← Environmental Law Center← Centro de Derecho Ambiental
Res. 01023-2022 Sala Constitucional · Sala Constitucional · 14/01/2022
OutcomeResultado
The amparo is granted, and the Mayor and Municipal Council President of Matina are ordered to solve the flooding problem caused by the dike in the 23 Millas community within three months, with costs assessed.Se declara con lugar el amparo y se ordena al Alcalde y al Presidente del Concejo Municipal de Matina solucionar el problema de inundaciones causado por el dique en la comunidad de 23 Millas, en un plazo de tres meses, con condena en costas.
SummaryResumen
The Constitutional Chamber hears an amparo filed by a resident of the 23 Millas community in Matina against the Mayor and the Municipal Council President. The petitioner claims that the banana plantation Limonfrut C has built and expanded a dike bordering the community without municipal permits and with the Municipality's tacit approval. Despite protecting the plantation, the dike creates an imminent flood risk by enclosing the community with earthen walls. The community had filed complaints since 2008 without response, and even a prior amparo (2010) was granted but its orders were not followed by the Municipality. In July 2021, severe flooding caused irreparable economic losses. The Chamber finds that the Municipality neglected to act for over a decade despite knowledge of the situation, violating the right to a healthy environment and the right to life and physical integrity. The amparo is granted, and the Municipality is ordered to solve the flooding problem within three months.La Sala Constitucional conoce un recurso de amparo presentado por una vecina de la comunidad de 23 Millas de Matina contra el Alcalde y el Presidente del Concejo Municipal. La recurrente alega que la finca bananera Limonfrut C ha construido y ampliado un dique en la colindancia con la comunidad sin los permisos municipales correspondientes y a vista y paciencia de la Municipalidad. Esta obra, aunque busca proteger la plantación, expone a la población a un peligro inminente de inundaciones, al dejar la localidad encerrada por paredes de tierra. La comunidad había presentado gestiones desde 2008 sin recibir respuesta, e incluso un amparo anterior (2010) fue declarado con lugar sin que la Municipalidad cumpliera la orden. En julio de 2021, una fuerte inundación dejó pérdidas económicas irreparables. La Sala concluye que la Municipalidad omitió actuar pese a tener conocimiento de la situación por más de un decenio, lo que vulnera los derechos a un ambiente sano y a la vida e integridad física. Se declara con lugar el recurso y se ordena solucionar el problema de inundaciones en un plazo de tres meses.
Key excerptExtracto clave
Of particular importance for the resolution of this matter is to reiterate that municipalities, by constitutional mandate, are responsible for safeguarding local interests and, consequently, must oversee all works carried out within their jurisdiction. Therefore, even admitting that the banana company has built or repaired dikes without the respective municipal permits (it is reported that no permit application for the construction of a dike or earth movements has ever been filed with the Municipality of Matina by Limonfrut C or any other natural or legal person on the banks of the canal in the 23 Millas community), it is evident that, given the scale of the work, the municipal corporation should have become aware of its existence and, consequently, halted construction. Nevertheless, the municipality had knowledge of the dike constructions or repairs taking place in the canton of Matina. It is proven that on October 10, 2008, the 23 Millas de Matina community filed a written complaint with the Municipality expressing concern over the erection of a dike bordering 23 Millas by the banana plantation Limonfrut C, as they believed it entailed more risks than benefits. They also requested to be informed whether permits had been granted for that construction. Likewise, on October 19, 2009, a group of neighbors from 23 Millas de Matina again submitted another document to the Municipality reiterating the problem with the dike. In addition, on February 26, 2010, the petitioner here filed the amparo processed under file 10-002951-0007-CO, due to the lack of response to a request filed on June 9, 2008 and reiterated on October 19, 2009, in which several neighbors of 23 Millas asked the Municipal Council of Matina to provide information on the permits granted to the company Limonfrut C to make modifications to a dike located in the community where they reside. By judgment No. 2010-007815 of 08:44 hours on April 30, 2010, the amparo was granted and the Mayor and the President of the Council, both of the Municipality of Matina, were ordered to respond to both requests within fifteen days. It is thus clear that, although the authorities of said municipality have had full knowledge of the alleged situation for more than a decade, they have not taken the necessary steps to resolve it decisively. It is even reported that the damage suffered in the last flood of July in the 23 Millas sector is mainly due to the damage suffered by the dike structure known as Dique Placeres, caused by floods and the failure of water retention. Furthermore, damage not recorded on previous occasions occurred, which is why the local government, immediately upon these events, made the corresponding request to the National Emergency Commission and other institutions that collaborated to rebuild the retention structure of the dike protecting the community of Matina. From the foregoing, it is concluded that the Municipality failed to act as required by constitutional mandate and currently there is a problem within its jurisdiction that must be given priority and solution, in protection of the environment and the lives of its residents. Therefore, regardless of who was responsible for carrying out the work and the eventual liabilities that may be established in ordinary proceedings against the dike builders, the fact is that the problem must be solved.De particular importancia para la resolución de este asunto es reiterar que las municipalidades, por mandato constitucional están encargadas de velar por los intereses locales y en consecuencia deben fiscalizar todas aquellas obras que se realicen dentro de su jurisdicción, razón por la cual, aun admitiendo que la empresa bananera ha construido o reparado diques sin los respectivos permisos municipales (se informa que ante la Municipalidad de Matina nunca se ha presentado solicitud de permiso para la construcción de un dique o movimientos de tierra por parte de la sociedad Limonfrut C o cualquier otra persona física/jurídica, a las márgenes del canal en la comunidad de 23 Millas) es evidente que por la magnitud de la obra, la corporación municipal debió percatarse de su existencia y, en consecuencia, detener las labores de construcción. No obstante, la municipalidad tuvo conocimiento de las construcciones o reparaciones de diques que se estaban llevando a cabo en el cantón de Matina. Se acredita que el 10 de octubre de 2008, la comunidad de 23 Millas de Matina, planteó ante la Municipalidad por escrito, su preocupación por el levantamiento de un dique en la colindancia con 23 Millas, por parte de la finca bananera Limonfrut C, pues consideran que conlleva más riesgos que beneficios. También requirieron se les indicara si se habían otorgado permisos para esa construcción. Igualmente, el 19 de octubre de 2009, un grupo de vecinos de 23 Millas de Matina volvió a entregar otro documento a la Municipalidad reiterando la problemática con el dique. Además, el 26 de febrero de 2010, la aquí recurrente interpuso el recurso de amparo que se tramitó en el expediente 10-002951-0007-CO, por falta de respuesta de una gestión presentada el 09 de junio de 2008 y reiterada el 19 de octubre de 2009, donde varios vecinos de 23 Millas solicitaron al Concejo de Matina que se les brindara información sobre los permisos otorgados a la empresa Limonfrut C para realizar modificaciones a un dique ubicado en la comunidad en que residen. Mediante sentencia No. 2010-007815, de las 08:44 horas del 30 de abril de 2010, se declaró con lugar el recurso el amparo y se ordenó al Alcalde y al Presidente del Concejo, ambos de la Municipalidad de Matina, contestar ambas gestiones en el plazo de quince días. De este modo, resulta claro que, pese a que las autoridades de tal municipio tienen pleno conocimiento, desde hace más de un decenio, de la situación alegada, no han realizado las gestiones necesarias para solventarla de manera contundente. Incluso se informa que la afectación que sufrió en la pasada inundación de julio el sector de 23 Millas, responde principalmente al daño sufrido en la estructura del dique conocido como Dique Placeres, causado por las inundaciones y la falla en la retención del agua. Además, que se dieron afectaciones no registradas en ocasiones anteriores, por lo que el gobierno local, inmediatamente al suceso de estos hechos, generó la solicitud correspondiente ante la Comisión Nacional de Emergencias y otras instituciones que colaboraron para reconformar la estructura de retención del dique que protege a la comunidad de Matina. De lo expuesto, se concluye que la Municipalidad omitió actuar según corresponde por mandato constitucional y en la actualidad existe un problema dentro de su jurisdicción al cual debe darse prioridad y solución, en tutela del medio ambiente y la vida de sus munícipes. Así que independientemente de quien fue el encargado de ejecutar la obra y las eventuales responsabilidades que puedan sentarse en la vía ordinaria con respecto a los constructores del dique, lo cierto es que el problema debe solucionarse.
Pull quotesCitas destacadas
"Se concluye que la Municipalidad omitió actuar según corresponde por mandato constitucional y en la actualidad existe un problema dentro de su jurisdicción al cual debe darse prioridad y solución, en tutela del medio ambiente y la vida de sus munícipes."
"It is concluded that the Municipality failed to act as required by constitutional mandate and currently there is a problem within its jurisdiction that must be given priority and solution, in protection of the environment and the lives of its residents."
Considerando VI
"Se concluye que la Municipalidad omitió actuar según corresponde por mandato constitucional y en la actualidad existe un problema dentro de su jurisdicción al cual debe darse prioridad y solución, en tutela del medio ambiente y la vida de sus munícipes."
Considerando VI
"Los Gobiernos Locales deben de cambiar su papel pasivo de espectador ante uno de protagonista vital y definitivo en los propósitos de bienestar trazados en el texto Constitucional."
"Local Governments must change their passive role of spectator to one of vital and definitive protagonist in the welfare goals outlined in the Constitutional text."
Considerando VI, citando sentencia No. 2009-002247
"Los Gobiernos Locales deben de cambiar su papel pasivo de espectador ante uno de protagonista vital y definitivo en los propósitos de bienestar trazados en el texto Constitucional."
Considerando VI, citando sentencia No. 2009-002247
"la injerencia de la jurisdicción constitucional solamente es viable ante la inercia comprobada del Estado, a través de sus órganos competentes, en atender las demandas que en ejercicio de sus derechos realicen los habitantes del país"
"the interference of the constitutional jurisdiction is only viable in the face of proven inaction by the State, through its competent bodies, in addressing the demands made by the country's inhabitants in exercise of their rights."
Considerando IV
"la injerencia de la jurisdicción constitucional solamente es viable ante la inercia comprobada del Estado, a través de sus órganos competentes, en atender las demandas que en ejercicio de sus derechos realicen los habitantes del país"
Considerando IV
Full documentDocumento completo
Court of Constitutional Review Date of Resolution: January 14, 2022 at 09:20 Case File: 21-018274-0007-CO Type of Matter: Amparo Appeal *210182740007CO* Case File: 21-018274-0007-CO CONSTITUTIONAL REVIEW CHAMBER OF THE SUPREME COURT OF JUSTICE. San José, at nine hours twenty minutes on January fourteenth, two thousand twenty-two. Amparo appeal filed by [Name 001], of legal age, in a common-law union, management assistant, identity card [Value 001], resident of Matina, on behalf of the Group of residents of 23 Millas de Matina de Limón, against the Mayor and the President of the Council, both of the Municipality of Matina. Whereas: 1.- Through a written brief received in the Secretariat of the Chamber at 09:53 on September 16, 2021, the appellant files an amparo appeal against the Mayor and the President of the Council, both of the Municipality of Matina, and states that on July 22, 2021, her community experienced a severe flood, leaving them isolated, and furthermore, the local residents suffered irreparable economic losses.
She reports that the banana farm Limonfrut C has been building and expanding a levee (dique) on the boundary with 23 Millas for a long time, in full view of the respondent Municipality. Although this work aims to protect the plantation, it also exposes the population to an imminent danger, since their locality remains enclosed by earthen walls, meaning "in future floods the water height will be even higher, and with this the danger faced by the inhabitants is even greater." She argues that on October 10, 2008, the community of 23 Millas de Matina filed a written concern with the Municipality regarding the raising of the levee, as it entails more risks than benefits. There, they also requested to be informed whether permits had been granted for that construction. On October 19, 2009, almost a year later, a group of neighbors again delivered another document to the municipal entity in the same terms, to which they have received no response to date.
She asserts that on February 26, 2010, she had to initiate an amparo appeal processed under case file 10-002951-0007-CO, in which the Chamber granted the appeal; however, the order contained in the resolution at 08:44 on April 30, 2010, was never complied with by the respondent Municipality. She requests that the respondent municipality be ordered to halt the works on the levee and proceed with the demolition of what has already been built, in order to safeguard the well-being of the inhabitants of the community of 23 Millas. Based on the foregoing, she considers that the actions of the respondent authorities violated fundamental rights. 2.- By resolution at 14:32 on September 16, 2021, the Presidency of the Chamber admitted this amparo and requested a report from the Mayor and the President of the Council, both of Matina, regarding the facts alleged by the appellant. 3.- Walter Céspedes Salazar, in his capacity as Mayor of Matina, reports under oath (brief filed at 16:03 on September 24, 2021), attaching official letter UTGVM-PRS-044-2021, dated September 24, 2021, through which Mr.
Lic. Bryan Navarro Hernández, Social Promoter of the Municipal Road Management Technical Unit (Unidad Técnica de Gestión Vial Municipal) of that Municipality, and Mr. Ing. José Manuel Lee Obando, Assistant of that Unit, render the corresponding report. This document indicates the following: "in accordance with a situation occurring in the community of 23 millas (In response to the amparo appeal under case file 21-018274-0007-CO, at the request for information by MBA. Johnny Rodríguez (Municipal Manager) and Licenciado Ricardo Sossa (legal advisor of the Municipality of Matina)), on September 23 of this year, we visited the site. It is important to inform you of the location of the site where the reported events occurred; therefore, for a better indication, a sketch is attached: (…) At the site, a survey was conducted with an unmanned aircraft (drone), in order to obtain a resource (photogrammetry), to generate this report, providing an important input.
A survey of approximately 4.5 hectares was conducted, resulting in the following area: (…) A drainage channel (canal) that flows toward the community of 23 millas is observed at the site. It appears to be an existing channel where signs of cleaning work are indeed visible; however, its condition prior to this visit is unknown. It is presumed that due to the amount of water passing through the site, an increase in sediment in the channel was generated due to the recent floods. However, this inquiry must be directed to the banana company. It must be clear and emphatic that our department does not maintain a registry of levees or constructions of this type, as our primary function is the attention and maintenance of roads within the RVC (Cantonal Road Network, Red Vial Cantonal). From this point, the following channel profile is generated for its respective analysis: (…) From the preceding image, it is observed that the channel has a bottom width of approximately 4 meters; piles of earth are observed on both sides, for an approximate total width of 35 meters.
It must be emphasized that the section analyzed is the red line in illustration 3, with a cross-sectional distance of the channel of 83.5 meters. A cross-section of the channel is analyzed in a stretch near the homes adjacent to the channel in 23 millas (as it is the place denounced in the amparo appeal), which crosses the banana farm and serves as drainage for the southern sector of national route 805, in front of the community of 23 Millas. Thus, a new profile is obtained, which was analyzed to identify whether the condition in illustration 3 is maintained, obtaining the following data: (…) In this section (Illustration 4), a line is taken (the one appearing in red), corresponding to 62.5 meters (cross-section of the channel). From the same data, it follows that the material piled adjacent to the banana farm is approximately 2 meters lower than the elevation inhabited by the town of 23 millas.
This last point is very important because, although it is true that this entire sector of Matina corresponds to a floodplain (llanura de inundación), having a difference of approximately 2 meters makes the northeastern area of Illustration 4 more prone to receiving water in the event of a flood. Another particularity of the community of 23 millas is that it is largely surrounded by the Banana plantation, but its access involves crossing the railway line. This public infrastructure also presents an elevation above the typical geography of this area, so we also analyzed the channel's entry to this community from one of these points to ascertain the height of the Train line, obtaining the following data: (…) In the red line, the analyzed access is observed, from which the following data is obtained: (…) As observed, the height difference between the highest point of the train line and the section of terrain near this public infrastructure exceeds 1 meter.
As an important input, some wide-panorama photographs are generated from an approximate height of 50 meters: (…) Delving slightly into the topic of flooding, it must be emphasized that these sectors (23 Millas, Placeres, 24 Millas) are prone to flooding during the rainy season. Incidentally, in the past July flood, this sector was even more affected due to the damage to the retention structure located on the Río Barbilla. It is also important to consider this point, because this breach occurred and is very close to the community of 23 millas, thus generating a disproportionate increase in the flow carried by the channel adjacent to the community, to such an extent that impacts not recorded on previous occasions occurred. A sketch is attached to show the proximity to the described break. It should be noted that the local government, immediately upon these events, generated the corresponding request before CNE and other institutions that collaborated to reconstruct the retention structure of the levee protecting the community of Matina: (…) As observed, the distance is approximately 1.7 kilometers, a very short distance; combined with the channel that already exists and which has been discussed throughout this report, they generated the damages alleged by the residents.
This can be seen in the following panoramic photo: (…) As part of the reconstruction works, photos were generated to glimpse the impacts caused to the levee that protects both the community of Matina from the Río Barbilla and that affects the 23 millas sector. Said image is provided: (…) Thus, it is concluded that the impact suffered by the 23 millas sector during the past flood was primarily due to the damage suffered in the structure of the levee known as Dique Placeres, caused by the flooding and the failure in water retention. Furthermore, information must be expanded upon by the pertinent departments regarding the infrastructure works undertaken by the banana farms in the study sector. With nothing further for now, they bid farewell." 4.- Alfredo Wheathey Burton, in his capacity as President of the Municipal Council of Matina, reports under oath (brief filed at 16:03 on September 24, 2021), in the same terms as Walter Céspedes Salazar, Mayor of Matina. 5.- By resolution at 16:27 on October 11, 2021, as evidence for a better resolution, the Instructing Judge ordered Walter Céspedes Salazar, in his capacity as Mayor of Matina or whoever holds that position, to clarify to this Chamber who authorized the construction of the levee referred to by the appellant and located in that canton, since the attached study indicates that the Municipal Road Management Technical Unit does not have a registry of levees or constructions of this type, as its primary function is the attention and maintenance of roads in the cantonal road network.
The foregoing also considering that what the appellant has been claiming since the amparo appeal No. 10-002951-0007-CO -whose judgment 2010-007815, at 08:54 on April 30, 2010, is indicated as not having been complied with by that Municipality- is information regarding the permits granted to the company Limonfrut C to make modifications to a levee located in the community where she resides. 6.- According to certification dated December 14, 2021, the Mayor of Matina did not render the report requested of him in the resolution for evidence for a better resolution issued at 16:27 on October 11, 2021. 7.- By resolution at 14:57 on December 15, 2021, as evidence for a better resolution, the Instructing Judge ordered that the Contraventional Court of Matina be commissioned to serve the resolution issued at 16:27 on October 11, 2021, personally on the Mayor of Matina. 8.- Walter Céspedes Salazar, in his capacity as Mayor of Matina, reports under oath (brief filed at 15:57 on December 16, 2021), that, in compliance with the order by resolution at 16:27 on October 11, 2021, he attaches the corresponding report prepared by Architect Carlos Fuentes Espinoza of the Construction Unit (Unidad de Construcciones) of the Municipality of Matina, official letter CMFE-2021-001, dated December 3, 2021, which certifies that no application for a permit for the construction of a levee or earthworks (movimientos de tierra) by the company Limonfrut C or any other natural/legal person on the banks of the channel in the community of 23 Millas has ever been filed before that Municipality. 9.- The prescribed legal procedures have been observed in these proceedings.
Drafted by Judge Pacheco Salazar; and, Considering: I.- Purpose of the appeal. The appellant alleges that the banana farm Limonfrut C has been building and expanding a levee on the boundary with 23 Millas for a long time, in full view of the Municipality of Matina. Although this work aims to protect the plantation, it also exposes the population to an imminent danger, since their locality remains enclosed by earthen walls. II.- Proven facts. Of importance for the decision in this matter, the following facts are deemed duly demonstrated, either because they have been accredited or because the respondents have failed to refer to them as prescribed in the initial order:
In environmental matters, it is the undersigned’s view that if the Public Administration has already intervened, its cognizance and resolution lie with the administrative contentious jurisdiction. Nevertheless, I do proceed to hear the merits when other rights of the affected persons are at stake, as occurs in this case, in which flooding in the community of 23 Millas de Matina is alleged, due to the construction of a dike, which endangers the health and physical integrity of the petitioner and its residents whenever heavy rainfall occurs.
IX.Documentation submitted to the case file. The parties are warned that, if they have submitted any paper document, as well as objects or evidence contained in any additional electronic, computer, magnetic, optical, telematic, or new-technology-produced device, these must be retrieved from the office within a maximum period of thirty business days counted from the notification of this judgment. Otherwise, all material not retrieved within this period shall be destroyed, pursuant to the provisions of the "Reglamento sobre Expediente Electrónico ante el Poder Judicial," approved by the Corte Plena in Session No. 27-11 of August 22, 2011, article XXVI and published in Judicial Bulletin No. 19 of January 26, 2012, as well as in the agreement approved by the Consejo Superior del Poder Judicial, in Session No. 43-12 held on May 3, 2012, article LXXXI.
Por tanto:
The appeal is granted. Walter Céspedes Salazar and Alfredo Wheathey Burton, respectively, in their capacity as Mayor and President of the Council, both of the Municipalidad de Matina, or whoever holds those positions, are ordered to issue the pertinent orders and carry out all actions within the scope of their powers, so that, within a period of three months, counted from the notification of this judgment, the flooding problem that is alleged to be caused by a dike on the boundary with the community of 23 Millas de Matina, as reported by the petitioner [Name 001], is resolved. The foregoing, without prejudice to any provisional works that may eventually be necessary to prevent damage that rains may cause to the protected party. The respondents are warned that, in accordance with the provisions of Article 71 of the Ley de la Jurisdicción Constitucional, a prison sentence of three months to two years, or a fine of twenty to sixty days, shall be imposed on anyone who receives an order that must be fulfilled or enforced, issued in an amparo appeal, and fails to fulfill it or cause it to be fulfilled, provided that the offense is not more severely punished.
The Municipalidad de Matina is ordered to pay the costs, damages, and losses caused by the events that have given rise to this declaration, which shall be liquidated in enforcement of judgment of the administrative contentious jurisdiction. Magistrate Salazar Alvarado enters a note. Notify.
Fernando Castillo V.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Ana María Picado B.
Aracelly Pacheco S.
Jorge Isaac Solano A.
*JWOGUKUN4CG61* Telephones: 2549-1500 / 800-SALA-4TA (800-7252-482). Fax: 2295-3712 / 2549-1633. Email: www.poder-judicial.go.cr/salaconstitucional. Address: (Sabana Sur, Calle Morenos, 100 mts.Sur de la iglesia del Perpetuo Socorro). Reception of matters from vulnerable groups: Edificio Corte Suprema de Justicia, San José, Distrito Catedral, Barrio González Lahmann, calles 19 y 21, avenidas 8 y 6 Classification prepared by SALA CONSTITUCIONAL of the Poder Judicial. Reproduction and/or distribution for profit is prohibited.
Indicadores de Relevancia Sentencia relevante Sentencia con datos protegidos, de conformidad con la normativa vigente Contenido de Interés:
Tipo de contenido: Voto de mayoría Rama del Derecho: 4. ASUNTOS DE GARANTÍA Tema: MUNICIPALIDAD Subtemas:
INFRAESTRUCTURA Y CONDICIONES.
01023-22. SE ORDENA AL ALCALDE Y AL PRESIDENTE DEL CONCEJO, AMBOS DE LA MUNICIPALIDAD DE MATINA, QUE GIREN LAS ÓRDENES PERTINENTES Y LLEVEN A CABO TODAS LAS ACTUACIONES QUE ESTÉN DENTRO DEL ÁMBITO DE SUS COMPETENCIAS, PARA QUE, DENTRO DEL PLAZO DE TRES MESES, CONTADO A PARTIR DE LA NOTIFICACIÓN DE ESTA SENTENCIA, SE SOLUCIONE EL PROBLEMA DE INUNDACIONES QUE SE INDICA CAUSA UN DIQUE EN LA COLINDANCIA CON LA COMUNIDAD DE 23 MILLAS DE MATINA. LBH09/22 ... Ver más *210182740007CO* SALA CONSTITUCIONAL DE LA CORTE SUPREMA DE JUSTICIA. San José, a las nueve horas veinte minutos del catorce de enero de dos mil veintidos . Recurso de amparo interpuesto por [Nombre 001], mayor, en unión libre, asistente de gerencia, cédula de identidad [Valor 001], vecina de Matina, a favor del Grupo de vecinos de 23 Millas de Matina de Limón, contra el Alcalde y el Presidente del Concejo, ambos de la Municipalidad de Matina.
Resultando: 1.- Por escrito recibido en la Secretaría de la Sala a las 09:53 horas del 16 de setiembre de 2021, la recurrente interpone recurso de amparo contra el Alcalde y el Presidente del Concejo, ambos de la Municipalidad de Matina y expresa que el 22 de julio de 2021, su comunidad tuvo una fuerte inundación que quedaron incomunicados y, además, los vecinos del lugar sufrieron pérdidas económicas irreparables. Refiere que la finca bananera Limonfrut C, desde hace mucho tiempo, está construyendo y ampliando un dique en la colindancia con 23 Millas, ello, a vista y paciencia de la Municipalidad recurrida. Pese a que esa obra busca proteger la plantación, también expone a la población a un peligro inminente, dado que, su localidad queda encerrada por paredes de tierras, con lo que "en futuras inundaciones que la altura de las aguas sea aún más altas y con esto el peligro que corren los habitantes es aún mayor".
Arguye que el 10 de octubre de 2008, la comunidad de 23 Millas de Matina, planteó ante la Municipalidad por escrito, su preocupación por el levantamiento del dique, por conllevar más riesgos que beneficios. Allí, también requirieron se les indicara si se habían otorgado permisos para esa construcción. El 19 de octubre de 2009, casi un año después, un grupo de vecinos volvió a entregar otro documento al ente municipal en los mismos términos, sin que a la fecha, hayan recibido respuesta alguna de ninguno. Asevera que el 26 de febrero de 2010, tuvo que incoar un recurso de amparo que se tramitó en el expediente 10-002951-0007-CO, en el que, la Sala declaró con lugar el recurso; empero, la orden contenida en la resolución de las 08:44 horas del 30 de abril de 2010, nunca fue atendida por la Municipalidad accionada. Solicita que se ordene al municipio recurrido que ordene la suspensión de las obras en el dique y proceda con la demolición de lo ya construido, a fin de salvaguardar la integridad de los habitantes de la comunidad de 23 Millas.
Por lo expuesto, estima que con la actuación de las autoridades recurridas, fueron lesionados derechos fundamentales. 2.- Mediante resolución de las 14:32 horas del 16 de setiembre de 2021, la Presidencia de la Sala dio curso a este amparo y se le solicitó informe al Alcalde y al Presidente del Concejo, ambos de Matina, sobre los hechos alegados por la recurrente. 3.- Informa bajo juramento Walter Céspedes Salazar, en su condición de Alcalde de Matina (escrito presentado a las 16:03 horas del 24 de setiembre de 2021), que adjunta el oficio UTGVM-PRS-044-2021, del 24 de setiembre de 2021, mediante el cual los señores Lic. Bryan Navarro Hernández, Promotor Social de la Unidad Técnica de Gestión Vial Municipal de ese ayuntamiento y el Ing. José Manuel Lee Obando, Asistente de esa Unidad, rinden el informe correspondiente. Ese documento indica lo siguiente: “de conformidad con una situación que se presenta en la comunidad de 23 millas (En atención al recurso de amparo bajo expediente 21-018274-0007-CO, esto a solicitud de información por parte de MBA.
Johnny Rodríguez (Gerente Municipal) y Licenciado Ricardo Sossa (asesor legal de la Municipalidad de Matina)), el día 23 de setiembre del presente año, nos apersonamos al sitio. Es importante hacer de su conocimiento la ubicación del sitio donde se presentaron los hechos que se reportan en el recurso de amparo, por lo que para una mejor indicación se adjunta croquis: (…) En el sitio se realiza un levantamiento con aeronave no tripulada (dron), a fin de obtener un recurso (fotogrametría), esto para poder generar el presente informe, dando un insumo importante, se realiza un levantamiento de aproximadamente 4,5 hectáreas, resultando la siguiente área: (…) Se observa en el sitio un canal que fluye hacia la comunidad de 23 millas, aparentemente es un canal existente donde efectivamente se ven indicios de trabajos de limpieza, sin embargo, se desconoce el estado anterior a esta visita. Se presume que por la cantidad de agua que pasa por el sitio se generó un aumento en el sedimento del canal debido a las inundaciones recientes.
Sin embargo, esta consulta debe de ser generada ante la empresa bananera, debe de ser claro y enfático que nuestro departamento no tiene un registro de diques o construcciones de este tipo, por cuanto nuestra función principal es la atención y mantenimiento de caminos de la RVC (Red Vial Cantonal). De este punto se genera el siguiente perfil del canal para su respectivo análisis: (…) De la imagen anterior, se observa que el canal, tiene un ancho de fondo aproximadamente 4 metros, se observan apilamientos de tierra a ambos lados, para un ancho aproximado de 35 metros. Se debe recalcar que la sección que se analiza es la línea roja de la ilustración 3, con una distancia de la sección transversal del canal de 83,5 metros. Se analiza una sección transversal del canal, en un tramo cercano a las viviendas contiguas al canal en 23 millas (por ser el lugar denunciado en el recurso de amparo), mismo que atraviesa la finca bananera y que sirve de desagüe del sector sur de la ruta nacional 805, frente a la comunidad de 23 Millas, por lo que se obtiene un nuevo perfil, que fue analizando para identificar si se mantiene la condición de la ilustración 3, obteniendo el siguiente dato: (…) En esta sección (Ilustración 4), se toma una línea (la que aparece en color rojo), que corresponde a 62,5 metros (sección transversal al canal), del mismo dato se desprende que el apilamiento de material contiguo a la finca bananera se encuentra aproximadamente 2 metros más bajo que la altura que tiene el poblado de 23 millas.
Este último punto es muy importante ya que, si bien es cierto todo este sector de Matina, corresponde a una llanura de inundación, al tener una diferencia de aproximados 2 metros, convierte el área noreste de la Ilustración 4, en un sector más propenso a recibir agua en caso de inundación. Otra particularidad que tiene la comunidad de 23 millas es que se encuentra rodeada en gran medida por Bananera, pero su acceso es atravesando la línea férrea, esta infraestructura pública, también presenta una elevación sobre la geografía típica de esta zona, por lo que analizamos también el ingreso al canal de esta comunidad desde uno de estos puntos, para conocer de la altura de la línea del Tren, obteniéndose el siguiente dato: (…) En la línea roja se observa el acceso analizado, mismo del que se obtiene el siguiente dato: (…) Como se observa la altura entre el punto más alto de la línea del tren y la sección del terreno cercano a esta infraestructura pública, supera una diferencia de 1 metro.
Como insumo importante se generan algunas fotografías con panorama amplio desde una altura aproximada a los 50 metros: (…) Ahondando un poco en el tema de las inundaciones, se debe ser enfático al indicar que estos sectores (23 Millas, Placeres, 24 Millas), son propensos en época de lluvia a presentar inundaciones, dicho sea de paso, en la pasada inundación de Julio, este sector se vio aun más afectado, debido a la afectación de la estructura de retención que se encuentra en el Río Barbilla. Siendo importante considerar también este punto, por cuanto se dio esta ruptura y la misma es muy cercana a la comunidad de 23 millas, generando con esto un aumento desmedido en el caudal que se transportaba por el canal contiguo a la comunidad, a tal punto que se dieron afectaciones no registradas en ocasiones anteriores, se adjunta un croquis para observar la cercanía con el rompimiento descrito, se debe indicar que el gobierno local, inmediatamente al suceso de estos hechos, genera la solicitud correspondiente ante CNE y otras instituciones que colaboraron para reconformar la estructura de retención del dique que protege a la comunidad de Matina: (…) Como se observa, la distancia es de aproximadamente 1,7 kilómetros, una distancia muy corta, sumado al canal que ya existe y del que se ha conversado a lo largo del presente informe, generaron los daños que alegan los vecinos.
Esto se puede ver en la siguiente foto panorámica: (…) Como parte de los trabajos de reconstrucción se generaron fotos para poder vislumbrar las afectaciones que se generaron en el dique que protege tanto a la comunidad de Matina del Río Barbilla y que afecta el sector de 23 millas, se facilita dicha toma: (…) Estando, así las cosas, se concluye que la afectación que sufrió en la pasada inundación el sector de 23 millas, responde principalmente al daño sufrido en la estructura del dique conocido como Dique Placeres, causado por las inundaciones y la falla en la retención del agua, además se tiene que ampliar información por parte de los departamentos pertinentes de los trabajos de infraestructura que intervienen las fincas bananeras en el sector de estudio. Sin otro particular de momento se despiden”. 4.- Informa bajo juramento Alfredo Wheathey Burton, en su condición de Presidente del Concejo Municipal de Matina (escrito presentado a las 16:03 horas del 24 de setiembre de 2021), en iguales términos que Walter Céspedes Salazar, Alcalde de Matina. 5.- Mediante resolución de las 16:27 horas del 11 de octubre de 2021, como prueba para mejor resolver, la Magistrada Instructora previno a Walter Céspedes Salazar, en su condición de Alcalde de Matina o a quien ocupe ese cargo, que aclare a esta Sala quién autorizó la construcción del dique que refiere la recurrente y que se ubica en ese cantón, pues en el estudio que adjunta se indica que la Unidad Técnica de Gestión Vial Municipal no tiene un registro de diques o construcciones de este tipo, por cuanto su función principal es la atención y mantenimiento de caminos de la red vial cantonal.
Lo anterior tomando en cuenta, además, que lo reclamado por la recurrente desde el recurso de amparo No. 10-002951-0007-CO -cuya sentencia 2010-007815, de las 08:54 horas del 30 de abril de 2010, se señala no cumplió ese ayuntamiento- es información sobre los permisos otorgados a la empresa Limonfrut C para realizar modificaciones a un dique ubicado en la comunidad donde reside. 6.- Según constancia del 14 de diciembre de 2021, el Alcalde de Matina no rindió el informe que se le solicitó en la resolución de prueba para mejor resolver dictada a las 16:27 horas de 11 de octubre de 2021. 7.- Mediante resolución de las 14:57 horas del 15 de diciembre de 2021, como prueba para mejor resolver, la Magistrada Instructora dispuso comisionar al Juzgado Contravencional de Matina, a fin de que se le notificara en forma personal al Alcalde de Matina la resolución de las 16:27 horas de 11 de octubre de 2021. 8.- Informa bajo juramento Walter Céspedes Salazar, en su condición de Alcalde de Matina (escrito presentado a las 15:57 horas del 16 de diciembre de 2021), que, en cumplimiento de lo ordenado por resolución de las 16:27 horas de 11 de octubre de 2021, adjunto el informe correspondiente realizado por el Arquitecto Carlos Fuentes Espinoza de la Unidad de Construcciones de la Municipalidad de Matina, oficio CMFE-2021-001, del 03 de diciembre de 2021, en el que se hace constar que nunca se ha presentado ante ese ayuntamiento solicitud de permiso para la construcción de un dique o movimientos de tierra por parte de la sociedad Limonfrut C o cualquier otra persona física/jurídica, a las márgenes del canal en la comunidad de 23 Millas. 9.- En los procedimientos seguidos se han observado las prescripciones legales.
Redacta la Magistrada Pacheco Salazar; y, Considerando: I.- Objeto del recurso. La recurrente alega que la finca bananera Limonfrut C, desde hace mucho tiempo, está construyendo y ampliando un dique en la colindancia con 23 Millas, ello, a vista y paciencia de la Municipalidad de Matina. Pese a que esa obra busca proteger la plantación, también expone a la población a un peligro inminente, dado que, su localidad queda encerrada por paredes de tierras. II.- Hechos probados. De importancia para la decisión de este asunto, se estiman como debidamente demostrados los siguientes hechos, sea porque así han sido acreditados o bien porque los recurridos hayan omitido referirse a ellos según lo prevenido en el auto inicial:
Fernando Castillo V.
Paul Rueda L.
Luis Fdo. Salazar A.
Jorge Araya G.
Ana María Picado B.
Aracelly Pacheco S.
Jorge Isaac Solano A.
*JWOGUKUN4CG61* Clasificación elaborada por SALA CONSTITUCIONALdel Poder Judicial. Prohibida su reproducción y/o distribución en forma onerosa.