) or sectoral laws for special administrative procedures, to resolve by final act an administrative procedure — initiated ex officio or at the request of a party — or to hear admissible administrative appeals. Precisely, in this case, an exception scenario is presented, as we are dealing with complaints and situations of an environmental nature, which allegedly have not been resolved within a reasonable timeframe by the appealed authorities. Having clarified this point, we proceed to resolve the specific situation raised in this amparo.
By written brief added to the file on May 7, 2026, Antonio Trejos Mazariegos, identity card 0114780284, presents an active coadjuvancy in favor of the appellants.
On this matter, numeral 34, paragraph 3, of the Law of Constitutional Jurisdiction stipulates that whoever possesses a legitimate interest in the process may intervene, whether in an active or passive capacity, as a coadjuvant. Consequently, by virtue of the provisions in the aforementioned procedural norm and what is stated by the said intervenor, the referred coadjuvancy is admissible.
III.Purpose of the appeal. The appellants claim a violation of their fundamental rights, as they state that both the Municipality of San José and the National Environmental Technical Secretariat arbitrarily granted permits for the project “Di Escalante Verde S.A.” They affirm that they filed the respective complaints, but to date, no action has been taken regarding this issue.
IV.Proven facts. Of importance for the decision in this matter, the following facts are deemed duly demonstrated, either because they have been thus accredited or because the respondent has omitted to refer to them as provided in the initial order:
- Regarding the environmental viability granted by the National Technical Secretariat:
The project also includes a free area of 8,532m² of green areas and permeable surfaces, plazas open to commercial premises, common and recreational areas, children's play areas, living areas, and terraces. The project will have all basic services: Wastewater will be treated by a treatment plant. Solid waste will be collected by the Municipality of San José. Stormwater will be discharged into a storm drain. Potable water will be supplied by Acueductos y alcantarillados (AyA). Electricity service will be supplied by CNFL” (see the reports rendered and the evidence provided).
The bank accounts are registered at the Banco Nacional de Costa Rica in the name of MINAE, legal identification number (cédula jurídica No. 2-100-042014) (...) Appoint an Environmental Manager (Responsable Ambiental), with current registration in the SETENA Registry of Consultants, by sending a note signed by the owner with the acceptance of the assigned professional and present a Record Book to enable it as a Logbook (Bitácora), which must remain at the project facilities during the term of validity of the environmental management (regencia ambiental), before the start of works, and must present the indicated documents to this Secretariat within the same period. In the event of not presenting the indicated documents within the established time, the provisions of current legislation will be applied. THIRD: Based on the environmental characteristics of the AP and its interaction with the activities to be carried out by the project, the Plenary Commission establishes the periodicity for the submission of environmental management reports (informes regenciales), every SIX months during the construction phase and one final consolidated report.
The environmental management reports must be submitted within a maximum period of 10 days after the end of the period they cover. Upon starting activities, the period for the first environmental management report begins. For the preparation of these reports, according to the format established by this Secretariat, it will be the responsibility of the environmental manager (regente ambiental) to conduct the necessary number of visits, depending on the characteristics of the project. Based on these reports and the monitoring program, SETENA may adjust the guarantee amount and issue mandatory compliance measures to keep the project, work, or activity within a margin of controlled environmental impact. The manager and the owner must provide support to the work of SETENA during inspections it carries out. FOURTH: Failure to comply with the requirements of this Secretariat, as well as any of the obligations contracted in the Sworn Declaration of Environmental Commitments, the Environmental Management Prognosis-Plan (P-PGA), the environmental impact matrices, the complementary information along with Document D1, may be sanctioned in accordance with the provisions of Article 99 of the Organic Environmental Law (Ley Orgánica de Ambiente), as well as other current legislation.
FIFTH: To notify the interested party that, in accordance with Articles 17, 18, and 19 of the Organic Environmental Law, the environmental assessment procedure (procedimiento de evaluación ambiental) has been completed for the project with the following characteristics; Project Name: DI Condominium" File No: 18944-2016-SETENA Location: Province: San José Canton; San José District: Carmen Map Sheet: ABRA. Scale 1: 50,000 Coordinates: 493,192.63 E and 1,098,268.97 N. Cadastral Plan No: SJ-1889650-2016. Property Number: 1-673031-000. Project Description: It consists of the construction of a complex of 3 apartment buildings on 10 levels and two basement levels, the basements and the main level will be for parking spaces, while the remaining 9 levels will be for apartments, on the main level commercial premises will also be located. In total, the development of 323 apartments is planned, as well as 352 parking spaces.
The total construction area will be 34,724m^; while the coverage area (área de cobertura) will be 3,750m^: on a property with a total area of 12,282m^, for a coverage percentage of 30%. The project also includes a free area of 8532m^ of green areas and permeable surfaces, open plazas for commercial premises, common and recreational areas, children's play areas, sitting areas, and terraces. The project will have all basic services: Wastewater will be treated by a treatment plant. Solid waste will be collected by the Municipality of San José. Stormwater will be discharged into a storm drain. Potable water will be supplied by the Water and Sewer Authority (Acueductos y alcantarillados, AyA). The electricity service will be supplied by CNFL. Therefore, ENVIRONMENTAL VIABILITY (VIABILIDAD AMBIENTAL) is granted to the project, leaving the Environmental Management stage open, and with the understanding of complying with the fundamental Environmental Commitment Clause, indicated in the Third Considering (Considerando Tercero) above.
SIXTH: The validity of this viability will be for a period of Five Years for the start of works. In the event of not starting activities within the established time, the provisions of current legislation will be applied. SEVENTH: To warn the developer that the environmental viability only covers what is indicated in the project description and the submitted design (attached in Document D1), any modification must be reported to SETENA for it to carry out the environmental assessment of said modification, otherwise, action will be taken in accordance with current regulations. EIGHTH: To warn the developer that according to Article 11 of Executive Decree No. 31849-MINAE-S-MOPT-MAG-MEIC—Scope of the EIA procedure before SETENA, compliance with the EIA procedure does not exempt them from the procedures to be completed before other Administration authorities, in accordance with current competencies and regulations, nor from fulfilling the obligations or responsibilities derived from their management.
NINTH: To order the developers of activities, works, or projects that from the resolution granting Environmental Viability, a sign must be placed at the entrance of the project area, which must comply with the format established in resolution No. 1834-2016-SETENA of September 29, 2016. TENTH: Against this resolution, within a period of three days from the day following notification, the ordinary appeals for revocation before SETENA and for appeal before the Minister of Environment and Energy may be filed, in accordance with Articles 342 and following of the General Public Administration Law (Ley General de Administración Pública) and 87 of the Organic Environmental Law. ELEVENTH: Any documentation presented to SETENA must clearly indicate the file number, the resolution number, and the full name of the project" (see the reports rendered and the evidence provided).
The developer must attach a Sworn Declaration of Environmental Commitments, committing to fully comply with the proposed plan. The basic structure of the Compensation Measures Plan to be presented is: 1. Cover Page, 2. Introduction, 3. Objectives (General Objective and Specific Objectives), 4. Proposal, description of the proposal 5. Administrative Location and CRTM 05 coordinates, where the Compensation Plan will be developed, 6. Background, 7. Target population (must include basic information: legal identification number, legal representative, address, telephone numbers, fax numbers), 8. Proposal to be implemented in the Compensation Plan (what is intended to be carried out e.g., Aid to Civil Society or Educational Centers, Environmental Education Programs, etc.). 9. Activity Schedule, 10. Cost of the work(s) to be carried out, 11. Results, 12. Others (at the discretion of the professional responsible for preparing the Compensation Plan and the Developer, if they wish to add more components).
Note: The Compensation Plan must be presented with the signature of the developer and the professional responsible for the EIA process. The developer must present the Compensation Measures Plan in written and digital form with their signature (individually) and that of the professional responsible for the submitted study. It must be presented to SETENA within a maximum period of 30 calendar days; once approved, it may be implemented. The deadline set for submission will begin to run from the business day following notification of this resolution. Once it has been carried out, documentary and photographic evidence of the execution of the proposed actions must be presented to this Secretariat. The plan must be directed at the environmental area or the Social area of the neighborhood of the project, and must comply with the format established in Agreement No. CP-042-2011-SETENA. SECOND: To order the "Developer" to present, within a period of 10 business days: a. Appointment of the environmental responsibility for the project. b. Acceptance of the new environmental responsibility. c. Enable the environmental logbook (bitácora ambiental) for the project.
THIRD: To order the project developer to proceed immediately to present the proof of renewal of the Environmental Guarantee. According to science and technique, a reasonable period of 30 business days is set, counted from the business day following the notification of this resolution, to present the proof of renewal of the Environmental Guarantee. FOURTH: To warn the "Developer" that false information or non-compliance with this order will expose the "Developer" to a technical and legal investigation process. FIFTH: Against this resolution, within a period of three days from the day following notification, the ordinary appeals for revocation before SETENA and for appeal before the Minister of Environment and Energy may be filed. With legal basis in Article 342 of the General Public Administration Law and the Organic Environmental Law. SIXTH: Any documentation presented to SETENA must clearly indicate the file number, the resolution number, and the full name of the project.
An email address must also be indicated to receive notifications from this Secretariat. SEVENTH: The original digitally signed documents (Digital Signature) will be available to the interested party on the website https://tramites.setena.go.cr where it must be verified by any interested party and public or private entity. EIGHTH: In accordance with Article 8 of Law 8220, the interested party who requires a procedure may not be asked to present certifications or copies of information that another institution already possesses, according to pre-established legal means. NINTH: The result of the discussion and analysis of the case at hand is: 5 in favor, 0 against, 1 abstained, and 1 absent, the details of said voting information can be consulted in the corresponding minutes, which are in the custody of this Secretariat and are publicly accessible" (see the reports rendered and the evidence provided).
- Regarding the complaint filed before the Environmental Technical Secretariat:
Currently there is no constructed building. (see photo 1) (…) The land where the buildings are intended to be constructed is a property that is completely mechanized, devoid of vegetation; in the central part of the land there is a small depression which is where the Los Negritos stream supposedly runs, however, no running water is observed, since apparently it is piped and it is not possible to specify its route. (see photo 2) (…) During the inspection, the presence of persons on the property was not found, nor was machinery working or parked at the site identified. Likewise, it was not possible to establish when the mechanization of the land was carried out. To determine a possible invasion of the protection area of the Los Negritos stream, it should be very clear exactly where the body of water passes through, which is impossible to determine in this case, since it supposedly goes piped in this sector and its course cannot be observed.
It is important to know exactly where the Los Negritos stream passes through in this sector, specifically where it crosses this property, in order to determine the protection area of said stream, even if it is piped, this before the construction of works begins and to have said protection area delimited according to what is established in Article 33 of the Forest Law (Ley Forestal) No. 7575. Conclusions and/or Recommendations: A field inspection is carried out at the request of SETENA, to determine a possible invasion of the protection area of the Los Negritos stream, where three apartment buildings called Condominio DI Escalante Verde S.A. will be built. At the site, the construction of buildings has not yet begun, but what exists and is observed is a heavily mechanized land for the construction of infrastructure. The water course of the Los Negritos stream is not observed as it is piped, making it difficult to determine its protection area because its course is not visible.
It is important that the project developer delimits the protection area of the Los Negritos stream in this sector and that it is marked visibly in the field, before any type of work begins, whether construction or earthworks (movimiento de tierra). To accurately determine the protection area of the Los Negritos stream in this sector and for it to be demarcated in the field before work begins, that the Water Directorate locates said body of water exactly where it crosses, as it is the regulating entity in this matter. Communicate to SETENA the scope of the inspection carried out so that it takes the necessary measures for the protection of the body of water present at the site" (see the reports rendered and the evidence provided).
Technically, since the CNE layers currently exist and upon verifying that there is indeed a flood risk, segment B of hydrology and measures to mitigate this threat must be requested, which will likely affect the site design" (see the reports rendered and the evidence provided).
Therefore, in the field the existence of the stream on the properties of interest was corroborated through two observation wells of the piped channel, located at the coordinates with CRTM05 projection (taken with precision of ± 1 m in the second inspection), latitude: 1098856 and longitude: 493184 (well 1), and, latitude: 1098910 and longitude: 493146 (well 2). Figure 1 shows photographs of the observation wells (…) Subsequently, through a desk review, it was verified that the location of such observation wells approximately coincides with the route shown on the 1:5000 scale map sheet of the National Territorial Information System (Sistema Nacional de Información Territorial, SNIT). Being of interest the route of the stream in the area, based on the existing observation wells, 1:5000 scale cartography of the SNIT, as well as plans from file 122-O of the Water Directorate, a second inspection was carried out on June 19 of this year accompanied by Water Directorate official, César Sánchez, officials from the National System of Conservation Areas (SINAC), Lioudmila Malomuzh and Stephanie Castillo, and project representatives Ricardo Molina and Julio Mena, so on site the possible center of the channel was delimited by a rope and the coordinates for the requested trace of the stream were also taken.
In this inspection, a third observation well was located at the coordinates with CRTM05 projection, latitude: 1098943 and longitude: 493089, as well as the end point of the piping at the coordinates, latitude: 1098990 and longitude: 493062; Figure 2 shows photographs of the foregoing (…) It is worth noting that, in the first inspection, the demarcation by stakes of the possible protection zone of the stream carried out by the condominium developers was observed, which was based on the guideline granted by the National Institute of Housing and Urbanism (Instituto Nacional de Vivienda y Urbanismo, INVU). The stakes were spaced approximately 24 m wide. However, given that in the field the route of the stream varied with respect to the demarcation followed for such marked protection zones, a new delimitation using topographic equipment was communicated on site by the developers, which will be communicated to both the Water Directorate and the competent entity in the matter, the National System of Conservation Areas (SINAC), as soon as it is carried out.
Figure 3 shows the requested route of interest of the "Negritos" stream (…) Furthermore, it is considered important to mention that, for the demarcation to be carried out of the respective protection zones, a channel width of 4 m will be taken, according to the developers. Annex 1 shows photographs of the signaling of the stream by means of a rope mentioned previously" (see the reports rendered and the evidence provided).
The survey carried out in the field was based on the existing observation wells, 1:5000 scale cartography of the SNIT, as well as plans from file 122-O of the Water Directorate. The observation wells and the end of the piping are located at the following coordinates with CRTM05 projection: - Observation well 1, latitude: 1098856 and longitude: 493184. - Observation well 2, latitude: 1098910 and longitude: 493146. - Observation well 3, latitude: 1098943 and longitude: 493089. - End of the pipe, latitude: 1098990 and longitude: 493062. Figure 1 shows photographs of the observation wells existing on site and the end of the stream piping (…) From the coordinates taken in the field based on the trace carried out, Figure 2 shows the estimated route of the "Negritos" stream in the area of interest (…) As expressed on site by the developers, given that the demarcation of the protection zone stakes varied due to the traced route of the stream, a new delimitation will be carried out using topographic equipment, which will be communicated to both the Water Directorate and your represented entity as the competent entity in the matter, as soon as it is carried out (…) Furthermore, it is considered important to mention that, for the demarcation to be carried out of the respective protection zones, a channel width of 4 m will be taken, according to the developers.
Figure 3 shows photographs of the signaling of the stream by means of a rope carried out in the field (…) With nothing further to add, you are informed of the above so that corresponding actions may be taken" (see the reports rendered and the evidence provided).
Participating in the inspection were Engineers Rosibel De Los Angeles Solano and César Sánchez Vega, officials of the Water Directorate, MINAE, as well as the representatives of the construction project, Ricardo Molina Quirós and Julio Mena. The officials from the Water Directorate, MINAE, proceeded with the demarcation of the protection area of the piped Quebrada de los Negritos, as the competent body in the matter. Conclusions and/or Recommendations: Accompaniment is provided to the officials of the Water Directorate, MINAE, during an inspection aimed at establishing and delineating in the field the center of the piped channel of the Quebrada Los Negritos. It is requested that the corresponding report be sent to the office, as a verifier and an instrument for applying the technical study conducted, for appropriate action” (see the reports rendered and the evidence provided).
The presence of nearby faults potentially generating strong earthquakes is an important factor to take into account for the proper design of foundations and structures, all in accordance with the Código Sísmico y de Cimentaciones de Costa Rica. In general, it is considered that the land presents adequate stability conditions for the proposed works. The topography and the expected underlying phytology favor soil stability; the subsoil study serves to verify the suitability of the underlying materials. There is no potential for the AP to suffer the effects of liquefaction, the foregoing due to the cohesive nature of the silts and clays of the subsoil” (see the reports rendered and the evidence provided).
Submit the project modification request duly signed by the project developer. 2. Update the project description respecting the protection area of the Quebrada Los Negritos, which is enclosed in a pipe (entubada), in accordance with the provisions of the current legislation established, Articles 33 and 58 of the Forest Law (Ley Forestal), incorporating this area as a works-free area. 3. Submit an updated site design, which contemplates the alignment granted by the Instituto Nacional de Vivienda y Urbanismo (INVU), as well as the route of the Quebrada Los Negritos determined by the Water Directorate through criterion N° DA-UHTPCOSJ-1598-2025 and the provisions of the current legislation established, Articles 33 and 58 of the Forest Law (Ley Forestal). 4. Submit the updated shape file with the adjustment to the required project site design and with the respective delimitation of the protection zone of the Quebrada Los Negritos. 5.
Update the environmental measures for the construction phase of the project, which must consider the safeguarding of the protection area of the Quebrada Los Negritos, which is enclosed in a pipe (entubada), in accordance with the provisions of the current legislation established, Articles 33 and 58 of the Forest Law (Ley Forestal). THIRD: To notify the Municipalidad de San José so that it may proceed as corresponds according to its competencies. FOURTH: Against this resolution, within a period of three days starting from the day following notification, the ordinary remedies of revocation before SETENA, and appeal before the Minister of Environment and Energy, may be filed. With legal basis in Article 342 of the General Public Administration Law and the Organic Environmental Law FIFTH: All documentation submitted to SETENA must clearly indicate the file number, the resolution number, and the full name of the project.
An email address must also be indicated to receive notifications from this Secretariat. SIXTH: The original digitally signed documents (Digital Signature) will be available to the interested party at the web address https://tramites.setena.go.cr where they must be verified by any interested party and public or private entity. SEVENTH: In accordance with Article 8 of Law 8220, an interested party requiring a procedure may not be asked to submit certifications or copies of information already held by another institution, according to the pre-established legal means. EIGHTH: The result of the discussion and analysis of the case at hand is: 5 in favor, 0 against, 1 ABSTENTION and 1 absent; the details of the information on said vote can be consulted in the corresponding minutes, which are in the custody of this Secretariat and are of public access. NINTH: To receive notifications, the Developer and Environmental Manager and the complainant have indicated in the file the following email addresses: [email protected] / [email protected] / [email protected] / [email protected] / [Name 004]@gmail.com / [email protected] / Municipalidad de San José: [email protected] / [email protected]”. Said resolution was communicated to the parties, including the complainant, on August 13, 2025 (see the reports rendered and the evidence provided).
aa) Currently, there are no other complaints in progress before the National Environmental Technical Secretariat regarding this project (see the reports rendered and the evidence provided).
- Regarding the construction permit granted by the Municipalidad de San José:
bb) On November 1, 2021, the representative of Di Escalante Verde S.A. submitted, through the APC Digital Platform, a construction permit application to the Municipalidad de San José (see the reports rendered and the evidence provided).
- Regarding the complaint filed with the Municipalidad de San José:
dd) On April 1, 2025, through official letter no. SPC-153-2025 of March 31, 2025, the head of the Construction Permits Section of the Municipalidad de San José communicated the following to the appellant: “In response to official letter CM-PFA-031-2025 referring to the DI ESCALANTE VERDE S.A. project, I will address the various concerns mentioned according to the information and steps taken before the department I represent. Questions raised. - According to the documents and film maps right now the land in question is classified as recreational and communal green areas (áreas verdes recreativas y comunales, AVRC) and public areas (áreas públicas, APU) in addition to having a piped body of water. In this sense, I am concerned that a construction permit has been granted in said area, since there are clear regulations that restrict this type of development in areas with these characteristics.
R/ The construction permits area is unaware of the issue in question, given that the two land use certificates submitted to obtain said license (CUS 519199 and CUS 50322020) present a Zona Residencial-1 zoning and not recreational and communal green area. • Regarding ART. 33 OF THE Forest Law (Ley Forestal), as well as matters related to the environmental aspect and protection margins issued for said project, I state. R/ Regarding the environmental variables raised in your note, I will indicate that there is great ignorance of the management specific to the construction area, which ensures faithful compliance with requirements, as well as the responsibilities of each institution involved when issuing a construction license; since in this case it is SETENA who is the governing entity in environmental matters, validated the approach presented by the project developer group for the work to be carried out, mitigation measures, etc.; all this, without neglecting the pending connection and piping works that AyA itself has requested (given that more than a decade ago this work was partially carried out by the municipality itself, currently presenting blackwater runoff in the open air).
On the other hand, it is necessary to reaffirm that the parameters mentioned in relation to the protection zone by the Urban Development Regulation have been covered by the professional responsible for the environmental management (regencia ambiental), as well as by the public faith issued by the surveyor assigned to the project. Therefore, the aspects of gradients or slopes, as well as the margin of the protection zone, are aspects that are proper for authorization by the National Technical Secretariat and not by this department. With regard to the works to be carried out in the protection zone, this department recalls that it is properly AyA who has requested and approved the piping proposal generated by the developer. Likewise, the construction license has the endorsement of the Municipal Stormwater Network office, aspects which are a basic requirement for the approval of any construction permit.
Therefore, as head of the Construction Permits Area I can indicate that the aspects concerning the fulfillment of requirements for obtaining the construction license for the Escalante Verde project, as well as others in the area, have been fully validated and analyzed by the professional team of this office” (see the reports rendered and the evidence provided).
ee) By means of official letter no. SPC-181-2025 of April 24, 2025, the head of the Construction Permits Section of the Municipalidad de San José communicated the following to the appellant: “In response to your query regarding the validity of Construction Permit number 067-2022_CFIA-920253, corresponding to the Condominio Vertical Residencial Di Escalante Verde project, I hereby inform you of the following: As established in Article 19 of the San José Regulatory Plan RDU, regarding the validity of licenses, the following is indicated: 19.1 Licenses for demolition, earthworks (movimiento de tierras), construction, and others (such as urbanizations, subdivisions (fraccionamientos), and condominium projects) shall be valid for one year to begin the work, counted from its issuance. a. If one year has elapsed since the issuance of the license and work has not begun, and execution is still desired, a new license must be requested, complying with all corresponding legal procedures and requirements. b. If the work begins within the first year and continues uninterrupted, the validity of the permit is automatically extended to three years, without the need for an extension. c. If the work is abandoned for more than one year, a new license must be processed, adjusting the project to the urban planning regulations in force at the time of the new application. d. The administered party may re-stamp the valid license up to three times for one year each, at no cost, provided it is requested before its expiration. e. Once the municipal license is granted, modifications are not allowed within the same proceeding.
If changes are required, a new license must be requested in accordance with applicable regulations. According to what is recorded in the digital logbook, the professional responsible for the work, Architect Ricardo Molina, indicated that work began on January 31, 2024, specifically with earthworks (movimiento de tierras) activities, among other activities described by the responsible professional (…) Additionally, the Municipal Inspector assigned to the sector has made periodic visits to the site as part of the follow-up control of the approved permit, which have been duly documented in the work execution control sheet, where it is also recorded that the work start date was 01/31/2024 (…) In conclusion, as has been verified based on official records and the project’s digital logbook, the validity of the construction permit is fully in order, and it has not expired, as has been erroneously interpreted.
This is by virtue that the work began within the established one-year period from the issuance of the permit, which automatically extends its validity to three years, in accordance with the provisions of Article 19 of the San José Regulatory Plan RDU” (see the reports rendered and the evidence provided).
ff) On May 28, 2025, the appellants filed a request for Administrative Procedure and Precautionary Measures - Construction Permit no. 067-2022_CFIA-920253 (official letter CM-PFA-057-2025), before the Municipalidad de San José (see the reports rendered and the evidence provided).
gg) By means of official letter MSJ-ALCALDIA-3087-2025 of July 29, 2025, the Mayor requested an opinion from the Municipal Management Manager regarding said complaint (see the reports rendered and the evidence provided).
hh) At 10:53 hours on June 5, 2025, the resolution was notified, forwarding it to the Municipalidad de San José (see notification record).
What is shown in the file is a Certificate of Collection Capacity, which does not constitute an authorization for construction or interconnection. It is important to mention that the aforementioned Certificate is issued for a total of 300 subsidiary properties according to cadastral plan Nº 1-0923485-2004, given that SETENA mentions that environmental viability (viabilidad ambiental) is granted for a total of 323 apartments. While the municipality in construction permit 067-2022_CFIA-920253 authorizes the construction of 135 units, for a total of 13,331 m2 corresponding to a 10-level building. ▪ Endorsement from UE PAPS for the relocation of the Negritos Collector. ▪ At the time of approval of the construction permits, there is a lien on the property farm 498246 cadastral plan SJ-923485-2004 that corresponds to the sanitary sewer easement (servidumbre de alcantarillado sanitario). Doubt arises about the viability of granting a construction license in a condition where the lien has not been formally lifted at both the cadastral and registry levels.
It is not recorded in the documents analyzed that said lien has been lifted or is in the process of resolution. ▪ Although the developer proposes the relocation of the ‘Los Negritos’ blackwater collector to be located parallel to the piping of the stream, and since this is a work in the channel, no written Approval or approval was found from the Water Directorate of MINAE for these works; only the new layout is observed in the construction plans. In this regard, a query was sent by means of official letter GGMDU-0230- 2025 to engineer José Miguel Zeledón Calderón, Director of the Water Directorate, whose response is still pending. ▪ Calculation report for earthworks (movimiento de tierra), as well as defining the disposition, possible impacts, and respective mitigation measures. ▪ Geotechnical study that demonstrates the urban suitability according to the provisions of subsection 10.3.5 Areas Subject to Study, of the Urban Development Regulations in force at the time of approval of the construction permit. ▪ Regarding the zoning based on which the construction permit was granted, it is important to note that the Urban Development Regulations in force (2014) at the time of approval of the construction permit indicate that part of the area where the project is located is identified as a zone with moderate risk of landslides and susceptible to flooding (map of landslide and flood hazard zones).
An affectation that did not suffer variation with respect to the update of the Urban Development Regulations of 2023 and in force to date. This zoning indicates that, in these areas subject to study, the required analyses must be conducted to demonstrate their urban suitability. By virtue of the foregoing, this Management considers it necessary to review the processing and approval process for the construction permit of the Di Escalante Verde project, therefore a detailed study of the actions taken by the administration is recommended, including the consultations that are pertinent both to the institutions and the developer, in order to determine the relevance for the continuity of the works based on the common interest, environmental protection, and the quality of life of the people of the community of Barrio Escalante and surrounding areas” (see the reports rendered and the evidence provided).
jj) On August 21, 2025, the appellant submitted an addendum and reminder for non-response to his request for the opening of the procedure (Art. 173 LGAP) for annulment of Permit No. 067-2022_CFIA_920253 (see the reports rendered and the evidence provided).
kk) By means of official letter no. GGMDU-0668-2025 of August 25, 2025, the Municipal Management and Urban Development Management of the Municipalidad de San José issued a response to the criterion requested by the Mayor's Office through official letter MSJ-ALCALDIA-3087-2025. Said official letter indicated the following: “Therefore, regarding the request made for the opening of an administrative procedure and precautionary measures, this Management recommends, based on the analysis conducted, that it is indeed necessary to investigate the following actions: 1. Conditions included in the 2019 land use certificate. 2. Recording of the incentive of a 30% increase in the Land Use Coefficient (Coeficiente de Aprovechamiento del Suelo, CAS), without this benefit having been recommended by the Repopulation Commission and without the technical or legal support of the Urban Development Regulations, given that this benefit does not apply to the zoning associated with the property where the project is built. 3.
Omission of supervision of the authorized earthworks (movimiento de tierra) and execution of works in the channel affecting the topography, the forest cover (cobertura vegetal), without filing complaints before SETENA or other bodies.” Thus, this Management prepared a technical-administrative criterion through official letter GGMDU-0668-2025, related to the approval process for the construction license of the Di Escalante Verde project, in which the need to investigate specific actions associated with the processing of the granted license was recommended, with the purpose of verifying the conformity of the actions taken with the applicable legal system, in safeguarding the principle of legality and the public interest (see the reports rendered and the evidence provided).
It should be noted that, to Mr. Guadamuz, the Construction Permits Section answered a series of queries related to the project through official letter SPC-181-2025, dated April 24, 2025, in addition to other email exchanges in which additional queries were resolved. Consequently, the Municipal Management and Urban Development Management prepared and processed various official letters before different institutions, as well as provided a comprehensive response, which this Mayor's Office makes known to you below: (…) Therefore, regarding the request made for the opening of an administrative procedure and precautionary measures, this Management recommends, based on the analysis conducted, that it is indeed necessary to investigate the following actions: 1. Conditions included in the 2019 land use certificate. 2. Recording of the incentive of a 30% increase in the Land Use Coefficient (Coeficiente de Aprovechamiento del Suelo, CAS), without this benefit having been recommended by the Repopulation Commission and without the technical or legal support of the Urban Development Regulations, given that this benefit does not apply to the zoning associated with the property where the project is built. 3.
Omission of supervision of the authorized earthworks (movimiento de tierra) and execution of works in the channel affecting the topography, the forest cover (cobertura vegetal), without filing complaints before SETENA or other bodies. By virtue of the foregoing, this Mayor's Office considers the request made in official letter CM-PFA-057-2025 to be addressed, reiterating that aspects requiring administrative investigation and the adoption of corrective measures have been identified. Likewise, the willingness of this Municipality is confirmed to follow up on pending actions and guarantee that the entire process related to the DI Escalante Verde project conforms to the current legal framework, in strict adherence to the principles of transparency, legality, and protection of the public interest. Consequently, the commitment of the Mayor's Office to address the concerns raised regarding this project with the utmost seriousness and transparency is reiterated.
Finally, it is placed on record that the official channel for attending to requests for information or submission of official letters is the email alcaldí[email protected], being the only institutional means enabled in the Mayor's Office for such purposes.” The foregoing was communicated to the appellant on August 26, 2025 (see the reports rendered and the evidence provided).
- Regarding the criminal complaint filed:
mm) On June 10, 2025, Ariel Robles Barrantes, in his capacity as deputy of the Republic, filed a criminal complaint before the Deputy Agrarian Environmental Prosecutor's Office for usurpation of public domain property, in which the following was stated: “1. That, within the property registration San José-449735-000, owned by the company DI ESCALANTE VERDE SOCIEDAD ANONIMA, legal identification number 3-101-765846, the project CONDOMINIO DI is being developed. (See Evidence number 2 and resolution number 1148-2019-SETENA). 2. That according to resolution number 1148-2019-SETENA, issued from file D1-18944-2016-SETENA, the existence of a public domain watercourse (cauce de dominio público) within the project is recognized: 'Surface water bodies: A natural depression is observed approximately in the middle of the AP property, which according to information from the developers is the old watercourse of the Quebrada Los Negritos.' (emphasis added).
(See resolution number 1148-2019-SETENA). 3. That upon consulting the National Information System for Integrated Water Resource Management (SINIGIRH), the Quebrada Los Negritos crosses through the project to be developed. (See evidence number 3). 4. That according to the National Territorial Information System (SNIT), within the property registration San José-449735-000, the watercourse of the Quebrada Los Negritos exists. (See evidence number 4). 5. That through resolution number 682-2018-SETENA, within file D1-18944-2016-SETENA, Environmental Viability (Viabilidad Ambiental) was granted to the project, without having precise information on the real boundaries of the public domain watercourse of the Quebrada Los Negritos that was piped or channeled (entubada o alcantarillada) in that sector, the project to be built, without defining the public watercourse, being the following: (…) 6. In this vein, and as it is evident that a public domain watercourse does not disappear by having been channeled or piped, the project CONDOMINIO DI could be being built in whole or in part on the public domain watercourse of the Quebrada Los Negritos. 7.
That on June 10, 2025, the presence of machinery belonging to a construction company was verified, carrying out earthworks (movimientos de tierra) in a sector that appears to coincide with the public domain watercourse of the Quebrada Los Negritos. (See evidence number 5) (…) V. PETITION A. That this Prosecutor's Office investigate the stated facts, as well as the responsibility of the persons also mentioned herein for the possible environmental crimes indicated above, or for any other legal classification that this prosecuting entity determines. VI. PRECAUTIONARY PETITION A. Given that, to date, earthworks are being carried out in the denounced area, we respectfully request that, in accordance with Principle 15 (precautionary principle) of the Rio Declaration on Environment and Development, Article 50 of our Political Constitution, Article 11 of the Biodiversity Law, and Article 140 of the Criminal Procedure Code, measures for the stoppage of works and/or earthworks be requested, in order to avoid serious and irreversible damage to the environment of the indicated place, as well as the demolition of structures that do not have the corresponding permits.
B. Furthermore, the annotation of this case in the National Public Registry is requested for the property registration San José-449735-000 and other properties of the project through which the public domain watercourse of the Quebrada Los Negritos runs, to prevent harm to third parties acting in good faith and to ensure comprehensive reparation of the corresponding environmental damage”. This criminal complaint is processed in file no. 25-000021-611-PE (see the rendered reports and the evidence provided).
nn) Through inspection report No. SINAC-ACC-OSJ-inf-0074-2026 of January 15, 2026, the San José Subregional Office of the National System of Conservation Areas established the following: “(…) Inspection report DPE-OFI-1682-2025 File 25-21-611-PE. Inspection date: January 14, 2026 (…) Description of Results: A visit was made to the indicated site, in response to official communication DPE-OFI-1682-2025 File 25-21-611-PE from the Attorney General's Office in which they request an investigation for the crime of Invasion of a protection area and, based on the damages, to submit an Economic Valuation of Environmental Damage. According to File D1-18944-2016, the inspection site belongs to Di Escalante Verde S.A, legal identification number 3-101-765846, cadastral plans SJ-923485-2004 and SJ-0668597-2000. Background On April 25, 2025, through report number SINAC-ACC-OSJ-inf-0498-2025 and in response to official communication SETENA-SG-0399-2025 and according to an inspection conducted on April 22, 2025, the following was concluded: • A field inspection is carried out at the request of SETENA, to determine a possible invasion of the protection area of the Quebrada Los Negritos, where three apartment buildings called Condominio DI Escalante Verde S.A. will be built. • The construction of buildings has not yet begun on the site, yet what exists and is observed is a terrain extensively mechanized for the construction of infrastructures. • The flow of the water of the Quebrada Los Negritos is not observed as it is piped (entubada), making it difficult to determine its protection area because its course cannot be seen. • It is important that the project developer delineate the protection area of the Quebrada Los Negritos in this sector and that this be visibly marked in the field, before any type of work begins, whether construction or earthworks. • To accurately determine the protection area of the Quebrada Los Negritos in this sector and for it to be demarcated in the field before works begin, the Directorate of Water should locate exactly where this body of water crosses, as it is the regulatory entity in this matter.
On June 6, 2025, through CARTA-SINAC-ACC-OSJ-699-2025, the head of the San José Subregional Office of the ACC requested from the Directorate of Water a joint inspection to locate the natural watercourse of the Quebrada Los Negritos to accurately determine the protection area of the body of water, before any type of work begins, whether construction or earthworks. On June 23, 2025, according to report DA-UHTPCOSJ-1614-2025, officials from the Tárcoles-Central Pacific Hydrological Unit of the MINAE Directorate of Water communicated to the San José Subregional Office of the Central Conservation Area the delineation by means of a cord of the possible center of the watercourse and coordinates for the trace of the Quebrada Los Negritos in the office, also indicating that the field survey was based on the existing observation wells, 1:50000 scale cartography from SNIT, as well as plans from file 122-O of the Directorate of Water.
It is indicated that since the demarcation of the protection zone stakes varied due to the traced path of the stream, a new delineation will be carried out using topographical equipment. Furthermore, it is indicated that a watercourse width of 4 meters will be used. Observations On January 14 of the current year, we appeared at the scene of the events. Once there, we identified ourselves as MINAE-SINAC officials to a person in charge of the property access area, who, after consulting with his superiors, allowed us access to the site. At the inspection site, three observation wells for the piped body of water are observed. See Image No. 1. According to a Google Earth satellite image on February 26, there are no alterations to the A.P. of Quebrada Los Negritos. See Image No. 2. According to report SINAC-ACC-OSJ-inf-0498-2025, on April 22, 2025, earthworks are observed at the inspection site.
See photos No. 1 and 2. At the inspection site, a physical demarcation with 1” rods and a plastic protective mesh is observed on both sides of the location above the piped watercourse of the Quebrada Los Negritos. At the time of inspection, no works are observed within the protection area of the Quebrada Los Negritos. Earthworks are observed outside the protection area of the Quebrada Los Negritos and a natural regeneration of grasses in the AP of the body of water. See Photo No. 3. An overflight is performed with a DJI Mavic 3 drone with the aim of obtaining photographs of the piped route of the Quebrada Los Negritos and its protection area. A linear survey is carried out over the demarcation of the boundary of the body of water's protection area with the following points: See Image No. 3. (…) According to report DA-UHTPCOSJ-1614-2025, from the MINAE Directorate of Water, they performed the delineation by means of a cord of the possible center of the watercourse and coordinates for the trace of the Quebrada Los Negritos in the office, also indicating that the field survey was based on the existing observation wells, 1:50000 scale cartography from SNIT, as well as plans from file 122-O of the Directorate of Water.
It is indicated that since the demarcation of the protection zone stakes varied due to the traced path of the stream, a new delineation will be carried out using topographical equipment. Furthermore, it is indicated that a watercourse width of 4 meters will be used (…) Conclusions: 1. The inspection site corresponds to a construction project for Condominium Towers according to File D1-18944-2016, which began earthworks between February 27, 2025, and April 21 of the same year. 2. Through report number SINAC-ACC-OSJ-inf-0498-2025 and in response to official communication SETENA-SG-399-2025 and according to an inspection conducted on April 22, 2025, it is concluded that the construction of buildings has not yet begun on the site, yet what exists and is observed is a terrain extensively mechanized for the construction of infrastructures, the flow of the water of the Quebrada Los Negritos is not observed as it is piped, that the project developer should delineate the protection area of the Quebrada Los Negritos in this sector and that this should be visibly marked in the field before any type of work begins, whether construction or earthworks, and that the Directorate of Water should locate the piped watercourse of the body of water. 3.
Through CARTA-SINAC-ACC-OSJ-699-2025, the head of the San José Subregional Office of the ACC requested from the Directorate of Water a joint inspection to locate the natural watercourse of the Quebrada Los Negritos to accurately determine the protection area of the body of water, before any type of work begins, whether construction or earthworks. 4. According to report DA-UHTPCOSJ-1614-2025, the MINAE Directorate of Water communicated to the San José Subregional Office of the Central Conservation Area the delineation by means of a cord of the possible center of the watercourse and coordinates for the trace of the Quebrada Los Negritos in the office, also indicating that the field survey was based on the existing observation wells, 1:50000 scale cartography from SNIT, as well as plans from file 122-O of the Directorate of Water. Furthermore, it is indicated that a watercourse width of 4 meters will be used. 5.
At the inspection site, the physical demarcation of the protection area of the Quebrada Los Negritos body of water is located by means of construction rods and plastic mesh. 6. At the time of the inspection, earthworks are being carried out outside the protection area of the Quebrada Los Negritos. 7. The protection area of the Quebrada Los Negritos body of water presents a natural regeneration of grasses. 8. According to a survey of GPS points in the field, an impact to the protection area is determined in an approximate area of 3748.08 m2. 9. The Forestry Law (Ley Forestal) 7575 in its Article 33 subsection b) establishes as protection areas: “b) A strip of fifteen meters in rural zones and ten meters in urban zones, measured horizontally on both sides, on the banks of rivers, streams, or creeks, if the terrain is flat, and fifty horizontal meters, if the terrain is uneven”. Recommendations: The presentation of an environmental remediation plan for the protection area of the Quebrada Los Negritos is recommended, covering an area of no less than 3748.08 m2 along the 190 linear meters of the route of the piped watercourse of the body of water.
Submit to the Public Prosecutor's Office and the Attorney General's Office an Economic Valuation of the environmental damage for the impact to the public domain watercourse protection area in an area of 3748.08m2” (see the rendered reports and the evidence provided).
oo) Through official communication no. CARTA-SINAC-ACC-OSJ-0097-2026 of January 21, 2026, the head of the San José Subregional Office of the National System of Conservation Areas communicated to the Directorate of Criminal Law of the Attorney General's Office the following: “Reference: File 25-000021-0611-PE. Subject: Estimation of Environmental Damage or Degradation of Natural Resources (Natural Capital Assets), requested by the Attorney General's Office Official Communication No. DPE-OFI-1682-2025. INTRODUCTION: The Economic Estimation of Environmental Damage is carried out based on the legal and technical information contained in the following technical document: The Economic Estimation of Environmental Damage is carried out based on the legal and technical information contained in the following technical document: According to report No. SINAC-ACC-OSJ-inf-0074-2026, from the inspection carried out on January 14, 2026, by Jorge Gamboa Elizondo and Randall Araya Villalobos, officials of the San José Subregional Office, it was determined that, on the property located in Barrio Escalante, canton and province of San José, impact to the protection area of the Quebrada Los Negritos: “…impact to the protection area of a public domain watercourse in an area of 3748.08 m²…” As previously mentioned, the area affected by earthworks is 3,748.08 m²; this area will be the basis for the environmental damage estimation in this case (…) 3-Estimation of Environmental Damage or Degradation, due to invasion, of the affected protection area of the Quebrada Los Negritos.
For the purposes of this estimation, the following parameters were mainly considered: the absence or loss of forest cover (cobertura vegetal forestal), the costs for its replacement or restoration through carrying out activities to establish a plantation with native species of the zone. Since we do not know the type of vegetation or cover that the protection area of the Quebrada Los Negritos had at the time, at the site of the events, for purposes of establishing an estimate amount, the value of the replacement cost for the restoration of the forest cover (cobertura boscosa) of the protection areas is taken as a basis, which will once again provide environmental services (servicios ambientales) and ecosystem services: protection of soils and water resources, maintaining biodiversity, improving carbon fixation and oxygen production, biological corridors, noise absorption, microclimate regulation, flocculation of suspended solids in the air, soil permeabilization and stabilization, among other services.
The total economic estimation of the damage caused in the approximate area of 3748.08 m², due to carrying out activities that affected the protection area of the Quebrada Los Negritos. The estimation of environmental damage is based on the recovery costs of the intervened site, plus the social cost caused, measured by the loss of benefits that society ceases to receive. The recovery of the ecosystem can occur in two ways: a) natural recovery where there is no human intervention, other than monitoring and maintenance; b) reforestation that tends towards an ecosystem structure similar to what existed before the intervention. For this case, the reforestation criterion was used, with a planning horizon of 25 years; considering that, starting from obtaining the nursery plant in a bag, it presents a critical period of at least three years so that it can develop, establish itself adequately on the site, and considering the climatic conditions of the area.
Once this stage is overcome, the planted trees are expected to reach a state of maturation, knowing that not all species have the same growth speed. Additionally, the reforestation must include phytosanitary care and, if necessary, fertilization is required, mainly due to the poverty of the soils. 3.1. Direct use cost: In this sense, for the affected protection area, the environmental damage caused is estimated by the value of establishing a planting of 387 trees in the affected area of 3748.08 m² (3X3) of native species. Cost of one tree is ¢ 9,000.00* Total cost of these activities: ¢ 9,000.00 x 387 = ¢ 3,483,000.00 * Data provided by the forest nursery “Vivero Procesa”, in La Garita de Alajuela. 3.2. Social cost. The social cost should be understood as the benefits that society stopped receiving as a consequence of the impact or absence of the vegetative and forest cover of the protection areas of a stream, existing at the site of the events, due to the non-capture of carbon dioxide, the absence of scenic beauty, site stability, microclimate regulation, and others.
Because we do not have sufficient elements to value these resources and based on the officialized IPS methodology, where the social cost has been estimated at 30% with respect to the total cost of the environmental damage estimation for its recovery. Social cost = ¢ 3,483,000.00 X 0.3 = ¢ 1,044,900.00. 3.3. Total Estimated Cost: Direct use cost ¢ 3,483,000.00 + Social cost: ¢ 1,044,900.00 = 4,527,900.00 Based on the environmental damage estimation carried out within our competencies, the conclusion is that the Environmental Damage Estimation is: ¢ 4,527,900.00 (four million five hundred twenty-seven thousand nine hundred colones, with zero céntimos). Conclusions: The primary objective for the State Forestry Administration (Administración Forestal del Estado, AFE), as the regulatory entity of natural resources, is that the protection areas must be free of invasive works, for which the demolition of these works and removal of debris is required, thereby promoting the ideal state for the establishment of forest cover, to once again provide environmental services and ecosystem services” (see the rendered reports and the evidence provided).
pp) Through inspection report no. SINAC-ACC-OSJ-inf-0118-2026 of January 30, 2026, the San José Subregional Office of the National System of Conservation Areas established the following: “Description of Results: A visit was made to the indicated site, in response to a request from the investigator of the Judicial Investigation Agency, Randall Alexander Flores Solano, in collaboration with case File 25-000021-611-PE. The inspection site belongs to Di Escalante Verde S.A, legal identification number 3-101-765846, cadastral plans SJ-923485-2004 and SJ-0668597-2000. The inspection includes the participation of Messrs. Randall Flores Solano and Stheff Martínez Barquero, both officials of the Judicial Investigation Agency, in addition to Ms. Milena Rodríguez Garro from the Public Prosecutor's Office. At the inspection site, a physical demarcation with 1” rods and a plastic protective mesh is observed on both sides of the location above the piped watercourse of the Quebrada Los Negritos.
At the time of inspection, no works are observed within the protection area of the Quebrada Los Negritos. Earthworks are observed outside the protection area of the Quebrada Los Negritos and a natural regeneration of grasses in the AP of the body of water (see image 1). During the inspection, a collaborator of the construction company appears, who is interviewed by Ms. Rodríguez Garro, where he explains the tasks being carried out on the site (…) Conclusions and recommendations The inspection site corresponds to a construction project for Condominium Towers according to case File 25-000021-611-PE. At the inspection site, the physical demarcation of the protection area of the Quebrada Los Negritos body of water is located by means of construction rods and plastic mesh. At the time of the inspection, earthworks are being carried out outside the protection area of the Quebrada Los Negritos.
The protection area of the Quebrada Los Negritos body of water presents a natural regeneration of grasses. Inform the Judicial Investigation Agency of what was seen in the field on the day of inspection as requested” (see the rendered reports and the evidence provided).
V.Regarding the environmental viability (viabilidad ambiental) granted by the National Technical Secretariat (Secretaría Técnica Nacional Ambiental). After analyzing the evidentiary elements provided, this Tribunal verifies that there has been no violation of the fundamental rights of the appellants regarding this point. The foregoing, because in the reports rendered by the representatives of the respondent authorities—which are taken as given under oath with the consequences, including criminal ones, provided for in Article 44 of the Law that governs this Jurisdiction—and the evidence provided for the resolution of the matter, it has been duly accredited that on December 14, 2016, the Environmental Impact Assessment Document (D1) "Condominio DI" was received at the National Technical Secretariat (Secretaría Técnica Nacional Ambiental), submitted by Mr. Arnoldo Ricardo André Tinoco– ID No.: 1-0545-0969; in his capacity as legal representative of the company [Name 007] - S.A - Legal ID No. 3- 101-243226., File No. D1-18944-2016-SETENA.
On October 18, 2017, officials of the National Technical Secretariat (Secretaría Técnica Nacional Ambiental) conducted a field inspection at the site, where the following environmental conditions were corroborated: "• Accesses Project Area (AP): Public road (said property is located about 200 mtrs from the old Setena. • Land topography: flat-undulating. • Vegetation cover (cobertura vegetal): grasses and isolated trees. • Surface water bodies: A natural depression is observed approximately in the middle of the AP property, which according to information from the developers is the old channel of the Quebrada Los Negritos". By resolution no. 682-2018-SETENA at 07:00 hours on April 17, 2018, the Plenary Commission (Comisión Plenaria) of the National Technical Secretariat (Secretaría Técnica Nacional Ambiental) resolved the following: "In Ordinary Session N° 038-2018 of this Secretariat, held on APRIL 16, 2018, in Article No. 03, it agrees: FIRST: To approve the environmental assessment document D1, the Sworn Declaration of Environmental Commitments (Declaración Jurada de Compromisos Ambientales, DJCA), the Prognosis - Environmental Management Plan (Pronóstico - Plan de Gestión Ambiental, P-PGA), the additional technical information presented, and the environmental impact matrices, submitted together with the D1 Document, which were subjected to evaluation by the project designer.
SECOND: To order Mr. Arnoldo Ricardo André Tinoco- ID No.: 1-0545- 0969, of the project "Condominio DI"; administrative file D1-18944-2016- SETENA, to deposit the amount of the environmental guarantee (garantía ambiental) for the sum of $324,350.11 (Three Hundred Twenty-Four Thousand Three Hundred Fifty and 11 cents of dollars or its equivalent in colones) (equivalent to 1% of the total investment amount of the project). The bank accounts are registered at the Banco Nacional de Costa Rica in the name of MINAE, legal ID (legal ID No. 2-100-042014) (…) Appoint an Environmental Supervisor (Responsable Ambiental), with valid registration in the Registry of Consultants of SETENA, by sending a note signed by the owner with the acceptance of the assigned professional and present a Minutes Book to enable it as a Logbook (Bitácora), which must remain at the project facilities during the validity period of the environmental supervision (regencia ambiental), before the start of works, and the indicated documents must be submitted to this Secretariat within that same period.
In case of failure to submit the indicated documents within the established time, the provisions of current legislation will be applied. THIRD: Based on the environmental characteristics of the AP and its interaction with the activities to be carried out by the project, the Plenary Commission (Comisión Plenaria) establishes the frequency for the submission of supervisory reports (informes regenciales) as every SIX months during the construction phase, and a final consolidated report. Supervisory reports (informes regenciales) must be submitted within a maximum period of 10 days after the end of the period they cover. At the moment activities begin, the period for the first environmental supervision (regencia ambiental) report begins. For the preparation of these reports, according to the format established by this Secretariat, it shall be the responsibility of the environmental supervisor (regente ambiental) to conduct the necessary number of visits, depending on the project characteristics.
Based on these reports and the monitoring program, SETENA may adjust the guarantee amount and issue mandatory compliance measures to keep the project, work, or activity within a controlled environmental impact margin. The supervisor (responsable) and the owner must provide support to the work of SETENA during inspections it carries out. FOURTH: Failure to comply with the requirements of this Secretariat, as well as any of the obligations contracted in the Sworn Declaration of Environmental Commitments (Declaración Jurada de Compromisos Ambientales, DJCA), the Prognosis - Environmental Management Plan (Pronóstico - Plan de Gestión Ambiental, P-PGA), the environmental impact matrices, and the complementary information together with the D1 Document, may be sanctioned in accordance with the provisions of Article 99 of the Organic Environmental Law (Ley Orgánica del Ambiente), as well as other current legislation.
FIFTH: To inform the interested party that, in accordance with Articles 17, 18, and 19 of the Organic Environmental Law (Ley Orgánica del Ambiente), the environmental assessment procedure for the project has been completed, which has the following characteristics; Project Name: Condominio DI" File No.: 18944-2016-SETENA Location: Province: San José Canton; San José District: Carmen Map Sheet: ABRA. Scale 1: 50,000 Coordinates: 493,192.63 E and 1,098,268.97 N. Cadastral Plan No.: SJ-1889650-2016. Property Number: 1-673031-000. Project Description: It consists of the construction of a complex of 3 apartment buildings with 10 levels and two basement levels, the basements and the main level will be for parking spaces, while the remaining 9 levels will be for apartments; commercial premises will also be located on the main level. In total, the development of 323 apartments is proposed, as well as 352 parking spaces.
The total construction area will be 34,724m²; while the coverage area (área de cobertura) will be 3,750m²; on a lot with a total area of 12,282m², for a coverage percentage of 30%. The project also includes a free area of 8,532m² of green areas and permeable surfaces, open plazas for commercial premises, common and recreational areas, children's play areas, seating areas, and terraces. The project will have all basic services: Wastewater will be treated by a treatment plant. Solid waste will be collected by the Municipality of San José. Stormwater (aguas pluviales) will be discharged into a storm drain. Drinking water will be supplied by the Water and Sanitation Authority (Acueductos y Alcantarillados, AyA). Electricity service will be supplied by will be provided by CNFL. Therefore, ENVIRONMENTAL VIABILITY (VIABILIDAD AMBIENTAL) is granted to the project, opening the Environmental Management stage and on the understanding of compliance with the fundamental Environmental Commitment Clause, indicated in the preceding Third Considerando.
SIXTH: The validity of this viability shall be for a period of Five Years for the start of works. In case of failure to begin activities within the established time, the provisions of current legislation will be applied. SEVENTH: To warn the developer that the environmental viability (viabilidad ambiental) only contemplates what is indicated in the project description and the presented design (attached in the D1 Document); any modification must be reported to SETENA, so that it can carry out the environmental assessment of said modification, otherwise action will be taken in accordance with current regulations. EIGHTH: To warn the developer that according to Article 11 of Executive Decree N° 31849-MINAE-S-MOPT-MAG-MEIC—Scope of the EIA procedure before SETENA, compliance with the EIA procedure does not exempt them from procedures to be completed before other Administration authorities, in accordance with current competencies and regulations, nor from fulfilling their obligations or responsibilities derived from their management.
NINTH: To order the developers of activities, works, or projects that, upon the resolution granting Environmental Viability (Viabilidad Ambiental), a sign must be placed at the entrance of the project area, which must comply with the format established in resolution N° 1834-2016-SETENA of September 29, 2016. TENTH: Against this resolution, within a period of three days from the day following notification, the ordinary remedies of revocation before SETENA, and appeal before the Minister of Environment and Energy, may be filed, in accordance with Articles 342 and following of the General Public Administration Law (Ley General de Administración Pública) and 87 of the Organic Environmental Law (Ley Orgánica del Ambiente). ELEVENTH: All documentation submitted to SETENA must clearly indicate the file number, the resolution number, and the full name of the project." By resolution no. 1148-2019-SETENA at 10:10 hours on April 9, 2019, the Plenary Commission (Comisión Plenaria) of the National Technical Secretariat (Secretaría Técnica Nacional Ambiental) resolved the following: "In Ordinary Session Nº 036-2019 of this Secretariat, held on APRIL 9, 2019, in Article No. 16, it agrees: FIRST: To correct the error in the cadastral plan numbers and property numbers described in resolution Nº 0682-2018-SETENA, so that they read correctly as follows: Plans Nos.
SJ-0668597-2000 / SJ-923485-2004 and Properties Nos. 1- 449735-000 / 1-548229-000. SECOND: In all other respects contemplated in resolution No. 0682-2018- SETENA, at 07 hours 00 minutes on April 17, 2018, it remains unaltered and is reiterated in this administrative act." Thus, the project description, according to the National Technical Secretariat (Secretaría Técnica Nacional Ambiental), is as follows: "Project characteristics: Location: Province: San José Canton: San José District: Carmen Map Sheet: ABRA. Scale 1: 50,000 Coordinates: 493,192.63 E and 1,098,268.97 N. Cadastral Plan No.: SJ-0668597-2000 / SJ-923485-2004 Property Number: 1-449735-000 / 1-548229-000 Project Description: It consists of the construction of a complex of 3 apartment buildings with 10 levels and two basement levels, the basements and the main level will be for parking spaces, while the remaining 9 levels will be for apartments; commercial premises will also be located on the main level.
In total, the development of 323 apartments is proposed, as well as 352 parking spaces. The total construction area will be 34,724m²; while the coverage area (área de cobertura) will be 3,750m²; on a lot with a total area of 12,282m², for a coverage percentage of 30%. The project also includes a free area of 8,532m² of green areas and permeable surfaces, open plazas for commercial premises, common and recreational areas, children's play areas, seating areas, and terraces. The project will have all basic services: Wastewater will be treated by a treatment plant. Solid waste will be collected by the Municipality of San José. Stormwater (aguas pluviales) will be discharged into a storm drain. Drinking water will be supplied by the Water and Sanitation Authority (Acueductos y Alcantarillados, AyA). Electricity service will be supplied by will be provided by CNFL." Subsequently, by resolution no. 0772-2025-SETENA at 09:33 hours on June 5, 2025, the National Technical Secretariat (Secretaría Técnica Nacional Ambiental) resolved, regarding the project Condominio DI, administrative file no. D1-18944-2016-SETENA, the following: "THEREFORE THE PLENARY COMMISSION (COMISIÓN PLENARIA) RESOLVES In Ordinary Session Nº 027 of this Secretariat, held on JUNE 5, 2025, in Article Nº. 004, it agrees: FIRST: Based on the conclusions of the TENTH CONSIDERANDO As a sanction for the evidenced non-compliances, order the developer and the supervisor (regente) of the project to present and submit for approval by SETENA a Compensation Measures Plan (Plan de Medidas de Compensación).
The requested Compensation Measures Plan (Plan de Medidas de Compensación) must contain compensatory measures of environmental and social content and application, and may not be contained within an environmental supervision (regencia ambiental) report. The developer must attach a Sworn Declaration of Environmental Commitments (Declaración Jurada de Compromisos Ambientales), in which they commit to fully comply with the proposed plan. The basic structure of the Compensation Measures Plan (Plan de Medidas Compensatorias) to be presented is: 1. Cover page, 2. Introduction, 3. Objectives (General Objective and Specific Objectives), 4. Proposal, description of the proposal, 5. Administrative Location and CRTM 05 coordinates, where the Compensation Plan will be developed, 6. Background, 7. Target population (must include basic information: legal ID, legal representative, address, telephones, faxes), 8.
Proposal to be implemented in the Compensation Plan (what is intended to be carried out, e.g., Aid to Civil Society or Educational Centers, Environmental Education Programs, etc.). 9. Activity schedule, 10. Cost of the work(s) to be carried out, 11. Results, 12. Others (at the discretion of the professional responsible for preparing the Compensation Plan and the Developer, if they wish to add more components). Note: The Compensation Plan must be presented with the signature of the developer and the professional responsible for the EIA process. The developer must present the Compensation Measures Plan (Plan de Medidas de Compensación) in written and digital form with their signature (individually) and that of the professional responsible for the presented study. It must be submitted to SETENA within a maximum period of 30 calendar days; once approved, it may be implemented. The period set for submission shall begin to run from the next business day following the notification of this resolution.
Once it has been carried out, documentary and photographic evidence of the execution of the proposed actions must be submitted to this Secretariat. The plan must be directed to the environmental area or the Social area of the project's neighborhood, and must comply with the format established in Agreement Nº CP-042-2011- SETENA. SECOND: To order the "Developer" to, within a period of 10 business days, submit: a. Appointment of the environmental supervision (responsabilidad ambiental) for the project. b. Acceptance of the new environmental supervision (responsabilidad ambiental). c. Enable the environmental logbook (bitácora ambiental) of the project. THIRD: To order the project developer to immediately proceed to submit proof of renewal of the Environmental Guarantee (Garantía Ambiental). According to science and technique, a reasonable period of 30 business days is set, counted from the next business day following the notification of this resolution, to present proof of renewal of the Environmental Guarantee (Garantía Ambiental).
FOURTH: To warn the "Developer" that false information or non-compliance with this mandate will expose the "Developer" to a technical and legal investigation process. FIFTH: Against this resolution, within a period of three days from the day following notification, the ordinary remedies of revocation before SETENA, and appeal before the Minister of Environment and Energy, may be filed. With legal basis in Article 342 of the General Public Administration Law (Ley General de Administración Pública) and the Organic Environmental Law (Ley Orgánica del Ambiente). SIXTH: All documentation submitted to SETENA must clearly indicate the file number, the resolution number, and the full name of the project. An email address must also be indicated to receive notifications from this Secretariat. SEVENTH: The digitally signed original documents (Digital Signature) will be available to the interested party at the web address https://tramites.setena.go.cr, where they must be verified by any interested party and public or private instance.
EIGHTH: In accordance with Article 8 of Law 8220, it may not be required of an interested party requesting a procedure to present certifications or copies of information already held by another institution, according to pre-established legal means. NINTH: The result of the discussion and analysis of the case at hand is: 5 in favor, 0 against, 1 abstention, and 1 absent; the detail of the information on said vote can be consulted in the corresponding minutes, which are in the custody of this Secretariat and are of public access."
In this sense, it is verified that the National Technical Secretariat (Secretaría Técnica Nacional Ambiental) proceeded to approve the environmental assessment document D1 and other documents submitted together with the D1 Document of the project "Condominio DI"; administrative file D1-18944-2016- SETENA, this by resolution no. 682-2018-SETENA at 07:00 hours on April 17, 2018, which was corrected by resolution no. 1148-2019-SETENA at 10:10 hours on April 9, 2019, a correction referring to the cadastral plan numbers and property numbers described in said resolution. Likewise, the National Technical Secretariat (Secretaría Técnica Nacional Ambiental) has provided the respective follow-up to the project, so that upon establishing evidenced non-compliances in that follow-up, it proceeded to order the developer and the supervisor (regente) of the project to "present and submit for approval by SETENA a Compensation Measures Plan (Plan de Medidas de Compensación)", this by resolution no. 0772-2025-SETENA at 09:33 hours on June 5, 2025. That is, it is reiterated that SETENA has indeed followed up on the case.
Consequently, it is denoted that the environmental viability (viabilidad ambiental) was granted in accordance with current regulations, verifying that the project complied with the stages and requirements established for obtaining environmental viability (viabilidad ambiental), and furthermore, that the environmental impact assessment (estudio de impacto ambiental) includes prevention measures aimed at protecting the environment. Finally, it is verified that the respective follow-up has been given, ruling out any injury to the fundamental rights of the appellants.
Now then, the appellants question the granting of said environmental viability (viabilidad ambiental) to that project, as they argue that it was granted without taking into account aspects related to the public domain protection of the watercourse and its protection area in accordance with environmental regulations. In this regard, it is important to explain that this Tribunal recently heard a similar challenge. Thus, by judgment no. 2026-08040, at 9:25 hours on March 6, 2026, the following was indicated:
"…Indeed, in that precedent, the plaintiff questioned the granting of environmental viability (viabilidad ambiental) under allegations substantially linked to the supposed existence of technical irregularities in the evaluation procedure followed by SETENA, as well as to the sufficiency of the studies and assessments incorporated into the administrative file. In that context, the debate raised before this jurisdiction revolved around whether the environmental authority had adequately complied with the technical and regulatory standards required to approve the project…
…In such a way, with such examples it can be observed that, contrary to what was indicated by the plaintiff, there were indeed considerations regarding factors that can cause climate impacts, so that it is not possible, in this summary proceeding (vía sumaria), to prove that there was an absolute omission regarding the assessment of this type of aspect. Furthermore, it should be noted that disagreement with particular methodologies that may have been used constitutes a dispute of ordinary legality that must be ventilated before the competent common instances. By virtue of the foregoing, under the terms formulated by the appellant, it is not possible at this time to prove any situation that evidently and manifestly justifies the intervention of this Chamber regarding this particular point." Regarding that particular matter, this Tribunal precisely delimited the proper scope of the amparo remedy (recurso de amparo), recalling that its summary nature does not allow substituting the Administration in the technical appreciation of specialized studies or opening a broad evidentiary debate regarding compliance with regulatory requirements, unless manifest arbitrariness or an absolute omission that directly compromises fundamental rights is proven.
Consequently, it was emphasized that discrepancies relating to the technical sufficiency of environmental studies, the weighting of risks, or the correct application of sectoral regulations constitute matters that, in principle, must be ventilated before the Administration itself or in the contentious-administrative jurisdiction, where the possibility of a full evidentiary discussion exists." (emphasis not in original).
In this way, taking into account the cited precedent, it is necessary to indicate to the appellants that this Tribunal precisely delimited the proper scope of the amparo remedy (recurso de amparo), recalling that its summary nature does not allow substituting the Administration in the technical appreciation of specialized studies or opening a broad evidentiary debate regarding compliance with regulatory requirements, unless manifest arbitrariness or an absolute omission that directly compromises fundamental rights is proven. Consequently, it was emphasized that discrepancies relating to the technical sufficiency of environmental studies, the weighting of risks, or the correct application of sectoral regulations constitute matters that, in principle, must be ventilated before the Administration itself or in the contentious-administrative jurisdiction, where the possibility of a full evidentiary discussion exists.
Consequently, as in the cited precedent, the grievances set forth did not evidence a direct and current injury to fundamental rights, but rather reflected a disagreement with the technical assessment carried out by the competent authority within the framework of its legal powers. Thus, it is not for this Chamber to substitute the technical criterion of SETENA regarding the granted environmental viability (viabilidad ambiental), as this is a matter pertaining to ordinary legality. Therefore, the appropriate course is to dismiss the appeal regarding this point, without prejudice to reminding the respondent authorities of their obligation to continue verifying strict compliance with the applicable environmental requirements, in safeguarding the due protection of the environment in accordance with the parameters set by this constitutional jurisdiction.
Now then, this Constitutional Chamber verifies that the local residents, together with the appellants, have filed a complaint against this project before the National Technical Secretariat (Secretaría Técnica Nacional Ambiental), which, as indicated in Considerando I of this judgment, does lead to an examination of any possible delay in resolving that complaint. This will be analyzed in the next considerando.
VI.Regarding the complaint filed with the Environmental Technical Secretariat. On the other hand, it is verified that on March 19, 2025, complaint No. 54208-2025 (assigned to the technician on June 4, 2025) was filed with the National Environmental Technical Secretariat through the Integrated System for the Processing and Handling of Environmental Complaints (SITADA), a complaint presented by the residents of Barrio El Carmen, jointly with the appellants, which is related to consecutive number 02755-2025, received through the SETENA document management system on March 19, 2025, regarding a complaint against the Condominio DI project, file D1-18944- 2016-SETENA. Thus, both proceedings (No. 54208-2025 and No. 02755-2025) were consolidated for unified processing. By official letter SETENA-DT-ASA-0596-2025 of March 20, 2025, the National Environmental Technical Secretariat requested the developer to address the reported facts regarding a potential environmental impact caused by the referenced project.
By official letter SETENA-SG-0399-2025 of March 24, 2025, the National Environmental Technical Secretariat requested an opinion from the Central Conservation Area, SINAC-ACC, as the competent entity, to analyze and indicate the possible encroachment into the protection zone of the Los Negritos stream in Barrio Escalante, by the works being carried out in the project area called Condominio DI, pursuant to the information presented by the Carmen District Council, and to provide SETENA with any other relevant information regarding the case under analysis within a period of 10 business days. By official letter SETENA-DT-ASA-0660-2025 of March 25, 2025, the National Environmental Technical Secretariat provided a response to the information request from the Carmen District Council. On April 1, 2025, the National Environmental Technical Secretariat, by means of Inspection Report No. ASA-ACT INS-0057-2025, conducted a field inspection of the project area, where the following was noted: "- No machinery was observed working.
The stream is piped and there is no certainty as to its protection area. A query was made to SINAC. - In the field, it is known through neighbors that the property is crossed by a piped stream and a sanitary sewer. - GPS Point # 565 coordinates 1098901 / 0493094 main entrance. - GPS Point # 566 coordinates 1099018 / 0493080. - Southern boundary of plan SJ-658597 GPS Point # 567 coordinates 1098987/ 0493110 no encroachment on the protection area of the Río Torres was observed." On April 3, 2025, the legal representative of the company [Name 007]. formally submitted the statement of defense and technical references in response to the transfer of the complaint. By official letter SETENA-SG-0507-2025 of April 21, 2025, the National Environmental Technical Secretariat sent a reminder of the request for an opinion from the Central Conservation Area, SINAC-ACC, as the competent entity, made through official letter SETENA-SG-0399-2025 of March 24, 2025, and granted a period of 10 business days.
By official letter no. Oficio SINAC-ACC-OSJ-inf-0498-2025 of April 25, 2025, the head of the San José Subregional Office of the National System of Conservation Areas communicated to SETENA the following: "Description of Results: In response to official letter SETENA-SG-0399-2025, which requests: 1. 'Analyze and indicate to this Secretariat the possible encroachment into the protection zone of the Los Negritos stream in Barrio Escalante, by the works being carried out in the project area called Condominio DI, pursuant to the information presented by the Carmen District Council.' 2. 'That, in accordance with your powers, provide this Secretariat with any other relevant information regarding the case under analysis.' This concerns a property where environmental viability has been issued by SETENA and construction permits by the Municipality of San José. (see photos 1 and 2) (...) Regarding the above, the following is described: On April 22 of the current year, a site inspection was conducted accompanied by official Stephanie Castillo Herrera, where a lot was observed where a complex of three apartment buildings of 10 levels and two basement levels is supposedly to be built.
Currently there is no building constructed. (see photo 1) (...) The lot where the buildings are intended to be constructed is a property that is completely mechanized and devoid of vegetation; in the central part of the lot there is a small depression where the Los Negritos stream supposedly runs, however, no flowing water is observed, as it apparently is piped and its exact course cannot be determined. (see photo 2) (...) During the inspection, no people were found on the property, nor was any machinery working or parked on the site identified. Likewise, it was not possible to establish when the mechanization of the land was carried out. To determine a possible encroachment of the protection area of the Quebrada Los Negritos, it would be necessary to know exactly where the water body passes, which is impossible to determine in this case, since it is supposedly piped in this sector and its course cannot be observed.
It is important to know exactly where the Quebrada Los Negritos passes in this sector, specifically where it crosses this property, in order to determine the protection area of said stream, even if it is piped, this before construction of the works begins and to have said protection area demarcated in accordance with the provisions of article 33 of the Forestry Law No. 7575. Conclusions and/or Recommendations: A field inspection was conducted at the request of SETENA to determine a possible encroachment of the protection area of the Quebrada Los Negritos, where three apartment buildings called Condominio DI Escalante Verde S.A. will be constructed. Construction of buildings has not yet begun on the site, rather what exists and is observed is extensively mechanized land for the construction of infrastructure. The course of the water of the Quebrada Los Negrito is not observed, as it is piped, making it difficult to determine its protection area because its course cannot be observed.
It is important that the project developer delimits the protection area of the Quebrada Los Negritos in this sector and that this be visibly marked in the field before any type of work begins, whether construction or earthworks (movimientos de tierra). That to determine exactly the protection area of the Quebrada Los Negritos in this sector and that it can be demarcated in the field before works begin, the Water Directorate locate said water body where it exactly crosses, as it is the regulatory body in this matter. Communicate to SETENA the scope of the inspection carried out so that it may take the necessary measures for the protection of the water body present at the site." By official letter SETENA-SG-0583-2025 of May 8, 2025, the National Environmental Technical Secretariat requested an opinion from the Water Directorate of MINAE, in accordance with what was indicated in official letter SINAC-ACC-OSJ-inf-0498-2025.
By official letter SETENA-SG-0741-2025 of June 5, 2025, the National Environmental Technical Secretariat sent a reminder of the request for an opinion made through official letter SETENA-SG-0583-2025.
Thus, as of the date of filing of this appeal, SETENA had not resolved the complaint filed by the local residents and the appellants.
Now then, subsequent to the notification of the course order to the Municipality of San José to the National Environmental Technical Secretariat, according to official letter no. SETENA-DT-0099-2025 of June 12, 2025, the National Environmental Technical Secretariat conducted a geospatial analysis using the Geographic Information System, through recent layers from the National Emergency Commission (CNE), to determine the current risks present in the Ap and the presence of flood and landslide threats, and the following was established: "It is identified that in the project area there is a flood threat, but not a landslide threat, as observed in the attached image (...) From the foregoing, it is concluded that at the time of the Environmental Assessment, the official layers currently available to the CNE were not available, and that the threat studies did not indicate risk of flooding or natural hazards.
It is indicated that the conditions of that stream could have changed since the moment of the file evaluation, due to the increase in meteorological phenomena, as well as the construction of both public works (circunvalación works, for example) and private works, which changed the hydraulic dynamics of the stream, which is piped in certain sectors, which is why conditions could have varied over time, concerning the moment the file analysis was carried out. Technically, since the CNE layers currently exist and verifying that a flood risk does exist, segment B of hydrology and the measures to mitigate this threat must be requested, which will probably affect the site design." By official letter no. DA-UHTPCOSJ-1598-2025 of June 20, 2025, the Tárcoles-Central Pacific Hydrological Unit of the Water Directorate of MINAE communicated to the National Environmental Technical Secretariat the following: "Reference: Proceedings 1446-2025 (official letter SETENA-SG-0583-2025) and 1794-2025 (official letter SETENA-SG-0741-2025) Dear Sirs, In response to the referenced proceedings, in which through official letters SETENA-SG-0583-2025 and SETENA-SG-0741-2025 the tracing of the 'Negritos' stream is requested on the properties with plans SJ-0668597-2000 and SJ-923485-2004, in interest arising from the project 'Condominio DI Escalante Verde' in the Escalante area in El Carmen de San José, the following is indicated.
Although the dates of May 29 and June 5 of the current year were initially proposed to carry out the corresponding inspection, given that coordination with your represented party was not possible, on June 12 of the current year the first site visit was conducted jointly with official José Ricardo Hidalgo from the Water Directorate, as well as representatives of the project, Ricardo Molina and Jorge Montenegro. Therefore, in the field, the existence of the stream on the properties of interest was corroborated through two observation wells of the piped channel, located at the coordinates with CRTM05 projection (taken with an accuracy of ± 1 m in the second inspection), latitude: 1098856 and longitude: 493184 (well 1), and latitude: 1098910 and longitude: 493146 (well 2). Photographs of the observation wells are shown in Figure 1 (...) Subsequently, through a desk review, it was verified that the location of said observation wells approximately coincides with the path shown on the 1:5000 scale cartographic sheet of the National Territorial Information System (SNIT).
Being of interest the course of the stream in the area, based on the existing observation wells, 1:5000 scale cartography of the SNIT, as well as plans from file 122-O of the Water Directorate, a second inspection was conducted on June 19 of the current year accompanied by Water Directorate official César Sánchez, officials from the National System of Conservation Areas (SINAC), Lioudmila Malomuzh and Stephanie Castillo, and the project representatives Ricardo Molina and Julio Mena, so that on site the possible center of the channel was delimited using a rope, and coordinates were also taken for the requested tracing of the stream. During said inspection, a third observation well was located at the coordinates with CRTM05 projection, latitude: 1098943 and longitude: 493089, as well as the end point of the piping at the coordinates, latitude: 1098990 and longitude: 493062; photographs of the foregoing are shown in Figure 2 (...) It should be noted that during the first inspection, the demarcation by means of stakes of the possible protection zone of the stream, carried out by the condominium developers, was observed, which was based on the guideline given by the National Institute of Housing and Urbanism (INVU).
The stakes were spaced approximately 24 m wide. However, given that in the field the path of the stream varied with respect to the demarcation followed for said marked protection zones, a new delimitation using topographic equipment was communicated on site by the developers, which will be notified to both the Water Directorate and the competent entity on the matter, the National System of Conservation Areas (SINAC), as soon as it is carried out. Figure 3 demarcates the requested path of interest of the 'Negritos' stream (...) Furthermore, it is considered important to mention that, for the demarcation to be carried out of the respective protection zones, a channel width of 4 m will be used, according to the developers. Annex 1 shows photographs of the marking of the stream using a rope mentioned previously." By official letter no. DA-UHTPCOSJ-1614-2025 of June 23, 2025, the Tárcoles-Central Pacific Hydrological Unit of the Water Directorate of MINAE communicated to the San José Subregion of the National System of Conservation Areas, regarding proceeding 1827-2025, the following: "In response to the referenced proceeding, in which through official letter CARTA-SINAC-ACC-OSJ-699- 2025 the tracing of the 'Negritos' stream is requested on the properties with plans SJ-0668597-2000 and SJ-923485-2004, in interest arising from the project 'Condominio DI Escalante Verde' in the Escalante area in El Carmen de San José, the following is indicated.
Through the inspection carried out on June 19 of the current year accompanied by Water Directorate official, Eng. César Sánchez Vega, the project representatives, Ricardo Molina Quirós and Julio Mena Van Deer Laat, and your represented entity, on site the possible center of the channel was delimited using a rope, and coordinates were also taken for the tracing of the stream in the office. The survey carried out in the field was based on the existing observation wells, 1:5000 scale cartography of the SNIT, as well as plans from file 122-O of the Water Directorate. The observation wells and the end of the piping are located at the following coordinates with CRTM05 projection: - Observation well 1, latitude: 1098856 and longitude: 493184. - Observation well 2, latitude: 1098910 and longitude: 493146. - Observation well 3, latitude: 1098943 and longitude: 493089. - End of the pipe, latitude: 1098990 and longitude: 493062.
Photographs of the observation wells existing on site and the end of the stream piping are shown in Figure 1 (...) From the coordinates taken in the field based on the tracing carried out, Figure 2 shows the estimated path of the 'Negritos' stream in the area of interest (...) As expressed on site by the developers, since the demarcation of the stakes for the protection zone varied due to the traced path of the stream, a new delimitation will be carried out using topographic equipment, which will be communicated to both the Water Directorate and your represented entity as the competent entity on the matter, as soon as it is carried out (...) Furthermore, it is considered important to mention that, for the demarcation to be carried out of the respective protection zones, a channel width of 4 m will be used, according to the developers. Figure 3 shows photographs of the marking of the stream using a rope carried out in the field (...) With nothing further to add, you are informed of the above so that the corresponding action may be taken." By field visit report No. SINAC-ACC-OSJ-inf-0866-2025 of June 29, 2025, the head of the San José Subregional Office established the following: "(...) Detail: Inspection scheduled jointly with the Water Directorate, MINAE, case file D1-18944-2016, SETENA.
Field visit date: June 19, 2025 Time: Start: 09:00 a.m. (...) Description of Results: On June 19, 2025, an inspection of the aforementioned site was conducted jointly with the Water Directorate, MINAE, requested by this office through official letter CARTA-SINAC-ACC-699-2025, in order to establish and locate the natural channel of the Quebrada de los Negritos located in Barrio Escalante, coordinates 1098867; 493196, on the property where a construction project of apartment towers called Condominio De Escalante Verde, S.A. is intended to be carried out, to determine exactly the protection area of the Quebrada Los Negritos in this sector, which is piped, before any type of work begins, whether construction or earthworks (movimientos de tierra). Participating in the inspection were Eng. Rosibel De Los Angeles Solano and César Sánchez Vega, officials from the Water Directorate, MINAE, also the representatives of the construction project Ricardo Molina Quirós and Julio Mena.
The officials from the Water Directorate, MINAE proceeded with the demarcation of the protection area of the piped Quebrada de los Negritos, as the competent entity in the matter. Conclusions and/or Recommendations: Accompaniment is provided to the officials of the Water Directorate, MINAE, in an inspection aimed at establishing and delimiting in the field the center of the piped channel of the Quebrada Los Negritos. It is requested to send the corresponding report to the office, as a verifier and instrument for applying the technical study carried out, for the corresponding action." By official letter no. SETENA-SG-0840-2025 of June 30, 2025, the secretary of the National Environmental Technical Secretariat requested the head of the San José Subregion of the Central Conservation Area of SINAC the following: "(...) By virtue of the foregoing, and based on the principle of inter-institutional coordination, this Secretariat requires the pronouncement of SINAC, in accordance with its powers, regarding: 1.
Considering the project description and the site design (which includes non-permeable streets and sidewalks) contained in the administrative file, indicate the type of works that the developer may or may not carry out in the project area, that allow the safeguarding of the protection zones of the Quebrada Los Negrito, in accordance with the provisions of the regulations. Considering the relevance of the response, to determine what corresponds to SETENA in accordance with its powers and in concordance with the efficiency and effectiveness it must guarantee, we resort to the diligences within your reach, in order to have the corresponding opinion. It is not omitted to indicate that if any additional action is required from this Secretariat to facilitate the requested matter, I remain at your attentive service (...)". By official letter no. CARTA-SINAC-ACC-OSJ-0928-2025 of July 4, 2025, the head of the San José Subregional Office communicated to the general secretary of the General Environmental Technical Secretariat the following: "SUBJECT: Official Letter No. SETENA-SG-0840-2025, related to file D1-18944- 2016-SETENA.
Dear Sir: In response to the request made through official letter No. SETENA-SG-0840-2025, relating to file D1-18944-2016-SETENA., I am pleased to inform you of the following: In accordance with the powers conferred on us by article 22 of the Biodiversity Law, and considering the scope of our technical competence, it is not possible to attend to the request related to: '...indicating the type of works that the developer may or may not carry out in the project area...' According to the legislation in force established in articles 33 and 58 of the Forestry Law, the developer must respect the protection area in this case of a piped stream Negritos. These matters exceed the scope of our institutional faculties, therefore we recommend that said assessments be referred to the pertinent and competent entities in carrying out civil works." According to official letter no. SETENA-DT-0099-2025 of June 12, 2025, the technical director of SETENA communicated to the legal advisor of that institution that the natural hazards study presented by the developer before the National Environmental Technical Secretariat in the file indicates the following: "The possible influence of natural hazards on the project will be minimized as the corresponding available precaution and mitigation measures are taken.
The stability of the accesses and the mitigation of erosive processes depend largely on good surface water management. During the construction stage, special attention must be paid to preventing soil erosion and avoiding the stagnation of meteoric water. The geomorphological, topographical, and climatological conditions of the area, in combination with an effective management of surface runoff water, allow discarding the occurrence of accelerated erosive processes, floods, or mass movements in the Ap. The presence of nearby faults potentially generating strong earthquakes is an important factor to consider for the adequate design of foundations and structures, all in accordance with the Seismic Code and Foundations Code of Costa Rica. In general, it is considered that the terrain presents adequate stability conditions for the proposed works. The topography and the expected underlying phytology favor soil stability; the subsoil study serves to verify the suitability of the underlying materials.
There is no potential for the Ap to suffer the effects of liquefaction, the foregoing due to the cohesive nature of the subsoil silts and clays." By resolution no. 1203-2025-SETENA at 09:10 on July 30, 2025, the National Environmental Technical Secretariat resolved the following: "PROJECT CONDOMINIO DI ADMINISTRATIVE FILE NO. D1-18944-2016-SETENA The Plenary Commission of this Secretariat acknowledges the technical report INF-TEC-DT-ASA-0440- 2025 regarding an environmental complaint against the project: Condominio DI, file number D1-18944- 2016-SETENA (...) THEREFORE PLENARY COMMISSION RESOLVES In Ordinary Session No. 043 of this Secretariat, held on JULY 30, 2025, in Article No. 10 it agrees: FIRST: Reject the complaint filed before SETENA on March 19, 2025, through consecutive number No. 02755-2025 and complaint No. 54208-2025 the Integrated System for the Processing and Handling of Environmental Complaints (SITADA) by users [Name 002], [Name 004], and [Name 005] against the project Condominio DI file D1-18944-2016-SETENA SECOND: Order Mr. [Name 006], identity card [Value 004], legal representative of [Name 007]., legal ID [Value 005], and the environmental manager, Mr. [Name 008], identity card [Value 006], that, prior to continuing with the works in the project area, the following must be submitted to this Secretariat within a period of 30 business days: 1.
Submit the project modification request duly signed by the project developer. 2. Update the project description respecting the protection area of the Quebrada Los Negritos which is piped, in accordance with the provisions of the legislation in force, articles 33 and 58 of the Forestry Law, incorporating this area as a works-free zone. 3. Submit an updated site design, which contemplates the alignment granted by the National Institute of Housing and Urbanism (INVU), as well as the path of the Quebrada Los Negritos determined by the Water Directorate through opinion No. DA-UHTPCOSJ-1598-2025 and the provisions of the legislation in force, articles 33 and 58 of the Forestry Law. 4. Submit the updated shape file with the required adjustment to the project site design and with the respective delimitation of the protection zone of the Quebrada Los Negritos. 5. Update the environmental measures for the construction phase of the project, which must consider the safeguarding of the protection area of the Quebrada Los Negritos that is piped, in accordance with the provisions of the legislation in force, articles 33 and 58 of the Forestry Law.
THIRD: Notify the Municipality of San José to proceed as corresponding according to its powers. FOURTH: Against this resolution, the ordinary remedies of revocation before SETENA, and appeal before the Minister of Environment and Energy may be filed within a period of three days from the day following notification. With legal basis in article 342 of the General Public Administration Law and the Organic Law of the Environment FIFTH: Any documentation submitted to SETENA must clearly indicate the file number, the resolution number, and the full name of the project. An email address must also be indicated to receive notifications from this Secretariat. SIXTH: The original digitally signed documents (Digital Signature) will be available to the interested party at the web address https://tramites.setena.go.cr where they must be verified by any interested party and public or private instance. SEVENTH: In accordance with article 8 of Law 8220, the interested party requesting a procedure cannot be asked to submit certifications or copies of information already held by another institution, according to pre-established legal means.
EIGHTH: The result of the discussion and analysis of the case in question is: 5 in favor, 0 against, 1 RECUSED, and 1 absent; the details of said voting information can be consulted in the corresponding minutes, which are held in custody by this Secretariat and are accessible to the public. NINTH: To receive notifications, the Developer and Environmental Manager and complainant have indicated in the file the emails: [email protected] / [email protected] / [email protected] / [email protected] / [Name 004]@gmail.com / [email protected] / Municipality of San José: [email protected] / [email protected]". Said resolution was communicated to the parties, including the complainant, on August 13, 2025. Thus, currently, there are no other ongoing complaints before the National Environmental Technical Secretariat regarding this project.
In this way, it is verified that on March 19, 2025, the local residents, jointly with the appellants, effectively filed complaints 54208-2025 and 02755-2025 against the project in question, which, as of the date the appeal was filed, had not been resolved. On this point, it is on record that by the date the amparo was formulated, an approximate period of 2 and a half months had elapsed since the complaint was filed and it had not been addressed by the respondent authority. Likewise, said complaints were resolved by SETENA through resolution no. 1203-2025-SETENA at 09:10 on July 30, 2025, which rejected "the complaint filed before SETENA on March 19, 2025, through consecutive number No. 02755-2025 and complaint No. 54208-2025 the Integrated System for the Processing and Handling of Environmental Complaints (SITADA) by users [Name 002], [Name 004], and [Name 005] against the project Condominio DI file D1-18944-2016-SETENA".
Additionally, in that resolution, the legal representative and the environmental manager were ordered to comply with a series of issues relating to the project. The foregoing was communicated to the parties on August 13, 2025. Therefore, it is confirmed that the complaint in question was resolved on the occasion of the amparo and after an excessive and unreasonable period of approximately 4 and a half months had elapsed since the complaint was filed, indicating an injury to the appellants' fundamental rights by SETENA due to the undue delay in the resolution of the environmental complaint.
Likewise, regarding the National System of Conservation Areas (SINAC) and the Water Directorate of the Ministry of Environment and Energy, it is also confirmed that they were responsible for the delay incurred by SETENA when resolving the respective complaint. This is because it is verified that SETENA requested an opinion from these respondent authorities, but it was necessary for a reminder to be issued to them to provide said opinion. Thus, it is noted that these two authorities contributed to the delay of the corresponding resolution. Note that in judgment no. 2025-023951 at 09:15 on August 1, 2025, it was indicated that "SINAC not only has the obligation to establish the technical measures to be followed for the proper management, conservation, and administration of wildlife, but also, it is responsible for establishing procedures on complaints filed for violations of environmental regulations and issuing administrative acts to ensure their compliance, which, without a doubt, goes far beyond conducting an inspection at the appellants' home and issuing a series of simple recommendations, without greater attention to or analysis of a definitive solution to the problem experienced by the residents of the area." That is, from what was indicated in that judgment, an obligation of SINAC to act upon an environmental complaint is derived.
Therefore, it is reiterated that the National System of Conservation Areas (SINAC) and the Water Directorate of the Ministry of Environment and Energy were also responsible for the delay incurred by SETENA when resolving the respective complaint, so this appeal must be declared partially upheld against those institutions for the delay in the resolution of the complaint.
In any event, taking into account that it was on the occasion of the filing of this remedy that the complaint filed was resolved, the amparo remedy must be granted on this point, in application of Article 52 of the Ley de la Jurisdicción Constitucional, with the consequences that are detailed further below.
VII.Regarding the construction permit granted by the Municipalidad de San José. On the other hand, the petitioners also challenge the construction permit granted by the Municipalidad de San José. In this regard, it is proven that on November 1, 2021, the representative of Di Escalante Verde S.A. filed, through the APC Digital Platform, an application for a construction permit before the Municipalidad de San José. Thus, in response to that application, through construction permit no. 067-2022_CFIA-920253, approved on February 7, 2023, the Municipalidad de San José granted the construction permit for the project “Di Escalante Verde S.A.,” type of work “earthworks (construcción movimiento de tierra).” Thus, said document indicated the following: “OC-920253 Di Escalante Verde S.A Project. Vertical Residential Condominium Di Escalante Verde. ID: 3101765846 Location: (…) Residential use project. The project consists of a 10-level building, and 2 basements, it has three parking levels with 139 parking spaces and nine apartment levels with 135 units.
Front yard setback 2.00 m. Vehicular access (…) INVU setback for Quebrada los Negritos 10.0 meters from the edge. Has Environmental Viability 18944-2016-SETENA, D1-1148—2019-SETENA. Has a Traffic Impact Study (…) License only within the processed property line, respecting the established guidelines. Works are only allowed within the property line both for underground elements and area. This license is valid for one year to begin the work, counting from its issuance (approval date) (…)”.
In this sense, it is verified that the project representative submitted an application for a construction permit, which was approved by the Municipalidad de San José, granting construction permit no. 067-2022_CFIA-920253, approved on February 7, 2023. Likewise, said municipality reported under oath that the land-use (uso de suelo) certificate for procedure 5032-2020 for cadastral map SJ-0923485-2004, CT 519199-2019 for cadastral map SJ-0668597-2000, and construction permit 067-2022_CAFIA-92053, were granted under the previous Regulatory Plan, published in the Digital Supplement No. 2 of Gazette No. 29 of February 11, 2014.
Now then, it is reiterated that the petitioners challenge the granting of that permit. Regarding this situation, it is necessary to bring up what was resolved by this Court in a recent case. Thus, through judgment no. 2026-003449 at 09:20 hours on January 30, 2026, it was resolved, in what is relevant, as follows:
“In the present matter, it is for this Chamber to examine whether the action attributed to the Municipalidad de Montes de Oro projects as a real, direct, and current disturbance or threat to the constitutional right to a healthy environment, or if, on the contrary, what is submitted for its knowledge is a controversy that, by its nature, requires a prior ruling at the level of administrative and jurisdictional legality. For this purpose, it is essential to start from the scope that constitutional jurisprudence has delimited in environmental matters, insofar as the intervention of this jurisdiction cannot extend to the point of substituting technical authorities or becoming a reviewing body of the specialized criteria rendered by the competent administrative agencies.
From that perspective, this Chamber has reiterated that its jurisdiction in environmental matters is limited to verifying whether the institutions called upon by the legal system to protect the environment have assumed responsible, diligent, and timely action, as required by Article 50 of the Constitución Política, without it being its responsibility to verify the technical correctness of the studies, assessments, or authorizations issued in that area. Precisely for this reason, the admissibility of the amparo remedy is conditioned upon proving a concrete injury or threat to a fundamental right, and not simply disagreement with the content or scope of administrative acts issued in the exercise of legally assigned powers (…) Indeed, from the accredited factual list, it emerges that the environmental viability of the project was granted by the Secretaría Técnica Nacional Ambiental and confirmed in the administrative venue after the resolution of the appeals filed, acquiring firmness through pronouncements of the Ministerio de Ambiente y Energía, which shows that the environmental component of the project was known and resolved by the competent authorities (…) Likewise, the irregularities invoked by the petitioners –relating to specific sectoral authorizations, discharge permits, technical alignments, or cadastral discrepancies– project as questions that demand an analysis of legality and administrative jurisdiction, the resolution of which presupposes the assessment of infra-constitutional norms and specialized technical criteria.
In such a scenario, to determine whether such aspects were correctly weighed or not, a prior review typical of ordinary channels is necessary, which exceeds the summary nature of the amparo process and the jurisdiction of this Chamber, which is not called upon to issue declaratory pronouncements on the validity or invalidity of administrative acts from a purely legal standpoint.” Therefore, in this specific case, the Municipalidad de San José approved construction permit no. 067-2022_CFIA-920253 on February 7, 2023 in accordance with its normative powers and after having verified compliance with the respective requirements. Hence, the petitioners' challenge revolves around controversies that are proper to ordinary instances. Let us remember that the cited precedent indicates that it is not for this Court to verify the technical correctness of the studies, assessments, or authorizations issued in that area.
Precisely for this reason, the admissibility of the amparo remedy is conditioned upon proving a concrete injury or threat to a fundamental right, and not simply disagreement with the content or scope of administrative acts issued in the exercise of legally assigned powers. Therefore, the irregularities invoked by the petitioners –relating to discrepancies regarding the Reglamento de Desarrollo Urbano, the alleged non-existence of a current alignment on said property, and the difference between the construction units analyzed by SETENA and the Municipalidad de San José– project as questions that demand an analysis of legality and administrative jurisdiction, the resolution of which presupposes the assessment of infra-constitutional norms and specialized technical criteria. In such a scenario, to determine whether such aspects were correctly weighed or not, a prior review typical of ordinary channels is necessary, which exceeds the summary nature of the amparo process and the jurisdiction of this Chamber, which is not called upon to issue declaratory pronouncements on the validity or invalidity of administrative acts from a purely legal standpoint. Hence, regarding this point, the injury to the fundamental rights of the petitioners is ruled out.
VIII.Regarding the complaint filed with the Municipalidad de San José. As to this point, it is necessary to clarify that although it is true that in this amparo remedy the petitioners do not directly challenge this situation, the truth is that, from the ample evidence provided and the facts demonstrated, it is evident that this complaint filed on May 28, 2025 has an intrinsic relationship with the points disputed here. Thus, regarding the action of the Municipalidad de San José, it is verified that on May 28, 2025, the petitioners filed a request for Administrative Procedure and Precautionary Measures-Construction Permit no. 067-2022_CFIA-920253 (official letter CM-PFA-057-2025), before the Municipalidad de San José. Through official letter MSJ-ALCALDIA-3087-2025 of July 29, 2025, the mayor requested criteria from the manager of Municipal Management regarding said complaint. Thus, after the notification of the course resolution to the Municipalidad de San José, on June 13, 2025, the mayor's office of the Municipalidad de San José proceeded to request criteria from the Municipal Management and Urban Development management, which management performed an analysis of the administrative file in the Municipality, and therefore, through official letter no. GGMDU-447-2025, concluded the following: “Conclusions of the file analysis: It was not possible to find in the file the following documents, which are considered important for the purposes of the requested analysis: ▪ The instrument for consulting the population that complies with the provisions of Decreto Nº32966-MINAE.
Nor were all the documents found that certify that the consultation process meets the minimum technical requirements established in resolution 682-2018-SETENA third result point 3. ▪ The approval or endorsement from the Dirección General de Ingeniería y Tránsito of the MOPT for the Traffic Impact Study and the project accesses. ▪ The detail of the environmental measures to be taken by the developer to address the community's concerns. ▪ Approval or endorsement from the Dirección de Urbanizaciones of the AYA regarding the relocation of the Los Negritos sanitary collector. ▪ Approval from the Dirección de Urbanizaciones of the AYA for the connection of the project to the existing sanitary network. What is shown in the file is a Collection Capacity Certificate, which does not constitute a construction or interconnection authorization. It is important to mention that said Certificate is issued for a total of 300 subsidiary properties according to cadastral map No. 1-0923485-2004, while SETENA mentions that the environmental viability is granted for a total of 323 apartments.
Meanwhile, the municipality in construction permit 067-2022_CFIA-920253 authorizes the construction of 135 units, for a total of 13,331 m2 corresponding to a 10-level building. ▪ Endorsement from UE PAPS for the relocation of the Negritos Collector. ▪ At the time of the approval of the construction permits, there is an encumbrance on property 498246 cadastral map SJ-923485-2004 that relates to the sanitary sewer easement (servidumbre de alcantarillado sanitario). A question arises regarding the viability of granting a construction license in a condition where the encumbrance has not been formally lifted at both the cadastral and registry levels. It is not recorded in the documents analyzed that said encumbrance has been lifted or is in the process of resolution. ▪ Although the developer proposes the relocation of the “Los Negritos” black water collector to be placed parallel to the channelization of the stream and since this is a work in a watercourse, no approval or written endorsement from the Dirección de Aguas of the MINAE was found for these works; only the new route is observed in the construction plans.
In this regard, an inquiry was sent through official letter GGMDU-0230-2025 to engineer José Miguel Zeledón Calderón, Director of the Dirección de Aguas, whose response is still pending. ▪ Calculation report for the earthworks (memoria de cálculo del movimiento de tierra), as well as defining the disposal, possible impacts, and the respective mitigation measures. ▪ Geotechnical study demonstrating the urban suitability according to the provisions of section 10.3.5 Zones Subject to Study, of the Reglamentos de Desarrollo Urbano in force at the time of the approval of the construction permit. ▪ Regarding the zoning based on which the construction permit was granted, it is important to point out that the Reglamentos de Desarrollo Urbano in force (2014) at the time of the construction permit approval indicate that part of the area where the project is located is identified as a zone with moderate risk of landslides and susceptible to flooding (map of landslide and flood hazard zones).
This condition did not change with respect to the update of the Reglamentos de Desarrollo Urbano of 2023 and currently in force. This zoning indicates that, in these zones subject to study, the required analyses must be carried out to demonstrate their urban suitability. By virtue of the foregoing, this Management considers it necessary to review the application and approval process for the construction permit for the Di Escalante Verde project, and therefore recommends the detailed study of the administration's actions, including the pertinent inquiries to both the institutions and the developer, in order to determine the pertinence of the continuity of the works based on the common interest, environmental protection, and the quality of life of the people of the Barrio Escalante community and surroundings.” On August 21, 2025, the petitioner filed an addendum and reminder for non-response to his request for the opening of the procedure (Art. 173 LGAP) for nullity of Permit No. 067-2022_CFIA_920253.
Through official letter no. GGMDU-0668-2025 of August 25, 2025, the Municipal Management and Urban Development Management of the Municipalidad de San José issued a response to the criteria requested by the Mayor's Office through official letter MSJ-ALCALDIA-3087-2025. Through official letter no. MSJ-ALCALDIA-3514-2025 of August 25, 2025, the mayor of the Municipalidad de San José communicated the following to the petitioner: “Subject: Response to official letter CM-PFA-057-2025 regarding the request for administrative procedure and precautionary measures in relation to construction permit No. 067-2022-CFIA-920253 and the project DI Escalante Verde (…) In response to your official letter CM-PFA-057-2025, regarding the approval process for the construction license for the project called DI Escalante Verde, as well as the points raised by the councilor and the district councilors of El Carmen, this Mayor's Office allows itself to state the following: Through official letter MSJ-ALCALDÍA-1830-2025, dated May 16, 2025, the Municipal Management and Urban Development Management, the Urban Control Directorate, and the head of the Construction Permits Section were requested to carry out an immediate visit to the construction site, in order to verify various technical and administrative aspects.
It should be noted that, to Mr. Guadamuz, the Construction Permits Section answered a series of queries related to the project through official letter SPC-181-2025, dated April 24, 2025, in addition to other email exchanges in which additional queries were addressed. Consequently, the Municipal Management and Urban Development Management prepared and managed various official letters to different institutions, as well as provided a comprehensive response, which this Mayor's Office makes known to you below: (…) Therefore, regarding the request made for the opening of an administrative procedure and precautionary measures, this Management recommends, based on the analysis carried out, that it is indeed necessary to investigate the following actions: 1. Conditions included in the 2019 land-use certificate. 2. Awarding of the incentive of a 30% increase in the Land-Use Coefficient (Coeficiente de Aprovechamiento del Suelo, CAS), without this benefit having been recommended by the Repopulation Commission and without the technical or legal basis of the Reglamentos de Desarrollo Urbano, given that this benefit does not apply in the zoning associated with the property where the project is being built. 3.
Omission of supervision of the authorized earthworks and execution of works in the watercourse affecting topography, vegetation cover (cobertura vegetal), without filing complaints before SETENA or other bodies. By virtue of the foregoing, this Mayor's Office considers the request in official letter CM-PFA-057-2025 as addressed, reiterating that aspects requiring administrative investigation and the adoption of corrective measures have been identified. Likewise, the willingness of this Municipality is confirmed to follow up on pending actions and ensure that the entire process related to the project DI Escalante Verde conforms to the current legal framework, in strict adherence to the principles of transparency, legality, and protection of the public interest. Consequently, the commitment of the Mayor's Office to address with the utmost seriousness and transparency the concerns raised around this project is reiterated.
Finally, it is placed on record that the official channel for attending to requests for information or the submission of official letters is the email alcaldí[email protected], being the only institutional means enabled in the Mayor's Office for such purposes.” The foregoing was communicated to the petitioner on August 26, 2025.
In this regard, this Court verifies that the processing of that complaint was already resolved by this Court in a remedy filed by one of the same petitioners of this amparo ([Name 002]). Thus, through judgment no. 2025-029376 at 10:25 hours on September 12, 2025, issued within file no. 25-024412-0007-CO, the following was resolved regarding that complaint:
“IV.- Regarding the specific case. In the sub examine, the petitioner indicates that on May 28, 2025, official letter CM-PFA-057-2025 was sent, through which the respondent mayor was requested to open an administrative procedure in accordance with Article 173 of the Ley General de la Administración Pública. The objective is the annulment of construction permit no. 067-2022-CFIA-920253, granted on February 7, 2023, for having been authorized on land affected by a watercourse protection zone (Quebrada Negritos) and for granting urban benefits without normative or technical support. Additionally, precautionary measures were requested to temporarily suspend the permit and avoid irreparable damage to the environment and the protection area. He claims that his request has not been attended to.
Having examined the case file, the Chamber considered it proven that, by official communication CM-PFA-057-2025 of May 28, 2025, the individual under protection and two other persons, in their capacity as district council members and councilors, requested the respondent mayor to open an administrative procedure for the annulment of construction permit No. 067-2022-CFIA-920253, as well as the imposition of precautionary measures. On June 4, 2025, the Municipal Management and Urban Development Office of the Municipality of San José acknowledged receipt of the foregoing request. In response to the request, by official communication MSJ-ALCALDIA-3514-2025 of August 25, 2025, the Mayor's Office replied to the petitioners: "Subject: Response to official communication CM-PFA-057-2025 regarding the request for an administrative procedure and precautionary measures in relation to construction permit No. 067-2022-CFIA-920253 and the DI Escalante Verde project.
Dear Sirs: In response to your official communication CM-PFA-057-2025, regarding the approval process of the construction permit for the project called DI Escalante Verde, as well as the points raised by the councilor and the district council members of the Carmen district, this Mayor's Office hereby states the following: By official communication MSJ-ALCALDÍA-1830-2025, dated May 16, 2025, the Municipal Management and Urban Development Office, the Urban Control Department, and the head of the Construction Permits Section were requested to conduct an immediate visit to the construction site, in order to verify various technical and administrative aspects. It should be noted that, to Mr. Guadamuz, the Construction Permits Section answered a series of queries related to the project through official communication SPC-181-2025, dated April 24, 2025, in addition to other email exchanges in which additional queries were addressed.
Consequently, the Municipal Management and Urban Development Office prepared and processed various official communications before different institutions, as well as provided a comprehensive response, which this Mayor's Office brings to your attention below: For control and verification purposes, this Office requested and received, via WeTransfer electronic means, on March 19, 2025, the case file for permit No. 067-222_CFIA-920253 (Di Escalante Verde Project). According to what is indicated in official communication GGMDU-447-2025, from the review of the case file sent by the Construction Permits Section, documental and technical gaps were identified which, in the opinion of this body, should have been subject to prior verification before granting the construction permit and thus be recorded in the referenced case file. While the Urban Control Department and the Construction Permits Section have stated that they found no anomalies in the permit's approval and that matters relating to environmental regulations correspond exclusively to SETENA, it is the opinion of this Office that such interpretation is contrary to the provisions of the Office of the Attorney General of the Republic in Opinions C-034-2009 (February 10, 2009), C-200-20091 (July 21, 2009), and C-267-2010 (December 16, 2010), which establish that the granting of construction permits by the municipality implies comprehensive preventive control that must be carried out in accordance with the entire applicable legal framework —urban planning, environmental, health, road, among others— and not be limited to a merely formal review of requirements or the automatic acceptance of approvals issued by other institutions.
In addition to the foregoing and regarding that criterion, this Office processed official communications to different institutions to confirm the validity and currency of documents and approvals, namely: • March 28, 2025: ➢ Official communication GGMDU-0229-2025 addressed to the National Institute of Housing and Urbanism (Instituto de Vivienda y Urbanismo, INVU), requesting supporting documents regarding river alignment (alineamiento fluvial) No. 52799, receiving a response through official communication CDUV-049-04-2025 (April 3, 2025). ➢ Official communication GGMDU-0230-2025 addressed to the Water Department of the Ministry of Environment and Energy (Ministerio de Ambiente y Energía, MINAE), requesting detail of works in the watercourse (cauce) required of the developer, receiving a response through official communication DAUHTPCOSJ-1775-2025 (July 7, 2025). • June 3, 2025: ➢ Official communication GGMDU-0413-2025 requesting the National Institute of Housing and Urbanism (INVU) to review alignment No. Placa22286, in response to the previously issued reply.
To date, a response is pending. • June 25, 2025: ➢ Official communication GGMDU-0495-2025 addressed to the National Environmental Technical Secretariat (Secretaría Técnica Nacional Ambiental, SETENA), requesting clarifications on resolutions No. 682-2018-SETENA and No. 1148-2019-SETENA, receiving a response through official communication SETENA-DT-0128-2025 (July 10, 2025). ➢ Official communication GGMDU-0496-2025 addressed to the General Directorate of Traffic Engineering of the Ministry of Public Works and Transport (Ministerio de Obras Públicas y Transportes, MOPT), consulting about any actions related to the traffic impact study and project access points, which was forwarded to the Department of Studies and Designs (DGIT) and a response is pending. • July 9, 2025: ➢ Official communication GGMDU-0544-2025 addressed to the Costa Rican Institute of Aqueducts and Sewers (Instituto Costarricense de Acueductos y Alcantarillados, AyA), requesting approval for the diversion of the Negritos sub-collector, receiving a response through official communication UEN-PC-2025-02006 (July 23, 2025) attaching memorandum PRE-PAPS-2021-02017, which includes the approval of the diversion proposal and the technical criteria of the Engineering Directorate.
Now, from the review conducted of the case file that Ms. Natalia Gamboa sent to the Mayor's Office, in response to official communication MSJ-ALCALDÍA-3087-2025, documentation was identified that was not included either in the digital file originally received by this Office on March 19, 2025, nor were copies of other later documents generated by the Construction Permits Section sent. In particular, the absence of the following documents is noted: • Letter addressed to the Municipality of San José (without institutional receipt stamp or date in any department), sent on February 14, 2022, detailing the route of the dump trucks that would carry out the earthworks (movimientos de tierra) and debris removal for the DI Escalante Verde Vertical Residential Condominium project. The document mentions mitigation and prevention measures, material loading procedures, route procedure, dumping procedure, measures to follow for site personnel, procedure for carrying out earthworks next to existing buildings on adjacent properties (colindancias), and procedure for carrying out work in slope areas. • Email from Councilor [Name 001], dated January 8, 2025, addressed to Arch.
Royeé Álvarez, Head of the Construction Permits Section, requesting general information on the San José Repopulation Program. • Email dated February 16, 2025, from the company SCMTM Arquitectura y Diseño, Grupo Inmobiliario del Parque, addressed to the inspector of the Construction Permits Section, with official communication EV-T1-2025 (January 10, 2025), regarding the status of the DI Escalante Verde project. The inspector sends a copy to Arch. Royeé Álvarez, who in turn replies to Arch. Ricardo Molina Quirós of the cited company, informing that they are addressing queries from councilors and neighbors at 1358 Street and indicating to the developer that the design of the housing units must not undergo changes. • Email of March 24, 2025, from Arch. Melissa Gómez Salas (Construction Permits Section), with a response to Mr. [Name 004], council member of the Carmen District. • Official communication GPS-OMGRD-0122-2025 (March 27, 2025), with a response to the alternate district council member Name121535, in response to official communication OSCD-CDCAR-007-2025, referring to queries about the project and its construction permit. • Official communication SPC-153-2025 (March 31, 2025), with a response to the Frente Amplio councilor, [Name 001], regarding queries raised by the Municipal Management and Urban Development Office, through official communication GGMDU-226-2025. • Email dated May 16, 2025, from Arch.
Melissa Gómez Salas (Construction Permits Section), with a response to councilor [Name 001], through which she sends the AyA approval, evidencing the authorization to carry out works within the protection zone. • Official communication SPC-290-2025 (July 1, 2025), addressed to the Urban Control Department, providing information on the project and the construction permit, indicating that the technical and professional basis for the authorization is supported. • Official communication SPC-297-2025 (July 3, 2025), addressed to councilor [Name 001], with information related to the construction permit, noting that the project logbook must be requested from the company SCMTM Arquitectura y Diseño, Grupo Inmobiliario del Parque, specifically from Arch. Ricardo Molina. Additionally, an unnumbered sheet without a tracking code is attached, containing the work execution monitoring report prepared by the inspection area. • Official communication DAJ-1154-32-2025 (June 5, 2025), addressed to Arch.
Royeé Álvarez, Head of the Construction Permits Section, requesting a response to the amparo appeal case file No. 25-015494-007-CO. It is clear that the omission of these documents caused this Office to lack all the necessary information to conduct the analysis requested by the Municipal Mayor's Office, potentially running the risk of error by issuing an opinion based on partial and incomplete documentation. It is important to mention that on August 18, 2025, the Councilor and the District Council Members of the Carmen district were received at the office of the Municipal Management Office, in order to inform them of the results of the analysis conducted by this Office on the case file of the DI Escalante Verde project, as well as to share the responses sent by the institutions that were consulted based on the official communication GGMDU-447-2025, already mentioned above. However, on August 22, 2025, official communication DAJ-1683-2025 was received requesting information to respond to the Amparo Appeal filed by Mr.
Name121535 and Antonio Trejos Mazariegos (recently seen by the undersigned), due to the lack of response to official communication CM-PFA-057-2025. In this regard, the appeal makes reference to the following points: 1. 50-meter alignment granted for a previous project. The first argument raised in the Amparo Appeal indicates that SINAC granted a 50-meter alignment through official communication SRC-OSJ-307-2008, which led to the archiving of case file 13-30-08 for Environmental Viability (Viabilidad Ambiental) of the Oficentro Escalante project by SETENA. In contrast, INVU grants a 10-meter alignment from the upper edge of the Quebrada Negritos watercourse for the Di Escalante Verde project on the same property, cadastral map Placa22287. 2. INVU alignment not valid at the time of granting the construction permit. The second argument indicates that the river alignment granted by INVU had expired on the date the construction permit was approved (February 7, 2023); however, the Construction Permits Section indicates, through official communication SPC-153-2025, that all documents were valid at the time the permit was requested. 3.
Municipal authority to set alignments different from those established by INVU. The third argument indicates that article 24.1 of Regulation 1 of the current Regulatory Plan for the canton of San José (22.1 of the General Provisions Regulation of the previous Regulatory Plan) establishes that the MSJ may define an alignment greater than that set by INVU, according to the specific geographic and geological conditions of each zone and the susceptibility to landslides of its slopes or immediate surroundings, in accordance with the landslide susceptibility map of these regulations. 4. Tree felling in a protection zone. The fourth argument refers to the illegal felling of trees in the protection zone of the Quebrada Negritos. 5. Granting of a CAS incentive. A series of benefits related to the CAS were granted that have no regulatory or factual basis, given that the Urban Renewal and Repopulation Commission of the Municipality of San José, by act of March 12, 2020, only approved the reduction of the construction tax.
Regarding the first argument, as established by articles 33 bis and 33 ter of the Forestry Law (Ley Forestal) (Law 7575), the authority to set the river alignments on public domain watercourses corresponds to the National Institute of Housing and Urbanism, not to SINAC, whose competence is limited to conserving the country's forest resources (Art. 6 of the Forestry Law). In this sense, a competence cannot be delegated or assumed by another institution, so the legality of official communication SRC-OSJ-307-2009 would have to be reviewed within the framework of institutional competences. Regarding the second argument, the approval date of the municipal construction permit, as stated in the case file sent via email, corresponds to February 7, 2023. INVU issued two alignments: August 21, 2019, and October 12, 2021, each with a validity of 24 months, so this requirement was valid at the time of approving the construction permit.
Regarding the third argument, it is important to mention that the Di Escalante Verde project was processed during the validity of the previous Regulatory Plan (2014-2023), therefore the regulations contained in that instrument are applicable, and article 24.1 of Regulation 1 of the current Regulatory Plan for the canton of San José does not apply, as indicated in the amparo appeal. On the map of Zones Susceptible to Slope Instability and Potential Flood Zones of the previous Regulatory Plan (2014-2023), it is evident that the area where the project is located is mostly classified as a low susceptibility zone, with a portion of moderate susceptibility; it also identifies some potential flood zones. On the other hand, in the Integrated IFA map, the same area appears with a moderate fragility classification (III-V), with limitations due to geo-suitability and bio-suitability conditions and with a recommendation to be zoned as a protection zone subject to study.
It follows from the foregoing that the limitations are subject to a series of technical criteria associated with the presentation of a mitigation and slope conservation works plan, supported by a geotechnical study. Regarding the fourth argument, article 34 of the Forestry Law does indeed establish the prohibition of felling, cutting, or removing trees in protection areas. In this sense, the clearing carried out, as observed in some photographs, covered the entire lot, including the protection zone of the Quebrada Negritos. The foregoing could constitute an environmental offense that must be reported to the competent authorities. Regarding the fifth argument, the Urban Renewal and Repopulation Commission of the Municipality of San José, by act of March 12, 2020, did indeed only approve the reduction of the construction tax for the Di Escalante Verde project. However, Arch. Melissa Gómez, from the Construction Permits Section, indicated the following in the issued construction permit: "project has an incentive for tax payment, and a CAS increase of 30% more, granted by the Repopulation Commission, according to the attached Act dated March 12, 2020." However, the 30% increase in CAS was never authorized by the Repopulation Commission, nor was it implemented in the project design.
As a result of the analysis of the case file available for review and the additional information provided, this Office considers it necessary to address other elements not expressly considered in the amparo appeal or in official communication CM-PFA-057-2025, which do merit an exhaustive investigation, as detailed below: 1. Land Use Certificate. The document corresponding to the Land Use Certificate issued on December 18, 2019, indicates that the property on cadastral map 1-668597-2000 is located in a mixed residential-commercial zone with the following conditions: ▪ VB MSJ Hydrology storm drainage ▪ VB SETENA ▪ VB INVU Condominium Property Law ▪ Respect Construction Law – current RDU From the above, it is possible to note 2 elements: (1) according to the cartography of the same regulatory plan (2014-2023), the property is located in a zone subject to study, requiring for land with a slope of 30% or less, a maximum coverage of 50% of the area corresponding to the slope, providing beforehand a mitigation and slope conservation works plan, supported by a geotechnical study; land with steeper slopes can only be used for forestry uses, gardens and linear, stormwater, or recreational parks, and (2), the conditions indicated in the issued land use certificate constitute admissibility requirements for any construction permit, they are not conditions for project development, so a vacuum of technical criteria that should have been identified from the land use certificate for the proper technical guidance of the subsequent project stages is evident. 2.
Impropriety of granting additional CAS. Regarding the granting of incentives for the project, the Urban Renewal and Repopulation Commission, in its session of March 12, 2020, approved recommending the reduction of the construction tax from 1% to 0.01%. It is important to note that the Commission's decisions are recommendations to the Municipality, which must be analyzed by the Construction Permits Section. This department may reject or follow the recommendation, but in no case can it modify or add new incentives. However, in the construction permit certificate approved by the Construction Permits Section on February 7, 2023, other incentives that do not appear in the act of March 12, 2020, are recorded. Specifically, it is mentioned: "Project has an Incentive for tax payment, and a CAS increase 30% more, granted by the Repopulation Commission, according to the attached Act dated March 12, 2020." A reading of the construction permit reflects that, by error or omission, the incentive of a 30% increase in the Floor Area Ratio (Coeficiente de Aprovechamiento del Suelo, CAS) was recorded for the Di Escalante Verde project.
This benefit was not recommended by the Repopulation Commission. Although in the project design, the developer did not require a larger buildable area (i.e., did not make effective the incentive granted in error), it is important to note that previous interpretations by the Construction Permits Section have allowed projects in Residential Zones to increase height above that established by the Urban Development Regulations, after applying the respective Height Coefficient. Therefore, the error of recording a 30% increase in the Floor Area Ratio generated a declaratory act of rights in favor of the developer without the authorization of the Repopulation Commission and without the technical or legal support of the Urban Development Regulations. This is because the zone where the project is located is governed by a Height Coefficient that defines the maximum height of buildings. 3. Municipal authority to set river alignments.
While Opinion C-200-2009 and Ruling No. 1220-2002 establish the municipal authority to pursue administrative and judicial action if it disagrees with the criteria of SETENA -or any other institution-, the specific issue of determining the river alignment deserves to be analyzed considering the principle of the specialty of the norm. However, as established by Ruling No. 6324-2003, there is always broad procedural standing in matters of environmental protection to take judicial action by any means, both administrative and judicial. In this sense, the Municipality can indeed take action through any of these means the moment it detects, as a result of the urban and construction inspection process, any irregularity or non-compliance. 4. Prohibition of felling trees in protection zones. Such a prohibition does indeed exist, and according to what is observed in the photographs provided in the initial complaint, earthworks and removal of vegetation cover (cobertura vegetal) are observed in the protection zone of the Quebrada Negritos, which constitutes an action that should have been reported as a result of the municipal inspection and denounced to the corresponding authorities.
Said inspection is not evident in the work logbook provided as additional evidence in the Amparo Appeal. Therefore, regarding the request made for the opening of an administrative procedure and precautionary measures, this Office recommends, based on the analysis conducted, that it is indeed necessary to investigate the following actions: 1. Conditions included in the 2019 land use certificate. 2. Recording of the incentive of a 30% increase in Floor Area Ratio (CAS), without this benefit being recommended by the Repopulation Commission and without the technical or legal support of the Urban Development Regulations, given that this benefit does not apply in the zoning associated with the property where the project is being built. 3. Omission of inspection of authorized earthworks (movimiento de tierra) and execution of works in the watercourse affecting the topography, the vegetation cover, without filing complaints with SETENA or other authorities.
By virtue of the foregoing, this Mayor's Office considers the matter requested in official communication CM-PFA-057-2025 as addressed, reiterating that aspects requiring administrative investigation and the adoption of corrective measures have been identified. Likewise, this Municipality's willingness to follow up on pending actions and ensure that the entire process related to the DI Escalante Verde project conforms to the current legal framework, in strict adherence to the principles of transparency, legality, and protection of the public interest, is confirmed. Consequently, the Mayor's Office reiterates its commitment to address the concerns raised regarding this project with the utmost seriousness and transparency. Finally, it is placed on record that the official channel for receiving information requests or sending official communications is the email address ...1251, being the sole authorized institutional means in the Mayor's Office for such purposes." Now, based on the facts presented, the Chamber considers that the petitioner's request has not yet been duly addressed by the respondent municipality.
Indeed, the purpose of such request was to ask the municipality to initiate an administrative procedure to determine the annulment of construction permit No. 067-2022-CFIA-920253. Likewise, it requested that precautionary measures be taken. In view of this claim, in its response, the municipality transcribed official communication GGMDU-0668-2025 from the Municipal Management and Urban Development Office, a body which stated the following:
"...this Office recommends, based on the analysis conducted, that it is indeed necessary to investigate the following actions:
1. Conditions included in the 2019 land use certificate.
2. Recording of the incentive of a 30% increase in Floor Area Ratio (CAS), without this benefit being recommended by the Repopulation Commission and without the technical or legal support of the Urban Development Regulations, given that this benefit does not apply in the zoning associated with the property where the project is being built.
3. Omission of inspection of authorized earthworks and execution of works in the watercourse affecting the topography, the vegetation cover, without filing complaints with SETENA or other authorities." Furthermore, based on that official communication, it stated:
"...aspects requiring administrative investigation and the adoption of corrective measures have been identified. Likewise, this Municipality's willingness to follow up on pending actions and ensure that the entire process related to the DI Escalante Verde project conforms to the current legal framework, in strict adherence to the principles of transparency, legality, and protection of the public interest, is confirmed." That is to say, given the recommendations of the Municipal Management and Urban Development Office to investigate certain actions, related to the construction permit that was the subject of the petitioner's request, the Mayor's Office merely confirmed its "willingness" to follow up, without clearly defining whether or not it would open an administrative procedure or take precautionary measures, as the petitioner requested. This uncertainty regarding the petitioner's claim, as well as the fact that more than two months have elapsed since that request was originally filed, constitute a violation of his fundamental rights, given that they evidence an administrative delay contrary to the parameters established by the Chamber in its jurisprudence, derived from Article 41 of the Constitution. By virtue of the foregoing, the appeal is granted, in the terms set forth in the operative part of this judgment.
V.Note by Judge Castillo Víquez, regarding prompt and complete administrative justice. I have supported this Court’s thesis that when a claimant alleges a violation of the right to prompt and complete justice in the administrative sphere, those who must hear the legal dispute are the Administrative-Contentious Courts and not this Chamber. Now, with the recent enactment of Law No. 9097, Law Regulating the Right of Petition, it has been established that this right is susceptible to judicial protection through the amparo appeal established by Article 32 of the Law of Constitutional Jurisdiction, in relation to Article 27 of the Political Constitution of the Republic of Costa Rica, in those cases where the petitioner considers that the Administration’s material actions, its administrative acts, or its response are affecting their fundamental rights. In my view, the recently enacted regulation does not imply that this Court must modify its jurisprudential line, as it is up to the Court, based on numeral 7 of its Law, to define exclusively its own competence.
Therefore, except for those legal-constitutional disputes that have been recognized by this same Chamber as exceptional cases that may indeed be heard in this jurisdiction through the constitutional amparo process, in all other cases, and for the reasons this Court has given (Judgment No. 2008-02545 of 8:55 a.m. on February 22, 2008), the competent judges are those of the administrative-contentious jurisdiction, all of which is in accordance with numeral 25 of the American Convention on Human Rights, the Law of the Constitution (values, principles, and norms), and the corresponding legal norms based on a logical, systemic, and teleological interpretation of the legal system.
(...) Therefore: The appeal is granted. Luis Diego Miranda Méndez, in his capacity as mayor of San José, or whoever holds that office, is ordered to coordinate what is pertinent and arrange what is necessary within the scope of his competences so that, within a maximum period of ONE MONTH, counted from the notification of this judgment, the petitioner's request, the subject of this process, is addressed as legally appropriate, and the respective notification is made to the means indicated by him. The respondent authorities are warned that, in accordance with the provisions of Article 71 of the Law of Constitutional Jurisdiction, a prison sentence of three months to two years or a fine of twenty to sixty days shall be imposed on anyone who receives an order that must be complied with or enforced, issued within an amparo appeal, and does not comply with it or enforce it, provided the offense is not more severely punished. The Municipality of San José is ordered to pay the costs, damages, and losses caused by the facts serving as the basis for this declaration, which shall be liquidated in the execution of a sentence in the administrative-contentious jurisdiction. Judge Castillo Víquez sets down a note. Notify." Thus, taking into account that it concerns the same complaint, the petitioners must abide by what is ordered in said judgment.
IX.Regarding the actions of the Municipality of San José concerning the irregularities found in the file. Now, regarding the actions of that Municipality in the processing of construction permit no. 067-2022_CFIA-920253, it is verified that in the second report rendered under oath by that authority on June 27, 2025, the following was stated: "I refer to official letter MSJ-ALCALDIA-2387-2025 of June 13, 2025, in which the evaluation and complement to the response issued in relation to file number 25-015494-0007-CO of the Constitutional Chamber is requested. In this regard, we proceeded to review the file for the Di Escalante Verde Project sent by the Construction Permits Section, which contains the following information: (...) From the information sent, we proceeded to build a physical file with the main information of the construction permit: (...) • That the information presented for the local perception study does not meet the minimum requirements established in D.E.
Nº32966-MINAE. Furthermore, people were not consulted about the project. The point referring to available basic services must be developed again. The survey must be developed with a 90% confidence level and must take into account the Direct Area of Influence (AID). The formula used to extract the sample must be presented. Prior to the consultation, a project information process must be carried out detailing the components, impacts, and environmental measures, so that the population has criteria to opine. Each of the points to be consulted must be graphed with the proper interpretation of the case. The local perception study must indicate the perception, position, attitudes, and concerns of the social influence area regarding the execution of the project, as well as the perception of potential impacts it could generate. In addition, the information needs of the population regarding the project must be identified, and possible conflicts arising from the construction must be identified and characterized.
The environmental mitigation, compensation, or control measures must be incorporated into the Environmental Management Plan (PGA) table. • Expand the section on project access and road infrastructure in accordance with the provisions of Annex I of Executive Decree Nº32966-MINAE of May 4, 2006. • Present the mapping with the accesses and the most traveled routes, locating schools, high schools, parks, etc. It must indicate the main concerns raised by civil society. Describe the environmental measures to be applied for each concern raised. Incorporate a pronouncement from the MOPT regarding the project accesses and the traffic impact study (estudio de impacto vial). Indicate whether compensatory measures will be established. • Present the sworn statement of environmental commitments again, as the one submitted does not comply with the established format. • Present the calculation report for earthworks (movimiento de tierra), as well as define the disposal, possible impacts, and the respective mitigation measures. • Must present the location permit for the treatment plant duly endorsed by the MINSA and the proper authorization for the treatment plant's discharge. • The environmental management summary table does not comply with the provisions of Executive Decree Nº32966-MINAE of May 4, 2006. • They describe the technical aspects contemplated in the environmental impact assessment (evaluación de impacto ambiental) where no major conclusions were found.
Despite the fact that in the RESULTANDOS, Fourth, Fifth, Sixth, and Seventh, reference is made to the submission of additional requested documentation, it does not appear in the file that was sent by the Construction Permits Section. In the CONSIDERANDOS section, the only aspect to be taken into account is that the cadastral map number SJ-1889650-2016 does not coincide with the cadastral map numbers on which the construction permit was issued, namely, SJ-0668597-2000 and SJ-0923485-2004. However, regarding the latter, resolution 1148-2019-SETENA was subsequently issued, in which the material error regarding the cadastral map numbers is corrected. Nevertheless, no reference is made to the correction of the other points mentioned in the previous resolution. In the POR TANTO, environmental viability (viabilidad ambiental) is granted to the project. Official letter SIGDD-2020-00049728-1-2-1: The Costa Rican Institute of Aqueducts and Sewers (ICAA) issues a certificate of wastewater collection capacity for a flow of 240.87 m2/d, corresponding to one potable water service (macro meter).
This capacity is conditioned on the diversion of the Negritos Subcollector proposed by the developer, as indicated in the official letter, and the plans for this improvement must be approved by the Urban Development Directorate (Dirección de Urbanizaciones) with the endorsement of the UE PAPS. EIV: Although the project has a traffic impact study (estudio de impacto vial), the approval or endorsement of the General Directorate of Traffic Engineering (Dirección General de Ingeniería de Tránsito) for this is not found in the file. CFIA Approval: Furthermore, the project was approved by the CFIA on July 1, 2021, approved by the Municipality on February 24, 2022, and the construction license entered into force on February 7, 2023. Official letter SPC-262-2025: The response provided by Architect Álvarez to the Constitutional Chamber stems from the conclusion that this was analyzed under the urban regulations in force at that time, meaning the Urban Development Regulations published in digital scope 2 of Gazette #29 of February 11, 2014.
In this regulation, the zoning where the project is located is considered a Zone Subject to Study (Zona Sujeta a Estudio) and additionally, according to the environmental cartography of the Urban Development Regulations in force, it is located in a zone predominantly of low landslide susceptibility with some sectors of moderate landslide susceptibility and zones with flooding potential. Conclusions from the file analysis: It was not possible to find the following documents in the file, which are considered important for the purposes of the requested analysis: ▪ The instrument for consulting the population that complies with the provisions of decree Nº32966-MINAE. Nor were all documents found to prove that the consultation process meets the minimum technical requirements established in resolution 682-2018-SETENA, third result, point 3. ▪ The approval or endorsement of the General Directorate of Engineering and Traffic of the MOPT for the Traffic Impact Study (Estudio de Impacto Vial) and the project access points. ▪ The detail of the environmental measures to be taken by the developer to address community concerns. ▪ Approval or endorsement of the ICAA's Urban Development Directorate (Dirección de Urbanizaciones) regarding the relocation of the Los Negritos sanitary collector. ▪ Approval of the ICAA's Urban Development Directorate (Dirección de Urbanizaciones) for the project's connection to the existing sanitary network.
What is shown in the file is a Certificate of Collection Capacity, which does not constitute a construction or interconnection authorization. It is important to mention that the aforementioned Certificate is issued for a total of 300 subsidiary properties according to cadastral map No. 1-0923485-2004, while SETENA mentions that environmental viability (viabilidad ambiental) is granted for a total of 323 apartments. Meanwhile, the municipality, in construction permit 067-2022_CFIA-920253, authorizes the construction of 135 units, for a total of 13,331 m2 corresponding to a 10-level building. ▪ Endorsement of UE PAPS for the relocation of the Negritos Collector. ▪ At the time of the approval of the construction permits, there is an encumbrance on property 498246 cadastral map SJ-923485-2004 corresponding to the sanitary sewer easement (servidumbre de alcantarillado sanitario). A doubt arises about the viability of granting a construction license in a condition where the encumbrance has not been formally lifted at both the cadastral and registry level.
It does not appear in the analyzed documents that said encumbrance has been lifted or is in the process of being resolved. ▪ Although the developer proposes the relocation of the "Los Negritos" blackwater collector to be placed parallel to the stream's piping, and as this is a work in the watercourse, no written approval or endorsement from the Water Directorate (Dirección de Aguas) of MINAE was found for these works; only the new layout is observed in the construction plans. In this regard, an inquiry was sent via official letter GGMDU-0230-2025 to engineer José Miguel Zeledón Calderón, Director of the Water Directorate, whose response is still pending. ▪ Calculation report for earthworks (movimiento de tierra), as well as defining the disposal, possible impacts, and respective mitigation measures. ▪ Geotechnical study demonstrating urban suitability as established in subsection 10.3.5 Zones Subject to Study (Zonas Sujetas a Estudio), of the Urban Development Regulations in force at the time of the construction permit approval. ▪ Regarding the zoning on the basis of which the construction permit was granted, it is important to note that the Urban Development Regulations in force (2014) at the time of the construction permit approval indicate that part of the area where the project is located is identified as a zone with moderate landslide risk and susceptible to flooding (map of landslide and flood hazard zones).
This condition did not change with the update of the Urban Development Regulations of 2023, currently in force. This zoning indicates that, in these zones subject to study, the required analyses must be carried out to demonstrate their urban suitability." Thus, given that situation, the report continues by stating the following: "By virtue of the foregoing, this Management considers it necessary to review the process of processing and approving the construction permit for the Di Escalante Verde project, therefore, a detailed study of what has been done by the administration is recommended, including the pertinent consultations with both the institutions and the developer, in order to determine the relevance of the continuity of the works based on the common interest, the protection of the environment, and the quality of life of the people of the community of Barrio Escalante and its surroundings" (the highlighting is not from the original).
Consequently, in view of that indication, in the report in question, the mayor of San José stated the following: "the undersigned Mayor considers sending this report to the Constitutional Chamber, which I did not have at hand when answering the present Amparo Appeal, this Mayor's Office reiterates its commitment to legality, transparency, and the protection of the public interest. Therefore, the corresponding actions will be undertaken to determine the validity of what was done in the processing of the construction permit for the Di Escalante Verde project, even though at first glance it seemed that all the required documentation was available. This review will be carried out with due technical and legal rigor, addressing the observations indicated by the Municipal Management and Urban Development Office (Gerencia de Gestión Municipal y Desarrollo Urbano), and safeguarding the rights and interests of the community." Therefore, in the face of those statements, this Court, through a resolution at 1:15 p.m. on March 26, 2026, requested evidence for better resolution from the mayor of the Municipality of San José so that he could address the following: "- to the mayor of the Municipality of San José: taking into account that in the second report rendered under oath by that authority on June 27, 2025, the following was stated: '(...) the corresponding actions will be undertaken to determine the validity of what was done in the processing of the construction permit for the Di Escalante Verde project, even though at first glance it seemed that all the required documentation was available.
This review will be carried out with due technical and legal rigor, addressing the observations indicated by the Municipal Management and Urban Development Office (Gerencia de Gestión Municipal y Desarrollo Urbano), and safeguarding the rights and interests of the community.' Therefore, he must clarify what actions have been taken to determine that situation and what has happened with that investigation" (the highlighting is not from the original).
In this regard, through a report rendered on April 8, 2026, the mayor of the Municipality of San José informed under oath as follows: "We proceed to attach official letters MSJ-ALCALDIA-1229-2026 from Ms. Laura Brenes Fernández, Chief of the Mayor's Office, and with official letter GGMDU-0292-2026, from Arch. Jessica Martínez Porras, Manager of Municipal Management and Urban Development, from which it follows, as will be seen below, that the actions of the Municipality of San José have been diligent and proactive, framing our actions within the broadest concept of attributions and powers. I. In relation to the technical report Once what was requested by this Honorable Chamber was notified, the Directorate of Legal Affairs of the Municipality proceeded to instruct the process, requesting from the linked and/or competent bodies, in light of the issue raised, the appropriate reports, in order to give due process, this, through official letter No. DAJ-535-32-2026, which was answered with official letter No. MSJ-ALCALDIA-1229-2026 and with official letter DAJ-561-32-2026, which was answered with official letter GGMDU-0292-2026.
Likewise, the other documentation and/or information related to the case was received, which will be reported below: From the study of the process followed, in the case in question, it is clear that the actions of this Municipality of San José, in our view, have been in accordance with the Law and in accordance with its conferred powers, based on the following: FIRST: That Licda. Laura Brenes Fernández, Chief of the Mayor's Office, with official letter No. MSJ-ALCALDIA-1229-2026, reports in relation to the object of the litigation: (...) SECOND: That Arch. Jessica Martínez Porras, Manager of Municipal Management and Urban Development, reports in relation to the object of the litigation the following: (...) Given the foregoing, it is verified that this Municipality, within its possibilities and competencies, has carried out various actions in relation to the construction of the Di Escalante Verde Project." Thus, it is verified that the Municipality of San José mentions the complaint filed by the appellants, which was discussed in the preceding whereas clause, where it is noted, among others, official letter no. GGMDU-0668-2025 of August 25, 2025, from the Municipal Management and Urban Development Office of the Municipality of San José, and official letter no. MSJ-ALCALDIA-3514-2025 of August 25, 2025, from the mayor of the Municipality of San José, but this Court verifies that said official letters still indicate the need to carry out an administrative investigation and the adoption of corrective measures, without affirming that this investigation has been carried out or concluded.
It should be noted that a large part of the investigation action by that Municipality regarding the project in question has occurred on the occasion of the notification of the course resolution to said municipal corporation, without, to date, it being reiterated that this administrative investigation has not been concluded, and the adoption of corrective measures is not clear. Thus, through official letter no. GGMDU-0668-2025 of August 25, 2025, from the Municipal Management and Urban Development Office of the Municipality of San José, a technical-administrative criterion was prepared, related to the approval process of the construction license for the Di Escalante Verde project, in which the need to investigate specific actions associated with the processing of the granted license was recommended, with the purpose of verifying the conformity of what was done with the applicable legal system, in safeguarding the principle of legality and the public interest, but without clarifying specific actions associated with the processing of the granted license with the purpose of verifying the conformity of what was done with the applicable legal system.
Likewise, official letter no. MSJ-ALCALDIA-3514-2025 of August 25, 2025, from the mayor of the Municipality of San José, mentions the following: "By virtue of the foregoing, this Mayor's Office considers the request in official letter CM-PFA-057-2025 fulfilled, reiterating that aspects requiring administrative investigation and the adoption of corrective measures have been identified. Likewise, the willingness of this Municipality to follow up on pending actions and ensure that the entire process related to the DI Escalante Verde project conforms to the current legal framework is confirmed, in strict adherence to the principles of transparency, legality, and protection of the public interest. Consequently, the Mayor's Office reiterates its commitment to address the concerns raised regarding this project with the utmost seriousness and transparency." That is, it is reiterated that both documents continue to indicate the need to carry out an administrative investigation and the adoption of corrective measures, without indicating that this investigation has been carried out or concluded.
Consequently, an omission on the part of the Municipality is denoted in carrying out an adequate investigation to rule out any anomalous situation regarding the processing of the construction permit for the project in question or that it has taken corrective measures regarding any environmental situation in this regard. Thus, this Constitutional Chamber reiterates what was stated in the precedent cited in the preceding whereas clause, regarding that the Mayor's Office only confirmed its "willingness" to follow up, without clearly defining whether or not it would open an administrative procedure or whether precautionary measures would be taken. This uncertainty regarding the action of the respondent Municipality constitutes an injury to their fundamental rights, as it demonstrates an omission regarding its municipal obligations. Let us remember that this Court has mentioned that Article 169 of the Political Constitution establishes the duty of the country's municipalities to safeguard the interests of the inhabitants of their jurisdiction; hence, in repeated pronouncements, this Court has indicated that said corporations are obligated to eliminate any type of threat that puts the rights to health and a healthy and ecologically balanced environment of the people living in their canton at risk (see Judgment No. 2008-11739 of 12:12 p.m. on July 25, 2008, reiterated in No. 2020-014753, of 9:15 a.m. on August 7, 2020).
In accordance with the foregoing, although, as has been explained in this judgment, disagreement with construction permits is a matter of ordinary legality, the truth is that, in this particular case, it is evident that the Municipality of San José itself identifies that there could be situations that affected the granting of the construction permits due to the environmental variables involved. In this regard, it is the Municipality itself that indicates the importance of advancing in this internal verification "in order to determine the relevance of the continuity of the works based on the common interest, the protection of the environment, and the quality of life of the people of the community of Barrio Escalante and its surroundings." Therefore, while it is reiterated that discussing the granting of a construction permit is a matter of legality, in this particular case, the respondent Municipality itself acknowledges that in the process of granting the permit, evaluations of aspects related to environmental protection may have been lacking. This situation merits the intervention of this Court to instruct the Municipality that it must conclude the internal procedures so that what is legally appropriate regarding this construction permit and/or the documents that may be missing and could affect environmental protection is resolved.
Ergo, on this point, an injury to the fundamental rights of the appellants is denoted.
X.Regarding the criminal complaint. Finally, it is verified that on June 10, 2025, Ariel Robles Barrantes, in his capacity as deputy of the Republic, filed a criminal complaint before the Deputy Environmental Agrarian Prosecutor's Office for usurpation of public domain property against the project in question. Thus, the following actions have resulted from said complaint: a) field visit report No. SINAC-ACC-OSJ-inf-0074-2026 of January 15, 2026, from the San José Subregional office of the National System of Conservation Areas (SINAC); b) official letter no. CARTA-SINAC-ACC-OSJ-0097-2026 of January 21, 2026, from the head of the San José Subregional Office of the National System of Conservation Areas; c) and field visit report no. SINAC-ACC-OSJ-inf-0118-2026 of January 30, 2026, from the San José Subregional office of the National System of Conservation Areas.
Now, taking into account that those actions are circumscribed within said criminal complaint, the situations reported therein will therefore be determined in that criminal process, as it is not for this Constitutional Court to supplant the criminal jurisdiction or act as an appellate body in the matter, since that would imply influencing the sphere of competence proper to said jurisdiction, which is constitutionally reserved to the corresponding judges, in accordance with the provisions of Article 153 of the Political Constitution. In this regard, it must be noted that the actions and resolutions deemed contrary to the Law of the Constitution come from an organ of the Judicial Branch in the exercise of its jurisdictional function. Therefore, it is inadmissible for this Chamber to rule on the extremes alleged in the appeal, since, according to Article 30, subsection b) of the Constitutional Jurisdiction Law, those acts are not subject to constitutionality control by way of amparo and, furthermore, a situation of exception in this regard is not legally provided for (see judgment no. 2026-001574 of 10:05 a.m. on January 13, 2026).
Thus, any situation regarding that criminal process must be alleged through the mechanisms provided for by criminal procedural law, so that what is legally appropriate is resolved.
XI.Conclusion. By virtue of the foregoing, the appropriate action is to partially grant the appeal against the Municipality of San José, for the omission to carry out and complete the internal investigation process aimed at determining the continuity of the works based on the common interest, the protection of the environment, and the quality of life of the people who make up the community of Barrio Escalante and its surroundings in the central canton of the province of San José, related to construction permit no. 067-2022_CFIA-920253. Likewise, the appeal is granted regarding the delay in the resolution of the complaint filed before the National Technical Environmental Secretariat (SETENA). Now, taking into account that it was on the occasion of the filing of this appeal that the complaint filed before SETENA was resolved, the amparo appeal must be granted on this point, in application of Article 52 of the Constitutional Jurisdiction Law. On the other hand, the appeal is dismissed regarding the environmental viability (viabilidad ambiental) granted by the National Technical Secretariat and the construction permit granted by the Municipality of San José. Finally, regarding the complaint filed with the Municipality of San José, they must abide by what was resolved in judgment no. 2025-029376 of 10:25 a.m. on September 12, 2025.
Now, regarding the complaint filed before SETENA, the appropriate course is to remind SETENA, SINAC, and the Water Directorate (Dirección de Agua) of MINAE, each according to its competencies, of their obligation to continue verifying strict compliance with the required environmental requirements, in safeguarding the proper protection of the environment in accordance with the parameters set by this constitutional jurisdiction.
XII.Regarding the award of costs, damages, and losses in accordance with Article 52 of the Constitutional Jurisdiction Law. On better consideration, the majority of the Chamber considers that, in the sub examine, in accordance with the provisions of paragraph 1 of Article 52 of the Constitutional Jurisdiction Law ("If, while the amparo is in process, an administrative or judicial resolution is issued that revokes, stops, or suspends the challenged action, the appeal shall be granted solely for the purposes of compensation and costs, if they are applicable"), the granting must be without a special award of costs, damages, and losses, based on the following considerations. While there is an express text in the law requiring the operative part of the ruling to state that the appeal is granted when the grievance is resolved while the amparo is in process, it is no less true that the same paragraph in fine states that the granting is dictated "solely for the purposes of compensation and costs, if they are applicable." It is emphasized that the Law states "if they are applicable," which means that the applicability or inapplicability of compensation and costs depends on an assessment, appreciation, or weighing by the Court.
In cases like this, the content of the petitioner's claim and the conduct of the respondent authority in acknowledging it suggest that the alleged impairments, injuries, or alterations are not directly related to a repercussion on a constitutional right of an evident patrimonial nature (as would occur, for example, with an effect on the right to a salary). To dispel any doubt in this regard, it is important to highlight the provision in Article 51 of the same Constitutional Jurisdiction Law, which states that: "any decision that upholds the appeal shall condemn in the abstract to the compensation of the damages and losses caused and to the payment of the costs of the appeal, reserving their liquidation for the execution of the judgment," where the possibility of assessing whether or not compensation and costs are applicable is not foreseen. The principles of Constitutional Law, Public and General Procedural Law or, where appropriate, International or Community Law and, in addition, in order, the General Public Administration Law and the Contentious Administrative Procedural Code and the other procedural codes, are supplementary sources for the application and interpretation of the norms of the Constitutional Jurisdiction Law - cf.
Article 14. For the contentious-administrative jurisdiction, the legislator established a precept fully applicable to the case by analogy, in Article 197 of the Contentious Administrative Procedural Code, which responds to procedural logic in any field. In any case, the affected party in the sub lite retains the possibility of turning, if they deem it appropriate, to a declaratory proceeding in order to demonstrate that they have suffered some type of impairment. Based on the foregoing, the majority opinion is to resolve this appeal without awarding costs, damages, and losses.
While I agree with the majority vote, which partially grants the appeal for violation of the right of petition and prompt response, I consider it should be upheld; but imposing on the respondent party the payment of costs, as well as compensation for the damages and losses caused, for the following reasons.
The right of petition and prompt response, contained in Article 27 of the Political Constitution and Article 32 of the Constitutional Jurisdiction Law, obliges public officials to resolve the requests of citizens within a period of ten business days from the date of submission of such applications, unless a different period has been specified for responding. However, the cited Article 32 further provides that, in the decision on the petition, the Chamber shall assess the reasons adduced for considering said period insufficient, considering the circumstances and the nature of the matter. In any case, the Administration is obliged to inform the petitioner of the reasons for the delay in issuing a pronouncement. For the purposes of this analysis, it is relevant to bear in mind what is stated in the aforementioned norms.
Article 27 of the Political Constitution establishes the following:
"The freedom of petition, individually or collectively, before any public official or official entity, and the right to obtain a prompt resolution, is guaranteed." For its part, numeral 32 of the Constitutional Jurisdiction Law establishes the following:
"When the amparo refers to the right of petition and to obtain a prompt resolution, established in Article 27 of the Political Constitution, and no period has been specified for responding, it shall be understood that the violation occurs once ten business days have elapsed from the date the application was filed in the administrative office, without prejudice to the fact that, in the decision of the appeal, the reasons adduced for considering that period insufficient are assessed, given the circumstances and the nature of the matter." In the same vein, the Law Regulating the Right of Petition No. 9097 of October 26, 2012, establishes that this right is subject to judicial protection by means of the amparo remedy established by Article 32 of the Law of Constitutional Jurisdiction, in relation to Article 27 of the Political Constitution, for those cases in which the petitioner considers that the material actions of the Administration, its administrative acts, or its response are affecting their fundamental rights. It is relevant to bear in mind what is indicated in numeral 6 of said regulation:
"Submission of writings and response period.
The writing in which the petition is submitted and any other documents and communications provided to the corresponding public administration, as indicated in Article 2 of this law, shall oblige the administration to acknowledge receipt thereof, and it must respond within the non-extendable period of ten business days counted from the day following receipt, provided the requirements established in this law are met. This action shall be carried out by the corresponding body, in accordance with the organizational rule of each entity…".
Thus, in amparo remedies referring to the alleged violation of this right, there is an express legal rule—constitutionally endorsed by the law governing this jurisdiction—that orders the required information to be provided within the ten business days following its request, as provided by Articles 32 of the Law of Constitutional Jurisdiction and 27 of the Political Constitution, as indicated previously. Additionally, said period is reiterated in Article 6 of Law No. 9097, which reinforces the legislator's intention regarding the protection of this right.
Likewise, the Law of Constitutional Jurisdiction, in Article 51, provides:
"...every resolution that grants the remedy shall, in the abstract, order compensation for the damages caused and the payment of the costs of the remedy, reserving their liquidation for the execution of the judgment".
This last rule establishes the general system regulating matters concerning compensation and the payment of costs, which the majority calls the "natural or normal form of concluding the proceeding, where there is a ruling on the merits of the matter and acknowledgment of the facts that have violated the fundamental rights…".
Consequently, in the case at hand, a violation of the constitutionally endorsed ten-day period is confirmed—a period, by the way, not required for other amparo remedies, except for that of rectification and response (numeral 68 of the Law of Constitutional Jurisdiction)—.
Therefore, what is appropriate in this regard, and with due respect to the majority's thesis, is to deem the violation of the right of petition and prompt response accredited, as well as the violation of the right of access to public information (Article 30, Constitutional), which guarantees free access to administrative departments for purposes of information on matters of public interest, ordering the conviction for costs, damages, and losses against the respondent authority.
Thus, dealing with a constitutionally endorsed period—both by the legislator and by this Constitutional Court—, its non-compliance entails a violation of the fundamental right mentioned, which prompted the appellant to file this amparo remedy as a mechanism for obtaining a response to their request or access to the information they have required, regardless of whether the response or the delivery of information occurred before or upon the occasion of the amparo; because it is certain that, ultimately, the administered party saw their constitutional right satisfied upon the occasion of the filing of the amparo remedy they were forced to submit, with the inconveniences and costs that this entails. It bears repeating, the response or access provided by the respondent Administration, occurring after the period in question has expired, even if it arises before the notification of the amparo's course, or, as in this case, upon the occasion of being made aware of said course, does not constitute a timely fulfillment of the obligation imposed by ordinals 27 and 30 of the Constitution.
It is clear that in that scenario, this extemporaneous response represents satisfaction of the claim of the amparo-protected party, but this is no obstacle to recognizing the damages and losses that this indolence may have caused the appellant, as well as the costs associated with the exercise of this procedural action, necessary for the protection of their fundamental rights, as enabled by precept 52 of the Law of Constitutional Jurisdiction.
Consequently, I partially dissent from the vote, and I impose on the respondent party the payment of the costs, damages, and losses.
XIV.Dissenting vote of Judge Garro Vargas regarding the operative part of this judgment. Article 52 of the Law of Constitutional Jurisdiction (LJC) states: "If, while the amparo is in progress, an administrative or judicial resolution is issued that revokes, stops, or suspends the challenged action, the remedy shall be granted solely for purposes of compensation and costs, if they are applicable".
My interpretation of that rule is as follows: That "resolution" is any valid and effective act by which the competent authority restores the enjoyment of the violated right. The phrase "if they are applicable" refers to costs. Furthermore, Article 197 of the Contentious-Administrative Procedural Code, cited by the majority, based on Article 14 of the LJC, refers specifically only to these: costs.
Certainly, pursuant to Article 48 of the Political Constitution (CP), the essential content of the right to the amparo remedy is not compensatory but restitutive; however, Article 51 of the LJC states: "Every resolution granting the remedy shall, in the abstract, order compensation for the damages and losses caused and the payment of the costs of the remedy, reserving their liquidation for the execution of the judgment".
If the right has been violated and the Chamber so verifies, even if it has been restored, damages and losses may have arisen. For that reason, it is appropriate to issue an abstract condemnation for these. If it were not done this way, if such condemnation were not issued, in the event that damages had indeed occurred, there would be no title—derived from this proceeding—to claim them, which could violate Article 41 of the CP. If, despite an abstract condemnation, no damages and losses have occurred, the judge in the ordinary jurisdiction will so declare, as only he is competent to determine the real existence and magnitude thereof.
With the thesis defended by the majority, I believe that, contrary to what is sought, it would incentivize the Administration to respect rights only in the face of an amparo remedy. It remains to be said that Article 52 of the LJC provides for the possibility that, if it is deemed just, the Chamber may order the payment of costs, even when the right has been restored.
By reason of the foregoing, I partially dissent from the vote regarding the operative part and order the condemnation for damages and losses, but not for costs.
The parties are warned that if they have provided any paper document, as well as objects or evidence contained in any additional electronic, computer, magnetic, optical, telematic device, or one produced by new technologies, these must be withdrawn from the office within a maximum period of 30 business days counted from the notification of this judgment. Otherwise, any material not withdrawn within this period will be destroyed, pursuant to the provisions of the "Electronic Case File Regulation before the Judiciary" (Reglamento sobre Expediente Electrónico ante el Poder Judicial), approved by the Full Court in session No. 27-11 of August 22, 2011, Article XXVI, and published in Judicial Bulletin number 19 of January 26, 2012, as well as the agreement approved by the Superior Council of the Judiciary, in session No. 43-12 held on May 3, 2012, Article LXXXI.
Therefore:
Regarding the complaint filed before the Municipalidad de San José on May 28, 2025, the appellants shall abide by what was resolved in the judgment of this Chamber No. 2025-029376, at 10:25 a.m. on September 12, 2025. The remedy is partially granted against the Municipalidad de San José, for the omission to carry out and complete the internal investigation process aimed at determining the continuity of the works based on the common interest, the protection of the environment, and the quality of life of the people forming the community of Barrio Escalante and its surroundings in the central canton of the province of San José, related to construction permit No. 067-2022_CFIA-920253. Consequently, Diego Miranda Méndez, in his capacity as mayor of the Municipalidad de San José, or whoever holds the position, is ordered to: a) within a period of two months counted from the notification of this judgment, carry out the replacement of the corresponding pieces in the file of construction permit No. 067-2022_CFIA-920253, and resolve what is legally appropriate; b) within that same period, open the pertinent administrative disciplinary proceedings if they prove relevant, and resolve them without undue delay; c) provide follow-up to the complaint filed by the appellants on May 28, 2025, as indicated in the judgment of this Chamber No. 2025-029376 at 10:25 a.m. on September 12, 2025.
The foregoing, under warning that, based on the provisions of Article 71 of the Law of Constitutional Jurisdiction, a prison term of three months to two years, or a fine of twenty to sixty days, will be imposed on anyone who receives an order that must be complied with or enforced, issued in an amparo remedy, and fails to comply with it or have it complied with, provided the offense is not more severely punished. The Municipalidad de San José is ordered to pay the costs, damages, and losses caused to the appellant by the facts serving as the basis for this declaration, which shall be liquidated in the execution of the judgment of the contentious-administrative jurisdiction. On the other hand, regarding the Secretaría Técnica Nacional Ambiental, the remedy is granted, based on the provisions of Article 52, paragraph 1, of the Law of Constitutional Jurisdiction, without a special award of costs, damages, and losses, for the delay in resolving the complaint filed before that body on March 19, 2025.
Judge Salazar Alvarado records different reasons and partially dissents from the vote, solely for compensation purposes, and imposes on the Secretaría Técnica Nacional Ambiental the payment of costs, damages, and losses. Judge Garro Vargas partially dissents from the vote and orders the condemnation for damages and losses, but not for costs, regarding the granting of the amparo against the Secretaría Técnica Nacional Ambiental. In all other respects, the remedy is denied. Let the Secretaría Técnica Nacional Ambiental, the Sistema Nacional de Áreas de Conservación, and the Dirección de Agua of the Ministerio de Ambiente y Energía take note of what is indicated in the last paragraph of Considerando XI of this judgment. Notify.- Fernando Castillo V.
President Fernando Cruz C.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.
CASE FILE No. 25-015494-0007-CO Telephones: 2549-1500 / 800-SALA-4TA (800-7252-482). Fax: 2220-4607 / 2220-4844. Electronic address: www.poder-judicial.go.cr/salaconstitucional. Address: (Sabana Sur, Calle Morenos, 100 mts. South of the Perpetuo Socorro church).
Revisión del Documento SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del quince de mayo de dos mil veintiseis .
Recurso de amparo interpuesto por [Nombre 001], en su condición de regidor municipal de San José, cédula de identidad [Valor 001], [Nombre 002], en su condición de síndico suplente municipal de san José, cédula de identidad [Valor 002] y [Nombre 003] en su condición de sindica propietaria municipal de San José, cédula de identidad [Valor 003], contra la SECRETARÍA TÉCNICA NACIONAL AMBIENTAL (SETENA), LA MUNICIPALIDAD DE SAN JOSÉ Y OTROS.
Resultando:
Redacta el Magistrado Araya García; y,
Considerando:
I.Cuestión Preliminar. De previo a analizar el fondo del asunto -por la presunta violación del derecho a un procedimiento pronto y cumplido- debe aclararse que, a partir de la sentencia No. 2008-02545 de las 8:55 horas de 22 de febrero de 2008, esta Sala ha remitido a la jurisdicción contencioso administrativa -con algunas excepciones-, aquellos asuntos en los que se discute si la administración pública ha cumplido o no los plazos pautados por la Ley General de la Administración Pública (artículos 261 y 325) o las leyes sectoriales para los procedimientos administrativos especiales, para resolver por acto final un procedimiento administrativo -instruido de oficio o a instancia de parte- o conocer de los recursos administrativos procedentes. Precisamente, en este caso, se plantea un supuesto de excepción, pues, se está ante unas denuncias y situaciones de índole ambiental, las cuales, presuntamente, no han sido resueltas dentro de un plazo razonable por parte de las autoridades recurridas. Aclarado el punto, se entra a resolver la situación concreta planteada en este amparo.
Por escrito agregado al expediente el 07 de mayo de 2026, Antonio Trejos Mazariegos, cédula de identidad 0114780284, presenta una coadyuvancia activa a favor de los recurrentes.
Sobre este particular, el numeral 34, párrafo 3°, de la Ley de la Jurisdicción Constitucional, estipula que quien posea un interés legítimo en el proceso puede intervenir, sea en su perfil activo o pasivo, como coadyuvante. En consecuencia, en virtud de lo dispuesto en la norma de rito supra señalada y lo expuesto por el mencionado interviniente, resulta admisible la referida coadyuvancia.
III.Objeto del recurso. Los recurrentes reclaman violación a sus derechos fundamentales, pues señala que tanto la Municipalidad de San José como la Secretaría Técnica Nacional Ambiental otorgaron permisos de forma arbitraria al proyecto “Di Escalante Verde S.A.”. Afirman que interpusieron las denuncias respectivas, pero a la fecha no se ha realizado acción alguna sobre esa problemática.
IV.Hechos probados. De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos, sea porque así han sido acreditados o bien porque el recurrido haya omitido referirse a ellos según lo prevenido en el auto inicial:
- Sobre la viabilidad ambiental otorgada por la Secretaría Técnica Nacional:
El proyecto, además, incluye un área libre de 8532m² de áreas verdes y superficies permeables, plazas abiertas a locales comerciales, áreas comunes y recreativas, áreas de juegos infantiles, áreas de estar y terrazas. El proyecto contará con todos los servicios básicos: Las aguas residuales serán tratadas mediante planta de tratamiento. Los desechos sólidos serán recolectados por la Municipalidad de San José. Las aguas pluviales serán descargadas a un canal pluvial. El agua potable será suministrada por el Acueductos y alcantarillados (AyA). El servicio de electricidad será suministrado por será brindado por CNFL” (ver los informes rendidos y la prueba aportada).
Las cuentas bancadas están registradas en el Banco Nacional de Costa Rica a nombre del MINAE, cédula jurídica (cédula jurídica No. 2-100-042014) (…) Nombrar un Responsable Ambiental, con su inscripción vigente en el Registro de Consultores de la SETENA, mediante el envío de una nota firmada por el propietario con la aceptación del profesional asignado y presentar un Libro de Actas para habilitarlo como Bitácora, la misma deberá permanecer en las instalaciones del proyecto durante el tiempo de vigencia de la regencia ambiental, antes del inicio de las obras, debiendo presentar los documentos indicados a esta Secretaría en ese mismo plazo. En caso de no presentar los documentos indicados en el tiempo establecido, se procederá a aplicar lo que establece la legislación vigente. TERCERO: Con base en las características ambientales del AP y su interacción con las actividades que realizará el proyecto, la Comisión Plenaria, establece la periodicidad de presentación de informes regenciales, cada SEIS meses durante la fase constructiva y un informe final consolidado.
Los informes regenciales deberán ser presentados en un plazo máximo de 10 días posteriores a la finalización del periodo que cubren. En el momento de iniciar actividades se inicia el periodo del primer informe de regencia ambiental. Para la elaboración de estos informes, de acuerdo al formato establecido por esta Secretaría, será responsabilidad del regente ambiental realizar el número de visitas necesarias, dependiendo de las características del proyecto. Con base en estos informes y al programa de monitoreo, la SETENA podrá ajustar el monto de garantía y dictar medidas de acatamiento obligatorio para mantener al proyecto, obra o actividad dentro de un margen de impacto ambiental controlado. El responsable y el propietario deberán brindar apoyo a las labores de la SETENA, en las inspecciones que esta efectúe. CUARTO: El incumplimiento de los requerimientos de esta Secretaría, así como de cualquiera de las obligaciones contraídas en la Declaración Jurada de Compromisos Ambientales, el Pronóstico - Plan de Gestión Ambiental (P-PGA), las matrices de impacto ambiental, la información complementaria junto con el Documento DI, podrán ser sancionados de conformidad con lo establecido en el artículo 99 de la Ley Orgánica de Ambiente, así como la demás legislación vigente.
QUINTO: Comunicar al interesado que, de conformidad con los artículos 17,18 y 19 de la Ley Orgánica del Ambiente, se ha cumplido con el procedimiento de evaluación ambiental del proyecto que tiene las siguientes características; Nombre Proyecto: Condominio DI” No. Exp: 18944-2016-SETENA Ubicación: Provincia: San José Cantón; San José Distrito: Carmen Hoja Cartográfica: ABRA. Escala 1: 50 000 Coordenadas: 493.192,63 E y 1.098.268,97 N. No. De Plano Catastrado: SJ-1889650-2016. Número de Finca: 1-673031-000. Descripción del Proyecto: Consiste en la construcción de un complejo de 3 edificios de apartamentos en 10 niveles y dos niveles de sótanos, los sótanos y el nivel principal serán para espacios de estacionamientos, mientras que los 9 niveles restantes serán para los apartamentos, en el nivel principal también se ubicarán locales comerciales. En total se plantea el desarrollo de 323 apartamentos, así como 352 espacios para estacionamientos.
El área de construcción total será de 34.724m^; mientras que el área de cobertura será de 3.750m^: en un terreno con un área total de 12.282m^, para un porcentaje de cobertura del 30%. El proyecto, además, incluye un área libre de 8532m^ de áreas verdes y superficies permeables, plazas abiertas a locales comerciales, áreas comunes y recreativas, áreas de juegos infantiles, áreas de estar y terrazas. El proyecto contará con todos los servicios básicos: Las aguas residuales serán tratadas mediante planta de tratamiento. Los desechos sólidos serán recolectados por la Municipalidad de San José. Las aguas pluviales serán descargadas a un canal pluvial. El agua potable será suministrada por el Acueductos y alcantarillados (AyA). El servicio de electricidad será suministrado por será brindado por CNFL. Por lo que se le otorga la VIABILIDAD AMBIENTAL al provecto, quedando abierta la etapa de Gestión Ambiental y en el entendido de cumplir con la Cláusula de Compromiso Ambiental fundamental, indicado en el Considerando Tercero anterior.
SEXTO: La vigencia de esta viabilidad será por un período de Cinco Años para el inicio de las obras. En caso de no iniciar las actividades en el tiempo establecido, se procederá a aplicar lo que establece la legislación vigente. SÉTIMO: Prevenir al desarrollador que la viabilidad ambiental, sólo contempla lo indicado en la descripción del proyecto y el diseño presentado (que se adjunta en el Documento D1), cualquier modificación debe ser informada a la SETENA, para que realice la evaluación ambiental de dicha modificación, de lo contrario se procederá conforme a la normativa vigente. OCTAVO: Prevenir al desarrollador que de acuerdo al Artículo 11 del Decreto Ejecutivo N° 31849-MINAE-S-MOPT-MAG-MEIC—Alcance del trámite de EIA ante la SETENA, el cumplimiento del procedimiento de EIA, no lo exime del trámite a cumplir ante otras autoridades de la Administración, de conformidad con las competencias y normativa vigentes, ni de cumplir con sus obligaciones o responsabilidades que de su gestión deriven.
NOVENO: Ordenar a los desarrolladores de actividades, obras o proyectos que a partir de la resolución que otorga la Viabilidad Ambiental, se debe colocar un rótulo en la entrada del área del proyecto el cual debe cumplir con el formato establecido en la resolución N° 1834-2016-SETENA del 29 de setiembre 2016. DÉCIMO: Contra esta resolución cabe interponer dentro del plazo de tres días a partir del día siguiente a la notificación, los recursos ordinarios de revocatoria ante la SETENA, y el de apelación ante el Ministro de Ambiente y Energía, de conformidad con los artículos 342 y siguientes de la Ley General de Administración Pública y 87 de la Ley Orgánica del Ambiente. DÉCIMO PRIMERO: Toda documentación que sea presentada ante la SETENA deberá indicarse claramente el número de expediente, el número de resolución y el nombre completo del proyecto” (ver los informes rendidos y la prueba aportada).
La estructura básica del Plan de Medidas Compensatorias a presentar es: 1. Portada, 2. Introducción, 3. Objetivos (Objetivo General y Objetivos Específicos), 4. Propuesta, descripción de la propuesta 5. Localización Administrativa y coordenadas de CRTM 05, donde se desarrollará en Plan de Compensación, 6. Antecedentes, 7. Población meta (deberá incluir información básica: cédula jurídica, representante legal, dirección, teléfonos, faxes), 8. Propuesta a implementar en el Plan de Compensación (que se pretende realizar p.e. Ayudas a la Sociedad Civil o Centros Educativos, Programas de Educación Ambiental, etc.). 9. Cronograma actividades, 10. Costo de la (s) obra (s) a realizar, 11. Resultados, 12. Otros (queda a criterio de la profesional responsable de realizar el Plan de Compensación y Desarrollador, si desean agregar más componentes). Nota: El Plan de Compensación se deberá presentar con la firma del desarrollador y del profesional responsable del proceso de EIA.
El desarrollador deberá presentar el Plan de Medidas de Compensación de manera escrita y digital con la firma del mismo (en forma individual) y del profesional responsable del estudio presentado. Se deberá presentar a SETENA en un plazo máximo de 30 días naturales; una vez que sea aprobado, podrá implementarse. El plazo fijado para la presentación empezará a regir a partir del día siguiente hábil de notificada esta resolución. Una vez que sea llevado a cabo, deberá presentarse ante esta Secretaría la evidencia documental y fotográfica de la ejecución de las acciones propuestas. El plan deberá ir direccionado al área ambiental o al área Social de la vecindad del proyecto, y debe cumplir con el formato establecido en el Acuerdo Nº CP-042-2011- SETENA. SEGUNDO: Ordenar al “Desarrollador” que, presente en un plazo de 10 días hábiles: a. Nombramiento de la responsabilidad ambiental del proyecto. b. Aceptación de la nueva responsabilidad ambiental. c. Habilitar la bitácora ambiental del proyecto.
TERCERO: Ordenar al desarrollador del proyecto proceder de inmediato a presentar el comprobante de renovación de la Garantía Ambiental. De acuerdo a la ciencia y la técnica se fija un plazo razonable de 30 días hábiles, contados a partir del día hábil siguiente de la notificación de la presente resolución, para presentar el comprobante de renovación de la Garantía Ambiental. CUARTO: Advertir al “Desarrollador” que la información falsa o incumplimiento de este mandato expondrá al “Desarrollador” a un proceso de investigación técnica y legal. QUINTO: Contra esta resolución cabe interponer dentro del plazo de tres días a partir del día siguiente a la notificación, los recursos ordinarios de revocatoria ante la SETENA, y el de apelación ante el Ministro de Ambiente y Energía. Con fundamento legal en el artículo 342 de la Ley General Administración Pública y la Ley Orgánica del Ambiente. SEXTO: Toda documentación que sea presentada ante la SETENA deberá indicar claramente el número de expediente, el número de resolución y el nombre completo del proyecto.
También se deberá indicar una dirección de correo electrónico, para recibir notificaciones de parte de esta Secretaría. SÉTIMO: Los documentos originales firmados digitalmente (Firma Digital) estarán a disposición del interesado en la dirección web https://tramites.setena.go.cr donde debe ser verificado por cualquier interesado e instancia pública o privada. OCTAVO: De conformidad con el artículo 8 de la Ley 8220, no podrá solicitarse al interesado que requiera un trámite la presentación de certificaciones, copias de información que ya posea otra institución, según los medios legales preestablecidos. NOVENO: El resultado de la discusión y análisis del caso de marras es: 5 a favor, 0 en contra, 1 inhibido y 1 ausentes, el detalle de la información de dicha votación puede ser consultada en el acta correspondiente, la cual se encuentra en custodia de esta Secretaría y es de acceso público” (ver los informes rendidos y la prueba aportada).
- Sobre la denuncia interpuesta ante la Secretaría Técnica Ambiental:
Actualmente no hay ninguna edificación construida. (ver foto 1) (…) El terreno donde se pretende construir los edificios, es un inmueble que está completamente mecanizado desprovisto de vegetación, en la parte central del terreno hay una pequeña depresión que es por donde supuestamente discurre la quebrada los Negritos, sin embargo, no se observa agua que corra, ya que al parecer se encuentra entubada y no se puede precisar por donde va la misma. (ver foto 2) (…) Durante la inspección, no se encontró presencia de personas en la propiedad, ni se identificó maquinaria trabajando o estacionada en el lugar. Del mismo modo, no fue posible establecer el momento en que se llevó a cabo la mecanización del terreno. Para determinar una posible invasión del área de protección de la quebrada Los Negritos se debería tener muy claro por donde pasa exactamente en cuerpo de agua, lo que es imposible determinar en este caso, ya que la misma supuestamente va entubada en este sector y no se puede observar el curso de la misma.
Es importante tener claro por donde pasa exactamente la quebrada Los Negritos en este sector, propiamente por donde cruza en esta propiedad, para poder determinar el área de protección de dicha quebrada, aunque esta se encuentre entubada, esto antes de inicien la construcción de las obras y que se tenga delimitado dicha área de protección de acuerdo a lo que se establece en el artículo 33 de la ley forestal N° 7575. Conclusiones y / o Recomendaciones: Se realiza inspección de campo a solicitud de la SETENA, para determinar una posible invasión del área de protección de la quebrada Los Negritos, en donde se construirán tres edificios de apartamentos denominado Condominio DI Escalante Verde S.A. En el sitio aún no han iniciado la construcción de edificaciones, más lo que existe y se observa es un terreno ampliamente mecanizado para la construcción de infraestructuras. No se observa el curso del agua de la quebrada Los Negrito ya que la misma se encuentra entubada por lo que se dificulta determinar el área de protección de la misma debido a que no se observa por donde discurre la misma.
En importante que el desarrollador del proyecto delimite el área de protección de la quebrada Los Negritos en este sector y que esta sea marcada en campo de manera visible, antes que se inicien cualquier tipo de obra, ya sea constructiva o de movimiento de tierra. Que para determinar con exactitud el área de protección de la quebrada Los Negritos en este sector y que pueda ser demarcada en campo antes que se inicien las obras, que la Dirección de Aguas ubique dicho cuerpo de agua por donde cruza exactamente ya que es el ente regulador en esta materia. Comunicar a la SETENA de los alcances de la inspección realizada para este tome las medidas necesarias para la protección del cuerpo de agua presente en el lugar” (ver los informes rendidos y la prueba aportada).
Técnicamente, al existir las capas de la CNE en la actualidad y al verificar que si existe riesgo de inundación, se deberá solicitar el segmento B de hidrología y las medidas para mitigar esta amenaza, lo que probablemente afectará el diseño de sitio” (ver los informes rendidos y la prueba aportada).
Por lo que, en campo se corroboró la existencia de la quebrada en las propiedades de interés mediante dos pozos de observación del cauce entubado, localizados en las coordenadas con proyección CRTM05 (tomadas con precisión de ± 1 m en la segunda inspección), latitud: 1098856 y longitud: 493184 (pozo 1), y, latitud: 1098910 y longitud: 493146 (pozo 2). En la Figura 1 se muestran fotografías de los pozos de observación (…) Posteriormente por medio de la revisión de gabinete, se comprobó que la ubicación de tales pozos de observación coincide aproximadamente con el trayecto expuesto en la hoja cartográfica escala 1: 5000 del Sistema Nacional de Información Territorial (SNIT). Siendo de interés el recorrido de la quebrada en la zona, con base en los pozos de observación existentes, cartografía escala 1: 5000 del SNIT, así como planos del expediente 122-O de la Dirección de Agua, se realizó una segunda inspección el 19 de junio del presente año en compañía del funcionario de la Dirección de Agua, César Sánchez, las funcionarias del Sistema Nacional de Áreas de Conservación (SINAC), Lioudmila Malomuzh y Stephanie Castillo, y los representantes del proyecto Ricardo Molina y Julio Mena, por lo que en sitio se delimitó mediante una cuerda el posible centro del cauce y también fueron tomadas las coordenadas para el trazo de la quebrada solicitado.
En dicha inspección se ubicó un tercer pozo de observación en las coordenadas con proyección CRTM05, latitud: 1098943 y longitud: 493089, así como el punto de finalización del entubado en las coordenadas, latitud: 1098990 y longitud: 493062; en la Figura 2 se muestran fotografías de lo expuesto (…) Cabe destacar que, en la primera inspección se observó la demarcación mediante estacas de la posible zona de protección de la quebrada realizada por los desarrolladores del condominio, la cual se fundamentó en el lineamiento otorgado por el Instituto Nacional de Vivienda y Urbanismo (INVU). Las estacas se encontraban distanciadas aproximadamente 24 m a lo ancho. No obstante, siendo que en campo el trayecto de la quebrada varió respecto a la demarcación seguida para tales zonas de protección marcadas, se comunicó en sitio por parte de los desarrolladores una nueva delimitación mediante equipo topográfico, la cual será comunicada tanto a la Dirección de Agua como al ente competente en el tema, el Sistema Nacional de Áreas de Conservación (SINAC), en cuanto se realice.
En la Figura 3 se demarca el trayecto solicitado como de interés de la quebrada “Negritos” (…) Además, se considera importante mencionar que, para la demarcación que se realizará de las zonas de protección respectivas, se tomará según desarrolladores, un ancho de cauce de 4 m. En el Anexo 1 se muestran fotografías de la señalización de la quebrada mediante una cuerda mencionada anteriormente” (ver los informes rendidos y la prueba aportada).
El levantamiento efectuado en campo se fundamentó en los pozos de observación existentes, cartografía escala 1: 5000 del SNIT, así como planos del expediente 122-O de la Dirección de Agua. Los pozos de observación y el final del entubamiento se ubican en las siguientes coordenadas con proyección CRTM05: - Pozo de observación 1, latitud: 1098856 y longitud: 493184. - Pozo de observación 2, latitud: 1098910 y longitud: 493146. - Pozo de observación 3, latitud: 1098943 y longitud: 493089. - Final de la tubería, latitud: 1098990 y longitud: 493062. En la Figura 1 se muestran fotografías de los pozos de observación existentes en sitio y del final del entubamiento de la quebrada (…) De las coordenadas tomadas en campo basadas en el trazo realizado, en la Figura 2 se muestra el trayecto estimado de la quebrada “Negritos” en la zona de interés (…) Tal y como se expresó en sitio por parte de los desarrolladores, siendo que la demarcación de las estacas de la zona de protección varió por el trayecto de la quebrada trazado, se realizará una nueva delimitación mediante equipo topográfico, la cual será comunicada tanto a la Dirección de Agua como a su representada como ente competente en el tema, en cuanto se realice (…) Además, se considera importante mencionar que, para la demarcación que se realizará de las zonas de protección respectivas, se tomará según desarrolladores, un ancho de cauce de 4 m. En la Figura 3 se muestran fotografías de la señalización de la quebrada mediante una cuerda efectuada en campo (…) Sin más que agregar, se le informa lo anterior para que se realice lo que corresponda” (ver los informes rendidos y la prueba aportada).
En la inspección participaron los Ing. Rosibel De Los Angeles Solano y César Sánchez Vega, funcionarios de Dirección de Aguas, MINAE, también los representantes del proyecto constructivo Ricardo Molina Quirós y Julio Mena. Los funcionarios del Dirección de Aguas, MINAE procedieren con demarcación del área protección de la quebrada de los Negritos intubada, como ente competente en la materia. Conclusiones y / o Recomendaciones: Se realiza acompañamiento a los funcionarios de Dirección de aguas, MINAE, en inspección con objetivo de establecer y delimitar en el campo el centro del cauce intubado de la quebrada Los Negritos. Solicita enviar el informe correspondiente a la oficina, como verificador y instrumento de aplicación del estudio técnico realizado, para que corresponde” (ver los informes rendidos y la prueba aportada).
La presencia de fallas cercanas potencialmente generadoras de sismos fuertes es un factor importante a tomar en cuenta para el adecuado diseño de cimientos y de las estructuras, todo de acuerdo al Código Sísmico y de Cimentaciones de Costa Rica. En general se considera que el terreno presenta condiciones adecuadas de estabilidad para las obras propuestas. La topografía y la esperada fitología subyacente favorecen la estabilidad del suelo, el estudio del subsuelo sirve para verificar la idoneidad de los materiales subyacentes. No hay potencial de que el AP sufra los efectos de licuefacción, lo anterior decido a la naturaleza cohesiva de los fimos y arcillas del subsuelo” (ver los informes rendidos y la prueba aportada).
Presentar la solicitud de modificación de proyecto debidamente firmada por el desarrollador del proyecto. 2. Actualizar la descripción de proyecto respetando el área de protección de la Quebrada Los Negritos que se encuentra entubada, de conformidad con lo establecido en la legislación vigente establecida, artículos 33 y 58 de la Ley Forestal, incorporando esta área como área libre de obras. 3. Presentar un diseño de sitio actualizado, en el que se contemplen el alineamiento otorgado por el Instituto Nacional de Vivienda y Urbanismo (INVU), así como el trayecto de la quebrada Los Negritos determinado por la Dirección de Agua mediante criterio N° DA-UHTPCOSJ-1598-2025 y lo establecido en la legislación vigente establecida, artículos 33 y 58 de la Ley Forestal. 4. Presentar el archivo shape file actualizado con el ajuste al diseño de sitio del proyecto requerido y con la respectiva delimitación de la zona de protección de la quebrada Los Negritos. 5.
Actualizar las medidas ambientales para la fase constructiva del proyecto debiendo considerar el resguardo del área de protección de la Quebrada Los Negritos que se encuentra entubada, de conformidad con lo establecido en la legislación vigente establecida, artículos 33 y 58 de la Ley Forestal. TERCERO: Notificar a la Municipalidad de San José para que se proceda según corresponda con sus competencias. CUARTO: Contra esta resolución cabe interponer dentro del plazo de tres días a partir del día siguiente a la notificación, los recursos ordinarios de revocatoria ante la SETENA, y el de apelación ante el Ministro de Ambiente y Energía. Con fundamento legal en el artículo 342 de la Ley General Administración Pública y la Ley Orgánica del Ambiente QUINTO: Toda documentación que sea presentada ante la SETENA deberá indicar claramente el número de expediente, el número de resolución y el nombre completo del proyecto.
También se deberá indicar una dirección de correo electrónico, para recibir notificaciones de parte de esta Secretaría. SEXTO: Los documentos originales firmados digitalmente (Firma Digital) estarán a disposición del interesado en la dirección web https://tramites.setena.go.cr donde debe ser verificado por cualquier interesado e instancia pública o privada. SETIMO: De conformidad con el artículo 8 de la Ley 8220, no podrá solicitarse al interesado que requiera un trámite la presentación de certificaciones, copias de información que ya posea otra institución, según los medios legales preestablecidos. OCTAVO: El resultado de la discusión y análisis del caso de marras es: 5 a favor, 0 en contra, 1 INHIBIDO y 1 ausentes, el detalle de la información de dicha votación puede ser consultada en el acta correspondiente, la cual se encuentra en custodia de esta Secretaría y es de acceso público. NOVENO: Para recibir notificaciones el Desarrollador y Responsable Ambiental y denunciante han indicado en el expediente los correos electrónicos: [email protected] / [email protected] / [email protected] / [email protected] / [Nombre 004]@gmail.com / [email protected] / Municipalidad de San José: [email protected] / [email protected]”. Dicha resolución le fue comunicada a las partes, incluida el denunciante, el 13 de agosto de 2025 (ver los informes rendidos y la prueba aportada).
aa) Actualmente, no existen otras denuncias en curso ante la Secretaría Técnica Nacional Ambiental respecto a este proyecto (ver los informes rendidos y la prueba aportada).
- Sobre el permiso de construcción otorgado por la Municipalidad de San José:
bb) El 01 de noviembre de 2021, el representante de Di Escalante Verde S.A. presentó, a través de la Plataforma Digital APC, una solicitud de permiso de construcción ante la Municipalidad de San José (ver los informes rendidos y la prueba aportada).
- Sobre la denuncia presentada en la Municipalidad de San José:
dd) El 01 de abril de 2025, mediante oficio no. SPC-153-2025 del 31 de marzo de 2025, el jefe de la Sección de Permisos de Construcción de la Municipalidad de San José le comunicó al recurrente lo siguiente: “En atención al oficio CM-PFA-031-2025 referente al proyecto DI ESCALANTE VERDE S.A. me permito referirme a las distintas inquietudes que se mencionan según la información y gestión realizada ante la dependencia que represento. Cuestionamientos planteados. - Según los documentos y mapas de película ahorita el terreno en cuestión está clasificado como áreas verdes recreativas y comunales (AVRC) y áreas públicas (APU) además de contar con un cuerpo de agua entubado, En este sentido me preocupar que se haya otorgado un permiso de construcción en dicha zona, ya que existen regulaciones claras que restringen este tipo de desarrollos con áreas con estas características. R/ El área de permisos de construcción desconoce el tema en cuestión, dado que los dos certificados de usos de suelo presentados aportados para la obtención de dicha licencia (CUS 519199 y CUS 50322020) presentan una zonificación Zona Residencial-1 y no de área verde recreativa y comunal • En lo concerniente al ART. 33 DE LA Ley Forestal, así como lo relacionado al tema ambiental y márgenes de protección emitidos para dicho proyecto indico.
R/ En lo concerniente a las variables ambientales planteadas en su nota, me pernito indicar que existe un gran desconocimiento de la gestión propia del área de construcción, quien vela por el fiel cumplimiento de requisitos, así como de las responsabilidades propias de cada institución involucrada a la hora de emitir una licencia constructiva; pues en este caso es SETENA quien ente rector en materia ambiental, validó el planteamiento presentado por el grupo desarrollador de los trabajos a realizar, medidas de mitigación, etc.; todo ello, sin dejar de lado los trabajos do conexión y entubado pendiente que ha solicitado el propio AyA (dado que hace más de una década se realizó esté trabajo de manera parcial por el propia municipio, presentando actualmente una escorrentía de aguas negras al aire libre). Por otra parte, es necesario reafirmar que los parámetros mencionados en relación con la zona de protección por parte del Reglamento de Desarrollo Urbano han sido cubiertos por el profesional responsable de la regencia ambiental, así como por la fe pública que emite el topógrafo adscrito al proyecto.
Por lo tanto, los aspectos de gradientes o pendientes, así como margen de la zona de protección son aspectos propios de autorizar por La Secretaria Técnica Nacional y no de esta dependencia. En lo que respecta a las obras a realizarse sobre la zona de protección, esta dependencia recuerda que es propiamente el AYA quien ha solicitado y aprobado la propuesta de entubamiento generada por el desarrollador. De igual manera, la licencia de construcción cuenta con el aval de la oficina do Red Pluvial Municipal, aspectos que son requisito básico para la aprobación de cualquier permiso constructivo. Por lo tanto, como jefatura del Área de Permisos de Construcción puedo indicar que los aspectos concernientes al cumplimiento de requisitos para la obtención de la licencia constructiva del proyecto Escalante Verde, así como otros en la zona han sido validados y analizados a cabalidad por el equipo profesional de esta oficina” (ver los informes rendidos y la prueba aportada).
ee) Mediante oficio no. SPC-181-2025 del 24 de abril de 2025, la jefe de la Sección de Permisos de Construcción de la Municipalidad de San José le comunicó al recurrente lo siguiente: “En atención a su consulta referente a la vigencia del Permiso de Construcción número 067-2022_CFIA-920253, correspondiente al proyecto Condominio Vertical Residencial Di Escalante Verde, me permito informarle lo siguiente: Según lo establecido en el artículo 19 del Plan Regulador de San José RDU, relativo a la vigencia de las licencias, se indica lo siguiente: 19.1 Las licencias para demolición, movimiento de tierras, construcción y otras (como urbanizaciones, fraccionamientos y proyectos de condominios) tendrán una vigencia de un año para iniciar la obra, contado a partir de su otorgamiento. a. Si transcurrido un año desde la emisión de la licencia no se ha iniciado la obra, y aún se desea ejecutarla, se deberá solicitar una nueva licencia cumpliendo con todos los procedimientos y requisitos legales correspondientes. b. Si la obra inicia dentro del primer año y continúa de manera ininterrumpida, la vigencia del permiso se extiende automáticamente a tres años, sin necesidad de una prórroga. c. Si la obra se abandona por más de un año se deberá tramitar una nueva licencia, ajustando al proyecto a la normativa urbanística vigente al momento de la nueva solicitud. d. El administrado pude resellar le licencia vigente hasta tres veces por un año cada una, sin costo, siempre que lo solicite antes del vencimiento de la misma. e. Una vez otorgada la licencia municipal, no se permiten modificaciones dentro del mismo trámite.
En caso de requerir cambios, se deberá solicitar una nueva licencia conforme a la normativa aplicable. De acuerdo con lo registrado en la bitácora digital, el profesional responsable de la obra, Arq. Ricardo Molina, se indicó que los trabajos dieron inicio el día 31 de enero de 2024, específicamente con labores de movimiento de tierras, entro otras actividades descritas por el profesional encargado (…) Adicionalmente, el Inspector Municipal asignado al sector ha realizado visitas periódicas al sitio como parte del control de seguimiento del permiso aprobado, las cuales han quedado debidamente documentadas en la hoja de control de ejecución de obras, donde de igual manera se registra que la fecha de inicio de obras fue el 31/01/2024 (…) En conclusión, según se ha podido constatar con base en los registros oficiales y la bitácora digital del proyecto, la vigencia del permiso de construcción se encuentra plenamente a derecho, y no ha vencido, como erróneamente se ha interpretado.
Esto en virtud de que las obras dieron inicio dentro del plazo establecido de un año a partir de la emisión del permiso, lo cual extiende automáticamente su vigencia a tres años, conforme a lo dispuesto en el artículo 19 del Plan Regulador de San José RDU” (ver los informes rendidos y la prueba aportada).
ff) El 28 de mayo de 2025, los recurrentes presentaron una solicitud de Procedimiento Administrativo y Medidas Cautelares-Permiso de Construcción no. 067-2022_CFIA-920253 (oficio CM-PFA-057-2025), esto ante la Municipalidad de San José (ver los informes rendidos y la prueba aportada).
gg) Mediante oficio MSJ-ALCALDIA-3087-2025 del 29 de julio de 2025, el alcalde le solicitó criterio a la gerente de Gestión Municipalidad respecto a dicha denuncia (ver los informes rendidos y la prueba aportada).
hh) A las 10:53 horas del 05 de junio de 2025, se notificó la resolución de curso a la Municipalidad de San José (ver acta de notificación).
Lo que se muestra en el expediente es una Constancia de Capacidad de Recolección, la cual no constituye una autorización de construcción o interconexión. Es importante mencionar que la mencionada Constancia se emite para un total de 300 fincas filiales según plano catastro Nº 1-0923485-2004, siendo que SETENA menciona que la viabilidad ambiental se otorga para un total de 323 apartamentos. Mientras que la municipalidad en el permiso de construcción 067-2022_CFIA-920253 autoriza la construcción de 135 unidades, para un total de 13.331 m2 correspondientes a un edificio de 10 niveles. ▪ Aval de UE PAPS para la reubicación del Colector Negritos. ▪ Al momento de la aprobación de los permisos de construcción, existe un gravamen sobre la propiedad finca 498246 plano catastro SJ-923485-2004 que responde a la servidumbre de alcantarillado sanitario. Surge la duda sobre la viabilidad de otorgar una licencia de construcción en una condición donde el gravamen no ha sido formalmente levantado tanto a nivel catastral como registral.
No consta en los documentos analizados que dicho gravamen haya sido levantado o esté en proceso de resolución. ▪ Aunque el desarrollador propone la reubicación del colector de aguas negras “Los Negritos” para ser ubicado de forma paralela al entubamiento de la quebrada y al ser esta una obra en cauce, no se encontró Visto Bueno o aprobación escrita de la Dirección de Aguas del MINAE para estos trabajos, únicamente se observa el nuevo trazado en los planos constructivos. Al respecto se remitió consulta mediante oficio GGMDU-0230- 2025 al ingeniero José Miguel Zeledón Calderón, Director de la Dirección de Aguas, cuya respuesta aún se encuentra pendiente. ▪ Memoria de cálculo del movimiento de tierra, así como definir la disposición, posibles impactos y las respectivas medidas de mitigación. ▪ Estudio geotécnico que demuestre la aptitud urbanística según lo establecido en el inciso 10.3.5 Zonas Sujetas a Estudio, de los Reglamentos de Desarrollo Urbano Vigentes en el momento de la aprobación del permiso de construcción. ▪ Al respecto de la zonificación con base a la cual se otorgó el permiso de construcción, es importante señalar que los Reglamentos de Desarrollo Urbano vigentes (2014) al momento de la aprobación del permiso de construcción, indican que parte de la zona donde se ubica el proyecto se identifica como zona con riesgo moderado a deslizamientos y susceptible a inundación (mapa de zonas de amenaza a deslizamientos e inundaciones).
Afectación que no sufrió variación respecto de la actualización de los Reglamentos de Desarrollo Urbano del 2023 y vigentes a la fecha. Esta zonificación indica que, en estas zonas sujetas a estudio, deben realizarse los análisis requeridos que demuestren su aptitud urbanística. En virtud de lo anterior esta Gerencia considera necesario revisar el proceso de tramitación y aprobación del permiso de construcción del proyecto Di Escalante Verde, por lo que se recomienda el estudio pormenorizado de lo actuado por la administración incluyendo las consultas que sean pertinentes tanto a las instituciones, como al desarrollador, a efectos de determinar la pertinencia para la continuidad de las obras en función del interés común, la protección del ambiente y la calidad de vida de las personas de la comunidad de Barrio Escalante y alrededores” (ver los informes rendidos y la prueba aportada).
jj) El 21 de agosto de 2025, el recurrente presentó un adendum y recordatorio por no respuesta a su solicitud de apertura del procedimiento (art. 173 LGAP) para nulidad de Permiso No. 067-2022_CFIA_920253 (ver los informes rendidos y la prueba aportada).
kk) Mediante oficio no. GGMDU-0668-2025 del 25 de agosto de 2025, la Gerencia de Gestión Municipal y Desarrollo Urbano de la Municipalidad de San José emitió respuesta al criterio solicitado por la Alcaldía mediante oficio MSJ-ALCALDIA-3087-2025. En dicho oficio se indicó lo siguiente: “Por tanto, sobre la solicitud planteada para la apertura de un procedimiento administrativo y medidas cautelares, esta Gerencia recomienda a partir del análisis realizado que sí resulta necesario investigar las siguientes actuaciones: 1. Condicionantes incluidas en el certificado de uso del suelo del 2019. 2. Consignación del incentivo de un 30% más de Coeficiente de Aprovechamiento del Suelo (CAS), sin que este beneficio fuera recomendado por la Comisión de Repoblamiento y sin el sustento técnico o legal de los Reglamentos de Desarrollo Urbano, dado que ese beneficio no aplica en la zonificación asociada a la propiedad donde se construye el proyecto.
Omisión-de fiscalización de las obras de movimiento de tierra autorizadas y ejecución de obres en cauce afectando la topografía, la cobertura vegetal, sin presentarse las denuncias ante la SETENA u otras instancias”. Así, esa Gerencia elaboró un criterio técnico-administrativo mediante el oficio GGMDU-0668-2025, relacionado con el proceso de aprobación de la licencia de construcción del proyecto Di Escalante Verde, en el cual se recomendó la necesidad de investigar actuaciones específicas asociadas al trámite de la licencia otorgada con el propósito de verificar la conformidad de lo actuado con el ordenamiento jurídico aplicable, en resguardo del principio de legalidad y del interés público (ver los informes rendidos y la prueba aportada).
Debe señalarse que, al señor Guadamuz, la Sección de Permisos de Construcción le contestó una serie de consultas relacionadas con el proyecto mediante el oficio SPC-181-2025, de fecha 24 de abril de 2025, además de otros intercambios de correos electrónicos en los que se evacuaron consultas adicionales. En consecuencia, la Gerencia de Gestión Municipal y Desarrollo Urbano elaboró y gestionó diversos oficios ante distintas instituciones, así como brindó una respuesta integral, la cual esta Alcaldía pone en su conocimiento a continuación: (…) Por tanto, sobre la solicitud planteada para la apertura de un procedimiento administrativo y medidas cautelares, esta Gerencia recomienda a partir del análisis realizado que sí resulta necesario investigar las siguientes actuaciones: 1. Condicionantes incluidas en el certificado de uso del suelo del 2019. 2. Consignación del incentivo de un 30% más de Coeficiente de Aprovechamiento del Suelo (CAS), sin que este beneficio fuera recomendado por la Comisión de Repoblamiento y sin el sustento técnico o legal de los Reglamentos de Desarrollo Urbano, dado que ese beneficio no aplica en la zonificación asociada a la propiedad donde se construye el proyecto. 3.
Omisión de fiscalización de las obras de movimiento de tierra autorizadas y ejecución de obras en cauce afectando la topografía, la cobertura vegetal, sin presentarse denuncias ante la SETENA u otras instancias. En virtud de lo anterior, esta Alcaldía da por atendido lo solicitado en el oficio CM-PFA-057-2025, reiterando que se han identificado aspectos que requieren investigación administrativa y la adopción de medidas correctivas. Asimismo, se confirma la disposición de esta Municipalidad para dar seguimiento a las actuaciones pendientes y garantizar que todo el proceso relacionado con el proyecto DI Escalante Verde se ajuste al marco legal vigente, en estricto apego a los principios de transparencia, legalidad y protección del interés público. En consecuencia, se reitera el compromiso de la Alcaldía de atender con la mayor seriedad y transparencia las inquietudes planteadas en torno a este proyecto.
Finalmente, se deja constancia de que el canal oficial para la atención de solicitudes de información o remisión de oficios es el correo electrónico alcaldí[email protected], siendo el único medio institucional habilitado en la Alcaldía, para tales efectos”. Lo anterior, le fue comunicado al recurrente el 26 de agosto de 2025 (ver los informes rendidos y la prueba aportada).
- Sobre la denuncia penal interpuesta:
mm) El 10 de junio de 2025, Ariel Robles Barrantes, en su condición de diputado de la República, interpuso una denuncia penal ante la Fiscalía Adjunta Agrario Ambiental por usurpación de bienes de dominio público, en donde se indicó lo siguiente: “1. Que, dentro del inmueble matrícula San José-449735-000, propiedad de la empresa DI ESCALANTE VERDE SOCIEDAD ANONIMA, cédula jurídica 3-101- 765846, se desarrolla el proyecto CONDOMINIO DI. (Ver Prueba número 2 y resolución número 1148-2019-SETENA). 2. Que según la resolución número 1148-2019-SETENA, emanada del expediente D1-18944-2016-SETENA, se reconoce la existencia de un cauce de dominio público dentro del proyecto: “Cuerpos de agua superficiales: Se observa aproximadamente a la mitad de la propiedad del AP una depresión natural, que según información de los desarrolladores es el antiguo cauce de la Quebrada Los Negritos.” (resaltado es propio).
(Ver resolución número 1148-2019-SETENA). 3. Que una vez consultado el Sistema Nacional de Información para la Gestión Integrada del Recurso Hídrico (SINIGIRH), la quebrada los negritos atraviesa el proyecto a desarrollar. (Ver prueba número 3). 4. Que según el Sistema Nacional de Información Territorial (SNIT), dentro del inmueble matrícula San José-449735-000, existe el cauce de la quebrada Los Negritos. (Ver prueba número 4). 5. Que mediante resolución número 682-2018-SETENA, dentro del expediente D1-18944-2016-SETENA, se otorga Viabilidad Ambiental al proyecto, sin contar con información precisa de los límites reales del cauce de dominio público de la quebrada los negritos que fue entubada o alcantarillada en ese sector, siendo el proyecto por construir, sin definir el cauce público, el siguiente: (…) 6. En ese orden de ideas, y al ser evidente de que un cauce de dominio público no desaparece por haberse alcantarillado o entubado, el proyecto CONDOMINIO DI, podría estar siendo construido en todo o en parte sobre el cauce de dominio público de la Quebrada Los Negritos. 7.
Que con fecha 10 de junio de 2025, se constató la presencia de maquinaria perteneciente a una empresa constructora realizando movimientos de tierra en un sector que aparenta coincidir con el cauce de dominio público de la Quebrada Los Negritos. (Ver prueba número 5) (…) V. PETITORIA A. Se investigue por parte de esta Fiscalía los hechos señalados, así como la responsabilidad de las personas que también aquí se mencionan por los posibles delitos ambientales indicados anteriormente, o bien, por cualquier otra calificación jurídica que este ente acusador determine. VI. PETITORIA CAUTELAR A. En virtud de que en el lugar denunciado se encuentran realizando a la fecha movimientos de tierra en el área señalada, solicitamos de la manera más atenta que de conformidad al Principio 15 (principio precautorio) de la Declaración de Río sobre el Medio Ambiente y el Desarrollo artículo, artículo 50 de nuestra Constitución Política, artículo 11 de la Ley de Biodiversidad y el artículo 140 del Código Procesal Penal, se proceda a solicitar medidas de paralización de obras y/o movimientos de tierra, en aras de evitar daños graves e irreversibles en el medio ambiente del lugar señalado, así como la demolición de las estructuras que no cuenten con los permisos correspondientes.
B. Además, se solicita la anotación en el Registro Nacional Público la presente causa en el inmueble matrícula San José-449735-000 y demás inmuebles del proyecto por donde transcurra el cauce de dominio público de la quebrada Los Negritos, para evitar distracciones en terceros de Buena Fe y asegurar una reparación integral del daño ambiental correspondiente”. Esa denuncia penal se tramita en el expediente no. 25-000021-611-PE (ver los informes rendidos y la prueba aportada).
nn) Mediante informe de gira No. SINAC-ACC-OSJ-inf-0074-2026 del 15 de enero de 2026, la oficina Subregional de San José del Sistema Nacional de Áreas de Conservación estableció lo siguiente: “(…) Informe de gira DPE-OFI-1682-2025 Exp 25-21-611-PE. Fecha de gira: 14 de enero del 2026 (…) Descripción de Resultados: Se realizó visita al sitio indicado, en atención a oficio DPE-OFI-1682-2025 Exp 25-21-611-PE de la Procuraduría General de la República en el cual solicitan investigación por el delito de Invasión en área de protección y conforme a los daños se remita Valoración Económica del Daño Ambiental. Según Exp. D1-18944-2016, el sitio de inspección pertenece a Di Escalante Verde S.A Cédula jurídica 3-101-765846, planos catastrados SJ-923485-2004 y SJ-0668597-2000. Antecedentes El día 25 de abril de 2025, mediante informe número SINAC-ACC-OSJ-inf-0498-2025 y ante solicitud a oficio SETENA-SG-0399-2025 y según inspección realizada el día 22 de abril de 2025 se concluye lo siguiente: • Se realiza inspección de campo a solicitud de la SETENA, para determinar una posible invasión del área de protección de la quebrada Los Negritos, en donde se construirán tres edificios de apartamentos denominado Condominio DI Escalante Verde S.A. • En el sitio aún no han iniciado la construcción de edificaciones, más lo que existe y se observa es un terreno ampliamente mecanizado para la construcción de infraestructuras. • No se observa el curso del agua de la quebrada Los Negritos ya que la misma se encuentra entubada por lo que se dificulta determinar el área de protección de la misma debido a que no se observa por donde discurre la misma. • En importante que el desarrollador del proyecto delimite el área de protección de la quebrada Los Negritos en este sector y que esta sea marcada en campo de manera visible, antes que se inicien cualquier tipo de obra, ya sea constructiva o de movimiento de tierra. • Que para determinar con exactitud el área de protección de la quebrada Los Negritos en este sector y que pueda ser demarcada en campo antes que se inicien las obras, que la Dirección de Aguas ubique dicho cuerpo de agua por donde cruza exactamente ya que es el ente regulador en esta materia.
El día 06 de junio de 2025 mediante CARTA-SINAC-ACC-OSJ-699-2025, la jefatura de la oficina Subregional de San José del ACC, solicita a la Dirección de Aguas inspección en conjunto para ubicar el cauce natural de la Quebrada Los Negritos para determinar con exactitud el área de protección del cuerpo de agua, antes de que se inicien cualquier tipo de obra, ya sea constructiva o de movimiento de tierra. El día 23 de junio de 2025 según informe DA-UHTPCOSJ-1614-2025, funcionaros de la Unidad Hidrológica Tárcoles-Pacífico Central de la Dirección de Agua del MINAE comunican a la oficina subregional de San José del Área de Conservación Central la delimitación mediante una cuerda del posible centro del cauce y coordenadas para el trazo de la quebrada los Negritos en gabinete, además indican que el levantamiento en campo se fundamentó en los pozos de observación existentes, cartografía escala 1:50000 del SNIT, así como planos del expediente 122-O de la Dirección de Agua.
Se indica que siendo que la demarcación de las estacas de la zona de protección varió por el trayecto de la quebrada trazado, se realizará una nueva delimitación mediante equipo topográfico. Además, se indica que se tomará un ancho de cauce de 4metros. Observaciones El día 14 de enero de los corrientes nos apersonamos al lugar de los hechos, una vez en el lugar nos identificamos como funcionarios del MINAE-SINAC ante un encargado del área de acceso al inmueble, mismo que una vez que consulta con sus superiores nos permite el acceso al lugar. En el sitio de inspección se observan tres pozos de observación del entubado del cuerpo de agua. Ver Imagen N°1. Según imagen satelital Google Earth en fecha 26 de febrero no hay alteraciones al A.P Quebrada Los Negritos. Ver Imagen N°2. Según informe SINAC-ACC-OSJ-inf-0498-2025, en fecha 22-4-2025 se observan trabajos de movimiento de tierra en el sitio de inspección.
Ver foto N°1 y 2. El en el sitio de inspección se observa una demarcación física con varillas de 1” y una malla plástica de protección en ambos lados de la ubicación sobre el cauce entubado de la Quebrada Los Negritos. En el momento de inspección no se observan trabajos en el área de protección de la Quebrada Los Negritos. Se observan trabajos de movimiento de tierra fuera del área de protección de la Quebrada Los Negritos y una regeneración natural de gramíneas en el AP del cuerpo de agua. Ver Foto N°3. Se procede a realizar un sobre vuelo con drone DJI Mavic 3 con el objetivo de obtener fotografías del recorrido entubado de la Quebrada Los Negritos y su área de protección. Se realiza un levantamiento lineal sobre la demarcación del límite del área de protección del cuerpo de agua con los siguientes puntos: Ver imagen N°3. (…) Según informe DA-UHTPCOSJ-1614-2025, de la Dirección de Agua del MINAE, realizan la delimitación mediante una cuerda del posible centro del cauce y coordenadas para el trazo de la quebrada los Negritos en gabinete, además indican que el levantamiento en campo se fundamentó en los pozos de observación existentes, cartografía escala 1:50000 del SNIT, así como planos del expediente 122-O de la Dirección de Agua.
Se indica que siendo que la demarcación de las estacas de la zona de protección varió por el trayecto de la quebrada trazado, se realizará una nueva delimitación mediante equipo topográfico. Además, se indica que se tomará un ancho de cauce de 4metros (…) Conclusiones: 1. El sitio de inspección corresponde a un proyecto de construcción de Torres de Condominio según Expediente D1-18944-2016, mismo que inició obras de movimiento de tierra entre el 27 de febrero del año 2025 y 21 de abril del mismo año. 2. Mediante informe número SINAC-ACC-OSJ-inf-0498-2025 y ante solicitud a oficio SETENA-SG-399-2025 y según inspección realizada el día 22 de abril de 2025 se concluye que en el sitio aún no han iniciado la construcción de edificaciones, más lo que existe y se observa es un terreno ampliamente mecanizado para la construcción de infraestructuras, no se observa el curso del agua de la quebrada Los Negritos ya que la misma se encuentra entubada, que el desarrollador del proyecto delimite el área de protección de la quebrada Los Negritos en este sector y que esta sea marcada en campo de manera visible, antes que se inicien cualquier tipo de obra, ya sea constructiva o de movimiento de tierra, y que la dirección de aguas ubique el cauce entubado del cuerpo de agua. 3.
Mediante CARTA-SINAC-ACC-OSJ-699-2025, la jefatura de la oficina Subregional de San José del ACC, solicita a la Dirección de Aguas inspección en conjunto para ubicar el cauce natural de la Quebrada Los Negritos para determinar con exactitud el área de protección del cuerpo de agua, antes de que se inicien cualquier tipo de obra, ya sea constructiva o de movimiento de tierra. 4. Según informe DA-UHTPCOSJ-1614-2025, la Dirección de Agua del MINAE comunican a la oficina subregional de San José del Área de Conservación Central la delimitación mediante una cuerda del posible centro del cauce y coordenadas para el trazo de la quebrada los Negritos en gabinete, además indican que el levantamiento en campo se fundamentó en los pozos de observación existentes, cartografía escala 1:50000 del SNIT, así como planos del expediente 122-O de la Dirección de Agua. Además, se indica que se tomará un ancho de cauce de 4metros. 5.
En el sitio de inspección de ubican la demarcación física del área de protección del cuerpo de agua Quebrada Los Negritos mediante varillas de construcción y malla plástica. 6. Al momento de la inspección se están realizando trabajos de movimiento de tierra fuera del área de protección de la Quebrada Los Negritos. 7. El área de protección del cuerpo de agua Quebrada Los Negritos, presenta una regeneración natural de gramíneas. 8. Según levantamiento de puntos de GPS en el campo se determina una afectación al área de protección en un área aproximada de 3748.08 m2. 9. La ley Forestal 7575 en su artículo 33 inciso b) establece como áreas de protección: “b) Una franja de quince metros en zona rural y de diez metros en zona urbana, medidas horizontalmente a ambos lados, en las riberas de los ríos, quebradas o arroyos, si el terreno es plano, y de cincuenta metros horizontales, si el terreno es quebrado”.
Recomendaciones: Se recomienda la presentación de un plan reparador ambiental del área de protección de la Quebrada Los Negritos en un área no menor de 3748.08 m2 a lo largo de los 190 metros lineales de recorrido del cauce entubado del cuerpo de agua. Presentar ante el Ministerio Público y Procuraduría General de la República Valoración Económica del daño ambiental por la afectación de área de protección de cauce de domino público en un área de 3748.08m2” (ver los informes rendidos y la prueba aportada).
oo) Mediante oficio no. CARTA-SINAC-ACC-OSJ-0097-2026 del 21 de enero de 2026, la jefa de la Oficina Subregional de San José del Sistema Nacional del Área de Conservación le comunicó a la Dirección de Derecho Penal de la Procuraduría General de la República lo siguiente: “Referencia: Expediente 25-000021-0611-PE. Asunto: Estimación del Daño o Degradación Ambiental de los Recursos Naturales (Activos del Capital Natural), solicitado por Procuraduría General de la Republica Oficio N° DPE-OFI-1682-2025. INTRODUCCION: La Estimación Económica del Daño Ambiental, se realiza con base en la información legal y técnica contenida en el siguiente documento técnico: La Estimación Económica del Daño Ambiental, se realiza con base en la información legal y técnica contenida en el siguiente documento técnico: Según el informe N° SINAC-ACC-OSJ-inf-0074-2026, de la inspección realizada el día 14 de enero, del año 2026, por Jorge Gamboa Elizondo y Randall Araya Villalobos, funcionarios de la oficina Subregional San José, se determinó, que, en la propiedad ubicada en Barrio Escalante, cantón y provincia San José, afectación del área de protección de la quebrada Los negritos: “…afectación del área de protección de cause de dominio público en un área 3748,08 m²…” Según antes mencionado el área afectada por movimientos de tierra es de 3 748,08 m², sobre esta área se realizará la estimación del daño ambiental del presente caso (…) 3-Estimación del Daño o Degradación Ambiental, por invasión, del área de protección afectada de la quebrada Los Negritos.
Para efectos de esta estimación se consideró principalmente los siguientes parámetros: la ausencia o pérdida de la cobertura vegetal forestal, los costos para su reposición o restauración por medio de una realizar las actividades para establecimiento de una plantación con especies nativas de la zona. Como no conocemos el tipo de vegetación o cobertura que tenía en su momento el área de protección la quebrada Los Negritos, en el sitio de los hechos, para efectos de establecer un monto de la estimación, se toma como base el valor del costo de la reposición para la restauración de la cobertura boscosa de las áreas de protección, que con lleven de nuevo a dar los servicios ambientales y ecosistémicos: protección de los suelos y recurso hídrico, mantener la biodiversidad, mejorar la fijación de carbono y producción de oxígeno, corredores biológicos, absorción del ruido, regulación del microclima, floculación de los sólidos en suspensión aérea, permeabilización y estabilización del suelo, entre otros servicios.
La estimación económica total del daño ocasionado en el área aproximadamente de 3748,08 m², por realizar las actividades que afectaron el área de protección de la quebrada Los Negritos. La estimación del daño ambiental se base de los costos de recuperación del sitio intervenido, más el costo social causado, medido por la pérdida de beneficios que deja de percibir la sociedad. La recuperación del ecosistema puede darse de dos formas: a) recuperación natural donde no hay intervención del hombre, más que la del monitoreo y mantenimiento; b) reforestación que tienda a una estructura del ecosistema, similar a la que existía antes de la intervención. Para este caso se utilizó el criterio de la reforestación, con un horizonte de planificación de 25 años; considerando que, a partir de la obtención de la planta de vivero en bolsita, la misma presenta un período crítico de al menos tres años a fin de que pueda desarrollarse, establecerse adecuadamente en el sitio y considerando las condiciones climáticas de la zona.
Superada esta etapa se espera que los árboles plantados lleguen hasta un estado de maduración, sabiendo que no todas las especies tienen la misma rapidez de crecimiento. Adicionalmente, la reforestación debe contar con los cuidados fitosanitarios y de ser necesario se requiere fertilización, debido principalmente a la pobreza de los suelos. 3.1. Costo de uso directo: En este sentido para el área protección afectada se estima el daño ambiental causado por valor de establecer una siembra de 387 árboles en área afectada 3748,08 m² (3X3) de especies autóctonas. Costo de un árbol es de ¢ 9 000.00* Costo total de estas actividades: ¢ 9 000.00 x 387= ¢ 3 483 000.00 * Los datos suministrados por vivero forestal “Vivero Procesa”, en la Garita de Alajuela. 3.2. Costo social. El Costo social, debe entenderse como los beneficios que dejó de percibir la sociedad por consecuencia de la afectación o ausencia de la cobertura vegetal y boscosa de las áreas de protección de una quebrada, existente en lugar de los hechos, por la no captación de dióxido de carbono, la ausencia de belleza escénica, la estabilidad del sitio, la regulación del microclima y otros.
Debido a que no tenemos elementos suficientes para valorar estos recursos y con base a la metodología del IPS oficializada, donde se ha estimado el costo social en un 30% con respecto al costo total de la estimación del daño ambiental para la recuperación del mismo. Costo social = ¢ 3 483 000.00 X 0,3 = ¢ 1 044 900.00. 3.3. Costo Total estimado: Costo de uso directo ¢ 3 483 000.00 + Costo social: ¢ 1 044 900.00= 4 527 900.00 A partir de la estimación del daño ambiental realizada dentro de nuestras competencias, se tiene como conclusión que la Estimación del Daño Ambiental es de: ¢ 4 527 900.00 (cuatro millones quinientos doscientos y siete mil novecientos colones, con cero céntimos). Conclusiones: El objetivo primordial para la Administración Forestal del Estado (AFE), como ente regulador de los recursos naturales, es que las áreas de protección deberán ser libre de las obras invasoras, para lo que se requiere la demolición de estas obras y retiro de escombros, con ello se propicie el estado idóneo para el establecimiento de cobertura forestal boscosa, para nuevamente brindar los servicios ambientales y ecosistémicos” (ver los informes rendidos y la prueba aportada).
pp) Mediante informe de gira no. SINAC-ACC-OSJ-inf-0118-2026 del 30 de enero de 2026, la oficina Subregional de San José del Sistema Nacional de Áreas de Conservación estableció lo siguiente: “Descripción de Resultados: Se realizó visita al sitio indicado, en atención a solicitud del investigador del Organismo de Investigación Judicial Randall Alexander Flores Solano en colaboración de causa Expediente 25-000021-611-PE, el sitio de inspección pertenece a Di Escalante Verde S.A Cédula jurídica 3-101-765846, planos catastrados SJ-923485-2004 y SJ-0668597-2000. En la inspección se cuenta con la participación de los señores Randall Flores Solano y Stheff Martínez Barquero, ambos funcionarios del Organismo de Investigación Judicial además de la Licda. Milena Rodríguez Garro del Ministerio Público. El en el sitio de inspección se observa una demarcación física con varillas de 1” y una malla plástica de protección en ambos lados de la ubicación sobre el cauce entubado de la Quebrada Los Negritos.
En el momento de inspección no se observan trabajos en el área de protección de la Quebrada Los Negritos. Se observan trabajos de movimiento de tierra fuera del área de protección de la Quebrada Los Negritos y una regeneración natural de gramíneas en el AP del cuerpo de agua (ver imagen 1). Durante la inspección se hace presente un colaborador de la empresa constructora, quien es entrevistado por la Licda Rodríguez Garro, donde le manifiesta las labores que se están desarrollando en el lugar (…) Conclusiones y recomendaciones El sitio de inspección corresponde a un proyecto de construcción de Torres de Condominio según causa Expediente 25-000021-611-PE En el sitio de inspección de ubican la demarcación física del área de protección del cuerpo de agua Quebrada Los Negritos mediante varillas de construcción y malla plástica. Al momento de la inspección se están realizando trabajos de movimiento de tierra fuera del área de protección de la Quebrada Los Negritos.
El área de protección del cuerpo de agua Quebrada Los Negritos, presenta una regeneración natural de gramíneas. Informar al Organismo de Investigación Judicial de lo visto en campo en día de inspección según lo solicitado” (ver los informes rendidos y la prueba aportada).
V.Sobre la viabilidad ambiental otorgada por la Secretaría Técnica Nacional. Después de analizar los elementos probatorios aportados, este Tribunal verifica que no ha existido violación a los derechos fundamentales de los recurrentes en cuanto a este extremo. Lo anterior, porque en los informes rendidos por los representantes de las autoridades recurridas -que se tiene por dado bajo fe de juramento con las consecuencias, incluso penales, previstas en el artículo 44 de la Ley que rige esta Jurisdicción- y la prueba aportada para la resolución del asunto, ha sido debidamente acreditado que el 14 de diciembre de 2016, en la Secretaría Técnica Nacional Ambiental se recibió el documento de Evaluación de Impacto Ambiental (D1) “Condominio DI” presentado por el señor Arnoldo Ricardo André Tinoco– No. de Cédula: 1-0545-0969; en calidad de representante legal de la empresa [Nombre 007] - S.A - Cédula Jurídica No. 3- 101-243226., Expediente Nº D1-18944-2016-SETENA.
El 18 de octubre de 2017, funcionarios de la Secretaría Técnica Nacional Ambiental realizaron una inspección de campo en el lugar, en donde se corroboraron las siguientes condiciones ambientales: “• Accesos Área de Proyecto (AP): Calle pública (dicha propiedad se ubica a unos 200 mtrs de la antigua Setena. • Topografía del terreno: plana-ondulada. • Cobertura vegetal: gramíneas y arboles aislados. • Cuerpos de agua superficiales: Se observa aproximadamente a la mitad de la propiedad del Ap una depresión natural, que según información de los desarrolladores es el antiguo cauce de la Quebrada Los Negritos”. Mediante resolución no. 682-2018-SETENA de las 07:00 horas del 17 de abril de 2018, la Comisión Plenaria de la Secretaría Técnica Nacional Ambiental resolvió lo siguiente: “En sesión Ordinaria N° 038-2018 de esta Secretaría, realizada el 16 de ABRIL del 2018, en el Artículo No. 03 acuerda: PRIMERO: Aprobar el documento de evaluación ambiental DI, la Declaración Jurada de Compromisos Ambientales (DJCA), el Pronóstico - Plan de Gestión Ambiental (P-PGA), la información técnica adicional presentada y las matrices de impacto ambiental, presentados junto al Documento DI, los cuales fueron sometidos a evaluación por el proyectista.
SEGUNDO: Ordenar al señor Amoldo Ricardo André Tinoco- No. De Cédula: 1-0545- 0969, del proyecto ““Condominio DI”; expediente administrativo DI-18944-2016- SETENA, a depositar el monto de garantía ambiental por la suma de $324 350,11 (Trescientos Veinti y Cuatro Mil Trescientos Cincuenta con 11 centavos de dólares o su equivalencia en colones) (equivalente al 1% del monto de inversión total del proyecto). Las cuentas bancadas están registradas en el Banco Nacional de Costa Rica a nombre del MINAE, cédula jurídica (cédula jurídica No. 2-100-042014) (…) Nombrar un Responsable Ambiental, con su inscripción vigente en el Registro de Consultores de la SETENA, mediante el envío de una nota firmada por el propietario con la aceptación del profesional asignado y presentar un Libro de Actas para habilitarlo como Bitácora, la misma deberá permanecer en las instalaciones del proyecto durante el tiempo de vigencia de la regencia ambiental, antes del inicio de las obras, debiendo presentar los documentos indicados a esta Secretaría en ese mismo plazo.
En caso de no presentar los documentos indicados en el tiempo establecido, se procederá a aplicar lo que establece la legislación vigente. TERCERO: Con base en las características ambientales del AP y su interacción con las actividades que realizará el proyecto, la Comisión Plenaria, establece la periodicidad de presentación de informes regenciales, cada SEIS meses durante la fase constructiva y un informe final consolidado. Los informes regenciales deberán ser presentados en un plazo máximo de 10 días posteriores a la finalización del periodo que cubren. En el momento de iniciar actividades se inicia el periodo del primer informe de regencia ambiental. Para la elaboración de estos informes, de acuerdo al formato establecido por esta Secretaría, será responsabilidad del regente ambiental realizar el número de visitas necesarias, dependiendo de las características del proyecto. Con base en estos informes y al programa de monitoreo, la SETENA podrá ajustar el monto de garantía y dictar medidas de acatamiento obligatorio para mantener al proyecto, obra o actividad dentro de un margen de impacto ambiental controlado.
El responsable y el propietario deberán brindar apoyo a las labores de la SETENA, en las inspecciones que esta efectúe. CUARTO: El incumplimiento de los requerimientos de esta Secretaría, así como de cualquiera de las obligaciones contraídas en la Declaración Jurada de Compromisos Ambientales, el Pronóstico - Plan de Gestión Ambiental (P-PGA), las matrices de impacto ambiental, la información complementaria junto con el Documento DI, podrán ser sancionados de conformidad con lo establecido en el artículo 99 de la Ley Orgánica de Ambiente, así como la demás legislación vigente. QUINTO: Comunicar al interesado que, de conformidad con los artículos 17,18 y 19 de la Ley Orgánica del Ambiente, se ha cumplido con el procedimiento de evaluación ambiental del proyecto que tiene las siguientes características; Nombre Proyecto: Condominio DI” No. Exp: 18944-2016-SETENA Ubicación: Provincia: San José Cantón; San José Distrito: Carmen Hoja Cartográfica: ABRA.
Escala 1: 50 000 Coordenadas: 493.192,63 E y 1.098.268,97 N. No. De Plano Catastrado: SJ-1889650-2016. Número de Finca: 1-673031-000. Descripción del Proyecto: Consiste en la construcción de un complejo de 3 edificios de apartamentos en 10 niveles y dos niveles de sótanos, los sótanos y el nivel principal serán para espacios de estacionamientos, mientras que los 9 niveles restantes serán para los apartamentos, en el nivel principal también se ubicarán locales comerciales. En total se plantea el desarrollo de 323 apartamentos, así como 352 espacios para estacionamientos. El área de construcción total será de 34.724m^; mientras que el área de cobertura será de 3.750m^: en un terreno con un área total de 12.282m^, para un porcentaje de cobertura del 30%. El proyecto, además, incluye un área libre de 8532m^ de áreas verdes y superficies permeables, plazas abiertas a locales comerciales, áreas comunes y recreativas, áreas de juegos infantiles, áreas de estar y terrazas.
El proyecto contará con todos los servicios básicos: Las aguas residuales serán tratadas mediante planta de tratamiento. Los desechos sólidos serán recolectados por la Municipalidad de San José. Las aguas pluviales serán serán descargadas a un canal pluvial. El agua potable será suministrada por el Acueductos y alcantarillados (AyA). El servicio de electricidad será suministrado por será brindado por CNFL. Por lo que se le otorga la VIABILIDAD AMBIENTAL al provecto, quedando abierta la etapa de Gestión Ambiental y en el entendido de cumplir con la Cláusula de Compromiso Ambiental fundamental, indicado en el Considerando Tercero anterior. SEXTO: La vigencia de esta viabilidad será por un período de Cinco Años para el inicio de las obras. En caso de no iniciar las actividades en el tiempo establecido, se procederá a aplicar lo que establece la legislación vigente. SÉTIMO: Prevenir al desarrollador que la viabilidad ambiental, sólo contempla lo indicado en la descripción del proyecto y el diseño presentado (que se adjunta en el Documento D1), cualquier modificación debe ser informada a la SETENA, para que realice la evaluación ambiental de dicha modificación, de lo contrario se procederá conforme a la normativa vigente.
OCTAVO: Prevenir al desarrollador que de acuerdo al Artículo 11 del Decreto Ejecutivo N° 31849-MINAE-S-MOPT-MAG-MEIC—Alcance del trámite de EIA ante la SETENA, el cumplimiento del procedimiento de EIA, no lo exime del trámite a cumplir ante otras autoridades de la Administración, de conformidad con las competencias y normativa vigentes, ni de cumplir con sus obligaciones o responsabilidades que de su gestión deriven. NOVENO: Ordenar a los desarrolladores de actividades, obras o proyectos que a partir de la resolución que otorga la Viabilidad Ambiental, se debe colocar un rótulo en la entrada del área del proyecto el cual debe cumplir con el formato establecido en la resolución N° 1834-2016-SETENA del 29 de setiembre 2016. DÉCIMO: Contra esta resolución cabe interponer dentro del plazo de tres días a partir del día siguiente a la notificación, los recursos ordinarios de revocatoria ante la SETENA, y el de apelación ante el Ministro de Ambiente y Energía, de conformidad con los artículos 342 y siguientes de la Ley General de Administración Pública y 87 de la Ley Orgánica del Ambiente.
DÉCIMO PRIMERO: Toda documentación que sea presentada ante la SETENA deberá indicarse claramente el número de expediente, el número de resolución y el nombre completo del proyecto”. Mediante resolución no. 1148-2019-SETENA de las 10:10 horas del 09 de abril de 2019, la Comisión Plenaria de la Secretaría Técnica Nacional Ambiental resolvió lo siguiente: “En sesión Ordinaria Nº 036-2019 de esta Secretaría, realizada el 09 de ABRIL del 2019, en el Artículo No. 16 acuerda: PRIMERO: Corregir el error de los números de planos catastrados y números de fincas descritos en la resolución Nº 0682-2018-SETENA, para que se lean correctamente de la siguiente manera: Planos Nos. SJ-0668597-2000 / SJ-923485-2004 y las Fincas Nos. 1- 449735-000 / 1-548229-000. SEGUNDO: En todo lo demás que ha contemplado la resolución No. 0682-2018- SETENA, de las 07 horas 00 minutos del 17 de abril del 2018, queda incólume y se reitera en el presente acto administrativo”.
Así, la descripción del proyecto, según la Secretaría Técnica Nacional Ambiental, es el siguiente: “Características del proyecto: Ubicación: Provincia: San José Cantón: San José Distrito: Carmen Hoja Cartográfica: ABRA. Escala 1: 50 000 Coordenadas: 493.192,63 E y 1.098.268,97 N. No. De Plano Catastrado: SJ-0668597-2000 / SJ-923485-2004 Número de Finca: 1-449735-000 / 1-548229-000 Descripción del Proyecto: Consiste en la construcción de un complejo de 3 edificios de apartamentos en 10 niveles y dos niveles de sótanos, los sótanos y el nivel principal serán para espacios de estacionamientos, mientras que los 9 niveles restantes serán para los apartamentos, en el nivel principal también se ubicarán locales comerciales. En total se plantea el desarrollo de 323 apartamentos, así como 352 espacios para estacionamientos. El área de construcción total será de 34.724m²; mientras que el área de cobertura será de 3.750m²; en un terreno con un área total de 12.282m², para un porcentaje de cobertura del 30%.
El proyecto, además, incluye un área libre de 8532m² de áreas verdes y superficies permeables, plazas abiertas a locales comerciales, áreas comunes y recreativas, áreas de juegos infantiles, áreas de estar y terrazas. El proyecto contará con todos los servicios básicos: Las aguas residuales serán tratadas mediante planta de tratamiento. Los desechos sólidos serán recolectados por la Municipalidad de San José. Las aguas pluviales serán serán descargadas a un canal pluvial. El agua potable será suministrada por el Acueductos y alcantarillados (AyA). El servicio de electricidad será suministrado por será brindado por CNFL”. Posteriormente, mediante resolución no. 0772-2025-SETENA de las 09:33 horas del 05 de junio de 2025, la Secretaría Técnica Nacional Ambiental resolvió, respecto al proyecto Condominio DI, expediente administrativo no. D1-18944-2016-SETENA, lo siguiente: “POR TANTO COMISIÓN PLENARIA RESUELVE En sesión Ordinaria Nº 027 de esta Secretaría, realizada el 05 de JUNIO de 2025, en el Artículo Nº. 004 acuerda: PRIMERO: Con base en las conclusiones del CONSIDERANDO DECÍMO Como sanción a los incumplimientos evidenciados, ordenar al desarrollador y al regente del del proyecto presentar y someter a aprobación de SETENA un Plan de Medidas de Compensación.
El Plan de Medidas de Compensación solicitado deberá contener medidas compensatorias de contenido y aplicación ambiental y social y no podrá estar contenido dentro de un informe de responsabilidad ambiental entiéndase regencia ambiental. El desarrollador debe adjuntar una Declaración Jurada de Compromisos Ambientales, en la que se compromete a cumplir a cabalidad con el plan propuesto. La estructura básica del Plan de Medidas Compensatorias a presentar es: 1. Portada, 2. Introducción, 3. Objetivos (Objetivo General y Objetivos Específicos), 4. Propuesta, descripción de la propuesta 5. Localización Administrativa y coordenadas de CRTM 05, donde se desarrollará en Plan de Compensación, 6. Antecedentes, 7. Población meta (deberá incluir información básica: cédula jurídica, representante legal, dirección, teléfonos, faxes), 8. Propuesta a implementar en el Plan de Compensación (que se pretende realizar p.e.
Ayudas a la Sociedad Civil o Centros Educativos, Programas de Educación Ambiental, etc.). 9. Cronograma actividades, 10. Costo de la (s) obra (s) a realizar, 11. Resultados, 12. Otros (queda a criterio de la profesional responsable de realizar el Plan de Compensación y Desarrollador, si desean agregar más componentes). Nota: El Plan de Compensación se deberá presentar con la firma del desarrollador y del profesional responsable del proceso de EIA. El desarrollador deberá presentar el Plan de Medidas de Compensación de manera escrita y digital con la firma del mismo (en forma individual) y del profesional responsable del estudio presentado. Se deberá presentar a SETENA en un plazo máximo de 30 días naturales; una vez que sea aprobado, podrá implementarse. El plazo fijado para la presentación empezará a regir a partir del día siguiente hábil de notificada esta resolución. Una vez que sea llevado a cabo, deberá presentarse ante esta Secretaría la evidencia documental y fotográfica de la ejecución de las acciones propuestas.
El plan deberá ir direccionado al área ambiental o al área Social de la vecindad del proyecto, y debe cumplir con el formato establecido en el Acuerdo Nº CP-042-2011- SETENA. SEGUNDO: Ordenar al “Desarrollador” que, presente en un plazo de 10 días hábiles: a. Nombramiento de la responsabilidad ambiental del proyecto. b. Aceptación de la nueva responsabilidad ambiental. c. Habilitar la bitácora ambiental del proyecto. TERCERO: Ordenar al desarrollador del proyecto proceder de inmediato a presentar el comprobante de renovación de la Garantía Ambiental. De acuerdo a la ciencia y la técnica se fija un plazo razonable de 30 días hábiles, contados a partir del día hábil siguiente de la notificación de la presente resolución, para presentar el comprobante de renovación de la Garantía Ambiental. CUARTO: Advertir al “Desarrollador” que la información falsa o incumplimiento de este mandato expondrá al “Desarrollador” a un proceso de investigación técnica y legal.
QUINTO: Contra esta resolución cabe interponer dentro del plazo de tres días a partir del día siguiente a la notificación, los recursos ordinarios de revocatoria ante la SETENA, y el de apelación ante el Ministro de Ambiente y Energía. Con fundamento legal en el artículo 342 de la Ley General Administración Pública y la Ley Orgánica del Ambiente. SEXTO: Toda documentación que sea presentada ante la SETENA deberá indicar claramente el número de expediente, el número de resolución y el nombre completo del proyecto. También se deberá indicar una dirección de correo electrónico, para recibir notificaciones de parte de esta Secretaría. SÉTIMO: Los documentos originales firmados digitalmente (Firma Digital) estarán a disposición del interesado en la dirección web https://tramites.setena.go.cr donde debe ser verificado por cualquier interesado e instancia pública o privada. OCTAVO: De conformidad con el artículo 8 de la Ley 8220, no podrá solicitarse al interesado que requiera un trámite la presentación de certificaciones, copias de información que ya posea otra institución, según los medios legales preestablecidos.
NOVENO: El resultado de la discusión y análisis del caso de marras es: 5 a favor, 0 en contra, 1 inhibido y 1 ausentes, el detalle de la información de dicha votación puede ser consultada en el acta correspondiente, la cual se encuentra en custodia de esta Secretaría y es de acceso público”.
En este sentido, se constata que Secretaría Técnica Nacional Ambiental procedió a aprobar el documento de evaluación ambiental DI y demás documentos presentados junto al Documento DI del proyecto “Condominio DI”; expediente administrativo DI-18944-2016- SETENA, esto mediante resolución no. 682-2018-SETENA de las 07:00 horas del 17 de abril de 2018, la cual fue corregida por la resolución no. 1148-2019-SETENA de las 10:10 horas del 09 de abril de 2019, corrección referente a los números de planos catastrados y números de fincas descritos en dicha resolución. Asimismo, la Secretaría Técnica Nacional Ambiental le ha dado el seguimiento respectivo al proyecto, por lo que, al establecer incumplimientos evidenciados en ese seguimiento, procedió a ordenarle al desarrollador y al regente del proyecto “presentar y someter a aprobación de SETENA un Plan de Medidas de Compensación”, esto, mediante resolución no. 0772-2025-SETENA de las 09:33 horas del 05 de junio de 2025. Es decir, se reitera que SETENA sí le ha dado seguimiento al caso.
Por consiguiente, se denota que la viabilidad ambiental fue otorgada conforme a la normativa vigente, comprobándose que el proyecto cumplió con las etapas y requerimientos establecidos para la obtención de la viabilidad ambiental, además, que el estudio de impacto ambiental contempla medidas de prevención orientadas a la protección del entorno. Por último, se constata que se le ha dado el seguimiento respectivo, descartándose lesión alguna a los derechos fundamentales de los recurrentes.
Ahora bien, los recurrentes cuestionan el otorgamiento de dicha viabilidad ambiental a ese proyecto, ya que discuten que se otorgó sin tomar en cuenta aspectos relativos a la protección demanial del cauce del agua y su área de protección conforme a la normativa ambiental. Al respecto, es importante explica que recientemente este Tribunal conoció un cuestionamiento similar. Así, mediante sentencia nro. 2026-08040, de las 9:25 horas del 6 de marzo de 2026, se indicó lo siguiente:
“…En efecto, en aquel precedente el accionante cuestionó el otorgamiento de la viabilidad ambiental bajo alegatos sustancialmente vinculados con la supuesta existencia de irregularidades técnicas en el procedimiento de evaluación seguido por la SETENA, así como con la suficiencia de los estudios y valoraciones incorporados al expediente administrativo. En ese contexto, el debate planteado ante esta jurisdicción giró en torno a si la autoridad ambiental había cumplido adecuadamente con los estándares técnicos y normativos exigibles para aprobar el proyecto…
…De tal manera, con tales ejemplos se logra observar que, contrario a lo señalado por la parte accionante, sí hubo consideraciones respecto de factores que pueden ocasionar afectaciones climáticas, de manera que no es posible, en esta vía sumaria, acreditar que haya existido una absoluta omisión en cuanto a la valoración de este tipo de aspectos. Además, cabe destacar que la disconformidad con metodologías particulares que se hayan utilizado resulta un diferendo de legalidad ordinaria que deberá ventilarse ante las instancias comunes competentes. En virtud de lo expuesto, en los términos formulados por la recurrente no es posible en este momento acreditar alguna situación que de manera evidente y manifiesta justifique la intervención de esta Sala en cuanto a este extremo en particular”. Sobre ese particular, este Tribunal delimitó con precisión el ámbito propio del recurso de amparo, recordando que su naturaleza sumarísima no permite sustituir a la Administración en la apreciación técnica de estudios especializados ni abrir un debate probatorio amplio respecto del cumplimiento de requisitos reglamentarios, salvo que se acredite una arbitrariedad manifiesta o una omisión absoluta que comprometa de manera directa derechos fundamentales.
En consecuencia, se enfatizó que las discrepancias relativas a la suficiencia técnica de los estudios ambientales, la ponderación de riesgos o la correcta aplicación de la normativa sectorial constituyen materias que, en principio, deben ventilarse ante la propia Administración o en la jurisdicción contencioso administrativa, donde existe la posibilidad de una discusión probatoria plena”. El énfasis no es del original.
De esa forma, tomando en cuenta el precedente citado, es menester indicarles a los recurrentes que este Tribunal delimitó con precisión el ámbito propio del recurso de amparo, recordando que su naturaleza sumarísima no permite sustituir a la Administración en la apreciación técnica de estudios especializados ni abrir un debate probatorio amplio respecto del cumplimiento de requisitos reglamentarios, salvo que se acredite una arbitrariedad manifiesta o una omisión absoluta que comprometa de manera directa derechos fundamentales. En consecuencia, se enfatizó que las discrepancias relativas a la suficiencia técnica de los estudios ambientales, la ponderación de riesgos o la correcta aplicación de la normativa sectorial constituyen materias que, en principio, deben ventilarse ante la propia Administración o en la jurisdicción contencioso administrativa, donde existe la posibilidad de una discusión probatoria plena.
Por consiguiente, al igual que el precedente citado, los agravios expuestos no evidenciaban una lesión directa y actual a derechos fundamentales, sino que reflejaban una disconformidad con la valoración técnica realizada por la autoridad competente en el marco de sus atribuciones legales. De ese modo, no corresponde a esta Sala sustituir el criterio técnico de SETENA respecto a la viabilidad ambiental otorgada, por tratarse de un extremo propio de la legalidad ordinaria. Por ende, lo procedente es declarar sin lugar el recurso en cuanto a este extremo, sin perjuicio de recordar a las autoridades recurridas su obligación de continuar verificando el cumplimiento estricto de los requisitos ambientales exigibles, en resguardo de la debida protección del medio ambiente conforme a los parámetros fijados por esta jurisdicción constitucional.
Ahora bien, esta Sala Constitucional verifica que los vecinos del lugar, en conjunto con los recurrentes, han planteado una denuncia en contra de este proyecto ante la Secretaría Técnica Nacional Ambiental, lo cual, conforme a lo indicado en el considerando I de esta sentencia, sí se entra a conocer alguna posible dilación en resolver esa denuncia. Lo cual, será analizando en el próximo considerando.
VI.Sobre la denuncia interpuesta ante la Secretaría Técnica Ambiental. Por otra parte, se comprueba que el 19 de marzo de 2025, ingresó en la Secretaría Técnica Nacional Ambiental, mediante el Sistema Integrado De Trámite y Atención De Denuncias Ambientales (SITADA) denuncia N° 54208-2025 (asignada al técnico en fecha 04 de junio de 2025), denuncia presentada por los vecinos de Barrio El Carmen, en conjunto con los recurrentes, la cual se encuentra relacionada a consecutivo 02755-2025, recibido mediante el gestor documental de la SETENA en fecha 19 de marzo de 2025, sobre denuncia contra el proyecto Condominio DI expediente D1-18944- 2016-SETENA. Así, ambas gestiones (N° 54208-2025 y N° 02755-2025) fueron acumuladas para su trámite unificado. Mediante oficio SETENA-DT-ASA-0596-2025 del 20 de marzo de 2025, la Secretaría Técnica Nacional Ambiental le solicitó al desarrollador referirse a los hechos denunciados por una potencial afectación ambiental ocasionados por el proyecto referido.
Mediante oficio SETENA-SG-0399-2025 del 24 de marzo de 2025, la Secretaría Técnica Nacional Ambiental le solicitó criterio al Área de Conservación Central, SINAC-ACC, como ente competente, con el fin de que se analice e indique la posible invasión a la zona de protección de la Los Negritos en Barrio Escalante, por parte de las obras que se realizan en el área de proyecto denominado Condominio DI, conforme a la información presentada por el Concejo de Distrito del Carmen y se aporte a SETENA cualquier otro dato de relevancia respecto al caso en análisis en un plazo de 10 días hábiles. Mediante oficio SETENA-DT-ASA-0660-2025 del 25 de marzo de 2025, la Secretaría Técnica Nacional Ambiental brindó respuesta a la solicitud de información del Concejo de Distrito del Carmen. El 01 de abril de 2025, la Secretaría Técnica Nacional Ambiental, mediante Acta de Inspección N° ASA-ACT INS-0057-2025, realizó inspección de campo al área de proyecto, en donde se indicó lo siguiente: “- No se evidencia maquinaria trabando.
La Quebrada se encuentra entubada y no hay certeza de cuál es el área de protección de la misma. Se realizó consulta al SINAC. - En campo se conoce por medio de vecinos que la propiedad es cruzada por Quebrada entubada y alcantarillado sanitario. - Punto GPS # 565 coordenadas 1098901 / 0493094 entrada principal. - Punto GPS # 566 coordenadas 1099018 / 0493080. - Lindero sur plano SJ-658597 punto GPS # 567 coordenadas 1098987/ 0493110 no se observa invasión al área de protección del Río Torres”. El 03 de abril de 2025, el representante legal de la sociedad [Nombre 007]. presentó formalmente el escrito de descargos y referencias técnicas en respuesta al traslado de la denuncia. Mediante oficio SETENA-SG-0507-2025 del 21 de abril de 2025, la Secretaría Técnica Nacional Ambiental realizó recordatorio de solicitud criterio al Área de Conservación Central, SINAC-ACC, como ente competente, realizada mediante oficio SETENA-SG-0399-2025 del 24 de marzo de 2025 y se otorga un plazo de 10 días hábiles.
Mediante oficio no. Oficio SINAC-ACC-OSJ-inf-0498-2025 del 25 de abril de 2025, la jefa de la Subregional de San José del Sistema Nacional de Áreas de Conservación le comunicó a SETENA lo siguiente: “Descripción de Resultados: En respuesta al oficio SETENA-SG-0399-2025, en donde se solicita: 1. “Analice e indique a esta Secretaria la posible invasión a la zona de protección de la Los Negritos en Barrio Escalante, por parte de las obras que se realizan en el área de proyecto denominado Condominio DI, conforme a la información presentada por el Consejo de Distrito del Carmen.” 2. “Que, conforme a sus competencias, aporte a esta Secretaría cualquier otro dato de relevancia respecto al caso en análisis.” Esto en una propiedad donde se ha emitido la viabilidad ambiental por parte de la SETENA y los permisos de construcción por parte de la Municipalidad de San José. (ver foto 1 y 2) (…) En relación a lo anterior se describe lo siguiente: El día 22 de abril del año en curso, se realiza inspección al sitio en compañía de la funcionaria Stephanie Castillo Herrera, en donde se observa un terreno donde supuestamente se construirá un complejo de tres edificios de apartamentos en 10 niveles y dos niveles de sótanos.
Actualmente no hay ninguna edificación construida. (ver foto 1) (…) El terreno donde se pretende construir los edificios, es un inmueble que está completamente mecanizado desprovisto de vegetación, en la parte central del terreno hay una pequeña depresión que es por donde supuestamente discurre la quebrada los Negritos, sin embargo, no se observa agua que corra, ya que al parecer se encuentra entubada y no se puede precisar por donde va la misma. (ver foto 2) (…) Durante la inspección, no se encontró presencia de personas en la propiedad, ni se identificó maquinaria trabajando o estacionada en el lugar. Del mismo modo, no fue posible establecer el momento en que se llevó a cabo la mecanización del terreno. Para determinar una posible invasión del área de protección de la quebrada Los Negritos se debería tener muy claro por donde pasa exactamente en cuerpo de agua, lo que es imposible determinar en este caso, ya que la misma supuestamente va entubada en este sector y no se puede observar el curso de la misma.
Es importante tener claro por donde pasa exactamente la quebrada Los Negritos en este sector, propiamente por donde cruza en esta propiedad, para poder determinar el área de protección de dicha quebrada, aunque esta se encuentre entubada, esto antes de inicien la construcción de las obras y que se tenga delimitado dicha área de protección de acuerdo a lo que se establece en el artículo 33 de la ley forestal N° 7575. Conclusiones y / o Recomendaciones: Se realiza inspección de campo a solicitud de la SETENA, para determinar una posible invasión del área de protección de la quebrada Los Negritos, en donde se construirán tres edificios de apartamentos denominado Condominio DI Escalante Verde S.A. En el sitio aún no han iniciado la construcción de edificaciones, más lo que existe y se observa es un terreno ampliamente mecanizado para la construcción de infraestructuras. No se observa el curso del agua de la quebrada Los Negrito ya que la misma se encuentra entubada por lo que se dificulta determinar el área de protección de la misma debido a que no se observa por donde discurre la misma.
En importante que el desarrollador del proyecto delimite el área de protección de la quebrada Los Negritos en este sector y que esta sea marcada en campo de manera visible, antes que se inicien cualquier tipo de obra, ya sea constructiva o de movimiento de tierra. Que para determinar con exactitud el área de protección de la quebrada Los Negritos en este sector y que pueda ser demarcada en campo antes que se inicien las obras, que la Dirección de Aguas ubique dicho cuerpo de agua por donde cruza exactamente ya que es el ente regulador en esta materia. Comunicar a la SETENA de los alcances de la inspección realizada para este tome las medidas necesarias para la protección del cuerpo de agua presente en el lugar”. Mediante oficio SETENA-SG-0583-2025 del 08 de mayo de 2025, la Secretaría Técnica Nacional Ambiental solicitó criterio a la Dirección de Aguas de MINAE, de conformidad con lo señalado en el oficio SINAC-ACC-OSJ-inf-0498-2025. Mediante oficio SETENA-SG-0741-2025 del 05 de junio de 2025, la Secretaría Técnica Nacional Ambiental realizó recordatorio de solicitud criterio realizada mediante oficio SETENA-SG-0583-2025.
De esa forma, a la fecha de interposición del presente recurso, SETENA no había resuelto la denuncia interpuesta por los vecinos del lugar y los recurrentes.
Ahora bien, posterior a la notificación de la resolución de curso a la Municipalidad de San José a la Secretaría Técnica Nacional Ambiental, según el oficio no. SETENA-DT-0099-2025 del 12 de junio de 2025, la Secretaría Técnica Nacional Ambiental realizó un análisis geoespacial por medio del Sistema de Información Geográfica, por medio de las capas recientes de la Comisión Nacional de Emergencias (CNE), para determinar los riesgos actuales que presenta el Ap y de la presencia de amenaza de inundación y de deslizamiento, y se estableció lo siguiente: “Se identifica que en el área del proyecto existe amenaza de inundación, mas no amenaza de deslizamiento, según se observa en la imagen adjunta (…) De lo anterior se concluye, que en el momento de la Evaluación Ambiental no estaban disponibles las capas oficiales con que cuenta la CNE actualmente y que los estudios de amenazas no indicaron riesgo, ni de inundación ni de amenazas naturales.
Se indica que las condiciones de esa quebrada, pudieron haber variado desde el momento de la evaluación del expediente, debido al incremento de fenómenos meteorológicos, así mismo, a la construcción de obras tanto públicas (obras de circunvalación, por ejemplo) como privadas, que cambiaron la dinámica hidráulica de la quebrada, la cual esta entubada en ciertos sectores, razón por la cual las condiciones pudieron variar con el tiempo, con respecto al momento en que se realizó el análisis del expediente. Técnicamente, al existir las capas de la CNE en la actualidad y al verificar que si existe riesgo de inundación, se deberá solicitar el segmento B de hidrología y las medidas para mitigar esta amenaza, lo que probablemente afectará el diseño de sitio”. Mediante oficio no. DA-UHTPCOSJ-1598-2025 del 20 de junio de 2025, la Unidad Hidrológica Tárcoles-Pacífico Central de la Dirección de Agua del MINAE le comunicó a la Secretaría Técnica Nacional Ambiental lo siguiente: “Referencia: Gestiones 1446-2025 (oficio SETENA-SG-0583-2025) y 1794-2025 (oficio SETENA-SG-0741-2025) Estimados señores, En atención a las gestiones de referencia, en las cuales mediante los oficios SETENA-SG-0583-2025 y SETENA-SG-0741-2025 se solicita el trazo de la quebrada “Negritos” en las propiedades con planos SJ-0668597-2000 y SJ-923485-2004, en interés a raíz del proyecto “Condominio DI Escalante Verde” en la zona de Escalante en el Carmen de San José, se indica lo siguiente.
Si bien primeramente se propuso como fechas 29 de mayo y 05 de junio del presente año para realizar la inspección correspondiente, siendo que no fue posible la coordinación con su representada, el 12 de junio del presente año se efectuó la primer visita al sitio en conjunto del funcionario José Ricardo Hidalgo de la Dirección de Agua, así como representantes del proyecto, Ricardo Molina y Jorge Montenegro. Por lo que, en campo se corroboró la existencia de la quebrada en las propiedades de interés mediante dos pozos de observación del cauce entubado, localizados en las coordenadas con proyección CRTM05 (tomadas con precisión de ± 1 m en la segunda inspección), latitud: 1098856 y longitud: 493184 (pozo 1), y, latitud: 1098910 y longitud: 493146 (pozo 2). En la Figura 1 se muestran fotografías de los pozos de observación (…) Posteriormente por medio de la revisión de gabinete, se comprobó que la ubicación de tales pozos de observación coincide aproximadamente con el trayecto expuesto en la hoja cartográfica escala 1: 5000 del Sistema Nacional de Información Territorial (SNIT).
Siendo de interés el recorrido de la quebrada en la zona, con base en los pozos de observación existentes, cartografía escala 1: 5000 del SNIT, así como planos del expediente 122-O de la Dirección de Agua, se realizó una segunda inspección el 19 de junio del presente año en compañía del funcionario de la Dirección de Agua, César Sánchez, las funcionarias del Sistema Nacional de Áreas de Conservación (SINAC), Lioudmila Malomuzh y Stephanie Castillo, y los representantes del proyecto Ricardo Molina y Julio Mena, por lo que en sitio se delimitó mediante una cuerda el posible centro del cauce y también fueron tomadas las coordenadas para el trazo de la quebrada solicitado. En dicha inspección se ubicó un tercer pozo de observación en las coordenadas con proyección CRTM05, latitud: 1098943 y longitud: 493089, así como el punto de finalización del entubado en las coordenadas, latitud: 1098990 y longitud: 493062; en la Figura 2 se muestran fotografías de lo expuesto (…) Cabe destacar que, en la primera inspección se observó la demarcación mediante estacas de la posible zona de protección de la quebrada realizada por los desarrolladores del condominio, la cual se fundamentó en el lineamiento otorgado por el Instituto Nacional de Vivienda y Urbanismo (INVU).
Las estacas se encontraban distanciadas aproximadamente 24 m a lo ancho. No obstante, siendo que en campo el trayecto de la quebrada varió respecto a la demarcación seguida para tales zonas de protección marcadas, se comunicó en sitio por parte de los desarrolladores una nueva delimitación mediante equipo topográfico, la cual será comunicada tanto a la Dirección de Agua como al ente competente en el tema, el Sistema Nacional de Áreas de Conservación (SINAC), en cuanto se realice. En la Figura 3 se demarca el trayecto solicitado como de interés de la quebrada “Negritos” (…) Además, se considera importante mencionar que, para la demarcación que se realizará de las zonas de protección respectivas, se tomará según desarrolladores, un ancho de cauce de 4 m. En el Anexo 1 se muestran fotografías de la señalización de la quebrada mediante una cuerda mencionada anteriormente”. Mediante oficio no. DA-UHTPCOSJ-1614-2025 del 23 de junio de 2025, la Unidad Hidrológica Tárcoles-Pacífico Central de la Dirección de Agua del MINAE le comunicó a la Subregión de San José del Sistema Nacional de Áreas de Conservación, respecto a la gestión 1827-2025, lo siguiente: “En atención a la gestión de referencia, en la cual mediante el oficio CARTA-SINAC-ACC-OSJ-699- 2025 se solicita el trazo de la quebrada “Negritos” en las propiedades con planos SJ-0668597-2000 y SJ-923485-2004, en interés a raíz del proyecto “Condominio DI Escalante Verde” en la zona de Escalante en el Carmen de San José, se indica lo siguiente.
Por medio de la inspección realizada el 19 de junio del presente año en compañía del funcionario de la Dirección de Agua, Ing. César Sánchez Vega, los representantes del proyecto, Ricardo Molina Quirós y Julio Mena Van Deer Laat, y su representada, en sitio se delimitó mediante una cuerda el posible centro del cauce y también fueron tomadas las coordenadas para el trazo de la quebrada en gabinete. El levantamiento efectuado en campo se fundamentó en los pozos de observación existentes, cartografía escala 1: 5000 del SNIT, así como planos del expediente 122-O de la Dirección de Agua. Los pozos de observación y el final del entubamiento se ubican en las siguientes coordenadas con proyección CRTM05: - Pozo de observación 1, latitud: 1098856 y longitud: 493184. - Pozo de observación 2, latitud: 1098910 y longitud: 493146. - Pozo de observación 3, latitud: 1098943 y longitud: 493089. - Final de la tubería, latitud: 1098990 y longitud: 493062.
En la Figura 1 se muestran fotografías de los pozos de observación existentes en sitio y del final del entubamiento de la quebrada (…) De las coordenadas tomadas en campo basadas en el trazo realizado, en la Figura 2 se muestra el trayecto estimado de la quebrada “Negritos” en la zona de interés (…) Tal y como se expresó en sitio por parte de los desarrolladores, siendo que la demarcación de las estacas de la zona de protección varió por el trayecto de la quebrada trazado, se realizará una nueva delimitación mediante equipo topográfico, la cual será comunicada tanto a la Dirección de Agua como a su representada como ente competente en el tema, en cuanto se realice (…) Además, se considera importante mencionar que, para la demarcación que se realizará de las zonas de protección respectivas, se tomará según desarrolladores, un ancho de cauce de 4 m. En la Figura 3 se muestran fotografías de la señalización de la quebrada mediante una cuerda efectuada en campo (…) Sin más que agregar, se le informa lo anterior para que se realice lo que corresponda”.
Mediante informe de gira Nº SINAC-ACC-OSJ-inf-0866-2025 del 29 de junio de 2025, la jefe de la Oficina Subregional de San José estableció lo siguiente: “(…) Detalle: Inspección programada conjunto con Dirección de Aguas, MINAE, caso exp. D1-18944-2016, SETENA. Fecha de gira: 19 de junio de 2025 Hora: Inicio: 09:00 a.m (…) Descripción de Resultados: El día 19 de junio del año 2025, se procede a realizar una inspección en el sitio antes mencionado, conjuntamente con Dirección de Aguas, MINAE, solicitado por esta oficina atreves del oficio CARTA-SINAC-ACC-699-2025, para poder establecer y ubicar el cauce natural de la quebrada de los Negritos ubicada en barrio Escalante, coordinadas 1098867; 493196, en la propiedad donde pretende realizar un proyecto de construcción de torres de apartamiento denominado Condominio De Escalante Verde, S.A, para determinar con exactitud el área de protección de la quebrada Los Negritos en este sector, la cual se encuentra intubada, antes de que se inicien cualquier tipo de obra, ya sea constructiva o de movimiento de tierra.
En la inspección participaron los Ing. Rosibel De Los Angeles Solano y César Sánchez Vega, funcionarios de Dirección de Aguas, MINAE, también los representantes del proyecto constructivo Ricardo Molina Quirós y Julio Mena. Los funcionarios del Dirección de Aguas, MINAE procedieren con demarcación del área protección de la quebrada de los Negritos intubada, como ente competente en la materia. Conclusiones y / o Recomendaciones: Se realiza acompañamiento a los funcionarios de Dirección de aguas, MINAE, en inspección con objetivo de establecer y delimitar en el campo el centro del cauce intubado de la quebrada Los Negritos. Solicita enviar el informe correspondiente a la oficina, como verificador y instrumento de aplicación del estudio técnico realizado, para que corresponde”. Mediante oficio no. SETENA-SG-0840-2025 del 30 de junio de 2025, el secretario de la Secretaría Técnica Nacional Ambiental le solicitó al jefe de la Subregional de San José del Área de Conservación Central del SINAC lo siguiente: “(…) En virtud de lo anterior, y con fundamento en el principio de coordinación interinstitucional esta Secretaría requiere el pronunciamiento del SINAC, conforme a sus competencias, respecto a: 1.
Considerando la descripción de proyecto y el diseño de sitio (contempla calles y aceras no permeables) que constan en el expediente administrativo, indicar el tipo de obras que puede o no, realizar el desarrollador en el área de proyecto, que permitan el resguardo de las zonas de protección de la Quebrada Los Negrito, de conformidad con lo que establece la normativa. En consideración de la relevancia de la respuesta, para determinar lo que corresponde a SETENA conforme a las competencias y en concordancia con la eficiencia y eficacia que debe garantizar, recurrimos a las diligencias a su alcance, a fin de disponer del criterio correspondiente. No se omite indicar que de requerir alguna acción adicional por parte de esta Secretaría para facilitar lo solicitado, quedo a sus atentas órdenes (…)”. Mediante oficio no. CARTA-SINAC-ACC-OSJ-0928-2025 del 04 de julio de 2025, la jefe de la Oficina Subregional de San José le comunicó al secretario general de la Secretaría General Técnica Ambiental lo siguiente: “ASUNTO: Oficio N° SETENA-SG-0840-2025, relacionado con expediente D1-18944- 2016-SETENA.
Estimado señor: En atención a lo solicitado mediante oficio N° SETENA-SG-0840-2025, relativo al expediente D1-18944-2016-SETENA., me permito informarle lo siguiente: De conformidad con las competencias que nos confiere el artículo 22 de la Ley de Biodiversidad, y en atención al ámbito de nuestra competencia técnica, no es posible atender la solicitud relacionada con: “…indicar el tipo de obras que puede o no, realizar el desarrollador en el área de proyecto…” Según la legislación vigente establecida en artículos 33 y 58 de la Ley Forestal, el desarrollador deberá respetar área de protección en este caso una quebrada intubada Negritos. Estas materias exceden el alcance de nuestras facultades institucionales, por lo que recomendamos que dichas valoraciones sean remitidas a las entidades atinentes y competentes en realización de las obras civiles”. Según el oficio no. SETENA-DT-0099-2025 del 12 de junio de 2025, el director técnico de SETENA le comunicó a la asesora legal de esa institución que el estudio de amenazas naturales presentado por el desarrollador ante la Secretaría Técnica Nacional Ambiental en el expediente indica lo siguiente: “Se minimizará la posible influencia de amenazas naturales sobre el proyecto ya que se toman las correspondientes medidas de precaución y mitigación disponibles.
La estabilidad de los accesos y la mitigación de los procesos erosivos depende en gran parte de un buen manejo de aguas superficiales. Durante la etapa constructiva, se debe poner especial atención a prevenir la erosión de los suelos y evitar el estancamiento de las aguas meteóricas. Las condiciones geomorfológicas, topográficas y climatológicas de la zona en combinación con un efectivo manejo de las aguas de escorrentía superficial permiten descartar la ocurrencia de procesos erosivos acelerados, inundaciones o movimientos en masa en el AP. La presencia de fallas cercanas potencialmente generadoras de sismos fuertes es un factor importante a tomar en cuenta para el adecuado diseño de cimientos y de las estructuras, todo de acuerdo al Código Sísmico y de Cimentaciones de Costa Rica. En general se considera que el terreno presenta condiciones adecuadas de estabilidad para las obras propuestas.
La topografía y la esperada fitología subyacente favorecen la estabilidad del suelo, el estudio del subsuelo sirve para verificar la idoneidad de los materiales subyacentes. No hay potencial de que el AP sufra los efectos de licuefacción, lo anterior decido a la naturaleza cohesiva de los fimos y arcillas del subsuelo”. Mediante resolución no. 1203-2025-SETENA de las 09:10 horas del 30 de julio de 2025, la Secretaría Técnica Nacional Ambiental resolvió lo siguiente: “PROYECTO CONDOMINIO DI EXPEDIENTE ADMINISTRATIVO Nº D1-18944-2016-SETENA Conoce la Comisión Plenaria de esta Secretaría el informe técnico INF-TEC-DT-ASA-0440- 2025 sobre denuncia ambiental al proyecto: Condominio DI, expediente número D1-18944- 2016-SETENA (…) POR TANTO COMISIÓN PLENARIA RESUELVE En sesión Ordinaria Nº 043 de esta Secretaría, realizada el 30 de JULIO de 2025, en el Artículo Nº. 10 acuerda: PRIMERO: Rechazar la denuncia presentada ante la SETENA el día 19 de marzo de 2025, mediante consecutivo N° 02755-2025 y denuncia N° 54208-2025 el Sistema Integrado De Trámite y Atención De Denuncias Ambientales (SITADA) por parte de los usuarios [Nombre 002], [Nombre 004] y [Nombre 005] contra el proyecto Condominio DI expediente D1-18944-2016-SETENA SEGUNDO: Ordenar al señor [Nombre 006], cédula de identidad [Valor 004], representante legal de [Nombre 007]., cédula jurídica [Valor 005], y al responsable ambiental, señor [Nombre 008], cédula de identidad [Valor 006], que, de previo a continuar con las obras en el área de proyecto, se deberá presentar a esta Secretaría en un plazo de 30 días hábiles, lo siguiente: 1.
Presentar la solicitud de modificación de proyecto debidamente firmada por el desarrollador del proyecto. 2. Actualizar la descripción de proyecto respetando el área de protección de la Quebrada Los Negritos que se encuentra entubada, de conformidad con lo establecido en la legislación vigente establecida, artículos 33 y 58 de la Ley Forestal, incorporando esta área como área libre de obras. 3. Presentar un diseño de sitio actualizado, en el que se contemplen el alineamiento otorgado por el Instituto Nacional de Vivienda y Urbanismo (INVU), así como el trayecto de la quebrada Los Negritos determinado por la Dirección de Agua mediante criterio N° DA-UHTPCOSJ-1598-2025 y lo establecido en la legislación vigente establecida, artículos 33 y 58 de la Ley Forestal. 4. Presentar el archivo shape file actualizado con el ajuste al diseño de sitio del proyecto requerido y con la respectiva delimitación de la zona de protección de la quebrada Los Negritos. 5.
Actualizar las medidas ambientales para la fase constructiva del proyecto debiendo considerar el resguardo del área de protección de la Quebrada Los Negritos que se encuentra entubada, de conformidad con lo establecido en la legislación vigente establecida, artículos 33 y 58 de la Ley Forestal. TERCERO: Notificar a la Municipalidad de San José para que se proceda según corresponda con sus competencias. CUARTO: Contra esta resolución cabe interponer dentro del plazo de tres días a partir del día siguiente a la notificación, los recursos ordinarios de revocatoria ante la SETENA, y el de apelación ante el Ministro de Ambiente y Energía. Con fundamento legal en el artículo 342 de la Ley General Administración Pública y la Ley Orgánica del Ambiente QUINTO: Toda documentación que sea presentada ante la SETENA deberá indicar claramente el número de expediente, el número de resolución y el nombre completo del proyecto.
También se deberá indicar una dirección de correo electrónico, para recibir notificaciones de parte de esta Secretaría. SEXTO: Los documentos originales firmados digitalmente (Firma Digital) estarán a disposición del interesado en la dirección web https://tramites.setena.go.cr donde debe ser verificado por cualquier interesado e instancia pública o privada. SETIMO: De conformidad con el artículo 8 de la Ley 8220, no podrá solicitarse al interesado que requiera un trámite la presentación de certificaciones, copias de información que ya posea otra institución, según los medios legales preestablecidos. OCTAVO: El resultado de la discusión y análisis del caso de marras es: 5 a favor, 0 en contra, 1 INHIBIDO y 1 ausentes, el detalle de la información de dicha votación puede ser consultada en el acta correspondiente, la cual se encuentra en custodia de esta Secretaría y es de acceso público. NOVENO: Para recibir notificaciones el Desarrollador y Responsable Ambiental y denunciante han indicado en el expediente los correos electrónicos: [email protected] / [email protected] / [email protected] / [email protected] / [Nombre 004]@gmail.com / [email protected] / Municipalidad de San José: [email protected] / [email protected]”.
Dicha resolución le fue comunicada a las partes, incluida el denunciante, el 13 de agosto de 2025. Así, actualmente, no existen otras denuncias en curso ante la Secretaría Técnica Nacional Ambiental respecto a este proyecto.
De este modo, se verifica que efectivamente el 19 de marzo de 2025 los vecinos del lugar, en conjunto con los recurrentes, presentaron las denuncias 54208-2025 y 02755-2025 en contra del proyecto en cuestión, las cuales, a la fecha de interpuesto el recurso, no habían sido resueltas. Sobre el particular, consta que para la fecha de formulado el amparo, había trascurrido un plazo aproximado de 2 meses y medio desde que se presentó la denuncia y esta no había sido atendida por la autoridad recurrida. Asimismo, dichas denuncias fueron resueltas por SETENA mediante resolución no. 1203-2025-SETENA de las 09:10 horas del 30 de julio de 2025, en donde se rechazó “la denuncia presentada ante la SETENA el día 19 de marzo de 2025, mediante consecutivo N° 02755-2025 y denuncia N° 54208-2025 el Sistema Integrado De Trámite y Atención De Denuncias Ambientales (SITADA) por parte de los usuarios [Nombre 002], [Nombre 004] y [Nombre 005] contra el proyecto Condominio DI expediente D1-18944-2016-SETENA”.
Además, en esa resolución se ordenó al representante legal y al responsable ambiental el cumplimiento de una serie de cuestiones relativas al proyecto. Lo anterior, le fue comunicado a las partes el 13 de agosto de 2025. Por ende, se constata que la denuncia en cuestión fue resuelta con ocasión del amparo y después de haber trascurrido un plazo excesivo e irrazonable de aproximadamente 4 meses y medio desde que se presentó la denuncia, denotándose una lesión a sus derechos fundamentales de los recurrentes por parte de SETENA por la dilación indebida en la resolución de la denuncia ambiental.
Igualmente, respecto al Sistema Nacional de Áreas de Conservación (SINAC) y a la Dirección de Aguas del Ministerio de Ambiente y Energía también se constata que fueron responsables del atraso en que incurrió SETENA a la hora de resolver la denuncia respectiva. Esto, pues se verifica que SETENA les solicitó criterio a estas autoridades recurridas, pero fue necesario que se le emitiera un recordatorio para brindar dicho criterio. Así, se denota que estas dos autoridades contribuyeron en el atraso de la resolución correspondiente. Nótese que en la sentencia no. 2025-023951 de las 09:15 horas del 01 de agosto de 2025, se indicó que “el SINAC no solo tiene la obligación de establecer las medidas técnicas por seguir para el buen manejo, conservación y administración de la vida silvestre, sino que, además, le corresponde instaurar los procedimientos sobre denuncias que se formulen por infracciones a la normativa ambiental y emitir actos administrativos para procurar su cumplimiento, lo cual, sin lugar a dudas va mucho más allá de realizar una inspección en la vivienda de los recurrentes y emitir una serie de recomendaciones simples, sin mayor atención ni análisis de una solución definitiva a la problemática que viven los vecinos de la zona”.
Es decir, de lo indicado en esa sentencia se deriva una obligación de SINAC de actuar ante una denuncia ambiental. Por ende, se reitera que el Sistema Nacional de Áreas de Conservación (SINAC) y a la Dirección de Aguas del Ministerio de Ambiente y Energía también fueron responsables del atraso en que incurrió SETENA a la hora de resolver la denuncia respectiva, por lo que el presente recurso debe ser declarado con lugar en contra de esas instituciones por el atraso en la resolución de la denuncia.
En todo caso, tomando en cuenta que fue con ocasión a la interposición del presente recurso que se procedió a resolver la denuncia interpuesta, el recurso de amparo debe ser declarado con lugar en cuanto a este punto, en aplicación del artículo 52 de la Ley de la Jurisdicción Constitucional, con las consecuencias que se particularizan más adelante.
VII.Sobre el permiso de construcción otorgado por la Municipalidad de San José. Por otro lado, los recurrentes también cuestionan el permiso de construcción otorgado por la Municipalidad de San José. Al respecto, se tiene por demostrado que el 01 de noviembre de 2021, el representante de Di Escalante Verde S.A. presentó, a través de la Plataforma Digital APC, una solicitud de permiso de construcción ante la Municipalidad de San José. Así, ante esa gestión, mediante permiso de construcción no. 067-2022_CFIA-920253, aprobado el 07 de febrero de 2023, la Municipalidad de San José otorgó el permiso de construcción al proyecto “Di Escalante Verde S.A.”, tipo de obras “construcción movimiento de tierra”. Así, en dicho documento se indicó lo siguiente: “OC-920253 Di Escalante Verde S.A Proyecto. condominio Vertical Residencial Di Escalante Verde. Cedula: 3101765846 Localización: (…) Proyecto de uso residencial.
El proyecto consiste en un edificio de 10 niveles, y 2 sótanos, cuenta con tres niveles de estacionamiento con 139 parqueos y nueve niveles de apartamentos con 135 unidades. Retiro de antejardín 2.00 m. Acceso vehicular (…) Retiro INVU por quebrada los Negritos 10.0 O metros del borde. Cuenta con Viabilidad Ambiental 18944-2016-SETENA, D1-1148—2019-SETENA. Cuenta con Estudio de Impacto Vial (…) Licencia únicamente dentro de línea de propiedad tramitada, respetando los lineamientos establecidos. Únicamente se permiten obras dentro de línea de propiedad tanto para elementos de forma subterráneas como área. Esta licencia tiene una vigencia de un año para iniciar la obra contando a partir de su otorgamiento (fecha de aprobación) (…)”.
En este sentido, se constata que el representante del proyecto presentó una solicitud de permiso de construcción, la cual fue aprobado por la Municipalidad de San José, otorgando el permiso de construcción no. 067-2022_CFIA-920253, aprobado el 07 de febrero de 2023. Asimismo, dicha municipalidad informó bajo juramento que el uso de suelo comprobante de trámite 5032-2020 para el plano catastro SJ-0923485-2004, CT 519199-2019 para el plano catastrado SJ-0668597-2000 y el permito de construcción 067-2022_CAFIA-92053, fueron otorgados bajo el anterior Plan Regulador, publicado en el Alcance Digital no. 2 de la Gaceta no. 29 del 11 de febrero de 2014.
Ahora bien, se reitera que los recurrentes cuestionan el otorgamiento de ese permiso. Sobre esta situación, es menester traer a colación lo resuelto por este Tribunal en un caso reciente. De ese modo, mediante sentencia no. 2026-003449 de las 09:20 horas del 30 de enero de 2026, se resolvió, en lo que interesa, lo siguiente:
“En el presente asunto, corresponde a esta Sala examinar si la actuación atribuida a la Municipalidad de Montes de Oro se proyecta como una perturbación o amenaza real, directa y actual al derecho constitucional a un ambiente sano, o si, por el contrario, lo que se somete a su conocimiento es una controversia que, por su naturaleza, exige un previo pronunciamiento en el plano de la legalidad administrativa y competencial. Para tal efecto, resulta indispensable partir del alcance que la jurisprudencia constitucional ha delimitado en materia ambiental, en tanto la intervención de esta jurisdicción no puede extenderse al punto de sustituir a las autoridades técnicas ni de erigirse en un órgano revisor de los criterios especializados vertidos por las dependencias administrativas competentes.
Desde esa perspectiva, esta Sala ha reiterado que su competencia en materia ambiental se circunscribe a constatar si las instituciones llamadas por el ordenamiento a tutelar el ambiente han asumido una actuación responsable, diligente y oportuna, conforme a lo exigido por el artículo 50 de la Constitución Política, sin que le corresponda verificar la corrección técnica de los estudios, valoraciones o autorizaciones emitidas en ese ámbito. Precisamente por ello, la procedencia del recurso de amparo se encuentra condicionada a que se acredite una lesión o amenaza concreta a un derecho fundamental, y no simplemente la disconformidad con el contenido o alcance de actos administrativos dictados en ejercicio de competencias legalmente atribuidas (…) En efecto, del elenco fáctico acreditado se desprende que la viabilidad ambiental del proyecto fue otorgada por la Secretaría Técnica Nacional Ambiental y confirmada en sede administrativa tras la resolución de los recursos interpuestos, adquiriendo firmeza mediante pronunciamientos del Ministerio de Ambiente y Energía, lo cual evidencia que el componente ambiental del proyecto fue conocido y resuelto por las autoridades competentes (…) Asimismo, las irregularidades invocadas por las personas recurrentes –relativas a autorizaciones sectoriales específicas, permisos de vertido, alineamientos técnicos o discrepancias catastrales– se proyectan como cuestionamientos que demandan un análisis de legalidad y de competencia administrativa, cuya resolución presupone la valoración de normas infra constitucionales y de criterios técnicos especializados.
En tal escenario, para determinar si tales aspectos fueron o no correctamente ponderados, resulta necesario un examen previo propio de las vías ordinarias, lo cual desborda el carácter sumario del proceso de amparo y la competencia de esta Sala, que no está llamada a efectuar pronunciamientos declarativos sobre la validez o invalidez de actos administrativos desde una óptica meramente legal”.
Por lo tanto, en este caso en concreto, la Municipalidad de San José aprobó el permiso de construcción no. 067-2022_CFIA-920253 el 07 de febrero de 2023 conforme a sus potestades normativas y después de haber constatado el cumplimiento de los requisitos respectivos. Por ende, el cuestionamiento de los recurrentes versa sobre controversias que es propio de las instancias ordinarias. Recordemos que en el precedente citado se indica que no le corresponde a este Tribunal verificar la corrección técnica de los estudios, valoraciones o autorizaciones emitidas en ese ámbito. Precisamente por ello, la procedencia del recurso de amparo se encuentra condicionada a que se acredite una lesión o amenaza concreta a un derecho fundamental, y no simplemente la disconformidad con el contenido o alcance de actos administrativos dictados en ejercicio de competencias legalmente atribuidas. Por ende, las irregularidades invocadas por las personas recurrentes –relativas a discrepancias respecto al Reglamento de Desarrollo Urbano, la supuesta no existencia de un alineamiento vigente en dicha propiedad y a la diferencia entre las unidades de construcción analizadas por SETENA y la Municipalidad de San José– se proyectan como cuestionamientos que demandan un análisis de legalidad y de competencia administrativa, cuya resolución presupone la valoración de normas infra constitucionales y de criterios técnicos especializados.
En tal escenario, para determinar si tales aspectos fueron o no correctamente ponderados, resulta necesario un examen previo propio de las vías ordinarias, lo cual desborda el carácter sumario del proceso de amparo y la competencia de esta Sala, que no está llamada a efectuar pronunciamientos declarativos sobre la validez o invalidez de actos administrativos desde una óptica meramente legal. Por ende, respecto a este punto se descarta la lesión a los derechos fundamentales de los recurrentes.
VIII.Sobre la denuncia presentada en la Municipalidad de San José. En cuanto a este punto, es menester aclarar que si bien es cierto en este recurso de amparo los recurrentes no cuestionan directamente esta situación, lo cierto es que, de la amplia prueba aportada y de los hechos demostrados, se denota que esta denuncia presentada el 28 de mayo de 2025 guarda una intrínseca relación con los puntos aquí disputados. De ese modo, respecto a la actuación de la Municipalidad de San José, se constata que el 28 de mayo de 2025, los recurrentes presentaron una solicitud de Procedimiento Administrativo y Medidas Cautelares-Permiso de Construcción no. 067-2022_CFIA-920253 (oficio CM-PFA-057-2025), esto ante la Municipalidad de San José. Mediante oficio MSJ-ALCALDIA-3087-2025 del 29 de julio de 2025, el alcalde le solicitó criterio a la gerente de Gestión Municipalidad respecto a dicha denuncia. Así, posterior a la notificación de la resolución de curso a la Municipalidad de San José, el 13 de junio de 2025, la alcaldía de la Municipalidad de San José procedió a solicitar criterio a la gerencia de Gestión Municipal y Desarrollo Urbano, gerencia que realizó un análisis del expediente administrativo en la Municipalidad, por lo que, mediante oficio no. GGMDU-447-2025, concluyó lo siguiente: “Conclusiones del análisis del expediente: No fue posible encontrar en el expediente, los siguientes documentos los cuales se consideran importantes para efectos del análisis solicitado: ▪ El instrumento de consulta a la población que cumpla con lo establecido en el decreto Nº32966-MINAE.
Tampoco se encontraron todos los documentos que hagan constar que el proceso de consulta cumple con los requerimientos técnicos mínimos establecidos en la resolución 682-2018-SETENA resultado tercero punto 3. ▪ El Visto Bueno o aprobación de la Dirección General de Ingeniería y Tránsito del MOPT del Estudio de Impacto Vial y los accesos al proyecto. ▪ El detalle de las medidas ambientales a ser tomadas por el desarrollador para atender a las inquietudes de la comunidad. ▪ Visto bueno o aprobación de la Dirección de Urbanizaciones del AYA al respecto de la reubicación del colector sanitario Los Negritos. ▪ Visto bueno de la Dirección de Urbanizaciones del AYA para la conexión del proyecto a la red sanitaria existente. Lo que se muestra en el expediente es una Constancia de Capacidad de Recolección, la cual no constituye una autorización de construcción o interconexión. Es importante mencionar que la mencionada Constancia se emite para un total de 300 fincas filiales según plano catastro Nº 1-0923485-2004, siendo que SETENA menciona que la viabilidad ambiental se otorga para un total de 323 apartamentos.
Mientras que la municipalidad en el permiso de construcción 067-2022_CFIA-920253 autoriza la construcción de 135 unidades, para un total de 13.331 m2 correspondientes a un edificio de 10 niveles. ▪ Aval de UE PAPS para la reubicación del Colector Negritos. ▪ Al momento de la aprobación de los permisos de construcción, existe un gravamen sobre la propiedad finca 498246 plano catastro SJ-923485-2004 que responde a la servidumbre de alcantarillado sanitario. Surge la duda sobre la viabilidad de otorgar una licencia de construcción en una condición donde el gravamen no ha sido formalmente levantado tanto a nivel catastral como registral. No consta en los documentos analizados que dicho gravamen haya sido levantado o esté en proceso de resolución. ▪ Aunque el desarrollador propone la reubicación del colector de aguas negras “Los Negritos” para ser ubicado de forma paralela al entubamiento de la quebrada y al ser esta una obra en cauce, no se encontró Visto Bueno o aprobación escrita de la Dirección de Aguas del MINAE para estos trabajos, únicamente se observa el nuevo trazado en los planos constructivos.
Al respecto se remitió consulta mediante oficio GGMDU-0230- 2025 al ingeniero José Miguel Zeledón Calderón, Director de la Dirección de Aguas, cuya respuesta aún se encuentra pendiente. ▪ Memoria de cálculo del movimiento de tierra, así como definir la disposición, posibles impactos y las respectivas medidas de mitigación. ▪ Estudio geotécnico que demuestre la aptitud urbanística según lo establecido en el inciso 10.3.5 Zonas Sujetas a Estudio, de los Reglamentos de Desarrollo Urbano Vigentes en el momento de la aprobación del permiso de construcción. ▪ Al respecto de la zonificación con base a la cual se otorgó el permiso de construcción, es importante señalar que los Reglamentos de Desarrollo Urbano vigentes (2014) al momento de la aprobación del permiso de construcción, indican que parte de la zona donde se ubica el proyecto se identifica como zona con riesgo moderado a deslizamientos y susceptible a inundación (mapa de zonas de amenaza a deslizamientos e inundaciones).
Afectación que no sufrió variación respecto de la actualización de los Reglamentos de Desarrollo Urbano del 2023 y vigentes a la fecha. Esta zonificación indica que, en estas zonas sujetas a estudio, deben realizarse los análisis requeridos que demuestren su aptitud urbanística. En virtud de lo anterior esta Gerencia considera necesario revisar el proceso de tramitación y aprobación del permiso de construcción del proyecto Di Escalante Verde, por lo que se recomienda el estudio pormenorizado de lo actuado por la administración incluyendo las consultas que sean pertinentes tanto a las instituciones, como al desarrollador, a efectos de determinar la pertinencia para la continuidad de las obras en función del interés común, la protección del ambiente y la calidad de vida de las personas de la comunidad de Barrio Escalante y alrededores”. El 21 de agosto de 2025, el recurrente presentó un adendum y recordatorio por no respuesta a su solicitud de apertura del procedimiento (art. 173 LGAP) para nulidad de Permiso No. 067-2022_CFIA_920253.
Mediante oficio no. GGMDU-0668-2025 del 25 de agosto de 2025, la Gerencia de Gestión Municipal y Desarrollo Urbano de la Municipalidad de San José emitió respuesta al criterio solicitado por la Alcaldía mediante oficio MSJ-ALCALDIA-3087-2025. Mediante oficio no. MSJ-ALCALDIA-3514-2025 del 25 de agosto de 2025, el alcalde de la Municipalidad de San José le comunicó al recurrente lo siguiente: “Asunto: Respuesta al oficio CM-PFA-057-2025 sobre solicitud de procedimiento administrativo y medidas cautelares en relación con el permiso de construcción N.° 067-2022-CFIA-920253 y el proyecto DI Escalante Verde (…) En atención a su oficio CM-PFA-057-2025, relativo al proceso de aprobación de la licencia construcción del proyecto denominado DI Escalante Verde, así como a los planteamientos efectuados por el señor regidor y los síndicos del distrito Carmen, esta Alcaldía se permite manifestar lo siguiente: Mediante oficio MSJ-ALCALDÍA-1830-2025, de fecha 16 de mayo de 2025, se solicitó a la Gerencia de Gestión Municipal y Desarrollo Urbano, a la Dirección de Control Urbano y al jefe de la Sección de Permisos de Construcción la realización de una visita inmediata a la obra constructiva, con el fin de verificar diversos aspectos técnicos y administrativos.
Debe señalarse que, al señor Guadamuz, la Sección de Permisos de Construcción le contestó una serie de consultas relacionadas con el proyecto mediante el oficio SPC-181-2025, de fecha 24 de abril de 2025, además de otros intercambios de correos electrónicos en los que se evacuaron consultas adicionales. En consecuencia, la Gerencia de Gestión Municipal y Desarrollo Urbano elaboró y gestionó diversos oficios ante distintas instituciones, así como brindó una respuesta integral, la cual esta Alcaldía pone en su conocimiento a continuación: (…) Por tanto, sobre la solicitud planteada para la apertura de un procedimiento administrativo y medidas cautelares, esta Gerencia recomienda a partir del análisis realizado que sí resulta necesario investigar las siguientes actuaciones: 1. Condicionantes incluidas en el certificado de uso del suelo del 2019. 2. Consignación del incentivo de un 30% más de Coeficiente de Aprovechamiento del Suelo (CAS), sin que este beneficio fuera recomendado por la Comisión de Repoblamiento y sin el sustento técnico o legal de los Reglamentos de Desarrollo Urbano, dado que ese beneficio no aplica en la zonificación asociada a la propiedad donde se construye el proyecto. 3.
Omisión de fiscalización de las obras de movimiento de tierra autorizadas y ejecución de obras en cauce afectando la topografía, la cobertura vegetal, sin presentarse denuncias ante la SETENA u otras instancias. En virtud de lo anterior, esta Alcaldía da por atendido lo solicitado en el oficio CM-PFA-057-2025, reiterando que se han identificado aspectos que requieren investigación administrativa y la adopción de medidas correctivas. Asimismo, se confirma la disposición de esta Municipalidad para dar seguimiento a las actuaciones pendientes y garantizar que todo el proceso relacionado con el proyecto DI Escalante Verde se ajuste al marco legal vigente, en estricto apego a los principios de transparencia, legalidad y protección del interés público. En consecuencia, se reitera el compromiso de la Alcaldía de atender con la mayor seriedad y transparencia las inquietudes planteadas en torno a este proyecto.
Finalmente, se deja constancia de que el canal oficial para la atención de solicitudes de información o remisión de oficios es el correo electrónico alcaldí[email protected], siendo el único medio institucional habilitado en la Alcaldía, para tales efectos”. Lo anterior, le fue comunicado al recurrente el 26 de agosto de 2025.
Al respecto, este Tribunal constata que el trámite de esa denuncia ya fue resuelto por este Tribunal en un recurso presentado por uno de los mismos recurrentes de este amparo ([Nombre 002]). Así, mediante sentencia no. 2025-029376 de las 10:25 horas del 12 de setiembre de 2025, dictada dentro del expediente no. 25-024412-0007-CO, se resolvió lo siguiente respecto a esa denuncia:
“IV.- Sobre el caso concreto. En el sub examine, la parte recurrente indica que el 28 de mayo de 2025 se remitió el oficio CM-PFA-057-2025, mediante el cual se solicitó al alcalde accionado la apertura de un procedimiento administrativo conforme al artículo 173 de la Ley General de la Administración Pública. El objetivo es la anulación del permiso de construcción nro. 067-2022-CFIA-920253, otorgado el 7 de febrero de 2023, por haberse autorizado en un terreno afectado por una zona de protección de un curso de agua (Quebrada Negritos) y por conceder beneficios urbanísticos sin sustento normativo ni técnico. Adicionalmente, se solicitaron medidas cautelares para suspender temporalmente el permiso y evitar daños irreparables al medio ambiente y al área de protección. Acusa que su gestión no ha sido atendida.
Analizados los autos, la Sala tuvo por probado que, mediante oficio CM-PFA-057-2025 del 28 de mayo de 2025, el tutelado y otras dos personas, en su condición de síndicos y regidores, solicitaron al alcalde accionado la apertura de un procedimiento administrativo para la anulación del permiso de construcción nro. 067-2022-CFIA-920253, así como la imposición de medidas cautelares. El 4 de junio de 2025, la Gerencia de Gestión Municipal y Desarrollo Urbano de la Municipalidad de San José acusó recibido de la gestión anterior. En atención a la gestión, por oficio MSJ-ALCALDIA-3514-2025 del 25 de agosto de 2025, la Alcaldía respondió a los gestionantes: “Asunto: Respuesta al oficio CM-PFA-057-2025 sobre solicitud de procedimiento administrativo y medidas cautelares en relación con el permiso de construcción N.° 067-2022- CFIA-920253 y el proyecto DI Escalante Verde. Estimados señores: En atención a su oficio CM-PFA-057-2025, relativo al proceso de aprobación de la licencia de construcción del proyecto denominado DI Escalante Verde, así como a los planteamientos efectuados por el señor regidor y los síndicos del distrito Carmen, esta Alcaldía se permite manifestar lo siguiente: Mediante oficio MSJ-ALCALDÍA-1830-2025, de fecha 16 de mayo de 2025, se solicitó a la Gerencia de Gestión Municipal y Desarrollo Urbano, a la Dirección de Control Urbano y al jefe de la Sección de Permisos de Construcción la realización de una visita inmediata a la obra constructiva, con el fin de verificar diversos aspectos técnicos y administrativos.
Debe señalarse que, al señor Guadamuz, la Sección de Permisos de Construcción le contestó una serie de consultas relacionadas con el proyecto mediante el oficio SPC-181-2025, de fecha 24 de abril de 2025, además de otros intercambios de correos electrónicos en los que se evacuaron consultas adicionales. En consecuencia, la Gerencia de Gestión Municipal y Desarrollo Urbano elaboró y gestionó diversos oficios ante distintas instituciones, así como brindó una respuesta integral, la cual esta Alcaldía pone en su conocimiento a continuación: Para efectos de control y verificación, esta Gerencia solicitó y recibió, mediante vía electrónica WeTransfer, el 19 de marzo del 2025, el expediente del permiso N.° 067-222_CFIA-920253 (Proyecto Di Escalante Verde). Conforme a lo indicado en el oficio GGMDU-447-2025, de la revisión efectuada al expediente remitido por la Sección de Permisos de Construcción, se identificaron vacíos de orden documental y técnico que, a criterio de esta instancia, debieron ser objeto de verificación previa al otorgamiento de la licencia constructiva y así constar en el expediente referido.
Si bien la Dirección de Control Urbano y la Sección de Permisos de Construcción han manifestado que no encontraron anomalías en la aprobación de la licencia y que lo relativo a la normativa ambiental, corresponde exclusivamente a la SETENA, es criterio de esta Gerencia que dicha interpretación resulta contraria a lo dispuesto por la Procuraduría General de la República en los Dictámenes C-034-2009 (10 de febrero de 2009), C-200-20091 (21 de julio de 2009) y C-267-2010 (16 de diciembre de 2010) en los cuales se establece que el otorgamiento de licencias constructivas por parte de la municipalidad implica un control preventivo integral que debe realizarse de conformidad con todo el ordenamiento jurídico aplicable —urbanístico, ambiental, sanitario, vial, entre otros—, y no limitarse a una revisión meramente formal de requisitos o a la aceptación automática de aprobaciones emitidas por otras instituciones.
Anudado a lo anterior y sobre ese criterio, esta Gerencia gestionó oficios a distintas instituciones para confirmar la validez y vigencia de documentos y aprobaciones, a saber: • 28 de marzo de 2025: ➢ Oficio GGMDU-0229-2025 dirigido al Instituto de Vivienda y Urbanismo (INVU), solicitando documentos de respaldo sobre el alineamiento fluvial N.° 52799, recibiéndose respuesta mediante oficio CDUV-049-04-2025 (3 abril del 2025). ➢ Oficio GGMDU-0230-2025 dirigido al Departamento de Aguas del Ministerio de Ambiente y Energía (MINAE), solicitando detalle de obras en cauce requeridas al desarrollador, recibiéndose respuesta mediante oficio DAUHTPCOSJ-1775-2025 (7 julio del 2025). • 3 de junio de 2025: ➢ Oficio GGMDU-0413-2025 solicitando al Instituto de Vivienda y Urbanismo (INVU) revisión del alineamiento N.° Placa22286, en atención a la respuesta emitida previamente. A la fecha pendiente de respuesta. • 25 de junio de 2025: ➢ Oficio GGMDU-0495-2025 dirigido a la Secretaría Técnica Nacional Ambiental (SETENA), solicitando aclaraciones sobre las resoluciones N.° 682-2018- SETENA y N.° 1148-2019-SETENA, recibiéndose respuesta mediante oficio SETENA-DT-0128-2025 (10 julio 2025). ➢ Oficio GGMDU-0496-2025 dirigido a la Dirección General de Ingeniería de Tránsito del Ministerio de Obras Públicas y Transportes (MOPT), consultando sobre eventuales gestiones relacionadas con el estudio de impacto vial y accesos del proyecto, el cual fue remitido al Departamento de Estudios y Diseños (DGIT) y se encuentra pendiente de respuesta. • 9 de julio de 2025: ➢ Oficio GGMDU-0544-2025 dirigido al Instituto Costarricense de Acueductos y Alcantarillados (AYA), solicitando el visto bueno para el desvío del subcolector Negritos, recibiéndose respuesta mediante oficio UEN-PC-2025-02006 (23 julio del 2025) adjuntando el memorando PRE-PAPS-2021-02017, que incluye la aprobación de la propuesta de desvío y el criterio técnico de la Dirección de Ingeniería.
Ahora bien, de la revisión realizada del expediente que la Licda. Natalia Gamboa remite a la Alcaldía, en respuesta al oficio MSJ-ALCALDÍA-3087-2025, se identificó documentación que no fue incluida ni en el archivo digital recibido por esta Gerencia originalmente el 19 de marzo de 2025, ni tampoco fue remitida copia de otros documentos posteriores generados por la Sección de Permisos de Construcción. En particular, se señala la ausencia de los siguientes documentos: • Carta dirigida a la Municipalidad de San José (sin sello ni fecha de recibido en ninguna dependencia institucional), remitida el 14 de febrero de 2022, en la cual se detalla la ruta de las vagonetas que realizarían los movimientos de tierra y escombros del proyecto Condominio Vertical Residencial DI Escalante Verde. El documento menciona las medidas de mitigación y prevención, procedimientos para el cargado de material, procedimiento de ruta, procedimiento de botado, medidas para seguir para personal de la obra, procedimiento para realizar movimiento de tierras junto a edificaciones existentes en colindancias y procedimiento para realizar trabajos en áreas de talud. • Correo del Regidor [Nombre 001], de fecha 8 de enero de 2025, dirigido al Arq. Royeé Álvarez, Jefe de la Sección de Permisos de Construcción, solicitando información general sobre el Programa de Repoblamiento de San José. • Correo de fecha 16 de febrero de 2025 de la empresa SCMTM Arquitectura y Diseño, Grupo Inmobiliario del Parque, dirigido al inspector de la Sección de Permisos de Construcción, con el oficio EV-T1-2025 (10 de enero de 2025), relativo al estatus del proyecto DI Escalante Verde.
El inspector remite copia al Arq. Royeé Álvarez, quien a su vez responde al Arq. Ricardo Molina Quirós de la empresa citada, informando que se encuentran atendiendo consultas de regidores y vecinos de Dirección1358 e indicando al desarrollador que el diseño de las unidades habitacionales no deben sufrir cambios. • Correo del 24 de marzo de 2025 de la Arq. Melissa Gómez Salas (Sección de Permisos de Construcción), con respuesta al señor [Nombre 004], concejal del Distrito Carmen. • Oficio GPS-OMGRD-0122-2025 (27 de marzo del 2025), con respuesta al síndico suplente Nombre121535 , en atención al oficio OSCD-CDCAR-007-2025, referente a consultas sobre el proyecto y su permiso de construcción. • Oficio SPC-153-2025 (31 de marzo del 2025), con respuesta al regidor del Frente Amplio, [Nombre 001], sobre consultas planteadas por la Gerencia de Gestión Municipal y Desarrollo urbano, mediante oficio GGMDU-226-2025. • Correo de fecha 16 de mayo de 2025, de la Arq. Melissa Gómez Salas (Sección de Permisos de Construcción), con respuesta al regidor [Nombre 001], mediante el cual remite aprobación del AyA, donde se evidencia la autorización para realizar obras dentro de la zona de protección. • Oficio SPC-290-2025 (1 de julio del 2025), dirigido a la Dirección de Control Urbano, mediante el cual se brinda información sobre el proyecto y el permiso de construcción, indicando que se respalda el fundamento técnico y profesional de la autorización. • Oficio SPC-297-2025 (3 de julio del 2025), dirigido al regidor [Nombre 001], con información relacionada al permiso de construcción, en el que se señala que la bitácora del proyecto debe ser solicitada a la empresa SCMTM Arquitectura y Diseño, Grupo Inmobiliario del Parque, específicamente al Arq. Ricardo Molina.
Asimismo, se adjunta una hoja sin consecutivo ni numeración, con el seguimiento de la ejecución de obras elaborado por el área de inspección. • Oficio DAJ-1154-32-2025 (5 de junio del 2025), dirigido al Arq. Royeé Álvarez, Jefe de la Sección de Permisos de Construcción, mediante el cual se solicita brindar respuesta al recurso de amparo expediente N.° 25-015494-007-CO. Es claro que la omisión de estos documentos ocasionó que esta Gerencia no contara con la totalidad de la información necesaria para realizar el análisis solicitado por la Alcaldía Municipal, pudiéndose haber incurrido en el riesgo de error al emitir un criterio sustentado en documentación parcial e incompleta. Resulta importante mencionar que el pasado 18 de agosto de 2025, se recibió en la oficina de la Gerencia de Gestión Municipal, al Regidor y los Síndicos del distrito Carmen, con el fin de darles a conocer los resultados del análisis realizado por esta Gerencia al expediente del proyecto DI Escalante Verde, así como compartirles las respuestas enviadas por las instituciones que fueron consultadas a partir del oficio GGMDU-447-2025, ya mencionado anteriormente.
No obstante, el día (22 de agosto del 2025), se recibió el oficio DAJ-1683-2025 solicitando información para responder el Recurso de Amparo interpuesto por el señor Nombre121535 y Antonio Trejos Mazariegos (recientemente atendidos por la suscrita), por ausencia de respuesta del oficio CM-PFA-057-2025. Al respecto, el recurso hace referencia a los siguientes puntos: 1. Alineamiento de 50 metros otorgado para un proyecto anterior. El primer argumento planteado en el Recurso de Amparo indica que SINAC otorgó un alineamiento de 50 metros mediante oficio SRC-OSJ-307-2008 que dio pie al archivo del expediente 13-30-08 de Viabilidad Ambiental del proyecto Oficentro Escalante por parte de la SETENA. En contraposición, el INVU otorga un alineamiento de 10 metros del borde superior del cauce de la Quebrada Negritos para el proyecto Di Escalante Verde en la misma propiedad, plano catastro Placa22287. 2.
Alineamiento del INVU no vigente al momento de otorgar el permiso de construcción. El segundo argumento indica que el alineamiento fluvial otorgado por el INVU estaba vencido en la fecha en que se aprobó el permiso de construcción (7 febrero 2023), sin embargo, la Sección de Permisos de Construcción indica mediante oficio SPC-153-2025 que todos los documentos se encontraban vigentes al momento de la solicitud del permiso. 3. Potestad municipal para fijar alineamientos distintos a los establecidos por el INVU. El tercer argumento indica que el artículo 24.1 del Reglamento 1 del Plan Regulador vigente del cantón de San José (22.1 del Reglamento de Disposiciones Generales del Plan Regulador anterior) establece que la MSJ podrá definir un alineamiento superior al fijado por el INVU, de acuerdo a la especificidad de las condiciones geográficas y geológicas de cada zona y la susceptibilidad al deslizamiento de sus laderas o entorno inmediato, de acuerdo con el mapa de susceptibilidad al deslizamiento de estos reglamentos. 4.
Tala de árboles en zona de protección. El cuarto argumento se refiere a la tala ilegal de árboles en zona de protección de la Quebrada Negritos. 5. Otorgamiento de incentivo del CAS Se otorgaron una serie de beneficios con relación al CAS que no tienen base normativa ni fáctica, siendo que la Comisión de Renovación Urbana y Repoblamiento de la Municipalidad de San José, mediante acta del 12 de marzo del 2020, únicamente aprobó la reducción del impuesto de construcción. Sobre el primer argumento, según lo establece el artículo 33 bis y 33 ter de la Ley Forestal (Ley 7575), corresponde al Instituto Nacional de Vivienda y Urbanismo, la potestad de fijar los alineamientos fluviales sobre los cauces de dominio público, no así al SINAC, cuya competencia se circunscribe a conservar los recursos forestales del país (Art. 6 Ley Forestal). En este sentido, una competencia no puede ser delegada o asumida por otra institución, por lo que habría que revisar la legalidad del oficio SRC-OSJ-307-2009, en el marco de las competencias institucionales.
Sobre el segundo argumento, se tiene que la fecha de aprobación del permiso de construcción municipal, según consta en el expediente remitido vía correo electrónico, corresponde al 7 febrero de 2023. El INVU emite dos alineamientos: 21 agosto del 2019 y 12 de octubre del 2021, cada uno con una vigencia de 24 meses, por lo que este requisito se encontraba vigente al momento de aprobar el permiso de construcción. Sobre el tercer argumento es importante mencionar que el proyecto Di Escalante Verde se tramitó durante la vigencia del Plan Regulador anterior (2014-2023), por lo que es aplicable la normativa contenida en ese instrumento y no aplica el artículo 24.1 del Reglamento 1 del Plan Regulador vigente del cantón de San José, como se indica en el recurso de amparo. En el mapa de Zonas susceptibles a la inestabilidad de laderas y Zonas potenciales a inundación del Plan Regulador anterior (2014-2023), se evidencia que la zona donde se ubica el proyecto se cataloga en su mayor parte como zona de baja susceptibilidad, con una porción de moderada susceptibilidad, asimismo identifica algunas zonas de potencial inundación.
Por otra parte, en el mapa de IFA Integrado, la misma zona aparece con una clasificación de fragilidad moderada (III-V), con limitaciones por condiciones de geoaptitud y bioaptitud y con recomendación de ser zonificada como zona de protección sujeta a estudio. De lo anterior se desprende que las limitaciones están sujetas a una serie de criterios técnicos asociados a la presentación de un plan de obras de mitigación y conservación de laderas, sustentado en un estudio geotécnico. Sobre el cuarto argumento, en efecto el artículo 34 de la Ley Forestal establece la prohibición de talar, cortar o eliminar árboles en áreas de protección. En este sentido, la limpieza de terreno realizada, según se observa en algunas fotografías, abarcó la totalidad del lote, incluyendo la zona de protección de la Quebrada Negritos. Lo anterior podría constituir un delito ambiental que debe ser denunciado ante las instancias competentes.
Sobre el quinto argumento, en efecto la Comisión de Renovación Urbana y Repoblamiento de la Municipalidad de San José, mediante acta del 12 de marzo del 2020, únicamente aprobó la reducción del impuesto de construcción al proyecto Di Escalante Verde. No obstante, la Arq. Melissa Gómez, de la Sección de Permisos de Construcción, indicó en el permiso de construcción otorgado lo siguiente: proyecto cuenta con incentivo al pago del impuesto y de aumento al CAS 30% más, otorgado por la Comisión de Repoblamiento. Sin embargo, el aumento del 30% del CAS nunca fue autorizado por la Comisión de Repoblamiento, como tampoco fue concretado en el diseño del proyecto. Como resultado del análisis del expediente que se tuvo a la vista y de la información adicional aportada, esta Gerencia considera necesario abordar otros elementos no considerados expresamente en el recurso de amparo ni en el oficio CM-PFA-057-2025, que sí ameritan una investigación exhaustiva, los cuales se detallan a continuación: 1.
Certificado de Uso del Suelo. En el documento correspondiente al Certificado de Uso del Suelo emitido el 18 de diciembre de 2019, se indica que la propiedad plano catastro 1-668597-2000, se ubica en una zona mixta residencial comercial con las siguientes condicionantes: ▪ VB Hidrología MSJ desfogue pluvial ▪ VB SETENA ▪ VB INVU Ley de propiedad horizontal ▪ Respetar Ley de Construcciones – RDU vigente De lo anterior, es posible anotar 2 elementos: (1) de acuerdo con la cartografía del mismo plan regulador (2014-2023), la propiedad se ubica en zona sujeta a estudio, requiriéndose para los terrenos que tengan una pendiente menor o igual a 30% una cobertura máxima del 50% del área correspondiente a la pendiente aportando de previo un plan de obras de mitigación y conservación de laderas, sustentado en un estudio geotécnico; los terrenos con pendientes mayores sólo pueden usarse para usos forestales, jardines y parques lineales, pluviales o recreativos, y (2), las condicionantes indicadas en el uso del suelo emitido constituyen requisitos de admisibilidad de cualquier permiso de construcción, no son condicionantes al desarrollo de un proyecto, por lo que es evidente un vacío de criterios técnicos que debieron ser identificados desde el certificado de uso del suelo para la adecuada orientación técnica de las etapas siguientes del proyecto. 2.
Improcedencia de otorgamiento de CAS adicional. Con respecto al otorgamiento de incentivos para el proyecto, la Comisión de Renovación Urbana y Repoblamiento, en su sesión del 12 de marzo de 2020, aprobó recomendar la reducción del impuesto de construcción del 1% al 0.01%. Es importante señalar que las decisiones de la Comisión son recomendaciones para la Municipalidad, las cuales deben ser analizadas por la Sección de Permisos de Construcción. Este departamento puede rechazar o seguir la recomendación, pero en ningún caso puede modificar o añadir nuevos incentivos. Sin embargo, en el certificado del permiso de construcción aprobado por la Sección de Permisos de Construcción el 7 de febrero de 2023, se consignan otros incentivos que no figuran en el acta del 12 de marzo de 2020. Específicamente, se menciona: “Proyecto cuenta con Incentivo al pago del impuesto, y de aumento al CAS 30% más, otorgado por la Comisión de Repoblamiento, según Acta adjunta fecha 12 de marzo de 2020”.
La lectura del permiso de construcción refleja que, por error u omisión, se consignó el incentivo de un 30% más de Coeficiente de Aprovechamiento del Suelo al proyecto Di Escalante Verde. Este beneficio no fue recomendado por la Comisión de Repoblamiento. Aunque en el diseño del proyecto el desarrollador no requirió una mayor área construible (es decir, no hizo efectivo el incentivo otorgado por error), es importante notar que interpretaciones previas de la Sección de Permisos de Construcción han permitido que proyectos en Zonas Residenciales aumentaran la altura por encima de lo establecido por los Reglamentos de Desarrollo Urbano, después de aplicar el respectivo Coeficiente de Altura. Por lo tanto, el error de consignar un aumento del 30% del Coeficiente de Aprovechamiento del Suelo generó un acto declaratorio de derechos a favor del desarrollador sin la autorización de la Comisión de Repoblamiento y sin el sustento técnico o legal de los Reglamentos de Desarrollo Urbano.
Esto se debe a que la zona donde se ubica el proyecto se rige por un Coeficiente de Altura que define la altura máxima de las edificaciones. 3. Potestad municipal de fijar alineamientos fluviales. Si bien el Dictamen C-200-2009 y el Voto No. 1220-2002 establecen la potestad municipal para gestionar en la vía administrativa y judicial si discrepa del criterio de la SETENA -o de cualquier otra institución-, el tema puntual sobre la determinación del alineamiento fluvial, merece ser analizado considerando el principio de especialidad de la norma. Sin embargo, tal y como lo establece el Voto No. 6324-2003, siempre existe una legitimación procesal amplia en materia de protección al ambiente, para gestionar judicialmente por cualquier vía, tanto administrativa como judicial. En este sentido, la Municipalidad sí puede accionar en cualquiera de estas vías en el momento en que detecte, como resultado del proceso de fiscalización urbanística y constructiva, alguna irregularidad o incumplimiento. 4.
Prohibición de talar árboles en zonas de protección Efectivamente existe esa prohibición y, según se observa en las fotografías aportadas en la primera denuncia, se observan movimientos de tierra y remoción de la capa vegetal en la zona de protección de la Quebrada Negritos, lo cual constituye una acción que debió ser notificada como resultado de la fiscalización municipal y denunciada a las instancias correspondientes. Dicha fiscalización no se aprecia en la bitácora de obras que se aporta como prueba adicional en el Recurso de Amparo. Por tanto, sobre la solicitud planteada para la apertura de un procedimiento administrativo y medidas cautelares, esta Gerencia recomienda a partir del análisis realizado que sí resulta necesario investigar las siguientes actuaciones: 1. Condicionantes incluidas en el certificado de uso del suelo del 2019. 2. Consignación del incentivo de un 30% más de Coeficiente de Aprovechamiento del Suelo (CAS), sin que este beneficio fuera recomendado por la Comisión de Repoblamiento y sin el sustento técnico o legal de los Reglamentos de Desarrollo Urbano, dado que ese beneficio no aplica en la zonificación asociada a la propiedad donde se construye el proyecto. 3.
Omisión de fiscalización de las obras de movimiento de tierra autorizadas y ejecución de obras en cauce afectando la topografía, la cobertura vegetal, sin presentarse las denuncias ante la SETENA u otras instancias. En virtud de lo anterior, esta Alcaldía da por atendido lo solicitado en el oficio CM-PFA-057- 2025, reiterando que se han identificado aspectos que requieren investigación administrativa y la adopción de medidas correctivas. Asimismo, se confirma la disposición de esta Municipalidad para dar seguimiento a las actuaciones pendientes y garantizar que todo el proceso relacionado con el proyecto DI Escalante Verde se ajuste al marco legal vigente, en estricto apego a los principios de transparencia, legalidad y protección del interés público. En consecuencia, se reitera el compromiso de la Alcaldía de atender con la mayor seriedad y transparencia las inquietudes planteadas en torno a este proyecto.
Finalmente, se deja constancia de que el canal oficial para la atención de solicitudes de información o remisión de oficios es el correo electrónico ...1251, siendo el único medio institucional habilitado en la Alcaldía, para tales efectos”.
Ahora bien, a partir de los hechos expuestos, la Sala estima que la gestión del recurrente todavía no ha sido debidamente atendida por la municipalidad accionada. En efecto, el objeto de tal gestión era pedir a la municipalidad que iniciara un procedimiento administrativo para conocer sobre la anulación del permiso de construcción nro. 067-2022-CFIA-920253. Asimismo, requirió que se tomaran medidas cautelares. Vista esta pretensión, en su respuesta, la municipalidad transcribió el oficio GGMDU-0668-2025 de la Gerencia de Gestión Municipal y Desarrollo Urbano, instancia que señaló lo siguiente:
“…esta Gerencia recomienda a partir del análisis realizado que sí resulta necesario investigar las siguientes actuaciones:
1. Condicionantes incluidas en el certificado de uso del suelo del 2019.
2. Consignación del incentivo de un 30% más de Coeficiente de Aprovechamiento del Suelo (CAS), sin que este beneficio fuera recomendado por la Comisión de Repoblamiento y sin el sustento técnico o legal de los Reglamentos de Desarrollo Urbano, dado que ese beneficio no aplica en la zonificación asociada a la propiedad donde se construye el proyecto.
3. Omisión de fiscalización de las obras de movimiento de tierra autorizadas y ejecución de obras en cauce afectando la topografía, la cobertura vegetal, sin presentarse las denuncias ante la SETENA u otras instancias”.
Además, con base en ese oficio, señaló:
“…se han identificado aspectos que requieren investigación administrativa y la adopción de medidas correctivas. Asimismo, se confirma la disposición de esta Municipalidad para dar seguimiento a las actuaciones pendientes y garantizar que todo el proceso relacionado con el proyecto DI Escalante Verde se ajuste al marco legal vigente, en estricto apego a los principios de transparencia, legalidad y protección del interés público”.
Es decir, ante las recomendaciones de la Gerencia de Gestión Municipal y Desarrollo Urbano de investigar ciertas actuaciones, relacionadas con el permiso de construcción que era objeto de la gestión del accionante, la Alcaldía únicamente confirmó su “disposición” para dar seguimiento, sin definir con claridad sí abriría o no un procedimiento administrativo o si tomaría medidas cautelares, como solicitó el accionante. Esta incertidumbre con respecto a la pretensión del recurrente, así como el hecho de que han transcurrido más de dos meses desde que esa gestión fue originalmente planteada, constituyen una lesión a sus derechos fundamentales, dado que evidencian una mora administrativa contraria a los parámetros establecidos por la Sala en su jurisprudencia, derivados del artículo 41 constitucional. En virtud de lo expuesto, se declara con lugar el recurso, en los términos que se dirán en la parte dispositiva de esta sentencia.
V.Nota del magistrado Castillo Víquez, en cuanto a la justicia administrativa pronta y cumplida. He apoyado la tesis de este Tribunal, de que cuando el justiciable alega una vulneración al derecho a una justicia pronta y cumplida en sede administrativa, quienes deben conocer la controversia jurídica son los Tribunales de lo Contencioso-Administrativo y no esta Sala. Ahora bien, con la reciente promulgación de la Ley n.° 9097, Ley de Regulación del Derecho de Petición, se ha establecido que ese derecho es susceptible de tutela judicial por medio del recurso de amparo establecido por el artículo 32 de la Ley de la Jurisdicción Constitucional, en relación con el artículo 27 de la Constitución Política de la República de Costa Rica, en aquellos casos en que el peticionario considere que las actuaciones materiales de la Administración, sus actos administrativos o su respuesta le estén afectando sus derechos fundamentales.
A mi modo de ver, la normativa recién promulgada no implica que este Tribunal deba modificar su línea jurisprudencial, quien, con base en el numeral 7 de su Ley, le corresponde definir exclusivamente su propia competencia. Por ende, salvo aquellas controversias jurídico-constitucionales que han sido reconocidas por esta misma Sala como supuestos de excepción, que sí proceden ser conocidas en esta jurisdicción a través del proceso constitucional de garantía del amparo, en los demás casos, y por las razones que ha dado este Tribunal (sentencia N° 2008-02545 de las 8:55 horas de 22 de febrero de 2008), los competentes son los Jueces de la jurisdicción de lo contencioso-administrativo, todo lo cual es conforme al numeral 25, de la Convención Americana sobre Derechos Humanos, el Derecho de la Constitución (valores, principios y normas) y las normas legales correspondientes con base en una interpretación lógica, sistémica y teleológica del ordenamiento jurídico.
(…) Por tanto: Se declara con lugar el recurso. Se ordena a Luis Diego Miranda Méndez, en su condición de alcalde de San José, o a quien ejerza ese cargo, que coordine lo pertinente y disponga lo correspondiente dentro del ámbito de sus competencias para que, en el plazo máximo de UN MES, contado a partir de la notificación de esta sentencia, se atienda la gestión del recurrente, objeto de este proceso, como en derecho corresponda, y se le notifique lo respectivo al medio señalado por él. Se advierte a las autoridades recurridas que, de conformidad con lo establecido por el artículo 71 de la Ley de la Jurisdicción Constitucional se impondrá prisión de tres meses a dos años o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada dentro de un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado. Se condena a la Municipalidad de San José al pago de las costas, daños y perjuicios causados con los hechos que sirven de fundamento a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso-administrativo. El Magistrado Castillo Víquez consigna nota. Notifíquese”.
De ese modo, tomando en cuenta que se trata de la misma denuncia, deberán los recurrentes estarse a lo dispuesto en dicha sentencia.
IX.Sobre la actuación de la Municipalidad de San José respecto a las irregularidades encontradas en el expediente. Ahora bien, respecto a la actuación de esa Municipalidad en el trámite del permiso de construcción no. 067-2022_CFIA-920253, se constata que en el segundo informe rendido bajo juramento por esa autoridad el 27 de junio de 2025, se indicó lo siguiente: “Hago referencia al oficio MSJ-ALCALDIA-2387-2025 del 13 de junio del 2025, en el cual se solicita la evaluación y complemento a la respuesta emitida en relación con el expediente número 25-015494-0007-CO de la Sala Constitucional. Al respecto, se procedió a revisar el expediente del Proyecto Di Escalante Verde remitido por la Sección de Permisos de Construcción que contiene la siguiente información: (…) De la información remitida se procedió a construir un expediente físico con la información principal del permiso de construcción: (…) • Que la información presentada para la percepción local no cumple con los requerimientos mínimos establecidos en el D.E.
Nº32966-MINAE. Además, no se consultó a las personas sobre el proyecto. El punto referente a servicios básicos disponibles debe desarrollarse nuevamente. La encuesta debe desarrollarse con un nivel de confianza del 90% y debe tomar en cuenta el AID. Debe presentarse la fórmula empleada para extraer la muestra. De manera previa a la consulta debe realizarse un proceso de información del proyecto en el cual se detallen los componentes, impactos, medidas ambientales, con la finalidad de que la población posea criterio de opinar. Cada uno de los puntos a consultar debe graficarse con la debida interpretación del caso. El estudio de percepción local debe indicar cuál es la percepción, posición, actitudes y preocupaciones del área de influencia social sobre la ejecución del proyecto, así como la percepción de potenciales impactos que este podría generar. Además, se deben identificar las necesidades de información que tiene la población sobre el proyecto e identificar y caracterizar los posibles conflictos derivados de la construcción.
Las medidas ambientales de mitigación, compensación o control deben ser incorporadas en el cuadro de PGA. • Ampliar lo referente al apartado accesos y vialidad del proyecto de acuerdo con lo establecido en el anexo I del Decreto Ejecutivo Nº32966-MINAE del 4 de mayo del 2006. • Presentar el mapeo con los accesos y las rutas más transitadas en el cual se ubiquen escuelas, colegios, parques, etc. Deberá indicar cuáles fueron las principales inquietudes formuladas por la sociedad civil. Describir las medidas ambientales a aplicar para cada inquietud formulada. Incorporar pronunciamiento del MOPT con relación a los accesos del proyecto y al estudio de impacto vial. Indicar si se establecerán medidas compensatorias. • Presentar nuevamente la declaración jurada de compromisos ambientales, pues la presentada no cumple con el formato establecido. • Presentar memoria de cálculo del movimiento de tierra, así como definir la disposición, posibles impactos y las respectivas medidas mitigatorias. • Deberá presentar el permiso de ubicación de la planta de tratamiento debidamente refrendado por el MINSA y la debida autorización del desfogue de la planta de tratamiento. • El cuadro resumen de la gestión ambiental no está de acuerdo con lo establecido en el Decreto Ejecutivo Nº32966-MINAE del 4 de mayo del 2006. • Describen los aspectos técnicos contemplados en la evaluación de impacto ambiental donde no se encontraron mayores conclusiones.
A pesar de que en los RESULTANDOS, Cuarto, Quinto, Sexto y Sétimo se hace referencia a la presentación de documentación adicional solicitada, la misma no consta en el expediente que fue remitido por parte de la Sección de Permisos de Construcción. El en apartado de CONSIDERANDOS, el único aspecto a ser tomado en cuenta es que el número de plano catastrado SJ-1889650-2016 no coincide con los números de planos catastro sobre los que se emitió el permiso de construcción, a saber, SJ-0668597-2000 y SJ-0923485-2004. Sin embargo, sobre este último se emite posteriormente la resolución 1148-2019-SETENA, en la cual se corrige el error material en cuanto a los números de planos catastrados. No obstante, no se hace ninguna referencia sobre la subsanación de los otros puntos mencionados en la resolución anterior. En el POR TANTO, se otorga la viabilidad ambiental al proyecto. Oficio SIGDD-2020-00049728-1-2-1: El Instituto Costarricense de Acueductos y Alcantarillados emite constancia de capacidad de recolección de aguas servidas para un caudal de 240.87 m2/d, que corresponde a un servicio (macro medidor) de agua potable.
Esta capacidad está condicionada al desvío del Subcolector Negritos propuesto por el desarrollador, según indica el oficio y los planos de esta mejora deberán ser aprobados por la Dirección de Urbanizaciones con el aval de la UE PAPS. EIV: Si bien el proyecto cuenta con un estudio de impacto vial, no se encuentra en el expediente el visto bueno o aval de la Dirección General de Ingeniería de Tránsito de este. Visado CFIA: Por otra parte, el proyecto fue visado por el CFIA el primero de julio del 2021, se aprobó por parte de la Municipalidad el 24 de febrero del 2022 y la licencia constructiva entró en vigor el 7 de febrero del 2023. Oficio SPC-262-2025: La respuesta brindada por el Arquitecto Álvarez a la Sala Constitucional, parte de la conclusión de que este fue analizado bajo la normativa urbana vigente en ese momento, entiéndase los Reglamentos de Desarrollo Urbano publicados en el alcance digital 2 de la Gaceta #29 del 11 de febrero del 2014.
En esta normativa, la zonificación donde se ubica el proyecto está considerada como Zona Sujeta a Estudio y adicionalmente se ubica según la cartografía ambiental de los Reglamentos de Desarrollo Urbano vigentes en una zona predominantemente de baja susceptibilidad a deslizamientos con algunos sectores con moderada susceptibilidad a deslizamientos y zonas con potencial a inundación. Conclusiones del análisis del expediente: No fue posible encontrar en el expediente, los siguientes documentos los cuales se consideran importantes para efectos del análisis solicitado: ▪ El instrumento de consulta a la población que cumpla con lo establecido en el decreto Nº32966-MINAE. Tampoco se encontraron todos los documentos que hagan constar que el proceso de consulta cumple con los requerimientos técnicos mínimos establecidos en la resolución 682-2018-SETENA resultado tercero punto 3. ▪ El Visto Bueno o aprobación de la Dirección General de Ingeniería y Tránsito del MOPT del Estudio de Impacto Vial y los accesos al proyecto. ▪ El detalle de las medidas ambientales a ser tomadas por el desarrollador para atender a las inquietudes de la comunidad. ▪ Visto bueno o aprobación de la Dirección de Urbanizaciones del AYA al respecto de la reubicación del colector sanitario Los Negritos. ▪ Visto bueno de la Dirección de Urbanizaciones del AYA para la conexión del proyecto a la red sanitaria existente.
Lo que se muestra en el expediente es una Constancia de Capacidad de Recolección, la cual no constituye una autorización de construcción o interconexión. Es importante mencionar que la mencionada Constancia se emite para un total de 300 fincas filiales según plano catastro Nº 1-0923485-2004, siendo que SETENA menciona que la viabilidad ambiental se otorga para un total de 323 apartamentos. Mientras que la municipalidad en el permiso de construcción 067-2022_CFIA-920253 autoriza la construcción de 135 unidades, para un total de 13.331 m2 correspondientes a un edificio de 10 niveles. ▪ Aval de UE PAPS para la reubicación del Colector Negritos. ▪ Al momento de la aprobación de los permisos de construcción, existe un gravamen sobre la propiedad finca 498246 plano catastro SJ-923485-2004 que responde a la servidumbre de alcantarillado sanitario. Surge la duda sobre la viabilidad de otorgar una licencia de construcción en una condición donde el gravamen no ha sido formalmente levantado tanto a nivel catastral como registral.
No consta en los documentos analizados que dicho gravamen haya sido levantado o esté en proceso de resolución. ▪ Aunque el desarrollador propone la reubicación del colector de aguas negras “Los Negritos” para ser ubicado de forma paralela al entubamiento de la quebrada y al ser esta una obra en cauce, no se encontró Visto Bueno o aprobación escrita de la Dirección de Aguas del MINAE para estos trabajos, únicamente se observa el nuevo trazado en los planos constructivos. Al respecto se remitió consulta mediante oficio GGMDU-0230- 2025 al ingeniero José Miguel Zeledón Calderón, Director de la Dirección de Aguas, cuya respuesta aún se encuentra pendiente. ▪ Memoria de cálculo del movimiento de tierra, así como definir la disposición, posibles impactos y las respectivas medidas de mitigación. ▪ Estudio geotécnico que demuestre la aptitud urbanística según lo establecido en el inciso 10.3.5 Zonas Sujetas a Estudio, de los Reglamentos de Desarrollo Urbano Vigentes en el momento de la aprobación del permiso de construcción. ▪ Al respecto de la zonificación con base a la cual se otorgó el permiso de construcción, es importante señalar que los Reglamentos de Desarrollo Urbano vigentes (2014) al momento de la aprobación del permiso de construcción, indican que parte de la zona donde se ubica el proyecto se identifica como zona con riesgo moderado a deslizamientos y susceptible a inundación (mapa de zonas de amenaza a deslizamientos e inundaciones).
Afectación que no sufrió variación respecto de la actualización de los Reglamentos de Desarrollo Urbano del 2023 y vigentes a la fecha. Esta zonificación indica que, en estas zonas sujetas a estudio, deben realizarse los análisis requeridos que demuestren su aptitud urbanística”. Así, ante esa situación, continúa el informe indicado lo siguiente: “En virtud de lo anterior esta Gerencia considera necesario revisar el proceso de tramitación y aprobación del permiso de construcción del proyecto Di Escalante Verde, por lo que se recomienda el estudio pormenorizado de lo actuado por la administración incluyendo las consultas que sean pertinentes tanto a las instituciones, como al desarrollador, a efectos de determinar la pertinencia para la continuidad de las obras en función del interés común, la protección del ambiente y la calidad de vida de las personas de la comunidad de Barrio Escalante y alrededores” (el resaltado no es del original).
Por consiguiente, ante esa indicación, en el informe en cuestión el alcalde de San José manifestó lo siguiente: “considera el suscrito Alcalde hacer llegar a la Sala Constitucional el presente informe señalado el cual no tuve a la vista a la hora de contestar el presente Recurso Amparo, esta Alcaldía reitera su compromiso con la legalidad, la transparencia y la protección del interés público. Por ello, se gestionarán las acciones correspondientes para determinar la validez de lo actuado en el trámite del permiso de construcción del proyecto Di Escalante Verde, aun cuando en una primera instancia pareciera que se contaba con toda la documentación requerida. Esta revisión se realizará con el debido rigor técnico y jurídico, atendiendo las observaciones señaladas por la Gerencia de Gestión Municipal y Desarrollo Urbano, y en resguardo de los derechos e intereses de la comunidad”.
Por lo tanto, ante esas afirmaciones, este Tribunal, mediante resolución de las 13:15 horas del 26 de marzo de 2026, le solicitó una prueba para mejor resolver al alcalde de la Municipalidad de San José a fin de que se refiriera sobre lo siguiente: “- al alcalde de la Municipalidad de San José: tomando en cuenta que en el segundo informe rendido bajo juramento por esa autoridad el 27 de junio de 2025, se indicó lo siguiente: "(…) se gestionarán las acciones correspondientes para determinar la validez de lo actuado en el trámite del permiso de construcción del proyecto Di Escalante Verde, aun cuando en una primera instancia pareciera que se contaba con toda la documentación requerida. Esta revisión se realizará con el debido rigor técnico y jurídico, atendiendo las observaciones señaladas por la Gerencia de Gestión Municipal y Desarrollo Urbano, y en resguardo de los derechos e intereses de la comunidad". Por ende, deberá aclarar que acciones se han realizado para determinar dicha situación y qué ha sucedido con esa averiguación” (el resaltado no es del original).
Al respecto, mediante informe rendido el 08 de abril de 2026, el alcalde de la Municipalidad de San José informó bajo juramento lo siguiente: “Se procede adjuntar oficios MSJ-ALCALDIA-1229-2026 de la señora Laura Brenes Fernández, Jefa del Despacho del Alcalde y con oficio GGMDU-0292-2026, de la Arq. Jessica Martínez Porras Gerente de la Gestión Municipal y Desarrollo Urbano, del cual se desprende, tal y como se verá más adelante, que el actuar de la Municipalidad de San José ha sido diligente y proactivo, enmarcándose nuestras acciones en el más amplio concepto de atribuciones y potestades. I. En relación con el informe técnicos Una vez que fuese notificado lo solicitado por esta Honorable Sala, se procedió por parte de la Dirección de Asuntos Jurídicos de la Municipalidad a instruir el proceso, solicitando a los órganos vinculados y/o competentes, a la luz del asunto planteado, los informes conducentes, a fin dar el debido trámite, esto, a través del oficio N°DAJ-535-32-2026, el cual fue contestado, con oficio N°MSJ-ALCALDIA-1229-2026 y con el oficio DAJ-561-32- 2026, el cual fue contestado con el oficio GGMDU-0292-2026.
Asimismo, se recibió la demás documentación y/o información relacionada con el caso, de lo cual se informará de seguido: Del estudio del proceso seguido, en el caso en cuestión, es claro el hecho de que las actuaciones de esta Municipalidad de San José, a nuestro criterio han sido ajustadas a Derecho y de conformidad con sus potestades conferidas, fundamentándonos en lo siguiente: PRIMERO: Que la Licda. Laura Brenes Fernández, Jefa del Despacho del Alcalde, El Arq. con oficio N°MSJ-ALCALDIA-1229-2026, informa con relación al objeto del litigio: (…) SEGUNDO: Que la Arq. Jessica Martínez Porras Gerente de la Gestión Municipal y Desarrollo Urbano, informa con relación al objeto del litigio lo siguiente: (…) Dado lo anterior, se logra comprobar que esta Municipalidad, dentro de sus posibilidades y competencias, ha realizado diversas acciones en relación con la construcción del Proyecto Di Escalante Verde”.
De este modo, se constata que la Municipalidad de San José hace mención de la denuncia interpuesta por los recurrentes, la cual fue conocida en el considerando anterior, en donde se señala, entre otros del oficio no. GGMDU-0668-2025 del 25 de agosto de 2025 de la Gerencia de Gestión Municipal y Desarrollo Urbano de la Municipalidad de San José y del oficio no. MSJ-ALCALDIA-3514-2025 del 25 de agosto de 2025 del alcalde de la Municipalidad de San José, pero este Tribunal constata que en dichos oficios se sigue indicando sobre la necesidad de realizar una investigación administrativa y la adopción de medidas correctivas, pero sin afirmarse que esa investigación se haya realizado o se haya concluido. Nótese que gran parte de la actuación de investigación de esa Municipalidad respecto al proyecto cuestionado se ha dado con ocasión de la notificación de la resolución de curso a dicha corporación municipal, sin que, a la fecha, se reitera que no se ha concluido esa investigación administrativa y no queda claro sobre la adopción de medidas correctivas.
Así, mediante oficio no. GGMDU-0668-2025 del 25 de agosto de 2025 de la Gerencia de Gestión Municipal y Desarrollo Urbano de la Municipalidad de San José se elaboró un criterio técnico-administrativo, relacionado con el proceso de aprobación de la licencia de construcción del proyecto Di Escalante Verde, en el cual se recomendó la necesidad de investigar actuaciones específicas asociadas al trámite de la licencia otorgada con el propósito de verificar la conformidad de lo actuado con el ordenamiento jurídico aplicable, en resguardo del principio de legalidad y del interés público, pero sin quedar claro actuaciones específicas asociadas al trámite de la licencia otorgada con el propósito de verificar la conformidad de lo actuado con el ordenamiento jurídico aplicable. Igualmente, el oficio no. MSJ-ALCALDIA-3514-2025 del 25 de agosto de 2025 del alcalde de la Municipalidad de San José menciona lo siguiente: “En virtud de lo anterior, esta Alcaldía da por atendido lo solicitado en el oficio CM-PFA-057-2025, reiterando que se han identificado aspectos que requieren investigación administrativa y la adopción de medidas correctivas.
Asimismo, se confirma la disposición de esta Municipalidad para dar seguimiento a las actuaciones pendientes y garantizar que todo el proceso relacionado con el proyecto DI Escalante Verde se ajuste al marco legal vigente, en estricto apego a los principios de transparencia, legalidad y protección del interés público. En consecuencia, se reitera el compromiso de la Alcaldía de atender con la mayor seriedad y transparencia las inquietudes planteadas en torno a este proyecto”. Es decir, se reitera que en ambos documentos se sigue indicado sobre la necesidad de realizar una investigación administrativa y la adopción de medidas correctivas, pero sin indicarse que esa investigación se haya realizado o se haya concluido. Por consiguiente, se denota una omisión por parte de la Municipalidad en realizar una investigación adecuada en donde se descarte alguna situación anómala en cuanto a la tramitación del permiso de construcción del proyecto en cuestión o que haya tomado medidas correctivas ante alguna situación ambiental al respecto.
De esa forma, esta Sala Constitucional reitera lo indicado en el precedente citado en el considerando anterior, respecto a que la Alcaldía únicamente confirmó su “disposición” para dar seguimiento, sin definir con claridad sí abriría o no un procedimiento administrativo o si tomarían medidas cautelares. Esta incertidumbre con respecto a la actuación de la Municipalidad recurrida constituye una lesión a sus derechos fundamentales, dado que evidencian una omisión en cuanto a sus obligaciones municipales. Recordemos que este Tribunal ha mencionado que el artículo 169, de la Constitución Política, dispone el deber de las municipalidades del país de velar por los intereses de los habitantes de su jurisdicción, de ahí que, en reiterados pronunciamientos, este Tribunal ha señalado que, dichas corporaciones se encuentran en la obligación de eliminar cualquier tipo de amenaza que ponga en riesgo los derechos a la salud y a un medio ambiente sano y ecológicamente equilibrado de las personas que viven en su cantón (véase la Sentencia N° 2008-11739 de las 12:12 horas del 25 de julio de 2008, reiterada en la N° 2020-014753, de las 9:15 horas del 7 de agosto de 2020).
En concordancia con lo anterior, si bien, como tal se ha explicado en esta sentencia, la inconformidad con los permisos de construcción es materia de legalidad ordinaria, lo cierto es que, en este caso particular, se evidencia que la propia Municipalidad de San José identifica que podría haber situaciones que afectaron el otorgamiento de los permisos de construcción por las variables ambientales involucradas. Al respecto, es la propia Municipalidad la que indica que es importante avanzar en esa verificación interna “a efectos de determinar la pertinencia para la continuidad de las obras en función del interés común, la protección del ambiente y la calidad de vida de las personas de la comunidad de Barrio Escalante y alrededores”.
Por ende, si bien se reitera que discutir el otorgamiento de un permiso de construcción es materia de legalidad, en este caso en particular, la propia Municipalidad recurrida reconoce que en el trámite de otorgamiento del permiso pudo haber hecho falta valoraciones de aspectos relacionados con la protección del ambiente. Dicha situación, amerita la intervención de este Tribunal a efectos de indicarle a la Municipalidad que debe concluir los procedimientos internos para que se resuelva lo que en derecho corresponda respecto a este permiso de construcción y/o los documentos que pudieran hacer falta y que pudieran incidir en la protección ambiental.
Ergo, respecto a este punto se denota una lesión a los derechos fundamentales de los recurrentes.
X.Sobre la denuncia penal. Por último, se constata que el 10 de junio de 2025, Ariel Robles Barrantes, en su condición de diputado de la República, interpuso una denuncia penal ante la Fiscalía Adjunta Agrario Ambiental por usurpación de bienes de dominio público en contra del proyecto en cuestión. Así, de dicha denuncia se han producido las siguientes actuaciones: a) informe de gira No. SINAC-ACC-OSJ-inf-0074-2026 del 15 de enero de 2026 de la oficina Subregional de San José del Sistema Nacional de Áreas de Conservación; b) oficio no. CARTA-SINAC-ACC-OSJ-0097-2026 del 21 de enero de 2026 de la jefa de la Oficina Subregional de San José del Sistema Nacional del Área de Conservación; c) y el informe de gira no. SINAC-ACC-OSJ-inf-0118-2026 del 30 de enero de 2026 de la oficina Subregional de San José del Sistema Nacional de Áreas de Conservación.
Ahora bien, tomando en cuenta que esas actuaciones se circunscriben dentro de dicha denuncia penal, por lo que será en dicho proceso penal en donde se determinen las situaciones ahí denuncias, pues no le corresponde a este Tribunal Constitucional suplir a la jurisdicción penal o actuar como alzada en la materia, toda vez que eso implicaría incidir en el ámbito de competencia propio de dicha jurisdicción, el cual está constitucionalmente reservado a los jueces correspondientes, de conformidad con lo dispuesto en el artículo 153 de la Constitución Política. Al respecto, se debe indicar que las actuaciones y resoluciones que se estiman contrarias al Derecho de la Constitución provienen de un órgano del Poder Judicial en ejercicio de su función jurisdiccional. Por ello, es improcedente que esta Sala se pronuncie sobre los extremos alegados en el recurso, toda vez que, conforme al artículo 30 inciso b) de la Ley de la Jurisdicción Constitucional, esos actos no están sometidos al control de constitucionalidad por la vía del amparo y, además, legalmente no está prevista una situación de excepción al respecto (ver la sentencia no. 2026-001574 de las 10:05 horas del 13 de enero de 2026).
Así, cualquier situación sobre ese proceso penal deberá alegarse a través de los mecanismos que el derecho procesal penal prevé, a fin de que se resuelva lo que en derecho corresponda.
XI.Conclusión. En virtud de lo expuesto, lo que corresponde es declarar parcialmente con lugar el recurso contra la Municipalidad de San José, por la omisión de realizar y culminar el proceso de investigación interna tendiente a la determinación de la continuidad de las obras en función del interés común, la protección del ambiente y la calidad de vida de las personas que conforman la comunidad de Barrio Escalante y sus alrededores en el cantón central de la provincia de San José, relacionadas con el permiso de construcción no. 067-2022_CFIA-920253. Asimismo, se declara con lugar el recurso respecto al atraso en la resolución de la denuncia interpuesta ante la Secretaría Técnica Ambiental. Ahora bien, tomando en cuenta que fue con ocasión a la interposición del presente recurso que se procedió a resolver la denuncia interpuesta ante SETENA, el recurso de amparo debe ser declarado con lugar en cuanto a este punto, en aplicación del artículo 52 de la Ley de la Jurisdicción Constitucional. Por otra parte, se declara sin lugar el recurso en cuanto a la viabilidad ambiental otorgada por la Secretaría Técnica Nacional y al permiso de construcción otorgado por la Municipalidad de San José. Por último, respecto a la denuncia presentada en la Municipalidad de San José, deberán estarse a lo resuelto en la sentencia no. 2025-029376 de las 10:25 horas del 12 de setiembre de 2025.
Ahora bien, respecto a la denuncia interpuesta ante SETENA, lo procedente es recordarle a SETENA, al SINAC y a la Dirección de Agua del MINAE, según respecto a sus competencias, su obligación de continuar verificando el cumplimiento estricto de los requisitos ambientales exigibles, en resguardo de la debida protección del medio ambiente conforme a los parámetros fijados por esta jurisdicción constitucional.
XII.Sobre la condenatoria en costas, daños y perjuicios de conformidad con el artículo 52 de la Ley de la Jurisdicción Constitucional. Bajo una mejor ponderación, la mayoría de la Sala considera que, en el sub examine, de conformidad con lo dispuesto en el párrafo 1° del artículo 52 de la Ley de la Jurisdicción Constitucional (“ Si, estando en curso el amparo, se dictare resolución, administrativa o judicial, que revoque, detenga o suspenda la actuación impugnada, se declarará con lugar el recurso únicamente para efectos de indemnización y de costas, si fueren procedentes” ), la estimatoria debe serlo sin especial condenatoria en costas, daños y perjuicios, con base en las siguientes consideraciones. Si bien hay un texto expreso en la ley que obliga a que la parte dispositiva del fallo indique que se declara con lugar el recurso, cuando estando en curso del amparo se resuelva el agravio, no menos cierto es que ese mismo párrafo in fine refiere que la estimatoria se dicta “únicamente para efectos de indemnización y de costas, si fueren procedentes”.
Se subraya que la Ley indica “si fueren procedentes”, lo cual significa que la procedencia o improcedencia de la indemnización y costas depende de una valoración, apreciación o ponderación del Tribunal. En casos como este, el contenido de la pretensión de la persona amparada y la conducta de la autoridad recurrida de reconocer aquella, sugieren que los menoscabos, lesiones o alteraciones alegados no están referidos de modo directo a una repercusión en un derecho constitucional de evidente naturaleza patrimonial (como sí ocurriría, por ejemplo, con una afectación al derecho al salario). Para disipar cualquier duda al respecto, es importante destacar lo dispuesto en el artículo 51 de la misma Ley de la Jurisdicción Constitucional, cuando dispone que: “toda resolución que acoja el recurso condenará en abstracto a la indemnización de los daños y perjuicios causados y al pago de las costas del recurso, y se reservará su liquidación para la ejecución de sentencia” , donde no se prevé la posibilidad de valorar si procede o no lo concerniente a indemnización y costas.
Los principios del Derecho Constitucional, los del Público y Procesal General o, en su caso, los del Derecho Internacional o Comunitario y, además, por su orden, la Ley General de la Administración Pública y el Código Procesal Contencioso Administrativo y los demás códigos procesales, son fuente supletoria para la aplicación e interpretación de las normas de la Ley de la Jurisdicción Constitucional - cfr. artículo 14-. Para la jurisdicción contencioso-administrativa, el legislador estableció un precepto plenamente aplicable al caso por analogía, en el artículo 197 del Código Procesal Contencioso Administrativo, que responde a la lógica procesal en cualquier materia. En todo caso, la parte afectada del sub lite preserva la posibilidad de acudir, si a bien lo tiene, a un proceso de conocimiento a fin de demostrar que ha sufrido algún tipo de menoscabo. Con base en lo anterior, es criterio de mayoría resolver este recurso sin condenatoria en costas, daños y perjuicios.
Si bien coincido con el voto de mayoría, que declara con lugar el recurso por violación al derecho de petición y pronta respuesta, considero que debe ser estimado; pero imponiendo a la parte recurrida el pago de las costas, así como a la indemnización por los daños y perjuicios ocasionados, por las siguientes razones.
El derecho de petición y pronta respuesta, contenido en los artículos 27, de la Constitución Política, y 32, de la Ley de la Jurisdicción Constitucional, obliga a los funcionarios públicos a resolver las solicitudes de los administrados en un plazo de diez días hábiles a partir de la fecha de presentación de tales gestiones, salvo que se haya señalado un plazo distinto para contestar. Sin embargo, el artículo 32 citado dispone, además, que, en la decisión de la petición, la Sala apreciará las razones que se aduzcan para considerar insuficiente dicho plazo, atendidas las circunstancias y la índole del asunto. En todo caso, la Administración está obligada a comunicarle al peticionario las causas de la demora en pronunciarse. Para efectos del presente análisis, resulta relevante tener presente lo señalado por las normas antes citadas.
El artículo 27, de la Constitución Política, establece lo siguiente:
“Se garantiza la libertad de petición, en forma individual o colectiva, ante cualquier funcionario público o entidad oficial, y el derecho a obtener pronta resolución”.
Por su parte, el numeral 32, de la Ley de la Jurisdicción Constitucional, establece lo siguiente:
“Cuando el amparo se refiera al derecho de petición y de obtener pronta resolución, establecido en el artículo 27 de la Constitución Política, y no hubiere plazo señalado para contestar, se entenderá que la violación se produce una vez transcurridos diez días hábiles desde la fecha en que fue presentada la solicitud en la oficina administrativa, sin perjuicio de que, en la decisión del recurso, se aprecien las razones que se aduzcan para considerar insuficiente ese plazo, atendidas las circunstancias y la índole del asunto”.
En el mismo sentido, en la Ley de Regulación del Derecho de Petición N° 9097 del 26 de octubre de 2012, se establece que ese derecho es susceptible de tutela judicial por medio del recurso de amparo establecido por el artículo 32, de la Ley de la Jurisdicción Constitucional, en relación con el artículo 27, de la Constitución Política, para aquellos casos en que el peticionario considere que las actuaciones materiales de la Administración, sus actos administrativos o su respuesta le estén afectando sus derechos fundamentales. Es de relevancia tener presente lo señalado en el numeral 6, de dicha normativa:
“Presentación de escritos y plazo de respuesta.
El escrito en que se presente la petición y cualesquiera otros documentos y comunicaciones que se aporten, ante la administración pública correspondiente, conforme lo indica el artículo 2 de esta ley, obligará a la administración a acusar recibo de esta, debiendo responder en el plazo improrrogable de diez días hábiles contado a partir del día siguiente de la recepción, siempre y cuando se cumplan los requisitos establecidos en la presente ley. Esta actuación se llevará a efecto por el órgano correspondiente, de acuerdo con la norma organizativa de cada entidad…”.
De este modo, en los recursos de amparo referidos a la presunta lesión de este derecho, existe norma legal expresa -avalada constitucionalmente por la ley que rige esta jurisdicción- que ordena brindar la información requerida dentro de los diez días hábiles siguientes a su solicitud, tal y como lo disponen los artículos 32, de la Ley de la Jurisdicción Constitucional y 27, de la Constitución Política, según se indicó anteriormente. Adicionalmente, dicho plazo es reiterado en el artículo 6, de la Ley N° 9097, lo cual refuerza la intención del legislador respecto de la tutela de este derecho.
Asimismo, la Ley de la Jurisdicción Constitucional, en el artículo 51, dispone:
“...toda resolución que acoja el recurso condenará en abstracto a la indemnización de los daños y perjuicios causados y al pago de las costas del recurso, y se reservará su liquidación para la ejecución de sentencia”.
Esta última norma establece el sistema general que regula lo relativo al tema de la indemnización y el pago de las costas, y que la mayoría denomina “forma natural o normal de terminación del proceso, donde hay pronunciamiento sobre el fondo del asunto y reconocimiento de los hechos que han vulnerado los derechos fundamentales…”.
En consecuencia, en el caso que nos ocupa, se constata la violación del plazo de diez días avalado constitucionalmente -que, por cierto, no se exige para el resto de los recursos de amparo, excepto para el de rectificación y respuesta (numeral 68, de la Ley de la Jurisdicción Constitucional)-.
Por lo tanto, lo que procede al respecto, y con el debido respeto a la tesis de la mayoría, es tener por acreditada la lesión al derecho de petición y pronta respuesta, así como al derecho de acceso a la información pública (artículo 30, Constitucional), que garantiza el libre acceso a los departamentos administrativos con propósitos de información sobre asuntos de interés público, ordenando la condenatoria en costas, daños y perjuicios a la autoridad recurrida.
Así, tratándose de un plazo avalado constitucionalmente -tanto por el legislador, así como por este Tribunal Constitucional-, su incumplimiento conlleva una lesión al derecho fundamental señalado que impulsó a la parte recurrente a formular el presente recurso de amparo como mecanismo para la obtención de la respuesta a su gestión o el acceso a la información que ha requerido, lo anterior con independencia de que la respuesta o la entrega de la información se haya producido antes o con ocasión del amparo; porque, es lo cierto, que finalmente el administrado vio satisfecho su derecho constitucional con ocasión a la interposición del recurso de amparo que se vio forzado a presentar, con los inconvenientes y los costos que ello ocasiona. Se insiste, la respuesta o el acceso dado por la Administración recurrida que se produce una vez vencido el plazo en cuestión, aún y cuando sobrevenga antes de la notificación del curso del amparo, o bien, como en este caso, con ocasión de la puesta en conocimiento de dicho curso, no constituye un cumplimiento en tiempo de la obligación que le imponen los ordinales 27 y 30 Constitucionales.
Es claro que en esa hipótesis, esa respuesta extemporánea supone una satisfacción al reclamo de la parte amparada, pero ello no es óbice para el reconocimiento de los daños y perjuicios que esa indolencia pudo ocasionar a la parte recurrente, así como de los costos asociados al ejercicio de la presente acción procesal, necesaria para el resguardo de sus derechos fundamentales, tal y como lo habilita el precepto 52, de la Ley de la Jurisdicción Constitucional.
En consecuencia, salvo parcialmente el voto, e impongo a la parte accionada el pago de las costas, daños y perjuicios.
XIV.Voto salvado de la Magistrada Garro Vargas respecto a la parte dispositiva de esta sentencia. Dice el artículo 52 de la Ley de la Jurisdicción Constitucional (LJC): “Si, estando en curso el amparo, se dictare resolución, administrativa o judicial, que revoque, detenga o suspenda la actuación impugnada, se declarará con lugar el recurso únicamente para efectos de indemnización y de costas, si fueren procedentes”.
Mi interpretación sobre esa norma es la siguiente: Esa “resolución” es todo acto válido y eficaz por el cual la autoridad competente restituye en el goce del derecho conculcado. La frase “si fueren procedentes” se refiere a las costas. Es más, el artículo 197 del Código Procesal Contencioso-Administrativo, citado por la mayoría, sobre la base del artículo 14 de la LJC, justamente se refiere sólo a estas: a las costas.
Ciertamente, a tenor del artículo 48 de la Constitución Política (CP), el contenido esencial del derecho al recurso de amparo no es indemnizatorio sino restitutorio; sin embargo, el artículo 51 de la LJC señala: “Toda resolución que acoja el recurso condenará en abstracto a la indemnización de los daños y perjuicios causados y al pago de las costas del recurso, y se reservará su liquidación para la ejecución de sentencia”.
Si el derecho ha sido violado y la Sala así lo constata, aún en caso de que haya sido restituido, podrían haber surgido daños y perjuicios. Por tal motivo, cabe la condenatoria en abstracto de éstos. Si no se hiciera así, si no se diera tal condenatoria, en el caso de que sí se hubieren dado, no habría título –derivado de este proceso– para reclamarlos, con lo que se podría violar el artículo 41 de la CP. Si a pesar de que se haya condenatoria en abstracto, no se han dado los daños y perjuicios, el juez en la vía ordinaria así lo declarará, pues sólo a él corresponde tener por probado la existencia real y la magnitud de los mismos.
Con la tesis defendida por la mayoría estimo que, contrario a lo que se busca, se estaría incentivando que la Administración respete los derechos sólo ante la existencia de un recurso de amparo. Resta decir que el artículo 52 de la LJC prevé la posibilidad de que, si se estima que es lo justo, la Sala condene en costas, aún cuando el derecho haya sido restituido.
En razón de lo anterior, salvo parcialmente el voto respecto de la parte dispositiva y ordeno la condenatoria en daños y perjuicios, pero no en costas.
Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, éstos deberán ser retirados del despacho en un plazo máximo de 30 días hábiles contados a partir de la notificación de esta sentencia. De lo contrario, será destruido todo aquel material que no sea retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en sesión N° 27-11 del 22 de agosto del 2011, artículo XXVI y publicado en el Boletín Judicial número 19 del 26 de enero del 2012, así como en el acuerdo aprobado por el Consejo Superior del Poder Judicial, en la sesión N° 43-12 celebrada el 3 de mayo del 2012, artículo LXXXI.
Por tanto:
En cuanto a la denuncia presentada ante la Municipalidad de San José el día 28 de mayo de 2025, estense los recurrentes a lo resuelto en la sentencia de esta Sala no. 2025-029376, de las 10:25 horas del 12 de setiembre de 2025. Se declara parcialmente con lugar el recurso contra la Municipalidad de San José, por la omisión de realizar y culminar el proceso de investigación interna tendiente a la determinación de la continuidad de las obras en función del interés común, la protección del ambiente y la calidad de vida de las personas que conforman la comunidad de Barrio Escalante y sus alrededores en el cantón central de la provincia de San José, relacionadas con el permiso de construcción no. 067-2022_CFIA-920253. En consecuencia, se ordena a Diego Miranda Méndez, en su condición de alcalde de la Municipalidad de San José, o a quien ocupe el cargo, que: a) dentro del plazo de dos meses contado a partir de la notificación de esta sentencia, se realice la reposición de piezas que corresponda en el expediente del permiso de construcción no. 067-2022_CFIA-920253, y se resuelva lo que en derecho corresponda; b) que, en ese mismo plazo, se aperture los procesos administrativos disciplinarios que resultaren pertinentes si así llegare a corresponder, y se resuelvan los mismos sin dilaciones indebidas; c) se brinde seguimiento a la denuncia interpuesta por los recurrentes el 28 de mayo de 2025, según lo indicado en la sentencia de esta Sala no. 2025-029376 de las 10:25 horas del 12 de setiembre de 2025.
Lo anterior, bajo apercibimiento que, con base en lo establecido en el artículo 71, de la Ley de la Jurisdicción Constitucional, se impondrá prisión de tres meses a dos años, o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada en un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado. Se condena a la Municipalidad de San José al pago de las costas, daños y perjuicios provocados a la recurrente con los hechos que sirven de fundamento a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso administrativo. Por otra parte, en cuanto a la Secretaría Técnica Nacional Ambiental, se declara con lugar el recurso, con base en lo dispuesto por el artículo 52, párrafo 1º, de la Ley de la Jurisdicción Constitucional, sin especial condenatoria en costas, daños y perjuicios, por el atraso en la resolución de la denuncia interpuesta ante dicha instancia el día 19 de marzo de 2025.
El magistrado Salazar Alvarado consigna razones diferentes y salva parcialmente el voto, únicamente para efectos indemnizatorios, e impone a la Secretaría Técnica Nacional Ambiental el pago de las costas, daños y perjuicios. La Magistrada Garro Vargas salva parcialmente el voto y ordena la condenatoria en daños y perjuicios, pero no en costas, respecto de la estimatoria del amparo contra la Secretaría Técnica Nacional Ambiental. En lo demás, se declara sin lugar el recurso. Tomen nota la Secretaría Técnica Nacional Ambiental, el Sistema Nacional de Áreas de Conservación y la Dirección de Agua del Ministerio de Ambiente y Energía, de lo indicado en el último párrafo del considerando XI de esta sentencia. Notifíquese.- Fernando Castillo V.
Fernando Cruz C.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.
Document not found. Documento no encontrado.