Res. 16396-2025 Sala Constitucional · Sala Constitucional · 30/05/2025
OutcomeResultado
The amparo is denied because the petitioner did not prove that the road condition posed a manifest risk to physical integrity or that there was a fundamental-rights-violating municipal omission, given that the nuisances were temporary, there was no prior complaint by the petitioner, and the situation was already being addressed by the Municipality.Se declara sin lugar el recurso de amparo porque no se demostró que la condición de la vía representara un riesgo manifiesto para la integridad de las personas ni que existiera una omisión municipal lesiva de derechos fundamentales, ya que los inconvenientes eran temporales, no hubo denuncia previa del recurrente y la situación fue atendida por la Municipalidad.
SummaryResumen
The Constitutional Chamber examined an amparo filed by a neighbor of Barrio Panamá in Santa Cruz, Guanacaste, who complained that the storm‑water and sanitary sewer works undertaken by the Municipality since mid‑2024 had left the road in gravel, clogged drains with soil, caused stagnant water, foul odors, dust, respiratory illnesses, and flooding that the project failed to remedy. The Chamber denied the appeal after finding that: (i) the project is a major, phased public work and the nuisances are temporary; (ii) the petitioner did not prove the road was impassable or posed a manifest risk to individuals’ physical integrity – a necessary condition for constitutional intervention in such matters; (iii) no prior complaint by the petitioner to the municipality was shown – the only documented warning came from municipal staff – and by the time the amparo was filed the situation had already been addressed; (iv) the foul odors from wastewater stemmed from illegal discharges, a matter for the Ministry of Health. The Chamber therefore held that there was no municipal omission violating fundamental rights that required its protection.La Sala Constitucional conoció un amparo interpuesto por un vecino del Barrio Panamá en Santa Cruz, Guanacaste, quien reclamó que las obras de alcantarillado pluvial y sanitario ejecutadas por la Municipalidad desde mediados de 2024 dejaron la calle en lastre, obstruyeron caños con tierra, provocaron aguas estancadas, malos olores, polvo y enfermedades respiratorias, e inundaciones que el proyecto no mitigaba. La Sala declaró sin lugar el recurso tras constatar que: (i) el proyecto es una obra mayor planificada por etapas y los inconvenientes son temporales; (ii) no se demostró que la vía fuera intransitable ni que representara un riesgo manifiesto para la integridad física de las personas, requisito sine qua non para la intervención constitucional en este tipo de asuntos; (iii) no se acreditó denuncia previa del recurrente ante la municipalidad sobre los hechos alegados –la única advertencia documentada provino de personal municipal– y para la fecha de interposición del amparo la situación ya había sido atendida; (iv) los malos olores por aguas residuales se originaban en desfogues ilegales que competen al Ministerio de Salud. En consecuencia, la Sala determinó que no existió omisión municipal lesiva de derechos fundamentales que ameritara su tutela.
Key excerptExtracto clave
V.- ON THE SPECIFIC CASE. In the sub lite, the petitioner… files an amparo against the Municipality. He states that since mid‑2024 the Municipality of Santa Cruz “has been conducting a road‑improvement and sewer project on Avenida O, from 27th Street to 3rd Street, specifically in Barrio Panamá.” … From the review of the record it is established that since mid‑2024 the Municipality of Santa Cruz has been carrying out a storm‑water and sanitary sewer construction project on Avenida O, as part of a larger urban‑infrastructure improvement work. … In this light, under the terms set out in the complaint, the Chamber finds no situation that currently warrants its intervention. … The petitioner neither alleged nor proved that the condition of the road in the sector of Barrio Panamá represents any manifest risk to the integrity of individuals. … Furthermore, regarding the clogging of the drains, the record contains no complaint by the petitioner to the municipality about this situation, nor any resulting condition that caused a danger to the integrity of individuals. … Consequently, the appeal is denied.V.- SOBRE EL CASO CONCRETO. En el sub lite, la parte accionante… plantea recurso de amparo en contra de la Municipalidad. Manifiesta que, desde mediados de 2024, la Municipalidad de Santa Cruz “mantiene un arreglo vial de alcantarillado en la Dirección02 desde calle 27 a Dirección03, específicamente en barrio Panamá”. … Del estudio de los autos se tiene por demostrado, que, desde mediados de 2024, la Municipalidad de Santa Cruz ejecuta un proyecto de construcción de alcantarillado pluvial y sanitario en la Dirección02, como parte de una obra mayor de mejoramiento de infraestructura urbana. … Desde este panorama, en los términos planteados en el escrito de interposición, se descarta alguna situación que, en este momento, amerite la intervención de la Sala. … Al respecto, la parte accionante no expuso ni demostró que la condición de la vía del sector del Dirección01 represente algún riesgo manifiesto para la integridad de las personas. … Por otra parte, con respecto a la obstaculización de los caños, no consta en el expediente alguna denuncia de tal situación a municipalidad por parte del recurrente, ni tampoco alguna situación derivada que haya ocasionado algún peligro para la integridad de las personas. … En consecuencia, se declara sin lugar el recurso.
Pull quotesCitas destacadas
"la parte accionante no expuso ni demostró que la condición de la vía del sector del Dirección01 represente algún riesgo manifiesto para la integridad de las personas."
"the petitioner neither alleged nor proved that the condition of the road in the sector of Barrio Panamá represents any manifest risk to the integrity of individuals."
Considerando V
"la parte accionante no expuso ni demostró que la condición de la vía del sector del Dirección01 represente algún riesgo manifiesto para la integridad de las personas."
Considerando V
"no consta en el expediente alguna denuncia de tal situación a municipalidad por parte del recurrente, ni tampoco alguna situación derivada que haya ocasionado algún peligro para la integridad de las personas."
"the record contains no complaint by the petitioner to the municipality about this situation, nor any resulting condition that caused a danger to the integrity of individuals."
Considerando V
"no consta en el expediente alguna denuncia de tal situación a municipalidad por parte del recurrente, ni tampoco alguna situación derivada que haya ocasionado algún peligro para la integridad de las personas."
Considerando V
"no se observa alguna omisión de las autoridades municipales que pueda ser declarada en este proceso."
"the Chamber finds no omission by the municipal authorities that can be declared in this proceeding."
Considerando V
"no se observa alguna omisión de las autoridades municipales que pueda ser declarada en este proceso."
Considerando V
Full documentDocumento completo
File: 25-013158-0007-CO CONSTITUTIONAL CHAMBER OF THE SUPREME COURT OF JUSTICE. San José, at nine twenty hours on the thirtieth of May two thousand twenty-five.
An amparo petition processed in file no. 25-013158-0007-CO, filed by Nombre01, identity card CED02, against the MUNICIPALITY OF SANTA CRUZ.
Whereas:
FINDING EIGHT: based on the information provided in official communication DAM-DGA-SUA-1272024, engineer Didier Monge Jiménez on May 16, 2025, conducted a field inspection at the site of the events with the purpose of verifying and taking the pertinent corrective measures; from the field visit it was concluded that both the storm drains (tragantes) and the curb and gutter (cordón y caño) in the Barrio Panamá sector are clean, this, because jointly with the Dirección de Gestión Ambiental, cleaning work began on May 8, 2025. FINDING NINE: In accordance with what was stated in official communication number DT-0612025 signed by engineer Oscar (sic) Danilo González Mora in his capacity as Tax Director (Director Tributario), from the review conducted within the records of the municipal tax system DECSIS, and in the official institutional email ...01, there is no record that Mr. Nombre01, identification number CED01, has submitted any request directed to the Unidad Técnica de Gestión Vial Municipal during the periods 2024 — 2025.
FINDING TEN: In this regard, from the inspection conducted by engineer Monge Jiménez on May 16, 2025, it was determined that there is no machinery or risk factors that could affect the physical integrity of the officials of the road cleaning crew (cuadrilla de limpieza de vías) of the Dirección de Gestión Ambiental. FINDING ELEVEN: As explained in finding one, the project was planned to be carried out in stages, with the construction of curbs, gutters (caños), and the connection to storm drains (tragantes) pending; therefore, the project has not yet been completed, therefore, the same, among other things, aims to eradicate flooding problems. The first rains dragged garbage and debris that obstructed the catchment points under construction; however, this situation is being addressed by the road cleaning crew, who, 1 to 2 times per week, appear at the site to clean the storm drains (tragantes) and curb and gutter (cordón y caño), and even perform two shifts, in the morning and in the afternoon, conditional on weather conditions permitting.
In addition to the above, on May 7, 2025, the Administration held a working group meeting (mesa de trabajo) with the residents of the Dirección01 sector, specifically, those who live on properties located in the section where the project in question is being developed; a meeting in which the following officials participated on behalf of the Municipality: Mitzy Salazar Morales, Municipal Vice Mayor, Maureen Contreras Arrieta, Municipal Council Member, Didier Monge Jiménez, coordinator of the UTGVM, and the undersigned, Jorge Arturo Alfaro Orias, Municipal Mayor. The working group meeting was held for the purpose of explaining the situation and addressing the following topics: 1. Impact on the main street. 2. Width of the right-of-way. 3. Flooding problems. 4. Waste collection. 5. Construction of sidewalks (aceras). 6. Lack of supervision. 7. Start of the next phase. 8. Wastewater 9. Administrative delays.
It is worth mentioning that the residents who attended the meeting expressed support and backing for the project. (See the minutes of the working group meeting of May 7, 2025). As was demonstrated in the attached technical reports, the project has not yet been completed and the execution of the last stage is pending; therefore, the Administration plans to issue the order to restart the works once the due process is concluded and it is verified that the contractor has complied with the payment of the business license tax (patente comercial), all in compliance with the provisions of the Ley General de la Administración Pública, Ley General de Contratación Pública and its Reglamento. Regarding the cleaning of the storm drains (tragantes), curb and gutter (cordón y caño), the road cleaning crew of the Dirección de Gestión Ambiental performs cleaning weekly, 1 to 2 times, and they have even been willing to redouble efforts and perform cleaning in double shifts, in the morning and in the afternoon.
Based on the foregoing and it being demonstrated that the Administration addressed the situation alleged by the appellant, and commits to continuing to effectively provide the road cleaning service, I respectfully request that the Recurso de Amparo filed against my represented party be declared without merit (…)".
Drafted by Magistrate Garita Navarro; and,
Considering:
Given that the president of the Municipal Council of Santa Cruz failed to respond to the hearing within the deadline set by this Court in the resolution processing the sub lite, the appeal is resolved in accordance with article 45 of the Ley de la Jurisdicción Constitucional and taking into consideration the evidentiary elements contained in the record.
The appellant, who claims to be a resident of Dirección01 of Santa Cruz, files a recurso de amparo against the Municipality. He states that, since mid-2024, the Municipality of Santa Cruz "is maintaining a sewerage road project on Dirección02 from 27th Street to Dirección03, specifically in Dirección01". He mentions that the company in charge removed the asphalt to proceed with the works, so the street was left as ballast (lastre) and "obstructing the gutters (caños) with earth". He asserts that the obstruction of gutters leaves stagnant water along the avenue's path, which emanates bad odors, since the "wastewater from the houses falls directly into the gutters". He maintains that the ballast streets generate dust that causes lung diseases and allergies to the affected population, because the road is traveled by trucks, buses, and pedestrians. He argues that the coordinator of UTGVM of the Municipality of Santa Cruz, through official communication DAM-DGA-SUA-127-2024, of April 1, 2025, referred to the transfer to the UTGVM of the request to clean curb and gutter (cordón y caño) in Barrio Panamá.
He adds that the project extends from "Dirección08 to Dirección05, Santa Cruz center". He relates that on March 27, 2025, server Randal Hernández Jaén, on the occasion of an inspection, verified several sectors "in the community of Dirección01" with the curb and gutter (cordón y caño) obstructed by "earth and ballast material due to the earthworks (movimientos de tierras) carried out with the machinery". He notes that, due to the above, a "formal request is submitted to the Unidad Técnica de Gestión Vial Municipal, to remove or unblock curb and gutter (cordón y caño) from the sectors obstructed with material". He explains that with the first rains it has been seen that the streets flood and that the sewerage project does not fulfill its function. He asks that "there be a prompt repair of the mentioned streets".
Of importance for the decision of this matter, the following facts are deemed duly proven:
a. Since mid-2024, the Municipality of Santa Cruz has been executing a stormwater and sanitary sewer construction project on Dirección02, as part of a larger urban infrastructure improvement project. The first stage (phase 1,2,3) of the project included the installation of the sewer system for the evacuation of stormwater. The fourth and final phase includes the construction of the remaining urban infrastructure such as sidewalks (aceras), pavement structure and wearing course (carpeta de rodamiento), curb and gutter (cordón y caño). (Report from the coordinator of the Departamento de Gestión Vial of the Municipality of Santa Cruz).
b. The works in the Dirección01 sector are part of the larger urban infrastructure improvement project corresponding to public tender No. 2021LN-000002-0021000001 called "Contracting of delivery according to demand for public works, maintenance and road improvement in Santa Cruz", which was awarded to Constructora Herrera S.A. (Report from the mayor of Santa Cruz).
c. The coordinator of Servicios Urbanos Ambientales of the Dirección de Gestión Ambiental of the Municipality of Santa Cruz, through official communication DAM-DGA-SUA-127-2024 (sic) of April 1, 2025 addressed to the coordinator of the UTGVM of that local government, indicated: "Receive a cordial greeting. The Unidad Técnica de Gestión Vial has been carrying out works on the street of Dirección01, the project that goes from the bridge of Rio En medio to Almacenes El Colono S.A. Santa Cruz center. (...) Mr. Randal Hernández Jaén reports that he conducted an inspection on Thursday, March 27, 2025, where he verifies several sectors in the Barrio Panamá community with the curb and gutter (cordón y caño) obstructed, with earth or ballast material due to the earthworks (movimientos de tierra) carried out with the machinery. (...) Due to the above, a formal request is submitted to the Unidad Técnica de Gestión Vial Municipal, to remove or unblock curb and gutter (cordón y caño) from the sectors obstructed with material, the sanitation and road officials cannot be exposed to risk due to occupational health issues and especially due to restricted access at the construction site, we must monitor their physical integrity and especially their health". (Evidence provided by the appellant).
d. The coordinator of the Departamento de Gestión Vial of the Municipality of Santa Cruz, in the report dated May 16, 2025 (official communication DDUR-DGV-COORD-0280-2025), stated: "The first stage included the installation of the storm sewer, which required the removal of the existing asphalt layer where needed. The removal of asphalt was necessary and planned as part of the construction phase. This technical procedure is carried out to replace the existing structures and facilitate the placement of the sewer pipe. (...) • currently there is an asphalt seal (sello asfaltico) on half of the length where the wearing course was completely removed. • in the second half, only the part where the storm pipe was located was excavated, which covers approximately one third of the width of the roadway, the rest is still on asphalt pavement (carpeta asfáltica). (...) During the earthworks (movimiento de tierras) stage, granular material was used as a provisional surface, which is common in works of this type.
The partial obstruction of some gutters was identified and documented in official communication DAM-DGA-SUA-127-2024, issued by the Departamento de Gestión Vial, which includes photographic documentation of their status as of April 1, 2025. This situation is () being addressed since May 8. The removal of asphalt was necessary to carry out the stormwater evacuation works; therefore, the street was temporarily covered with granular material. It is clarified that the project includes the replacement of the asphalt pavement (carpeta asfáltica) in its final phase. Additionally, it is important to note that the current ponding is partly due to the fact that, at the express request of the residents, vehicle accesses were built in ballast in front of each property, which has caused water damming by partially obstructing the natural passage where the curbs and gutters (caños), still under construction and to be installed in the future, are located.
This situation is temporary and will be corrected with the final coupling of the storm drainage system. (...) As a contingency, this department has already included the cleaning of storm drains (tragantes) in its work schedule. At the same time, the corresponding signage has been placed by the company in charge of this phase, because the construction of the curb and gutter (cordón y caño) and sidewalks (aceras) is still in process. However, these measures must be monitored since provisional devices are used which are removed by passersby. Furthermore, it is indicated that wastewater discharge onto the road has been found, which, under current legislation, this practice is not permitted, for which coordination will be made with the Ministry of Health (ministerio de salud) (sic) to carry out the respective notifications. (...) During the dry season, being in the construction phase, it was not possible to make additional improvements.
However, in the month of January, a temporary improvement was carried out to mitigate dust, which is maintained to date. It is indicated that currently there is an asphalt seal on half of the length and in the second half, only the part where the storm pipe was located was excavated, which makes up approximately one third of the width of the roadway; the rest is still on asphalt pavement (carpeta asfáltica). It is worth noting that during the current rainy season and the completion of the construction, the presence of dust will be absent. (...) In official communication DAM-DGA-SUA-127-2024... reference is made to the transfer to UTGVM of the request for unblocking curb and gutter (cordón y caño)... This department received said official communication by email on April 30, 2025. It is reported that the request was included in the schedule of the maintenance crew (cuadrilla de mantenimiento), in accordance with the programming carried out in response to the number of requests received from both the administration and the taxpayers.
However, due to the number of activities scheduled by the municipal crew, since May 8, the environment department (departamento de ambiente) has collaborated in cleaning gutters (caños) and storm drains (tragantes), which, according to a field inspection, were obstructed by the garbage carried by the stormwater runoff from the southern and western sector of the center of Santa Cruz during the initial heavy rains of the rainy season that were of greater intensity. As a contingency, it is confirmed that this intervention was included as additional in case it was required on an emergency basis with the maintenance crew of the road management department (departamento de gestión vial). (...) Based on official communication DAM-DGA-SUA-127-2024, issued by the Departamento de Gestión Vial, the mentioned obstructions are observed and accompanied by photographic documentation of the current state of the gutters in the sector.
Said inspection was key to adopting corrective measures. As a result of that, and jointly with the Department of Environment (Departamento de Ambiente), cleaning of the sector began on May 8, 2025, taking advantage of the construction pause between the third and fourth phase. During this period there was no machinery or occupational health risks for the workers". (Report from the coordinator of the Departamento de Gestión Vial of the Municipality of Santa Cruz).
e. The Departamento de Gestión Vial of the Municipality of Santa Cruz, in the annex to official communication DDUR-DGV-COORD-0280-2025 of May 16, 2025, recorded: "ANNEX Report CURRENT AS OF MAY 16, 2025 Inspection: Physical state of the road infrastructure improvement and storm drainage works sector, Barrio Panamá (...) Observations and Considerations: As of May 8, municipal crews began constant cleaning and monitoring to clean the catchment and drainage systems even without connection to the collector infrastructure (Curb and gutter [Cordones y caño])". (Evidence provided by the coordinator of the Departamento de Gestión Vial of the Municipality of Santa Cruz).
f. On May 16, 2025, engineer Didier Monge Jiménez conducted an inspection at the site, in which he concluded that "both the storm drains (tragantes) and the curb and gutter (cordón y caño) of the Barrio Panamá sector are clean, this, because jointly with the Dirección de Gestión Ambiental, cleaning work began on May 8, 2025". (Report from the mayor of Santa Cruz).
g. The tax director of the Municipality of Santa Cruz, in official communication DT-061-2025 of May 20, 2025, made known: "After consulting the official who currently holds the position of receptionist at the Service Platform (Plataforma de Servicios), I confirm that there are no records in the municipal tax system Decsis, nor in the official institutional email ...01, indicating that Mr. Nombre01, identification number CED01, has submitted any type of documentation addressed to the Unidad Técnica de Gestión Vial Municipal during the years 2024 or 2025". (Evidence provided by the mayor of Santa Cruz).
Of importance for the resolution of this matter, it is deemed not proven that the road in the Dirección09 sector presents any condition that represents a manifest risk to the integrity of persons, or that it is impassable.
In the sub lite, the appellant, who claims to be a resident of Dirección09, files a recurso de amparo against the Municipality. He states that, since mid-2024, the Municipality of Santa Cruz "is maintaining a sewerage road project on Dirección02 from 27th Street to Dirección03, specifically in Barrio Panamá". He mentions that the company in charge removed the asphalt to proceed with the works, so the street was left as ballast (lastre) and "obstructing the gutters (caños) with earth". He asserts that the obstruction of gutters leaves stagnant water along the avenue's path, which emanates bad odors, since the "wastewater from the houses falls directly into the gutters". He maintains that the ballast streets generate dust that causes lung diseases and allergies to the affected population, because the road is traveled by trucks, buses, and pedestrians. He argues that the coordinator of UTGVM of the Municipality of Santa Cruz, through official communication DAM-DGA-SUA-127-2024, of April 1, 2025, referred to the transfer to the UTGVM of the request to clean curb and gutter (cordón y caño) in Barrio Panamá.
He adds that the project extends from "Dirección08 to Dirección05, Santa Cruz center". He relates that on March 27, 2025, server Randal Hernández Jaén, on the occasion of an inspection, verified several sectors "in the community of Dirección01" with the curb and gutter (cordón y caño) obstructed by "earth and ballast material due to the earthworks (movimientos de tierras) carried out with the machinery". He notes that, due to the above, a "formal request is submitted to the Unidad Técnica de Gestión Vial Municipal, to remove or unblock curb and gutter (cordón y caño) from the sectors obstructed with material". He explains that with the first rains it has been seen that the streets flood and that the sewerage project does not fulfill its function. He asks that "there be a prompt repair of the mentioned streets".
From the study of the record, it is proven that, since mid-2024, the Municipality of Santa Cruz has been executing a stormwater and sanitary sewer construction project on Dirección02, as part of a larger urban infrastructure improvement project. The first stage (phase 1,2,3) of the project included the installation of the sewer system for the evacuation of stormwater. The fourth and final phase includes the construction of the remaining urban infrastructure such as sidewalks (aceras), pavement structure and wearing course (carpeta de rodamiento), curb and gutter (cordón y caño). The works in the Dirección01 sector are part of the larger urban infrastructure improvement project corresponding to public tender No. 2021LN-000002-0021000001 called "Contracting of delivery according to demand for public works, maintenance and road improvement in Santa Cruz", which was awarded to Constructora Herrera S.A. The coordinator of Servicios Urbanos Ambientales of the Dirección de Gestión Ambiental of the Municipality of Santa Cruz, through official communication DAM-DGA-SUA-127-2024 (sic) of April 1, 2025 addressed to the coordinator of the UTGVM of that local government, indicated: "Receive a cordial greeting.
The Unidad Técnica de Gestión Vial has been carrying out works on the street of Dirección01, the project that goes from the Dirección04 bridge to Almacenes El Colono S.A. Santa Cruz center. (...) Mr. Randal Hernández Jaén reports that he conducted an inspection on Thursday, March 27, 2025, where he verifies several sectors in the Barrio Panamá community with the curb and gutter (cordón y caño) obstructed, with earth or ballast material due to the earthworks (movimientos de tierra) carried out with the machinery. (...) Due to the above, a formal request is submitted to the Unidad Técnica de Gestión Vial Municipal, to remove or unblock curb and gutter (cordón y caño) from the sectors obstructed with material, the sanitation and road officials cannot be exposed to risk due to occupational health issues and especially due to restricted access at the construction site, we must monitor their physical integrity and especially their health".
The coordinator of the Departamento de Gestión Vial of the Municipality of Santa Cruz, in the report dated May 16, 2025 (official communication DDUR-DGV-COORD-0280-2025), stated: "The first stage included the installation of the storm sewer, which required the removal of the existing asphalt layer where needed. The removal of asphalt was necessary and planned as part of the construction phase. This technical procedure is carried out to replace the existing structures and facilitate the placement of the sewer pipe. (...) • currently there is an asphalt seal (sello asfaltico) on half of the length where the wearing course was completely removed. • in the second half, only the part where the storm pipe was located was excavated, which covers approximately one third of the width of the roadway, the rest is still on asphalt pavement (carpeta asfáltica). (...) During the earthworks (movimiento de tierras) stage, granular material was used as a provisional surface, which is common in works of this type.
The partial obstruction of some gutters was identified and documented in official communication DAM-DGA-SUA-127-2024, issued by the Departamento de Gestión Vial, which includes photographic documentation of their status as of April 1, 2025. This situation is () being addressed since May 8. The removal of asphalt was necessary to carry out the stormwater evacuation works; therefore, the street was temporarily covered with granular material. It is clarified that the project includes the replacement of the asphalt pavement (carpeta asfáltica) in its final phase. Additionally, it is important to note that the current ponding is partly due to the fact that, at the express request of the residents, vehicle accesses were built in ballast in front of each property, which has caused water damming by partially obstructing the natural passage where the curbs and gutters (caños), still under construction and to be installed in the future, are located.
This situation is temporary and will be corrected with the final coupling of the storm drainage system. (...) As a contingency, this department has already included the cleaning of storm drains (tragantes) in its work schedule. At the same time, the corresponding signage has been placed by the company in charge of this phase, because the construction of the curb and gutter (cordón y caño) and sidewalks (aceras) is still in process. However, these measures must be monitored since provisional devices are used which are removed by passersby. Furthermore, it is indicated that wastewater discharge onto the road has been found, which, under current legislation, this practice is not permitted, for which coordination will be made with the Ministry of Health (ministerio de salud) (sic) to carry out the respective notifications. (...) During the dry season, being in the construction phase, it was not possible to make additional improvements.
However, in the month of January, a temporary improvement was carried out to mitigate dust, which is maintained to date. It is indicated that currently there is an asphalt seal on half of the length and in the second half, only the part where the storm pipe was located was excavated, which makes up approximately one third of the width of the roadway; the rest is still on asphalt pavement (carpeta asfáltica). It is worth noting that during the current rainy season and the completion of the construction, the presence of dust will be absent. (...) In official communication DAM-DGA-SUA-127-2024... reference is made to the transfer to UTGVM of the request for unblocking curb and gutter (cordón y caño)... This department received said official communication by email on April 30, 2025. It is reported that the request was included in the schedule of the maintenance crew (cuadrilla de mantenimiento), in accordance with the programming carried out in response to the number of requests received from both the administration and the taxpayers.
However, due to the number of activities scheduled by the municipal crew, since May 8, the environment department (departamento de ambiente) has collaborated in cleaning gutters (caños) and storm drains (tragantes), which, according to a field inspection, were obstructed by the garbage carried by the stormwater runoff from the southern and western sector of the center of Santa Cruz during the initial heavy rains of the rainy season that were of greater intensity. As a contingency, it is confirmed that this intervention was included as additional in case it was required on an emergency basis with the maintenance crew of the road management department (departamento de gestión vial). (...) Based on official communication DAM-DGA-SUA-127-2024, issued by the Departamento de Gestión Vial, the mentioned obstructions are observed and accompanied by photographic documentation of the current state of the gutters in the sector.
Said inspection was key to adopting corrective measures. As a result of that, and jointly with the Department of Environment (Departamento de Ambiente), cleaning of the sector began on May 8, 2025, taking advantage of the construction pause between the third and fourth phase. During this period there was no machinery or occupational health risks for the workers". The Departamento de Gestión Vial of the Municipality of Santa Cruz, in the annex to official communication DDUR-DGV-COORD-0280-2025 of May 16, 2025, recorded: "ANNEX Report CURRENT AS OF MAY 16, 2025 Inspection: Physical state of the road infrastructure improvement and storm drainage works sector, Dirección01 (...) Observations and Considerations: As of May 8, municipal crews began constant cleaning and monitoring to clean the catchment and drainage systems even without connection to the collector infrastructure (Curb and gutter [Cordones y caño])".
On May 16, 2025, engineer Didier Monge Jiménez conducted an inspection at the site, in which he concluded that "both the storm drains (tragantes) and the curb and gutter (cordón y caño) of the Dirección01 sector are clean, this, because jointly with the Dirección de Gestión Ambiental, cleaning work began on May 8, 2025". The tax director of the Municipality of Santa Cruz, in official communication DT-061-2025 of May 20, 2025, made known: "After consulting the official who currently holds the position of receptionist at the Service Platform (Plataforma de Servicios), I confirm that there are no records in the municipal tax system Decsis, nor in the official institutional email ...01, indicating that Mr. Nombre01, identification number CED01, has submitted any type of documentation addressed to the Unidad Técnica de Gestión Vial Municipal during the years 2024 or 2025".
From this panorama, in the terms set forth in the filing brief, any situation that, at this moment, warrants the intervention of the Chamber is dismissed.
In this regard, the appellant neither set forth nor demonstrated that the condition of the road in the Dirección01 sector represents a manifest risk to the integrity of persons.
Now, with respect to the removal of the asphalt, the appellant neither alleged nor proved that the road was impassable. Furthermore, even though he mentioned that the street was left as ballast and generates dust that causes lung diseases and allergies to the affected population, it is no less true that in the filing brief he did not set forth any concrete impact on specific persons (accompanied by the respective evidence) that had also been previously alleged before the municipal authorities, so prima facie no omission susceptible of being declared is observed. Ergo, taking into consideration the particularities of the specific case, it is not for this jurisdiction to issue any order regarding the state of the road. In any case, it was not only reported that the removal of the asphalt layer is temporary, but that the part where it is absent (corresponding to half of the length) covers only one third of the roadway; indeed, it was indicated that the project includes the replacement of the asphalt pavement (carpeta asfáltica).
On the other hand, with respect to the obstruction of the gutters, there is no record in the file of any complaint of such situation to the municipality by the appellant, nor any derived situation that has caused any danger to the integrity of persons. Note that no reference was made to the dates of the floods nor to events derived from them that, due to their magnitude, generate any risk that makes the protection of the Right of the Constitution necessary in this jurisdiction. Rather, it is verified that the situation was noted by local government personnel on April 1, 2025, and that recourse was made to amparo on the following May 12, meaning an excessive period for addressing the situation had not elapsed. In fact, without prejudice to the foregoing, the respondent authorities stated that they had begun cleaning work on May 8 of this year and that on the 16th of that month the area was already clean.
Likewise, even though bad odors from stagnant water are alleged, no complaint of that situation before any competent authority is accredited.
In any event, in official communication dated May 16, 2025, the municipality stated that wastewater discharges were found on the road, and therefore coordination will be undertaken with the Ministry of Health. Hence, for the purposes of this proceeding, no omission by the municipal authorities is observed that could be declared in this proceeding.
Consequently, the appeal is declared without merit.
As a matter of principle, I consider that cases related to the action or inaction of the Public Administration regarding the repair, construction, modification, or demolition of any infrastructure work should be dismissed, because such omission constitutes a matter of legality, the discussion of which belongs to the ordinary jurisdiction, where the interested party can debate their disagreements more broadly. However, when that administrative conduct (whether by omission or not) results in a violation of other fundamental rights protected in this constitutional jurisdiction, or affects groups considered vulnerable, I do proceed to hear the merits of the matter, as this situation constitutes an exception to my position on this subject, as is the case here, where the appellant indicates that unfinished works by the Municipality of Santa Cruz cause problems of stagnant water with foul odors and, furthermore, dust that causes pulmonary diseases and allergies to the affected population.
The parties are warned that, if they have submitted any paper document or objects or evidence contained in any additional electronic, computer, magnetic, optical, telematic, or new-technology device, these must be withdrawn within a maximum period of 30 business days, counted from the notification of this judgment. It is warned that any material not collected within that period will be destroyed, based on the "Reglamento sobre Expediente Electrónico ante el Poder Judicial" (approved by the Corte Plena in article XXVI of session no. 27-11 of August 22, 2011, and published in Boletín Judicial no. 19 of January 26, 2012) and article LXXXI of the session of the Consejo Superior del Poder Judicial no. 43-12 of May 3, 2012.
Therefore:
The appeal is declared without merit. Judge Salazar Alvarado adds a note.
Fernando Castillo V.
Fernando Cruz C.
Luis Fdo. Salazar A.
Jorge Araya G.
Ingrid Hess H.
Ronald Salazar Murillo Jose Roberto Garita N.
SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del treinta de mayo de dos mil veinticinco .
Recurso de amparo que se tramita en el expediente nro. 25-013158-0007-CO, interpuesto por Nombre01, cédula de identidad CED02, contra la MUNICIPALIDAD DE SANTA CRUZ.
Resultando:
Redacta el Magistrado Garita Navarro; y,
Considerando:
En vista de que el presidente del Concejo Municipal de Santa Cruz omitió contestar la audiencia dentro del plazo fijado por este Tribunal en la resolución de curso del sub lite, se procede a resolver el recurso de acuerdo con el artículo 45 de la Ley de la Jurisdicción Constitucional y tomando en consideración los elementos probatorios que constan en los autos.
La parte accionante, quien dice ser vecino de Dirección01 de Santa Cruz, plantea recurso de amparo en contra de la Municipalidad. Manifiesta que, desde mediados de 2024, la Municipalidad de Santa Cruz “mantiene un arreglo vial de alcantarillado en la Dirección02 desde calle 27 a Dirección03, específicamente en Dirección01”. Menciona que la empresa encargada removió el asfalto para proceder con las obras, por lo que la calle quedó de lastre y “obstaculizando los caños con tierra”. Asevera que la obstaculización de caños deja aguas estancadas en el trayecto de la avenida, lo que emana malos olores, pues las “aguas residuales de las casas caen directamente a los caños”. Sostiene que las calles de lastre generan polvo que provoca enfermedades pulmonares y alergias a la población afectada, por cuanto la vía es transitada por camiones, buses y peatones. Arguye que el coordinador de UTGVM de la Municipalidad de Santa Cruz, por oficio DAM-DGA-SUA-127-2024, del 1 ̊ de abril del 2025, hizo referencia al traslado a la UTGVM de la solicitud de limpiar cordón y caño en el barrió Panamá.
Añade que el proyecto se extiende desde “el Dirección08 hasta Dirección05, Santa Cruz centro”. Refiere que el 27 de marzo de 2025, servidor Randal Hernández Jaén, con ocasión de una inspección, verificó varios sectores “en la comunidad de Dirección01” con el cordón y caño obstruido por “material de tierra y lastre debido a los movimientos de tierras realizados con la maquinaria”. Acota que, debido a lo anterior, se “presenta formal solicitud a la Unidad Técnica de Gestión Vial Municipal, para que retire o destaque cordón y caño de los sectores obstruidos con material”. Explica que con las primeras lluvias se ha visto que las calles se inundan y que el proyecto de alcantarillado no cumple la función. Pide que “haya pronto arreglo de las calles mencionadas”.
De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos:
a. Desde mediados de 2024, la Municipalidad de Santa Cruz ejecuta un proyecto de construcción de alcantarillado pluvial y sanitario en la Dirección02, como parte de una obra mayor de mejoramiento de infraestructura urbana. La primera etapa (fase 1,2,3) del proyecto contempló la instalación del sistema de alcantarillado para la evacuación de aguas pluviales. En la cuarta y última fase se contempla la construcción de lo faltante de infraestructura urbana como aceras, estructura de pavimento y carpeta de rodamiento, cordón y caño. (Informe del coordinador del Departamento de Gestión Vial de la Municipalidad de Santa Cruz).
b. Las obras en el sector de Dirección01 forman parte de la obra mayor de mejoramiento de infraestructura urbana correspondiente a la licitación pública nro. 2021LN-000002-0021000001 denominada “Contratación de entrega según demanda para obra pública, mantenimiento y mejoramiento vial en Santa Cruz”, que fue adjudicada a Constructora Herrera S.A. (Informe del alcalde de Santa Cruz).
c. La coordinadora de Servicios Urbanos Ambientales de la Dirección de Gestión Ambiental de la Municipalidad de Santa Cruz, mediante oficio DAM-DGA-SUA-127-2024 (sic) del 1 ̊ de abril de 2025 dirigido al coordinador de la UTGVM de ese gobierno local, señaló: “Reciban un cordial saludo. La Unidad Técnica de Gestión Vial ha venido realizando trabajos en la calle de Dirección01, el proyecto que va desde el puente de Rio En medio hasta Almacenes El Colono S.A. Santa Cruz centro. (…) Informa el señor Randal Hernández Jaén, que realizó inspección el día jueves 27 de marzo del 2025, donde verifica varios sectores en la comunidad de Barrio Panamá con el cordón y caño obstruidos, con el material de tierra o lastre debido los movimientos de tierra realizados con la maquinaria. (…) Debido a lo anterior, se presenta formal solicitud a la Unidad Técnica de Gestión Vial Municipal, para que retire o destaque cordón y caño de los sectores obstruidos con material, los funcionarios de aseo y vías no pueden exponerse ante riesgo por tema de salud ocupacional y en especial por el acceso restringido en el sitio de la obra en construcción, debemos vigilar su integridad física y especialmente su salud”. (Prueba aportada por la parte recurrente).
d. El coordinador del Departamento de Gestión Vial de la Municipalidad de Santa Cruz, en el informe fechado 16 de mayo de 2025 (oficio DDUR-DGV-COORD-0280-2025), manifestó: “La primera etapa incluyó la instalación del alcantarillado pluvial, lo que requirió la remoción de la capa asfáltica existente donde se requería. La remoción de asfalto fue necesaria y planificada como parte de la fase constructiva. Este procedimiento técnico se realiza para sustituir las estructuras existentes y facilitar la colocación de la tubería de alcantarillado. (…) • actualmente se cuenta con sello asfaltico en la mitad de la longitud donde se removió en su totalidad la carpeta. • en la segunda mitad solo se excavó la parte donde se ubicó la tubería pluvial, la cual abarca aproximadamente un tercio del ancho de la calzada, el resto aún se encuentra en carpeta asfáltica. (…) Durante la etapa de movimiento de tierras se utilizó material granular como superficie provisional, lo cual es habitual en obras de este tipo.
La obstrucción parcial de algunos caños fue identificada y documentada en el oficio DAM-DGA-SUA-127-2024, emitido por el Departamento de Gestión Vial, el cual incluye documentación fotográfica de su estado al 01 de abril de 2025. Esta situación esta () siendo atendida desde el 08 de mayo. La remoción del asfalto era necesaria para realizar las obras de evacuación de aguas pluviales, por lo tanto, temporalmente la calle quedó en material granular. Se aclara que el proyecto contempla la reposición de la carpeta asfáltica en su fase final. Adicionalmente, es importante señalar que los estancamientos actuales se deben en parte a que, por solicitud expresa de los vecinos, se construyeron accesos vehiculares en lastre frente a cada propiedad, lo cual ha provocado represamientos de agua al obstruir parcialmente el paso natural por donde se ubican los cordones y caños aún en construcción y futuramente a ubicar.
Esta situación es temporal y se corregirá con el acoplamiento final del sistema de drenaje pluvial. (…) Como contingencia este departamento ya ha incluido en su cronograma de trabajo la limpieza de tragantes. Al mismo tiempo, se han colocado las señalizaciones correspondientes por parte de la empresa encargada de esta fase, debido a que aún se encuentra en proceso la construcción de del cordón y caño y aceras. No obstante, estas diligencias se deben estar monitoreando ya que se utilizan dispositivos provisionales los cuales son quitados por los transeúntes. Por otra parte se indica que se han encontrado desfogue de aguas residuales al via (sic), lo que, bajo la legislación actual no es permitido esta práctica, para lo que se coordinará con él (sic) ministerio de salud (sic) para que realicen las notificaciones respectivas. (…) Durante la época seca, al encontrarse en fase constructiva, no fue posible realizar mejoras adicionales.
No obstante, en el mes de enero se ejecutó un mejoramiento temporal para mitigar el polvo, el cual se mantiene hasta la fecha. Se indica que actualmente se cuenta con sello asfaltico en la mitad de la longitud y en la segunda mitad solo se excavo (sic) la parte donde se ubicó la tubería pluvial, la cual conforma aproximadamente un tercio del ancho de la calzada, el resto aún se encuentra en carpeta asfáltica. Cabe acotar, durante la presente época lluviosa y el termino de ejecución de la construcción la presencia de polvo será ausente. (…) En oficio DAM-DGA-SUA-127-2024... se hace referencia a traslado a UTGVM solicitud de destaque en cordón y caño... Este departamento recibió dicho oficio por correo electrónico el 30 de abril de 2025. Se informa que la solicitud fue contemplada dentro del cronograma de la cuadrilla de mantenimiento, conforme a la programación que se realiza en atención a la cantidad de solicitudes recibidas tanto de la administración como de los contribuyentes.
No obstante, por la cantidad de actividades programadas por la cuadrilla municipal, desde el día 8 de mayo por parte del departamento de ambiente ha colaborado en la limpieza de caños y tragantes lo que según inspección de campo se al obstruido por la basura que acarreó la escorrentía pluvial del sector sur y oeste del centro de Santa Cruz durante los aguaceros iniciales de la época de lluvia que fueron de mayor intensidad. Como contingencia se confirma que esta intervención está se incluyó como adicional en caso de requerirse de forma emergente con de cuadrilla de mantenimiento del departamento de gestión vial. (…) Con base en el oficio DAM-DGA-SUA-127-2024, emitido por el Departamento de Gestión Vial se observa obstrucciones mencionadas y acompañado de documentación fotográfica del estado actual de los caños del sector. Dicha inspección fue clave para adoptar medidas correctivas. A raíz de eso, y en conjunto con el Departamento de Ambiente, se inició la limpieza del sector desde el 8 de mayo de 2025, aprovechando la pausa constructiva entre la tercera y cuarta fase. Durante este periodo no hubo maquinaria ni riesgos de salud ocupacional para los trabajadores”. (Informe del coordinador del Departamento de Gestión Vial de la Municipalidad de Santa Cruz).
e. El Departamento de Gestión Vial de la Municipalidad de Santa Cruz, en el anexo del oficio DDUR-DGV-COORD-0280-2025 de 16 de mayo de 2025, consignó: “ANEXO Informe ACTUAL AL 16 DE MAYO 2025 Inspección: Estado físico sector de obras mejoramiento infraestructura Vial y drenaje pluvial Barrio Panamá (…) Observaciones y Consideraciones: A partir del 8 de mayo y cuadrillas municipales iniciaron limpieza constante y monitoreo para realizar limpieza de los sistemas de captación y drenaje aun sin conectar a la infraestructura de colectora (Cordones y caño)”. (Prueba aportada por el coordinador del Departamento de Gestión Vial de la Municipalidad de Santa Cruz).
f. El 16 de mayo de 2025, el ingeniero Didier Monge Jiménez realizó una inspección en el lugar, en la cual concluyó que “tanto los tragantes como el cordón y caño del sector de Barrio Panamá están limpios, estos, debido a que de manera mancomunada con la Dirección de Gestión Ambiental se iniciaron los trabajos de limpieza desde el 08 de mayo de 2025”. (Informe del alcalde de Santa Cruz).
g. El director tributario de la Municipalidad de Santa Cruz, en el oficio DT-061-2025 de 20 de mayo de 2025, hizo saber: “Luego de realizada la consulta al funcionario que actualmente ocupa el puesto de recepcionista en la Plataforma de Servicios, le confirmo que no se encuentran registros en el sistema tributario municipal Decsis, ni en el correo institucional oficial ...01, que indiquen que el señor Nombre01, cédula CED01, haya presentado algún tipo de documentación dirigida a la Unidad Técnica de Gestión Vial Municipal durante los años 2024 o 2025”. (Prueba aportada por el alcalde de Santa Cruz).
De importancia para la resolución de este asunto, se estima como no demostrado que la vía en el sector de Dirección09 presente alguna condición que represente algún riesgo manifiesto para la integridad de las personas, o bien, que sea intransitable.
En el sub lite, la parte accionante, quien dice ser vecino de Dirección09, plantea recurso de amparo en contra de la Municipalidad. Manifiesta que, desde mediados de 2024, la Municipalidad de Santa Cruz “mantiene un arreglo vial de alcantarillado en la Dirección02 desde calle 27 a Dirección03, específicamente en barrio Panamá”. Menciona que la empresa encargada removió el asfalto para proceder con las obras, por lo que la calle quedó de lastre y “obstaculizando los caños con tierra”. Asevera que la obstaculización de caños deja aguas estancadas en el trayecto de la avenida, lo que emana malos olores, pues las “aguas residuales de las casas caen directamente a los caños”. Sostiene que las calles de lastre generan polvo que provoca enfermedades pulmonares y alergias a la población afectada, por cuanto la vía es transitada por camiones, buses y peatones. Arguye que el coordinador de UTGVM de la Municipalidad de Santa Cruz, por oficio DAM-DGA-SUA-127-2024, del 1 ̊ de abril del 2025, hizo referencia al traslado a la UTGVM de la solicitud de limpiar cordón y caño en el barrió Panamá.
Añade que el proyecto se extiende desde “el Dirección08 hasta Dirección05, Santa Cruz centro”. Refiere que el 27 de marzo de 2025, servidor Randal Hernández Jaén, con ocasión de una inspección, verificó varios sectores “en la comunidad de Dirección01” con el cordón y caño obstruido por “material de tierra y lastre debido a los movimientos de tierras realizados con la maquinaria”. Acota que, debido a lo anterior, se “presenta formal solicitud a la Unidad Técnica de Gestión Vial Municipal, para que retire o destaque cordón y caño de los sectores obstruidos con material”. Explica que con las primeras lluvias se ha visto que las calles se inundan y que el proyecto de alcantarillado no cumple la función. Pide que “haya pronto arreglo de las calles mencionadas”.
Del estudio de los autos se tiene por demostrado, que, desde mediados de 2024, la Municipalidad de Santa Cruz ejecuta un proyecto de construcción de alcantarillado pluvial y sanitario en la Dirección02, como parte de una obra mayor de mejoramiento de infraestructura urbana. La primera etapa (fase 1,2,3) del proyecto contempló la instalación del sistema de alcantarillado para la evacuación de aguas pluviales. En la cuarta y última fase se contempla la construcción de lo faltante de infraestructura urbana como aceras, estructura de pavimento y carpeta de rodamiento, cordón y caño. Las obras en el sector de Dirección01 forman parte de la obra mayor de mejoramiento de infraestructura urbana correspondiente a la licitación pública nro. 2021LN-000002-0021000001 denominada “Contratación de entrega según demanda para obra pública, mantenimiento y mejoramiento vial en Santa Cruz”, que fue adjudicada a Constructora Herrera S.A. La coordinadora de Servicios Urbanos Ambientales de la Dirección de Gestión Ambiental de la Municipalidad de Santa Cruz, mediante oficio DAM-DGA-SUA-127-2024 (sic) del 1 ̊ de abril de 2025 dirigido al coordinador de la UTGVM de ese gobierno local, señaló: “Reciban un cordial saludo.
La Unidad Técnica de Gestión Vial ha venido realizando trabajos en la calle de Dirección01, el proyecto que va desde el puente de Dirección04 hasta Almacenes El Colono S.A. Santa Cruz centro. (…) Informa el señor Randal Hernández Jaén, que realizó inspección el día jueves 27 de marzo del 2025, donde verifica varios sectores en la comunidad de Barrio Panamá con el cordón y caño obstruidos, con el material de tierra o lastre debido los movimientos de tierra realizados con la maquinaria. (…) Debido a lo anterior, se presenta formal solicitud a la Unidad Técnica de Gestión Vial Municipal, para que retire o destaque cordón y caño de los sectores obstruidos con material, los funcionarios de aseo y vías no pueden exponerse ante riesgo por tema de salud ocupacional y en especial por el acceso restringido en el sitio de la obra en construcción, debemos vigilar su integridad física y especialmente su salud”.
El coordinador del Departamento de Gestión Vial de la Municipalidad de Santa Cruz, en el informe fechado 16 de mayo de 2025 (oficio DDUR-DGV-COORD-0280-2025), manifestó: “La primera etapa incluyó la instalación del alcantarillado pluvial, lo que requirió la remoción de la capa asfáltica existente donde se requería. La remoción de asfalto fue necesaria y planificada como parte de la fase constructiva. Este procedimiento técnico se realiza para sustituir las estructuras existentes y facilitar la colocación de la tubería de alcantarillado. (…) • actualmente se cuenta con sello asfaltico en la mitad de la longitud donde se removió en su totalidad la carpeta. • en la segunda mitad solo se excavó la parte donde se ubicó la tubería pluvial, la cual abarca aproximadamente un tercio del ancho de la calzada, el resto aún se encuentra en carpeta asfáltica. (…) Durante la etapa de movimiento de tierras se utilizó material granular como superficie provisional, lo cual es habitual en obras de este tipo.
La obstrucción parcial de algunos caños fue identificada y documentada en el oficio DAM-DGA-SUA-127-2024, emitido por el Departamento de Gestión Vial, el cual incluye documentación fotográfica de su estado al 01 de abril de 2025. Esta situación esta () siendo atendida desde el 08 de mayo. La remoción del asfalto era necesaria para realizar las obras de evacuación de aguas pluviales, por lo tanto, temporalmente la calle quedó en material granular. Se aclara que el proyecto contempla la reposición de la carpeta asfáltica en su fase final. Adicionalmente, es importante señalar que los estancamientos actuales se deben en parte a que, por solicitud expresa de los vecinos, se construyeron accesos vehiculares en lastre frente a cada propiedad, lo cual ha provocado represamientos de agua al obstruir parcialmente el paso natural por donde se ubican los cordones y caños aún en construcción y futuramente a ubicar.
Esta situación es temporal y se corregirá con el acoplamiento final del sistema de drenaje pluvial. (…) Como contingencia este departamento ya ha incluido en su cronograma de trabajo la limpieza de tragantes. Al mismo tiempo, se han colocado las señalizaciones correspondientes por parte de la empresa encargada de esta fase, debido a que aún se encuentra en proceso la construcción de del cordón y caño y aceras. No obstante, estas diligencias se deben estar monitoreando ya que se utilizan dispositivos provisionales los cuales son quitados por los transeúntes. Por otra parte se indica que se han encontrado desfogue de aguas residuales al via (sic), lo que, bajo la legislación actual no es permitido esta práctica, para lo que se coordinará con él (sic) ministerio de salud (sic) para que realicen las notificaciones respectivas. (…) Durante la época seca, al encontrarse en fase constructiva, no fue posible realizar mejoras adicionales.
No obstante, en el mes de enero se ejecutó un mejoramiento temporal para mitigar el polvo, el cual se mantiene hasta la fecha. Se indica que actualmente se cuenta con sello asfaltico en la mitad de la longitud y en la segunda mitad solo se excavo (sic) la parte donde se ubicó la tubería pluvial, la cual conforma aproximadamente un tercio del ancho de la calzada, el resto aún se encuentra en carpeta asfáltica. Cabe acotar, durante la presente época lluviosa y el termino de ejecución de la construcción la presencia de polvo será ausente. (…) En oficio DAM-DGA-SUA-127-2024... se hace referencia a traslado a UTGVM solicitud de destaque en cordón y caño... Este departamento recibió dicho oficio por correo electrónico el 30 de abril de 2025. Se informa que la solicitud fue contemplada dentro del cronograma de la cuadrilla de mantenimiento, conforme a la programación que se realiza en atención a la cantidad de solicitudes recibidas tanto de la administración como de los contribuyentes.
No obstante, por la cantidad de actividades programadas por la cuadrilla municipal, desde el día 8 de mayo por parte del departamento de ambiente ha colaborado en la limpieza de caños y tragantes lo que según inspección de campo se al obstruido por la basura que acarreó la escorrentía pluvial del sector sur y oeste del centro de Santa Cruz durante los aguaceros iniciales de la época de lluvia que fueron de mayor intensidad. Como contingencia se confirma que esta intervención está se incluyó como adicional en caso de requerirse de forma emergente con de cuadrilla de mantenimiento del departamento de gestión vial. (…) Con base en el oficio DAM-DGA-SUA-127-2024, emitido por el Departamento de Gestión Vial se observa obstrucciones mencionadas y acompañado de documentación fotográfica del estado actual de los caños del sector. Dicha inspección fue clave para adoptar medidas correctivas. A raíz de eso, y en conjunto con el Departamento de Ambiente, se inició la limpieza del sector desde el 8 de mayo de 2025, aprovechando la pausa constructiva entre la tercera y cuarta fase.
Durante este periodo no hubo maquinaria ni riesgos de salud ocupacional para los trabajadores”. El Departamento de Gestión Vial de la Municipalidad de Santa Cruz, en el anexo del oficio DDUR-DGV-COORD-0280-2025 de 16 de mayo de 2025, consignó: “ANEXO Informe ACTUAL AL 16 DE MAYO 2025 Inspección: Estado físico sector de obras mejoramiento infraestructura Vial y drenaje pluvial Dirección01 (…) Observaciones y Consideraciones: A partir del 8 de mayo y cuadrillas municipales iniciaron limpieza constante y monitoreo para realizar limpieza de los sistemas de captación y drenaje aun sin conectar a la infraestructura de colectora (Cordones y caño)”. El 16 de mayo de 2025, el ingeniero Didier Monge Jiménez realizó una inspección en el lugar, en la cual concluyó que “tanto los tragantes como el cordón y caño del sector de Dirección01 están limpios, estos, debido a que de manera mancomunada con la Dirección de Gestión Ambiental se iniciaron los trabajos de limpieza desde el 08 de mayo de 2025”.
El director tributario de la Municipalidad de Santa Cruz, en el oficio DT-061-2025 de 20 de mayo de 2025, hizo saber: “Luego de realizada la consulta al funcionario que actualmente ocupa el puesto de recepcionista en la Plataforma de Servicios, le confirmo que no se encuentran registros en el sistema tributario municipal Decsis, ni en el correo institucional oficial ...01, que indiquen que el señor Nombre01, cédula CED01, haya presentado algún tipo de documentación dirigida a la Unidad Técnica de Gestión Vial Municipal durante los años 2024 o 2025”.
Desde este panorama, en los términos planteados en el escrito de interposición, se descarta alguna situación que, en este momento, amerite la intervención de la Sala.
Al respecto, la parte accionante no expuso ni demostró que la condición de la vía del sector del Dirección01 represente algún riesgo manifiesto para la integridad de las personas.
Ahora, con respecto a la remoción del asfalto, el accionante no alegó ni probó que la vía fuera intransitable. Además, aun cuando mencionó que la calle quedó de lastre y genera polvo que provoca enfermedades pulmonares y alergias a la población afectada, no menos cierto es que en el escrito de interposición no expuso alguna afectación concreta de personas individualizadas (acompañada de la prueba respectiva) que haya sido también previamente alegada ante las autoridades municipales, por lo que prima facie no se observa alguna omisión susceptible de ser declarada. Ergo, tomando en consideración las particularidades del caso concreto, no compete a esta jurisdicción emitir alguna orden con respecto al estado de la vía. En todo caso, no solo se informó que el retiro de la capa asfáltica es temporal, sino que la parte en la que no hay (correspondiente a la mitad de la longitud) abarca solo un tercio de la calzada; incluso, se indicó que el proyecto contempla la reposición de la carpeta asfáltica.
Por otra parte, con respecto a la obstaculización de los caños, no consta en el expediente alguna denuncia de tal situación a municipalidad por parte del recurrente, ni tampoco alguna situación derivada que haya ocasionado algún peligro para la integridad de las personas. Nótese que no se hizo alusión a las fechas de las inundaciones ni tampoco a hechos derivados de estas que, por su magnitud, generen algún riesgo que haga necesaria la tutela del Derecho de la Constitución en esta jurisdicción. Más bien, se constata que la situación fue advertida por personal del gobierno local el 1 de abril de 2025 y que se acudió en amparo el 12 de mayo siguiente, es decir, no había transcurrido un plazo excesivo para la atención de la situación. De hecho, sin perjuicio de lo anterior, las autoridades accionadas manifestaron haber iniciado labores de limpieza el 8 de mayo de este año y que el 16 de ese mes ya se encontraba limpia la zona.
Asimismo, si bien se alegan malos olores por las aguas estancadas, no se acredita alguna denuncia de esa situación ante alguna autoridad competente. En todo caso, en oficio de 16 de mayo de 2025, la municipalidad consignó que se encontraron desfogues de aguas residuales en la vía, por lo que se va a coordinar con el Ministerio de Salud. De ahí que, a los efectos de este proceso, no se observa alguna omisión de las autoridades municipales que pueda ser declarada en este proceso.
En consecuencia, se declara sin lugar el recurso.
En tesis de principio, considero que los casos relacionados con la actividad o inactividad de la Administración Pública en la reparación, construcción, modificación o demolición de cualquier obra de infraestructura, deben ser desestimados, por constituir, esa omisión, un tema de legalidad, cuya discusión corresponde a la jurisdicción ordinaria, ante la cual la persona interesada puede debatir, con mayor amplitud, sus disconformidades. Sin embargo, cuando de aquella conducta administrativa (omisiva o no) se derive alguna violación a otros derechos fundamentales tutelados en esta jurisdicción constitucional, o se afecten grupos considerados vulnerables, sí entro a conocer el fondo del asunto, por constituir esta situación una excepción a mi posición en esta materia, tal y como sucede en este caso, en que la parte recurrente indica que unos trabajos no finalizados por la Municipalidad de Santa Cruz, genera problemas de aguas estancadas con malos olores y, además, polvo que provoca enfermedades pulmonares y alergias a la población afectada.
Se previene a las partes que, de haber aportado algún documento en papel u objetos o pruebas contenidos en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, estos deberán ser retirados en un plazo máximo de 30 días hábiles, contado a partir de la notificación de esta sentencia. Se advierte que será destruido todo material que no sea recogido dentro de ese lapso, con base en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial" (aprobado por la Corte Plena en el artículo XXVI de la sesión nro. 27-11 de 22 de agosto de 2011 y publicado en el Boletín Judicial nro. 19 del 26 de enero de 2012) y en el artículo LXXXI de la sesión del Consejo Superior del Poder Judicial nro. 43-12 de 3 de mayo de 2012.
Por tanto:
Se declara sin lugar el recurso. El Magistrado Salazar Alvarado pone nota.