Res. 28309-2025 Sala Constitucional · Sala Constitucional · 05/09/2025
OutcomeResultado
The non-compliance claim is granted, ordering immediate compliance with the 2015 judgment, under warning of imprisonment or fine.Se acoge la gestión de desobediencia y se ordena el cumplimiento inmediato de la sentencia de 2015, bajo apercibimiento de prisión o multa.
SummaryResumen
The Constitutional Chamber addresses a non-compliance claim filed by a resident of Hatillo de Quepos against the Costa Rican Institute of Aqueducts and Sewers (AyA) and the Hatillo ASADA, alleging failure to comply with Judgment No. 2015017888 of 2015. That judgment ordered a definitive solution within 18 months to the water supply system's infrastructure and contamination problems affecting over 150 families, and, in the interim, to ensure potable water provision. Despite nearly 10 years having passed, the Chamber finds no definitive solution has been implemented: the community still relies on water tankers, and the long-term infrastructure project will not begin construction until 2030. The Chamber therefore grants the non-compliance claim, ordering the current heads of AyA and the ASADA to immediately comply with the 2015 judgment, under penalty of imprisonment or fine.La Sala Constitucional conoce una gestión de desobediencia planteada por un vecino de Hatillo de Quepos, quien acusa al Instituto Costarricense de Acueductos y Alcantarillados (AyA) y a la ASADA de Hatillo de no haber cumplido la sentencia N° 2015017888 de 2015. Dicha sentencia ordenó resolver definitivamente, en un plazo de 18 meses, los problemas de infraestructura y contaminación del acueducto que afectaban a más de 150 familias, y mientras tanto, garantizar el suministro de agua potable. A pesar del tiempo transcurrido —casi 10 años—, la Sala constata que no se ha materializado una solución definitiva: el abastecimiento sigue dependiendo de camiones cisterna y el proyecto de infraestructura a largo plazo no iniciará sino hasta 2030. Por tanto, la Sala declara con lugar la gestión de desobediencia, ordenando el cumplimiento inmediato de la sentencia de 2015 a los actuales jerarcas del AyA y la ASADA, bajo apercibimiento de prisión o multa.
Key excerptExtracto clave
Thus, this Chamber notes that approximately 10 years have passed since the main judgment was issued in this case, without a concrete and definitive solution having been provided to the problem of deficient potable water supply in the community of Hatillo de Quepos. The elapsed time is manifestly disproportionate, especially since the current supply in the area is provided by water tankers, which should be no more than a temporary measure. Furthermore, the project described by the ICAA will not even begin until at least six more years from now, implying an even further delay in resolving this longstanding problem. Consequently, it is evident that the respondent authorities have not been sufficiently diligent either in complying with the ordered measures in this case or in providing a solution to the community of Hatillo de Quepos; indeed, it was not until June of this year that agreements were made to implement a solution. Based on the foregoing, the non-compliance with judgment No. 2015017888 of 9:05 a.m. on November 13, 2015, is confirmed, insofar as it ordered that “within 18 months from notification of this ruling, the infrastructure and contamination problems of the Hatillo aqueduct be definitively resolved,” which is why the non-compliance claim is granted.De esta forma, esta Sala advierte que han transcurrido aproximadamente 10 años desde el dictado de la sentencia principal en el sub lite, sin que se haya brindado una solución concreta y definitiva a la problemática de deficiente abastecimiento de agua potable en la comunidad de Hatillo de Quepos. En ese tanto, el plazo transcurrido resulta abiertamente desproporcionado, máxime que el actual abastecimiento en la zona se da a través de camiones cisterna, lo cual no debería ser más que una medida temporal. Aunado a ello, el proyecto explicado por el ICAA se estaría realizando hasta dentro de al menos seis años más, lo que implica una demora aún mayor en la solución del problema de marras. En consecuencia, es evidente que las autoridades recurridas no han sido lo suficientemente diligentes ni en acatar lo ordenado en el sub iudice ni en darle una solución a la comunidad de Hatillo de Quepos; es más, no fue sino hasta en junio de este año que se efectuaron acuerdos para materializar una solución. A partir de lo anterior, se corrobora el incumplimiento a la sentencia nro. 2015017888 de las 9:05 horas de 13 de noviembre de 2015, en lo que atañe a que “dentro del plazo de 18 meses contado a partir de la notificación de este pronunciamiento, se resuelva definitivamente la problemática de infraestructura y contaminación del acueducto Hatillo”, razón por la cual se declara con lugar la gestión incoada.
Pull quotesCitas destacadas
"han transcurrido aproximadamente 10 años desde el dictado de la sentencia principal en el sub lite, sin que se haya brindado una solución concreta y definitiva a la problemática de deficiente abastecimiento de agua potable en la comunidad de Hatillo de Quepos."
"approximately 10 years have passed since the main judgment was issued in this case, without a concrete and definitive solution having been provided to the problem of deficient potable water supply in the community of Hatillo de Quepos."
Considerando III
"han transcurrido aproximadamente 10 años desde el dictado de la sentencia principal en el sub lite, sin que se haya brindado una solución concreta y definitiva a la problemática de deficiente abastecimiento de agua potable en la comunidad de Hatillo de Quepos."
Considerando III
"el plazo transcurrido resulta abiertamente desproporcionado, máxime que el actual abastecimiento en la zona se da a través de camiones cisterna, lo cual no debería ser más que una medida temporal."
"the elapsed time is manifestly disproportionate, especially since the current supply in the area is provided by water tankers, which should be no more than a temporary measure."
Considerando III
"el plazo transcurrido resulta abiertamente desproporcionado, máxime que el actual abastecimiento en la zona se da a través de camiones cisterna, lo cual no debería ser más que una medida temporal."
Considerando III
Full documentDocumento completo
Constitutional Chamber Date of Resolution: 05 September 2025 at 09:20 Case File: 15-015900-0007-CO Type of Matter: Amparo Action Case File: 15-015900-0007-CO CONSTITUTIONAL CHAMBER OF THE SUPREME COURT OF JUSTICE. San José, at nine hours twenty minutes on the fifth of September two thousand twenty-five.
Subsequent proceeding filed by Nombre119909, in case file no. 15-15900-0007-CO.
Whereas:
Drafted by Magistrate Rueda Leal; and,
Considering:
“Regarding the specific case. The petitioner claims to be a resident of Hatillo de Quepos. She alleges that, for years, the aqueduct that supplies the area with water for human consumption has presented infrastructure problems and contamination by fecal coliforms. She complains that neither the ASADA in charge nor AyA has done anything to solve the problem affecting approximately 200 families. She deems the right to access drinking water violated.
Indeed, this Tribunal considers it proven that on 15 October 2009, the Ministry of Health inspected the Hatillo aqueduct and concluded that its useful life had been exhausted, that the filtration system had been out of operation for a long time, that there was a public health problem since the liquid intake was open-air, that it lacked any purification treatment mechanism, that the water was contaminated with fecal coliforms, and that the system supplied water to 150 homes. As a result of this inspection, the Quepos Rectorate Health Area sent official letter No. PC-ARS-A-D-502-09 to AyA; however, there was no reply in this regard. Subsequently, on 11 September 2013, this ministry carried out another inspection of the Hatillo aqueduct and obtained the same findings as the inspection carried out in 2009. Consequently, by sanitary order No. PC-ARSA-A-OS- 226-2013 of 9 October 2013—duly notified—the ASADA of Hatillo was ordered to present a remedial plan for the administered aqueduct.
Later, by sanitary order No. PC-ARS-A-OS-0327-2015 of 29 July 2015—duly notified—, AyA was ordered to present a remedial plan for the Hatillo aqueduct, which was to indicate a start and completion schedule for the works. However, AyA has not yet presented any plan; on the contrary, through official letter PRE-2015-1192, it informed the Ministry of Health that “for the moment, the Project Administration unit does not have this community [Hatillo] among the projects to be carried out in 2016, so work will be done to make the project viable during 2016 and thus seek its financing in the budgets for 2017 or 2018 (…) a remedial plan cannot be provided within the period granted in sanitary order No. PC-ARS-A-OS-0327-2015, because (…) it requires the construction of a completely new system.” As can be inferred, indeed, the Hatillo aqueduct presents the infrastructure and contamination problem alleged by the petitioner; however, despite having been alerted to the problem years ago, the authorities responsible for the aqueduct—be it AyA as the governing body of the service and the ASADA of Hatillo as the administrator—have not taken effective measures aimed at the prompt resolution of the problem, which evidently violates the human right to access drinking water and, by connection, the right to health and life.
By virtue of the considerations put forth, the appropriate action is to declare the action with merit in the terms that will be set out in the operative part of the judgment (…)
Therefore:
The action is declared with merit. José Alberto Moya Segura and Juan Ramón Segura Picado, in their order General Manager of the Costa Rican Institute of Aqueducts and Sewers and President of the Administrative Association of the Hatillo Aqueduct and Sanitary Sewer, or whoever holds those positions in their place, are ordered to adopt the necessary measures and coordinate what is pertinent so that, within a period of 18 months counted from the notification of this pronouncement, the infrastructure and contamination problem of the Hatillo aqueduct is definitively resolved. Furthermore, in the interim, these authorities must take the necessary and appropriate measures so that the subscribers of the Hatillo aqueduct receive water suitable for human consumption. All of the above is ordered with the warning that, in accordance with Article 71 of the Law of Constitutional Jurisdiction, a prison sentence of three months to two years or a fine of twenty to sixty days shall be imposed on anyone who receives an order from this Chamber that they must comply with or enforce and disregards it, provided the crime is not more severely penalized.
The Costa Rican Institute of Aqueducts and Sewers and the Administrative Association of the Hatillo Aqueduct and Sanitary Sewer are ordered to pay the costs, damages, and losses caused by the facts serving as the basis for this declaration, which shall be liquidated in the execution of judgment in the contentious-administrative and civil jurisdictions, respectively. Notify this pronouncement to José Alberto Moya Segura and Juan Ramón Segura Picado, in their order, General Manager of the Costa Rican Institute of Aqueducts and Sewers and President of the Administrative Association of the Hatillo Aqueduct and Sanitary Sewer, or whoever holds those positions in their place, personally.
Said judgment was notified to the respondent ASADA on 17 November 2015, and to the authorities of the ICAA on 2 December 2015.
II.Based on the foregoing, it must be specified that this Tribunal issued two orders with different timeframes. The first was to coordinate what was pertinent, so that within the period of 18 months counted from the notification of that pronouncement, the infrastructure and contamination problem of the Hatillo aqueduct would be definitively resolved. And the second, that in the interim of such period, the respondents had to take the necessary and appropriate measures so that the subscribers of the Hatillo aqueduct would receive water suitable for human consumption. This is because in said pronouncement it was proven that the Ministry of Health had inspected the Hatillo aqueduct since 15 October 2009 and concluded that its useful life had been exhausted, that the filtration system had been out of operation for a long time, that there was a public health problem since the liquid intake was open-air, and that it lacked any purification treatment mechanism, so the water was contaminated with fecal coliforms and was thus distributed to the community.
Despite the sanitary order issued in due course by the Ministry of Health, not even a remedial plan had been submitted. Given the very serious public health problem, this Tribunal ordered both respondents to resolve this situation within 18 months, a period that has indeed already been exceeded, as it expired approximately in June 2017. Two years after said period expired, what the respondents reported is that the first solution planned was not viable, and subsequently the ASADA chose to join an ICAA project that is in process. However, the fact is that said situation remains unresolved and the community of Hatillo de Quepos is still being supplied by means of tanker trucks; that is, what has been adopted continues to be temporary measures, with which the community must procure water from two tanks placed in the community that are supplied by tanker trucks twice a week. On the other hand, this Tribunal finds it lacking that the respondents did not inform this Chamber of such a situation in a timely manner, or request in a timely manner an extension of the granted period, providing a schedule with sufficient proof of the corresponding responsibility.
Given the foregoing, it is appropriate to grant the petition filed, because although the second order has indeed been complied with and the temporary measures that bring drinking water to the community have been adopted, the fact is that the problem of providing drinking water service has not been resolved, nor addressed under the principles that should regulate it, of effectiveness, efficiency, celerity, continuity, and adaptation. Now, seeing that the current representatives of both respondents are not the same ones to whom Judgment No.
2015-17888, it is appropriate to order them to comply with what was ordered therein (…)
Therefore:
Manuel Antonio Salas Pereira, General Manager of the ICAA, José Juan Hernández Mena, Secretary of the Administrative Association of the Hatillo Aqueduct and Sanitary Sewer System, and the current President of said ASADA, or whoever holds those positions in their stead, are ordered to immediately comply with the provisions of judgment No. 2015-17888 of 9:05 a.m. on November 13, 2015. The respondents are warned that, in accordance with Article 71 of the Law of this jurisdiction, imprisonment of three months to two years, or a fine of twenty to sixty days, shall be imposed on anyone who receives an order that must be obeyed or enforced, issued in an amparo proceeding, and does not obey it or does not enforce it, provided that the offense is not more severely punished. This resolution shall be personally notified to Manuel Antonio Salas Pereira, General Manager of the ICAA, to José Juan Hernández Mena, Secretary of the Administrative Association of the Hatillo Aqueduct and Sanitary Sewer System, and to the current President of said ASADA, or to whoever holds those positions in their stead.”.
Said resolution was notified to the president of the respondent ASADA on July 1, 2019, and to the general manager of the ICAA on the 26th of the same month and year.
In the instant case, the plaintiff alleges that the respondent authorities have failed to comply with judgment No. 2015017888 of 9:05 a.m. on November 13, 2015, because they have not implemented effective measures for the prompt resolution of the problem alleged in this proceeding, such that neither the expansion nor the infrastructure improvements to the system that supplies the community have been carried out.
On this matter, it is worth reiterating that the main judgment in this case ordered the respondents to “within a period of 18 months from the notification of this ruling, definitively resolve the infrastructure and contamination problem of the Hatillo aqueduct. Furthermore, in the interim, these authorities must take the necessary and appropriate measures so that the subscribers of the Hatillo aqueduct receive water suitable for human consumption.” However, from what was stated by the respondents and the evidence on record, effective compliance with this Chamber’s order is not demonstrated.
In effect, the ICAA authorities explain that an integrated aqueduct system was initially attempted to cover the communities of Matapalo and Hatillo, using the springs (nacientes) supplying the Matapalo aqueduct as water sources. However, it was later decided to include the project within a long-term plan called “Improvements to the Dominical aqueduct system operated by AyA and inclusion of the Hatillo, Barú, and Dominicalito systems, to guarantee the supply of potable water to current and projected users of various communities in the districts of Bahía Ballena, Savegre, and Barú, of the cantons of Osa, Quepos, and Pérez Zeledón.” Nevertheless, the respondent institute admits that the aforementioned project will not begin construction until 2030, entering into operation only during the first quarter of 2031.
In turn, the respondent ASADA acknowledges that, given the need for short-term solutions, a meeting was held with the ICAA on June 3 of this year, since merging the Matapalo ASADA with the Hatillo ASADA is feasible. In this regard, it states that “for the moment, the technical studies are awaited and to see if the piping is available to begin the supply of potable water to the community, so we are awaiting the next meeting, which will be held in 22 days or, failing that, they will notify us, and to have a definitive response to proceed with the installation of the piping.”.
Thus, this Chamber notes that approximately 10 years have elapsed since the issuance of the main judgment in the case sub lite, without a concrete and definitive solution having been provided to the problem of deficient potable water supply in the community of Hatillo de Quepos. In this regard, the elapsed time is manifestly disproportionate, especially since the current supply in the area is provided by tanker trucks, which should be nothing more than a temporary measure. Added to this, the project explained by the ICAA would not be carried out for at least six more years, which implies an even longer delay in solving the problem at hand.
Consequently, it is evident that the respondent authorities have not been sufficiently diligent either in complying with what was ordered in the case sub iudice or in providing a solution to the community of Hatillo de Quepos; what is more, it was not until June of this year that agreements were reached to materialize a solution.
Based on the foregoing, non-compliance with judgment No. 2015017888 of 9:05 a.m. on November 13, 2015, is confirmed, regarding the part ordering that “within a period of 18 months from the notification of this ruling, definitively resolve the infrastructure and contamination problem of the Hatillo aqueduct,” which is why the filed petition is granted.
Now then, given that the persons currently holding the positions of general manager of the ICAA and president of the Hatillo ASADA differ from those to whom the order was issued in the aforementioned judgment, it is appropriate to issue the order to whoever currently holds the position (in this regard, see judgments Nos. 2021012671 of 9:15 a.m. on June 2, 2021, 2021022772 of 9:30 a.m. on October 12, 2021, 2022016686 of 10:05 a.m. on July 19, 2022, 2022022068 of 9:20 a.m. on September 23, 2022, 2023004160 of 10:25 a.m. on February 22, 2023, 2024000305 of 9:15 a.m. on January 10, 2024, Telf82 of 9:45 a.m. on March 4, 2025, among others).
The parties are advised that, should they have provided any paper document or objects or evidence contained in any additional electronic, computer, magnetic, optical, telematic device or device produced by new technologies, these must be retrieved within a maximum period of 30 business days, counted from the notification of this judgment. It is warned that any material not collected within that period will be destroyed, based on the "Regulations on the Electronic Case File before the Judiciary" (approved by the Plenary Court in Article XXVI of session No. 27-11 of August 22, 2011, and published in the Judicial Bulletin No. 19 of January 26, 2012) and Article LXXXI of the session of the Superior Council of the Judiciary No. 43-12 of May 3, 2012.
Therefore:
The petition for disobedience filed is granted. Consequently, María Alejandra Mora Segura and Guillermo Díaz Gómez are ordered, respectively, in their capacities as general manager of the Costa Rican Institute of Aqueducts and Sewers and president of the Administrative Association of the Hatillo Aqueduct and Sanitary Sewer System, or whoever holds those positions, to immediately comply with the provisions of judgment No. 2015017888 of 9:05 a.m. on November 13, 2015. The respondents are warned that, according to Article 71 of the Law of Constitutional Jurisdiction, imprisonment of three months to two years or a fine of twenty to sixty days shall be imposed on anyone who receives an order that must be obeyed or enforced, issued in an amparo proceeding, and does not obey it or does not enforce it, provided that the offense is not more severely punished. Notify personally.
Name137 V.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.
Alexandra Alvarado P.
CASE FILE No. 15-015900-0007-CO Telephones: Telf46 / (). Fax: Telf47 / Telf48. Electronic address: www.poder-judicial.go.cr/salaconstitucional. Address: (Dirección12 , Dirección13 , 100 mts. South of the Perpetuo Socorro Church).
Is a faithful copy of the original - Taken from Nexus.PJ on: 08-05-2026 11:16:51.
SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del cinco de setiembre de dos mil veinticinco .
Gestión posterior planteada por Nombre119909 , en el expediente nro. 15-15900-0007-CO.
Resultando:
Redacta el Magistrado Rueda Leal; y,
Considerando:
“Sobre el caso concreto. La recurrente aduce ser vecina de Hatillo de Quepos. Alega que, desde hace años, el acueducto que abastece a la zona de agua para consumo humano presenta problemas de infraestructura y de contaminación por coliformes fecales. Reclama que ni la ASADA a cargo ni el AyA han hecho nada para solucionar el problema que afecta a 200 familias aproximadamente. Estima violentado el derecho al acceso al agua potable.
En efecto, este Tribunal tiene por acreditado que el 15 de octubre de 2009, el Ministerio de Salud inspeccionó el acueducto de Hatillo y concluyó que la vida útil de este se había agotado, que el sistema de filtrado estaba fuera de operación desde hace mucho tiempo, que se presentaba un problema de salud pública ya que la captación del líquido se daba a cielo abierto, que no contaba con ningún mecanismo de tratamiento de purificación, que el agua estaba contaminada con coliformes fecales, y que el sistema suministraba agua a 150 viviendas. A consecuencia de esta inspección, el Área Rectora de Salud de Quepos envió al AyA el oficio Nº PC-ARS-A-D-502-09; sin embargo, no hubo contestación al respecto. Posteriormente, el 11 de setiembre de 2013, este ministerio realizó otra inspección en el acueducto de Hatillo y obtuvo los mismos hallazgos de la inspección realizada en el año 2009. En consecuencia, mediante orden sanitaria Nº PC-ARSA-A-OS- 226-2013 del 9 de octubre de 2013 –debidamente notificada- se ordenó a la ASADA de Hatillo presentar un plan remedial para el acueducto administrado.
Ulteriormente, por orden sanitaria NºPC-ARS-A-OS-0327-2015 del 29 de julio de 2015 –debidamente notificada-, se ordenó al AyA presentar un plan remedial para el acueducto de Hatillo, el cual debía indicar un cronograma de inicio y finalización de las obras. Sin embargo, el AyA aún no ha presentado plan alguno; por el contrario, mediante oficio PRE-2015-1192 indicó al Ministerio de Salud que “de momento, la unidad de Administración de Proyectos no tiene contemplado entre los proyectos a realizar en el año 2016 a esta comunidad [Hatillo], por lo que se trabajará en viabilizar el proyecto durante el año 2016 y así buscar el financiamiento del mismo en los presupuestos del año 2017 o 2018 (…) no se puede brindar plan remedial dentro del plazo otorgado en la orden sanitaria No. PC-ARS-A-OS-0327-2015, debido a que (…) requiere de la construcción de un nuevo sistema en su totalidad.” Como se colige, efectivamente, el acueducto de Hatillo presenta la problemática de infraestructura y contaminación alegada por la recurrente; sin embargo, pese a haber sido alertadas del problema años atrás, las autoridades encargadas del acueducto -sean el AyA como ente rector del servicio y la ASADA de Hatillo como administradora- no han tomado medidas efectivas tendentes a la pronta resolución de la problemática, lo que, evidentemente, lesiona el derecho humano al acceso al agua potable y, por conexidad, el derecho a la salud y la vida.
En mérito de las consideraciones esgrimidas, lo procedente es declarar con lugar el recurso en los términos que se dirán en la parte dispositiva de la sentencia (…)
Por tanto:
Se declara con lugar el recurso. Se le ordena a José Alberto Moya Segura y Juan Ramón Segura Picado, por su orden Gerente General del Instituto Costarricense de Acueductos y Alcantarillados y Presidente de la Asociación Administradora del Acueducto y Alcantarillado Sanitario de Hatillo, o a quienes en su lugar ocupen los cargos, que adopten las medidas necesarias y coordinen lo pertinente a fin de que, dentro del plazo de 18 meses contado a partir de la notificación de este pronunciamiento, se resuelva definitivamente la problemática de infraestructura y contaminación del acueducto Hatillo. Además, en el ínterin deberán estas autoridades tomar las medidas necesarias y adecuadas a fin de que los abonados del acueducto de Hatillo reciban agua apta para el consumo humano. Todo lo anterior se dicta con la advertencia de que de conformidad con el artículo 71 de la Ley de la Jurisdicción Constitucional, se impondrá pena de prisión de tres meses a dos años o de veinte a sesenta día multa a quien reciba una orden de esta Sala que deba cumplir o hacer cumplir y la inobserve, siempre que el delito no esté más gravemente penado.
Se condena al Instituto Costarricense Acueductos y Alcantarillados y a la Asociación Administradora del Acueducto y Alcantarillado Sanitario de Hatillo al pago de las costas, daños y perjuicios causados con los hechos que sirven de fundamento a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso administrativo y de lo civil, respectivamente. Notifíquese este pronunciamiento a José Alberto Moya Segura y Juan Ramón Segura Picado, por su orden, Gerente General del Instituto Costarricense Acueductos y Alcantarillados y Presidente de la Asociación Administradora del Acueducto y Alcantarillado Sanitario de Hatillo, o a quienes en su lugar ocupen los cargos, en forma personal.
Tal sentencia fue notificada a la Asada recurrida el 17 de noviembre de 2015, y las autoridades del ICAA el 2 de diciembre de 2015.
II.A partir de lo anterior se debe precisar que este Tribunal dispuso dos órdenes con plazos distintos. La primera fue coordinar lo pertinente, a fin de que dentro del plazo de 18 meses contado a partir de la notificación de ese pronunciamiento, se resolviera definitivamente la problemática de infraestructura y contaminación del acueducto Hatillo. Y la segunda, que en el ínterin de tal plazo, debían las recurridas tomar las medidas necesarias y adecuadas, a fin de que los abonados del acueducto de Hatillo recibieran agua apta para el consumo humano. Esto, toda vez que en dicho pronunciamiento se tuvo por demostrado que el Ministerio de Salud había inspeccionado el acueducto de Hatillo desde el 15 de octubre de 2009 y concluyó que la vida útil de este se había agotado, que el sistema de filtrado estaba fuera de operación desde hacía mucho tiempo, que se presentaba un problema de salud pública, ya que la captación del líquido se daba a cielo abierto, y que no contaba con ningún mecanismo de tratamiento de purificación, por lo que el agua estaba contaminada con coliformes fecales y así se distribuía a la comunidad.
A pesar de la orden sanitaria emitida en su oportunidad por el Ministerio de Salud, ni siquiera se había remitido un plan remedial. Dada la problemática tan seria de salud pública, este Tribunal ordenó a ambas recurrías resolver esta situación en 18 meses, plazo que efectivamente ya fue sobrepasado, pues venció aproximadamente en junio del año 2017. Dos años después de vencido dicho plazo, lo que informaron los recurridos es que la primera solución prevista no fue viable, y posteriormente la ASADA optó por unirse a un proyecto del ICAA que está en proceso. No obstante, lo cierto es que dicha situación sigue sin ser resuelta y la comunidad de Hatillo de Quepos aún se está abasteciendo mediante camiones cisterna, es decir, lo adoptado siguen siendo medidas temporales, con las cuales la comunidad debe procurarse el agua a partir de dos tanques colocados en la comunidad que son suplidos con los camiones cisterna dos veces a la semana.
Por otro lado, echa de menos este Tribunal que los recurridos informaran a esta Sala oportunamente de tal situación, o solicitaran oportunamente la ampliación del plazo concedido aportando un cronograma, con pruebas suficientes de la responsabilidad del caso. Dado lo anterior, procede acoger la gestión formulada, pues si bien la segunda orden sí ha sido acatada y se han adoptado las medidas temporales que llevan el agua potable a la comunidad, lo cierto es que la problemática de la prestación del servicio de agua potable no ha sido resuelta, ni atendida bajo los principios que deben regular la misma, de eficacia, eficiencia, celeridad, continuidad y adaptación. Ahora, visto que los actuales representantes de ambas recurridas no son los mismos a quienes fue notificada personalmente la sentencia No. 2015-17888, procede ordenarles el cumplimiento de lo ahí dispuesto (…)
Por tanto:
Se ordena a Manuel Antonio Salas Pereira, Gerente General del ICAA, a José Juan Hernández Mena, Secretario de la Asociación Administrativa del Acueducto y Alcantarillado Sanitario de Hatillo y al actual Presidente de dicha ASADA, o a quienes en su lugar ejerzan esos cargos, cumplir, de forma inmediata, lo dispuesto en la sentencia N° 2015-17888 de las 9:05 horas del 13 de noviembre de 2015. Se advierte a los recurridos, que de conformidad con el artículo 71 de la Ley de esta jurisdicción, se impondrá prisión de tres meses a dos años, o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada en un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado. Notifíquese esta resolución en forma personal a Manuel Antonio Salas Pereira, Gerente General del ICAA, a José Juan Hernández Mena, Secretario de la Asociación Administrativa del Acueducto y Alcantarillado Sanitario de Hatillo y al actual Presidente de dicha ASADA, o a quienes en su lugar ejerzan esos cargos.”.
Tal resolución se notificó al presidente de la Asada recurrida el 1° de julio de 2019, y al gerente general del ICAA el 26 de ese mismo mes y año.
En la especie, el accionante acusa que las autoridades recurridas han incumplido la sentencia nro. 2015017888 de las 9:05 horas de 13 de noviembre de 2015, porque no han ejecutado las medidas efectivas para la pronta solución de la problemática acusada en este proceso, de modo tal que no se han realizado ni la ampliación ni las mejoras de infraestructura del sistema que abastece a la comunidad.
Sobre el particular, cabe reiterar que en la sentencia principal de este asunto se le ordenó a los recurridos que “dentro del plazo de 18 meses contado a partir de la notificación de este pronunciamiento, se resuelva definitivamente la problemática de infraestructura y contaminación del acueducto Hatillo. Además, en el ínterin deberán estas autoridades tomar las medidas necesarias y adecuadas a fin de que los abonados del acueducto de Hatillo reciban agua apta para el consumo humano”.
Sin embargo, de lo expuesto por los accionados y de los elementos que constan en los autos no se acredita la efectiva observancia a lo dispuesto por esta Sala.
En efecto, las autoridades del ICAA explican que en un primer momento se intentó realizar un sistema de acueducto integrado que abarcara a las comunidades de Matapalo y Hatillo, para lo cual se usaron como fuentes hídricas las nacientes que suplen al acueducto de Matapalo. Empero, luego se decidió incluir el proyecto dentro de un plan a largo plazo denominado “Mejoras en el sistema del acueducto de Dominical operado por el AyA e inclusión de los sistemas de Hatillo, Barú y Dominicalito, para garantizar el suministro agua potable a los usuarios actuales y proyectados de diversas comunidades de los distritos de Bahía Ballena, Savegre y Barú, de los cantones de Osa, Quepos y Pérez Zeledón”. No obstante, admite el instituto accionado que el proyecto antedicho no iniciará su construcción sino hasta en el año 2030, entrando en operación hasta durante el primer trimestre del 2031.
A su vez, la Asada recurrida reconoce que, dada la necesidad de soluciones a corto plazo, el 3 de junio del año en curso se celebró una reunión con el ICAA, toda vez que es factible el unificar la Asada de Matapalo con la de Hatillo. En ese tanto, señala que “de momento se esperan los estudios técnicos y ver si se cuenta con la tubería para iniciar con el abastecimiento de agua potable a la comunidad, por lo que se está a la espera de la próxima reunión la cual se realizará en 22 días o en su defecto ellos notificaran, y tener ya una respuesta definitiva para proceder con la instalación de la tubería.”.
De esta forma, esta Sala advierte que han transcurrido aproximadamente 10 años desde el dictado de la sentencia principal en el sub lite, sin que se haya brindado una solución concreta y definitiva a la problemática de deficiente abastecimiento de agua potable en la comunidad de Hatillo de Quepos. En ese tanto, el plazo transcurrido resulta abiertamente desproporcionado, máxime que el actual abastecimiento en la zona se da a través de camiones cisterna, lo cual no debería ser más que una medida temporal. Aunado a ello, el proyecto explicado por el ICAA se estaría realizando hasta dentro de al menos seis años más, lo que implica una demora aún mayor en la solución del problema de marras.
En consecuencia, es evidente que las autoridades recurridas no han sido lo suficientemente diligentes ni en acatar lo ordenado en el sub iudice ni en darle una solución a la comunidad de Hatillo de Quepos; es más, no fue sino hasta en junio de este año que se efectuaron acuerdos para materializar una solución.
A partir de lo anterior, se corrobora el incumplimiento a la sentencia nro. 2015017888 de las 9:05 horas de 13 de noviembre de 2015, en lo que atañe a que “dentro del plazo de 18 meses contado a partir de la notificación de este pronunciamiento, se resuelva definitivamente la problemática de infraestructura y contaminación del acueducto Hatillo”, razón por la cual se declara con lugar la gestión incoada.
Ahora bien, visto que las personas que en este momento ejercen los cargos de gerente general del ICAA y presidente de la Asada de Hatillo difieren de a quienes se les giró la orden en la sentencia supracitada, corresponde dictarle la orden a quien en la actualidad ostenta el cargo (en este sentido ver las sentencias nros. 2021012671 de las 9:15 horas del 2 de junio de 2021, 2021022772 de las 9:30 horas del 12 de octubre de 2021, 2022016686 de las 10:05 horas del 19 de julio de 2022, 2022022068 de las 9:20 horas del 23 de setiembre de 2022, 2023004160 de las 10:25 horas del 22 de febrero de 2023, 2024000305 de las 9:15 horas del 10 de enero de 2024, Telf82 de las 9:45 horas del 4 de marzo de 2025, entre otras).
Se previene a las partes que, de haber aportado algún documento en papel u objetos o pruebas contenidos en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, estos deberán ser retirados en un plazo máximo de 30 días hábiles, contado a partir de la notificación de esta sentencia. Se advierte que será destruido todo material que no sea recogido dentro de ese lapso, con base en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial" (aprobado por la Corte Plena en el artículo XXVI de la sesión nro. 27-11 de 22 de agosto de 2011 y publicado en el Boletín Judicial nro. 19 del 26 de enero de 2012) y en el artículo LXXXI de la sesión del Consejo Superior del Poder Judicial nro. 43-12 de 3 de mayo de 2012.
Por tanto:
Se acoge la gestión de desobediencia formulada. En consecuencia, se le ordena a María Alejandra Mora Segura y Guillermo Díaz Gómez, por su orden, gerenta general del Instituto Costarricense de Acueductos y Alcantarillados y presidente de la Asociación Administradora del Acueducto y Alcantarillado Sanitario de Hatillo, o a quienes ocupen tales cargos, el cumplimiento inmediato de lo dispuesto en la sentencia nro. 2015017888 de las 9:05 horas de 13 de noviembre de 2015. Se advierte a los recurridos, que, según el artículo 71 de la Ley de la Jurisdicción Constitucional, se impondrá prisión de tres meses a dos años o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada en un recurso de amparo, y no la cumpliere o no la hiciera cumplir, siempre que el delito no esté más gravemente penado. Notifíquese de manera personal.
Nombre137 V.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.
Alexandra Alvarado P.