← Environmental Law Center← Centro de Derecho Ambiental
Res. 07768-2025 Sala Constitucional · Sala Constitucional · 14/03/2025
OutcomeResultado
The amparo is denied as no fundamental rights violation by the Ministry of Health or the Municipality of Mora is proven; the health authority addressed the complaint and the municipality has no pending actions.Se declara sin lugar el recurso de amparo al no acreditarse violación de derechos fundamentales por el Ministerio de Salud o la Municipalidad de Mora, ya que la autoridad sanitaria atendió la denuncia y el municipio no tiene gestiones pendientes.
SummaryResumen
The Constitutional Chamber hears an amparo filed by elderly neighbors against the Ministry of Health and the Municipality of Mora for failing to resolve noise and environmental pollution from an industrial warehouse adjacent to their home. The plaintiffs allege that since March 2024 they have filed complaints with the Mora Health Area, but no effective solution has been provided. They also argue that the Municipality granted land use permits and commercial licenses that worsen the problem. After reviewing the reports, the Chamber finds that the Health Area has carried out multiple inspections, issued sanitary orders, and verified compliance, including noise measurements that showed levels within legal limits. Regarding the Municipality, no pending actions or violations justifying constitutional intervention are proven. The amparo is denied, as no fundamental rights violation is shown, and any disagreement with technical criteria or administrative acts must be pursued through ordinary courts.La Sala Constitucional conoce un recurso de amparo interpuesto por vecinos adultos mayores contra el Ministerio de Salud y la Municipalidad de Mora por la falta de solución a la contaminación sónica y ambiental generada por una bodega industrial colindante a su vivienda. Los recurrentes denuncian que desde marzo de 2024 presentaron denuncias ante el Área Rectora de Salud de Mora, pero consideran que no han recibido una solución efectiva. Alegan también que la Municipalidad otorgó usos de suelo y licencias comerciales que agravan el problema. La Sala, tras analizar los informes recibidos, constata que el Área Rectora de Salud ha realizado múltiples inspecciones, emitido órdenes sanitarias y verificado su cumplimiento, incluida la medición de ruido, la cual determinó que los niveles no superaban los límites legales. Respecto de la Municipalidad, no se acredita una gestión pendiente ni una actuación que amerite intervención constitucional. La Sala declara sin lugar el recurso al considerar que no se demuestra una lesión a derechos fundamentales, y que las inconformidades con los criterios técnicos o los actos administrativos deben ventilarse en la jurisdicción ordinaria.
Key excerptExtracto clave
Firstly, regarding the Municipality of Mora, any situation currently requiring the intervention of this constitutional jurisdiction is ruled out a priori. In this regard, it should be noted that this Chamber is not responsible, in this summary amparo proceeding, for reviewing whether the land uses and operating permits granted to the company mentioned by the plaintiff comply with ordinary legislation. (...) Furthermore, with respect to the sanitary complaint filed with the Mora Health Area, this Chamber does not observe that said office has incurred in negligence warranting our intervention. (...) Now, the petitioners must be warned that this Court is not responsible for analyzing or reviewing the substance of the criteria expressed by the health authority in the various technical reports and inspections carried out.En primer lugar, en relación con la Municipalidad de Mora, a priori se descarta alguna situación que en este momento amerite la intervención de esta jurisdicción constitucional. Al respecto, conviene advertir que no le corresponde esta Sala, en este proceso sumario de amparo, revisar si los usos de suelo y los permisos de funcionamiento otorgados a la empresa aludida por la parte accionante se ajustan o no a las disposiciones de la legislación ordinaria. (...) Por otro lado, en cuanto a la denuncia sanitaria interpuesta ante el Área Rectora de Salud de Mora, no se observa que dicha dependencia haya incurrido en desatenciones que ameriten la intervención de esta Sala. (...) Ahora, deben advertir los tutelados que no le corresponde a este Tribunal analizar ni revisar el fondo de los criterios vertidos por la autoridad sanitaria en los distintos informes técnicos y en las inspecciones realizadas.
Pull quotesCitas destacadas
"no le corresponde esta Sala, en este proceso sumario de amparo, revisar si los usos de suelo y los permisos de funcionamiento otorgados a la empresa aludida por la parte accionante se ajustan o no a las disposiciones de la legislación ordinaria."
"this Chamber is not responsible, in this summary amparo proceeding, for reviewing whether the land uses and operating permits granted to the company mentioned by the plaintiff comply with ordinary legislation."
Considerando IV
"no le corresponde esta Sala, en este proceso sumario de amparo, revisar si los usos de suelo y los permisos de funcionamiento otorgados a la empresa aludida por la parte accionante se ajustan o no a las disposiciones de la legislación ordinaria."
Considerando IV
"no se verifica la desatención de la denuncia sanitaria incoada, ni alguna circunstancia lesiva de derechos fundamentales atribuible a la autoridad sanitaria accionada."
"no neglect of the filed sanitary complaint is verified, nor any circumstance harmful to fundamental rights attributable to the accused health authority."
Considerando V
"no se verifica la desatención de la denuncia sanitaria incoada, ni alguna circunstancia lesiva de derechos fundamentales atribuible a la autoridad sanitaria accionada."
Considerando V
"En asuntos ambientales, es criterio del suscrito, que si ya ha habido intervención de la Administración Pública, su conocimiento y resolución corresponde a la jurisdicción contenciosa administrativa."
"In environmental matters, it is the undersigned's view that if the Public Administration has already intervened, its knowledge and resolution correspond to the contentious-administrative jurisdiction."
Nota del Magistrado Salazar Alvarado
"En asuntos ambientales, es criterio del suscrito, que si ya ha habido intervención de la Administración Pública, su conocimiento y resolución corresponde a la jurisdicción contenciosa administrativa."
Nota del Magistrado Salazar Alvarado
Full documentDocumento completo
CONSTITUTIONAL CHAMBER OF THE SUPREME COURT OF JUSTICE. San José, at nine hours and twenty minutes on the fourteenth of March, two thousand twenty-five.
An amparo action processed under case file no. 24-035927-0007-CO, filed by Nombre128115, identity card CED72532, and Nombre128116, identity card CED72533, against the MINISTRY OF HEALTH AND THE MUNICIPALITY OF MORA.
Whereas:
(folios 0170 to 0171) The actions taken and confirmed were brought to the attention of the complainant via email on 21 August 2024 (folio 0172). On 20 August 2024, this Health Authority, accompanied by engineering professionals from the Regional Directorate, visited the establishment to assess the structure of the roofs. Engineers Allan Bolaños Benavides and Oscar Arroyo Barahona of the Regional Directorate concluded, through report MS-DRRSCS-URS-lT-0435-2024 dated 22 August 2024, that no imminent danger was detected in the stability of the roof structure that was reported. This circumstance was communicated to the protected party via email on 28 August 2024. (folios 0174 to 0178) Regarding the follow-up and verification of the technical proposal submitted by the reported company to comply with the arrangement of the structures, on 19 September 2024, during an inspection visit according to technical report MS-DRRSCS-ARSM-434-2024, it was certified that most of the points indicated in the technical proposal had been fulfilled, with only the placement of signage and the records of weekly inspections remaining pending (folios 0181 to 0186).
The actions taken were again reported to the complainant on 20 September 2024, via email. (folio 0186). where a sonic measurement was agreed for 23 September at 2:00 p.m., a day on which, due to a lack of noise from the reported company, it was impossible to complete the application of the sound level measurement (sonometría) test (folios 0187 to 0188). A new attempt at sonic measurement was made on 7 October; however, there was also no noise (folio 0189 to 0190). On 5 and 9 December 2024, adjusting to the complainant's schedule and the request to leave the institutional vehicle at a certain distance so as not to be perceived by the establishment's cameras, we again attempted to perform a sound level measurement (sonometría) test, which also could not be started due to a lack of noise. (folios 0191 to 0195) On 19 December at 10:00 a.m., Mr. Nombre128115 sent an email arguing that there was noise in the establishment (folio 0196), and despite the fact that a sound level measurement (sonometría) test had not been scheduled, personnel from the Health Governing Area (Área Rectora de Salud) neglected office work to proceed with the respective measurement, the result of which, according to technical report MS-DRRCSARSM-IT-001-2025, was 48.4 dB(A) for ambient noise plus active generating source, which does not exceed the 65 dB(A) prescribed for a residential zone as established by the Reglamento para el Control de la Contaminación por Ruido N° 39428-S, in force at the time the sound level measurement (sonometría) test was applied, and not as alleged by the protected party under health decree 28718-S, which had been repealed by Decreto Ejecutivo N° 39200 as of 24 July 2015 (folios 0197 to 0210).
The results of said test were communicated to the reported party via email on 7 January 2025 (folios 0211). In follow-up to the two points that had remained pending from technical report MSDRRSCS-ARSM-434-2024, namely the placement of signage and the records of weekly inspections, an inspection was carried out on 8 January 2025, and it was verified that the company complied with these two outstanding points, and therefore the establishment has complied with the notified health orders and resolved the issue of storage and stacking (estibo) of structures (folios 0214 to 0218). The actions taken were again reported to the complainant on 9 January 2025 via email. (folio 0219) Based on all of the foregoing, it is demonstrated that this Health Authority has not been negligent in fulfilling its duties and has focused on addressing each of the objections raised during the process of handling the complaint.
It must be clear that, although it is true, the protected parties file complaints against the establishment, the mere filing does not allow the alleged infractions announced to be taken as attributed. It should be noted that for the sub examine, the complaint was initially filed for noise and structures that exceed the height of the wall (tapia). Once the inconsistency regarding the structures was attributed, Mr. Nombre128115 filed a complaint against the roof, and later for the washing of latrines, assumptions that, as indicated in the case file, were not confirmed by this Health Authority, just as happened with the sound level measurement (sonometría) test, the result of which did not exceed the established legal parameters. In other words, given that by provision of Decreto Ejecutivo N" 40724-S "Reglamento Orgánico del Ministerio de Salud", we are the institution that directs and guides social actors for the development of actions that protect and improve the state of physical, mental, and social health of the inhabitants, with the character of authority and public faith in attending to complaints and exercising functions.
The protected parties are incorrect that fundamental rights are disregarded when, on the contrary (contrario sensu), given substantiated inconsistencies, the issuance and corresponding follow-up of administrative acts is demonstrated.”.
Drafted by Judge Rueda Leal; and,
Considering:
Before analyzing the merits of the matter, it must be clarified that, as of ruling number 2008-02545 of 8:55 a.m. on 22 February 2008, this Chamber has referred to the contentious-administrative jurisdiction—with some exceptions—those matters in which it is discussed whether the Public Administration has complied or not with the deadlines set by the General Law of Public Administration (articles 261 and 325) or the sectoral laws for special administrative procedures, to resolve an administrative procedure by final act—initiated ex officio or at the request of a party—or to hear the appropriate administrative appeals. Precisely, in the sub lite, a case of exception is raised, as this involves a complaint for health impacts, which is alleged not to have been resolved within a reasonable time. Having clarified the point, we proceed to resolve the specific situation claimed in this amparo.
The appellants state that, a few months ago, a large warehouse was installed on the property adjacent to their dwelling, which serves for industrial use and storage of pallets (tarimas), as well as for washing transport vehicles. They allege that since that time they have had problems of sonic and environmental pollution (contaminación sónica y ambiental), and therefore, on 11 March 2024, they filed the respective complaint before the Health Governing Area (Área Rectora de Salud) of Mora; however, said office has not solved the problem for them, as the orders issued are not complied with. They add that the Municipality of Mora has extended the land-use (uso de suelo) permits, which has caused the problem to worsen. They indicate that such industrial activity is carried out in contravention of municipal regulations. They claim that none of the respondent institutions has solved the described problem.
Of importance for the decision in this matter, the following facts are deemed duly demonstrated, either because they have been so accredited or because the respondent authority has omitted to refer to them, according to what is provided in the initial order:
Regarding the Municipality of Mora:
Regarding the Health Governing Area (Área Rectora de Salud) of Mora:
Said delimitation can be done by painting the corresponding stripes on the floor, with the color(s) intended for each type of area. 4. Except for structures that, by their nature, size, difficult mobilization or similar, do not permit it, the goods must be stacked on "racks" or shelves (tarimas) anchored to the floor and designed to support the weight, volume, and height thereof. The racks or shelves must have clearly indicated, in visible places or on the wall, the numbering, the maximum height of the load stability that can be stacked, for the safety of the shelves themselves, the goods, and the people who work. 5. Once the compliance deadlines indicated in the proposal are met, we will return to the site to verify what has been implemented.” (Report of the respondent authority and documentary evidence).
In the sub lite, the appellants state that, a few months ago, a large warehouse was installed on the property adjacent to their dwelling, which serves for industrial use and storage of pallets (tarimas), as well as for washing transport vehicles. They allege that since that time they have had problems of sonic and environmental pollution (contaminación sónica y ambiental), and therefore, on 11 March 2024, they filed the respective complaint before the Health Governing Area (Área Rectora de Salud) of Mora; however, said office has not solved the problem for them, as the orders issued are not complied with. They add that the Municipality of Mora has extended the land-use (uso de suelo) permits, which has caused the problem to worsen. They indicate that such industrial activity is carried out in contravention of municipal regulations. They claim that none of the respondent institutions has solved the described problem.
From the study of the case file, it is demonstrated that the Municipality of Mora granted the company “Tres Equipos” land-use (usos de suelo) permits nos. cu-22-373 and cu-24-488, as well as the respective business license, and the respondent mayor affirms that the “approved business licenses are registered as active and issued in accordance with the law and zoning according to the approved land-use (usos de suelo) certificates.” As of 7 January 2025, the respondent municipality did not record any pending action for resolution regarding the aforementioned company. On 11 March 2024, the petitioner filed a complaint before the Health Governing Area (Área Rectora de Salud) of Mora against the activity of the company adjacent to his property. On 18 March 2024, the respondent authority conducted an inspection on site, and the complainant pointed out that the problem lay in the generated noise and the risk of collapse of the metal structures that the company erected next to the wall (tapia).
On 8 April 2024, the respondent authority conducted an inspection. In said proceeding, no noise generation was verified, but the issues concerning the metal structures and other aspects were. For this reason, the health order was issued and notified on 22 April 2024, through which it was ordered that “within a period of 20 business days, place smoke detectors, place emergency signage, maintain dispensers with liquid soap and disposable towels, have a first-aid kit (botiquín de primeros auxilios), and not stack (estibar) structures above the wall (tapia) to avoid risk of collapse.” On 28 May 2024, the respondent authority conducted a compliance inspection of the issued order; however, regarding the metal structures, “partial compliance” was verified. In said visit, noise generation was not verified. Through health order no. CS-ARS-NIP-114-2024 of 30 May 2024, the respondent authority ordered the reported company: “1.
To obtain a sanitary operating permit (permiso sanitario de funcionamiento) that includes the activities carried out on the property where Terra Eventos is located 2. Within 15 business days, it must present a proposal for storage and stacking (estibaje) of structures, with compliance deadlines. For this proposal, it is recommended to have the advice of a professional in the field who must determine what the maximum heights of the stacks (estibas) will be and the setback from the boundaries (colindancias), to prevent falls that could cause damage to private property or the health of workers 3. It is recommended that the spaces intended for stacking (estiba) and unstacking be clearly identified areas and differentiated from those intended for pedestrian transit of workers, and from the area used for the mobilization of special equipment (forklifts/montacargas, hand trucks/carretillas, etc.).
Said delimitation can be done by painting the corresponding stripes on the floor, with the color(s) intended for each type of area. 4. Except for structures that, by their nature, size, difficult mobilization or similar, do not permit it, the goods must be stacked on "racks" or shelves (tarimas) anchored to the floor and designed to support the weight, volume, and height thereof. The racks or shelves must have clearly indicated, in visible places or on the wall, the numbering, the maximum height of the load stability that can be stacked, for the safety of the shelves themselves, the goods, and the people who work. 5. Once the compliance deadlines indicated in the proposal are met, we will return to the site to verify what has been implemented.” The respondent authority conducted an on-site inspection on 16 July 2024, and through the technical report produced as a result of said proceeding, it was recommended to request technical support from the Governing Unit (Unidad de Rectoría) of the Central South Regional Directorate (Dirección Regional Central Sur), for an engineer to assess the structure.
On 24 July 2024, the company presented an extension of the sanitary operating permit (permiso sanitario de funcionamiento), which was resolved through certificate no. CS-ARS-MP-PSF-214-2024. On 19 August 2024, the petitioner expanded the filed complaint, this time for the washing of latrines in the establishment, therefore an inspection was carried out on 20 August of that same year, without being able to corroborate the alleged facts. On 20 August 2024, the respondent authority conducted an inspection together with the engineer from the Regional Directorate, and after evaluating the metal structure of the roofs, it was determined through the technical report of 22 August 2024 that “no imminent danger was detected in the stability of the reported structure that suggests an impact on the health and safety of its users or that of its neighbors,” which was communicated to the petitioner on the 28th of that same month.
On 19 September 2024, in a follow-up visit, it was verified that the company had complied with almost all points of the structure arrangement proposal, with only the placement of signs (rótulos) and records of weekly inspections remaining. On 23 September 2024, the respondent authority conducted a sonic measurement to verify the alleged noise; however, no noise was recorded on site. On 7 October 2024, a visit was made for sonic measurement; however, no noise was recorded. The same situation occurred on 5 and 9 December 2024. On 19 December 2024, the respondent authority conducted the sound level measurement (sonometría) test; however, in the technical report of 7 January 2025, regarding the results of said study, it was concluded: “the generating entity Terra Eventos Colón, HAS NOT exceeded the current regulations. Since according to the result of the sound evaluation, the ambient noise plus that generated by the source DOES NOT EXCEED the 65.0 dB(A), established as a standard in the Reglamento para el Control de la Contaminación por Ruido, measured in the complainant's dwelling (living room), for the daytime period (06:00 hours to 20:00 hours).
Obtaining that the equivalent level reached in the study is 48.4 dB(A). Complying with what is indicated in Article 4, subsection A and Article 14 of the Reglamento para el Control de la Contaminación por Ruido. Decreto Ejecutivo N° 39428-S. (still in force on the date of the sonic measurement).” On that same date, the results were communicated to the appellant. On 8 January 2025, the respondent authority conducted another inspection of the reported company, and verified that the pending points relating to signage (rotulación) and records of weekly inspections had been complied with, therefore the matter concerning the storage and stacking (estibo) of the structures was considered resolved. Such aspects were communicated to the petitioner on 9 January 2025.
In the first place, in relation to the Municipality of Mora, any situation that at this time warrants the intervention of this constitutional jurisdiction is ruled out a priori.
In this regard, it should be noted that it is not for this Chamber, in this summary amparo proceeding, to review whether the land-uses (usos de suelo) and operating permits granted to the company alluded to by the petitioner comply or not with the provisions of ordinary legislation. Thus, if the petitioners are unconformable with such acts, they must formulate the pertinent allegations before the competent ordinary administrative or jurisdictional instances, venues where they can broadly discuss the merits of the matter and assert their claims.
Likewise, this Chamber does not observe that there exists any specific action formulated by the petitioners that is pending resolution before the municipal instance, since in their filing brief they make no direct and specific reference to any particular action, and, for their part, the authorities of the respondent municipality report under oath that no pending actions are registered in relation to the company in question.
Ergo, any action or omission by the respondent municipality susceptible to being declared in this venue is discarded prima facie.
V.On the other hand, regarding the health complaint filed before the Health Governing Area (Área Rectora de Salud) of Mora, it is not observed that said office has incurred in neglect that warrants the intervention of this Chamber.
In this regard, from the list of proven facts in the sub lite, it is verified that, from the beginning of the complaint (in March 2024), the respondent authority carried out various proceedings, such as inspections, issuance of technical criteria, health orders, noise measurements, among others; and, finally, in January of the current year, it determined that the reported company had complied with the issued provisions. Furthermore, it is verified that all actions were duly communicated to the petitioner.
Now, the protected parties must be advised that it is not for this Tribunal to analyze or review the substance of the criteria issued by the health authority in the various technical reports and inspections carried out. Thus, if the respondents are unconformable with the resolutions of the respondent authority regarding the sonic measurements (which determined that the noise generated did not violate the regulations), or regarding the criteria concerning the company's metal structures, they must raise the corresponding allegations before the ordinary instances, as these are disputes of ordinary legality that exceed the competencies of this summary amparo proceeding.
That being the case, no neglect of the filed health complaint is verified, nor any circumstance injurious to fundamental rights attributable to the respondent health authority.
By virtue of the considerations set forth, the appeal is declared without merit.
In environmental matters, it is the criterion of the undersigned that, if there has already been intervention by the Public Administration, its knowledge and resolution corresponds to the contentious-administrative jurisdiction. However, I do proceed to hear the merits of the matter when other rights of the persons affected by the source of contamination are at stake, including health, quality of life, and the right to enjoy a healthy environment free of pollution (Article 50 of the Political Constitution), as is the case here, in which the appellant accuses a lack of attention to a complaint filed for sonic and environmental pollution (contaminación sónica y ambiental) produced by a commercial premises located adjacent to their home, which affects their right to enjoy a healthy, ecologically balanced environment and a decent level of quality of life.
The parties are warned that, if they have provided any paper document, as well as objects or evidence contained in any additional electronic, computer, magnetic, optical, telematic device or one produced by new technologies, these must be withdrawn from the office within a maximum period of 30 business days counted from the notification of this judgment. Otherwise, all material not withdrawn within this period shall be destroyed, as provided in the "Reglamento sobre Expediente Electrónico ante el Poder Judicial", approved by the Full Court in session N°27-11 of 22 August 2011, article XXVI and published in the Judicial Bulletin number 19 of 26 January 2012, as well as in the agreement approved by the Superior Council of the Judiciary, in session N°43-12 held on 3 May 2012, article LXXXI.
Therefore:
The appeal is declared without merit. Judge Salazar Alvarado adds a note.
Fernando Cruz C.
Presidente a.i Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.
Ana Cristina Fernandez A.
Telephones: Telf7268/ (Telf10). Fax: Telf07 / Telf08. Electronic address: www.poder-judicial.go.cr/salaconstitucional. Address: (Dirección09, Dirección05, 100 mts. South of the Perpetuo Socorro church).
It is a faithful copy of the original - Taken from Nexus.PJ on: 08-05-2026 10:29:32.
SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del catorce de marzo de dos mil veinticinco .
Recurso de amparo que se tramita en el expediente nro. 24-035927-0007-CO, interpuesto por Nombre128115, cédula de identidad CED72532 Y Nombre128116, cédula de identidad CED72533, contra el MINISTERIO DE SALUD Y LA MUNICIPALIDAD DE MORA.
Resultando:
Redacta el Magistrado Rueda Leal; y,
Considerando:
Antes de analizar el fondo del asunto debe aclararse que, a partir de la sentencia número 2008-02545 de las 8:55 horas de 22 de febrero de 2008, esta Sala ha remitido a la jurisdicción contencioso administrativa –con algunas excepciones aquellos asuntos en los que se discute si la Administración Pública ha cumplido o no los plazos pautados por la Ley General de la Administración Pública (artículos 261 y 325) o las leyes sectoriales para los procedimientos administrativos especiales, para resolver por acto final un procedimiento administrativo –instruido de oficio o a instancia de parte– o conocer de los recursos administrativos procedentes. Precisamente, en el sub lite, se plantea un supuesto de excepción, pues se está ante una denuncia por afectaciones sanitarias, la cual se acusa que no ha sido resuelta dentro de un plazo razonable. Aclarado el punto, se entra a resolver la situación concreta reclamada en este amparo.
Los recurrentes manifiestan que, hace unos meses, en la propiedad contigua a su casa de habitación se instaló una bodega grande, que sirve para el uso industrial y de almacenamiento de tarimas, así como también para el lavado de vehículos de transporte. Acusa que desde ese momento han tenido problemas de contaminación sónica y ambiental, por lo que el 11 de marzo de 2024 interpusieron la respectiva denuncia ante el Área Rectora de Salud de Mora; empero, tal dependencia no les ha solucionado el problema, pues las órdenes que emiten no se cumplen. Agregan que la Municipalidad de Mora ha ampliado los permisos de uso de suelo, lo cual ha ocasionado que el problema se agrave. Señalan que tal actividad industrial se realiza en contraposición con las regulaciones municipales. Alegan que ninguna de las instituciones recurridas ha solucionado la problemática descrita.
De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos, sea porque así han sido acreditados o bien porque la autoridad recurrida haya omitido referirse a ellos, según lo prevenido en el auto inicial:
En cuanto a la Municipalidad de Mora:
En cuanto al Área Rectora de Salud de Mora:
Dicha delimitación puede hacerse pintando las franjas correspondientes en el piso, con el (o los) colores previstos para cada tipo de área. 4. Salvo para las estructuras que, por su naturaleza, tamaño, difícil movilización o similar, así no lo permitan, las mercancías deben estibarse en los "racks" o estantes (tarimas) anclados al piso y diseñados para soportar el peso, volumen y altura de estas. Los racks o estantes deben tener claramente señalada, en lugares visibles o en la pared, la numeración, la altura máxima de la estabilidad de la carga que es posible apilar, ello para efectos de la seguridad de los mismos estantes. las mercancías y las personas que laboran. 5. Una vez se cumplan los plazos de cumplimiento indicados en la propuesta, se regresará al sitio a verificar lo implementado.”. (Informe de la autoridad recurrida y prueba documental).
En el sub lite, los recurrentes manifiestan que, hace unos meses, en la propiedad contigua a su casa de habitación se instaló una bodega grande, que sirve para el uso industrial y de almacenamiento de tarimas, así como también para el lavado de vehículos de transporte. Acusa que desde ese momento han tenido problemas de contaminación sónica y ambiental, por lo que el 11 de marzo de 2024 interpusieron la respectiva denuncia ante el Área Rectora de Salud de Mora; empero, tal dependencia no les ha solucionado el problema, pues las ordenes que emiten no se cumplen. Agregan que la Municipalidad de Mora ha ampliado los permisos de uso de suelo, lo cual ha ocasionado que el problema se agrave. Señalan que tal actividad industrial se realiza en contraposición con las regulaciones municipales. Alegan que ninguna de las instituciones recurridas ha solucionado la problemática descrita.
Del estudio de los autos se tiene por demostrado, que, la Municipalidad de Mora le otorgó a la empresa “Tres Equipos” los usos de suelo nros. cu-22-373 y cu-24-488, así como la licencia comercial respectiva, y el alcalde accionado afirma que las “licencias comerciales aprobadas se registran activas y emitidas conforme a derecho y a la zonificación según los certificados de usos de suelo aprobados.”. Al 7 de enero de 2025, la municipalidad accionada no registraba ninguna gestión pendiente de resolución respecto de la empresa aludida. El 11 de marzo de 2024, el accionante planteó una denuncia ante el Área Rectora de Salud de Mora en contra de la actividad de la empresa que colinda con su propiedad. El 18 de marzo de 2024, la autoridad accionada efectuó una inspección en el sitio, y la parte denunciante señaló que el problema radicaba en el ruido generado y en el riesgo de caída de las estructuras metálicas que la empresa levantó contiguo a la tapia.
El 8 de abril de 2024, la autoridad accionada realizó una inspección. En dicha diligencia no se constató generación de ruido, pero sí la problemática atinente a las estructuras metálicas y a otros aspectos. Por ello, se emitió la orden sanitaria que se notificó el 22 de abril de 2024, a través de la cual se ordenó que “en el plazo de 20 días hábiles colocar detectores de humo, ubicar rotulación de emergencia, mantener dispensadores con jabón líquido y toallas desechables, contar con botiquín de primeros auxilios, y no estibar estructuras por sobre la tapia para evitar riesgo de caídas.”. El 28 de mayo de 2024, la autoridad accionada efectuó una inspección de cumplimiento de la orden dictada; empero, respecto de las estructuras metálicas, se verificó un “cumplimiento parcial”. En dicha visita no se constató la generación de ruido. Mediante la orden sanitaria nro. CS-ARS-NIP-114-2024 de 30 de mayo de 2024, la autoridad accionada le ordenó a la empresa denunciada: “1.
Obtener un permiso sanitario de funcionamiento que incluya las actividades que se realizan en el predio donde está ubicado Terra Eventos 2. En 15 días hábiles debe presentar una propuesta de almacenamiento y estibaje de estructuras, con plazos de cumplimiento. Para esta propuesta se recomienda contar con la asesoría de un profesional en la materia el cual debe determinar cuáles serán las alturas máximas de las estibas y el retiro a las colindancias, para evitar caídas que puedan causar daños a propiedad privada o a la salud de los trabajadores 3. Se recomienda que los espacios destinados a la estiba y desestiba sean áreas claramente identificadas y diferenciadas de las destinadas al tránsito peatonal de los trabajadores, y del área utilizada para la movilización del equipo especial (montacargas, carretillas etc.). Dicha delimitación puede hacerse pintando las franjas correspondientes en el piso, con el (o los) colores previstos para cada tipo de área. 4.
Salvo para las estructuras que, por su naturaleza, tamaño, difícil movilización o similar, así no lo permitan, las mercancías deben estibarse en los "racks" o estantes (tarimas) anclados al piso y diseñados para soportar el peso, volumen y altura de estas. Los racks o estantes deben tener claramente señalada, en lugares visibles o en la pared, la numeración, la altura máxima de la estabilidad de la carga que es posible apilar, ello para efectos de la seguridad de los mismos estantes. las mercancías y las personas que laboran. 5. Una vez se cumplan los plazos de cumplimiento indicados en la propuesta, se regresará al sitio a verificar lo implementado.”. La autoridad recurrida realizó una inspección en el sitio el 16 de julio de 2024 y mediante el informe técnico realizado como consecuencia de tal diligencia, se recomendó requerir el apoyo técnico de la Unidad de Rectoría de la Dirección Regional Central Sur, para que un ingeniero valorara la estructura.
El 24 de julio de 2024, la empresa presentó una ampliación de permiso sanitario de funcionamiento, la cual se resolvió mediante el certificado nro. CS-ARS-MP-PSF-214-2024. El 19 de agosto de 2024, el accionante amplia la denuncia efectuada, esta vez por el lavado de letrinas en el establecimiento, por lo que se realizó una inspección el 20 de agosto de ese mismo año sin que se pudiese corroborar los hechos acusados. El 20 de agosto de 2024, la autoridad accionada efectuó una inspección junto con el ingeniero de la Dirección Regional, y luego de evaluar la estructura metálica de los techos, se determinó mediante el informe técnico de 22 de agosto de 2024 que “no se detectó peligro inminente en la estabilidad de la estructura denunciada, que sugiera una afectación a la salud y seguridad de los usuarios de esta o la de sus vecinos”, lo cual se le comunicó al accionante el 28 de ese mismo mes.
El 19 de septiembre de 2024, en una visita de seguimiento, se constató que la empresa había cumplido con casi todos puntos de la propuesta de acomodo de las estructuras, solo restando la colocación de rótulos y los registros de las revisiones semanales. El 23 de septiembre de 2024, la autoridad accionada realizó una medición sónica para verificar los ruidos acusados; empero, no se registró ningún ruido en el sitio. El 7 de octubre de 2024 se realizó una visita para la medición sónica; sin embargo, tampoco se registraron ruidos. Misma situación ocurrió los días 5 y 9 de diciembre de 2024. El 19 de diciembre de 2024, la autoridad accionada efectuó la prueba de sonometría; empero, en el informe técnico de 7 de enero de 2025, atinente a los resultados de dicho estudio, se concluyó: “el ente generador Terra Eventos Colón, NO ha sobrepasado la normativa vigente. Ya que acuerdo con el resultado de la evaluación del sonido, el ruido ambiente más el generado por la fuente NO SUPERAN los 65.0 dB(A), establecidos como normativa en el Reglamento para el Control de la Contaminación por Ruido, medidos en la vivienda de la denunciante (sala), para el periodo diurno (06.0 horas a las 20.0 horas).
Obteniendo que el nivel equivalente alcanzado en el estudio es de 48.4 dB(A). Cumpliendo lo indicado en el Artículo 4 inciso A y el artículo 14 del Reglamento para el Control de la Contaminación por Ruido. Decreto Ejecutivo N° 39428-S. (aún vigente a la fecha de la medición sónica).”. En esa misma fecha se comunicaron los resultados al recurrente. El 8 de enero de 2025, la autoridad accionada realizó otra inspección a la empresa denunciada, y constató que se habían cumplido los puntos pendientes relativos a la rotulación y registros de revisiones semanales, por lo que se tuvo como resuelto lo atinente al almacenaje y estibo de las estructuras. Tales aspectos se le comunicaron al accionante el 9 de enero de 2025.
En primer lugar, en relación con la Municipalidad de Mora, a priori se descarta alguna situación que en este momento amerite la intervención de esta jurisdicción constitucional.
Al respecto, conviene advertir que no le corresponde esta Sala, en este proceso sumario de amparo, revisar si los usos de suelo y los permisos de funcionamiento otorgados a la empresa aludida por la parte accionante se ajustan o no a las disposiciones de la legislación ordinaria. De tal manera, si los accionantes se encuentran inconformes con tales actos, deberán formular los alegatos pertinentes ante las instancias administrativas o jurisdiccionales comunes competentes, sedes en las que podrán discutir de forma amplia el fondo del asunto y hacer valer sus pretensiones.
Asimismo, no observa esta Cámara que exista alguna gestión concreta formulada por los accionantes que esté pendiente de resolución ante la instancia municipal, pues en su escrito de interposición no hacen referencia directa y concreta a alguna gestión en particular, y, por su parte, las autoridades de la municipalidad accionada informan bajo juramento que no se registran gestiones pendientes en relación con la empresa de marras.
Ergo, prima facie se descarta alguna acción u omisión de la municipalidad recurrida susceptible de ser declarada en esta vía.
V.Por otro lado, en cuanto a la denuncia sanitaria interpuesta ante el Área Rectora de Salud de Mora, no se observa que dicha dependencia haya incurrido en desatenciones que ameriten la intervención de esta Sala.
Al respecto, de la relación de hechos probados del sub lite se constata que, desde el inicio de la denuncia (en marzo de 2024), la autoridad recurrida realizó distintas diligencias, como inspecciones, emisión de criterios técnicos, órdenes sanitarias, mediciones de ruido, entre otras; y, finalmente, en enero del año en curso determinó que la empresa denunciada había cumplido con las disposiciones dictadas. Además, se constata que todas las actuaciones le fueron debidamente comunicadas a la parte accionante.
Ahora, deben advertir los tutelados que no le corresponde a este Tribunal analizar ni revisar el fondo de los criterios vertidos por la autoridad sanitaria en los distintos informes técnicos y en las inspecciones realizadas. De tal manera, si los accionados se encuentran inconformes con las resoluciones de la autoridad accionada en cuanto a las mediciones sónicas (que determinaron que el ruido generado no incumplía la normativa), o respecto de los criterios atinentes a las estructuras metálicas de la empresa, deberá plantear los alegatos que correspondan ante las instancias comunes, pues se trata de diferendos de legalidad ordinaria que exceden las competencias de este proceso sumario de amparo.
Así las cosas, no se verifica la desatención de la denuncia sanitaria incoada, ni alguna circunstancia lesiva de derechos fundamentales atribuible a la autoridad sanitaria accionada.
En virtud de las consideraciones expuestas, se declara sin lugar el recurso.
En asuntos ambientales, es criterio del suscrito, que si ya ha habido intervención de la Administración Pública, su conocimiento y resolución corresponde a la jurisdicción contenciosa administrativa. No obstante, sí entro a conocer el fondo del asunto cuando están de por medio otros derechos de las personas afectadas por el foco de contaminación, entre ellos, la salud, la calidad de vida y el derecho a gozar de un ambiente sano y libre de contaminación (artículo 50, de la Constitución Política), tal y como sucede en este caso, en el que la parte recurrente acusa la falta de atención a una denuncia presentada por contaminación sónica y ambiental que produce un local comercial que se ubica contiguo a su vivienda, lo cual afecta su derecho a disfrutar de un ambiente sano, ecológicamente equilibrado y de un nivel digno de calidad de vida.
Se previene a las partes que, de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, éstos deberán ser retirados del despacho en un plazo máximo de 30 días hábiles contados a partir de la notificación de esta sentencia. De lo contrario, será destruido todo aquel material que no sea retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en sesión N°27-11 del 22 de agosto del 2011, artículo XXVI y publicado en el Boletín Judicial número 19 del 26 de enero del 2012, así como en el acuerdo aprobado por el Consejo Superior del Poder Judicial, en la sesión N°43-12 celebrada el 3 de mayo del 2012, artículo LXXXI.
Por tanto:
Se declara sin lugar el recurso. El magistrado Salazar Alvarado pone nota.
Fernando Cruz C.
Presidente a.i Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Anamari Garro V.
Ingrid Hess H.
Ana Cristina Fernandez A.
Document not found. Documento no encontrado.