Res. 25665-2025 Sala Constitucional · Sala Constitucional · 14/08/2025

Institutional Inaction on Culvert and Wastewater HazardsDescoordinación institucional ante alcantarilla y vertido de aguas residuales

View document ↓ Ver documento ↓ View original source ↗ Ver fuente original ↗

Loading…Cargando…

OutcomeResultado

GrantedCon lugar

The Chamber granted the amparo and ordered the Ministry of Health, MOPT, and CONAVI to coordinate on designing and beginning, within six months, a plan addressing the reported culvert, ditch, and water-related hazards.La Sala declaró con lugar el amparo y ordenó a Salud, MOPT y CONAVI coordinarse para diseñar y comenzar a ejecutar, dentro de seis meses, un plan que atienda la alcantarilla, la zanja y los problemas de aguas denunciados.

SummaryResumen

The Constitutional Chamber granted an amparo because the Ministry of Health, MOPT, and CONAVI responded inadequately and without coordination to a hazardous culvert and ditch along National Route 126 in Barva, Heredia. The conditions included standing water, suspected wastewater discharges, mosquito breeding, erosion, and dangers to pedestrians and vehicles. Although the Ministry of Health had issued a sanitary order and CONAVI reported inspections, scheduling, and technical surveys, the problem remained unresolved. The Chamber found that the agencies were shifting responsibility among themselves instead of coordinating their respective powers to protect the affected rights. It ordered the three authorities to undertake the necessary actions so that, within six months, a plan would be designed and implementation of its measures would begin. The judgment also ordered the State and CONAVI to pay costs and damages, while warning officials of the criminal consequences that may follow from failure to comply with an amparo order.La Sala Constitucional declaró con lugar un recurso de amparo por la respuesta insuficiente y descoordinada del Ministerio de Salud, el MOPT y el CONAVI ante una alcantarilla y una zanja peligrosas en la ruta nacional 126, en Barva de Heredia. La situación comprendía estancamiento de agua, posibles vertidos de aguas residuales, criaderos de mosquitos, erosión y riesgos para peatones y vehículos. Aunque Salud había emitido una orden sanitaria y CONAVI reportó inspecciones, programación y levantamientos técnicos, el problema permanecía sin solución. La Sala determinó que las instituciones se atribuían recíprocamente la responsabilidad, en vez de coordinar sus competencias para proteger los derechos afectados. Ordenó a las tres autoridades realizar las actuaciones necesarias para que, dentro de seis meses, se diseñe un plan y comiencen a ejecutarse sus medidas. También condenó al Estado y al CONAVI al pago de costas, daños y perjuicios, y advirtió sobre las consecuencias penales del incumplimiento.

Key excerptExtracto clave

In light of the foregoing, the violation of fundamental rights by all respondent authorities has been established. Although the respondents state that they have taken actions to resolve the reported problem, those actions have nevertheless been insufficient. In addition, there is serious interinstitutional disorganization, as the respondents merely shift responsibility onto one another. Thus, the Ministry of Health authorities state that the sanitary order was issued and appropriately followed up, but MOPT has not complied with it. The Ministry of Public Works and Transportation, in turn, states that addressing the problem is CONAVI's responsibility, while the respondent council maintains that intervention by the Ministry of Health is required to resolve the wastewater-discharge situation. Considering the foregoing, the appropriate course is to grant the amparo, as provided in the operative part of this judgment. The amparo is granted. María Antonieta Acuña Hernández, Mauricio Batalla Otárola, and Mauricio Sojo Quesada, respectively the Director of the San Rafael de Heredia Health Governing Area, the Minister of Public Works and Transportation, and the Executive Director of the National Road Council—or whoever holds those offices—are ordered to undertake the necessary actions and coordinate as appropriate within their respective spheres of authority so that, within SIX MONTHS from notice of this judgment, a plan is designed and implementation begins of the measures established therein to address the problem reported by the petitioner.En atención de lo expuesto, se comprueba la lesión de los derechos fundamentales por parte de todas las autoridades accionadas. En este sentido, si bien los recurridos señalan que han ejecutado acciones para solventar la problemática denunciada, no menos cierto es que han sido insuficientes. Aunado a ello, se observa una grave descoordinación interinstitucional, pues los accionados se limitan a endilgarse la responsabilidad entre sí. De esta forma, nótese que las autoridades del Ministerio de Salud señalan que ya se giró la orden sanitaria y han realizado el seguimiento respectivo; empero, el MOPT no la ha cumplido. A su vez, el Ministerio de Obras Públicas y Transportes señala que la atención del problema es responsabilidad del Conavi; y, el consejo accionado sostiene que se requiere la intervención del Ministerio de Salud para solventar la situación del vertido de aguas residuales. En consideración de lo expuesto, lo procedente es declarar con lugar el recurso, de acuerdo con lo establecido en la parte dispositiva de esta sentencia. Se declara con lugar el recurso. Se les ordena a María Antonieta Acuña Hernández, Mauricio Batalla Otárola y Mauricio Sojo Quesada, por su orden, de directora del Área Rectora de Salud de San Rafael de Heredia, ministro de Obras Públicas y Transportes y director ejecutivo del Consejo Nacional de Vialidad, o a quienes desempeñen esos cargos, que lleven a cabo las actuaciones necesarias y coordinen lo pertinente dentro del ámbito de sus respectivas competencias, a fin de que, en el plazo de SEIS MESES, contado a partir de la notificación de esta sentencia, se diseñe un plan y se comiencen a aplicar las medidas ahí establecidas para atender la problemática denunciada por el amparado.

Pull quotesCitas destacadas

  • "En asuntos ambientales, es criterio del suscrito, que si ya ha habido intervención de la Administración Pública, su conocimiento y resolución corresponde a la jurisdicción contenciosa administrativa."

    "In environmental matters, it is the undersigned judge's view that, where the Public Administration has already intervened, jurisdiction to hear and resolve the matter lies with the administrative courts."

    Nota del magistrado Salazar Alvarado

  • "En asuntos ambientales, es criterio del suscrito, que si ya ha habido intervención de la Administración Pública, su conocimiento y resolución corresponde a la jurisdicción contenciosa administrativa."

    Nota del magistrado Salazar Alvarado

  • "No obstante, sí entro a conocer el fondo del asunto cuando están de por medio otros derechos de las personas afectadas por el foco de contaminación, entre ellos, la salud, la calidad de vida y el derecho a gozar de un ambiente sano y libre de contaminación (artículo 50, de la Constitución Política), tal y como sucede en este caso."

    "Nevertheless, I do examine the merits when other rights of people affected by the pollution source are at stake, including health, quality of life, and the right to enjoy a healthy environment free from pollution under Article 50 of the Constitution, as occurs in this case."

    Nota del magistrado Salazar Alvarado

  • "No obstante, sí entro a conocer el fondo del asunto cuando están de por medio otros derechos de las personas afectadas por el foco de contaminación, entre ellos, la salud, la calidad de vida y el derecho a gozar de un ambiente sano y libre de contaminación (artículo 50, de la Constitución Política), tal y como sucede en este caso."

    Nota del magistrado Salazar Alvarado

  • "Se condena al Estado y al Consejo Nacional de Vialidad al pago de las costas, daños y perjuicios causados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de la jurisdicción contencioso-administrativa."

    "The State and the National Road Council are ordered to pay the costs and damages caused by the facts underlying this judgment, to be quantified in enforcement proceedings before the administrative courts."

    Por tanto

  • "Se condena al Estado y al Consejo Nacional de Vialidad al pago de las costas, daños y perjuicios causados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de la jurisdicción contencioso-administrativa."

    Por tanto

Full documentDocumento completo

Sections

Procedural marks

Document Review SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, at nine twenty a.m. on August fourteenth, two thousand twenty-five.

Amparo proceeding (recurso de amparo) processed under expediente number 25-002421-0007-CO, filed by LUIS ALBERTO GARCÍA ZÚÑIGA, identification card CED01, against the MINISTERIO DE SALUD, the MINISTERIO DE OBRAS PÚBLICAS Y TRANSPORTES (MOPT), and the CONSEJO NACIONAL DE VIALIDAD (CONAVI).

Background:

  1. 1In a written submission added to the electronic case file on January 27, 2025, the petitioner filed an amparo proceeding. He states that he filed a complaint with the Ministerio de Salud regarding a large culvert lacking any protective barrier, which poses a risk to people and vehicles; there is even evidence that several people have died in that culvert. He explains that 90 meters of the ditch must be piped and the corresponding sidewalk built because a deep ditch has formed that is eroding the national highway, undermining electric utility poles, causing water to stagnate and become a breeding ground for mosquitoes, and, above all, creating unsafe and dangerous conditions for people because they have no choice but to walk on the national highway. He asserts that the Área Rectora de Salud San Rafael - Barva issued sanitary order (orden sanitaria) no. MS-DRRSCN-DARSSRB-4569 of 2023, requiring MOPT to take the necessary steps to carry out the repairs; however, it has not been complied with.
  2. 2By a ruling of the Presidency of the Chamber issued at 14:05 on January 28, 2025, the proceeding was admitted, and reports were requested from the Ministro de Obras Públicas y Transportes and the Director del Área Rectora de Salud San Rafael- Barva.
  3. 3Mauricio Batalla Otárola, in his capacity as Ministro de Obras Públicas y Transportes, reports under oath. He states: “Within the framework of respect for the Principle of Legality, which limits the actions of public authorities, it must be considered that Ley No. 3155 ‘Ley Constitutiva del Ministerio de Obras Públicas y Transportes,’ in section 2, provides: ‘Article 2.- The purpose of the Ministerio de Obras Públicas y Transportes is: a) Without prejudice to the powers of the Consejo Nacional de Vialidad, to plan, construct, maintain, and improve the highways and roads of the national road network (red vial nacional). To regulate and control the rights-of-way (derechos de vía) of existing or planned highways within that network. To regulate, control, and oversee traffic and transportation on public roads. To exercise oversight and technical leadership in road infrastructure matters, by virtue of which it must advise and coordinate with local governments regarding the essential technical and logistical regulations pertaining to the proper functioning of the cantonal road network (red vial cantonal), considered both separately and in conjunction with the national road network.’ Based on the foregoing, the Consejo Nacional de Vialidad (CONAVI) is responsible for intervention in the maintenance, preservation, and development of national routes, as established in Article 4 of Ley No. 7798 ‘Ley de Creación del Consejo Nacional de Vialidad,’ which provides as follows: ‘(…) ARTICLE 4.- The objectives of the Consejo Nacional de Vialidad shall be as follows: a) To plan, schedule, administer, finance, carry out, and oversee the preservation and construction of the national road network, in accordance with the programs prepared by the Dirección de Planificación del Ministerio de Obras Públicas y Transportes. b) To administer its assets. c) To carry out, through contracts, the works, supplies, and services required for the preservation and construction of the entire national road network. d) To oversee the proper performance of the work, including quality control. e) To promote research, development, and technology transfer in the field of road construction and preservation. f) To enter into contracts or provide the services necessary to fulfill its objectives and functions.Likewise, Decreto Ejecutivo No. 27917 ‘Reforma Organizativa y Funcional del Ministerio de Obras Públicas y Transportes,’ in Article 15, provides: ‘(…) Article 15.—Public works functions. Considering that, on the one hand, the Consejo Nacional de Vialidad is responsible for the preservation and construction of the Red Vial Nacional and, on the other, that the Municipalidades are responsible for the Red Vial Cantonal, the role of the División de Obras Públicas shall shift toward providing technical assistance and support to the Municipalities for the preservation of that network, while also seeking to ensure that the Municipalities gradually assume their responsibilities as they acquire the financial and technical capacity to do so. Therefore, the División de Obras Públicas is essential for assisting with and channeling the Municipalities’ requirements during the transition period so that they may assume responsibility for the Red Cantonal.Its objective is to provide, in a coordinated manner, technical assistance and support to the municipalities and other organizations in the country so that, together with them, the necessary public works may be carried out, with emphasis on cantonal road infrastructure, thereby enabling the country’s economic and social development in accordance with the general policies of the Government and the Ministry. Its general functions shall become: a. To cooperate with the municipalities in the routine and periodic maintenance, rehabilitation, and improvement of roads and bridges within the cantonal network and the country’s urban streets. b. To promote the national and international technical and financial cooperation necessary for addressing the needs of the cantonal road network. c. To inventory the country’s cantonal network and update its classification. d. To plan and carry out river works. e. To coordinate with the Comisión Nacional de Emergencia in activities aimed at preventing and responding to emergencies. f. To perform any other functions assigned to it by the Offices of the Minister and Vice Minister, laws, and regulations.’ As may be gathered from the provisions transcribed above, the Ministerio de Obras Públicas y Transportes cannot itself perform maintenance, preservation, or construction work on national or cantonal routes because, on the one hand, CONAVI is responsible for addressing those requirements on national routes and, on the other, the municipalities are responsible for acting on cantonal routes.Accordingly, it is important to note that, after receiving notice of Sanitary Order No. MS-DRRSCN-DARSSRB-4569 of 2023, this Ministerial Office, through official letter N° DM-TC-2023-3909 dated October 26, 2023, forwarded that sanitary order to the Director of CONAVI, requesting that a solution to the reported problem be provided within two months and that, once the matter had been addressed, a response be provided to the complainant and this Office. However, to date, no response has been received from CONAVI, which is why, after this amparo proceeding was received, the Institución’s Dirección de Asesoría Jurídica, through official letter No. DAJ-2025- 0418 dated January 29, 2025, requested the following from the Director Ejecutivo de CONAVI: ‘(…) By official letter No. DM-TC-2025-0054 dated January 29 of the current year, the Office of the Minister forwarded to this Dirección Jurídica a copy of the ruling issued by the Sala Constitucional at 14: 05 on January 28, 2025.That ruling requests that the Head of the Ministerio de Obras Públicas y Transportes submit a report on the work involving the culvert and the piping of the ditch located specifically on the highway toward Carrizal, 400 meters north of the Iglesia Católica de Barva. (Heredia) It is important to note that, through official letter No. DM-TC-2023- 3909 dated October 26, 2023, Licenciada Denisse Agüero Rojas forwarded to the Consejo Nacional de Vialidad (CONAVI) a copy of sanitary order N° MS-DRRSCNDARSSRB- 4569-2023 so that the Council would address the problem within the scope of its authority. However, to date, no response has been received to official letter DM-TC-2023- 3909. Accordingly, it is requested that a technical report detailing the actions carried out by that Council be submitted on January 30, 2025, as a consequence of the aforementioned sanitary order, which gave rise to the amparo proceeding now before us (…)’ That said, it should be noted that, because no response has been received from CONAVI and in order to comply with the deadlines established in the ruling now before us, this Ministerial Office transparently informs the Court that this Sanitary Order was forwarded by this Ministerial Office to the Consejo Nacional de Vialidad in 2023 so that, in accordance with that Council’s authority, it could provide a definitive solution to the reported problem.In connection with the foregoing, we must clarify that we do not have the report requested through Official Letter No. DAJ-2025-0418; therefore, once we have that information, it will be forwarded immediately to the Sala Constitucional.”
  4. 4María Antonieta Acuña Hernández, in her capacity as director of the Área Rectora de Salud de San Rafael de Heredia, reports under oath (bajo juramento). She states: “1. On 10 de julio del 2023, a complaint (denuncia) was received from Mr. Luis Alberto García Zúñiga, in which he reported the risk to vehicles and persons traveling on the Carrizal national highway posed by an overgrown area in the sector located 400 meters north of Dirección01 in Barva de Heredia, as well as the fact that work in the sector had not been completed and that there was no evidence of maintenance. The complaint was entered under expediente 118- DB-2023. 2. On 14 de setiembre del 2023, a site visit was conducted, and technical report MS-DRRSCN-DARSRB- 4568-2023 dated 18 de setiembre del 2023 and sanitary order (orden sanitaria) MS-DRRSCN-DARSRB-4569-2023 were issued. The latter was served on 13 de octubre del 2023 upon the Minister of Public Works and Transportation, Mr.Luis Esteban Amador Jiménez, granting a period of 2 months (expiring on 13 de diciembre del 2023). The administrative act (acto administrativo) ordered the following: “Submit a plan or proposal to resolve the current condition of the reported culvert, in accordance with the institution’s authority.” As a follow-up to the matter, on 16 de enero de 2024, official letter MS-DRRSCN-DARSSRB-143-2024 was issued to Luis Esteban Amador Jiménez (Minister of Public Works and Transportation), requesting compliance with the sanitary order served. The official letter was sent on 16 de enero de 2025, and, in addition, on 26 de febrero de 2024, the official letter and sanitary order were received by the MOPT Office for the Receipt and Transfer of Documents. 3. The inspection record (acta de inspección) dated 04 de abril de 2024 establishes that the situation reported by the protected party (amparado) persists and that there is no evidence of actions taken in the sector by the competent institution.This office issued official letter MS-DRRSCN-DARSSRB-3389-2024 dated 18 de julio de 2024, addressed to the Dirección de Rectoría de la Salud Central Norte, so that the matter could be handled through the Minister’s Office. By official letter MS-DRRSCN-1738-2024 dated 28 de julio de 2024, signed by Dr. Karina Garita Montoya, Dr. Mary Denisse Munive Angermüller (Minister of Health) was informed of the matter, and her intervention in the case was requested so that it could be referred to Engineer Mauricio Batalla Otárola (Minister of Public Works and Transportation) for appropriate action. Follow-up on the matter has also been repeatedly requested by emails dated 06 de noviembre de 2024 and 21 de enero de 2025, but to date there is no evidence that the problem has been resolved. 4. The record shows that the petitioner (recurrente) has been kept informed of the steps taken in response to the complaint filed, through emails and copies of the case file (expediente).The competent institution has not provided a solution to the problem. The case remains open and under continuous follow-up, and Mr. García continues to be informed of the steps taken to date. The undersigned considers that the Área Rectora de Salud de San Rafael Barva has not violated the protected party’s fundamental rights because, before this amparo proceeding (amparo) was filed, actions had been taken to address the reported problem, including requesting that the head of the ministry intervene in the matter at issue. RELIEF REQUESTED (PETITORIA) Based on the foregoing, I respectfully request that this Honorable Authority dismiss the action brought against this institution, since the matter is deemed to have received due attention through assessment of the case and issuance of the sanitary order to the entity responsible for assessing and maintaining the roadway. The matter has likewise been followed up on, and the case even remains open because, to date, the entity responsible for compliance has not taken the actions necessary to correct the existing problem at the reported site.”
  5. 5By order (resolución) of the reporting justice (magistrado instructor) issued at 9:31 hours on 19 de febrero de 2025, the parties to the proceeding were expanded, and a report was requested from the executive director of the Consejo Nacional de Vialidad.
  6. 6Mauricio Sojo Quesada, in his capacity as Executive Director of the Consejo Nacional de Vialidad, reports. He states: “FIRST: Before the filing of this amparo proceeding (recurso de amparo), CONAVI had already been carrying out maintenance work in the area reported herein (national route No.126, Barva Heredia,, Quebrada Seca, Birrí, río Porrosatí), including: a work schedule prepared on November 17, 2023; a field inspection in November 2023 to assess the circumstances described in health order (orden sanitaria) MS-DRRSCN-DARSSRB-4569-2023; an analysis of the measures required to resolve the problem; since that year, and before notice of this amparo proceeding was served, work had already been scheduled for the first quarter of 2025; on February 11, 2025, a topographic survey was conducted at the site; and direct procurement 2022CD-000145-0006000001, Routine Maintenance, Contingencies, Basic Bridge Maintenance, and Maintenance of the Stormwater Evaluation System of the Paved National Road Network, Directorate02, was arranged.All these actions demonstrate that CONAVI had been working to resolve the problem for nearly two years before this amparo proceeding was filed. SECOND: There is an environmental situation involving the alleged diversion of wastewater (aguas residuales) by residents whose properties adjoin the national route and who are diverting such water onto the national route; consequently, the Ministry of Health has legal jurisdiction to ensure that this wastewater-diversion issue is resolved. THIRD: CONAVI cannot construct sidewalks or install pipes until the Ministry of Health fulfills its legal obligation to eliminate the wastewater originating from residents along the national route and affecting the area. Having explained these preliminary considerations, we shall now respond to the facts alleged in the amparo petition filed against CONAVI. FACTS FIRST: Only the fact that a complaint was filed with the Ministry of Health is admitted, since documentary evidence thereof appears in the judicial record.The petitioner’s allegation that there is evidence of deaths is denied. The record contains no evidence supporting an assertion as serious as the one made by the petitioner. Furthermore, the judicial record contains no evidence that the utility poles have been destabilized. It is essential to note that, before the amparo petition was filed, CONAVI had already been working to provide a solution to the problem since November 2023. To that end, a schedule was prepared to address and resolve the problem. Based on the technical report submitted as evidence, it is essential to inform the Justices that the central problem underlying the reported circumstances results from the actions of persons living alongside the national route who are diverting wastewater onto the national route, thereby causing standing water, foul odors, mosquito breeding grounds, soil erosion, and danger to pedestrians, in addition to preventing the construction of pipelines and sidewalks.In this regard, technical report DRC-10-2025-0236 (0530) of February 26 2025, issued by CONAVI’s Gerencia de Conservación de Vías y Puentes, states as follows: The source of this problem lies in the properties adjoining the national route, which have created water passages that channel the flow into natural earthen ditches. Similarly, existing infrastructure, such as the bus stop, has formed a natural channel for the passage of water, which, as it flows across the land, has caused scouring and ponding. Regarding standing water in the area, it is stated that, during the inspection conducted at the beginning of January to verify the work to be performed, water was observed in the ditch even though it had not rained on the day of the field visit, which means that water other than stormwater (aguas pluviales) is being diverted from properties. Furthermore, as can be seen in the photograph, the water has a coloration consistent with suspected wastewater.It must be clarified to the Constitutional Chamber (Sala Constitucional) that, although stormwater management is indeed required in the area to cover the open channel, eliminate the existing risk, and provide pedestrians with a safe passage, the management and disposal of wastewater is not the responsibility of the Consejo Nacional de Vialidad; rather, according to the evidence submitted, there is also an alleged unlawful discharge of wastewater onto the public roadway by the adjoining properties. In this regard, Article 92 of the Ley General de Salud provides: “It is prohibited to discharge wastewater or any other type of pollutant onto public roadways or into bodies of water in common use, and the Ministry of Public Health, in coordination with other competent authorities, is responsible for monitoring, controlling, and sanctioning such activities.” Accordingly, the powers of the Ministry of Health include addressing the matter, issuing warnings, and taking the appropriate measures to stop this unlawful practice by the persons identified as responsible through the procedures and tools available to it.This situation is relevant because the Consejo Nacional de Vialidad cannot connect wastewater outlets to the stormwater systems of the national road network, as doing so would be unlawful (see evidence submitted). Pursuant to Ley 7798, Ley de Creación del CONAVI, the legal powers granted to this public administration include the construction and maintenance of roads, bridges, and through streets in the national road network; consequently, the elimination of wastewater is not among our powers but falls under those of the Ministry of Health. In this regard, Article 92 of the Ley General de Salud clearly states that this is the responsibility and within the legal jurisdiction of the Ministry of Health. Consistent with the foregoing, the Ministry of Health itself, in technical report MSDRRSCN- DARSSRB-4568-2023 dated November 18, 2023 (see evidence contained in the judicial record), clearly states as follows: (…) It is particularly striking to this CONAVI Executive Directorate that, on the one hand, the Ministry of Health acknowledges the existence of wastewater in the area reported by the petitioner and, on the other, through official letter MS-DRRSCN-AJ-019-2025 submitted to your authority, requests dismissal of the amparo proceeding filed.It is the legal obligation of the Ministry of Health to eliminate the wastewater in the area concerned, and it is essential that the Ministry of Health warn the residents who are diverting wastewater onto the national route and permanently eradicate this problem. As correctly stated in the technical report submitted as evidence, piping, drainage, and sewer-system work cannot be performed until the Ministry of Health fulfills its legal obligation to control and monitor the wastewater present in that area—duties that fall not within CONAVI’s jurisdiction but within that of said Ministry pursuant to Article 92 of the Ley General de Salud. SECOND: Only the complaint filed with the Ministry of Health, which issued health order MS-DRRSCN-DARSSRB- 4569 del 2023, is admitted, since documentary evidence supporting that assertion appears in the judicial record. It is very important to mention that the design proposal from Constructora MECO, the contractor awarded Procurement No. 2022CD 000145 0006000001 Routine Maintenance, Contingencies, Basic Bridge Maintenance, and Maintenance of the Stormwater Drainage System of the Paved National Road Network, Line 9, Zone 1 9, is currently pending, because it is necessary to determine, according to site conditions, the required diameter of the culvert, the level needed to establish the slope of the pipe to be installed, and the location of the nearest discharge point, thereby producing a comprehensive proposal that addresses the interested party’s request and makes the most efficient use of resources.Nevertheless, the members of the Chamber must be informed that this Administration has demonstrated that it is taking action to resolve the problem. Finally, Health Order No. MS-DRRSCN-DARSSRB-4569-2023 was addressed by this Gerencia de Conservación de Vías y Puentes, since a field inspection was conducted beginning in November 2023 to determine the nature of the problem and the work that should be scheduled. The requirement called for a schedule and action plan to address the matter; however, due to an inadvertent error in interpreting a series of emails, the information whose receipt was confirmed was apparently not the requested schedule.”
  7. 7The legal requirements have been observed in the proceedings conducted.

Justice Araya García authors the decision; and,

Considering:

I. SUBJECT MATTER OF THE PROCEEDING

The petitioner states that he filed a complaint with the Ministry of Health concerning a large culvert lacking any protective barrier, which poses a risk to people and vehicles and for which there is even evidence of several persons having died in that culvert. He explains that a deep ditch has formed, eroding the national highway, destabilizing utility poles, causing standing water and mosquito breeding grounds, and, above all, creating danger and unsafe conditions for people. He asserts that the Área Rectora de Salud San Rafael - Barva issued health order no. MS-DRRSCN-DARSSRB-4569 de 2023, which required MOPT to take the measures necessary to make the repairs; however, it has not been complied with.

II. PROVEN FACTS

The following facts are deemed duly established and relevant to the resolution of this matter, either because they have been proven or because the respondent authority failed to address them, as directed in the initial order:

  • a)On July 10, 2023, the petitioner filed a complaint with the Ministerio de Salud, stating: “I hereby report the problems and risks faced by vehicles and persons traveling on the national highway to Carrizal, specifically from Dirección03, 400 meters north at the left-hand turn toward Carrizal, because the right-hand side toward San José de la Montaña has already been piped and provided with sidewalks through work carried out less than 3 years ago by COSEVI. As shown in the photographs attached to Form D-1, Filing of Health Complaint, MS.NI.SLA.07.P.06, the following specific problems and risks exist: 1. During the repairs carried out by COSEVI 3 years ago, it left an open culvert (alcantarilla) without any type of protection; given its size—approximately 3meters wide and 5 long—it is a death trap if a person falls into it, due to the high volume of water and the drop during heavy rains.

There are two photographs, one showing a white car passing by and another showing a gray car where the culvert is located; the culvert cannot be seen because it is completely covered by brush, and because of the sharp curve, even a car could fall into it and fit inside. 2. The ditch (zanja), which is approximately 70 meters long, is deep and is already eroding the heavily traveled national highway, where vehicles travel at high speeds because of the slope and curve, resulting in many accidents and deaths, as shown in an attached photograph depicting a cross for a deceased person. 3. Contaminated water flowing down from the housing developments creates mosquito-breeding sites and foul odors during the dry season, and, as can be seen in the photographs, the contaminated water pools there. 4. The ditch is so dangerous that cutting the overgrowth or performing maintenance on our own initiative is hazardous because vehicles and trucks pass close by at high speeds; moreover, the terrain is sloped, unstable, and deep, so laborers willing to take the risk can no longer be found, even though timely maintenance is an obligation of COSEVI. 5.

The erosion is so severe and dangerous to vehicular traffic that the photographs show two utility poles leaning and with their foundations undermined; they could fall onto the roadway at any time, endangering a person or vehicle and/or both. 6. There is heavy pedestrian traffic in the area, and the IPEC Barva, Heredia recently opened; because there is no sidewalk, this poses an enormous risk, and accidents have occurred because the ditch forces people to walk on the national highway, which carries heavy traffic traveling at high speeds and has poor visibility because of the overgrowth and, at night, because of inadequate lighting. I look forward to a prompt response and a solution to the problem described, by piping the sewage, eliminating the open culvert, and constructing a sidewalk that will provide pedestrians with peace of mind and safety. I remain available should you have any questions and even offer to accompany you on an inspection of the site.” (See documentary evidence).

  • b)In technical report no. MS-DRRSCN-DARSSRB-4568-2023 of September 18, 2023, the respondent governing health area (área rectora) determined: “3. Inspection findings · On September 14, 2023, a site visit was conducted. We were present at the location identified in the complaint, and a very large open, unprotected culvert was indeed observed, which could pose a risk to pedestrians and even vehicles. · Several sections covered with vegetation and areas of soil erosion were observed. · The culvert contains water even when it is not raining; its color and odor confirm the presence of wastewater (aguas residuales), and solid waste that could cause blockages was also observed. (…) 6. Conclusions It is confirmed that there is a culvert requiring maintenance and that safety measures must be taken to prevent an accident and avoid endangering people’s lives.” (See documentary evidence).
  • c)Through sanitary order (orden sanitaria) no. MS-DRRSCN-DARSSRB-4569-2023 of September 18, 2023, served on October 13, 2023, the Área Rectora de Salud de San Rafael-Barva ordered the Ministerio de Obras Públicas y Transportes as follows: “According to the inspection visit conducted on September 14, 2023, in response to the complaint filed by Mr. Luis Alberto García Zúñiga, because there is apparently a culvert on the national highway leading toward carrizal, specifically 400 m north of the Iglesia Católica de Barva, there is a large culvert (approximately 3 meters wide and 5 m long) that is open and has no protection whatsoever, thereby posing a risk to persons traveling through this area, who, if they fell into it, could be seriously injured or even lose their lives because of the large quantity of water flowing through the culvert and its depth; a vehicle could even fall into it because visibility is poor due to the large amount of brush covering it.

An inspection visit was conducted at the site, and it was found that the culvert has indeed not received the required maintenance and poses a risk to persons traveling through the area. Pursuant to report N° MS-DRRSCN-DARSSRB-4568- 2023 (attached) and the regulations indicated below, it is ordered that the following be completed within the period granted: 1. Submit a plan or proposal to resolve the current condition of the reported culvert, consistent with the institution’s authority. 2. The exact location of this problem can be found at the following Google Maps link: https://maps.app.goo.gl/veZtSv5EBJgppFWJ9; from this point, the culvert extends approximately 150 m north. 3. A period of 2 months is granted to submit the plan.” (See documentary evidence).

  • d)By official letter DM-TC-2023-3039 of October 26, 2023, the office of the Minister of Obras Públicas y Transportes forwarded the sanitary order to the director of Conavi. (See documentary evidence).
  • e)In official letter CARTA-CONAVI-DRC-10-2025-0236 dated February 26, 2025, the engineer for Zone 1-9 Heredia and the director of the Central Region, both from Conavi’s Gerencia de Conservación de Vías y Puentes, stated: “I. Background Health Order (Orden Sanitaria) MS-DRRSCN-DARSSRB-4569-2023-attached-. It is important to note that the requirements in that document are as follows: 1. Submit a plan or proposal to resolve the current situation involving the reported culvert (alcantarilla), consistent with the institution’s authority. 2. The exact location of this issue can be found at the following link … 3. A period of 2 months is granted to submit the plan. In the email dated November 20, 2023, within an email thread, the Ministerio de Salud acknowledged receipt of information; therefore, it is presumed that there was confusion in interpreting it, since the following response schedule had been prepared as early as November 17, 2023: II.

Location The affected area reported is on a secondary national route, with an urban settlement on one side of the route and an undeveloped property on the other side of the road; it is part of Dirección04, as shown in the following table: (…) III. Actions Taken As part of the response provided by the Gerencia de Conservación de Vías y Puentes, a field inspection was conducted in November 2023 to assess the facts alleged in the Health Order and determine the level of risk related to road maintenance (conservación vial). The findings identified an area with an open channel measuring 84 meters long, 1.30 meters wide, and 1 meter deep. It is important to note that the pooling of water in the area is due to the existence of earthen water crossings, which formed naturally and lack the slopes necessary for proper water flow, resulting in scouring (socavación) in the area. A natural ditch (cuneta) can also be observed at the site along the edge of the road, limiting the space available for pedestrian traffic.

In addition, the water has scoured the surrounding ground, worsening the situation. Before a sidewalk can be built at this location, the water will first need to be channeled and adequate space created for the sidewalk structure. The root of this problem lies in the properties adjoining the national route, which have created water crossings that channel the flow into natural earthen ditches. Similarly, existing infrastructure, such as the bus stop, has formed a natural channel for the passage of water, which, as it flows across the land, has caused scouring and ponding (empozamientos). To address the situation and comply with the requirements of the Health Order, an intervention schedule was prepared and included in the Project Bank of Zone 1-9 Heredia. However, because various priorities and emergencies in the area had to be addressed, it was not possible to carry out the intervention during 2024.

Recognizing the importance of addressing the situation, the intervention was scheduled for the first quarter of 2025. Beginning on February 11, 2025, a topographic survey (levantamiento topográfico) was conducted in the area, and photographs document the performance of this work, for the purpose of preparing a design for a comprehensive solution to the problem. The design proposal from Constructora MECO, the contractor awarded Contract No. 2022CD 000145 0006000001 Routine Maintenance, Contingencies, Basic Bridge Maintenance, and Conservation of the Stormwater Drainage System of the Paved National Road Network, Line 9, Zone 1 9, is currently pending, because it is necessary to determine the diameter of the culvert required under the site conditions to channel the water, the elevation needed to provide the proper slope for the pipe to be installed, and the location of the nearest discharge point (punto de desfogue), thereby producing a comprehensive proposal that addresses the interested party’s request while making the most efficient use of resources.

IV. Additional Observations: Regarding the pooling of water in the area, it should be noted that during the inspection conducted at the beginning of January to confirm the work to be performed, water was observed in the ditch even though it had not rained on the day of the field visit, implying that water other than stormwater (aguas pluviales) is being diverted from properties. Furthermore, as can be seen in the photograph, the water has a coloration suggesting that it may be wastewater (aguas residuales). It must be clarified to the Sala Constitucional that, although there is indeed a requirement to address stormwater in the area in order to cover the open channel, eliminate the existing risk, and provide safe passage for pedestrians, the management and disposal of wastewater is not the responsibility of the Consejo Nacional de Vialidad. Rather, according to the evidence submitted, the adjoining properties also appear to be acting unlawfully by discharging wastewater onto the public roadway.

In this regard, Article 92 of the Ley General de Salud provides: ‘It is prohibited to discharge wastewater or any other type of pollutant onto public roads or into bodies of water intended for common use, and the Ministerio de Salud Pública, in coordination with other competent authorities, is responsible for monitoring, controlling, and penalizing such activities.’ Accordingly, the authority of the Ministerio de Salud includes taking action, issuing warnings, and carrying out the appropriate procedures to halt this unlawful practice by those determined to be responsible through the procedures and tools available to it. This situation is relevant because the Consejo Nacional de Vialidad cannot connect wastewater outlets to the stormwater systems of the national road network, as doing so would be unlawful. V. Conclusions i. Health Order No. MS-DRRSCN-DARSSRB-4569-2023 was addressed by this Gerencia de Conservación de Vías y Puentes, since a field inspection was conducted as early as November 2023, identifying the problem and the work that would need to be scheduled.

The requirement called for a schedule and action plan to address the matter; however, due to an inadvertent error in interpreting an email thread, the information whose receipt was apparently confirmed was not the requested schedule. ii. The required intervention is included in the Project Bank of Zone 1-9 Heredia, which provides road maintenance to 9 cantons in the province of Heredia, where interventions are carried out in accordance with established priorities and budget allocations. iii. Although it was not possible to carry out the intervention in the area during 2024, this Zone Engineering Office completed the appropriate coordination to schedule the intervention for the I quarter of 2025, and there is evidence of progress in the activities performed, reaffirming the Administration’s commitment to complying with the Health Order issued. iv. There is an environmental situation at the site involving a suspected wastewater discharge.

The Ministerio de Salud Pública de Costa Rica is responsible for safeguarding public health in connection with wastewater management by overseeing the proper treatment of wastewater before it is discharged into the environment. In cases of unlawful or improper discharges, the Ministerio de Salud is responsible for taking the appropriate corrective measures.” (See documentary evidence).

III. SPECIFIC CASE

In the case at bar (sub lite), the petitioner states that he filed a complaint with the Ministerio de Salud concerning a large culvert without any protection, which poses a risk to people and vehicles, and that there is even evidence that several people have died in that culvert. He explains that a deep ditch has formed and is eroding the national road, undermining electrical utility poles, causing water to stagnate and creating mosquito breeding grounds, and, above all, jeopardizing people’s safety and placing them in danger. He asserts that the Área Rectora de Salud San Rafael - Barva issued Health Order no. MS-DRRSCN-DARSSRB-4569 de 2023, which required MOPT to take the necessary steps to make the repairs; however, it has not complied.

In this regard, the Sala considers it established that, on July 10, 2023, the petitioner filed a complaint with the Ministerio de Salud, stating: “I hereby report the problems and risks faced by vehicles and people traveling on the national road to Carrizal, specifically 400 meters north of Dirección03, at the left-hand turn toward Carrizal, because the section to the right toward San José de la Montaña has already been piped and provided with sidewalks through work performed less than 3 years ago by COSEVI. As shown in the photographs attached to Form D-1 Submission of Health Complaint, MS.NI.SLA.07.P.06, the following specific problems and risks exist: 1. In the work performed by COSEVI 3 years ago, it left an open culvert without any type of protection, and given its size—approximately 3meters wide and 5 long—it is a death trap if a person falls into it or because of the high volume of water and the difference in elevation during heavy rainfall.

There are two photographs, one showing a white car passing by and another showing a gray car at the location of the culvert, which cannot be seen because it is completely covered by overgrowth and, due to the sharp curve, even a car could fall into and fit inside it. 2. The ditch, approximately 70 meters long, is deep and is already eroding the heavily traveled national road, where vehicles travel at high speed because of the slope, and the curve causes many accidents and deaths, as shown in an attached photograph depicting a cross for a person who died. 3. Contaminated water flows down from the residential developments, creating mosquito breeding grounds and foul odors during the dry season, and, as can be seen in the photographs, the contaminated water pools there. 4. The ditch is so dangerous that cutting back the overgrowth or performing maintenance on our own initiative is hazardous because vehicles and trucks pass close by at high speed; furthermore, the ground is sloped, unstable, and deep, so laborers willing to take the risk can no longer be found, even though its timely maintenance is an obligation of COSEVI. 5.

The erosion is so severe and hazardous to vehicular traffic that the photographs show two poles leaning, with their bases undermined, that could fall onto the road at any time and endanger a person, a vehicle, and/or both. 6. There is heavy pedestrian traffic in the area, and the IPEC Barva, Heredia recently opened. Because there is no sidewalk, this creates an enormous risk, and accidents have occurred because the ditch forces people to walk on the national road, which has heavy, high-speed traffic and poor visibility due to the overgrowth and, at night, inadequate lighting. Hoping for a prompt response and solution to the problem described, by piping the sewage, eliminating the open culvert, and constructing a sidewalk that will provide pedestrians with peace of mind and safety, I remain available should you have any questions and even offer to accompany you on an inspection of the site.” In response to that complaint, in technical report no. MS-DRRSCN-DARSSRB-4568-2023 of 18 de setiembre de 2023, the respondent governing area determined: “3.

Inspection findings · On 14 de setiembre 2023, a site visit was conducted; we were present at the location identified in the complaint, and a very large culvert (alcantarilla) was indeed observed, open and without protection, which could pose a risk to pedestrians and even vehicles. · Several sections covered with weeds and soil erosion were observed. · The culvert contains water even when it is not raining; its color and odor confirm the presence of wastewater (aguas residuales), and solid waste that could cause blockages was also observed. (…) 6. Conclusions It is confirmed that there is a culvert that requires maintenance and that safety measures must be taken to prevent an accident and avoid endangering people’s lives.” (Emphasis not in the original). For that reason, by sanitary order (orden sanitaria) no. MS-DRRSCN-DARSSRB-4569-2023 of 18 de setiembre de 2023, served on 13 de octubre de 2023, the Área Rectora de Salud de San Rafael-Barva ordered the Ministerio de Obras Públicas y Transportes: “According to the inspection visit conducted on 14 de setiembre 2023 in response to the complaint filed by Mr.

Luis Alberto García Zúñiga, because there is apparently a culvert along the national highway toward carrizal, specifically 400 m north of the Iglesia Católica de Barva, there is a large culvert (approximately 3 metros wide and 5 m long) that is open and has no protection, and therefore poses a risk to people traveling through this area, who, if they were to fall, could be seriously injured or even lose their lives due to the large amount of water flowing through the culvert and its depth; even a vehicle could fall in because visibility is poor due to the large amount of vegetation covering it. An inspection visit was conducted at the site, and it was found that the culvert has indeed not received the required maintenance and poses a risk to people traveling through the area. According to report N° MS-DRRSCN-DARSSRB-4568- 2023 (attached) and the regulations indicated below, it is ordered that, within the period granted, the following must be done: 1.

Submit a plan or proposal to resolve the current condition of the reported culvert, in accordance with the institution’s jurisdiction. 2. The exact location of this problem can be found at the following Google Maps link: https://maps.app.goo.gl/veZtSv5EBJgppFWJ9; from this point, the culvert extends approximately 150 m north. 3. A period of 2 months is granted to submit the plan.” Thus, by official letter DM-TC-2023-3039 of 26 de octubre de 2023, the office of the minister of Obras Públicas y Transportes forwarded the sanitary order to the director of Conavi.

Furthermore, in official letter CARTA-CONAVI-DRC-10-2025-0236 of 26 de febrero de 2025, the engineer for Zona 1-9 Heredia and the director of the Región Central, both from the Gerencia de Conservación de Vías y Puentes del Conavi, stated: “I. Background Sanitary Order MS-DRRSCN-DARSSRB-4569-2023—attached—it is important to indicate that the requirements in that document are: 1. Submit a plan or proposal to resolve the current condition of the reported culvert, in accordance with the institution’s jurisdiction. 2. The exact location of this problem can be found at the following link … 3. A period of 2 months is granted to submit the plan. In the email of 20 de noviembre del 2023, within an email thread, the Ministerio de Salud acknowledged receipt of information; therefore, it is presumed that there was confusion in its interpretation, since the following response schedule had been prepared as of 17 de noviembre del 2023: II.

Location The area affected as reported corresponds to a secondary national route, with an urban settlement on one side of the route and an undeveloped property on the other side of the road; it is part of Dirección04, as shown in the following table: (…) III. Actions taken As part of the response provided by the Gerencia de Conservación de Vías y Puentes, a field inspection was conducted in noviembre del 2023 to assess the facts alleged in the Sanitary Order and determine the degree of risk associated with road maintenance. The findings identified an area with an open channel measuring 84 metros long, 1,30 metros wide, and 1 metro deep. It is important to note that standing water in the area is due to the existence of earthen water crossings, which formed naturally and lack the slopes necessary for proper water flow, resulting in scouring (socavación) in the area. A natural roadside ditch (cuneta) is also visible at the site along the edge of the road, limiting the space available for pedestrian traffic.

In addition, the water has scoured the surrounding ground, worsening the situation. Before a sidewalk can be constructed at this location, the water must first be channeled and adequate space created for the sidewalk structure. The root of this problem lies in the properties adjoining the national route, which have created water crossings that channel the flow into natural earthen roadside ditches. Similarly, existing infrastructure, such as the bus stop, has formed a natural channel for the passage of water, which, as it flows across the ground, has caused scouring and pooling. To address the situation and comply with the Sanitary Order, an intervention schedule was prepared and included in the Banco de Proyectos de la Zona 1-9 Heredia. However, because various priorities and emergencies in the area had to be addressed, it was not possible to carry out the intervention during 2024. Recognizing the importance of addressing the situation, the intervention was scheduled for the first quarter of 2025.

Beginning on 11 de febrero de 2025, a topographic survey was conducted in the area, and photographs document the performance of this work, for the purpose of preparing a design for a comprehensive solution to the problem. The design proposal from Constructora MECO, the contractor awarded Contract No. 2022CD 000145 0006000001 Mantenimiento Rutinario, Contingencias, Mantenimiento Básico De Puentes Y Conservación Del Sistema De Evacuación Pluvial De La Red Vial Nacional Pavimentada Línea 9 Zona 1 9, is currently pending, because it is necessary to determine the culvert diameter required by site conditions to channel the water, the elevation required for the slope of the pipe to be installed, and the location of the nearest discharge point (punto de desfogue), thereby producing a comprehensive proposal that addresses the interested party’s request and makes the most efficient use of resources.

IV. Additional Observations: Regarding standing water in the area, it is noted that, during the inspection conducted at the beginning of enero to confirm the work to be performed, water was observed in the roadside ditch, even though it had not rained on the day of the field visit, which implies that water other than stormwater (aguas pluviales) is being diverted from properties. Furthermore, as can be seen in the photograph, the color of the water suggests that it may be wastewater. The Constitutional Chamber (Sala Constitucional) must be advised that, although stormwater management is indeed required in the area in order to cover the open channel, eliminate the existing risk, and provide a safe pedestrian passage, the Consejo Nacional de Vialidad is not responsible for wastewater management and disposal; rather, according to the evidence submitted, there also appears to be unlawful conduct by the neighboring properties in discharging wastewater onto the public roadway.

In this regard, as Article 92 of the Ley General de Salud provides: ‘It is prohibited to discharge wastewater or any other type of pollutant onto public roads or into bodies of water in common use, and the Ministerio de Salud Pública, in coordination with other competent authorities, is responsible for monitoring, controlling, and sanctioning such activities.’ Accordingly, the jurisdiction of the Ministerio de Salud includes responding to, issuing warnings concerning, and taking the appropriate measures to stop this unlawful practice by those identified as responsible through the procedures and tools available to it. This situation is relevant because the Consejo Nacional de Vialidad cannot connect wastewater outlets to the national road network’s stormwater systems, as doing so would be unlawful. V. Conclusions i. Sanitary Order No. MS-DRRSCN-DARSSRB-4569-2023 was addressed by this Gerencia de Conservación de Vías y Puentes, as a field inspection was conducted as early as noviembre del 2023, identifying the problem and the work that would need to be scheduled; the requirement called for a schedule and action plan to address the matter, but due to an inadvertent error in interpreting an email thread, it appears that the information whose receipt was confirmed was not the requested schedule. ii.

The required intervention is included in the Banco de Proyectos de la Zona 1-9 Heredia, which provides road maintenance for 9 cantones in the provincia de Heredia, where interventions are carried out according to established priorities and budget allocations. iii. Although it was not possible to carry out the intervention in the area during 2024, this Ingeniería de Zona undertook the necessary coordination to schedule the intervention for the I quarter of 2025, and the progress of the activities performed is documented, reinforcing the Administration’s commitment to complying with the Sanitary Order issued. iv. There is an environmental situation at the site involving a suspected wastewater discharge. The Ministerio de Salud Pública de Costa Rica is responsible for safeguarding public health in connection with wastewater management by overseeing the proper treatment of wastewater before it is discharged into the environment. In cases of unlawful or improper discharges, the Ministerio de Salud is responsible for taking the corresponding corrective measures.” (Emphasis supplied).

In view of the foregoing, it is established that all respondent authorities (autoridades accionadas) violated fundamental rights (derechos fundamentales). In this regard, although the respondents (recurridos) state that they have taken action to resolve the reported problem, it is equally true that those actions have been insufficient. Moreover, there is clearly a serious lack of interinstitutional coordination, as the respondents merely shift responsibility to one another. Thus, it should be noted that the authorities of the Ministerio de Salud state that the sanitary order has already been issued and that they have conducted the corresponding follow-up; nevertheless, MOPT has not complied with it. In turn, the Ministerio de Obras Públicas y Transportes states that addressing the problem is the responsibility of Conavi, while the respondent council maintains that intervention by the Ministerio de Salud is required to resolve the wastewater-discharge situation.

In view of the foregoing, the appropriate disposition is to grant the action (declarar con lugar el recurso), in accordance with the operative portion (parte dispositiva) of this judgment.

IV. NOTE BY JUSTICE SALAZAR ALVARADO

In environmental matters, it is the undersigned’s view that, if the Public Administration has already intervened, jurisdiction to hear and decide the matter lies with the administrative litigation jurisdiction (jurisdicción contenciosa administrativa). Nevertheless, I do consider the merits of the matter when other rights of the persons affected by the source of pollution (foco de contaminación) are at stake, including health, quality of life, and the right to enjoy a healthy environment free from pollution (article 50 of the Constitución Política), as occurs in this case, in which the petitioner states that a complaint was filed with the Ministerio de Salud concerning a large culvert without any protective barrier, which poses a risk to persons and vehicles; indeed, there is evidence that several people have died in that culvert. The petitioner explains that a deep ditch has formed, eroding the national highway, undermining electrical utility poles, causing standing water where mosquitoes breed, and, above all, creating unsafe and dangerous conditions for people.

The petitioner asserts that the Área Rectora de Salud San Rafael - Barva issued health order (orden sanitaria) no. MS-DRRSCN-DARSSRB-4569 of 2023, requiring MOPT to take the necessary steps to carry out the repairs; however, the order has not been complied with, thereby violating the fundamental rights (derechos fundamentales) of those traveling through the area.

V. DOCUMENTATION SUBMITTED TO THE CASE FILE (EXPEDIENTE)

The parties are hereby advised that, if they have submitted any paper document, as well as any objects or evidence contained on an electronic, computer, magnetic, optical, or telematic device, or produced using new technologies, they must retrieve them from the court office within a maximum period of 30 business days from notification of this judgment. The parties are warned that any material not retrieved within this period will be destroyed, pursuant to the "Reglamento sobre Expediente Electrónico ante el Poder Judicial", approved by the Corte Plena in article XXVI of session no. 27-11 of 22 de agosto de 2011, published in Boletín Judicial no. 19 of 26 de enero de 2012, as well as pursuant to the resolution of the Consejo Superior del Poder Judicial, approved in article LXXXI of session no. 43-12 held on 3 de mayo de 2012.

Por tanto:

The amparo petition (recurso) is granted. María Antonieta Acuña Hernández, Mauricio Batalla Otárola, and Mauricio Sojo Quesada, in their respective capacities as director of the Área Rectora de Salud de San Rafael de Heredia, minister of Obras Públicas y Transportes, and executive director of the Consejo Nacional de Vialidad, or whoever may hold those offices, are ordered to undertake the necessary actions and coordinate all pertinent measures within the scope of their respective authority so that, within SIX MONTHS from notification of this judgment, a plan is designed and implementation begins of the measures established therein to address the problem reported by the person protected by the amparo (amparado). The respondent authority (autoridad recurrida) is warned that, pursuant to article 71 of the Ley de la Jurisdicción Constitucional, anyone who receives an order issued in an amparo proceeding (recurso de amparo) that they are required to comply with or enforce, and who fails to comply with or enforce it, shall be punished by imprisonment for three months to two years or by a fine of twenty to sixty days, provided that the offense is not subject to a more severe penalty.

The State and the Consejo Nacional de Vialidad are ordered to pay the legal costs, damages, and losses caused by the facts forming the basis of this ruling, the amounts of which shall be determined in enforcement-of-judgment proceedings (ejecución de sentencia) before the administrative litigation jurisdiction. Justice Salazar Alvarado files a note. Let notice be given.

Fernando Castillo V.

President Fernando Cruz C.

Paul Rueda L.

Luis Fdo. Salazar A.

Jorge Araya G.

Anamari Garro V.

Ingrid Hess H.

CASE FILE NO. 25-002421-0007-CO Telephone numbers: Telf01/ ALA-4TA (Telf02). Fax: Telf03 / Telf04. Website: www.poder-judicial.go.cr/salaconstitucional. Address: (Dirección05, Dirección06, 100 meters south of the Perpetuo Socorro church).

Secciones

Marcadores

Revisión del Documento SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del catorce de agosto de dos mil veinticinco .

Recurso de amparo que se tramita en expediente número 25-002421-0007-CO, interpuesto por LUIS ALBERTO GARCÍA ZÚÑIGA, cédula de identidad CED01, contra el MINISTERIO DE SALUD, EL MINISTERIO DE OBRAS PÚBLICAS Y TRANSPORTES (MOPT) Y EL CONSEJO NACIONAL DE VIALIDAD (CONAVI).

Resultando:

  1. 1Por escrito incorporado al expediente digital el 27 de enero de 2025, la parte recurrente interpone recurso de amparo. Menciona que planteó una denuncia ante el Ministerio de Salud por una alcantarilla de gran tamaño y sin ninguna protección, lo que constituye un riesgo para las personas y vehículos e, incluso, existe evidencia por muerte de varias personas en esa alcantarilla. Explica que la zanja se debe entubar 90 metros y construir su respectiva acera porque se ha formado una zanja profunda que está erosionando la carretera nacional, falseando los postes de servicio eléctrico, estancamiento de aguas con criaderos de mosquitos y sobre todo la inseguridad y peligro para las personas porque no tienen otra opción que caminar sobre la carrera nacional. Afirma que el Área Rectora de Salud San Rafael - Barva emitió la orden sanitaria nro. MS-DRRSCN-DARSSRB-4569 de 2023, en la que se obligó al MOPT realizar lo necesario para reparar; sin embargo, no se ha cumplido.
  2. 2Mediante resolución de la Presidencia de la Sala de las 14:05 horas del 28 de enero de 2025, se dio curso al recurso y se le requirió informe al ministro de Obras Públicas y Transportes, así como al director del Área Rectora de Salud San Rafael- Barva.
  3. 3Informa bajo juramento Mauricio Batalla Otárola, en su condición de ministro de Obras Públicas y Transportes. Expone: “En el marco del respeto al Principio de Legalidad, que limita el actuar de las autoridades públicas, se debe considerar que la Ley No. 3155 “Ley Constitutiva del Ministerio de Obras Públicas y Transportes” , en su ordinal 2 señala: “Artículo 2.- El Ministerio de Obras Públicas y Transportes tiene por objeto: a) Sin perjuicio de las potestades del Consejo Nacional de Vialidad, planificar, construir, mantener y mejorar las carreteras y caminos de la red vial nacional. Regular y controlar los derechos de vía de las carreteras de dicha red existentes o en proyecto. Regular, controlar y vigilar el tránsito y el transporte por los caminos públicos. Ejercer la fiscalización y la rectoría técnica en materia de infraestructura vial, en virtud de lo cual debe asesorar y coordinar, con los gobiernos locales, sobre las regulaciones técnicas y logísticas indispensables que atañen a la adecuada funcionalidad de la red vial cantonal, considerada por separado y en integración con la red vial nacional." Basado en lo anterior, le corresponderá al Consejo Nacional de Vialidad (CONAVI), la intervención en el mantenimiento, conservación y desarrollo de las rutas nacionales, conforme se establece en el artículo 4 de la Ley No. 7798 “Ley de Creación del Consejo Nacional de Vialidad” , el cual señala lo siguiente: “(…) ARTÍCULO 4.- Serán objetivos del Consejo Nacional de Vialidad los siguientes: a) Planear, programar, administrar, financiar, ejecutar y controlar la conservación y la construcción de la red vial nacional, en concordancia con los programas que elabore la Dirección de Planificación del Ministerio de Obras Públicas y Transportes. b) Administrar su patrimonio. c) Ejecutar, mediante contratos, las obras, los suministros y servicios requeridos para el proceso de conservación y construcción de la totalidad de la red vial nacional. d) Fiscalizar la ejecución correcta de los trabajos, incluyendo el control de la calidad. e) Promover la investigación, el desarrollo y la transferencia tecnológica en el campo de la construcción y conservación vial. f) Celebrar contratos o prestar los servicios necesarios para el cumplimiento de sus objetivos y funciones.De igual manera, el Decreto Ejecutivo No. 27917 “Reforma Organizativa y Funcional del Ministerio de Obras Públicas y Transportes” , en su artículo 15, regula: “(…) Artículo 15. —Funciones de obras públicas. Considerando que, por una parte el Consejo Nacional de Vialidad es el responsable de la conservación y construcción de la Red Vial Nacional y por otra que las Municipalidades son las responsables de la Red Vial Cantonal, el rol de la División de Obras Públicas pasará a enfocarse en la asistencia técnica y apoyo a los Municipios para la conservación de dicha red, procurando al mismo tiempo que las Municipalidades vayan asumiendo gradualmente sus responsabilidades, en la medida que tengan capacidad financiera y técnica para ese cometido. Por lo tanto, la División de Obras Públicas es clave para ayudar y canalizar los requerimientos de las Municipalidades en la etapa de transición, para que estas asuman su responsabilidad sobre la Red Cantonal.Su objetivo es brindar en forma coordinada, la asistencia técnica y el apoyo a las municipalidades y a otras organizaciones del país, para que en conjunto con éstas, se lleven a cabo las obras públicas necesarias con énfasis en la infraestructura vial cantonal, que permita un desarrollo económico y social del país, acorde con las políticas generales del Gobierno y del Ministerio. Sus funciones generales pasarán a ser: a. Cooperar con las municipalidades en el mantenimiento rutinario y periódico, la rehabilitación y el mejoramiento de caminos y puentes de la red cantonal y calles urbanas del país. b. Promover la cooperación técnica y financiera nacional e internacional necesaria para la atención de la red vial cantonal. c. Inventariar la red cantonal del país y actualizar su clasificación. d. Planificar y ejecutar las obras fluviales. e. Coordinar con la Comisión Nacional de Emergencia en los eventos tendientes a la prevención y atención de situaciones de emergencia. f. Cumplir con las demás funciones que le sean asignadas por los Despachos del Ministro y del Viceministro, las leyes y los reglamentos.” Como se puede extraer de las normas transcritas, el Ministerio de Obras Públicas y Transportes no puede actuar por sí mismo en labores de mantenimiento, conservación o construcción de obras en las rutas nacionales o cantonales, ya que, por una parte, le compete al CONAVI atender esos requerimientos en las rutas nacionales y, por otro lado, les corresponde a las municipalidades actuar en las rutas cantonales.Por consiguiente, es importante señalar que, una vez recibida la notificación del Orden Sanitaria No. MS-DRRSCN-DARSSRB-4569 del 2023, este despacho Ministerial mediante el oficio N° DM-TC-2023-3909 de fecha 26 de octubre de 2023, traslado al Director de CONAVI dicha orden sanitaria, con lo cual se le solicitaba brindar una solución a la problemática denunciada en el transcurso de dos meses y que una vez atendida se brindara respuesta al denunciante y este despacho. Sin embargo, a la fecha no se tiene respuesta por parte del CONAVI, razón por la cual, una vez atendido este recurso de amparo, la Dirección de Asesoría Jurídica de la Institución -mediante- el oficio No. DAJ-2025- 0418 de fecha 29 de enero de 2025, solicitó al Director Ejecutivo de CONAVI lo siguiente: “(…) Mediante oficio No. DM-TC-2025-0054 de fecha 29 de enero del año en curso, el despacho del señor Ministro remite ante esta Dirección Jurídica copia de la resolución elaborada por la Sala Constitucional de las 14: 05 horas del 28 de enero de 2025.En dicha resolución se solicita al Jerarca del Ministerio de Obras Públicas y Transportes, remitir informe de los trabajos de la alcantarilla y entubamiento de la zanja propiamente en la carretera hacia Carrizal, 400 metros norte de la Iglesia Católica de Barva. (Heredia) Importante destacar que, mediante el oficio No. DM-TC-2023- 3909 de fecha 26 de octubre de 2023, la Licenciada Denisse Agüero Rojas, remitió ante el Consejo Nacional de Vialidad (CONAVI). Copia de la orden sanitaria N° MS-DRRSCNDARSSRB- 4569-2023, con la finalidad de que dicho Consejo atendiera la problemática conforme a sus competencias. Sin embargo, a la fecha no se tiene respuesta al oficio DM-TC-2023- 3909. Por consiguiente, se solicita remitir el día 30 de enero de 2025, un informe técnico que revele las acciones ejecutadas por ese Consejo, esto en consecuencia de la orden sanitaria ya comentada anteriormente y que genera el recurso de amparo en atendemos (…)” Ahora bien, cabe señalar que al no tener respuesta por parte de CONAVI y para cumplir con los tiempos establecidos en la resolución que atendemos, este Despacho Ministerial con toda trasparencia le informa que dicha Orden Sanitaria fue remitida por este despacho Ministerial al Consejo Nacional de Vialidad desde el año 2023, para que, según las competencias de ese Consejo, brindara una solución definitiva a lo denunciado.En relación con lo anterior, debemos aclarar que no contamos con el informe solicitado mediante Oficio No. DAJ-2025-0418, razón por la cual, una vez contemos con dicha información, la misma se estaría remitiendo de inmediato a la Sala Constitucional”.
  4. 4Informa bajo juramento María Antonieta Acuña Hernández, en su condición de directora del Área Rectora de Salud de San Rafael de Heredia. Expone: “1. El día 10 de julio del 2023, se recibió denuncia del señor Luis Alberto García Zúñiga, en que refirió el riesgo de vehículos y personas que transitan por la carretera nacional de Carrizal, al existir un montazal en el sector ubicado 400 metros norte de la Dirección01 en Barva de Heredia, además de que no se concluyeron obras en el sector, así como el hecho de que no hay evidencia de mantenimiento, la cual se ingresa bajo expediente 118- DB-2023. 2. El día 14 de setiembre del 2023, se realizó visita al sitio y se emitió informe técnico MS-DRRSCN-DARSRB- 4568-2023 con fecha del 18 de setiembre del 2023 y la orden sanitaria MS-DRRSCN-DARSRB-4569-2023 notificada el 13 de octubre del 2023 al ministro de Obras Públicas y Transportes el señor Luis Esteban Amador Jiménez, otorgando un plazo de 2 meses (con vencimiento el 13 de diciembre del 2023).En el acto administrativo se ordenó “Presentar un plan o propuesta para dar solución a la situación actual de la alcantarilla denunciada, acorde a las competencias de la institución”. En seguimiento al asunto, el día 16 de enero de 2024, se emitió oficio MS-DRRSCN-DARSSRB-143-2024, dirigido a Luis Esteban Amador Jiménez (Ministro de Obras Públicas y Transportes), en que se solicitó el cumplimiento de la orden sanitaria notificada. El oficio fue remitido el día 16 de enero de 2025 y además, día 26 de febrero de 2024, se realizó el recibo del oficio y la orden sanitaria por parte de la oficina de Recepción y Traslado de Documentos del MOPT. 3. Consta en acta de inspección de fecha 04 de abril de 2024, que la situación denunciada por el amparado se mantiene y no existe evidencia de las acciones realizadas en el sector por la institución competente. Esta instancia, emitió oficio MS-DRRSCN-DARSSRB-3389-2024 de fecha 18 de julio de 2024, dirigido a la Dirección de Rectoría de la Salud Central Norte, con el objetivo de que se gestione el tema desde el Despacho Ministerial.Con oficio MS-DRRSCN-1738-2024 de fecha 28 de julio de 2024 suscrito por la Dra. Karina Garita Montoya, se informó a la Dra. Mary Denisse Munive Angermüller (Ministra de Salud), sobre el asunto y se solicitó su intervención en el caso para que se redireccionara al Ing. Mauricio Batalla Otárola (Ministro de Obras Públicas y Transportes), a fin de que se diera atención al asunto. Además, se ha insistido el seguimiento del tema con correos electrónicos del 06 de noviembre de 2024 y 21 de enero de 2025, pero a la fecha no se cuenta con evidencia de resolución del problema. 4. Consta que, al recurrente se le ha mantenido informado de las gestiones llevadas a cabo en atención a la denuncia presentada, mediante correos electrónicos y copias del expediente. Al respecto no existe una solución al problema por parte de la institución competente. El caso se mantiene abierto y en constante seguimiento, además de informar al señor García sobre las gestiones que se han realizado a la fecha.Considera la suscrita, que el Área Rectora de Salud de San Rafael Barva, no ha violentado derechos fundamentales al amparado, ya que previo a la interposición de presente amparo se han llevaron a cabo acciones atinentes a atender la problemática denunciada, incluyendo la solicitud de la jerarca de la cartera que intervenga en el caso de marras. PETITORIA Con base en lo anteriormente expuesto, solicito a su Honorable Autoridad, se desestime la acción planteada contra esta institución, por cuanto se considera se ha dado la debida atención al asunto, realizando la valoración del caso y emitiendo la orden sanitaria al ente competente de realizar la valoración y mantenimiento de la vía de comunicación. Asimismo, se ha dado seguimiento al asunto e inclusive está abierto el caso, pues el ente encargado del cumplimiento, a la fecha no ha ejecutado las acciones tendientes a corregir la problemática existente en el sitio denunciado”.
  5. 5Mediante resolución de magistrado instructor de las 9:31 horas del 19 de febrero de 2025, se ampliaron las partes del recurso y se requirió informe al director ejecutivo del Consejo Nacional de Vialidad.
  6. 6Informa Mauricio Sojo Quesada, en su condición de director ejecutivo del Consejo Nacional de Vialidad. Expone: “PRIMERO: Que antes de la interposición del presente recurso de amparo, el CONAVI ya venía realizando obras de conservación en la zona que por este medio se está denunciando (ruta nacional No.126, Barva Heredia,, Quebrada Seca, Birrí, río Porrosatí), tales como: cronograma de atención hecho desde el 17 de noviembre de 2023), inspección de campo en noviembre de 2023 con la finalidad de evaluar los hechos contenidos en la orden sanitaria MS-DRRSCN-DARSSRB-4569-2023, analizar las acciones requeridas para solucionar la problemática, desde ese año y antes de la notificación del presente recurso de amparo ya se había programado una intervención para el primer trimestre de 2025, el 11 de febrero de 2025 se llevó a cabo un levantamiento topográfico en el lugar de los hechos, se gestionó una contratación directa 2022CD-000145-0006000001, Mantenimiento Rutinario, Contingencias, Mantenimiento Básico de Puentes y Conservación del Sistema de Evaluación Pluvial de la Red Vial Nacional Pavimentada, Dirección02.Todas estas acciones evidencian que el CONAVI ha estado trabajando en solucionar la problemática desde casi dos años antes de la interposición del presente recurso de amparo. SEGUNDO: Que existe una situación ambiental con un presunto desvío de aguas residuales de los vecinos que colindan con la ruta nacional, quienes están desviando dichas aguas hacia la ruta nacional, y por tal razón, es competencia legal del Ministerio de Salud velar para que este tema del desvío de aguas residuales sea solucionado. TERCERO: Que el tema de construcción de aceras y entubamiento no pueden realizarse por parte del CONAVI hasta tanto el Ministerio de Salud no cumpla con su obligación legal de erradicar las aguas residuales que provienen de los vecinos de la ruta nacional y están afectando la zona. Una vez explicado dichas consideraciones previas, se procederá a contestar los hechos alegados en el escrito del recurso de amparo interpuesto contra el CONAVI.HECHOS PRIMERO: Se acepta únicamente el hecho de la denuncia interpuesta ante el Ministerio de Salud, por cuanto en el expediente judicial consta prueba documental de la misma. Se rechaza el hecho alegado por el recurrente en el sentido de que se evidencia la muerte de personas. No consta ninguna prueba que fundamente una aseveración tan grave como la que pretende el señor recurrente. Aunado a lo anterior, tampoco consta en el expediente judicial pruebas de que los postes de electricidad se encuentren falseados. Es indispensable mencionar que antes de la interposición del escrito del recurso de amparo, el CONAVI ya venía trabajando en dar una solución al problema desde noviembre de 2023. Para ello se realizó un cronograma para atender y solucionar la problemática. Con base el informe técnico presentado como prueba, es indispensable hacer saber a los señores magistrados que la problemática central de los hechos denunciados se deben a acciones de las personas que viven al lado de la ruta nacional, quienes están desviando las aguas residuales hacia la ruta nacional, lo cual, está generando estancamiento de aguas, malos olores, criaderos de mosquitos, erosión de suelos, peligro para los transeúntes, aunado a que están impidiendo que se puedan realizar obras de construcción de tuberías así como de aceras.En este sentido, dice el informe técnico DRC-10-2025-0236 (0530) del 26 de febrero 2025, emitido por la Gerencia de Conservación de Vías y Puentes del CONAVI, indica lo siguiente: La raíz de esta problemática se encuentra en las propiedades colindantes con la ruta nacional, que han generado pasos de agua, encauzando el flujo en cunetas naturales de tierra. De manera similar, la infraestructura existente, como la parada de buses, ha formado un canal natural para el paso del agua, lo que, al circular por el terreno, ha causado socavaciones y empozamientos Con respecto al estancamiento de aguas en el sector se indica que durante la inspección realizada a inicios del mes de enero a fin de rectificar los trabajos a realizar se denotó que existía presencia de agua en la cuneta y para el día que se realizó la visita a campo no había llovido, lo que implica que se están desviando aguas de propiedades que no corresponden a aguas pluviales.Además, como se puede observar en la fotografía, el agua tiene una coloración de presuntas aguas residuales. De esta situación debe hacerse la aclaración a la Sala Constitucional que si bien es cierto existe un requerimiento de atención de aguas pluviales en el sector a fin de tapar el canal abierto y eliminar el riesgo existente y generar un paso seguro al peatón no así es responsabilidad del Consejo Nacional de Vialidad la gestión y disposición de aguas residuales sino que de acuerdo con la evidencia presentada existe también una presunta ilegalidad de las propiedades aledañas en cuanto al vertido de aguas residuales en la vía pública. De lo anterior, según dicta el Artículo 92 de la Ley General de Salud: "Es prohibido verter aguas residuales o cualquier otro tipo de contaminantes en la vía pública o en cuerpos de agua que sean de uso común, y se establece que el Ministerio de Salud Pública, en coordinación con otras autoridades competentes, es responsable de vigilar, controlar y sancionar dichas actividades." De tal forma, dentro de las competencias del Ministerio de Salud esta incluida la atención, apercibimiento y gestiones correspondientes a fin de detener esta práctica ilegal por parte de los responsables determinados mediante los procedimiento y herramientas con las que cuentan.Esta situación resulta relevante por cuanto el Consejo Nacional de Vialidad no puede conectar desfogues de aguas residuales a los sistemas de aguas pluviales de la red vial nacional al resultar ilegal (ver prueba aportada). De conformidad con la Ley 7798, Ley de Creación del CONAVI, las competencias legales atribuidas a esta administración pública están la construcción y conservación de carreteras, puentes y calles de travesía de la red vial nacional, y como consecuencia de lo anterior, la eliminación de aguas residuales no figura como competencia nuestra, sino del Ministerio de Salud. En este sentido, el artículo 92 de la Ley General de Salud, indica claramente que es responsabilidad y de competencia legal del Ministerio de Salud En consonancia con lo anterior, el mismo Ministerio de Salud, eu informe técnico MSDRRSCN- DARSSRB-4568-2023 de fecha 18 de noviembre de 2023, (ver prueba que consta en el expediente judicial) indica claramente lo siguiente: (…) Llama mucho la atención a esta Dirección Ejecutiva del CONAVI que por un lado el Ministerio de Salud reconoce la existencia de aguas residuales en la zona denunciada por el recurrente, y, por otro lado, mediante oficio MS-DRRSCN-AJ-019-2025 presentado a su autoridad, solicite la desestimación del recurso de amparo presentado obligación legal del Ministerio de Salud de erradicar las aguas residuales en la zona de los hechos, y resulta indispensable que el Ministerio de Salud aperciba a los vecinos que están desviando las aguas residuales hacia la ruta nacional, y se erradique de manera definitiva esta problemática.Como bien se indica en el informe técnico aportado como prueba, no se pueden realizar acciones de entubamiento, desagües, sistemas de alcantarillado hasta tanto el Ministerio de Salud cumpla con su obligación legal de controlar, vigilar las aguas residuales que constan en dicha zona, labores que no es competencia del CONAVI, sino de dicho Ministerio, según el artículo 92 Ley General de Salud. SEGUNDO: Se acepta únicamente la denuncia hecha ante el Ministerio de Salud quien generó la orden sanitaria MS-DRRSCN-DARSSRB- 4569 del 2023, por cuanto consta prueba documental en el expediente judicial que respalde lo afirmado. Es muy imprtante mencionar que actualmente se encuentra a la espera de la propuesta de diseño por parte de la Constructora MECO, contratista adjudicado para la Contratación No. 2022CD 000145 0006000001 Mantenimiento Rutinario, Contingencias, Mantenimiento Básico De Puentes Y Conservación Del Sistema De Evacuación Pluvial De La Red Vial Nacional Pavimentada Línea 9 Zona 1 9 ya que es necesario conocer el diámetro de la alcantarilla que se requiere según las condiciones de sitio para canalizar las aguas, el nivel requerido para la pendiente de la tubería a colocar así como ubicar el punto de desfogue más cercano, generando una propuesta integral que atienda la solicitud del interesado y haciendo el uso más eficiente de los recursos.Sin embargo, es preciso hacer saber a los miembros de la Sala, que esta Administración ha demostrado que está realizando acciones para solventar la problemática. Finalmente, la Orden Sanitaria No. MS-DRRSCN-DARSSRB-4569-2023 fue atendida por esta Gerencia de Conservación de Vías y Puentes por cuanto se realizó la inspección en campo desde noviembre del 2023 determinando la problemática y labores que se deberían programar, en el requerimiento se indicaba un cronograma y plan de acción para la atención de la misma, sin embargo por motivo de un error involuntario en la interpretación de una seguidilla de correos presuntamente la información que se confirmó como recibido no era el cronograma solicitado”.
  7. 7En los procedimientos seguidos se han observado las prescripciones legales.

Redacta el Magistrado Araya García; y,

Considerando:

I. OBJETO DEL RECURSO

El recurrente señala que planteó una denuncia ante el Ministerio de Salud por una alcantarilla de gran tamaño y sin ninguna protección, lo que constituye un riesgo para las personas y vehículos e, incluso, existe evidencia por muerte de varias personas en esa alcantarilla. Explica que se ha formado una zanja profunda que está erosionando la carretera nacional, falseando los postes de servicio eléctrico, estancamiento de aguas con criaderos de mosquitos y sobre todo la inseguridad y peligro para las personas. Afirma que el Área Rectora de Salud San Rafael - Barva emitió la orden sanitaria nro. MS-DRRSCN-DARSSRB-4569 de 2023, en la que se obligó al MOPT realizar lo necesario para reparar; sin embargo, no se ha cumplido.

II. HECHOS PROBADOS

De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos, sea porque así han sido acreditados o bien porque la autoridad recurrida haya omitido referirse a ellos, según lo prevenido en el auto inicial:

  • a)El 10 de julio de 2023, el accionante planteó una denuncia ante el Ministerio de Salud, en la que indicó: “Por este medio denuncio los problemas y riesgos de los vehículos y personas que transitan por la carretera nacional a Carrizal y exactamente de la Dirección03, 400 metros norte en el cruce a mano izquierda hacia Carrizal, porque hacia la derecha a San José de la Montaña ya está entubado y con aceras con un trabajo que realizo hace menos de 3 años por el COSEVI. Como se muestra en las fotos adjuntas en el Formulario D-1 Presentación denuncia Sanitaria, MS.NI.SLA.07.P.06, se presentan los siguientes problemas y riesgos puntales: 1. Con el arreglo que realizó COSEVI hace 3 años, dejo una alcantarilla a cielo abierto sin ningún tipo de protección y por su tamaño como 3metros de ancho y 5 de largo es una trampa mortal si una persona sufre una caída o por el alto volumen de agua y el desnivel con los aguaceros.

Hay dos fotos donde transita un carro blanco y en otra foto con un carro de color gris donde está la alcantarilla la cual no es visible por el monte que la tapa totalmente y por la curva pronunciada hasta un carro puede caer y caber en la misma. 2. La zanja de unos 70 metros de largo es profunda y ya está erosionando la calle nacional de mucho tránsito y de alta velocidad por la inclinación y la curva que hace que se presenten muchos accidentes y muertes como se ve en una foto adjunta en la que hay una cruz de una persona fallecida. 3. Aguas contaminadas que bajan de las urbanizaciones que producen criaderos de mosquitos y malos olores en época de verano y como se puede ver en las fotos se empoza el agua contaminada. 4. La zanja es tan peligrosa que para cortar el montazal o mantenimiento por iniciativa nuestra es peligroso porque los vehículos y camiones pasan cerca y a alta velocidad, además el terreno es inclinado, falseado y profundo por lo que ya no se consigue peones que quieran arriesgarse, siendo una obligación del COSEVI su mantenimiento oportuno. 5.

La erosión es tan crítica y peligrosa para el tránsito vehicular que se puede observar en las fotos dos postes que muestran inclinación y sus bases falseadas y que puede caer en cualquier momento hacia la calle con peligro hacia una persona o vehículo y/o ambos. 6. En la zona existe mucho tránsito de personas y hace poco se dio la apertura del IPEC Barva, Heredia y al no existir acera es un riesgo enorme y se han presentado accidentes porque la zanja solo permite caminar por la carretera nacional que es de alto tránsito a gran velocidad y de poca visibilidad por el montazal y en de noche por la poca iluminación. En espera de una pronta respuesta y solución al problema expuesto entubando las aguas negras, eliminando la alcantarilla a cielo abierto y una acera que de tranquilidad y seguridad a los peatones, estoy a sus órdenes por si tienen alguna consulta y hasta me ofrezco acompañarlos en una inspección al lugar”. (Ver prueba documental).

  • b)En informe técnico nro. MS-DRRSCN-DARSSRB-4568-2023 del 18 de setiembre de 2023, el área rectora accionada determinó: “3. Hallazgos de la inspección · día 14 de setiembre 2023 se realiza visita al sitio, estuvimos presentes en el lugar señalado en la denuncia y efectivamente se observa una alcantarilla muy grande que está a cielo abierto sin protección, que podría representar un riesgo para los transeúntes e incluso vehículos. · Si se observan varios tramos cubiertos de maleza y erosión del terreno. · La alcantarilla presenta agua incluso sin estar lloviendo, por la coloración y olor de esta se comprueba que hay presencia de aguas residuales, además se observa presencia de residuos sólidos que podrían generar obstrucciones. (…) 6. Conclusiones Se comprueba que existe una alcantarilla que requiere mantenimiento y que se tomen las medidas de seguridad para evitar un accidente y poner en riesgo la vida de personas”. (Ver prueba documental).
  • c)Por orden sanitaria nro. MS-DRRSCN-DARSSRB-4569-2023 del 18 de setiembre de 2023, notificada el 13 de octubre de 2023, el Área Rectora de Salud de San Rafael-Barva le ordenó al Ministerio de Obras Públicas y Transportes: “De acuerdo con la visita de inspección realizada el día 14 de setiembre 2023, en atención de la denuncia presentada por EL Sr. Luis Alberto García Zúñiga, debido a que, aparentemente, existe una alcantarilla sobre la carretera nacional que va hacia carrizal, específicamente 400 m al norte de la Iglesia Católica de Barva, existe una alcantarilla de gran tamaño (3 metros de ancho y 5 m de largo aproximadamente) que está a cielo abierto, sin ninguna protección, por lo que constituye un riesgo para las personas que transitan por este sector, que en caso de sufrir una caída podrían verse gravemente lesionados o incluso perder la vida, por la gran cantidad de agua que corre por dicha alcantarilla y profundidad de la misma, inclusive un vehículo podría caer por la poca visibilidad que hay por la gran cantidad de monte que la cubre; se realizó la visita de inspección al sitio, encontrándose que, efectivamente la alcantarilla no ha recibido el mantenimiento requerido y constituye un riesgo para las personas que transitan por el lugar.

De acuerdo con el informe N° MS-DRRSCN-DARSSRB-4568- 2023 (se adjunta) y los reglamentos abajo indicados, se ordena que en el plazo otorgado debe: 1. Presentar un plan o propuesta para dar solución a la situación actual de la alcantarilla denunciada, acorde a las competencias de la institución. 2. El punto exacto de dicha problemática se puede encontrar en el siguiente enlace del sitio Google Maps: https://maps.app.goo.gl/veZtSv5EBJgppFWJ9, de este punto, la alcantarilla se extiende aproximadamente 150 m al norte 3. Se le otorga un plazo de 2 meses para presentar el plan”. (Ver prueba documental).

  • d)Por oficio DM-TC-2023-3039 del 26 de octubre de 2023, el despacho del ministro de Obras Públicas y Transportes trasladó la orden sanitaria al director del Conavi. (Ver prueba documental).
  • e)En oficio CARTA-CONAVI-DRC-10-2025-0236 del 26 de febrero de 2025, la ingeniera de Zona 1-9 Heredia y el director de la Región Central, ambos de la Gerencia de Conservación de Vías y Puentes del Conavi señalaron: “I. Antecedentes Orden Sanitaria MS-DRRSCN-DARSSRB-4569-2023-adjunta-, es importante indicar que lo requerido en dicho documento corresponde a: 1. Presentar un plan o propuesta para dar solución a la situación actual de la alcantarilla denunciada, acorde a las competencias de la institución. 2. El punto exacto de dicha problemática se puede encontrar en el siguiente enlace … 3. Se le otorga un plazo de 2 meses para presentar el plan. En el correo del 20 de noviembre del 2023 mediante una seguidilla de correo el Ministerio de Salud indica un acuse de recibido de información por cuanto se presume que existe una confusión en la interpretación de la misma, ya que desde el 17 de noviembre del 2023 se había realizado el siguiente cronograma de atención: II.

Ubicación El sector de la afectación denunciada corresponde a una ruta nacional secundaria con presencia de un caserío urbano de un lado de la ruta y una propiedad en verde del otro lado de la carretera, la misma es parte de la Dirección04 tal como se muestra en el siguiente cuadro: (…) III. Acciones realizadas Como parte de la atención brindada por la Gerencia de Conservación de Vías y Puentes, en el noviembre del 2023 se realizó una inspección en campo para evaluar los hechos alegados en la Orden Sanitaria y visualizar el grado de riesgo relacionado con la conservación vial. En los hallazgos obtenidos, se identificó un sector con un canal abierto de 84 metros de longitud, 1,30 metros de ancho y 1 metro de profundidad. Es importante señalar que el estancamiento de aguas en la zona se debe a la existencia de pasos de agua en tierra, los cuales se han formado de manera natural y carecen de las pendientes necesarias para una adecuada circulación del agua, lo que ha ocasionado socavación en el área.

En el sitio, también se observa una cuneta natural ubicada al margen de la carretera, lo que limita el espacio para el tránsito de peatones. Además, el agua ha socavado el terreno circundante, empeorando la situación. Para la construcción de una acera en este lugar, será necesario primero realizar una canalización de aguas y crear el espacio adecuado para la estructura de la acera. La raíz de esta problemática se encuentra en las propiedades colindantes con la ruta nacional, que han generado pasos de agua, encauzando el flujo en cunetas naturales de tierra. De manera similar, la infraestructura existente, como la parada de buses, ha formado un canal natural para el paso del agua, lo que, al circular por el terreno, ha causado socavaciones y empozamientos. Con el objetivo de abordar la situación y en cumplimiento de lo establecido en la Orden Sanitaria, se elaboró un cronograma de intervención, el cual fue incluido en el Banco de Proyectos de la Zona 1-9 Heredia.

Sin embargo, debido a la atención de diversas prioridades y urgencias en la zona, no fue posible ejecutar la intervención durante el año 2024. Reconociendo la importancia de brindar atención a la situación, se programó la intervención para el primer trimestre de 2025. Desde el 11 de febrero de 2025, se llevó a cabo el levantamiento topográfico en el sector, cuyas fotografías evidencian la ejecución de estas labores, con el fin de generar el diseño de la solución integral a la problemática. Actualmente se encuentra a la espera de la propuesta de diseño por parte de la Constructora MECO, contratista adjudicado para la Contratación No. 2022CD 000145 0006000001 Mantenimiento Rutinario, Contingencias, Mantenimiento Básico De Puentes Y Conservación Del Sistema De Evacuación Pluvial De La Red Vial Nacional Pavimentada Línea 9 Zona 1 9 ya que es necesario conocer el diámetro de la alcantarilla que se requiere según las condiciones de sitio para canalizar las aguas, el nivel requerido para la pendiente de la tubería a colocar así como ubicar el punto de desfogue más cercano, generando una propuesta integral que atienda la solicitud del interesado y haciendo el uso más eficiente de los recursos.

IV. Observaciones Adicionales: Con respecto al estancamiento de aguas en el sector se indica que durante la inspección realizada a inicios del mes de enero a fin de rectificar los trabajos a realizar se denotó que existía presencia de agua en la cuneta y para el día que se realizó la visita a campo no había llovido, lo que implica que se están desviando aguas de propiedades que no corresponden a aguas pluviales. Además, como se puede observar en la fotografía, el agua tiene una coloración de presuntas aguas residuales De esta situación debe hacerse la aclaración a la Sala Constitucional que si bien es cierto existe un requerimiento de atención de aguas pluviales en el sector a fin de tapar el canal abierto y eliminar el riesgo existente y generar un paso seguro al peatón no así es responsabilidad del Consejo Nacional de Vialidad la gestión y disposición de aguas residuales sino que de acuerdo con la evidencia presentada existe también una presunta ilegalidad de las propiedades aledañas en cuanto al vertido de aguas residuales en la vía pública.

De lo anterior, según dicta el Artículo 92 de la Ley General de Salud: "Es prohibido verter aguas residuales o cualquier otro tipo de contaminantes en la vía pública o en cuerpos de agua que sean de uso común, y se establece que el Ministerio de Salud Pública, en coordinación con otras autoridades competentes, es responsable de vigilar, controlar y sancionar dichas actividades." De tal forma, dentro de las competencias del Ministerio de Salud esta incluida la atención, apercibimiento y gestiones correspondientes a fin de detener esta práctica ilegal por parte de los responsables determinados mediante los procedimiento y herramientas con las que cuentan. Esta situación resulta relevante por cuanto el Consejo Nacional de Vialidad no puede conectar desfogues de aguas residuales a los sistemas de aguas pluviales de la red vial nacional al resultar ilegal. V. Conclusiones i. La Orden Sanitaria No. MS-DRRSCN-DARSSRB-4569-2023 fue atendida por esta Gerencia de Conservación de Vías y Puentes por cuanto se realizó la inspección en campo desde noviembre del 2023 determinando la problemática y labores que se deberían programar, en el requerimiento se indicaba un cronograma y plan de acción para la atención de la misma, sin embargo por motivo de un error involuntario en la interpretación de una seguidilla de correos presuntamente la información que se confirmo como recibido no era el cronograma solicitado. ii.

La intervención requerida esta incluida en el Banco de Proyectos de la Zona 1-9 Heredia que da conservación vial a 9 cantones de la provincia de Heredia, en donde se van realizando las intervenciones de acuerdo a las prioridades y asignaciones presupuestarias dadas. iii. Si bien es cierto que no fue posible en el año 2024 poder atender la intervención en el sector esta Ingeniería de Zona realizó las coordinaciones correspondientes a fin de programar la intervención en el I trimestre del 2025 y se evidencia el avance de las actividades realizadas, reforzando el compromiso de la Administración en el acatamiento de la Orden Sanitaria girada. iv. Existe en el sitio una situación ambiental con presunto vertido de aguas residuales, el Ministerio de Salud Pública de Costa Rica tiene la responsabilidad de velar por la salud pública en relación con la gestión de aguas residuales, supervisando que las aguas residuales sean tratadas adecuadamente antes de ser vertidas en el medio ambiente. En el caso de vertidos ilegales o inadecuados, el Ministerio de Salud es responsable de tomar las medidas correctivas correspondientes”. (Ver prueba documental).

III. CASO CONCRETO

En el sub lite, el recurrente señala que planteó una denuncia ante el Ministerio de Salud por una alcantarilla de gran tamaño y sin ninguna protección, lo que constituye un riesgo para las personas y vehículos e, incluso, existe evidencia por muerte de varias personas en esa alcantarilla. Explica que se ha formado una zanja profunda que está erosionando la carretera nacional, falseando los postes de servicio eléctrico, estancamiento de aguas con criaderos de mosquitos y sobre todo la inseguridad y peligro para las personas. Afirma que el Área Rectora de Salud San Rafael - Barva emitió la orden sanitaria nro. MS-DRRSCN-DARSSRB-4569 de 2023, en la que se obligó al MOPT realizar lo necesario para reparar; sin embargo, no se ha cumplido.

Al respecto, la Sala tiene por demostrado que, el 10 de julio de 2023, el accionante planteó una denuncia ante el Ministerio de Salud, en la que indicó: “Por este medio denuncio los problemas y riesgos de los vehículos y personas que transitan por la carretera nacional a Carrizal y exactamente de la Dirección03, 400 metros norte en el cruce a mano izquierda hacia Carrizal, porque hacia la derecha a San José de la Montaña ya está entubado y con aceras con un trabajo que realizo hace menos de 3 años por el COSEVI. Como se muestra en las fotos adjuntas en el Formulario D-1 Presentación denuncia Sanitaria, MS.NI.SLA.07.P.06, se presentan los siguientes problemas y riesgos puntales: 1. Con el arreglo que realizó COSEVI hace 3 años, dejo una alcantarilla a cielo abierto sin ningún tipo de protección y por su tamaño como 3metros de ancho y 5 de largo es una trampa mortal si una persona sufre una caída o por el alto volumen de agua y el desnivel con los aguaceros.

Hay dos fotos donde transita un carro blanco y en otra foto con un carro de color gris donde está la alcantarilla la cual no es visible por el monte que la tapa totalmente y por la curva pronunciada hasta un carro puede caer y caber en la misma. 2. La zanja de unos 70 metros de largo es profunda y ya está erosionando la calle nacional de mucho tránsito y de alta velocidad por la inclinación y la curva que hace que se presenten muchos accidentes y muertes como se ve en una foto adjunta en la que hay una cruz de una persona fallecida. 3. Aguas contaminadas que bajan de las urbanizaciones que producen criaderos de mosquitos y malos olores en época de verano y como se puede ver en las fotos se empoza el agua contaminada. 4. La zanja es tan peligrosa que para cortar el montazal o mantenimiento por iniciativa nuestra es peligroso porque los vehículos y camiones pasan cerca y a alta velocidad, además el terreno es inclinado, falseado y profundo por lo que ya no se consigue peones que quieran arriesgarse, siendo una obligación del COSEVI su mantenimiento oportuno. 5.

La erosión es tan crítica y peligrosa para el tránsito vehicular que se puede observar en las fotos dos postes que muestran inclinación y sus bases falseadas y que puede caer en cualquier momento hacia la calle con peligro hacia una persona o vehículo y/o ambos. 6. En la zona existe mucho tránsito de personas y hace poco se dio la apertura del IPEC Barva, Heredia y al no existir acera es un riesgo enorme y se han presentado accidentes porque la zanja solo permite caminar por la carretera nacional que es de alto tránsito a gran velocidad y de poca visibilidad por el montazal y en de noche por la poca iluminación. En espera de una pronta respuesta y solución al problema expuesto entubando las aguas negras, eliminando la alcantarilla a cielo abierto y una acera que de tranquilidad y seguridad a los peatones, estoy a sus órdenes por si tienen alguna consulta y hasta me ofrezco acompañarlos en una inspección al lugar”.

En atención a esa denuncia, en informe técnico nro. MS-DRRSCN-DARSSRB-4568-2023 del 18 de setiembre de 2023, el área rectora accionada determinó: “3. Hallazgos de la inspección · día 14 de setiembre 2023 se realiza visita al sitio, estuvimos presentes en el lugar señalado en la denuncia y efectivamente se observa una alcantarilla muy grande que está a cielo abierto sin protección, que podría representar un riesgo para los transeúntes e incluso vehículos. · Si se observan varios tramos cubiertos de maleza y erosión del terreno. · La alcantarilla presenta agua incluso sin estar lloviendo, por la coloración y olor de esta se comprueba que hay presencia de aguas residuales, además se observa presencia de residuos sólidos que podrían generar obstrucciones. (…) 6. Conclusiones Se comprueba que existe una alcantarilla que requiere mantenimiento y que se tomen las medidas de seguridad para evitar un accidente y poner en riesgo la vida de personas”.

(El énfasis no es del original). Por tal motivo, mediante orden sanitaria nro. MS-DRRSCN-DARSSRB-4569-2023 del 18 de setiembre de 2023, notificada el 13 de octubre de 2023, el Área Rectora de Salud de San Rafael-Barva le ordenó al Ministerio de Obras Públicas y Transportes: “De acuerdo con la visita de inspección realizada el día 14 de setiembre 2023, en atención de la denuncia presentada por EL Sr. Luis Alberto García Zúñiga, debido a que, aparentemente, existe una alcantarilla sobre la carretera nacional que va hacia carrizal, específicamente 400 m al norte de la Iglesia Católica de Barva, existe una alcantarilla de gran tamaño (3 metros de ancho y 5 m de largo aproximadamente) que está a cielo abierto, sin ninguna protección, por lo que constituye un riesgo para las personas que transitan por este sector, que en caso de sufrir una caída podrían verse gravemente lesionados o incluso perder la vida, por la gran cantidad de agua que corre por dicha alcantarilla y profundidad de la misma, inclusive un vehículo podría caer por la poca visibilidad que hay por la gran cantidad de monte que la cubre; se realizó la visita de inspección al sitio, encontrándose que, efectivamente la alcantarilla no ha recibido el mantenimiento requerido y constituye un riesgo para las personas que transitan por el lugar.

De acuerdo con el informe N° MS-DRRSCN-DARSSRB-4568- 2023 (se adjunta) y los reglamentos abajo indicados, se ordena que en el plazo otorgado debe: 1. Presentar un plan o propuesta para dar solución a la situación actual de la alcantarilla denunciada, acorde a las competencias de la institución. 2. El punto exacto de dicha problemática se puede encontrar en el siguiente enlace del sitio Google Maps: https://maps.app.goo.gl/veZtSv5EBJgppFWJ9, de este punto, la alcantarilla se extiende aproximadamente 150 m al norte 3. Se le otorga un plazo de 2 meses para presentar el plan”. Así, por oficio DM-TC-2023-3039 del 26 de octubre de 2023, el despacho del ministro de Obras Públicas y Transportes trasladó la orden sanitaria al director del Conavi.

Otrosí, en oficio CARTA-CONAVI-DRC-10-2025-0236 del 26 de febrero de 2025, la ingeniera de Zona 1-9 Heredia y el director de la Región Central, ambos de la Gerencia de Conservación de Vías y Puentes del Conavi señalaron: “I. Antecedentes Orden Sanitaria MS-DRRSCN-DARSSRB-4569-2023-adjunta-, es importante indicar que lo requerido en dicho documento corresponde a: 1. Presentar un plan o propuesta para dar solución a la situación actual de la alcantarilla denunciada, acorde a las competencias de la institución. 2. El punto exacto de dicha problemática se puede encontrar en el siguiente enlace … 3. Se le otorga un plazo de 2 meses para presentar el plan. En el correo del 20 de noviembre del 2023 mediante una seguidilla de correo el Ministerio de Salud indica un acuse de recibido de información por cuanto se presume que existe una confusión en la interpretación de la misma, ya que desde el 17 de noviembre del 2023 se había realizado el siguiente cronograma de atención: II.

Ubicación El sector de la afectación denunciada corresponde a una ruta nacional secundaria con presencia de un caserío urbano de un lado de la ruta y una propiedad en verde del otro lado de la carretera, la misma es parte de la Dirección04 tal como se muestra en el siguiente cuadro: (…) III. Acciones realizadas Como parte de la atención brindada por la Gerencia de Conservación de Vías y Puentes, en el noviembre del 2023 se realizó una inspección en campo para evaluar los hechos alegados en la Orden Sanitaria y visualizar el grado de riesgo relacionado con la conservación vial. En los hallazgos obtenidos, se identificó un sector con un canal abierto de 84 metros de longitud, 1,30 metros de ancho y 1 metro de profundidad. Es importante señalar que el estancamiento de aguas en la zona se debe a la existencia de pasos de agua en tierra, los cuales se han formado de manera natural y carecen de las pendientes necesarias para una adecuada circulación del agua, lo que ha ocasionado socavación en el área.

En el sitio, también se observa una cuneta natural ubicada al margen de la carretera, lo que limita el espacio para el tránsito de peatones. Además, el agua ha socavado el terreno circundante, empeorando la situación. Para la construcción de una acera en este lugar, será necesario primero realizar una canalización de aguas y crear el espacio adecuado para la estructura de la acera. La raíz de esta problemática se encuentra en las propiedades colindantes con la ruta nacional, que han generado pasos de agua, encauzando el flujo en cunetas naturales de tierra. De manera similar, la infraestructura existente, como la parada de buses, ha formado un canal natural para el paso del agua, lo que, al circular por el terreno, ha causado socavaciones y empozamientos. Con el objetivo de abordar la situación y en cumplimiento de lo establecido en la Orden Sanitaria, se elaboró un cronograma de intervención, el cual fue incluido en el Banco de Proyectos de la Zona 1-9 Heredia.

Sin embargo, debido a la atención de diversas prioridades y urgencias en la zona, no fue posible ejecutar la intervención durante el año 2024. Reconociendo la importancia de brindar atención a la situación, se programó la intervención para el primer trimestre de 2025. Desde el 11 de febrero de 2025, se llevó a cabo el levantamiento topográfico en el sector, cuyas fotografías evidencian la ejecución de estas labores, con el fin de generar el diseño de la solución integral a la problemática. Actualmente se encuentra a la espera de la propuesta de diseño por parte de la Constructora MECO, contratista adjudicado para la Contratación No. 2022CD 000145 0006000001 Mantenimiento Rutinario, Contingencias, Mantenimiento Básico De Puentes Y Conservación Del Sistema De Evacuación Pluvial De La Red Vial Nacional Pavimentada Línea 9 Zona 1 9 ya que es necesario conocer el diámetro de la alcantarilla que se requiere según las condiciones de sitio para canalizar las aguas, el nivel requerido para la pendiente de la tubería a colocar así como ubicar el punto de desfogue más cercano, generando una propuesta integral que atienda la solicitud del interesado y haciendo el uso más eficiente de los recursos.

IV. Observaciones Adicionales: Con respecto al estancamiento de aguas en el sector se indica que durante la inspección realizada a inicios del mes de enero a fin de rectificar los trabajos a realizar se denotó que existía presencia de agua en la cuneta y para el día que se realizó la visita a campo no había llovido, lo que implica que se están desviando aguas de propiedades que no corresponden a aguas pluviales. Además, como se puede observar en la fotografía, el agua tiene una coloración de presuntas aguas residuales De esta situación debe hacerse la aclaración a la Sala Constitucional que si bien es cierto existe un requerimiento de atención de aguas pluviales en el sector a fin de tapar el canal abierto y eliminar el riesgo existente y generar un paso seguro al peatón no así es responsabilidad del Consejo Nacional de Vialidad la gestión y disposición de aguas residuales sino que de acuerdo con la evidencia presentada existe también una presunta ilegalidad de las propiedades aledañas en cuanto al vertido de aguas residuales en la vía pública.

De lo anterior, según dicta el Artículo 92 de la Ley General de Salud: "Es prohibido verter aguas residuales o cualquier otro tipo de contaminantes en la vía pública o en cuerpos de agua que sean de uso común, y se establece que el Ministerio de Salud Pública, en coordinación con otras autoridades competentes, es responsable de vigilar, controlar y sancionar dichas actividades." De tal forma, dentro de las competencias del Ministerio de Salud esta incluida la atención, apercibimiento y gestiones correspondientes a fin de detener esta práctica ilegal por parte de los responsables determinados mediante los procedimiento y herramientas con las que cuentan. Esta situación resulta relevante por cuanto el Consejo Nacional de Vialidad no puede conectar desfogues de aguas residuales a los sistemas de aguas pluviales de la red vial nacional al resultar ilegal. V. Conclusiones i. La Orden Sanitaria No. MS-DRRSCN-DARSSRB-4569-2023 fue atendida por esta Gerencia de Conservación de Vías y Puentes por cuanto se realizó la inspección en campo desde noviembre del 2023 determinando la problemática y labores que se deberían programar, en el requerimiento se indicaba un cronograma y plan de acción para la atención de la misma, sin embargo por motivo de un error involuntario en la interpretación de una seguidilla de correos presuntamente la información que se confirmó como recibido no era el cronograma solicitado. ii.

La intervención requerida está incluida en el Banco de Proyectos de la Zona 1-9 Heredia que da conservación vial a 9 cantones de la provincia de Heredia, en donde se van realizando las intervenciones de acuerdo a las prioridades y asignaciones presupuestarias dadas. iii. Si bien es cierto que no fue posible en el año 2024 poder atender la intervención en el sector esta Ingeniería de Zona realizó las coordinaciones correspondientes a fin de programar la intervención en el I trimestre del 2025 y se evidencia el avance de las actividades realizadas, reforzando el compromiso de la Administración en el acatamiento de la Orden Sanitaria girada. iv. Existe en el sitio una situación ambiental con presunto vertido de aguas residuales, el Ministerio de Salud Pública de Costa Rica tiene la responsabilidad de velar por la salud pública en relación con la gestión de aguas residuales, supervisando que las aguas residuales sean tratadas adecuadamente antes de ser vertidas en el medio ambiente. En el caso de vertidos ilegales o inadecuados, el Ministerio de Salud es responsable de tomar las medidas correctivas correspondientes”. (El énfasis es suplido).

En atención de lo expuesto, se comprueba la lesión de los derechos fundamentales por parte de todas las autoridades accionadas. En este sentido, si bien los recurridos señalan que han ejecutado acciones para solventar la problemática denunciada, no menos cierto es que han sido insuficientes. Aunado a ello, se observa una grave descoordinación interinstitucional, pues los accionados se limitan a endilgarse la responsabilidad entre sí. De esta forma, nótese que las autoridades del Ministerio de Salud señalan que ya se giró la orden sanitaria y han realizado el seguimiento respectivo; empero, el MOPT no la ha cumplido. A su vez, el Ministerio de Obras Públicas y Transportes señala que la atención del problema es responsabilidad del Conavi; y, el consejo accionado sostiene que se requiere la intervención del Ministerio de Salud para solventar la situación del vertido de aguas residuales.

En consideración de lo expuesto, lo procedente es declarar con lugar el recurso, de acuerdo con lo establecido en la parte dispositiva de esta sentencia.

IV. NOTA DEL MAGISTRADO SALAZAR ALVARADO

En asuntos ambientales, es criterio del suscrito, que si ya ha habido intervención de la Administración Pública, su conocimiento y resolución corresponde a la jurisdicción contenciosa administrativa. No obstante, sí entro a conocer el fondo del asunto cuando están de por medio otros derechos de las personas afectadas por el foco de contaminación, entre ellos, la salud, la calidad de vida y el derecho a gozar de un ambiente sano y libre de contaminación (artículo 50, de la Constitución Política), tal y como sucede en este caso, en el que la parte recurrente indica que planteó una denuncia ante el Ministerio de Salud por una alcantarilla de gran tamaño y sin ninguna protección, lo que constituye un riesgo para las personas y vehículos e, incluso, existe evidencia por muerte de varias personas en esa alcantarilla. Explica que se ha formado una zanja profunda que está erosionando la carretera nacional, falseando los postes de servicio eléctrico, estancamiento de aguas con criaderos de mosquitos y sobre todo la inseguridad y peligro para las personas. Afirma que el Área Rectora de Salud San Rafael - Barva emitió la orden sanitaria nro. MS-DRRSCN-DARSSRB-4569 de 2023, en la que se obligó al MOPT realizar lo necesario para reparar; sin embargo, no se ha cumplido, por lo que se vulneran los derechos fundamentales de quienes transitan la zona.

V. DOCUMENTACIÓN APORTADA AL EXPEDIENTE

Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidos en algún dispositivo de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, estos deberán ser retirados del despacho en el plazo máximo de 30 días hábiles contado a partir de la notificación de esta sentencia. Se advierte que será destruido todo aquel material no retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en el artículo XXVI de la sesión nro. 27-11 del 22 de agosto de 2011, publicado en el Boletín Judicial nro. 19 del 26 de enero de 2012, así como en el acuerdo de Consejo Superior del Poder Judicial, aprobado en el artículo LXXXI de la sesión nro. 43-12 celebrada el 3 de mayo de 2012.

Por tanto:

Se declara con lugar el recurso. Se les ordena a María Antonieta Acuña Hernández, Mauricio Batalla Otárola y Mauricio Sojo Quesada, por su orden, de directora del Área Rectora de Salud de San Rafael de Heredia, ministro de Obras Públicas y Transportes y director ejecutivo del Consejo Nacional de Vialidad, o a quienes desempeñen esos cargos, que lleven a cabo las actuaciones necesarias y coordinen lo pertinente dentro del ámbito de sus respectivas competencias, a fin de que, en el plazo de SEIS MESES, contado a partir de la notificación de esta sentencia, se diseñe un plan y se comiencen a aplicar las medidas ahí establecidas para atender la problemática denunciada por el amparado. Se advierte a la autoridad recurrida, que de acuerdo con lo establecido por el artículo 71 de la Ley de la Jurisdicción Constitucional se impondrá prisión de tres meses a dos años o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada dentro de un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado.

Se condena al Estado y al Consejo Nacional de Vialidad al pago de las costas, daños y perjuicios causados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de la jurisdicción contencioso-administrativa. El magistrado Salazar Alvarado pone nota. Notifíquese.

Fernando Castillo V.

Fernando Cruz C.

Paul Rueda L.

Luis Fdo. Salazar A.

Jorge Araya G.

Anamari Garro V.

Ingrid Hess H.

Document not found. Documento no encontrado.

Implementing decreesDecretos que afectan

    TopicsTemas

      Concept anchorsAnclajes conceptuales

        Spanish key termsTérminos clave en español

        News & Updates Noticias y Actualizaciones

        All articles → Todos los artículos →

        Weekly Dispatch Boletín Semanal

        Field reporting and policy analysis from Costa Rica's forests. Reportajes y análisis de política desde los bosques de Costa Rica.

        ✓ Subscribed. ✓ Suscrito.

        One email per week. No spam. Unsubscribe in one click. Un correo por semana. Sin spam. Cancela en un clic.

        Or WhatsApp channelO canal de WhatsApp →
        Coalición Floresta © 2026 · All rights reserved © 2026 · Todos los derechos reservados

        Stay Informed Mantente Informado

        Conservation news and action alerts, straight from the field Noticias de conservación y alertas de acción, directo desde el campo

        Email Updates Actualizaciones por Correo

        Weekly updates, no spam Actualizaciones semanales, sin spam

        Successfully subscribed! ¡Suscripción exitosa!

        WhatsApp Channel Canal de WhatsApp

        Join to get instant updates on your phone Únete para recibir actualizaciones instantáneas en tu teléfono

        Join Channel Unirse al Canal
        Coalición Floresta Coalición Floresta © 2026 Coalición Floresta. All rights reserved. © 2026 Coalición Floresta. Todos los derechos reservados.
        🙏