Res. 33901-2025 Sala Constitucional · Sala Constitucional · 17/10/2025

Municipality Must Resolve Encroachment on River Protection ZoneMunicipio debe resolver invasión de zona de protección fluvial

View document ↓ Ver documento ↓ View original source ↗ Ver fuente original ↗

Loading…Cargando…

OutcomeResultado

GrantedCon lugar

The Chamber ordered the Municipality of Goicoechea to provide a definitive solution to the river protection-zone encroachment within two months and held it liable for costs and damages.La Sala ordenó a la Municipalidad de Goicoechea brindar, en un máximo de dos meses, una solución definitiva a la invasión de la zona de protección fluvial y la condenó al pago de costas, daños y perjuicios.

SummaryResumen

The Constitutional Chamber granted an amparo against the Municipality of Goicoechea because of its excessive delay in addressing buildings located within the protection zone of the Purral River. Although municipal officials confirmed in October 2022 that four buildings stood along the riverbank, the municipality waited two years before formally requesting SINAC’s intervention. SINAC inspected the site in February 2025 and later confirmed the encroachment, recommending demolition of the structures, debris removal, and restoration of riparian forest cover. Despite receiving that report in July 2025, the municipality did not issue notices to vacate until October, after the amparo had been filed. The Chamber held that allowing more than three years to pass without a definitive solution was excessive and unreasonable and violated the right to a healthy environment under Article 50 of the Constitution. It ordered the officials, within their respective powers, to deliver a definitive solution within no more than two months.La Sala Constitucional declaró con lugar un recurso de amparo contra la Municipalidad de Goicoechea por la demora excesiva en atender construcciones ubicadas dentro de la zona de protección del río Purral. Aunque el municipio verificó desde octubre de 2022 la existencia de cuatro edificaciones en el margen fluvial, esperó dos años para solicitar formalmente la intervención del SINAC. Este inspeccionó el sitio en febrero de 2025 y posteriormente confirmó la invasión, recomendando demoler las estructuras, retirar los escombros y restaurar la cobertura forestal ribereña. Pese a recibir ese informe en julio de 2025, la municipalidad notificó el desalojo hasta octubre, después de interpuesto el amparo. La Sala consideró que los más de tres años sin una solución definitiva constituyeron un plazo excesivo e irrazonable y vulneraron el derecho a un ambiente sano reconocido en el artículo 50 constitucional. Ordenó adoptar, dentro de sus competencias, una solución definitiva en un máximo de dos meses.

Key excerptExtracto clave

First, it was demonstrated that, since October 2022, the authorities of the Municipality of Goicoechea had verified the existence of four consolidated buildings established along the bank of the Purral River identified by the petitioner. Although they stated that they would undertake the necessary coordination with SINAC to determine the environmental damage, that action was not ultimately taken until October 2024, after an absolutely excessive and unreasonable period of two years had elapsed. While it may be understood that SINAC first had to inspect the site and submit a report to the municipality regarding the situation, it must also be considered that, as stated, the request to that institution was made manifestly and arbitrarily late. Second, although SINAC submitted its report to the Municipality of Goicoechea in July 2025, confirming the encroachment upon the protected area or zone along the banks of the Purral River, it was not until three months later, on October 8, 2025—and because of this amparo—that the respondent officials decided to follow the recommendations and notified the occupants of the properties in the protection zone to vacate, further warning that otherwise the municipality would carry out demolitions to protect the encroached protected area. Third, in summary, the reported situation had persisted for more than three years and, despite the excessive and unreasonable time elapsed since then, had not received a definitive solution as of that date, in clear violation of Article 50 of the Political Constitution.Primero, por cuanto se demostró que, desde el mes de octubre del año 2022 las autoridades de la Municipalidad de Goicoechea verificaron la existencia de cuatro edificaciones consolidades y establecidas en el margen del Río Purral señalado por el recurrente y, pese haber sostenido que realizarían las gestiones pertinentes con el SINAC para determinar el daño ambiental, esta última actuación se llevó a cabo finalmente hasta en el mes de octubre de 2024, sea, luego de trascurrido un plazo absolutamente excesivo e irrazonable de dos años. Nótese que, si bien se puede entender que, de forma previa, el SINAC debía inspeccionar el sitio y rendir un informe al municipio respecto a la referida situación, lo cierto es que igualmente debe tomarse en cuenta que esa solicitud fue planteada, como se dijo, de manera evidente y arbitrariamente tardía ante la primera institución. Segundo, dado que, pese a que el informe del SINAC fue rendido en julio de 2025 a la Municipalidad de Goicoechea (confirmándose la invasión al área o zona protegida de los márgenes del Río Purral), fue hasta tres meses después (8 de octubre de 2025) y, con motivo de este amparo, que los recurridos decidieron acatar las recomendaciones giradas y notificaron a los habitantes de los predios que se hallan en la zona de protección para que desalojen, advirtiéndose además, que, caso contrario, el municipio procedería a realizar las demoliciones para proteger el área protegida invadida. Tercero, habida cuenta que, en resumen, la situación descrita tiene más de tres años de haber sido denunciada y, pese al excesivo e irrazonable plazo trascurrido desde entonces, no ha encontrado, a la fecha, una solución definitiva, en claro quebrantado de lo dispuesto de lo dispuesto en el ordinal 50 de la Constitución Política.

Pull quotesCitas destacadas

  • "Precisamente, en este caso se plantea un supuesto de excepción –respaldado por la mayoría de este Tribunal Constitucional–, pues se está ante una solicitud relacionada con el medio ambiente."

    "This case presents an exception—supported by a majority of this Constitutional Court—because the request concerns the environment."

    Considerando II

  • "Precisamente, en este caso se plantea un supuesto de excepción –respaldado por la mayoría de este Tribunal Constitucional–, pues se está ante una solicitud relacionada con el medio ambiente."

    Considerando II

  • "Revisados los autos, este Tribunal Constitucional considera que existe mérito suficiente para acoger este proceso de amparo, por los motivos puntuales que se dirán a continuación."

    "Having reviewed the record, this Constitutional Court finds sufficient grounds to grant this amparo proceeding for the specific reasons set out below."

    Considerando V

  • "Revisados los autos, este Tribunal Constitucional considera que existe mérito suficiente para acoger este proceso de amparo, por los motivos puntuales que se dirán a continuación."

    Considerando V

  • "Se declara con lugar el recurso."

    "The amparo is granted."

    Por tanto

  • "Se declara con lugar el recurso."

    Por tanto

  • "Se le ordena a Nombre42169, en su condición de Alcalde y a Nombre56763, en su condición de Director de Ingeniería y Operaciones, ambos de la Municipalidad de Goicoechea, o a quienes en su lugar ocupen respectivamente tales cargos, que giren las órdenes pertinentes y lleven a cabo todas las actuaciones que estén dentro del ámbito de sus competencias para que, dentro del plazo máximo de DOS MESES, contado a partir de la notificación de la presente sentencia, se brinde una solución definitiva a la situación denunciada por el recurrente (invasión de zona protegida)."

    "Nombre42169, in his capacity as Mayor, and Nombre56763, in his capacity as Director of Engineering and Operations, both of the Municipality of Goicoechea, or whoever respectively holds those offices, are ordered to issue the appropriate directives and carry out all actions within the scope of their authority so that, within a maximum period of TWO MONTHS from notice of this judgment, a definitive solution is provided to the situation reported by the petitioner (encroachment upon a protected zone)."

    Por tanto

  • "Se le ordena a Nombre42169, en su condición de Alcalde y a Nombre56763, en su condición de Director de Ingeniería y Operaciones, ambos de la Municipalidad de Goicoechea, o a quienes en su lugar ocupen respectivamente tales cargos, que giren las órdenes pertinentes y lleven a cabo todas las actuaciones que estén dentro del ámbito de sus competencias para que, dentro del plazo máximo de DOS MESES, contado a partir de la notificación de la presente sentencia, se brinde una solución definitiva a la situación denunciada por el recurrente (invasión de zona protegida)."

    Por tanto

Full documentDocumento completo

Sections

Procedural marks

Document Review SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, at nine twenty on diecisiete de octubre de dos mil veinticinco.

Amparo action (recurso de amparo) filed by Nombre32681, identity card CED14718, against LA MUNICIPALIDAD DE GOICOECHEA.

BACKGROUND:

  1. 1In a written submission filed with the Chamber on 12 de septiembre de 2025, the petitioner files an amparo action and states that the Director of Engineering and Operations of the Municipalidad de Goicoechea (in official letter No. MG-AG-DI-3328-2022) said that “a structure was found within the protection zone (zona de protección)” of the river. However, he complains that, to date, that municipality has taken no action to remove those illegal structures and protect that protected zone or area, in safeguarding the right to a healthy and ecologically balanced environment (derecho a un ambiente sano y ecológicamente equilibrado). He asserts that the municipality’s inaction may lead to the continued construction of buildings in that zone. He requests that the action be granted and that the respondents be ordered to take the appropriate steps to have those structures removed and the river area protected.
  2. 2By ruling issued at 22:53 hrs. on 19 de septiembre de 2025, the proceeding was admitted and reports were requested from the respondent authorities.
  3. 3Through a brief filed with the Chamber on 9 de octubre de 2025, Nombre42169, in his capacity as Mayor of Goicoechea, submits a report. He discusses the powers of SINAC. He states that the municipality lacks authority to determine whether possible environmental damage (daño ambiental) exists and therefore contacted SINAC to determine whether there was an encroachment and such possible damage. This was done so that an administrative eviction proceeding (procedimiento administrativo de desalojo) could be initiated. He explains that on 13 de octubre de 2022, the Mayor’s Office received an official letter from the petitioner asking whether the existing structures along the Río Purral stream bordering the district of Mata de Plátano and the bridge comply with article 33 of Ley Forestal, since, in his view, they might be encroaching on a protected area (área de protección). On 25 de octubre de 2022, a response was provided to the protected party, informing him that the Municipal Engineering Directorate had inspected the site and found a structure within the protection zone, and that coordination with SINAC would therefore be undertaken to conduct a thorough inspection and determine the possible environmental damage caused, so that the protected area could be restored while observing due process (debido proceso).He asserts that SINAC conducted that inspection on 24 de febrero de 2025 and did not issue its report until julio de 2025, confirming the encroachment reported by the petitioner. He notes that, once the report prepared by SINAC became known, the occupants of the properties located within the protection zone were notified to vacate them; otherwise, demolitions would be carried out to protect the encroached-upon protected area. He states that recovery of the protection zone could not proceed without first obtaining SINAC’s report to determine the environmental damage at the site and the properties to be vacated. He asserts that this authority belongs exclusively to SINAC.
  4. 4Through a written submission filed with the Chamber on 9 de octubre de 2025, Nombre56763, in his capacity as Director of Engineering and Operations of the Municipalidad de Goicoechea, submits a report. He states that information related to the case is being provided and that a case file remains open against the two property owners for encroachment upon that protection zone.
  5. 5The statutory requirements have been observed in the processing of the proceeding.

Justice Araya García writes the opinion; and,

CONSIDERING:

I. SUBJECT MATTER OF THE ACTION

The petitioner complains that, although the authorities of the Municipalidad de Goicoechea have known since 2022 of the existence of illegal structures erected within a river protection zone, as of the filing of this amparo action they had taken no steps to remove them, thereby violating the right to a healthy and ecologically balanced environment.

II.Preliminary Issue. Before examining the merits of the matter—concerning the alleged violation of the right to a prompt and duly completed proceeding (derecho a un procedimiento pronto y cumplido)—it must be clarified that, since Judgment No. 2008-02545 issued at 8:55 on 22 de febrero de 2008, this Chamber has referred to the administrative litigation jurisdiction (jurisdicción contencioso administrativa)—with certain exceptions—those matters involving disputes over whether the public administration has complied with the time limits established by Ley General de la Administración Pública (articles 261 and 325) or by sector-specific laws governing special administrative proceedings (procedimientos administrativos especiales), either to conclude an administrative proceeding—initiated ex officio or at a party’s request—through a final administrative act (acto final), or to adjudicate the applicable administrative appeals (recursos administrativos). This case presents precisely such an exception—supported by a majority of this Constitutional Court—because it concerns a request related to the environment. Having clarified this point, the Chamber proceeds to decide the specific situation raised in this amparo action.

III. PROVEN FACTS

The following facts relevant to deciding this amparo action are deemed established:

  • 1)On 12 de octubre de 2022, the Mayor’s Office of Goicoechea received an official letter signed by the petitioner asking whether the existing structures along the Río Purral stream bordering the district of Mata de Plátano and the bridge comply with article 33 of Ley Forestal, since, in his view, they might be encroaching on a protected area (see report and evidence).
  • 2)By official letter No. MG-AG-DI-3325-2022 dated 20 de octubre de 2022, the Director of the Directorate of Engineering, Operations and Urban Planning of the Municipalidad de Goicoechea informed the respondent Mayor as follows regarding the communication sent by the petitioner: “(…) regarding article 33 of Ley Forestal, which establishes a 10-meter setback (retiro) from watercourses (cauces fluviales), specifically concerning the area of the bridge connecting Alto de Guadalupe and Purral Quebrada Tanques, a site inspection was conducted and 4 long-established permanent structures were found within the protection zone, both upstream and downstream on both banks. The respective notices will be issued and, should they not be complied with, the case will be referred to the Tribunal Ambiental Administrativo (…)” (see evidence).
  • 3)By official letter No. MG-AG-DI-3328-2022 dated 20 de octubre de 2022, the Director of the Directorate of Engineering, Operations and Urban Planning of the Municipalidad de Goicoechea informed the respondent Mayor as follows regarding the communication sent by the petitioner: “(…) he is advised that the bridge belongs to a cantonal route, where the watercourse borders municipal public areas along the left bank both upstream and downstream; on the right bank, no encroachment was found upstream, whereas downstream a structure of (sic) was found within the protection zone, in respect of which the notification process will be initiated; likewise, the case will be referred to SINAC-MINAE so that entity may determine whether any environmental damage exists (…)” (see evidence).
  • 4)By official letter No. MG-AG-05279-2022 dated 21 de octubre de 2022, the Mayor of Goicoechea informed the protected party that an inspection had been conducted in the reported area and that four long-established structures located within the protection zone had been found. He was also informed that the respective notices would be issued and that, if the instructions were not followed, the case would be referred to the Tribunal Ambiental Administrativo (see evidence).
  • 5)By official letter No. MG-AG-05341-2022 dated 25 de octubre de 2022, the respondent Mayor forwarded to the claimant the contents of the aforementioned official letter No. MG-AG-DI-3328-2022, signed by the Director of Engineering and Operations (see evidence).
  • 6)By official letter No. MG-AG-DI-02859-2024 dated 10 de octubre de 2024, the Director of the Directorate of Engineering, Operations and Urban Planning of the Municipalidad de Goicoechea requested that the SINAC authorities establish “(…) the status of the existing structures on the right bank of Río Purral, upstream and downstream of the bridge connecting Purral with Mata de Plátano, for the purpose of determining whether the river’s protection zone has been encroached upon, as well as determining whether environmental damage exists and the appropriate measures to be taken; in this regard, they are most respectfully requested to conduct a joint site visit so that this resident’s concerns may be addressed, for which purpose the telephone numbers (…) or email address (…) are provided” (see evidence).
  • 7)By official letter No. MG-AG-DI-3340-2024 dated 10 de diciembre de 2024, the respondent municipality reiterated the preceding request to SINAC. Specifically, it reiterated the need to inspect the reported site in order to assess the condition of the structures and verify whether they comply with the legal system (ordenamiento jurídico) (see evidence).
  • 8)On 24 de febrero de 2025, SINAC conducted an inspection in the area reported by the petitioner (see report and evidence).
  • 9)In julio de 2025, SINAC submitted report No. SINAC-ACC-OSJ-inf-254-2025 to the respondent municipality, confirming the encroachment reported by the petitioner in the protected area. The report additionally stated: “(…) As measures to be taken, it is recommended that, to restore the site, the encroaching structures be demolished and the debris removed so that the forest cover (cobertura forestal) typical of a riparian forest (bosque ribereño) may be established. The plan must be prepared by a qualified professional and submitted to this office for the corresponding review and approval (…)” (see report and evidence).
  • 10)On 12 de septiembre de 2025, the petitioner filed this amparo action (see initiating submission).
  • 11)On 7 de octubre de 2025, the respondent authorities were notified that this amparo action had been filed (see certificates of service).
  • 12)On 8 de octubre de 2025, the respondents notified the occupants of the properties located within the protection zone that they must vacate them and warned that, otherwise, the municipality would proceed with the demolitions in order to protect the encroached-upon protected area (see evidence).

IV. RELEVANT PRECEDENT

When deciding a case similar to the present one, in Judgment No. 2025-14025 issued at 13:05 hrs. on 9 de mayo de 2025 (subsequently corrected by Voto No. 2025-19272 issued at 13:29 hrs. on 20 de junio de 2025), this Chamber expressly stated as follows:

“(…) II.- SUBJECT MATTER OF THE ACTION. The petitioner states that on 09 de septiembre de 2024 he filed a complaint concerning the failure to remove certain structures near Río Ipís in the Municipalidad de Vásquez de Coronado, but that, to date, he has received no response and the respondent authority has not taken the appropriate action. (…)

VI. THE RIGHT TO A HEALTHY AND ECOLOGICALLY BALANCED ENVIRONMENT

In addition, the petitioner requests that the authority “…take all necessary steps to ensure that the river area is respected….” Having examined the response provided by the respondent authority, to the effect that no measure could be adopted to safeguard the river’s protection zone because of the age of the structures, the majority of the Chamber disagrees with that approach and finds that safeguarding the right to a healthy environment, of which the protection of bodies of water (cuerpos de aguas) is an essential component, requires a different solution.

To begin, a brief review of the legal framework protecting water resources leads to the conclusion that the temporal starting point for giving concrete effect to such protection could hardly be Ley Forestal No. 7575, dated 16 de abril de 1996. In other words, it is legally untenable to assert that violations of the setbacks (retiros) intended to protect water resources may be penalized only after abril de 1996. For example, Article 7 of Ley de Tierras y Colonización number 2825 dated 14 de octubre de 1961 provided:

“Article 7. - Until the State, on its own initiative or at the request of the Ministerio de Agricultura or the Instituto de Tierras y Colonización, for reasons of national interest, determines which lands must remain under its ownership, the following shall be deemed inalienable and incapable of being acquired by claim or possession, except for those held as private property under lawful title:(...)

  • c)Lands on islands; lands located along the banks of rivers and streams; and, in general, lands surrounding all water sources located in drainage basins or watersheds where springs arise, or where any watercourses supplying a population have their sources or headwaters, or which should be reserved for the same purpose. On flat or gently sloping land, a strip measuring two hundred meters on either side of such rivers, springs, or streams shall be deemed inalienable; and in drainage basins or watersheds, a strip of land measuring three hundred meters on either side of the point of maximum depression, along the entire line, measured from the nearest highest elevation; (...)” Even Ley Forestal of 1996, on which the response of the respondent local government relies, had several earlier versions that also recognized protective margins along watercourses: Ley Forestal of 1969 established a 5-meter protected area measured from the bank in Article 84, while the 1990 amendment established a 10-meter protected area measured from the riverbank.

Furthermore, the impact of the structures referred to by the petitioner on water resources is entirely disregarded. No technical study or inspection concerning this issue was conducted or cited that would make it possible to determine whether the effects are harmless or environmentally significant.

Thus, in light of the right to a healthy environment, the relinquishment of the municipal powers whose exercise was requested by the petitioner is unacceptable. The constitutional protection proceeding (amparo) must therefore be granted and official letter AL-200-0180-2025 annulled. The respondent authority must exercise its powers to ensure effective protection of the protected area (área de protección) of the río Ipís, as well as its powers to coordinate with the appropriate authorities, in accordance with the applicable environmental regulations. (…)

THEREFORE: By majority vote, the petition is granted insofar as it concerns the violation of the right to a healthy environment. Official letter AL-200-0180-2025 is annulled, and Nombre46689, mayor of Vázquez de Coronado, or whoever holds that office, is ordered to exercise the office’s powers to ensure effective protection of the protected area of the río Ipís, as well as its powers to coordinate with the appropriate authorities, in accordance with the applicable environmental regulations. With regard to the failure to respond to the request submitted by the petitioner on 09 de septiembre de 2024, and pursuant to Article 52 of Ley de la Jurisdicción Constitucional, the petition is granted without a specific award of costs or damages. Justice Jara Velásquez partially dissents and orders an award of damages and costs. Justice Salazar Alvarado dissents and would deny the petition, finding that it falls to the ordinary courts, specifically the contentious-administrative jurisdiction (jurisdicción contencioso-administrativa), to determine whether the challenged administrative actions and conduct substantively comply with the provisions of statutory law concerning the protection, safeguarding, and preservation of the right to a healthy and ecologically balanced environment (…)”.

V. SPECIFIC CASE

The petitioner comes before this Chamber and states that, since 2022, the authorities of the Municipalidad de Goicoechea have been aware of structures erected along the bank of a river in the area and that, despite this, as of the date this amparo was filed, they had taken no action to remove them, in clear violation of the right to a healthy environment.

Having reviewed the record, this Constitutional Court finds sufficient grounds to grant this amparo proceeding for the specific reasons set forth below.

First, it was established that, since octubre 2022, the authorities of the Municipalidad de Goicoechea had verified the existence of four completed structures erected along the bank of the Río Purral identified by the petitioner. Although they stated that they would undertake the appropriate coordination with SINAC to determine the environmental damage, that action was ultimately not taken until octubre 2024—that is, after an entirely excessive and unreasonable period of two years had elapsed. It should be noted that, although it is understandable that SINAC first needed to inspect the site and submit a report to the municipality regarding the situation in question, it must also be taken into account that, as stated, the request to that institution was clearly and arbitrarily delayed.

Second, although the SINAC report was submitted to the Municipalidad de Goicoechea in julio 2025, confirming the encroachment upon the protected area or zone along the banks of the Río Purral, it was not until three months later (8 de octubre de 2025), and because of this amparo, that the respondents decided to comply with the recommendations issued and notified the occupants of the properties located within the protected zone (zona de protección) that they must vacate. They further warned that, should the occupants fail to do so, the municipality would proceed with the demolitions necessary to protect the encroached-upon protected area.

Third, in summary, the situation described was reported more than three years ago and, despite the excessive and unreasonable period that has elapsed since then, no final solution has been reached to date, in clear violation of Article 50 of the Constitución Política.

* Under this reasoning, this amparo must be granted, with the consequences set forth in the operative portion of this judgment.

VI. NOTE BY JUSTICE CASTILLO VÍQUEZ REGARDING PROMPT AND EFFECTIVE ADMINISTRATIVE JUSTICE

I have supported this Court’s position that, when a litigant alleges a violation of the right to prompt and effective justice in administrative proceedings, the legal dispute must be heard by the Contentious-Administrative Courts and not by this Chamber. However, the recent enactment of Ley n.° 9097, Ley de Regulación del Derecho de Petición, established that this right may receive judicial protection through the amparo provided for in Article 32 of Ley de la Jurisdicción Constitucional, in connection with Article 27 of the Constitución Política de la República de Costa Rica, in cases in which the petitioner believes that the Administration’s physical acts, administrative acts, or response are affecting the petitioner’s fundamental rights. In my view, the newly enacted legislation does not require this Court to alter its line of precedent, since, pursuant to Article 7 of its Law, this Court alone is responsible for defining its own jurisdiction.

Consequently, except for those constitutional-law disputes that this Chamber itself has recognized as exceptional circumstances that may properly be heard in this jurisdiction through the constitutional amparo guarantee proceeding, in all other cases, and for the reasons given by this Court (judgment N° 2008-02545 at 8:55 hours on 22 de febrero de 2008), jurisdiction lies with the judges of the contentious-administrative jurisdiction. All of this is consistent with Article 25 of the Convención Americana sobre Derechos Humanos, the constitutional law (values, principles, and rules), and the relevant statutory provisions, based on a logical, systemic, and purposive interpretation of the legal system.

VII. DISSENTING OPINION OF JUSTICE GARRO VARGAS

In the case under review (sub examine), the petitioner complains that the respondent municipality detected certain unlawful structures erected within the protected zone of the río Purral; however, the petitioner contends that, as of the date this proceeding was filed, the municipality had taken no action to remove them, thereby violating the right to a healthy and ecologically balanced environment.

In this regard, based on the report submitted by the Municipalidad de Goicoechea, I consider it essential to join the Sistema Nacional de Áreas de Conservación as a party. Along those lines, the mayor of the respondent municipality specified that the entity he represents lacks jurisdiction to determine whether environmental damage may exist, and it therefore follows that the municipality coordinated with the authorities of the Sistema Nacional de Áreas de Conservación, which conducted an inspection on 6 de febrero de 2025. The record shows that, as a result of that visit, official letter no. SINAC-ACC-OSJ-inf-254-2025 dated 24 de febrero de 2025 was issued, stating:

“Conclusions and recommendations: A visit was made to the specified site, where encroachment upon the protected area of the río Torres and the quebrada Mozotal was detected due to the construction of residential buildings. The estimated extent of the encroachments is set forth in Table 1 of this report. The encroachment upon the protected area was detected on two properties, which must be identified by the municipality so that it may submit the corresponding report to the Ministerio Pública. The encroachment upon the protected area was estimated using aerial imagery, the possible location of the watercourse, and field data; however, an exact survey must be conducted. It is therefore recommended that the survey be performed by qualified personnel, whether from the municipality itself or from Ingeniería Forense del OIJ, following the necessary steps by the Ministerio Público to obtain proper access to the property.

As measures to be taken, it is recommended that restoration of the site include demolition of the encroachments and removal of the debris so that the forest cover (cobertura forestal) typical of a riparian forest may be established. The plan must be prepared by a qualified professional and submitted to this office for the corresponding review and approval. It is important to note that every restoration project must be carried out with the greatest possible care and must consider the environmental impacts arising at the outset of the work and ensure that the measures adopted will make it possible to restore the site. It is recommended that any project to restore the protected area use native trees of low to medium stature and that they be planted away from the infrastructure. It is recommended that each tree have a minimum height of 1,5 meters to ensure the lowest possible mortality rate.” Consequently, I dissent and order that the processing of the petition continue so that a report may be requested from the Sistema Nacional de Áreas de Conservación.

viii.- Documentation submitted to the case file (expediente). The parties are hereby advised that, if they submitted any paper document, as well as any objects or evidence contained on any additional electronic, computer, magnetic, optical, telematic, or new-technology device, they must retrieve them from the court office within a maximum period of 30 business days from notification of this judgment. Otherwise, any material not retrieved within that period shall be destroyed, in accordance with the "Reglamento sobre Expediente Electrónico ante el Poder Judicial", approved by the Corte Plena at session number 27-11 of 22 de agosto de 2011, article XXVI, and published in Boletín Judicial number 19 of 26 de enero de 2012, as well as the resolution approved by the Consejo Superior del Poder Judicial at session number 43-12 held on 3 de mayo de 2012, article LXXXI.

POR TANTO:

The appeal is granted. Nombre42169, in his capacity as Mayor, and Nombre56763, in his capacity as Director of Engineering and Operations, both of the Municipalidad de Goicoechea, or whoever may respectively hold those positions in their stead, are ordered to issue the appropriate directives and undertake all actions within the scope of their authority so that, within a maximum period of TWO MONTHS from notification of this judgment, a definitive solution is provided for the situation reported by the appellant (encroachment upon a protected area). The respondent authorities are hereby warned that, pursuant to article 71 of the Ley de la Jurisdicción Constitucional, any person who receives an order issued in an amparo proceeding (recurso de amparo) that must be complied with or enforced, and who fails to comply with or enforce it, shall be subject to imprisonment for three months to two years or a fine of twenty to sixty days, provided that the offense is not punishable by a more severe penalty.

The Municipalidad de Goicoechea is ordered to pay the legal costs, damages, and losses arising from the facts underlying this ruling, which shall be assessed during enforcement of the judgment before the contentious-administrative jurisdiction (ejecución de sentencia de lo contencioso administrativo). Justice Castillo Víquez adds a separate note. Justice Garro Vargas dissents (salva el voto) and orders that processing of the appeal continue so that a report may be requested from the Sistema Nacional de Áreas de Conservación. Let notice be served.- Fernando Castillo V.

Presiding Justice Fernando Cruz C.

Paul Rueda L.

Luis Fdo. Salazar A.

Jorge Araya G.

Anamari Garro V.

Ingrid Hess H.

Telephone numbers: 2549-1500 / 800-SALA-4TA (800-7252-482). Fax: Telf07 / Telf08. Website: www.poder-judicial.go.cr/salaconstitucional. Address: (Dirección09, Dirección05, 100 mts. south of the Perpetuo Socorro church).

Secciones

Marcadores

Revisión del Documento SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del diecisiete de octubre de dos mil veinticinco .

Recurso de amparo interpuesto por Nombre32681, cédula de identidad CED14718, contra LA MUNICIPALIDAD DE GOICOECHEA.

RESULTANDO:

  1. 1Por escrito aportado a la Sala el 12 de septiembre de 2025, el recurrente interpone recurso de amparo y manifiesta que el Director de Ingeniería y Operaciones de la Municipalidad de Goicoechea (en oficio No. MG-AG-DI-3328-2022), dijo que “se encontró una construcción sobre la zona de protección” del río. Sin embargo, reclama que, a la fecha, dicha municipalidad no ha realizado gestión alguna para eliminar esas construcciones ilegales y proteger dicha zona o área protegida, en resguardo del derecho a un ambiente sano y ecológicamente equilibrado. Afirma que la inercia del municipio puede conllevar a que se continúen levantando edificaciones en dicha zona. Solicita que se declare con lugar el recurso y se les ordene a los recurridos gestionar lo pertinente para que se eliminen dichas construcciones y se proteja el área del río.
  2. 2Por resolución de las 22:53 hrs. de 19 de septiembre de 2025, se le da curso al proceso y se requieren los informes a las autoridades recurridas.
  3. 3Mediante memorial aportado a la Sala el 9 de octubre de 2025, Nombre42169, en su condición de Alcalde de Goicoechea, rinde informe. Se refiere a las competencias del SINAC. Indica que la municipalidad carece de competencia para determinar la existencia de un posible daño ambiental, por lo que se acudió al SINAC para determinar la invasión y ese posible daño. Lo anterior, para poder iniciar procedimiento administrativo de desalojo. Explica que el 13 de octubre de 2022, se recibió en la Alcaldía un oficio del recurrente donde se consultó si las edificaciones existentes en la quebrada del Río Purral que colinda con el distrito de Mata de Plátano y el puente cumplen o no con lo dispuesto en el artículo 33 de la Ley Forestal, pues, a su juicio, podrían estar invadiendo un área de protección. El 25 de octubre de 2022 se le dio respuesta al tutelado y se le indicó que la Dirección de Ingeniería Municipal había realizado inspección en el sitio y se había encontrado una construcción en zona de protección, motivo por el cual se coordinaría con el SINAC para realizar una inspección de fondo y determinar el posible daño ambiental causado, para, así, recuperar el área de protección, respetándose el debido proceso.Asevera que dicha inspección se realizó por el SINAC el 24 de febrero de 2025 y se rindió informe hasta el mes de julio de 2025, confirmándose la invasión denunciada por el recurrente. Apunta que, una vez conocido dicho informe elaborado por el SINAC, se procedió a notificar a los habitantes de los predios que se hallan en la zona de protección para que desalojen, siendo que, en caso contrario, procederían a realizar demoliciones para proteger el área protegida invadida. Indica que no se podía ejercer la recuperación de la zona de protección sin tener de previo el informe del SINAC para determinar el daño ambiental en el sitio y los predios a desalojar. Asevera que esa competencia es exclusiva del SINAC.
  4. 4Mediante escrito aportado a la Sala el 9 de octubre de 2025, Nombre56763, en su condición de Director de Ingeniería y Operaciones de la Municipalidad de Goicoechea, rinde informe. Indica que se remite información relacionada con el caso y que se mantiene un expediente abierto contra los dos propietarios por invasión a dicha zona de protección.
  5. 5En la substanciación del proceso se han observado las prescripciones de ley.

Redacta el Magistrado Araya García; y,

CONSIDERANDO:

I. OBJETO DEL RECURSO

El recurrente reclama que, pese a que desde el año 2022 las autoridades de la Municipalidad de Goicoechea tienen conocimiento de la existencia de edificaciones ilegales levantadas en zona de protección de un río, a la fecha de formulado este amparo no habían realizado gestión alguna para eliminarlas, lesionándose con esto el derecho a un ambiente sano y ecológicamente equilibrado.

II.Cuestión Preliminar. De previo a analizar el fondo del asunto –por la presunta violación del derecho a un procedimiento pronto y cumplido– debe aclararse que, a partir de la sentencia No. 2008-02545 de las 8:55 horas de 22 de febrero de 2008, esta Sala ha remitido a la jurisdicción contencioso administrativa –con algunas excepciones–, aquellos asuntos en los que se discute si la administración pública ha cumplido o no los plazos pautados por la Ley General de la Administración Pública (artículos 261 y 325) o las leyes sectoriales para los procedimientos administrativos especiales, para resolver por acto final un procedimiento administrativo –instruido de oficio o a instancia de parte– o conocer de los recursos administrativos procedentes. Precisamente, en este caso se plantea un supuesto de excepción –respaldado por la mayoría de este Tribunal Constitucional–, pues se está ante una solicitud relacionada con el medio ambiente. Aclarado el punto, se entra a resolver la situación concreta planteada en este amparo.

III. HECHOS PROBADOS

De relevancia para dirimir el presente recurso de amparo, se tienen por acreditados los siguientes:

  • 1)El 12 de octubre de 2022, se recibió en la Alcaldía de Goicoechea un oficio suscrito por el recurrente mediante el cual se consultó si las edificaciones existentes en la quebrada del Río Purral que colinda con el distrito de Mata de Plátano y el puente, cumplen o no con lo dispuesto en el artículo 33 de la Ley Forestal, pues, a su juicio, podrían estar invadiendo un área de protección (ver informe y prueba).
  • 2)Por oficio No. MG-AG-DI-3325-2022 de fecha 20 de octubre de 2022, el Director de la Dirección de Ingeniería, Operaciones y Urbanismo de la Municipalidad de Goicoechea, le indicó al Alcalde recurrido lo siguiente, respecto a la nota enviada por el recurrente: “(…) en relación al respecto del artículo 33 de la Ley Forestal, que establece un retiro de 10 metros con respecto a los cauces fluviales, específicamente, en relación con el sector del puente que comunica el Alto de Guadalupe y Purral Quebrada Tanques, al respecto se realizó una inspección al sitio y se localizó la existencia 4 edificaciones consolidadas de mucha antigüedad, que se ubican sobre la zona de protección, tanto aguas arriba como aguas abajo en ambos márgenes. Se harán las notificaciones respectivas y de no acatar se trasladará el caso al Tribunal Ambiental Administrativo (…)” (ver prueba).
  • 3)Por oficio No. MG-AG-DI-3328-2022 de fecha 20 de octubre de 2022, el Director de la Dirección de Ingeniería, Operaciones y Urbanismo de la Municipalidad de Goicoechea, le indicó al Alcalde recurrido lo siguiente, respecto a la nota enviada por el recurrente: “(…) se le indica que dicho puente pertenece a una ruta cantonal, en donde en la margen izquierda aguas arriba y aguas abajo dicho cauce colinda con zonas públicas municipales y en la margen derecha aguas arriba no se encontró invasión mientras que aguas abajo sí se encontró una construcción de (sic) sobre la zona de protección a la cual se le iniciará el proceso de notificación, asimismo, se remitirá el caso al SINAC-MINAE para que esa entidad determine si hay algún daño ambiental (…)” (ver prueba).
  • 4)Por oficio No. MG-AG-05279-2022 de 21 de octubre de 2022, el Alcalde de Goicoechea le indicó al tutelado que se había realizado una inspección en la zona denunciada y se habían localizado cuatro edificaciones de mucha antigüedad ubicadas sobre la zona de protección. Asimismo, se le indicó que se harían las notificaciones respectivas y que, de no acatar lo señalado, el caso sería trasladado al Tribunal Ambiental Administrativo (ver prueba).
  • 5)Por oficio No. MG-AG-05341-2022 de 25 de octubre de 2022, el Alcalde recurrido le remitió al accionante lo consignado en el citado oficio No. MG-AG-DI-3328-2022, suscrito por el Director de Ingeniería y Operaciones (ver prueba).
  • 6)Por oficio No. MG-AG-DI-02859-2024 de fecha 10 de octubre de 2024, el Director de la Dirección de Ingeniería, Operaciones y Urbanismo de la Municipalidad de Goicoechea le solicitó a las autoridades del SINAC establecer “(…) el status de las edificaciones existentes en la margen derecha del Río Purral, aguas arriba y abajo del puente que comunica Purral con Mata de Plátano, para efectos de establecer si existe invasión a la zona de protección del río, asimismo, establecer si hay daño ambiental y las medidas correspondientes a tomar, al respecto se les solicita de la manera más respetuosa realizar una visita conjunta al sitio para poder atender las inquietudes de este vecino, por lo que se ofrecen los teléfonos (…) o el correo (…)” (ver prueba).
  • 7)Por oficio No. MG-AG-DI-3340-2024 de 10 de diciembre de 2024, el municipio recurrido reiteró la anterior solicitud al SINAC. Concretamente, se reiteró la necesidad de realizar una inspección en el sitio denunciado para evaluar las condiciones de las edificaciones y verificar si estas están o no conforme a lo dispuesto en el ordenamiento jurídico (ver prueba).
  • 8)El 24 de febrero de 2025, el SINAC realizó una inspección en la zona denunciada por el recurrente (ver informe y prueba).
  • 9)En julio de 2025, el SINAC rindió informe No. SINAC-ACC-OSJ-inf-254-2025 a la municipalidad recurrida, confirmándose la invasión denunciada por el recurrente en el área protegida. En este informe se consignó adicionalmente lo siguiente: “(…) Como medidas a tomar se recomienda que para la restauración del sitio se efectúe la demolición de las invasiones y el retiro de los escombros para el establecimiento de la cobertura forestal típica de un bosque ribereño. El plan deberá ser elaborado por un profesional atinente y presentado ante esta oficina para el respectivo análisis y visto bueno (…)” (ver informe y prueba).
  • 10)El 12 de septiembre de 2025, el recurrente formuló el presente amparo (ver escrito de interposición).
  • 11)El 7 de octubre de 2025, las autoridades recurridas fueron notificadas de la interposición de este amparo (ver actas de notificación).
  • 12)El 8 de octubre de 2025, los recurridos notificaron a los habitantes de los predios que se hallan en la zona de protección para que desalojen y advirtió que, caso contrario, el municipio procedería a realizar las demoliciones para proteger el área protegida invadida (ver prueba).

IV. ANTECEDENTE DE INTERÉS

Esta Sala, al conocer un caso similar al ahora planteado, en la Sentencia No. 2025-14025 de las 13:05 hrs. de 9 de mayo de 2025 (corregida posteriormente mediante el Voto No. 2025-19272 de las 13:29 hrs. de 20 de junio de 2025), señaló expresamente lo siguiente:

“(…) II.- OBJETO DEL RECURSO. El recurrente manifiesta que, realizó una denuncia en fecha 09 de septiembre de 2024, por la falta de retiro de unas construcciones respecto del Río Ipís, en la Municipalidad de Vásquez de Coronado, sin que a la fecha haya obtenido respuesta, ni la autoridad recurrida haya procedido de conformidad. (…)

VI. SOBRE EL DERECHO A UN MEDIO AMBIENTE SANO Y ECOLÓGICAMENTE EQUILIBRADO

Adicionalmente, la parte recurrente solicita “…proceder a realizar todas las gestiones necesarias para que se respete el área del río…”. Examinada la respuesta que brindó la autoridad recurrida, en el sentido de que, por la antigüedad de las obras, no podía adoptarse ninguna medida de salvaguarda del área de protección del río, difiere la mayoría de la Sala de ese enfoque y considera que la tutela del derecho a un medio ambiente sano, del cual forma parte esencial la protección de los cuerpos de aguas, impone una solución distinta.

Para empezar, un somero repaso del ordenamiento jurídico protector de aguas permite concluir que el punto de partida temporal para la concretización de tal tutela difícilmente podría ser la Ley Forestal No. 7575, de 16 de abril de 1996. Dicho con otras palabras, jurídicamente resulta insostenible afirmar que las infracciones a los retiros tendientes a proteger las aguas solo pueden sancionarse con posterioridad a abril de 1996. Por ejemplo, el artículo 7 de la Ley de Tierras y Colonización número 2825 de 14 de octubre de 1961 dispuso:

"Artículo 7º. - Mientras el Estado, por voluntad propia o por indicación del Ministerio de Agricultura o del Instituto de Tierras y Colonización, atendiendo razones de conveniencia nacional, no determine los terrenos que deben mantenerse bajo su dominio, se considerarán inalienables y no susceptibles de adquirirse por denuncio o posesión, salvo los que estuvieren bajo el domino privado, con título legítimo, los siguientes:(...)

  • c)Los terrenos de las islas, los situados en las márgenes de los ríos, arroyos y, en general, de todas las fuentes que estén en cuencas u hoyas hidrográficas en que broten manantiales, o en que tengan sus orígenes o cabeceras cualesquiera cursos de agua de los cuales se surta alguna población, o que convenga reservar con igual fin. En terrenos planos o de pequeño declive se considerará inalienable una faja de doscientos metros a uno y otros lados de dichos ríos, manantiales o arroyos; y en las cuencas u hoyas hidrográficas, una faja de terreno de trescientos metros a uno y otros lados de la depresión máxima, en toda la línea, a contar de la mayor altura inmediata; (...)" Aún la Ley Forestal de 1996, en la que se apoya la respuesta del ente local accionado, tuvo varias versiones anteriores, que también reconocen márgenes de protección de los cauces: la Ley Forestal de 1969 establecía 5 metros de protección a partir del margen en su artículo 84, mientras que la reforma de 1990 establecía una protección de 10 metros del margen del río.

Por otra parte, se omite toda referencia al impacto de las construcciones a las que se refiere el recurrente sobre el recurso hídrico. No se efectuó ni se citó ningún estudio de carácter técnico o inspección sobre este aspecto, que permita entender si se trata de afectaciones inocuas o ambientalmente relevantes.

De esta forma, a la luz del derecho a un medio ambiente sano, resulta inaceptable la renuncia de las competencias municipales cuyo ejercicio instó el actor y corresponde, por ende, estimar el amparo y anular el oficio AL-200-0180-2025. Deberá la autoridad recurrida ejercer sus competencias de tutela efectiva del área de protección del río Ipís, así como aquellas de coordinación con las autoridades correspondientes, de conformidad con la normativa ambiental aplicable. (…)

POR TANTO: Por mayoría, se declara con lugar el recurso, en cuanto a la infracción del derecho a un medio ambiente sano. Se anula el oficio AL-200-0180-2025 y se ordena a Nombre46689, alcaldesa de Vázquez de Coronado, o a quien ocupe su cargo, ejercer sus competencias de tutela efectiva del área de protección del río Ipís, así como aquellas de coordinación con las autoridades correspondientes, de conformidad con la normativa ambiental aplicable. En cuanto a la falta de respuesta de la gestión presentada por el recurrente en fecha 09 de septiembre de 2024 y de conformidad con lo dispuesto en el artículo 52, de la Ley de la Jurisdicción Constitucional, se estima el amparo, sin especial condenatoria en costas, daños y perjuicios. La Magistrada Jara Velásquez salva parcialmente el voto y dispone la condenatoria en daños, perjuicios y costas. El Magistrado Salazar Alvarado salva el voto y declara sin lugar el recurso, al estimar que corresponde a la jurisdicción ordinaria, en específico, a la contencioso-administrativa, determinar si las actuaciones y conductas administrativas acusadas se ajustan o no, en sustancia, a lo preceptuado en el ordenamiento jurídico de rango legal, en cuanto a la protección, tutela y conservación del derecho a un ambiente sano y ecológicamente equilibrado (…)”.

V.- caso concreto. El recurrente acude a esta Sala y señala que, desde el año 2022, las autoridades de la Municipalidad de Goicoechea tienen conocimiento de construcciones levantadas sobre el margen de un río de la zona y, pese a esto, para el día de formulado este amparo, no habían realizado gestión alguna para eliminarlas, en clara lesión del derecho a un ambiente sano.

Revisados los autos, este Tribunal Constitucional considera que existe mérito suficiente para acoger este proceso de amparo, por los motivos puntuales que se dirán a continuación.

Primero, por cuanto se demostró que, desde el mes de octubre del año 2022 las autoridades de la Municipalidad de Goicoechea verificaron la existencia de cuatro edificaciones consolidades y establecidas en el margen del Río Purral señalado por el recurrente y, pese haber sostenido que realizarían las gestiones pertinentes con el SINAC para determinar el daño ambiental, esta última actuación se llevó a cabo finalmente hasta en el mes de octubre de 2024, sea, luego de trascurrido un plazo absolutamente excesivo e irrazonable de dos años. Nótese que, si bien se puede entender que, de forma previa, el SINAC debía inspeccionar el sitio y rendir un informe al municipio respecto a la referida situación, lo cierto es que igualmente debe tomarse en cuenta que esa solicitud fue planteada, como se dijo, de manera evidente y arbitrariamente tardía ante la primera institución.

Segundo, dado que, pese a que el informe del SINAC fue rendido en julio de 2025 a la Municipalidad de Goicoechea (confirmándose la invasión al área o zona protegida de los márgenes del Río Purral), fue hasta tres meses después (8 de octubre de 2025) y, con motivo de este amparo, que los recurridos decidieron acatar las recomendaciones giradas y notificaron a los habitantes de los predios que se hallan en la zona de protección para que desalojen, advirtiéndose además, que, caso contrario, el municipio procedería a realizar las demoliciones para proteger el área protegida invadida.

Tercero, habida cuenta que, en resumen, la situación descrita tiene más de tres años de haber sido denunciada y, pese al excesivo e irrazonable plazo trascurrido desde entonces, no ha encontrado, a la fecha, una solución definitiva, en claro quebrantado de lo dispuesto de lo dispuesto en el ordinal 50 de la Constitución Política.

* Bajo dicha inteligencia, lo que procede es acoger este amparo, con las consecuencias que se dirán en la parte dispositiva de la presente sentencia.

VI. NOTA DEL MAGISTRADO CASTILLO VÍQUEZ, EN CUANTO A LA JUSTICIA ADMINISTRATIVA PRONTA Y CUMPLIDA

He apoyado la tesis de este Tribunal, de que cuando el justiciable alega una vulneración al derecho a una justicia pronta y cumplida en sede administrativa, quienes deben conocer la controversia jurídica son los Tribunales de lo Contencioso-Administrativo y no esta Sala. Ahora bien, con la reciente promulgación de la Ley n.° 9097, Ley de Regulación del Derecho de Petición, se ha establecido que ese derecho es susceptible de tutela judicial por medio del recurso de amparo establecido por el artículo 32 de la Ley de la Jurisdicción Constitucional, en relación con el artículo 27 de la Constitución Política de la República de Costa Rica, en aquellos casos en que el peticionario considere que las actuaciones materiales de la Administración, sus actos administrativos o su respuesta le estén afectando sus derechos fundamentales. A mi modo de ver, la normativa recién promulgada no implica que este Tribunal deba modificar su línea jurisprudencial, quien, con base en el numeral 7 de su Ley, le corresponde definir exclusivamente su propia competencia.

Por ende, salvo aquellas controversias jurídico-constitucionales que han sido reconocidas por esta misma Sala como supuestos de excepción, que sí proceden ser conocidas en esta jurisdicción a través del proceso constitucional de garantía del amparo, en los demás casos, y por las razones que ha dado este Tribunal (sentencia N° 2008-02545 de las 8:55 horas de 22 de febrero de 2008), los competentes son los Jueces de la jurisdicción de lo contencioso-administrativo, todo lo cual es conforme al numeral 25, de la Convención Americana sobre Derechos Humanos, el Derecho de la Constitución (valores, principios y normas) y las normas legales correspondientes con base en una interpretación lógica, sistémica y teleológica del ordenamiento jurídico.

VII. VOTO SALVADO DE LA MAGISTRADA GARRO VARGAS

En el sub examine, la parte accionante reclama que el municipio accionado detectó unas edificaciones ilegales levantadas en la zona de protección del río Purral; sin embargo, reprocha que a la fecha de formulado este proceso no han realización acción alguna para eliminarlas, lesionándose con esto el derecho a un ambiente sano y ecológicamente equilibrado.

Al respecto, a partir del informe rendido por parte de la Municipalidad de Goicoechea considero imprescindible tener como parte al Sistema Nacional de Áreas de Conservación. En esa línea, el alcalde del municipio accionado puntualizó que su representada carece de competencia para determinar la existencia de un posible daño ambiental, motivo por el cual se desprende que procedieron a efectuar una coordinación con las autoridades del Sistema Nacional de Áreas de Conservación, quienes el 6 de febrero de 2025 llevaron a cabo una inspección. Consta que como resultado de dicha visita se emitió el oficio nro. SINAC-ACC-OSJ-inf-254-2025 del 24 de febrero de 2025, donde se consignó:

“Conclusiones y recomendaciones: Se realizó una visita al sitio indicado, donde se detecta invasión al área de protección del río Torres y la quebrada Mozotal, lo anterior por el establecimiento de edificaciones de tipo vivienda. La estimación de las invasiones se indica en el cuadro 1 del presente informe. Que la invasión al área de protección se detecta en dos predios los cuales se han de identificar por parte del municipio para que procedan a interponer el respectivo informe ante el Ministerio Pública. La invasión al área de protección se estima mediante el uso de imágenes aéreas, la posible ubicación del cauce y los datos de campo, sin embargo, es necesario realizar la medición exacta para lo cual, se recomienda que ésta se realice por personal atinente, ya sea del mismo Municipio o bien de ingeniería Forense del OIJ, previa gestión del Ministerio Público para el debido ingreso al predio.

Como medidas a tomar se recomienda que para la restauración del sitio se efectué la demolición de las invasiones y el retiro de los escombros para el establecimiento de la cobertura forestal típica de un bosque ribereño. El plan deberá ser elaborado por un profesional atinente y presentado ante esta oficina para el respectivo análisis y visto bueno. Importante señalar que todo proyecto de restauración deberá realizarse con el mayor cuidado posible y este debe considerar los impactos ambientales que se origen al inicio de las obras y garantizar que mediante las medidas adoptadas se podrá restaurar el sitio. Se recomienda que cualquier proyecto de restauración del área de protección se realice con árboles nativos de porte bajo a mediano y que los mismos se establezcan alejados de la infraestructura. Se recomienda que cada árbol posea una altura mínima de 1,5 metros con el fin de garantizar la menor mortalidad posible”.

En consecuencia, salvo el voto y ordeno continuar la tramitación del recurso a los efectos de que se solicite informe al Sistema Nacional de Áreas de Conservación.

viii.- Documentación aportada al expediente. Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, estos deberán ser retirados del despacho en un plazo máximo de 30 días hábiles contados a partir de la notificación de esta sentencia. De lo contrario, será destruido todo aquel material que no sea retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en sesión número 27-11 del 22 de agosto de 2011, artículo XXVI y publicado en el Boletín Judicial número 19 del 26 de enero de 2012, así como en el acuerdo aprobado por el Consejo Superior del Poder Judicial, en la sesión número 43-12 celebrada el 3 de mayo de 2012, artículo LXXXI.

POR TANTO:

Se declara con lugar el recurso. Se le ordena a Nombre42169, en su condición de Alcalde y a Nombre56763, en su condición de Director de Ingeniería y Operaciones, ambos de la Municipalidad de Goicoechea, o a quienes en su lugar ocupen respectivamente tales cargos, que giren las órdenes pertinentes y lleven a cabo todas las actuaciones que estén dentro del ámbito de sus competencias para que, dentro del plazo máximo de DOS MESES, contado a partir de la notificación de la presente sentencia, se brinde una solución definitiva a la situación denunciada por el recurrente (invasión de zona protegida). Se advierte a las autoridades recurridas que, de conformidad con lo establecido por el artículo 71 de la Ley de la Jurisdicción Constitucional, se impondrá prisión de tres meses a dos años o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada dentro de un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado.

Se condena a la Municipalidad de Goicoechea al pago de las costas, daños y perjuicios ocasionados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso administrativo. El magistrado Castillo Víquez pone nota. La magistrada Garro Vargas salva el voto y ordena continuar la tramitación del recurso a los efectos de que se solicite informe al Sistema Nacional de Áreas de Conservación. Notifíquese.- Fernando Castillo V.

Fernando Cruz C.

Paul Rueda L.

Luis Fdo. Salazar A.

Jorge Araya G.

Anamari Garro V.

Ingrid Hess H.

Document not found. Documento no encontrado.

Implementing decreesDecretos que afectan

    TopicsTemas

      Concept anchorsAnclajes conceptuales

        Spanish key termsTérminos clave en español

        News & Updates Noticias y Actualizaciones

        All articles → Todos los artículos →

        Weekly Dispatch Boletín Semanal

        Field reporting and policy analysis from Costa Rica's forests. Reportajes y análisis de política desde los bosques de Costa Rica.

        ✓ Subscribed. ✓ Suscrito.

        One email per week. No spam. Unsubscribe in one click. Un correo por semana. Sin spam. Cancela en un clic.

        Or WhatsApp channelO canal de WhatsApp →
        Coalición Floresta © 2026 · All rights reserved © 2026 · Todos los derechos reservados

        Stay Informed Mantente Informado

        Conservation news and action alerts, straight from the field Noticias de conservación y alertas de acción, directo desde el campo

        Email Updates Actualizaciones por Correo

        Weekly updates, no spam Actualizaciones semanales, sin spam

        Successfully subscribed! ¡Suscripción exitosa!

        WhatsApp Channel Canal de WhatsApp

        Join to get instant updates on your phone Únete para recibir actualizaciones instantáneas en tu teléfono

        Join Channel Unirse al Canal
        Coalición Floresta Coalición Floresta © 2026 Coalición Floresta. All rights reserved. © 2026 Coalición Floresta. Todos los derechos reservados.
        🙏