Res. 30943-2023 Sala Constitucional · Sala Constitucional · 28/11/2023
OutcomeResultado
The Constitutional Chamber dismisses the noncompliance motion as premature because the deadline to solve the water shortage expires on May 8, 2024.La Sala Constitucional declara sin lugar la gestión de incumplimiento por prematura, ya que el plazo otorgado para solucionar el desabastecimiento de agua vence el 8 de mayo de 2024.
SummaryResumen
The Constitutional Chamber dismisses a subsequent noncompliance motion filed by a Curridabat resident against the authorities convicted in judgment No. 2019-012231. The movant alleges that officials have failed to comply with the order to resolve the water shortage problem in the Miravalles I urban project. However, the Chamber verifies that by interlocutory resolution No. 2021-015951 the deadline to solve this issue was extended until May 8, 2024, and that such deadline had not yet expired at the time of the filing. Hence, the Chamber dismisses the motion as premature, without addressing the merits of the allegations regarding lack of action or negligence by the authorities. The parties are warned to retrieve any documents submitted in paper or electronic devices. The decision underscores that the deadline remains in effect and that the orders must be complied with under penalty of criminal and administrative sanctions provided in Article 71 of the Constitutional Jurisdiction Law.La Sala Constitucional rechaza una gestión posterior de incumplimiento planteada por un munícipe de Curridabat contra las autoridades condenadas en la sentencia N° 2019-012231. El recurrente alega que los funcionarios no han cumplido con la orden de resolver el problema de desabastecimiento de agua en el proyecto urbanístico Miravalles I. Sin embargo, la Sala verifica que mediante resolución interlocutoria N° 2021-015951 se amplió el plazo para solucionar esa problemática hasta el 8 de mayo de 2024, y que dicho plazo aún no ha vencido al momento de la presentación de la gestión. Por lo tanto, la Sala declara sin lugar la gestión por prematura, sin entrar al fondo de las alegaciones sobre falta de acción o negligencia de las autoridades. Se previene a las partes sobre el retiro de documentación aportada en papel o dispositivos electrónicos. La resolución subraya que el plazo sigue vigente y que las órdenes deben cumplirse bajo apercibimiento de las sanciones penales y administrativas previstas en el artículo 71 de la Ley de la Jurisdicción Constitucional.
Key excerptExtracto clave
That is, note that the deadline to solve the water shortage issue in the Miravalles I urban project does not expire until May 8, 2024, so it is premature at this moment to refer to any disobedience regarding that point. Therefore, the motion is dismissed.Es decir, nótese que el plazo para solucionar la problemática del desabastecimiento de agua en el proyecto urbanístico Miravalles I no fenece sino hasta el 8 de mayo de 2024, por lo que resulta prematuro referirse en este momento a alguna desobediencia en relación con ese extremo. Ergo, no ha lugar a la gestión formulada.
Pull quotesCitas destacadas
"el plazo para solucionar la problemática del desabastecimiento de agua en el proyecto urbanístico Miravalles I no fenece sino hasta el 8 de mayo de 2024, por lo que resulta prematuro referirse en este momento a alguna desobediencia en relación con ese extremo."
"the deadline to solve the water shortage issue in the Miravalles I urban project does not expire until May 8, 2024, so it is premature at this moment to refer to any disobedience regarding that point."
Considerando IV
"el plazo para solucionar la problemática del desabastecimiento de agua en el proyecto urbanístico Miravalles I no fenece sino hasta el 8 de mayo de 2024, por lo que resulta prematuro referirse en este momento a alguna desobediencia en relación con ese extremo."
Considerando IV
"Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico... deberán ser retirados del despacho en un plazo máximo de 30 días hábiles."
"The parties are warned that if any paper document, as well as objects or evidence contained in any additional electronic device... they must be retrieved from the office within a maximum of 30 business days."
Considerando V
"Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico... deberán ser retirados del despacho en un plazo máximo de 30 días hábiles."
Considerando V
Full documentDocumento completo
File: 19-003040-0007-CO CONSTITUTIONAL CHAMBER OF THE SUPREME COURT OF JUSTICE. San José, at nine hours fifty-five minutes on the twenty-eighth of November two thousand twenty-three.
Subsequent proceeding filed by Nombre9697 , in relation to resolution no. 2019012231 of 9:30 a.m. on July 5, 2019.
Whereas:
Drafted by Judge Alvarado Paniagua; and,
Considering:
I.Regarding what was resolved in the principal judgment of this process. In judgment no. 2019012231 of 9:30 a.m. on July 5, 2019, the following was ordered, as relevant:
“Therefore:
The appeal is granted. Hernán Masís Quesada, Alicia Borja Rodríguez, Yamileth Astorga Espeleta, and Manuel Rosales Caamaño, in their order President of the Municipal Council of Curridabat, Mayor of Curridabat, Executive President of the Costa Rican Institute of Aqueducts and Sewers, and Director of the Curridabat Health Area, or whoever holds those positions, are ordered, within the non-extendable period of 3 days, to issue the respective orders within the framework of their competence, so that the Inter-institutional Commission formed by the Ombudsman's Office (Defensoría de los Habitantes) for addressing the water shortage problem in the Miravalles I urban development project is reactivated, so that in a coordinated manner the necessary actions are executed that definitively resolve said problem, within a maximum period of 24 months from the notification of this judgment. Likewise, Alicia Borja Rodríguez and Manuel Rosales Caamaño, in their order Mayor of Curridabat and Director of the Curridabat Health Area, or whoever holds those positions, are ordered to immediately coordinate and adopt the necessary measures and execute the respective evictions (desalojos) of those families who are in risk zones verified since 2009 and currently are at risk to their physical integrity; and within 6 months coordinate and resolve what pertains to the complaint filed by the petitioner on May 28, 2018, in relation to the sewage problem, and notify him of the resolution.
The foregoing under warning that, based on the provisions of Article 71 of the Constitutional Jurisdiction Law, imprisonment of three months to two years, or a fine of twenty to sixty days, will be imposed on anyone who receives an order that must be complied with or enforced, issued in an amparo appeal, and does not comply with it or does not enforce it, provided that the crime is not more severely punished. The Municipality of Curridabat, the State, and the Costa Rican Institute of Aqueducts and Sewers are ordered to pay the costs, damages, and losses caused by the facts that serve as the basis for this declaration, which will be settled in the execution of the judgment of the administrative contentious jurisdiction. Notify this resolution personally to Hernán Masís Quesada, Alicia Borja Rodríguez, Yamileth Astorga Espeleta, and Manuel Rosales Caamaño, in their order President of the Municipal Council of Curridabat, Mayor of Curridabat, Executive President of the Costa Rican Institute of Aqueducts and Sewers, and Director of the Curridabat Health Area, or whoever holds those positions; as well as to the Executive President of IMAS, the Minister of Housing and Human Settlements, and the Ombudsman. Judge Salazar Alvarado makes a note, regarding the sewage issue”. (The underlining is not from the original).
Said judgment was notified on July 9, 2019, to the Executive President of IMAS, on July 10, 2019, to the Minister of Housing and Human Settlements, on July 11, 2019, to the Mayor of Curridabat, the Director of the Curridabat Health Area, and the Ombudsman, on July 16, 2019, to the President of the Municipal Council of Curridabat, and on July 19, 2019, to the Executive President of ICAA.
“III.- Regarding the non-compliance proceeding. In this case, from the complete reading of the subsequent proceeding, it is clear that the protected party accuses disobedience of what was ordered in judgment no. 2019-012231 of 9:30 a.m. on July 5, 2019, solely regarding the following: “(…) Alicia Borja Rodríguez and Manuel Rosales Caamaño, in their order Mayor of Curridabat and Director of the Curridabat Health Area, or whoever holds those positions, are ordered (…) within 6 months coordinate and resolve what pertains to the complaint filed by the petitioner on May 28, 2018, in relation to the sewage problem, and notify him of the resolution”. In that sense, the protected party claims that Alicia Borja Rodríguez and Manuel Rosales Caamaño, in their order Mayor of Curridabat and Director of the Curridabat Health Area, were ordered within 6 months to coordinate and resolve what pertains to the complaint filed by the petitioner on May 28, 2018, in relation to the sewage problem, and notify him of the resolution, and he further explains that said complaint was made due to a series of threats to the population, given that there is a sewage flow at the curb level at Dirección1319 in Tirrases; however, as of the date of filing this proceeding, he has no evidence that the Health Area has issued any sanitary order, nor that the respondent authorities have addressed the stated problem, thus he accuses partial non-compliance with the principal judgment of the process, as the six-month period to solve the sewage problem in the area has already elapsed. He requests that the judgment be executed regarding the partial non-compliance and asks that the technical justifications issued by the respondent authorities not be accepted.
In this regard, the Mayor of Curridabat indicated that, regarding the complaint filed by the amparo beneficiary on May 28, 2018, regarding the sewage issue, the following actions were carried out: “• Information required to begin identifying the problem was managed and shared, including a topographic survey, registry information, and delimitation of the site, as well as a map of the area of interest with the storm drain pipes (lines) inventoried by the Road Management Directorate in that sector that flow towards the water body under analysis, nodes corresponding to wells, manholes, or other types of elements that join the pipe segments, water bodies, and properties. • The initial inspections to detect contamination problems and the accompaniment of the Municipality of Curridabat to the Ministry of Health occurred between November and December 2019 on four different dates with four dye tests performed on average per date, across homes and businesses.
In relation to this last item developed, it is important to consider that the Municipality requires the intervention of the Ministry of Health to verify from which property or lot the inadequate connection comes and proceed with notification. Likewise, and according to information from this Ministry, more fieldwork is still required; however, for 2020 it has not been possible to carry it out. At the beginning of this year, official letter MC-PMA 0104-01-2020 was submitted to the Ministry of Health, referring to a strategy for addressing diffuse contamination in watercourses in the canton of Curridabat, with special emphasis on resolution no. 2019012231 of the Constitutional Chamber of the Supreme Court of Justice, for which meeting dates were proposed to discuss the issues and progress on the case, but these dates had to be canceled by the Ministry of Health entity, as its priority at this time is attending to urgencies regarding public service and the consequent availability of human resources, in compliance with Executive Decree No. 42221-S and Ministerial guidelines in response to the health alert due to COVID-19, for which reason they informed this municipal corporation that it was not possible to attend the convened meetings, since the resources of that organizational unit are focused on attending to the health alert.
The mentioned dye tests require entry into private property and the application of the fluorescein reagent in systems suspected of potentially being connected to the storm drain system; this therefore requires interaction between municipal officials, health personnel, inhabitants of the dwelling, and owners or collaborators of the visited business. The foregoing is in order to correct infractions and alterations to natural resources; however, it is important to mention that we comply with the directives issued by the Health governing body, regarding the necessary sanitary measures to reduce contagion and protect both officials, their families, and the community”.
On the other hand, regarding the 6-month period granted to address the sewage problem, the Acting Director of the Curridabat Health Area indicated that “coordination was carried out with the Municipality of Curridabat, so that it would provide support to this Health Area with the resources it has in cartographic and registry matters, to provide a survey of the area of influence of the reported sewage problem. (…) A sketch was provided with the location of the properties to be intervened, with information on the owner's name, establishing a total of 62 properties. With this information and with the human and material resources available in this Health Area, a schedule was established for travel to the area, in order to carry out the respective dye tests in each identified dwelling, to determine the management and disposal of sewage. The dye testing process began in November 2019; this process is slow, given that said test can only be performed on one dwelling at a time, the result must be waited for and verified at points of difficult access.
The dye testing process has advanced approximately 32%, given that due to the national emergency declared by Executive Decree No. 42227-MP-S, “Declares a state of national emergency throughout the territory of the Republic of Costa Rica, due to the health emergency situation caused by the COVID-19 disease”, it has been necessary to prioritize attention to this emergency”.
Now, while the authorities presented various actions taken in order to solve the sewage problem complained of by the petitioner and, furthermore, justified that due to the covid 19 pandemic they have not been able to fully comply with what was ordered by the Chamber, it is no less true that the six-month period granted expired in January 2020, that is, before the issuance of decree no. 42227-MP-S “Declares a state of national emergency throughout the territory of the Republic of Costa Rica, due to the health emergency situation caused by the COVID-19 disease” of March 16, 2020, by the Executive Branch. In addition, such authorities did not formulate an extension request within the granted period, nor any compliance schedule, and, in any case, the evidence does not show that the petitioner was notified.
In light of the foregoing, this Tribunal deems the non-compliance with what was ordered in judgment no. 2019-012231 of 9:30 a.m. on July 5, 2019, to be proven, solely regarding the Mayor of Curridabat and the Director of the Curridabat Health Area, in the terms indicated above. However, as the persons currently holding the positions of Mayor of Curridabat and Director of the Curridabat Health Area are not the same ones to whom judgment no. 2019-012231 of 9:30 a.m. on July 5, 2019, was notified, it is appropriate to order the compliance with what was ordered therein to the current representatives, as will be provided in the operative part of this resolution. (…)
Therefore:
The non-compliance proceeding is accepted. Jimmy Cruz Jiménez and Melissa Arguedas Arce, in their order Mayor of Curridabat and Director of the Curridabat Health Area, or whoever holds such positions, are ordered to comply with what was ordered in judgment no. 2019-012231 of 9:30 a.m. on July 5, 2019, regarding that “within 6 months coordinate and resolve what pertains to the complaint filed by the petitioner on May 28, 2018, in relation to the sewage problem, and notify him of the resolution”. The respondents are warned that, in accordance with Article 71 of the Constitutional Jurisdiction Law, imprisonment of three months to two years, or a fine of twenty to sixty days, will be imposed on anyone who receives an order that must be complied with or enforced, issued in an amparo appeal, and does not comply with it or does not enforce it, provided that the crime is not more severely punished. The filed joinder is declared inadmissible.
Notify this resolution to Jimmy Cruz Jiménez and Melissa Arguedas Arce, in their respective capacities as Mayor of Curridabat and Director of the Curridabat Health Area, or to whoever holds such positions, personally.” This pronouncement was notified to the respondent authorities on October 26, 2020.
“The noncompliance proceeding is partially granted, only in relation to what was ordered in judgment No. 2019-012231 of 9:30 a.m. on July 5, 2019, corresponding to the requirement that ‘within a period of 6 months coordinate and resolve the matter of the complaint filed by the petitioner on May 28, 2018, in relation to the sewage problem, and notify him of the resolution.’ Jimmy Cruz Jiménez and Melissa Arguedas Arce are ordered, in their respective capacities as Mayor of Curridabat and Acting Director of the Curridabat Health Area, or whoever holds such positions, to comply with the provisions of judgment No. 2019-012231 of 9:30 a.m. on July 5, 2019, in relation to the requirement that ‘within a period of 6 months coordinate and resolve the matter of the complaint filed by the petitioner on May 28, 2018, in relation to the sewage problem, and notify him of the resolution.’ The foregoing under warning of ordering certified copies of the case file to be sent to the Public Prosecutor's Office against the Mayor of Curridabat and the opening of an administrative procedure against the Acting Director of the Curridabat Health Area if they fail to do so.
Furthermore, the deadline granted in judgment No. 2019-012231 of 9:30 a.m. on July 5, 2019, is extended, only with respect to ‘addressing the water shortage problem in the Miravalles I residential development, so that the necessary actions are carried out in a coordinated manner to definitively resolve said problem, within a maximum period of 24 months,’ and consequently, Tomás Martínez Baldares, Jimmy Cruz Jiménez, Óscar Mora Altamirano, and Johanna Chavarría Víquez, in their respective capacities as Executive President of the Costa Rican Institute of Aqueducts and Sewers (Instituto Costarricense de Acueductos y Alcantarillados), Mayor of Curridabat, President of the Curridabat Municipal Council, and Acting Director of the Curridabat Health Area, or whoever holds those positions, are granted a deadline until May 8, 2024, solely to resolve the water shortage problem in the Miravalles I residential development, in accordance with the terms ordered in judgment No. 2019-012231 of 9:30 a.m. on July 5, 2019.
In all other respects, the motions filed are denied. Notify this resolution to Jimmy Cruz Jiménez and Melissa Arguedas Arce, in their respective capacities as Mayor of Curridabat and Acting Director of the Curridabat Health Area, or to whoever holds such positions, personally.”
IV.Regarding the noncompliance proceeding. In this case, from a comprehensive reading of the petitioner’s brief, it can be inferred that what is alleged is disobedience of what was ordered in judgment No. 2019012231 of 9:30 a.m. on July 5, 2019, specifically in relation to the water supply problem of the Miravalles I residential development, as he maintains that based on the information he has requested from the respondents, it appears that they have taken no action to resolve this situation.
In this regard, it should be noted that in the aforementioned interlocutory resolution No. 2021015951 of 9:20 a.m. on July 16, 2021, it was resolved: “. Furthermore, the deadline granted in judgment No. 2019-012231 of 9:30 a.m. on July 5, 2019, is extended, only with respect to ‘addressing the water shortage problem in the Miravalles I residential development, so that the necessary actions are carried out in a coordinated manner to definitively resolve said problem, within a maximum period of 24 months,’ and consequently, Tomás Martínez Baldares, Jimmy Cruz Jiménez, Óscar Mora Altamirano, and Johanna Chavarría Víquez, in their respective capacities as Executive President of the Costa Rican Institute of Aqueducts and Sewers (Instituto Costarricense de Acueductos y Alcantarillados), Mayor of Curridabat, President of the Curridabat Municipal Council, and Acting Director of the Curridabat Health Area, or whoever holds those positions, are granted a deadline until May 8, 2024, solely to resolve the water shortage problem in the Miravalles I residential development, in accordance with the terms ordered in judgment No. 2019-012231 of 9:30 a.m. on July 5, 2019.” That is to say, note that the deadline to resolve the issue of the water shortage in the Miravalles I residential development does not expire until May 8, 2024, making it premature to refer at this time to any disobedience regarding that point.
Ergo, the motion filed is denied.
V.Documentation provided to the case file. The parties are warned that if any paper documents, as well as objects or evidence contained in any additional electronic, computer, magnetic, optical, telematic, or new-technology device have been provided, they must be withdrawn from the office within a maximum period of 30 business days counted from the notification of this judgment. Otherwise, all material not withdrawn within this period will be destroyed, as provided in the “Regulation on Electronic Case Files before the Judicial Branch” (Reglamento sobre Expediente Electrónico ante el Poder Judicial), approved by the Full Court in session No. 27-11 of August 22, 2011, article XXVI and published in Judicial Bulletin number 19 of January 26, 2012, as well as in the agreement approved by the Superior Council of the Judicial Branch, in session No. 43-12 held on May 3, 2012, article LXXXI.
Therefore:
The motion filed is denied.
Name137 V.
President Name152 C.
Luis Fdo. Salazar A.
Name9451 G.
Name5659 H.
Name6376 B.
Alexandra Alvarado P.
SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas cincuenta y cinco minutos del veintiocho de noviembre de dos mil veintitres .
Gestión posterior planteada por Nombre9697 , en relación con la resolución nro. 2019012231 de las 9:30 horas del 5 de julio de 2019.
Resultando:
Redacta la Magistrada Alvarado Paniagua; y,
Considerando:
I.Sobre lo resuelto en la sentencia principal de este proceso. En la sentencia nro. 2019012231 de las 9:30 horas del 5 de julio de 2019, se dispuso, en lo que interesa, lo siguiente:
“Por tanto:
Se declara con lugar el recurso. Se ordena a Hernán Masís Quesada, Alicia Borja Rodríguez, Yamileth Astorga Espeleta y a Manuel Rosales Caamaño, por su orden Presidente del Concejo Municipal de Curridabat, Alcaldesa de Curridabat, Presidenta Ejecutiva del Instituto Costarricense de Acueductos y Alcantarillado y Director del Área Rectora de Salud de Curridabat, o a quienes ocupen esos cargos, que en el plazo improrrogable de 3 días, emitan las órdenes respectivas en el marco de su competencia, a fin de que se reactive la Comisión Interinstitucional conformada por la Defensoría de los Habitantes para la atención del problema de desabastecimiento de agua en el proyecto urbanístico Miravalles I, para que en forma coordinada se ejecuten las acciones necesarias que resuelvan de forma definitiva dicha problemática, en el plazo máximo de 24 meses a partir de la notificación de esta sentencia. Asimismo, se ordena a Alicia Borja Rodríguez y a Manuel Rosales Caamaño, por su orden Alcaldesa de Curridabat y Director del Área Rectora de Salud de Curridabat, o a quienes ocupen esos cargos, que de inmediato coordinen y adopten las medidas necesarias y ejecuten los desalojos respectivos de aquellas familias que se encuentran en las zonas de riesgo constatadas desde el año 2009 y que actualmente mantengan en riesgo su integridad física; y que en el plazo de 6 meses coordinen y resuelvan lo relativo a la denuncia planteada por el recurrente el 28 de mayo de 2018, en relación con el problema de aguas negras, y le notifiquen lo resuelto.
Lo anterior bajo apercibimiento que, con base en lo establecido en el artículo 71 de la Ley de la Jurisdicción Constitucional, se impondrá prisión de tres meses a dos años, o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada en un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado. Se condena a la Municipalidad de Curridabat, al Estado y al Instituto Costarricense de Acueductos y Alcantarillados, al pago de las costas, daños y perjuicios causados con los hechos que sirven de base a esta declaratoria, los que se liquidarán en ejecución de sentencia de lo contencioso administrativo. Notifíquese esta resolución en forma personal a Hernán Masís Quesada, Alicia Borja Rodríguez, Yamileth Astorga Espeleta y a Manuel Rosales Caamaño, por su orden Presidente del Concejo Municipal de Curridabat, Alcaldesa de Curridabat, Presidenta Ejecutiva del Instituto Costarricense de Acueductos y Alcantarillado y Director del Área Rectora de Salud de Curridabat, o a quienes ocupen esos cargos, o a quienes ocupen esos cargos; así como también al Presidente Ejecutivo del IMAS, a la Ministra de Vivienda y Asentamientos Humanos y a la Defensora de los Habitantes. El Magistrado Salazar Alvarado pone nota, respecto al tema de aguas negras”. (El subrayado no es del original).
Tal sentencia fue notificada el 9 de julio de 2019 al presidente Ejecutivo del IMAS, el 10 de julio de 2019 a la ministra de Vivienda y Asentamientos Humanos, el 11 de julio de 2019 a la alcaldesa de Curridabat, al director del Área Rectora de Salud de Curridabat y a la Defensora de los Habitantes, el 16 de julio de 2019 al presidente del Concejo Municipal de Curridabat y el 19 de julio de 2019 a la presidenta Ejecutiva del ICAA.
“III.- Sobre la gestión de incumplimiento. En la especie, de la lectura íntegra de la gestión posterior, se desprende que el tutelado acusa desobediencia de lo dispuesto en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019, únicamente respecto a lo siguiente: “(…) se ordena a Alicia Borja Rodríguez y a Manuel Rosales Caamaño, por su orden Alcaldesa de Curridabat y Director del Área Rectora de Salud de Curridabat, o a quienes ocupen esos cargos, que (…) en el plazo de 6 meses coordinen y resuelvan lo relativo a la denuncia planteada por el recurrente el 28 de mayo de 2018, en relación con el problema de aguas negras, y le notifiquen lo resuelto”. En ese sentido, el tutelado reclama que se le ordenó a Alicia Borja Rodríguez y a Manuel Rosales Caamaño, por su orden Alcaldesa de Curridabat y Director del Área Rectora de Salud de Curridabat, que en el plazo de 6 meses coordinen y resuelvan lo relativo a la denuncia planteada por el recurrente el 28 de mayo de 2018, en relación con el problema de aguas negras, y le notifiquen lo resuelto, además, explica que tal denuncia se efectuó debido a una serie de amenazas a la población, puesto que existe una corriente de aguas negras a nivel de cordón de caño en la Dirección1319 en Tirrases; sin embargo, a la fecha de interposición de esta gestión, no le consta que el Área Rectora de Salud haya emitido orden sanitaria alguna, ni que las autoridades recurridas hayan atendido la problemática expuesta, por lo que acusa el incumplimiento parcial a la sentencia principal del proceso, en tanto que ya ha transcurrido el plazo de seis meses para solucionar el problema de aguas negras de la zona. Solicita que se ejecute la sentencia en cuanto al incumplimiento parcial y pide que no se acepten las justificaciones técnicas emitidas por las autoridades recurridas.
Al respecto, el Alcalde de Curridabat indicó que, en cuanto a la denuncia planteada por el amparado el 28 de mayo de 2018 por el tema de aguas negras, se llevaron a cabo las siguientes actuaciones: “• Se gestionó y compartió información requerida para comenzar a identificar la problemática, entre esto se encuentra un levantamiento topográfico, información registral y delimitación del sitio, así como un mapa del área de interés con las tuberías pluviales (líneas) que se tienen inventariadas en la Dirección de Gestión Vial de ese sector y que tributan hacia el cuerpo de agua en análisis, nodos que corresponden a pozos, cajas de registro u otro tipo de elemento que une los tramos de tuberías, cuerpos de agua y propiedades. • Las inspecciones iniciales para detectar problemas de contaminación y el acompañamiento de la Municipalidad de Curridabat al Ministerio de Salud ocurrieron entre noviembre y diciembre 2019 en cuatro fechas distintas con cuatro coloraciones realizadas en promedio por fecha, entre viviendas y comercio.
En relación con este último item (sic) desarrollado, es importante tomar en cuenta que, la Municipalidad requiere de la intervención por del Ministerio de Salud para hacer las comprobaciones respecto a cuál propiedad o predio viene la inadecuada conexión y proceder con la notificación. Asimismo, y de acuerdo con información de este Ministerio, aún se requiere más trabajo de campo; sin embargo, para el 2020 no se ha logrado realizar. A inicios de este año, se presentó ante el Miniserio (sic) de Salud el oficio MC-PMA 0104-01-2020, que hacía referencia a una estrategia para el abordaje de contaminación difusa en cursos de agua en el cantón de Curridabat, con énfasis especial en la resolución n°2019012231 de la Sala Constitucional de la Corte Suprema de Justicia, para lo cual se propusieron fechas de reunión para tratar los temas y los avances con el caso, pero dichas fechas debieron ser canceladas por parte del ente Ministerial de Salud, pues su proridad (sic) en este momento es atender urgencias en cuanto la atención del público y consecuente disponibilidad de recursos humano, en cumplimiento del Decreto Ejecutivo N°42221-S y lineamientos Ministeriales en atención a la alerta sanitaria por COVID-19, por lo que, comunicaron a esta corporación municipal que, no era posible asistir a las reuniones convocadas, ya que los recursos de esa unidad organizativa se encuentran enfocados en la atención de la alerta sanitaria.
Las coloraciones mencionadas requieren el ingreso a propiedad privada y la aplicación del reactivo fluoresceína en los sistemas que se sospechan puedan estar conectados al sistema pluvial, esto requiere por lo tanto una interacción entre funcionarios municipales, personal de salud, habitantes de la vivienda y dueños o colabores del comercio visitado. Lo anteiror (sic) con el fin de que se corrijan infracciones y alteraciones a los recursos naturales; sin embargo, es importante mencionar que acatamos las directrices emitidas por el ente rector de Salud, en cuanto a las medidas sanitarias necesarias para reducir los contagios y proteger tanto a los funcionarios, sus familias y a la comunidad”.
Por otro lado, en cuanto al plazo de 6 meses otorgado para atender la problemática de aguas negras, la Directora a.i. del Área Rectora de Salud de Curridabat indicó que “se procedió a la coordinación con la Municipalidad de Curridabat, con el fin de que brindara el apoyo a esta Área Rectora de Salud con los recursos con que esta dispone en materia cartográfica y registral, para que aportara un levantamiento del área de influencia de la problemática denunciada de aguas negras. (…) Se aportó un croquis con la ubicación de las propiedades a intervenir con la información del nombre del propietario, llegándose a establecer una cantidad de 62 propiedades. Con esta información y con los recursos humanos y materiales disponibles en esta Área Rectora de Salud, se procedió a establecer una programación para el desplazamiento a la zona, con el fin de realizar las respectivas pruebas de coloración en cada vivienda identificada, con el fin de terminar el manejo y disposición de las aguas negras.
El proceso de pruebas de coloración se inició en el mes de noviembre de 2019, este proceso es lento, dado que solo se puede realizar dicha prueba a una vivienda a la vez, se debe esperar el resultado y verificarlo en puntos de difícil acceso. El proceso de las pruebas de coloración se ha avanzado en un 32% aproximadamente, dado que por la emergencia nacional decretada mediante Decreto Ejecutivo No 42227-MP-S, “Declara estado de emergencia nacional en todo el territorio de la República de Costa Rica, debido a la situación de emergencia sanitaria provocada por la enfermedad COVID-19”, se ha requerido priorizar la atención de esta emergencia”.
Ahora, si bien las autoridades expusieron diversas acciones efectuadas en aras de solventar la problemática de aguas negras acusada por el recurrente y, además, justificaron que debido a la pandemia de la covid 19 no han podido cumplir a cabalidad lo ordenado por la Sala, no menos cierto es que el plazo de seis meses otorgado feneció en enero de 2020, esto es, antes de la emisión del decreto n.° 42227-MP-S “Declara estado de emergencia nacional en todo el territorio de la República de Costa Rica, debido a la situación de emergencia sanitaria provocada por la enfermedad COVID-19” del 16 de marzo de 2020 por parte del Poder Ejecutivo. En adición, tales autoridades no formularon dentro del plazo otorgado una solicitud de prórroga ni tampoco algún cronograma de cumplimiento y, en todo caso, de la prueba no se desprende que se le hayan notificado a la parte recurrente.
En mérito de lo expuesto, este Tribunal tiene por acreditado el incumplimiento a lo ordenado en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019, únicamente respecto al Alcalde de Curridabat y al Director del Área Rectora de Salud de Curridabat, en los términos supra señalados. No obstante, como las personas que actualmente ejercen los cargos de Alcalde de Curridabat y Directora del Área Rectora de Salud de Curridabat no son las mismas a quienes se les notificó la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019, lo procedente es ordenar el cumplimiento de lo ahí dispuesto a los actuales representantes, tal y como se dispondrá en la parte dispositiva de esta resolución. (…)
Por tanto:
Se acoge la gestión de incumplimiento. Se ordena a Jimmy Cruz Jiménez y Melissa Arguedas Arce por su orden Alcalde de Curridabat y Directora del Área Rectora de Salud de Curridabat, o a quienes ejerzan tales cargos, cumplir lo dispuesto en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019, en relación con que “en el plazo de 6 meses coordinen y resuelvan lo relativo a la denuncia planteada por el recurrente el 28 de mayo de 2018, en relación con el problema de aguas negras, y le notifiquen lo resuelto”. Se advierte a los recurridos que, de conformidad con el artículo 71 de la Ley de la Jurisdicción Constitucional, se impondrá prisión de tres meses a dos años, o de veinte a sesenta días multa, a quien recibiere una orden que deba cumplir o hacer cumplir, dictada en un recurso de amparo y no la cumpliere o no la hiciere cumplir, siempre que el delito no esté más gravemente penado. Se declara inadmisible la coadyuvancia planteada. Notifíquese esta resolución a Jimmy Cruz Jiménez y Melissa Arguedas Arce por su orden Alcalde de Curridabat y Directora del Área Rectora de Salud de Curridabat, o a quienes ejerzan tales cargos, en forma personal”.
Tal pronunciamiento fue notificado a las autoridades recurridas el 26 de octubre de 2020.
“Se acoge parcialmente la gestión de incumplimiento, solo en relación con lo ordenado en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019, correspondiente a que “en el plazo de 6 meses coordinen y resuelvan lo relativo a la denuncia planteada por el recurrente el 28 de mayo de 2018, en relación con el problema de aguas negras, y le notifiquen lo resuelto”. Se ordena a Jimmy Cruz Jiménez y Melissa Arguedas Arce por su orden alcalde de Curridabat y directora a.i del Área Rectora de Salud de Curridabat, o a quienes ejerzan tales cargos, cumplir lo dispuesto en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019, en relación con que “en el plazo de 6 meses coordinen y resuelvan lo relativo a la denuncia planteada por el recurrente el 28 de mayo de 2018, en relación con el problema de aguas negras, y le notifiquen lo resuelto”. Lo anterior bajo el apercibimiento de ordenar el testimonio de piezas ante el Ministerio Público contra el alcalde de Curridabat y la apertura de un procedimiento administrativo contra la directora a.i. del Área Rectora de Salud de Curridabat si no lo hicieren.
Por otra parte, se amplía el plazo otorgado en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019, solo en lo relativo a “la atención del problema de desabastecimiento de agua en el proyecto urbanístico Miravalles I, para que en forma coordinada se ejecuten las acciones necesarias que resuelvan de forma definitiva dicha problemática, en el plazo máximo de 24 meses” y en consecuencia se confiere a Tomás Martínez Baldares, Jimmy Cruz Jiménez, Óscar Mora Altamirano y Johanna Chavarría Víquez, por su orden, presidente ejecutivo del Instituto Costarricense de Acueductos y Alcantarillados, alcalde de Curridabat, presidente del Concejo Municipal de Curridabat y directora a.i. del Área Rectora de Salud de Curridabat, o a quienes ejerzan esos cargos, plazo hasta el 8 de mayo de 2024, únicamente para solucionar el problema de desabastecimiento de agua en el proyecto urbanístico Miravalles I, de acuerdo con los términos ordenados en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019.
En todo lo demás, no ha lugar a las gestiones formuladas. Notifíquese esta resolución a Jimmy Cruz Jiménez y Melissa Arguedas Arce por su orden alcalde de Curridabat y directora a.i del Área Rectora de Salud de Curridabat, o a quienes ejerzan tales cargos, en forma personal”.
IV.Sobre la gestión de incumplimiento. En la especie, de la lectura integral del escrito del recurrente, se desprende que lo planteado es una desobediencia a lo ordenado en la sentencia nro. 2019012231 de las 9:30 horas del 5 de julio de 2019, específicamente en lo relativo al problema de abastecimiento de agua del proyecto urbanístico Miravalles I, pues sostiene que a partir de la información que le ha solicitado a los recurridos se desprende que estos no han tomado acción alguna para solventar esa situación.
Al respecto, adviértase que en la supracitada resolución interlocutoria nro. 2021015951 de las 9:20 horas del 16 de julio de 2021 se resolvió: “. Por otra parte, se amplía el plazo otorgado en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019, solo en lo relativo a “la atención del problema de desabastecimiento de agua en el proyecto urbanístico Miravalles I, para que en forma coordinada se ejecuten las acciones necesarias que resuelvan de forma definitiva dicha problemática, en el plazo máximo de 24 meses” y en consecuencia se confiere a Tomás Martínez Baldares, Jimmy Cruz Jiménez, Óscar Mora Altamirano y Johanna Chavarría Víquez, por su orden, presidente ejecutivo del Instituto Costarricense de Acueductos y Alcantarillados, alcalde de Curridabat, presidente del Concejo Municipal de Curridabat y directora a.i. del Área Rectora de Salud de Curridabat, o a quienes ejerzan esos cargos, plazo hasta el 8 de mayo de 2024, únicamente para solucionar el problema de desabastecimiento de agua en el proyecto urbanístico Miravalles I, de acuerdo con los términos ordenados en la sentencia n.° 2019-012231 de las 9:30 horas del 5 de julio de 2019”.
Es decir, nótese que el plazo para solucionar la problemática del desabastecimiento de agua en el proyecto urbanístico Miravalles I no fenece sino hasta el 8 de mayo de 2024, por lo que resulta prematuro referirse en este momento a alguna desobediencia en relación con ese extremo.
Ergo, no ha lugar a la gestión formulada.
V.Documentación aportada al expediente. Se previene a las partes que de haber aportado algún documento en papel, así como objetos o pruebas contenidas en algún dispositivo adicional de carácter electrónico, informático, magnético, óptico, telemático o producido por nuevas tecnologías, éstos deberán ser retirados del despacho en un plazo máximo de 30 días hábiles contados a partir de la notificación de esta sentencia. De lo contrario, será destruido todo aquel material que no sea retirado dentro de este plazo, según lo dispuesto en el "Reglamento sobre Expediente Electrónico ante el Poder Judicial", aprobado por la Corte Plena en sesión N° 27-11 del 22 de agosto del 2011, artículo XXVI y publicado en el Boletín Judicial número 19 del 26 de enero del 2012, así como en el acuerdo aprobado por el Consejo Superior del Poder Judicial, en la sesión N° 43-12 celebrada el 3 de mayo del 2012, artículo LXXXI.
Por tanto:
No ha lugar a la gestión formulada.
Nombre137 V.
Nombre152 C.
Luis Fdo. Salazar A.
Nombre9451 G.
Nombre5659 H.
Nombre6376 B.
Alexandra Alvarado P.
Document not found. Documento no encontrado.