Res. 27436-2025 Sala Constitucional · Sala Constitucional · 29/08/2025
OutcomeResultado
The Constitutional Chamber denied the amparo, finding no threat to the right to health or a healthy environment, as the landfill has environmental viability, a current sanitary permit, and active oversight by the Ministry of Health, with no situation warranting its intervention.La Sala Constitucional declaró sin lugar el recurso de amparo por no evidenciarse una amenaza al derecho a la salud o al ambiente sano, al constatar que el relleno sanitario cuenta con viabilidad ambiental, permiso sanitario vigente y una supervisión activa del Ministerio de Salud, sin percibir una situación que requiriera su intervención.
SummaryResumen
Two residents filed an amparo against Empresas Berthier EBI de Costa Rica S.A. and the Municipality of Limón, arguing that transferring solid waste from the Greater Metropolitan Area (GAM) to the El Tomatal landfill threatened Limón residents' rights to health and a healthy environment, and endangered the landfill's lifespan. The Constitutional Chamber dismissed the action after verifying that the project has had environmental viability granted by SETENA since 2008 and a current sanitary operating permit from the Ministry of Health. It also confirmed that the Ministry of Health has conducted periodic inspections (monthly since 2024) and issued sanitary orders to correct deficiencies, which the company has progressively complied with, including approval of an intervention plan. At the time of ruling, the Chamber found no grounds for intervention.Dos ciudadanos interpusieron recurso de amparo contra Empresas Berthier EBI de Costa Rica S.A. y la Municipalidad de Limón, alegando que el traslado de residuos sólidos del Gran Área Metropolitana (GAM) al relleno sanitario El Tomatal, en Limón, amenazaba el derecho a la salud y a un ambiente sano de los limonenses, y ponía en riesgo la vida útil del relleno. La Sala Constitucional desestimó el recurso tras constatar que el proyecto cuenta con viabilidad ambiental otorgada por SETENA desde 2008 y permiso sanitario de funcionamiento vigente emitido por el Ministerio de Salud. Además, verificó que el Ministerio de Salud ha realizado inspecciones periódicas (mensuales desde 2024) y ha girado órdenes sanitarias para corregir deficiencias, las cuales la empresa ha venido cumpliendo, incluyendo la aprobación de un plan de intervención. La Sala no encontró, en el momento de la resolución, ninguna situación que ameritara su intervención, por lo que declaró sin lugar el amparo.
Key excerptExtracto clave
Given this context and how the amparo was framed, it must be dismissed. In this regard, note that the proven facts show the challenged project is indeed regulated and constantly supervised by the Ministry of Health, which has given it extensive follow-up. Likewise, this Court also verified that the landfill located in Limón province, specifically at the 'El Tomatal' Environmental Technology Park, does have environmental impact studies approved by SETENA, which granted environmental viability through resolution no. [...], and additionally, the Ministry of Health granted the defendant company a sanitary operating permit, which remains in force until April 28, 2026. Moreover, while the proven facts reveal that the health authority noted operational shortcomings, it is equally true that corresponding interventions were made so the company would solve the problems found during on-site inspections, which the company has been complying with; the intervention plan submitted by the company was even approved, and recommendations were issued to maintain long-term actions for proper landfill management.Desde este panorama y en los términos en que fue planteado el amparo, lo correspondiente es desestimarlo. En este sentido, nótese que de la relación de hechos probados se desprende que el proyecto acusado sí tiene regulación y una constante supervisión de parte del Ministerio de Salud, de donde se le ha dado un amplio seguimiento. De igual forma, este Tribunal también constató que relleno sanitario ubicado en la provincia de Limón, específicamente en el Parque Tecnológico Ambiental “El Tomatal”, sí cuenta con los estudios de impacto ambiental aprobado por Setena, entidad que le otorgó la viabilidad ambiental mediante resolución nro. [...] y, además, el Ministerio de Salud le concedió a la empresa accionada el permiso sanitario de funcionamiento, mismo que se encuentra vigente hasta el 28 de abril del 2026. Además, si bien de la relación de hechos probados se logra dilucidar que la autoridad rectora en temas de salud señaló que el proyecto en cuestión tuvo falencias en su funcionamiento, no menos cierto es que se han realizado las intervenciones correspondientes a fin de que la empresa accionada solucione los problemas encontrados en las inspecciones realizadas in situ, lo que se ha constatado que la empresa ha venido cumpliendo e, incluso, se aprobó el plan de intervención aportado por la empresa en cuestión y se emitieron recomendaciones a fin de que se mantenga a largo plazo acciones para el buen manejo del relleno sanitario.
Pull quotesCitas destacadas
"En el caso concreto, es claro el cumplimiento de esos presupuestos, pues se trata de un derecho de sujeto privado que está en una situación de poder en la cual podría quebrantar al derecho a la salud y a un ambiente sano y ecológicamente equilibrado..."
"In this specific case, those requirements are clearly met, as it involves a private party in a position of power that could potentially violate the right to health and to a healthy and ecologically balanced environment..."
Considerando I
"En el caso concreto, es claro el cumplimiento de esos presupuestos, pues se trata de un derecho de sujeto privado que está en una situación de poder en la cual podría quebrantar al derecho a la salud y a un ambiente sano y ecológicamente equilibrado..."
Considerando I
"Desde este panorama y en los términos en que fue planteado el amparo, lo correspondiente es desestimarlo."
"Given this context and how the amparo was framed, it must be dismissed."
Considerando IV
"Desde este panorama y en los términos en que fue planteado el amparo, lo correspondiente es desestimarlo."
Considerando IV
"La Sala no observa en este momento situación alguna que amerite su intervención."
"At this time, the Chamber does not see any situation that warrants its intervention."
Considerando IV
"La Sala no observa en este momento situación alguna que amerite su intervención."
Considerando IV
Full documentDocumento completo
Date of Resolution: August 29, 2025 at 10:10 a.m.
Case File: 25-012830-0007-CO Type of Matter: *Recurso de amparo* SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, at ten hours and ten minutes on the twenty-ninth of August, two thousand twenty-five.
*Recurso de amparo* processed in case file no. 25-012830-0007-CO, filed by Nombre119927, identity card CED94651 and Nombre119928, identity card CED94652, against EMPRESAS BERTHIER EBI DE COSTA RICA SOCIEDAD ANÓNIMA and the MUNICIPALIDAD DE LIMON.
Whereas:
S.A., for a period of three business days, so that they may express themselves in writing regarding the precautionary measure requested by the plaintiff, as well as offer the evidence they deem pertinent. In that same sense, the State is ordered, at the time of providing its response, to indicate whether, in relation to the facts set forth by the plaintiff, there exists or not any scientific technical study referring to the effects and eventual environmental impact of such facts, as well as to provide the respective technical criteria of the competent authorities, namely MINAE and the Ministry of Health. NOTIFY. - Alex Rojas Ortega, Judge." (Name211 does not correspond to the original document) THIRD: In what is of interest to this proceeding, regarding what was requested in the previous point, it is important to cite what was stated by the Office of the Attorney General of the Republic on May 12, 2025, in case file 25-001560-1027-CA: "In accordance with what was outlined in the preceding lines, on February 18, 2025, Sanitary Order No. MS-DRRSHC-ARSL-00046-2025 was notified to the Berthier company, through which a period of 10 business days was granted for the main aeration chamber of the wastewater treatment system at the El Tomatal PTA facilities to become operational, and it was ordered not to allow the entry of other quantities of solid waste that were not contemplated in the initial proposal submitted to the Ministry of Health; that is, it was prevented from transferring solid waste from the GAM, among others.
(See evidence No. 2, Volume 30, folios 4725-4725). Consequently, from that moment until today, there is an impediment regarding the transfer of solid waste produced, collected, or recovered in the Gran Área Metropolitana or from any other part of the country to the El Tomatal Limón PTA, since only waste from said zone is allowed entry (Municipalities of Limón, Matina, and Talamanca), which was detailed and authorized when the Operating Permit was requested. It is important to note that, even though the appeal filed against that act is pending resolution, as the motion for reconsideration was rejected by Resolution No. MS-DRRSHC-0379-2024, it does not have suspensive effects. (See evidence No. 2, Volume 30, folios 4730-4762, 4773-4777, 4794-4797, 4853, 4858-4861, 4864, 4865). In the same context, through official letter No. CARTA-MS-DRRSHC-ARSL-0849-2025 dated February 28, 2025, signed by Licda. Fanny Madrigal Núñez, Health Services, Limón Health Governing Area, and Eng.
Rosibel Villafuerte Rodríguez, Huetar Caribe Regional Directorate, Health Governance, it was recorded that: "8. On February 17, 2025, an inspection visit was conducted, and it was identified that the same condition as the last visit persisted in the main aeration chamber, since no works had been carried out for the advancement of the required improvements. For this reason, Engineer Name5638 reported that they would have the activity schedule to implement the actions for its operation as soon as possible, under official letter CARTA-MS-DRRSHC-ARSL-00683-2025. During said visit, Engineer Name5638 reported that, two weeks ago, they made the decision that EBI Limón would not be receiving waste, due to the fact that they were carrying out expansion works on Cell 3, and for that, greater equipment and personnel capacity was required, official letter CARTA-MS-DRRSHC-ARSL-00683-2025." (Name211 and the underlining are ours) (See evidence No. 2, Volume 30, folios 4763-4766).
In support of the above, as of April 28 last, the "Regulation for the Regionalized Management of Ordinary and Organic Solid Waste in Costa Rica" (Executive Decree No. 44974) entered into force, the purpose of which is to establish a framework of action based on cantonal systems (regional model) mandating intermunicipal collaboration to optimize the use of resources and reduce environmental impact. (Article 1) Under this framework, the municipalities and other entities responsible for waste management must organize themselves within the regions established by MIDEPLAN, as indicated in Executive Decree No. 37735, and they shall autonomously manage their solid waste, reducing their dependence on other regions and promoting the implementation of circular economy models. (Executive Decree No. 44974, Article 4). Specifically, Articles 9 and 10 of the regulation in question establish the obligation that the management of ordinary solid waste must be carried out within the corresponding region.
Nevertheless, when transfer outside the municipal territory where it is generated is necessary for treatment or final disposal, the distance may not exceed 80 kilometers from the farthest generation point. Likewise, in cases where the distance is exceeded, the use of Transfer Stations will be mandatory to optimize transport and guarantee efficient operation within the same region, and in exception cases, a technical report supporting the decision must be submitted. Therefore, since the transfer of waste from the GAM ceased as of the month of February, and specific regulations have been enacted setting the current conditions under which work must be done on transfers of solid waste for treatment or final disposal from one canton to another, we request the rejection of the petition and the immediate closure of the present matter, given that what was claimed herein has ceased. FOURTH: That on May 12, 2025, in case file 25-001560-1027-CA, the Administrative and Civil Treasury Tribunal of the Second Judicial Circuit of San José, Goicoechea, issued judgment number No. 2025004402, at thirteen hours and five minutes of May twelfth, two thousand twenty-five, in which it ordered: "THEREFORE: The request for a precautionary measure filed by the Municipality of Limón is rejected.
Notify." FIFTH: Thus, it is demonstrated: 1.-) that the interests of the appellants were not affected as a consequence of omissions made by the Municipality of Limón, 2.-) that the existing legal procedures have been exercised in order to safeguard the interests of the population. However, the aforementioned does not mean that the Municipality does not continue to face the problem of attempts to introduce garbage that apparently comes from the GAM, despite the existence of a sanitary order prohibiting it, as already indicated, and a new regulation that expressly prohibits transporting garbage more than 80 kilometers, for which reason the Municipality continues to act in favor of the interests of the administered parties. Take as reference the news published on the website https://elmundo.cr/municipales/limon-frena-ingreso-ilegal-de-basura-de-la-gam-al- relleno-sanitario/ dated May 26, 2025, which states: "Limón stops illegal entry of garbage from the GAM into the sanitary landfill Limón, May 26 (elmundo.cr) - The Municipal Police, the Ministry of Health, and Traffic Police stopped a trailer that was transporting garbage from the Gran Área Metropolitana (GAM) and attempting to enter the Limón sanitary landfill.
The vehicle was intercepted and returned to its place of origin, La Carpio. The joint operation, which will be maintained indefinitely, was carried out thanks to a constant monitoring system and coordinated actions. The truck was transporting solid waste from the GAM destined for the Limón sanitary landfill. The company responsible for the transport must answer to a formal complaint filed by the Limón Mayor's Office before the Ministry of Health. Furthermore, an investigation was requested at the La Carpio Office for an alleged violation of the new Ministry of Health regulation. The Municipality of Limón reiterates its stance: 'Limón is not a garbage dump!' A call is made to users of the Directorate92 to report in real-time the detection of suspicious trailers to the number Telf1704. It is requested not to send videos whose origin or timeliness cannot be verified. The mayor of Limón, Ana McCalla, 'from the Mayor's Office, we will continue to sustain the joint operations indefinitely until this situation is controlled or a precedent is set with the company in order to enforce the new Ministry of Health regulation and defend the useful life of the landfill.' The mayor made a call 'to the other local governments that also use the Limón landfill and who are also affected by this situation of our sanitary landfill losing useful life.
The truth is that Limón cannot remain alone in this fight. I call upon the other cantons and local governments to also join with articulated operations, with surveillance, with monitoring of this situation so that we can unite and defend the landfill as is necessary, since we are all users.' 'I greatly regret that public resources, which are intended to improve the lives of our inhabitants and for their protection, are having to be used. In the case, for example, of the Municipal Police, and that public resources have to be allocated in an almost extraofficial manner. That is to say, in addition to the available resources, we have to make a double or triple effort to be practically watching over a private company that should be adhering to the law and the legal framework,' she stated. McCalla emphasized that 'it is not possible that we are using public resources for these situations. This is the last straw.
I mean, really make a call of conscience to the company to please adhere to the legal framework, to the current regulations.' 'We cannot be uncovering sectors, in the case of the Municipal Police, uncovering sectors and duplicating the resources that are really needed on the streets of Limón to protect citizens for these things. Truly, this is a very painful, very regrettable situation, and we hope it does not happen again because we will be very firm in ensuring that the law and current regulations are complied with and that our sanitary landfill does not lose useful life by hauling garbage from other territories,' she concluded. Based on the foregoing, it is requested that the Central Municipality of Limón not be sanctioned, since it did not authorize the entry of waste from the GAM, and when this occurred, the corresponding Precautionary Measure was requested before the Administrative Contentious Tribunal, summary proceeding 25-001560-1027-CA, prior to the sanitary order that prohibits EBI from transferring waste from the GAM to be received in Limón, as well as the new regulation that prohibits the transfer of waste more than 80 kilometers."
Drafted by Judge Araya García; and,
Considering:
Due to their exceptional nature, the ordinary processing of amparo appeals against subjects of private law requires beginning by examining whether, in this specific case, we are faced with any of the conditions that make it admissible, in order to—subsequently and in the affirmative case—elucidate whether it is sustainable or not. In this regard, the Law of Constitutional Jurisdiction, in its Article 57, stipulates under which conditions the amparo is admissible against the actions or omissions of subjects of private law, that is, when they act or must act in the exercise of public functions or powers, or are, de jure or de facto, in a position of power against which the ordinary jurisdictional remedies would be clearly insufficient or tardy to guarantee the fundamental rights or freedoms referred to in Article 2, subsection a), of the same Law. In the specific case, compliance with these conditions is clear, as it involves a private subject's right that is in a position of power in which it could breach the right to health and to a healthy and ecologically balanced environment of the inhabitants of the province of Limón, due to the transfer of solid waste from the GAM to that province, reason for which the merits of the amparo are analyzed.
The appellants indicate that in various media outlets and social networks, it has been reported that waste from the Gran Área Metropolitana, specifically from the canton of San José, is being transferred to the sanitary landfill administered by EBI in Limón. They consider that the foregoing translates into a threat to the fundamental right to health of the inhabitants of the province of Limón and puts at risk the capacity and useful life of the local sanitary landfill. They claim that the Limón population has not been duly informed or consulted about this decision.
Of importance for the decision in this matter, the following facts are deemed duly proven:
| REPORT | INSPECTION DATE | FINDINGS AND/OR ACTIONS |
|---|---|---|
| MS-DRRSHC-ARSL-IT 06210-2024 | November 21, 2024 | CONCLUSION. During the visit and tour conducted, no weaknesses requiring the notification of a sanitary order were identified; however, upon identifying a lack of maintenance in green areas of the fuel self-consumption area, the companion was informed at that moment, and he explained that it is included in the work plan for green area care. Likewise, surveillance and control visits will be maintained by this Governing Area. |
| MS-DRRSHC-ARSL-IT 06365-2024 | December 11, 2024 | CONCLUSION. During the visit and tour conducted, no weaknesses requiring the notification of a sanitary order were identified; likewise, surveillance and control visits will be maintained by this Governing Area. |
| MS-DRRSHC-ARSL 00535-2025. | SUBJECT: "ANALYSIS OF VI QUARTER 2024 SOLID WASTE REPORT / EBI CR SANITARY LANDFILL". | CONCLUSION. Therefore, it is recommended that the Area Directorate grant approval to the present report submitted by the administered party. On the other hand, it is reported that the total incoming waste for the present quarter was recorded. |
| CARTA-MS-DRRSHC-ARSL-00481-2025 | January 30, 2025. | CONCLUSION. In view of the fact that the main aeration chamber is not yet functioning, due to it being in a maintenance process since the end of 2024, and managing to identify little progress in the execution of works, due to the unforeseen events indicated above, the company is using a sedimentator as a temporary measure as an aeration chamber and the other sedimentator as such. Due to the foregoing, and given the increase in solid waste received from the GAM to be treated by said company due to the technical closure, it is concerning that said measure may impair or affect operating capacity, which is why, very respectfully, it is requested that you interpose your good offices for a Regional Engineering inspection visit to be conducted to have a technical criterion regarding said situation. |
| CARTA-MS-DRRSHC-ARSL-00683-2025 | February 17, 2025 | CONCLUSION. As a result of the inspection, it was identified that no inconsistencies were detected in Cell 3 at the time of the visit, nor in other areas of the Environmental Technology Park processes; however, in the wastewater treatment system, there is no progress in its maintenance works, which is why it is not advisable for the establishment to be an option to receive solid waste from the GAM due to the indicated situation. Therefore, sanitary order MS-DRRSHC-ARSL-00046-2025 is notified to the administered party with a period of 10 business days for the main aeration chamber of the facility's wastewater treatment system to become operational, this being part of the water purification process in order to guarantee its adequate operation. Moreover, entry shall not be permitted for other quantities of solid waste not contemplated in the initial proposal submitted to this Governing Body. A joint follow-up visit with Regional Engineering is recommended to verify compliance with the notified administrative act once the granted period has expired. Sanitary order MS DRRSHC-ARSL-00046-2025-OS is issued, which ordered: "The establishment must carry out the necessary actions for the main aeration chamber of the facility's wastewater treatment system to become operational, this being part of the water purification process in order to guarantee its adequate operation. Moreover, entry shall not be permitted for other quantities of solid waste not contemplated in the initial proposal submitted to this Governing Body" (Name211 is not from the original) Expiration date: 03/04/2025. |
| MS-DRRSHC-URS-IT 0018-2025 | February 28 | CONCLUSIONS. 1. Regulatory non-compliance in solid waste management was evidenced within the EBI Environmental Technology Park, specifically in the compaction, coverage, and disposal of contaminated material, which could generate environmental and sanitary impacts. 2. The accumulation of waste without proper coverage has fostered the proliferation of carrion-eating fauna, which represents a risk to public health and the environment. 3. It is necessary for the company to implement immediate corrective actions to guarantee compliance with the Regulation of Environmental Parks for the Separation, Treatment, Recovery, and Final Disposal of Solid Waste (Reglamento de parques ambientales para la separación, tratamiento, aprovechamiento y disposición final de residuos sólidos, Decree No. 44421). Therefore, it is recommended to the Limón Health Governing Area as the Governing Health Body: I. To request, through the application of the corresponding special measures dictated by Law, from the administration of the EBI Environmental Technology Park, the following: 1. A detailed intervention plan, with its respective activity schedule, which must be sent to this Health Governance Unit within a maximum period of 8 business days granted as of the respective notification; said plan must include at a minimum: a. Corrective actions for the adequate compaction and coverage of solid waste, in compliance with current regulations. b. Correct disposal of contaminated material or soil, ensuring it is not used as cover, and ensuring its treatment, and providing a stockpile of cover material in accordance with established regulations. c. Proposal of measures for the control of carrion-eating fauna, considering options such as the optimization of waste coverage and the implementation of strategies to prevent their presence. 2. In the event that the intervention plan indicated in the previous point is approved, the implementation of the required actions must begin immediately upon the respective notification. II. To continue periodic joint inspections between the Local Level and the Regional Level, as coordinated prior to the preparation of this report, to monitor compliance with sanitary and environmental provisions, ensuring continuous improvement in the site's management. Consequently, sanitary order MS-DRRSHC-ARSL-00062-2025-OS is issued, through which it is ordered: I. To request, through the application of the corresponding special measures dictated by Law, from the administration of the EBI Environmental Technology Park, the following: 1. A detailed intervention plan, with its respective activity schedule, which must be sent to this Health Governance Unit within a maximum period of 8 business days granted as of the respective notification; said plan must include at a minimum: A. Corrective actions for the adequate compaction and coverage of solid waste, in compliance with current regulations. B. Correct disposal of contaminated material or soil, ensuring it is not used as cover, and ensuring its treatment, and providing a stockpile of cover material in accordance with established regulations. C. Proposal of measures for the control of carrion-eating fauna, considering options such as the optimization of waste coverage and the implementation of strategies to prevent their presence. 2. In the event that the intervention plan indicated in the previous point is approved, the implementation of the required actions must begin immediately upon the respective notification. |
| MS-DRRSHC-URS-IT-0022-2025 | Inspection No. 1 – March 7, 2025 (afternoon) - Inspection No. 2 – March 11, 2025 (morning) - Inspection No. 3 – March 11, 2025 (afternoon). | CONCLUSIONS. 1. Significant progress has been observed in the elimination of waste-contaminated soil, with a focus on its adequate final disposal in the corresponding cells. 2. Waste compaction and coverage work continues in accordance with regulations, achieving an estimated 80% progress in the closure of the cells in use. 3. A reduction in the presence of carrion birds has been recorded, although it is recommended to reinforce measures for their control. 4. The construction of the new cell is progressing as scheduled, highlighting the installation of the geomembrane. 5. Areas for improvement have been identified, such as the need to daily record the outflow from the Wastewater Treatment System and the elimination of mosquito larvae in stored tires. RECOMMENDATIONS. 1. Maintain and accelerate the total elimination of contaminated material and its transfer to the corresponding cell. 2. Strengthen actions for the reduction of carrion birds and evaluate the effectiveness of the implemented measures. 3. Guarantee the daily recording of outflow in the logbook of the Wastewater Treatment System. 4. Implement preventive measures to avoid the accumulation of water in tires or other materials that may serve as mosquito breeding grounds. 5. Continue periodic monitoring of the progress and compliance with the Regulation of Environmental Parks, ensuring that all activities are carried out in accordance with current regulations." |
(See documentary evidence).
ANALYSIS. The document presented by the representatives of the EBI PTA, although it does not include a detailed activity schedule, does describe the methodological actions to address the observations indicated in report No. MS-DRRSHC-URS-IT-0018 2025 and in sanitary order No. MS-DRRHSC-ARSL-00062-2025. Below, compliance with the points required in the sanitary order is analyzed: a. Corrective actions for the adequate compaction and coverage of solid waste, in compliance with current regulations. • It is reported that the exposed areas identified in the February 28 inspection have been covered, leaving only the main cut for operation. • To guarantee daily coverage at the closing time of the main cut's operation, schedules will be adjusted to have heavy machinery personnel until 6:00 pm or even until complete closure. • The machinery and personnel for the coverage closure will be the following: o 2 draglines o 1 articulated truck o 1 tractor o 1 laborer for support at times when the use of chains is required to pull the machinery, in critical moments that occur on the cell surface due to a lack of dry waste to give shape and consistency to the running surface. b. Correct disposal of contaminated material or soil, ensuring it is not used as cover, and ensuring its treatment, and providing a stockpile of cover material in accordance with established regulations.
It is clarified that all contaminated soil entering the project is disposed of in the safety cells. • Regarding the material observed at the entrance to the Environmental Park's cells, the same as indicated in the visit report, it will be used as a cover base and clean material will be placed over it, complying with what was requested. This material was excess cover that was extracted during the construction of the new cell, when we created the union of the previous cell's membrane with the new one, a normal activity in this type of project. • We proceed as indicated, and the activity of relocating this type of recycled earth directly into the safety cells of the PTA is reinforced. c. Proposal of measures for the control of carrion-eating fauna, considering options such as the optimization of waste coverage and the implementation of strategies to prevent their presence. • To adjust this direct impact on our activity, we will reinforce the operation by having more personnel for control, to prevent them from descending onto the main cut during the operational day.
Additionally, adjusting daily coverage by minimizing the tributary area of open waste. • Personnel will be adjusted in the following manner for bird control: o 2 people from 6:00 am to 7:00 am (outside waste entry hours) o 2 people during operating hours from 7:00 am to 4:30 pm o 2 people during lunch hours from 12:00 pm to 1:00 pm o 2 people from 4:30 pm to 6:00 pm (outside waste entry hours) • In this way, the operation is covered both during waste entry hours and outside reception hours, preventing birds from descending onto the main cut. • After this stage, the protection ring of the main cut in the operating cells will be increased, gradually forcing them to move farther from the area. CONCLUSION Based on the previous analysis, the intervention plan presented by Mr. Julien Charbonneau and Eng. Gustavo Acuña Solano is approved. It is recommended that the Limón Health Governing Area continue monitoring the compliance with and progress of the presented intervention plan. (See case file 25-008408-0007-CO ad effectum videndi et probandi).
In the case at bar, the petitioners state that in various media outlets and social networks it has been indicated that waste is being transported from the Greater Metropolitan Area (Gran Área Metropolitana), specifically from the canton of San José, to the landfill (relleno sanitario) managed by EBI in Limón. They consider that this translates into a threat to the fundamental right to health of the inhabitants of the province of Limón and puts the capacity and useful life of the local landfill (relleno sanitario) at risk. They claim that the population of Limón has not been duly informed or consulted about this decision.
In this regard, the Chamber verifies that the project in question corresponds to file FEAP-0242-2004-SETENA, project “Relleno Sanitario de Limón”. This project has the following description: “Construction of a landfill (relleno sanitario) with a capacity of 80 tons of garbage per day, on a 45-hectare property (cadastral map L-689751-87). The landfill (Relleno) will occupy 86,177 m2. It has had environmental feasibility (viabilidad ambiental) since 2008, when the environmental impact assessment studies (estudios de impacto ambiental) for the development of said project were approved; the approval of the environmental feasibility (viabilidad ambiental) was granted through resolution No. Nombre119929”. The respondent company has a valid operating sanitary permit (permiso sanitario de funcionamiento) until April 28, 2026, which was issued in compliance with the general regulation for operating sanitary permits (permisos sanitarios de funcionamiento), habilitation permits, and authorization for temporary events of mass concentration of people, granted by the Ministry of Health, Decreto 43432-S; Ley 8839.
Before 2023, the Ministry of Health conducted an average of one to three inspections per year at the landfill (relleno sanitario) in question, and, as of 2024, inspections are conducted monthly; additionally, in February and March 2025, they were carried out monthly. The Ministry of Health has taken the following actions:
| INFORME | FEHCA DE INSPECCIÓN | HALLAZGOS Y/O ACCIONES |
|---|---|---|
| MS-DRRSHC-ARSL-IT 06210-2024 | 21 de noviembre 2024 | CONCLUSIÓN. During the visit and tour conducted, no weaknesses were identified that would necessitate the notification of a sanitary order; however, upon identifying a lack of maintenance in green areas of the fuel self-consumption area, the accompanying person was informed at the time, and they explained to us that it is included in the work plan for green area care. Likewise, surveillance and control visits by this Rector Area will continue. |
| MS-DRRSHC-ARSL-IT 06365-2024 | 11 de diciembre DEL 2024 | CONCLUSIÓN. During the visit and tour conducted, no weaknesses were identified that would necessitate the notification of a sanitary order; likewise, surveillance and control visits by this Rector Area will continue. |
| MS-DRRSHC-ARSL 00535-2025. | ASUNTO: “ANALISIS REPORTE VI TRIMESTRE 2024 DE RESIDUOS SOLIDOS / RELLENO SANITARIO EBI CR”. | CONCLUSION. Therefore, it is recommended that the Area Directorate grant approval to this report submitted by the operator. Moreover, it is reported that the total waste intake for this quarter has been recorded. |
| CARTA-MS-DRRSHC-ARSL-00481-2025 | 30 de enero del 2025. | CONCLUSIÓN Given that the main aeration chamber is not yet functioning, due to being in a maintenance process since the end of 2024, and having identified little progress in the execution of works, due to the unforeseen events indicated above, the company is using, as a temporary measure, one sedimentation tank as an aeration chamber and the other sedimentation tank as such. Due to the foregoing, and given the increase in solid waste received from the GAM to be treated by said company due to the technical closure, it is concerning that this measure may harm or potentially affect the operational capacity. For this reason, very respectfully, it is requested that you interpose your good offices so that a Regional Engineering inspection visit is conducted to obtain a technical criterion regarding this situation. |
| CARTA-MS-DRRSHC-ARSL-00683-2025 | 17 de febrero del 2025 | CONCLUSIÓN As a result of the inspection, it was identified that in Cell 3 no inconsistencies were detected at the time of the visit, nor in other areas of the Environmental Technology Park processes; however, in the wastewater treatment system, there is no progress on its maintenance works. For this reason, it is not advisable for the establishment to be an option to receive solid waste from the GAM due to the situation indicated. Due to the foregoing, sanitary order MS-DRRSHC-ARSL-00046-2025 is notified to the operator with a period of 10 business days for the main aeration chamber of the facility's wastewater treatment system to be put into operation, this being part of the water purification process to guarantee its adequate operation. Furthermore, no intake of other quantities of solid waste not contemplated in the initial proposal presented to this Rector Entity shall be allowed. It is recommended to conduct a joint follow-up visit with Regional Engineering to verify compliance with the notified administrative act once the granted period has expired. Sanitary order MS DRRSHC-ARSL-00046-2025-OS is issued, which ordered: “The establishment must take the necessary actions for the main aeration chamber of the facility's wastewater treatment system to be put into operation, this being part of the water purification process to guarantee its adequate operation. Furthermore, no intake of other quantities of solid waste not contemplated in the initial proposal presented to this Rector Entity shall be allowed” (the Nombre211 is not from the original). Expiration date: 04/03/2025. |
| MS-DRRSHC-URS-IT 0018-2025 | 28 de febrero | CONCLUSIONES. 1. Regulatory non-compliance was evident in the solid waste management within the EBI Environmental Technology Park, specifically in the compaction, cover, and disposal of contaminated material, which could generate environmental and health impacts. 2. The accumulation of waste without adequate cover has led to the proliferation of scavenger fauna, which represents a risk to public health and the environment. 3. It is necessary for the company to implement immediate corrective actions to ensure compliance with the Reglamento de parques ambientales para la separación, tratamiento, aprovechamiento y disposición final de residuos sólidos (Decreto N° 44421). Therefore, it is recommended that the Limón Health Rector Area, as the health Rector Entity: I. Request, through the application of the corresponding special measures dictated by the Law, that the administration of the EBI Environmental Technology Park do the following: 1. A detailed intervention plan, with its respective activity schedule, which must be sent to this Health Rector Unit within a maximum period of 8 business days granted from the respective notification; said plan must include, at a minimum: a. Corrective actions for the adequate compaction and cover of solid waste, in compliance with current regulations. b. Correct disposal of contaminated material or soil, ensuring it is not used as cover, and ensuring its treatment and providing a stockpile of cover material in accordance with established regulations. c. Proposal of scavenger fauna control measures, considering options such as the optimization of waste cover and the implementation of strategies to prevent their presence. 2. If the intervention plan indicated in the previous point is approved, the implementation of the required actions must begin immediately upon the respective notification. II. Continue periodic joint inspections between the Local Level and the Regional Level, as coordinated prior to the preparation of this report, to monitor compliance with health and environmental provisions, ensuring continuous improvement in site management. Consequently, sanitary order MS-DRRSHC-ARSL-00062-2025-OS is issued, by which it is ordered: I. Request, through the application of the corresponding special measures dictated by the Law, that the administration of the EBI Environmental Technology Park do the following: 1. A detailed intervention plan, with its respective activity schedule, which must be sent to this Health Rector Unit within a maximum period of 8 business days granted from the respective notification, said plan must include, at a minimum: A. Corrective actions for the adequate compaction and cover of solid waste, in compliance with current regulations. B. Correct disposal of contaminated material or soil, ensuring it is not used as cover, and ensuring its treatment and providing a stockpile of cover material in accordance with established regulations. C. Proposal of scavenger fauna control measures, considering options such as the optimization of waste cover and the implementation of strategies to prevent their presence. 2. If the intervention plan indicated in the previous point is approved, the implementation of the required actions must begin immediately upon the respective notification. |
| MS-DRRSHC-URS-IT-0022-2025 | Inspection No. 1 – 7 de marzo de 2025 (afternoon) - Inspection No. 2 – 11 de marzo de 2025 (morning) - Inspection No. 3 – 11 de marzo de 2025 (afternoon). | CONCLUSIONES. 1. Significant progress has been observed in the elimination of waste-contaminated soil, with a focus on its proper final disposal in the corresponding cells. 2. Waste compaction and cover activities continue in accordance with regulations, achieving an estimated 80% progress in the closure of the cells in use. 3. A reduction in the presence of scavenger birds has been recorded, although it is recommended to reinforce measures for their control. 4. The construction of the new cell is progressing as scheduled, highlighting the installation of the geomembrane. 5. Areas for improvement have been identified, such as the need to record the daily outflow rate from the Wastewater Treatment System and the elimination of mosquito larvae in stored tires. RECOMENDACIONES 1. Maintain and accelerate the total elimination of contaminated material and its transfer to the corresponding cell. 2. Strengthen actions for the reduction of scavenger birds and evaluate the effectiveness of the implemented measures. 3. Guarantee the daily recording of the outflow rate in the logbook of the Wastewater Treatment System. 4. Implement preventive measures to avoid water accumulation in tires or other materials that could serve as mosquito breeding sites. 5. Continue periodic monitoring of progress and compliance with the Reglamento de Parques Ambientales, ensuring that all activities are carried out in accordance with current regulations. |
Finally, it is verified that in technical report MS-DRRSHC-URS-IT-0034-2025 of April 1, 2025, signed by Rosibeth Villafuerte Rodríguez, civil engineer of the Health Regulation Process of the Rector Unit of the Huetar Caribe Health Region, and addressed to Dr. Yorleny Molina Retana, head of the Rector Unit of the Huetar Caribe Health Region, the following is indicated: “Asunto: CRITERIO DE RESPUESTA A PLAN DE INTERVENCIÓN, PARQUE DE TECNOLOGÍA AMBIENTAL EBI – FINCA TOMATAL, SANTA ROSA, MATAMA, LIMÓN. ANTECEDENTES. In response to official letter N° GF-081-2025, issued on March 18, 2025, by Mr. Julien Charbonneau, Legal Representative, and Eng. Gustavo Acuña Solano, Director of Operations, the intervention plan has been received, required through sanitary order N° MS-DRRHSC-ARSL-00062-2025, issued by the Limón Health Rector Area. Said requirement is based on follow-up report N° MS-DRRSHC URS-IT-0018-2025, of March 4, 2025, prepared by the undersigned, in which observations to be rectified by the Environmental Technology Park (PTA) of the company Berthier de Costa Rica EBI S.A. were established.
DESARROLLO. The document presented by the representatives of the PTA EBI, although it does not include a detailed schedule of activities, does describe the methodological actions to address the observations indicated in report N° MS-DRRSHC-URS-IT-0018 2025 and in sanitary order N° MS-DRRHSC-ARSL-00062-2025. Below, compliance with the points required in the sanitary order is analyzed: a. Corrective actions for the adequate compaction and cover of solid waste, in compliance with current regulations. • It is reported that the exposed areas identified in the inspection of February 28 have been covered, leaving only the main cut for operation. • To guarantee daily cover at the closing time of the main cut operation, schedules will be adjusted to have heavy machinery personnel until 6:00 p.m. or until complete closure. • The machinery and personnel for the cover closure will be as follows: o 2 dredges o 1 articulated dump truck o 1 tractor o 1 laborer for support in moments when the use of chains is required to pull the machinery, in critical moments that occur on the cell surface due to a lack of dry waste to give shape and consistency to the rolling surface. b. Correct disposal of contaminated material or soil, ensuring it is not used as cover, and ensuring its treatment and providing a stockpile of cover material in accordance with established regulations.
It is clarified that all contaminated soil entering the project is disposed of in the security cells. • Regarding the material observed at the entrance of the Environmental Park cells, the same material indicated in the inspection report, it will be used as a cover base, and clean material will be placed over it, complying with what was requested. This material was excess cover that was extracted during the construction of the new cell, when the union of the previous cell's membrane with the new one was generated, a normal activity in this type of project. • The indicated action is proceeded with, and the activity of relocating this type of recycled earth directly into the PTA's security cells is reinforced. c. Proposal of scavenger fauna control measures, considering options such as the optimization of waste cover and the implementation of strategies to prevent their presence. • To adjust this direct impact on our activity, we will reinforce the operation by having more personnel for control and thus prevent them from descending onto the main cut during the operational day.
Additionally, by adjusting daily cover to minimize the tributary area of open waste. • The personnel will be adjusted as follows for bird control: o 2 people from 6:00 a.m. to 7:00 a.m. (schedule outside waste intake hours) o 2 people during operating hours from 7:00 a.m. to 4:30 p.m. o 2 people during lunch hours from 12:00 p.m. to 1:00 p.m. o 2 people from 4:30 p.m. to 6:00 p.m. (schedule outside waste intake hours) • Thus, the operation is covered both during waste intake hours and outside reception hours, preventing birds from descending onto the main cut. • After this stage, the protection ring of the main cut in the operating cells will be increased, making it so that they are increasingly forced to move further away from the zone. CONCLUSIÓN Based on the previous analysis, the intervention plan presented by Mr. Julien Charbonneau and Eng. Gustavo Acuña Solano is approved. It is recommended that the Limón Health Rector Area continue monitoring the compliance and progress of the submitted intervention plan.” From this view and in the terms in which the amparo was raised, the appropriate course of action is to dismiss it.
In this sense, it should be noted that from the list of proven facts, it is evident that the accused project does have regulation and constant supervision from the Ministry of Health, through which it has been extensively monitored. Likewise, this Court also verified that the landfill (relleno sanitario) located in the province of Limón, specifically in the Environmental Technology Park “El Tomatal”, does have the environmental impact assessment studies (estudios de impacto ambiental) approved by SETENA, an entity that granted it environmental feasibility (viabilidad ambiental) through resolution number Nombre119929, and, in addition, the Ministry of Health granted the respondent company the operating sanitary permit (permiso sanitario de funcionamiento), which is valid until April 28, 2026.
Furthermore, although from the list of proven facts it can be elucidated that the rector authority on health matters indicated that the project in question had shortcomings in its operation, it is no less true that the corresponding interventions have been made so that the respondent company solves the problems found in the on-site inspections conducted. It has been verified that the company has been complying and, even more, the intervention plan provided by the company in question was approved, and recommendations were issued so that long-term actions for the proper management of the landfill (relleno sanitario) are maintained.
For the reasons stated, the Chamber does not currently observe any situation that merits its intervention.
The parties are warned that if they have provided any paper document, as well as objects or evidence contained in any additional electronic, computer, magnetic, optical, telematic device or device produced by new technologies, these must be withdrawn from the office within a maximum period of 30 business days counted from the notification of this judgment. Otherwise, any material that is not withdrawn within this period will be destroyed, in accordance with the provisions of the "Reglamento sobre Expediente Electrónico ante el Poder Judicial", approved by the Corte Plena in session N° 27-11 of August 22, 2011, article XXVI and published in the Boletín Judicial number 19 of January 26, 2012, as well as in the agreement approved by the Consejo Superior del Poder Judicial, in session N° 43-12 held on May 3, 2012, article LXXXI.
Por tanto:
The appeal is declared without merit.
Name137 V.
Name9290 .
Name138 .
Name139 V.
Name5268 .
Hubert Fernández A.
Jorge Isaac Solano A.
SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las diez horas diez minutos del veintinueve de agosto de dos mil veinticinco .
Recurso de amparo que se tramita en expediente nro. 25-012830-0007-CO, interpuesto por Nombre119927 , cédula de identidad CED94651 y Nombre119928 , cédula de identidad CED94652, contra EMPRESAS BERTHIER EBI DE COSTA RICA SOCIEDAD ANÓNIMA y la MUNICIPALIDAD DE LIMON.
Resultando:
Redacta el Magistrado Araya García; y,
Considerando:
Por su excepcional naturaleza, el trámite ordinario de los recursos de amparo contra sujetos de derecho privado exige comenzar por examinar si, en la especie, estamos o no ante alguno de los supuestos que lo hacen admisible, para -posteriormente y en caso afirmativo- dilucidar si es estimable o no. En ese particular, la Ley de la Jurisdicción Constitucional, en su artículo 57, estipula bajo qué supuestos es admisible el amparo contra las acciones u omisiones de sujetos de derecho privado, es decir, cuando éstos actúen o deban actuar en ejercicio de funciones o potestades públicas, o, se encuentren, de derecho o de hecho, en una posición de poder frente a la cual los remedios jurisdiccionales comunes resultarían claramente insuficientes o tardíos para garantizar los derechos o libertades fundamentales a que se refiere el artículo 2, inciso a), de la misma Ley. En el caso concreto, es claro el cumplimiento de esos presupuestos, pues se trata de un derecho de sujeto privado que está en una situación de poder en la cual podría quebrantar al derecho a la salud y a un ambiente sano y ecológicamente equilibrado, de las personas habitantes de la provincia de Limón, debido al traslado de residuos sólidos provenientes de la GAM hacia esa provincia, razón por la cual, se entra a analizar el fondo del amparo.
Los recurrentes indican que en diversos medios de comunicación y redes sociales se ha indicado que se están trasladando residuos del Gran Área Metropolitana, específicamente del cantón de San José hacia el relleno sanitario administrado por EBI en Limón. Consideran que lo anterior se traduce en una amenaza al derecho fundamental a la salud de los habitantes de la provincia de Limón y pone en riesgo la capacidad y la vida útil del relleno sanitario local. Reclaman que la población limonense no ha sido debidamente informada ni consultada sobre esta decisión.
De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos:
INFORME FEHCA DE INSPECCIÓN HALLAZGOS Y/O ACCIONES MS-DRRSHC-ARSL-IT 06210-2024 21 de noviembre 2024 CONCLUSIÓN. Durante la visita y recorrido realizado no se identificaron debilidades que fuera necesaria la notificación de una orden sanitaria, no obstante, al identificar falta de mantenimiento en zonas verdes del área de autoconsumo de combustible se le informó al acompañante en el momento y este nos explica que se encuentra contemplado en el plan de trabajo de cuido de zonas verdes. Así mismo, se mantendrán las visitas de vigilancia y control por parte de esta Área Rectora.
MS-DRRSHC-ARSL-IT 06365-2024 11 de diciembre DEL 2024 CONCLUSIÓN. Durante la visita y recorrido realizado no se identificaron debilidades que fuera necesaria la notificación de una orden sanitaria, así mismo, se mantendrán las visitas de vigilancia y control por parte de esta Área Rectora MS-DRRSHC-ARSL 00535-2025.
ASUNTO: “ANALISIS REPORTE VI TRIMESTRE 2024 DE RESIDUOS SOLIDOS / RELLENO SANITARIO EBI CR”.
CONCLUSION. Por lo tanto, se recomienda a la Dirección de Área, otorgar el visto bueno al presente reporte presentado por el administrado. Por otra parte, se informa que fueron registrados el total de ingresado de desechos del presente trimestre.
CARTA-MS-DRRSHC-ARSL-00481-2025 30 de enero del 2025.
CONCLUSIÓN En vista de que la cámara de aireación principal aún no está funcionando, esto debido a que se encuentra en proceso de mantenimiento desde finales del año 2024 y logrando identificar pocos avances en la ejecución de obras, debido a los imprevistos indicados líneas arriba, la empresa esta utilizado como medida temporal un sedimentador como cámara de aireación y el otro sedimentador como tal. Por lo anterior, y ante el incremento de residuos sólidos recibidos de la GAM para ser tratados por dicha empresa por el cierre técnico, es preocupante que dicha medida perjudique o pueda afectar la capacidad de operación, motivo por el cual, muy respetuosamente se solicita interponga sus buenos oficios para que se realice visita de inspección de Ingeniería Regional para contar con un criterio técnico ante dicha situación.
CARTA-MS-DRRSHC-ARSL-00683-2025 17 de febrero del 2025 CONCLUSIÓN Como resultado de la inspección se identificó que en la Celda 3 no se detectaron inconsistencias en el momento de visita, como tampoco en otras áreas de los procesos del Parque Tecnología Ambienta, no obstante, en el sistema de tratamiento de aguas residuales no hay avances en las obras de mantenimiento de esta, razón por la cual, no es recomendable que el establecimiento sea una opción para que reciba residuos sólidos de la GAM por la situación indicada. Por lo anterior, se notifica orden sanitaria MS-DRRSHC-ARSL-00046-2025 al administrado con un plazo de 10 días hábiles para que entre en funcionamiento la cámara de aireación principal del sistema de tratamiento de aguas residuales de las instalaciones, siendo esta parte del proceso de depuración del agua con el fin de garantizar la adecuada operación de este. Por otra parte, no se deberá dar ingreso de otras cantidades de residuos sólidos que no estén contempladas en la propuesta inicial planteada ante este Ente Rector.
Se recomienda realizar visita de seguimiento conjunta con Ingeniería Regional para verificar el cumplimiento del acto administrativo notificado una vez cumplido el plazo otorgado. Se gira orden sanitaria MS DRRSHC-ARSL-00046-2025-OS la cual ordenaba: “El establecimiento deberá realizar las acciones necesarias para que entre en funcionamiento la cámara de aireación principal del sistema de tratamiento de aguas residuales de las instalaciones, siendo esta parte del proceso de depuración del agua con el fin de garantizar la adecuada operación de este. Por otra parte, no se deberá de dar ingreso de otras cantidades de residuos sólidos que no estén contempladas en la propuesta inicial planteada ante este Ente Rector" (la Nombre211 no es del original) Fecha de vencimiento: 04/03/2025.
MS-DRRSHC-URS-IT 0018-2025 28 de febrero CONCLUSIONES. 1. Se evidenciaron incumplimientos normativos en la gestión de residuos sólidos dentro del Parque de Tecnología Ambiental EBI, específicamente en la compactación, cobertura y disposición del material contaminado, lo que podría generar impactos ambientales y sanitarios. 2. La acumulación de residuos sin la debida cobertura ha propiciado la proliferación de fauna carroñera, lo que representa un riesgo para la salud pública y el medio ambiente. 3. Es necesario que la empresa implemente acciones correctivas inmediatas para garantizar el cumplimiento del Reglamento de parques ambientales para la separación, tratamiento, aprovechamiento y disposición final de residuos sólidos (Decreto N° 44421). Por tanto, Se recomienda al Área Rectora de Salud de Limón como ente Rector en salud: I. Solicitar mediante la aplicación de las medidas especiales correspondientes que dicta la Ley, a la administración del Parque de Tecnología Ambiental EBI, lo siguiente: 1.
Plan de intervención detallado, con su respectivo cronograma de actividades, el cual, deberá ser remitido a esta Unidad de Rectoría de la Salud en un período máximo de 8 días hábiles otorgados a partir de la respectiva notificación, dicho plan deberá contemplar como mínimo: a. Acciones correctivas para la adecuada compactación y cobertura de residuos sólidos, en cumplimiento con la normativa vigente. b. Correcta disposición del material o suelo contaminado, garantizando que no se utilice como cobertura, y asegurar su tratamiento y proveer acopio de material de cobertura conforme a la regulación establecida c. Planteamiento de medidas de control de fauna carroñera, considerando opciones como la optimización de la cobertura de residuos y la implementación de estrategias para evitar su presencia. 2. En caso de aprobarse el plan de intervención indicado en el punto anterior, deberá implementarse de forma inmediata a partir de la respectiva notificación, la puesta en marcha de las acciones requeridas.
II. Continuar inspecciones periódicas conjuntas entre Nivel Local y Nivel Regional, tal y como se coordinó previo a la elaboración del presente informe, para monitorear el cumplimiento de las disposiciones sanitarias y ambientales, asegurando la mejora continúa en la gestión del sitio. Por lo que se gira orden sanitaria MS-DRRSHC-ARSL-00062-2025-OS, mediante la cual se ordena: I Solicitar mediante la aplicación de las medidas especiales correspondientes que dicta la Ley, a la administración del Parque de Tecnología Ambiental EBI, lo siguiente: 1. Plan de intervención detallado, con su respectivo cronograma de actividades, el cual, deberá ser remitido a esta Unidad de Rectoría de la Salud en un período máximo de 8 días hábiles otorgados a partir de la respectiva notificación, dicho plan deberá contemplar como mínimo: A. Acciones correctivas para la adecuada compactación y cobertura de residuos sólidos, en cumplimiento con la normativa vigente.
B. Correcta disposición del material o suelo contaminado, garantizando que no se utilice como cobertura, y asegurar su tratamiento y proveer acopio de material de cobertura conforme a la regulación establecida. C. Planteamiento de medidas de control de fauna carroñera, considerando opciones como la optimización de la cobertura de residuos y la implementación de estrategias para evitar su presencia 2. En caso de aprobarse el plan de intervención indicado en el punto anterior, deberá implementarse de forma inmediata a partir de la respectiva notificación, la puesta en marcha de las acciones requeridas.
MS-DRRSHC-URS-IT-0022-2025 Inspección N° 1 – 7 de marzo de 2025 (tarde) - Inspección N° 2 – 11 de marzo de 2025 (mañana) - Inspección N° 3 – 11 de marzo de 2025 (tarde).
CONCLUSIONES. 1. Se han observado avances significativos en la eliminación del suelo contaminado con residuos, con un enfoque en su disposición final adecuada en las celdas correspondientes. 2. Las labores de compactación y cobertura de residuos continúan conforme a la normativa, logrando un avance estimado del 80% en el cierre de las celdas en uso. 3. Se ha registrado una reducción en la presencia de aves carroñeras, aunque se recomienda reforzar las medidas para su control. 4. La construcción de la nueva celda avanza según lo programado, destacando la instalación de la geomembrana. 5. Se han identificado áreas de mejora, como la necesidad de registrar diariamente el caudal de salida del Sistema de Tratamiento de Aguas Residuales y la eliminación de larvas de mosquitos en llantas almacenadas. RECOMENDACIONES 1. Mantener y acelerar la eliminación total del material contaminado y su traslado a la celda correspondiente. 2.
Fortalecer las acciones para la reducción de aves carroñeras y evaluar la eficacia de las medidas implementadas. 3. Garantizar el registro diario del caudal de salida en la bitácora del Sistema de Tratamiento de Aguas Residuales. 4. Implementar medidas preventivas para evitar la acumulación de agua en llantas u otros materiales que puedan servir como criaderos de mosquitos. 5. Continuar con el monitoreo periódico de los avances y cumplimiento del Reglamento de Parques Ambientales, asegurando que todas las actividades se realicen conforme a la normativa vigente ”. (Ver prueba documental).
El documento presentado por los representantes del PTA EBI, si bien no incluye un cronograma detallado de actividades, sí describe las acciones metodológicas para atender las observaciones indicadas en el informe N° MS-DRRSHC-URS-IT-0018 2025 y en la orden sanitaria N° MS-DRRHSC-ARSL-00062-2025. A continuación, se analiza el cumplimiento de los puntos requeridos en la orden sanitaria: a. Acciones correctivas para la adecuada compactación y cobertura de residuos sólidos, en cumplimiento con la normativa vigente. • Se informa que las áreas expuestas identificadas en la inspección del 28 de febrero han sido cubiertas, dejando únicamente el corte principal para la operación. • Para garantizar la cobertura diaria a la hora del cierre de la operación del corte principal, se ajustarán horarios para contar con personal de maquinaria pesada hasta las 6:00 pm o bien hasta el cierre completo. • La maquinaria y el personal para el cierre de la cobertura será el siguiente: o 2 dragas o 1 articulada o 1 tractor o 1 peón para apoyo en los momentos que se requiera el uso de cadenas para jalar la maquinaria, en momentos críticos que se dan en la superficie de la celda por falta de residuos seco para darle forma y consistencia a la superficie de rodamiento. b. Correcta disposición del material o suelo contaminado, garantizando que no se utilice como cobertura, y asegurar su tratamiento y proveer acopio de material de cobertura conforme a la regulación establecida.
Se aclara que todo suelo contaminado que ingresa al proyecto se dispone en las celdas de seguridad. • Respecto al material observado al ingreso de las celdas del Parque Ambiental, mismo indicado en el informe de la visita, se utilizará como base de cobertura y sobre este se colocará material limpio, cumpliendo con lo solicitado. Este material fue exceso de cobertura que se extrajo en la construcción de la nueva celda, cuando generamos la unión de la membrana de la celda anterior con la nueva, actividad normal en este tipo de proyectos. • Se procede con lo indicado y se refuerza la actividad de reubicación de ese tipo de tierra reciclada directo en las cedas de seguridad del PTA. c. Planteamiento de medidas de control de fauna carroñera, considerando opciones como la optimización de la cobertura de residuos y la implementación de estrategias para evitar su presencia. • Para ajustar este impacto directo en nuestra actividad, vamos a reforzar la operación contando con más personal para el control y así evitar que bajen al corte principal en la jornada operativa.
Adicionalmente, ajustando la cobertura diaria minimizando el área tributaria de residuos abiertos. • El personal se ajustará de la siguiente manera para el control de aves: o 2 personas de 6:00 am a 7:00 am (horario fuera de ingreso de residuos) o 2 personas en horario operativo de 7:00 am a 4:30 pm 2 personas en horario de almuerzos de 12:00 md a 1:00 pm o 2 personas de 4:30 pm a 6:00 pm (horario fuera de ingreso de residuos) • Así, se abarca la operación tanto en horas de ingreso de residuos como fuera de horario de recepción, evitando las aves bajen al corte principal. • Posterior a esta etapa, se aumentará el anillo de protección del corte principal en las celdas de operación, haciendo que cada vez se vean obligadas a alejarse más de la zona. CONCLUSIÓN Con base en el análisis anterior, se aprueba el plan de intervención presentado por el Sr. Julien Charbonneau y el Ing. Gustavo Acuña Solano.
Se recomienda al Área Rectora de Salud de Limón continuar con el seguimiento del cumplimiento y avance del plan de intervención presentado. (Ver expediente 25-008408-0007-CO ad effectum videndi et probandi).
En el sub lite, los recurrentes indican que en diversos medios de comunicación y redes sociales se ha indicado que se están trasladando residuos del Gran Área Metropolitana, específicamente del cantón de San José hacia el relleno sanitario administrado por EBI en Limón. Consideran que lo anterior se traduce en una amenaza al derecho fundamental a la salud de los habitantes de la provincia de Limón y pone en riesgo la capacidad y la vida útil del relleno sanitario local. Reclaman que la población limonense no ha sido debidamente informada ni consultada sobre esta decisión.
Sobre el particular, la Sala verifica que el proyecto en cuestión corresponde al expediente FEAP-0242-2004-SETENA, proyecto “Relleno Sanitario de Limón”. Tal proyecto tiene la siguiente descripción: “Construcción de un relleno sanitario con una capacidad de 80 ton de basura por día, a finca de 45 ha (plano catastrado L-689751-87). El Relleno ocupará 86 177 m2. Cuenta con viabilidad ambiental desde el año 2008, momento en que se aprobaron los estudios de impacto ambiental para el desarrollo de dicho proyecto; la aprobación de la viabilidad ambiental se otorgó mediante la resolución No. Nombre119929”. La empresa accionada cuenta con permiso sanitario de funcionamiento vigente al 28 de abril del 2026, el cual se emitió en apego al reglamento general para permisos sanitarios de funcionamiento, permisos de habilitación y autorización para eventos temporales de concentración masiva de personas, otorgados por el Ministerio de Salud, Decreto 43432-S; Ley 8839. Antes de 2023, el Ministerio de Salud realizaba en promedio de una a tres inspecciones al año al relleno sanitario en cuestión y, a partir de 2024, las inspecciones se realizan de forma mensual; además, en febrero y marzo de 2025 se practicaron mensualmente. El Ministerio de Salud ha realizado las siguientes acciones:
INFORME FEHCA DE INSPECCIÓN HALLAZGOS Y/O ACCIONES MS-DRRSHC-ARSL-IT 06210-2024 21 de noviembre 2024 CONCLUSIÓN. Durante la visita y recorrido realizado no se identificaron debilidades que fuera necesaria la notificación de una orden sanitaria, no obstante, al identificar falta de mantenimiento en zonas verdes del área de autoconsumo de combustible se le informó al acompañante en el momento y este nos explica que se encuentra contemplado en el plan de trabajo de cuido de zonas verdes. Así mismo, se mantendrán las visitas de vigilancia y control por parte de esta Área Rectora.
MS-DRRSHC-ARSL-IT 06365-2024 11 de diciembre DEL 2024 CONCLUSIÓN. Durante la visita y recorrido realizado no se identificaron debilidades que fuera necesaria la notificación de una orden sanitaria, así mismo, se mantendrán las visitas de vigilancia y control por parte de esta Área Rectora MS-DRRSHC-ARSL 00535-2025.
ASUNTO: “ANALISIS REPORTE VI TRIMESTRE 2024 DE RESIDUOS SOLIDOS / RELLENO SANITARIO EBI CR”.
CONCLUSION. Por lo tanto, se recomienda a la Dirección de Área, otorgar el visto bueno al presente reporte presentado por el administrado. Por otra parte, se informa que fueron registrados el total de ingresado de desechos del presente trimestre.
CARTA-MS-DRRSHC-ARSL-00481-2025 30 de enero del 2025.
CONCLUSIÓN En vista de que la cámara de aireación principal aún no está funcionando, esto debido a que se encuentra en proceso de mantenimiento desde finales del año 2024 y logrando identificar pocos avances en la ejecución de obras, debido a los imprevistos indicados líneas arriba, la empresa esta utilizado como medida temporal un sedimentador como cámara de aireación y el otro sedimentador como tal. Por lo anterior, y ante el incremento de residuos sólidos recibidos de la GAM para ser tratados por dicha empresa por el cierre técnico, es preocupante que dicha medida perjudique o pueda afectar la capacidad de operación, motivo por el cual, muy respetuosamente se solicita interponga sus buenos oficios para que se realice visita de inspección de Ingeniería Regional para contar con un criterio técnico ante dicha situación.
CARTA-MS-DRRSHC-ARSL-00683-2025 17 de febrero del 2025 CONCLUSIÓN Como resultado de la inspección se identificó que en la Celda 3 no se detectaron inconsistencias en el momento de visita, como tampoco en otras áreas de los procesos del Parque Tecnología Ambienta, no obstante, en el sistema de tratamiento de aguas residuales no hay avances en las obras de mantenimiento de esta, razón por la cual, no es recomendable que el establecimiento sea una opción para que reciba residuos sólidos de la GAM por la situación indicada. Por lo anterior, se notifica orden sanitaria MS-DRRSHC-ARSL-00046-2025 al administrado con un plazo de 10 días hábiles para que entre en funcionamiento la cámara de aireación principal del sistema de tratamiento de aguas residuales de las instalaciones, siendo esta parte del proceso de depuración del agua con el fin de garantizar la adecuada operación de este. Por otra parte, no se deberá dar ingreso de otras cantidades de residuos sólidos que no estén contempladas en la propuesta inicial planteada ante este Ente Rector.
Se recomienda realizar visita de seguimiento conjunta con Ingeniería Regional para verificar el cumplimiento del acto administrativo notificado una vez cumplido el plazo otorgado. Se gira orden sanitaria MS DRRSHC-ARSL-00046-2025-OS la cual ordenaba: “El establecimiento deberá realizar las acciones necesarias para que entre en funcionamiento la cámara de aireación principal del sistema de tratamiento de aguas residuales de las instalaciones, siendo esta parte del proceso de depuración del agua con el fin de garantizar la adecuada operación de este. Por otra parte, no se deberá de dar ingreso de otras cantidades de residuos sólidos que no estén contempladas en la propuesta inicial planteada ante este Ente Rector" (la Nombre211 no es del original) Fecha de vencimiento: 04/03/2025.
MS-DRRSHC-URS-IT 0018-2025 28 de febrero CONCLUSIONES. 1. Se evidenciaron incumplimientos normativos en la gestión de residuos sólidos dentro del Parque de Tecnología Ambiental EBI, específicamente en la compactación, cobertura y disposición del material contaminado, lo que podría generar impactos ambientales y sanitarios. 2. La acumulación de residuos sin la debida cobertura ha propiciado la proliferación de fauna carroñera, lo que representa un riesgo para la salud pública y el medio ambiente. 3. Es necesario que la empresa implemente acciones correctivas inmediatas para garantizar el cumplimiento del Reglamento de parques ambientales para la separación, tratamiento, aprovechamiento y disposición final de residuos sólidos (Decreto N° 44421). Por tanto, Se recomienda al Área Rectora de Salud de Limón como ente Rector en salud: I. Solicitar mediante la aplicación de las medidas especiales correspondientes que dicta la Ley, a la administración del Parque de Tecnología Ambiental EBI, lo siguiente: 1.
Plan de intervención detallado, con su respectivo cronograma de actividades, el cual, deberá ser remitido a esta Unidad de Rectoría de la Salud en un período máximo de 8 días hábiles otorgados a partir de la respectiva notificación, dicho plan deberá contemplar como mínimo: a. Acciones correctivas para la adecuada compactación y cobertura de residuos sólidos, en cumplimiento con la normativa vigente. b. Correcta disposición del material o suelo contaminado, garantizando que no se utilice como cobertura, y asegurar su tratamiento y proveer acopio de material de cobertura conforme a la regulación establecida c. Planteamiento de medidas de control de fauna carroñera, considerando opciones como la optimización de la cobertura de residuos y la implementación de estrategias para evitar su presencia. 2. En caso de aprobarse el plan de intervención indicado en el punto anterior, deberá implementarse de forma inmediata a partir de la respectiva notificación, la puesta en marcha de las acciones requeridas.
II. Continuar inspecciones periódicas conjuntas entre Nivel Local y Nivel Regional, tal y como se coordinó previo a la elaboración del presente informe, para monitorear el cumplimiento de las disposiciones sanitarias y ambientales, asegurando la mejora continúa en la gestión del sitio. Por lo que se gira orden sanitaria MS-DRRSHC-ARSL-00062-2025-OS, mediante la cual se ordena: I Solicitar mediante la aplicación de las medidas especiales correspondientes que dicta la Ley, a la administración del Parque de Tecnología Ambiental EBI, lo siguiente: 1. Plan de intervención detallado, con su respectivo cronograma de actividades, el cual, deberá ser remitido a esta Unidad de Rectoría de la Salud en un período máximo de 8 días hábiles otorgados a partir de la respectiva notificación, dicho plan deberá contemplar como mínimo: A. Acciones correctivas para la adecuada compactación y cobertura de residuos sólidos, en cumplimiento con la normativa vigente.
B. Correcta disposición del material o suelo contaminado, garantizando que no se utilice como cobertura, y asegurar su tratamiento y proveer acopio de material de cobertura conforme a la regulación establecida. C. Planteamiento de medidas de control de fauna carroñera, considerando opciones como la optimización de la cobertura de residuos y la implementación de estrategias para evitar su presencia 2. En caso de aprobarse el plan de intervención indicado en el punto anterior, deberá implementarse de forma inmediata a partir de la respectiva notificación, la puesta en marcha de las acciones requeridas.
MS-DRRSHC-URS-IT-0022-2025 Inspección N° 1 – 7 de marzo de 2025 (tarde) - Inspección N° 2 – 11 de marzo de 2025 (mañana) - Inspección N° 3 – 11 de marzo de 2025 (tarde).
CONCLUSIONES. 1. Se han observado avances significativos en la eliminación del suelo contaminado con residuos, con un enfoque en su disposición final adecuada en las celdas correspondientes. 2. Las labores de compactación y cobertura de residuos continúan conforme a la normativa, logrando un avance estimado del 80% en el cierre de las celdas en uso. 3. Se ha registrado una reducción en la presencia de aves carroñeras, aunque se recomienda reforzar las medidas para su control. 4. La construcción de la nueva celda avanza según lo programado, destacando la instalación de la geomembrana. 5. Se han identificado áreas de mejora, como la necesidad de registrar diariamente el caudal de salida del Sistema de Tratamiento de Aguas Residuales y la eliminación de larvas de mosquitos en llantas almacenadas. RECOMENDACIONES 1. Mantener y acelerar la eliminación total del material contaminado y su traslado a la celda correspondiente. 2.
Fortalecer las acciones para la reducción de aves carroñeras y evaluar la eficacia de las medidas implementadas. 3. Garantizar el registro diario del caudal de salida en la bitácora del Sistema de Tratamiento de Aguas Residuales. 4. Implementar medidas preventivas para evitar la acumulación de agua en llantas u otros materiales que puedan servir como criaderos de mosquitos. 5. Continuar con el monitoreo periódico de los avances y cumplimiento del Reglamento de Parques Ambientales, asegurando que todas las actividades se realicen conforme a la normativa vigente Finalmente, se comprueba que en informe técnico MS-DRRSHC-URS-IT-0034-2025 del 1° de abril de 2025, suscrito por Rosibeth Villafuerte Rodríguez, ingeniera civil de Proceso de Regulación de la Salud de la Unidad de Rectoría de la Salud Región Huetar Caribe y dirigido a la Dra. Yorleny Molina Retana, jefe de la Unidad Rectoría de la Salud Región Huetar Caribe, se le indica lo siguiente: “Asunto: CRITERIO DE RESPUESTA A PLAN DE INTERVENCIÓN, PARQUE DE TECNOLOGÍA AMBIENTAL EBI – FINCA TOMATAL, SANTA ROSA, MATAMA, LIMÓN.
ANTECEDENTES. En atención al oficio N° GF-081-2025, emitido el 18 de marzo de 2025 por el Sr. Julien Charbonneau, Representante Legal, y el Ing. Gustavo Acuña Solano, Director de Operación, se ha recibido el plan de intervención, requerido mediante la orden sanitaria N° MS-DRRHSC-ARSL-00062-2025, emitida por el Área Rectora de Salud de Limón. Dicho requerimiento se fundamenta en el informe de seguimiento N° MS-DRRSHC URS-IT-0018-2025, del 04 de marzo de 2025, elaborado por la suscrita, en el cual se establecieron observaciones a subsanar por parte del Parque de Tecnología Ambiental (PTA) de la empresa Berthier de Costa Rica EBI S.A. DESARROLLO. El documento presentado por los representantes del PTA EBI, si bien no incluye un cronograma detallado de actividades, sí describe las acciones metodológicas para atender las observaciones indicadas en el informe N° MS-DRRSHC-URS-IT-0018 2025 y en la orden sanitaria N° MS-DRRHSC-ARSL-00062-2025.
A continuación, se analiza el cumplimiento de los puntos requeridos en la orden sanitaria: a. Acciones correctivas para la adecuada compactación y cobertura de residuos sólidos, en cumplimiento con la normativa vigente. • Se informa que las áreas expuestas identificadas en la inspección del 28 de febrero han sido cubiertas, dejando únicamente el corte principal para la operación. • Para garantizar la cobertura diaria a la hora del cierre de la operación del corte principal, se ajustarán horarios para contar con personal de maquinaria pesada hasta las 6:00 pm o bien hasta el cierre completo. • La maquinaria y el personal para el cierre de la cobertura será el siguiente: o 2 dragas o 1 articulada o 1 tractor o 1 peón para apoyo en los momentos que se requiera el uso de cadenas para jalar la maquinaria, en momentos críticos que se dan en la superficie de la celda por falta de residuos seco para darle forma y consistencia a la superficie de rodamiento. b. Correcta disposición del material o suelo contaminado, garantizando que no se utilice como cobertura, y asegurar su tratamiento y proveer acopio de material de cobertura conforme a la regulación establecida.
Se aclara que todo suelo contaminado que ingresa al proyecto se dispone en las celdas de seguridad. • Respecto al material observado al ingreso de las celdas del Parque Ambiental, mismo indicado en el informe de la visita, se utilizará como base de cobertura y sobre este se colocará material limpio, cumpliendo con lo solicitado. Este material fue exceso de cobertura que se extrajo en la construcción de la nueva celda, cuando generamos la unión de la membrana de la celda anterior con la nueva, actividad normal en este tipo de proyectos. • Se procede con lo indicado y se refuerza la actividad de reubicación de ese tipo de tierra reciclada directo en las cedas de seguridad del PTA. c. Planteamiento de medidas de control de fauna carroñera, considerando opciones como la optimización de la cobertura de residuos y la implementación de estrategias para evitar su presencia. • Para ajustar este impacto directo en nuestra actividad, vamos a reforzar la operación contando con más personal para el control y así evitar que bajen al corte principal en la jornada operativa.
Adicionalmente, ajustando la cobertura diaria minimizando el área tributaria de residuos abiertos. • El personal se ajustará de la siguiente manera para el control de aves: o 2 personas de 6:00 am a 7:00 am (horario fuera de ingreso de residuos) o 2 personas en horario operativo de 7:00 am a 4:30 pm 2 personas en horario de almuerzos de 12:00 md a 1:00 pm o 2 personas de 4:30 pm a 6:00 pm (horario fuera de ingreso de residuos) • Así, se abarca la operación tanto en horas de ingreso de residuos como fuera de horario de recepción, evitando las aves bajen al corte principal. • Posterior a esta etapa, se aumentará el anillo de protección del corte principal en las celdas de operación, haciendo que cada vez se vean obligadas a alejarse más de la zona. CONCLUSIÓN Con base en el análisis anterior, se aprueba el plan de intervención presentado por el Sr. Julien Charbonneau y el Ing. Gustavo Acuña Solano. Se recomienda al Área Rectora de Salud de Limón continuar con el seguimiento del cumplimiento y avance del plan de intervención presentado”.
Desde este panorama y en los términos en que fue planteado el amparo, lo correspondiente es desestimarlo.
En este sentido, nótese que de la relación de hechos probados se desprende que el proyecto acusado sí tiene regulación y una constante supervisión de parte del Ministerio de Salud, de donde se le ha dado un amplio seguimiento. De igual forma, este Tribunal también constató que relleno sanitario ubicado en la provincia de Limón, específicamente en el Parque Tecnológico Ambiental “El Tomatal”, sí cuenta con los estudios de impacto ambiental aprobado por Setena, entidad que le otorgó la viabilidad ambiental mediante resolución nro. Nombre119929 y, además, el Ministerio de Salud le concedió a la empresa accionada el permiso sanitario de funcionamiento, mismo que se encuentra vigente hasta el 28 de abril del 2026.
Además, si bien de la relación de hechos probados se logra dilucidar que la autoridad rectora en temas de salud señaló que el proyecto en cuestión tuvo falencias en su funcionamiento, no menos cierto es que se han realizado las intervenciones correspondientes a fin de que la empresa accionada solucione los problemas encontrados en las inspecciones realizadas in situ, lo que se ha constatado que la empresa ha venido cumpliendo e, incluso, se aprobó el plan de intervención aportado por la empresa en cuestión y se emitieron recomendaciones a fin de que se mantenga a largo plazo acciones para el buen manejo del relleno sanitario.
Por lo expuesto, la Sala no observa en este momento situación alguna que amerite su intervención.
Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, éstos deberán ser retirados del despacho en un plazo máximo de 30 días hábiles contados a partir de la notificación de esta sentencia. De lo contrario, será destruido todo aquel material que no sea retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en sesión N° 27-11 del 22 de agosto del 2011, artículo XXVI y publicado en el Boletín Judicial número 19 del 26 de enero del 2012, así como en el acuerdo aprobado por el Consejo Superior del Poder Judicial, en la sesión N° 43-12 celebrada el 3 de mayo del 2012, artículo LXXXI.
Por tanto:
Se declara sin lugar el recurso.